A method for calculating power flow in low voltage distribution network considering symmetrical current control of distributed generation PQ nodes

Through the low-voltage distribution network power flow calculation method with symmetrical current control, the problem of three-phase power flow analysis of distributed power sources in low-voltage distribution networks is solved, the effective integration of distributed power sources and the improvement of voltage quality are achieved, and the stability of the power grid is improved. and efficiency.

CN115173420BActive Publication Date: 2024-10-01STATE GRID ANHUI ELECTRIC POWER CO LTD ELECTRIC POWER SCI RES INST +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210801621.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-07-08
Publication Date
2024-10-01
Estimated Expiration
2042-07-08

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively perform three-phase power flow analysis of distributed power supplies in low-voltage distribution networks. Especially when distributed power supplies are integrated into low-voltage distribution networks, there is a lack of methods for symmetrical control of three-phase currents, resulting in poor voltage quality.

Method used

This paper proposes a low-voltage distribution network power flow calculation method considering symmetrical current control. By obtaining the basic data of the power grid, the power flow model and Jacobian matrix of symmetrical current control distributed power supplies are established, and Newton's method is used to iteratively calculate the admittance matrix of the low-voltage distribution network system. Realize the power flow calculation of PQ node of symmetrical current control distributed power supply.

Benefits of technology

This method can improve the voltage quality of low-voltage distribution networks in actual systems, ensure the total active and total reactive power control of distributed power supplies, and improve the stability and efficiency of the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115173420B_ABST
    Figure CN115173420B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for calculating the flow of a low-voltage distribution network considering a symmetrical current-controlled distributed power source PQ node, comprising the following steps: 1) acquiring basic data of a power grid; 2) establishing a flow model of a symmetrical current-controlled distributed power source in a distribution network based on a two-table method; 3) establishing an unbalanced quantity equation based on the flow model of a symmetrical current-controlled distributed power source in a distribution network; 4) establishing an end point admittance matrix of a low-voltage distribution network according to the basic data of the power grid; 5) establishing the Jacobian matrix of a PQ load end point and a symmetrical current-controlled distributed power source respectively; 6) updating a state variable x according to the Jacobian matrix (time) ; 7) Determine whether the iteration end condition is met, if so, output the power flow, otherwise, set time = time + 1, and return to step 6). The present invention connects the distributed power supply of the three-phase three-wire wiring mode to the three-phase four-wire low-voltage distribution network, and accurately calculates the low-voltage distribution network power flow of the distributed power supply PQ node considering the symmetrical current control.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of power system dispatching automation, and in particular to a low-voltage distribution network power flow calculation method considering symmetrical current control of distributed power source PQ nodes. Background Art

[0002] As a basic operation for steady-state analysis of distribution networks, the three-phase power flow calculation of low-voltage distribution networks plays an important role in distribution network planning and operation. In the context of energy shortages and environmental problems, the continuous expansion of distribution network scale has led to the increasing exposure of the disadvantages of single power supply systems and centralized power supply forms. Under the encouragement and advocacy of energy-saving and emission reduction policies, distributed power generation technology has flourished, and the proportion of distributed power sources in distribution networks has become increasingly higher. Most of the existing research on distributed power sources assumes that they are connected to medium-voltage distribution networks. How to integrate distributed power sources into low-voltage distribution networks and conduct three-phase power flow analysis is a topic that needs to be studied urgently.

[0003] At present, in the research on low-voltage distribution network containing distributed power sources, most of the distributed power sources adopt power and voltage control methods, but the three-phase current symmetrical control method is easier to implement, low cost, in line with the actual control of the current distribution network, and does not rely on the system's auxiliary control target requirements.

[0004] As for the grid connection of distributed power sources, most people think that it is connected to the low-voltage distribution network through a "three-phase four-bridge-arm converter", that is, a three-phase four-wire connection method. The PQ-controlled distributed power source controls the active and reactive power of the three phases relative to the neutral point, while the PV-controlled distributed power source controls the active power and voltage of the three phases relative to the neutral point. However, in the actual distribution network, in order to consume locally and reduce investment, the distributed power source is connected to the low-voltage distribution network through a "three-phase three-bridge-arm converter". Summary of the invention

[0005] The object of the present invention is to provide a method for calculating the low voltage distribution network power flow considering the symmetrical current control distributed power supply PQ node, comprising the following steps:

[0006] 1) Obtain basic data of the power grid;

[0007] The basic data of the power grid includes the network structure of the power grid, power grid parameters and quantity measurements of smart meters;

[0008] The network structure includes a power grid topology connection relationship.

[0009] The grid parameters include line resistance, reactance, susceptance and rated voltage in the grid;

[0010] The smart meter measures the three-phase active power of the load endpoint relative to the neutral point, the three-phase reactive power of the load endpoint relative to the neutral point, the three-phase active power of the low-voltage side endpoint of the distribution transformer relative to the neutral point, the three-phase reactive power of the low-voltage side endpoint of the distribution transformer relative to the neutral point, the voltage amplitude of the three-phase low-voltage side endpoint of the distribution transformer relative to the neutral point, and the total active power and total reactive power of the symmetrical current-controlled distributed power supply endpoint.

