A composite material transport riser and riser deployment system for seabed mining
By using flexible connection risers and steel cable systems made of composite materials, the problems of heavy weight and complex installation of existing metal risers are solved, achieving lightweight, fast installation and safe seabed mining riser deployment and recovery.
Patent Information
- Application Number
- CN202210955588.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-10
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-08-10
AI Technical Summary
Existing seabed mining risers made of metal are heavy, complex to install, and easily damaged, resulting in high costs and difficult installation, and flexible connections are difficult to achieve.
Conveying risers and flexible joint sections made of composite materials are used to achieve flexible connections through fixed flanges and flexible material layers to reduce bending moments and tension between risers. Steel cable and winch systems are used for lightweight deployment and recovery. .
The overall weight of the riser is reduced, installation efficiency and safety are improved, the risk of bending damage is reduced, and quick and continuous connection and disassembly are achieved.
Smart Images

Figure CN115303425B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of seabed mining equipment, and in particular to a composite material transport riser and a riser laying system for seabed mining. Background Art
[0002] With the development of marine engineering and seabed mining, the use of riser transportation is currently the most commercially valuable way to transport mineral resources from the seabed to the sea surface. Currently, riser transportation basically uses metal risers, each of which is tens of meters long. The metal risers are rigidly connected to form a series vertical system. However, this vertically laid riser system has at least the following shortcomings:
[0003] 1. From the perspective of vertical distribution of the risers, the upper riser will bear the weight of all the risers below it, so the wall thickness of the riser at this location needs to be thicker to bear the tension below it. The thicker wall leads to an increase in weight, which in turn makes the risers above it thicker and heavier, thus increasing the overall mass of the riser, resulting in high costs and difficulty in installation;
[0004] 2. Since each section of the riser is rigidly connected, the riser will be subjected to huge bending moment and tension caused by the movement of the ocean current and its supporting platform. The combined effect of bending moment and tension is the main factor causing the riser to fail.
[0005] 3. The whole riser is made up of each section of independent pipes rigidly connected. The installation process is time-consuming and laborious. Usually, when connecting the previous section of the riser, the lower connected riser must be supported and fixed, otherwise it cannot be aligned and fastened. The swaying and movement of the surface ship in the marine environment will cause the temporarily fixed riser to bend and break;
[0006] 4. The riser recovery process is similar to its installation process. The riser disassembly process is complicated, time-consuming and labor-intensive, and easily damaged by force;
[0007] 5. Currently, the riser sections are hard-connected, that is, the riser joints use screws and threaded buckles to transmit axial force and bending moment at the same time, which makes the installation and connection of clustered risers with multiple parallel pipes difficult or even impossible;
[0008] 6. Deepwater mining in the ocean mostly uses large-diameter metal risers, which weigh hundreds or even thousands of tons. Due to their heavy weight, it becomes impractical or uneconomical to use the top buoyancy blocks that are usually stored inside the hull to achieve emergency release of the entire riser. Summary of the invention
[0009] The present invention provides a composite material transport riser and a riser deployment system for seabed mining, which are used to solve the technical problems in the above-mentioned background technology.
[0010] To solve the above technical problems, in the first aspect, the present invention provides a composite material transport riser for seabed mining, comprising a fixed flange, and a joint section and a transport straight pipe made of composite materials, wherein the fixed flange is compositely installed at one end of the joint section, and the other end of the joint section is connected to the transport straight pipe, and the transport straight pipe can be inserted into the inner circle of the joint section of another section of the transport riser to form a flexible connection.
[0011] Furthermore, the fixing flange is compositely connected to one ends of the plurality of joint segments at the same time, and the other ends of the plurality of joint segments are respectively connected to the plurality of conveying straight pipes.
[0012] Furthermore, the inner circle of the joint section is provided with a flexible material layer, and the straight delivery pipe can be inserted into the flexible material layer of the joint section of another delivery riser, so that the two delivery risers form a flexible connection.
[0013] Furthermore, a plurality of flexible material rings are provided on the outside of the lower end of the conveying straight pipe. When the conveying straight pipe is inserted into the inner ring of the joint section of another conveying riser, the flexible material rings abut against the inner ring of the joint section of the other conveying riser, so that the two conveying risers form a flexible connection.
[0014] Furthermore, it also includes a flexible material section, which is installed between the joint section and the fixed flange. The straight conveying pipe is inserted into the flexible material section and the inner circle of the joint section of another conveying riser, so that the two conveying risers form a flexible connection.
[0015] Beneficial effects: The composite material transport riser for seabed mining of the present invention is made of lightweight composite material to reduce the weight of the transport riser while ensuring the strength of the transport riser. The bottom transport straight pipe of one transport riser is inserted into the inner circle of the joint section of another transport riser to form a flexible connection, so that the transport riser can be quickly and continuously connected and installed. The flexible connection between the transport risers can release the bending moment between the transport risers to a certain extent and avoid bending damage.