[0011] 2) Based on the two-meter method, a power flow model of symmetrical current-controlled distributed power sources in the distribution network is established;

[0012] The power flow model of symmetrical current controlled distributed generation in the distribution network is as follows:

[0013]

[0014] Where P ac and P bc Respectively represent the active power between the two phases of the distributed power source ac and bc; Q ac and Q bc Respectively represent the active power between the two phases of the distributed power supply ac and bc; P ∑ and Q ∑ are the total active power and total reactive power of distributed generation respectively; I a ,I b ,I c They are the three-phase currents of distributed power sources respectively.

[0015] 3) Based on the power flow model of symmetrical current-controlled distributed power sources in the distribution network, the unbalanced quantity equation is established;

[0016] The unbalance equation is as follows:

[0017]

[0018] In the formula, Δg ac and Δh ac They are the imaginary and real parts of the unbalanced current between phase a and phase c after the current rotates 120° clockwise; Δg bc and Δh bc They are the imaginary and real parts of the unbalanced current between phase b and phase c after rotating 120° counterclockwise; ΔP v and ΔQ v are the unbalanced amounts of total active power and total reactive power injected into distributed generation respectively; and Represents the real and imaginary parts of the admittance between the two phases αδ at the j and k endpoints; α, δ, t = {a, b, c}; represents the set of endpoints connected to endpoint v and including endpoint v; B1 = {a, b, c, n}; Bp ={a,b,c}; and f v δ Respectively indicate voltage The real and imaginary parts of the δ phase; and Respectively indicate voltage The real and imaginary parts of t.

[0019] 4) Establish the low-voltage distribution network endpoint admittance matrix based on the basic data of the power grid;

[0020] The steps of establishing the low-voltage distribution network endpoint admittance matrix based on the basic data of the power grid include:

[0021] 1) Calculate the injected current I at the end point j in the grid branch ij j ,Right now:

[0022]

[0023] In the formula, I j is the injected current at terminal j; is the self-admittance matrix of endpoint j; is the mutual admittance matrix between endpoint j and endpoint i; is the admittance matrix between endpoint j and endpoint p; is the set of endpoints directly connected to j, and Y ji is the admittance matrix of branch ji; Y jj is the endpoint parallel branch admittance matrix; V i 、V j 、V p is the voltage at endpoint i, endpoint j, and endpoint p; I ji is the current flowing through branch j; I jj It is a vector composed of the currents flowing out of each node in the endpoint.

[0024] Among them, the self-admittance matrix of endpoint j is The mutual admittance matrix between endpoint j and endpoint i As shown below:

[0025]

[0026] 2) Modify the self-admittance matrix of endpoint j to obtain:

[0027]

[0028] In the formula, is the set of other endpoints directly connected to endpoint j, and

[0029] 3) Establish the low voltage distribution network endpoint admittance matrix Right now:

[0030]

[0031] Where N is the total number of endpoints.

[0032] 5) Establish the Jacobian matrix of PQ load endpoints and symmetrical current controlled distributed power sources respectively;

[0033] The PQ load endpoint Jacobian matrix includes the state variable for the PQ endpoint itself, i.e., the state variable The Jacobian matrix H when jj (1:8,1:8), the state variables are other load endpoints except the PQ endpoint, that is, the state variables The Jacobian submatrix H when jq (1:8,1:8), Jacobian submatrix H when the state variable is the distributed power endpoint jv (1:8,1:6);q≠j;

[0034] Among them, the Jacobian matrix H jj (1:8,1:8) is shown below:

[0035]

[0036] In the formula, It is the inverse of the branch conductance between nodes δ1 and δ2 in endpoint j and the sum of all branch conductances between nodes δ1 and δ2 in the endpoints connected to endpoint j, δ1∈B1, δ2∈B1 B1={a,b,c,n}; It is the inverse of the branch susceptance between nodes δ1 and δ2 in endpoint j and the sum of all branch susceptances between nodes δ1 and δ2 in the endpoints connected to endpoint j;

[0037] Matrix ΔH jj (1:8,1:8) is shown below:

[0038]

[0039] parameter As shown below:

[0040]

[0041] In the formula, is the real part of the voltage of the d-phase node at the end point i, d∈B p ,B p ={a,b,c};f i d The imaginary part of the voltage at the d-phase node at the endpoint i; is the real part of the neutral point voltage at endpoint i; f i n The imaginary part of the neutral point voltage at terminal i; P i dn , is the active power and reactive power of endpoint d relative to the neutral point;

[0042] parameter As shown below:

[0043]

[0044] In the formula, is the reactive power of endpoint i relative to the neutral point;

[0045] Jacobian submatrix H jq (1:8,1:8) is shown below:

[0046]

[0047] Jacobian submatrix H jv (1:8,1:6) is as follows:

[0048]

[0049] In the formula, δ1∈B1,d2∈B P .

[0050] It is characterized in that the Jacobian matrix of the symmetrical current-controlled distributed power supply endpoint includes the state variable being the distributed power supply endpoint itself, that is, the state variable The Jacobian matrix H when vv (1:6,1:6), the state variables are other endpoints other than the distributed power endpoint, that is, the state variables The Jacobian matrix H when vj (1:6,1:8); j≠v;

[0051] Among them, the Jacobian matrix H vj (1:6,1:8) is as follows:

[0052] H vj (1:6,1:8)=[H vj1 (1:2,1:8); H vj2 (3:4,1:8); H vj3 (5,1:8); H vj4 (6,1:8)] (13)

[0053] Among them, the Jacobian submatrix H vj1 (1:2,1:8) is as follows:

[0054]

[0055] Jacobian submatrix H vj1 (3:4,1:8) is as follows:

[0056]

[0057] Jacobian submatrix H vj3 (5,1:8) is shown below:

[0058]

[0059] Jacobian submatrix H vj4 (6,1:8) is shown below:

[0060]

[0061] Jacobian matrix H vv (1:6,1:6) is shown below:

[0062] H vv =[H vv1 (1:2,1:6); H vv2 (3:4,1:6); H vv3 (5,1:6); H vv4 (6,1:6)] (18)

[0063] Among them, H vv1 (1:2,1:6),H vv2 (3:4,1:6) is the Jacobian submatrix;

[0064] Jacobian submatrix H vv3 (5,1:6) is shown below:

[0065]

[0066] Among them, the parameters parameter parameter parameter parameter parameter As shown below:

[0067]

[0068]

[0069] Jacobian submatrix H vv4 (6,1:6) is shown below:

[0070]

[0071] Among them, the parameters parameter parameter parameter parameter parameter As shown below:

[0072]

[0073]

[0074] In the formula, Represents admittance.

[0075] 6) Update the state variable x according to the Jacobian matrix (time) ;

[0076] 7) Determine whether the iteration end condition is met. If so, output the power flow. Otherwise, set time = time + 1 and return to step 6). Time is the number of iterations.

[0077] The iteration end condition includes the correction amount Δx of the state variable (time) Satisfy max(|Δx (time) |)<ε, or max(|Δx (time) |)≥ε and the number of iterations time≥Tmax; T max is the maximum number of iterations; ε is the correction threshold.

[0078] The technical effect of the present invention is unquestionable. The present invention proposes a method for calculating the flow of low-voltage distribution network considering symmetrical current controlled distributed power sources. The method connects the distributed power source of the three-phase three-wire wiring method to the three-phase four-wire low-voltage distribution network, adopts a symmetrical current and total power control method close to reality, and considers the distributed power flow model of the symmetrical current controlled total active and total reactive power constant in the distribution network. The Newton method is used to calculate the admittance matrix, Jacobian matrix, correction value, etc. of the low-voltage distribution network system, and the low-voltage distribution network flow considering the symmetrical current controlled distributed power source PQ node is accurately calculated through iterative convergence. BRIEF DESCRIPTION OF THE DRAWINGS

[0079] Figure 1 This is a schematic diagram of the low-voltage distribution network power flow calculation process considering the symmetrical current control distributed power generation PQ node;

[0080] Figure 2 It is the access diagram of three-phase three-wire distributed power source to low voltage distribution network;

[0081] Figure 3 It is the wiring diagram of the IEEE-13 node power distribution system;

[0082] Figure 3 The numbers 1-13 are nodes. DETAILED DESCRIPTION

[0083] The present invention is further described below in conjunction with the embodiments, but it should not be understood that the above subject matter of the present invention is limited to the following embodiments. Without departing from the above technical ideas of the present invention, various substitutions and changes are made according to the common technical knowledge and customary means in the art, which should all be included in the protection scope of the present invention.

[0084] Embodiment 1:

[0085] See also Figures 1 to 3 , a low voltage distribution network power flow calculation method considering a symmetrical current controlled distributed power generation PQ node includes the following steps:

[0086] 1) Obtain basic data of the power grid;

[0087] 2) Based on the two-meter method, a power flow model of symmetrical current-controlled distributed power sources in the distribution network is established;

[0088] 3) Based on the power flow model of symmetrical current-controlled distributed power sources in the distribution network, the unbalanced quantity equation is established;

[0089] 4) Establish the low-voltage distribution network endpoint admittance matrix based on the basic data of the power grid;

[0090] 5) Establish the Jacobian matrix of PQ load endpoints and symmetrical current controlled distributed power sources respectively;

[0091] 6) Update the state variable x according to the Jacobian matrix (time) ;

[0092] 7) Determine whether the iteration end condition is met. If so, output the power flow. Otherwise, set time = time + 1 and return to step 6).

[0093] Among them, obtaining basic data of the power grid

[0094] The basic data of power grid include the network structure, power grid parameters and the quantity measurement of smart meters;

[0095] The network structure includes a power grid topology connection relationship.

[0096] The grid parameters include line resistance, reactance, susceptance and rated voltage in the grid;

[0097] The smart meter measures the three-phase active power of the load endpoint relative to the neutral point, the three-phase reactive power of the load endpoint relative to the neutral point, the three-phase active power of the low-voltage side endpoint of the distribution transformer relative to the neutral point, the three-phase reactive power of the low-voltage side endpoint of the distribution transformer relative to the neutral point, the voltage amplitude of the three-phase low-voltage side endpoint of the distribution transformer relative to the neutral point, and the total active power and total reactive power of the symmetrical current-controlled distributed power supply endpoint.

[0098] The power flow model of symmetrical current controlled distributed generation in the distribution network is as follows:

[0099]

[0100] Where P ac and P bc Respectively represent the active power between the two phases of the distributed power source ac and bc; Q ac and Q bc Respectively represent the active power between the two phases of the distributed power supply ac and bc; P ∑ and Q ∑ are the total active power and total reactive power of distributed generation respectively; I a ,I b ,I c They are the three-phase currents of distributed power sources respectively.

[0101] The unbalance equation of the symmetrical current-controlled distributed generation in the distribution network is as follows:

[0102]

[0103] In the formula, Δg ac and Δh ac They are the imaginary and real parts of the unbalanced current between phase a and phase c after the current rotates 120° clockwise; Δg bc and Δh bc They are the imaginary and real parts of the unbalanced current between phase b and phase c after rotating 120° counterclockwise; ΔP v and ΔQ v are the unbalanced amounts of total active power and total reactive power injected into distributed generation respectively; and Represents the real and imaginary parts of the admittance between the two phases αδ at the j and k endpoints; α, δ, t = {a, b, c}; represents the set of endpoints connected to endpoint v and including endpoint v; B1 = {a, b, c, n}; B p ={a,b,c}; and f v δ Respectively indicate voltage The real and imaginary parts of the δ phase; and Respectively indicate voltage The real and imaginary parts of t.

[0104] The steps of establishing the low-voltage distribution network endpoint admittance matrix based on the basic data of the power grid include:

[0105] 1) Calculate the injected current I at the end point j in the grid branch ij j ,Right now:

[0106]

[0107] In the formula, I j is the injected current at terminal j; is the self-admittance matrix of endpoint j; is the mutual admittance matrix between endpoint j and endpoint i; is the admittance matrix between endpoint j and endpoint p; is the set of endpoints directly connected to j, and Y ji is the admittance matrix of branch ji; Y jj is the endpoint parallel branch admittance matrix; V i 、V j 、V p is the voltage at endpoint i, endpoint j, and endpoint p; I ji is the current flowing through branch j; I jj It is a vector composed of the currents flowing out of each node in the endpoint.

[0108] Among them, the self-admittance matrix of endpoint j is The mutual admittance matrix between endpoint j and endpoint i As shown below:

[0109]

[0110] 2) Modify the self-admittance matrix of endpoint j to obtain:

[0111]

[0112] In the formula, is the set of other endpoints directly connected to endpoint j, and

[0113] 3) Establish the low voltage distribution network endpoint admittance matrix Right now:

[0114]

[0115] Where N is the total number of endpoints.

[0116] Load node Jacobian matrix calculation

[0117] The PQ load endpoint Jacobian matrix includes the state variable for the PQ endpoint itself, i.e., the state variable The Jacobian matrix H when jj (1:8,1:8), the state variables are other load endpoints except the PQ endpoint, that is, the state variables The Jacobian submatrix H when jq (1:8,1:8), Jacobian submatrix H when the state variable is the distributed power endpoint jv (1:8,1:6);q≠j;

[0118] Among them, the Jacobian matrix H jj (1:8,1:8) is shown below:

[0119]

[0120] In the formula, It is the inverse of the branch conductance between nodes δ1 and δ2 in endpoint j and the sum of all branch conductances between nodes δ1 and δ2 in the endpoints connected to endpoint j, δ1∈B1, δ2∈B1 B1={a,b,c,n}; It is the inverse of the branch susceptance between nodes δ1 and δ2 in endpoint j and the sum of all branch susceptances between nodes δ1 and δ2 in the endpoints connected to endpoint j;

[0121] Matrix ΔH jj (1:8,1:8) is shown below:

[0122]

[0123] parameter As shown below:

[0124]

[0125] In the formula, is the real part of the voltage of the d-phase node at the end point i, d∈B p ,B p ={a,b,c};f i d The imaginary part of the voltage at the d-phase node at the endpoint i; is the real part of the neutral point voltage at endpoint i; f i n The imaginary part of the neutral point voltage at terminal i; P i dn , is the active power and reactive power of endpoint d relative to the neutral point;

[0126] parameter As shown below:

[0127]

[0128] In the formula, is the reactive power of endpoint i relative to the neutral point;

[0129] Jacobian submatrix H jq (1:8,1:8) is shown below:

[0130]

[0131] Jacobian submatrix H jv (1:8,1:6) is as follows:

[0132]

[0133] In the formula, δ1∈B1,d2∈B P .

[0134] Calculation of Jacobian Matrix of Distributed Power Supply Terminals with Symmetrical Current Control

[0135] It is characterized in that the Jacobian matrix of the symmetrical current-controlled distributed power supply endpoint includes the state variable being the distributed power supply endpoint itself, that is, the state variable The Jacobian matrix H when vv (1:6,1:6), the state variables are other endpoints other than the distributed power endpoint, that is, the state variables The Jacobian matrix H when vj (1:6,1:8); j≠v;

[0136] Among them, the Jacobian matrix H vj (1:6,1:8) is as follows:

[0137] H vj (1:6,1:8)=[H vj1 (1:2,1:8); H vj2 (3:4,1:8); H vj3 (5,1:8); H vj4 (6,1:8)] (13)

[0138] Among them, the Jacobian submatrix H vj1 (1:2,1:8) is as follows:

[0139]

[0140] Jacobian submatrix H vj1 (3:4,1:8) is as follows:

[0141]

[0142] Jacobian submatrix H vj3 (5,1:8) is shown below:

[0143]

[0144] Jacobian submatrix H vj4 (6,1:8) is shown below:

[0145]

[0146] Jacobian matrix H vv (1:6,1:6) is shown below:

[0147] H vv =[H vv1 (1:2,1:6); H vv2 (3:4,1:6); H vv3 (5,1:6); H vv4 (6,1:6)] (18)

[0148] Among them, H vv1 (1:2,1:6),H vv2 (3:4,1:6) is the Jacobian submatrix;

[0149] Jacobian submatrix H vv3 (5,1:6) is shown below:

[0150]

[0151] Among them, the parameters parameter parameter parameter parameter parameter As shown below:

[0152]

[0153]

[0154] Jacobian submatrix H vv4 (6,1:6) is shown below:

[0155]

[0156] Among them, the parameters parameter parameter parameter parameter parameter As shown below:

[0157]

[0158]

[0159] In the formula, Represents admittance.

[0160] The iteration end condition includes the correction amount Δx of the state variable (time) Satisfy max(|Δx (time) |)<ε, or max(|Δx (time) |)≥ε and the number of iterations time≥Tmax; Tmax is the maximum number of iterations; ε is the correction threshold.

[0161] Embodiment 2:

[0162] The method for calculating the low voltage distribution network power flow considering the symmetrical current control distributed power generation PQ node includes the following steps:

[0163] 1) Obtain basic data of the power grid;

[0164] The basic data of the power grid includes the network structure of the power grid, power grid parameters and quantity measurements of smart meters;

[0165] The network structure includes a power grid topology connection relationship.

[0166] The grid parameters include line resistance, reactance, susceptance and rated voltage in the grid;

[0167] The smart meter measures the three-phase active power of the load endpoint relative to the neutral point, the three-phase reactive power of the load endpoint relative to the neutral point, the three-phase active power of the low-voltage side endpoint of the distribution transformer relative to the neutral point, the three-phase reactive power of the low-voltage side endpoint of the distribution transformer relative to the neutral point, the voltage amplitude of the three-phase low-voltage side endpoint of the distribution transformer relative to the neutral point, and the total active power and total reactive power of the symmetrical current-controlled distributed power supply endpoint.

[0168] 2) Based on the two-meter method, a power flow model of the symmetrical current controlled distributed generation PQ node in the distribution network is established;

[0169] The power flow model of symmetrical current controlled distributed generation in the distribution network is as follows:

[0170]

[0171] Where P ac and P bc Respectively represent the active power between the two phases of the distributed power source ac and bc; Q ac and Q bcRespectively represent the active power between the two phases of the distributed power supply ac and bc; P ∑ and Q ∑ are the total active power and total reactive power of distributed generation respectively; I a ,I b ,I c They are the three-phase currents of distributed power sources respectively.

[0172] 3) Based on the power flow model of the distributed power generation PQ node considering symmetrical current control in the distribution network, the unbalanced quantity equation is established;

[0173] The unbalance equation is as follows:

[0174]

[0175] In the formula, Δg ac and Δh ac They are the imaginary and real parts of the unbalanced current between phase a and phase c after the current rotates 120° clockwise; Δg bc and Δh bc They are the imaginary and real parts of the unbalanced current between phase b and phase c after rotating 120° counterclockwise; ΔP v and ΔQ v are the unbalanced amounts of total active power and total reactive power injected into distributed generation respectively; and Represents the real and imaginary parts of the admittance between the two phases αδ at the j and k endpoints; α ={a,b,c}; represents the set of endpoints connected to endpoint v and including endpoint v; B1 = {a, b, c, n}; B p ={a,b,c}; and f v δ Respectively indicate voltage The real and imaginary parts of the δ phase; and Respectively indicate voltage The real and imaginary parts of t.

[0176] 4) Establish the low-voltage distribution network endpoint admittance matrix based on the basic data of the power grid;

[0177] The steps of establishing the low-voltage distribution network endpoint admittance matrix based on the basic data of the power grid include:

[0178] 1) Calculate the injected current I at the end point j in the grid branch ij j ,Right now:

[0179]

[0180] In the formula, I jis the injected current at terminal j; is the self-admittance matrix of endpoint j; is the mutual admittance matrix between endpoint j and endpoint i; is the admittance matrix between endpoint j and endpoint p; is the set of endpoints directly connected to j, and Y ji is the admittance matrix of branch ji; Y jj is the endpoint parallel branch admittance matrix; V i 、V j 、V p is the voltage at endpoint i, endpoint j, and endpoint p; I ji is the current flowing through branch j; I jj It is a vector composed of the currents flowing out of each node in the endpoint.

[0181] Among them, the self-admittance matrix of endpoint j is The mutual admittance matrix between endpoint j and endpoint i As shown below:

[0182]

[0183] 2) Modify the self-admittance matrix of endpoint j to obtain:

[0184]

[0185] In the formula, is the set of other endpoints directly connected to endpoint j, and

[0186] 3) Establish the low voltage distribution network endpoint admittance matrix Right now:

[0187]

[0188] Where N is the total number of endpoints.

[0189] 5) Establish the Jacobian matrix of PQ load endpoints and symmetrical current controlled distributed power sources respectively;

[0190] The PQ load endpoint Jacobian matrix includes the Jacobian matrix H when the state variable is the PQ endpoint itself jj (1:8,1:8), the Jacobian submatrix H when the state variable is other load endpoints except the PQ endpoint jq (1:8,1:8), Jacobian submatrix H when the state variable is the distributed power endpoint jv (1:8,1:6);

[0191] Among them, the Jacobian matrix H jj(1:8,1:8) is shown below:

[0192]

[0193] In the formula, It is the inverse of the branch conductance between nodes δ1 and δ2 in endpoint j and the sum of all branch conductances between nodes δ1 and δ2 in the endpoints connected to endpoint j, δ1∈B1, δ2∈B1 B1={a,b,c,n}; It is the inverse of the branch susceptance between nodes δ1 and δ2 in endpoint j and the sum of all branch susceptances between nodes δ1 and δ2 in the endpoints connected to endpoint j;

[0194] Matrix ΔH jj (1:8,1:8) is shown below:

[0195]

[0196] parameter As shown below:

[0197]

[0198] In the formula, is the real part of the voltage of the d-phase node at the end point i, d∈B p ,B p ={a,b,c};f i d The imaginary part of the voltage at the d-phase node at the endpoint i; is the real part of the neutral point voltage at endpoint i; f i n The imaginary part of the neutral point voltage at terminal i; P i dn , is the active power and reactive power of endpoint d relative to the neutral point;

[0199] parameter As shown below:

[0200]

[0201] In the formula, is the reactive power of endpoint i relative to the neutral point;

[0202] Jacobian submatrix H jq (1:8,1:8) is shown below:

[0203]

[0204] Jacobian submatrix H jv (1:8,1:6) is as follows:

[0205]

[0206] In the formula, δ1∈B1,d2∈B P .

[0207] The Jacobian matrix of the symmetrical current controlled distributed power source endpoint includes the Jacobian matrix H when the state variable is the distributed power source endpoint itself. vv (1:6,1:6), Jacobian matrix H when the state variable is other than the distributed power supply endpoint vj (1:6,1:8);

[0208] Among them, the Jacobian matrix H vj (1:6,1:8) is as follows:

[0209] H vj (1:6,1:8)=[H vj1 (1:2,1:8); H vj2 (3:4,1:8); H vj3 (5,1:8); H vj4 (6,1:8)] (13)

[0210] Among them, the Jacobian submatrix H vj1 (1:2,1:8) is as follows:

[0211]

[0212] Jacobian submatrix H vj1 (3:4,1:8) is as follows:

[0213]

[0214] Jacobian submatrix H vj3 (5,1:8) is shown below:

[0215]

[0216] Jacobian submatrix H vj4 (6,1:8) is shown below:

[0217]

[0218] Jacobian matrix H vv (1:6,1:6) is shown below:

[0219] H vv =[H vv1 (1:2,1:6); H vv2 (3:4,1:6); H vv3(5,1:6); H vv4 (6,1:6)] (18)

[0220] Among them, H vv1 (1:2,1:6),H vv2 (3:4,1:6) is the Jacobian submatrix;

[0221] Jacobian submatrix H vv3 (5,1:6) is shown below:

[0222]

[0223] Among them, the parameters parameter parameter parameter parameter parameter As shown below:

[0224]

[0225]

[0226] Jacobian submatrix H vv4 (6,1:6) is shown below:

[0227]

[0228] Among them, the parameters parameter parameter parameter parameter parameter As shown below:

[0229]

[0230]

[0231] 6) Update the state variable x according to the Jacobian matrix (time) ;

[0232] 7) Determine whether the iteration end condition is met. If so, output the power flow. Otherwise, set time = time + 1 and return to step 6).

[0233] The iteration end condition includes the correction amount Δx of the state variable (time) Satisfy max(|Δx (time) |)<ε, or max(|Δx (time) |)≥ε and the number of iterations time≥Tmax; Tmax is the maximum number of iterations; ε is the correction threshold.

[0234] Embodiment 3:

[0235] See also Figure 3 ,The simulation experiment of low-voltage distribution network power flow calculation method mainly includes the following steps:

[0236] Based on the IEEE-13 node standard system, an asymmetric correction system is constructed. The construction process of the IEEE-13 node correction system is as follows:

[0237] ① Select endpoint 1 as the balanced endpoint, with its neutral point connected to the ground as the zero potential reference point, and nodes 5, 7, and 8 as contact nodes.

[0238] ② The parallel capacitors, voltage regulators and distribution transformers in the system are ignored.

[0239] ③ Set the model of each branch to 501, there are 12 branches in total.

[0240] ④All loads are connected in constant power Y-type;

[0241] ⑤The voltage reference value is set to 2.4018kV.

[0242] On the constructed correction system, the three-phase power flow simulation of the low-voltage distribution network is carried out. Table 1 shows the voltage amplitude (pu) at each end of the system after the distribution network power flow calculation without considering the addition of distributed generation.

[0243] Table 1 Voltage amplitudes at each end of the distribution network when distributed power sources are not considered

[0244]

[0245] It can be seen from Table 1 that without adding distributed power sources, the voltage amplitudes of many nodes are below 0.95pu. For example, except for the balanced endpoint, the C-phase voltages of other endpoints are all below 0.95pu; the A-phase and B-phase voltages of endpoints 4, 7, 8, 9, 12, and 13 are below 0.95pu; the C-phase voltage of endpoint 13 even reaches 0.8813pu. It can be seen that the voltage quality of the distribution network under this load condition is seriously unqualified.

[0246] Embodiment 4:

[0247] See also Figure 3 The simulation experiment of adding a symmetrical current controlled distributed power source PQ node to a distribution network is as follows: Based on Example 2, terminal 8 is connected to a symmetrical current controlled three-phase three-wire distributed power source. The total active power of the distributed power source is known to be 2.00MVA; the total reactive power is known to be 0.23MVar. Table 2 shows the voltage amplitude (pu) of each terminal of the power flow calculation system after the symmetrical current controlled distributed power source is incorporated into the distribution network.

[0248] Table 2 Voltage amplitudes at each end of the distribution network when distributed power sources are included

[0249]

[0250] It can be seen from Table 1 and Table 2 that after the symmetrical current-controlled distributed power source is added to the distribution network, the three-phase voltage of each load node increases. The voltage of phase A and phase B of each node is above 0.95pu; while the voltage of phase C is already low, and after the three-phase symmetrical current-controlled distributed power source is connected to the grid, the voltage of phase C cannot catch up with the voltage of phase A and phase B, but the voltage of phase C reaches above 0.90pu, which has a significant effect on improving the voltage quality of the distribution network.

[0251] At this time, the three-phase current of the distributed power supply node is shown in Table 3, which is three-phase symmetrical.

[0252] Table 3 Distributed power supply three-phase ammeter

[0253]

[0254] From the above simulation, it can be seen that the low-voltage distribution power flow model considering symmetrical current control of distributed power sources constructed by the present invention is feasible. Under the conditions of reasonable total active power, total reactive power and three-phase symmetrical current control, the voltage quality of the low-voltage distribution network can be improved.

[0255] The present invention proposes a method for calculating the power flow of a low-voltage distribution network considering the symmetrical current control of distributed power generation PQ nodes, and performs simulation analysis based on an actual system. The method of the present invention has the following characteristics:

[0256] (1) The model takes into account the characteristics of the three-phase three-leg converter used by distributed power sources when connected to the grid. The three-phase three-wire connected distributed power sources with symmetrical current control are integrated into the three-phase four-wire low-voltage distribution network, and the Newton method is used to calculate the power flow of the low-voltage distribution network.

[0257] (2) In the low-voltage distribution network model, the distributed power sources adopt three-phase current symmetry, total active power and total reactive power control. The simulation results show that the distributed power sources that inject appropriate total active power and total reactive power can improve the voltage quality of the nodes when connected to the low-voltage distribution network.

Claims

1. A method for calculating the low voltage distribution network power flow considering the symmetrical current control distributed power generation PQ node, characterized in that: The following steps are involved: 1) Obtain basic data of the power grid; 2) Based on the two-meter method, a power flow model of symmetrical current-controlled distributed power sources in the distribution network is established; 3) Based on the power flow model of symmetrical current-controlled distributed power sources in the distribution network, the unbalanced quantity equation is established; 4) Establish the low-voltage distribution network endpoint admittance matrix based on the basic data of the power grid; 5) Establish the Jacobian matrix of PQ load endpoints and symmetrical current controlled distributed power sources respectively; 6) Update the state variable x according to the Jacobian matrix (time) ; 7) Determine whether the iteration end condition is met. If so, output the power flow. Otherwise, set time = time + 1 and return to step 6); time is the number of iterations; The power flow model of symmetrical current controlled distributed generation in the distribution network is as follows: Where P ac and P bc Respectively represent the active power between the two phases of the distributed power source ac and bc; Q ac and Q bc Respectively represent the active power between the two phases of the distributed power supply ac and bc; P ∑ and Q ∑ are the total active power and total reactive power of distributed generation respectively; I a ,I b ,I c They are the three-phase currents of distributed power supply; The unbalance equation is as follows: In the formula, Δg ac and Δh ac They are the imaginary and real parts of the unbalanced current between phase a and phase c after the current rotates 120° clockwise; Δg bc and Δh bc They are the imaginary and real parts of the unbalanced current between phase b and phase c after rotating 120° counterclockwise; ΔP v and ΔQ v are the unbalanced amounts of total active power and total reactive power injected into distributed generation respectively; and Represents the real and imaginary parts of the admittance between the two phases αδ at the j and k endpoints; α, δ, t = {a, b, c}; represents the set of endpoints connected to endpoint v and including endpoint v; B1 = {a, b, c, n}; B p ={a,b,c}; and Respectively indicate voltage The real and imaginary parts of the δ phase; and Respectively indicate voltage The real and imaginary parts of the t phase; The steps of establishing the low-voltage distribution network endpoint admittance matrix based on the basic data of the power grid include: s1) Calculate the injected current I at the end point j in the grid branch ij j ,Right now: In the formula, I j is the injected current at terminal j; is the self-admittance matrix of endpoint j; is the mutual admittance matrix between endpoint j and endpoint i; is the admittance matrix between endpoint j and endpoint p; is the set of endpoints directly connected to j, and Y ji is the admittance matrix of branch ji; Y jj is the endpoint parallel branch admittance matrix; V i 、V j 、V p is the voltage at endpoint i, endpoint j, and endpoint p; I ji is the current flowing through branch j; I jj is the vector composed of the current flowing out of each node in the endpoint; Among them, the self-admittance matrix of endpoint j is The mutual admittance matrix between endpoint j and endpoint i As shown below: s2) Modify the self-admittance matrix of endpoint j to obtain: In the formula, is the set of other endpoints directly connected to endpoint j, and s3) Establish the low voltage distribution network endpoint admittance matrix Right now: Where N is the total number of endpoints.

2. According to claim 1, a method for calculating low-voltage distribution network power flow considering symmetrical current control of distributed power supply PQ nodes is characterized in that: The basic data of the power grid includes the network structure of the power grid, power grid parameters and quantity measurements of smart meters; The network structure includes a topological connection relationship of the power grid; The grid parameters include line resistance, reactance, susceptance and rated voltage in the grid; The smart meter measures the three-phase active power of the load endpoint relative to the neutral point, the three-phase reactive power of the load endpoint relative to the neutral point, the three-phase active power of the low-voltage side endpoint of the distribution transformer relative to the neutral point, the three-phase reactive power of the low-voltage side endpoint of the distribution transformer relative to the neutral point, the voltage amplitude of the three-phase low-voltage side endpoint of the distribution transformer relative to the neutral point, and the total active power and total reactive power of the symmetrical current-controlled distributed power supply endpoint.

3. According to claim 1, a method for calculating low-voltage distribution network power flow considering symmetrical current control of distributed power supply PQ nodes is characterized in that: The PQ load endpoint Jacobian matrix includes the state variable for the PQ endpoint itself, i.e., the state variable The Jacobian matrix H when jj (1:8,1:8), the state variables are other load endpoints except the PQ endpoint, that is, the state variables The Jacobian submatrix H when jq (1:8,1:8), Jacobian submatrix H when the state variable is the endpoint of the distributed power generation jv (1:8,1:6);q≠j; Among them, the Jacobian matrix H jj (1:8,1:8) is shown below: In the formula, It is the inverse of the branch conductance between nodes δ1 and δ2 in endpoint j and the sum of all branch conductances between nodes δ1 and δ2 in the endpoints connected to endpoint j, δ1∈B1, δ2∈B1 B1={a,b,c,n}; It is the inverse of the branch susceptance between nodes δ1 and δ2 in endpoint j and the sum of all branch susceptances between nodes δ1 and δ2 in the endpoints connected to endpoint j; Matrix ΔH jj (1:8,1:8) is shown below: parameter As shown below: In the formula, is the real part of the voltage of the d-phase node at the end point i, d∈B p ,B p ={a,b,c};f i d The imaginary part of the voltage at the d-phase node at the endpoint i; is the real part of the neutral point voltage at endpoint i; f i n The imaginary part of the neutral point voltage at terminal i; P i dn , is the active power and reactive power of endpoint d relative to the neutral point; parameter As shown below: In the formula, is the reactive power of endpoint i relative to the neutral point; Jacobian submatrix H jq (1:8,1:8) is shown below: Jacobian submatrix H jv (1:8,1:6) is as follows: In the formula, δ1∈B1,d2∈B P .

4. According to a method for calculating low-voltage distribution network power flow considering symmetrical current control of distributed power supply PQ nodes according to claim 1, it is characterized in that: The Jacobian matrix of the symmetrical current-controlled distributed power source endpoint includes the state variable as the distributed power source endpoint itself, that is, the state variable The Jacobian matrix H when vv (1:6,1:6), the state variables are other endpoints other than the distributed power endpoint, that is, the state variables The Jacobian matrix H when vj (1:6,1:8); j≠v; Among them, the Jacobian matrix H vj (1:6,1:8) is as follows: H vj (1:6,1:8)=[H vj1 (1:2,1:8);H vj2 (3:4,1:8);H vj3 (5,1:8);H vj4 (6,1:8)] (13) Among them, the Jacobian submatrix H vj1 (1:2,1:8) is as follows: Jacobian submatrix H vj1 (3:4,1:8) is as follows: Jacobian submatrix H vj3 (5,1:8) is shown below: Jacobian submatrix H vj4 (6,1:8) is shown below: Jacobian matrix H vv (1:6,1:6) is shown below: H vv =[H vv1 (1:2,1:6);H vv2 (3:4,1:6);H vv3 (5,1:6);H vv4 (6,1:6)] (18) Among them, H vv1 (1:2,1:6),H vv2 (3:4,1:6) is the Jacobian submatrix; Jacobian submatrix H vv3 (5,1:6) is shown below: Among them, the parameters parameter parameter parameter parameter parameter As shown below: Jacobian submatrix H vv4 (6,1:6) is shown below: Among them, the parameters parameter parameter parameter parameter parameter As shown below: In the formula, Represents admittance.

5. A method for calculating low-voltage distribution network power flow considering symmetrical current control of distributed power supply PQ nodes according to claim 1, characterized in that: The iteration end condition includes the correction amount Δx of the state variable (time) Satisfy max(|Δx (time) |)<ε, or max(|Δx (time) |)≥ε and the number of iterations time≥Tmax; Tmax is the maximum number of iterations; ε is the correction threshold.