[0016] In a second aspect, the present invention further provides a riser deployment and recovery system for seabed mining, comprising: a plurality of transport risers as described in the first aspect, a mining vessel and a riser deployment and recovery platform arranged on the mining vessel, the fixed flange being provided with a plurality of steel cable through holes, the riser deployment and recovery platform comprising a plurality of winches for releasing or winding up the steel cable, the steel cable being fixed with connecting pieces corresponding to the positions of the fixed flanges of each section of the transport riser, the diameter of the steel cable connecting pieces being larger than the steel cable through holes, the connecting pieces abutting against the lower portion of the fixed flange when the transport riser is deployed or recovered, so that the steel cable bears the weight of each section of the transport riser.
[0017] Furthermore, the steel cable through hole has an opening, and the diameter of the steel cable is smaller than the diameter of the opening of the steel cable through hole.
[0018] Furthermore, the connecting fixture is a convex two-step structure, the diameter of the upper step of the connecting fixture is smaller than the diameter of the steel cable through hole and larger than the diameter of the opening of the steel cable through hole, and the diameter of the lower step of the connecting fixture is larger than the diameter of the steel cable through hole.
[0019] Furthermore, the fixing flange is provided with a cable through hole and a clamping ring, the cable through hole has an opening for allowing the cable to enter and exit, and the clamping ring is movably mounted on the fixing flange to open or close the opening of the cable through hole.
[0020] Furthermore, it also includes an emergency detachable buoyancy block that can support the underwater weight of the entire riser. The emergency detachable buoyancy block is arranged in the center of the moon pool of the mining ship and below the riser deployment and recovery platform. The emergency detachable buoyancy block is connected to the movable clamp ring of the moon pool wall through a fixed clamp on the outer surface.
[0021] Furthermore, the riser placement and recovery platform also includes a winch platform and a working platform. The channel space in the middle of the winch platform is larger than the channel in the middle of the working platform. The winch is arranged on the winch platform. The steel cable extended from the winch passes through the guide pulley and is placed in the steel cable through hole. The conveying riser passes through the channel in the middle of the working platform.
[0022] Furthermore, it also includes a seabed tug and a repeater, wherein the seabed tug is arranged on the seabed and connected to the repeater via a steel cable, and the repeater is connected to the transport riser.
[0023] Beneficial effects: The riser deployment and recovery system and the transport riser for seabed mining of the present invention extend the steel cable into the steel cable through hole so that the connecting fixture supports the bottom of the fixed flange, thereby allowing the steel cable to provide tension to the transport riser, so that each riser only needs to bear its own weight, which can minimize the overall weight of the transport riser. The transport risers are flexibly connected by plugging, so that the transport risers can be quickly and continuously connected and installed.
[0024] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail below with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0026] Figure 1 It is a structural schematic diagram of a riser deployment and recovery system for seabed mining according to a preferred embodiment of the present invention;
[0027] Figure 2 It is a structural schematic diagram of a riser deployment and recovery platform of a riser deployment and recovery system for seabed mining in a preferred embodiment of the present invention;
[0028] Figure 3 is a projection view of a winch platform of a riser deployment and recovery system for seabed mining according to a preferred embodiment of the present invention;
[0029] Figure 4 Schematic diagram of the connection between the steel cable and the fixed flange of the riser deployment and recovery system for seabed mining in a preferred embodiment of the present invention;
[0030] Figure 5 It is a schematic structural diagram of a fixed flange of a riser deployment and recovery system for seabed mining according to a preferred embodiment of the present invention;
[0031] Figure 6 It is a structural schematic diagram of an emergency detachable buoyancy block of a riser deployment and recovery system for seabed mining in a preferred embodiment of the present invention;
[0032] Figure 7 It is a schematic diagram of the connection between the cable and the fixing flange of the riser deployment and recovery system for seabed mining in a preferred embodiment of the present invention;
[0033] Figure 8 It is a structural schematic diagram of a composite material transport riser diagram of a riser deployment and recovery system for seabed mining in a preferred embodiment of the present invention;
[0034] Fig. 9 1 is a schematic diagram of a first structure of a composite material delivery riser for seabed mining according to a preferred embodiment of the present invention;
[0035] Fig.10 2 is a schematic diagram of a second structure of a composite material delivery riser for seabed mining according to a preferred embodiment of the present invention;
[0036] Fig.11 It is a third structural schematic diagram of a composite material transport riser for seabed mining according to a preferred embodiment of the present invention.
[0037] The symbols in the figure represent:
[0038] 100. Transmission riser; 110. Fixing flange; 111. Cable through hole; 112. Cable through hole; 113. Clamp; 120. Joint section; 121. Flexible material layer; 130. Transmission straight pipe; 131. Flexible material ring; 140. Flexible material section; 200. Mining ship; 300. Riser deployment and recovery platform; 310. Cable; 311. Connecting fixture; 320. Winch; 330. Winch platform; 340. Working platform; 350. Guide pulley; 360. Tower; 400. Emergency detachable buoyancy block; 500. Cable; 600. Subsea tug; 601. Steel rope; 700. Repeater. DETAILED DESCRIPTION
[0039] The embodiments of the present invention are described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways as defined and covered by the claims.
[0040] In addition, unless otherwise defined, the technical terms or scientific terms used in the description of this application shall be the common meanings understood by the general technicians in the field to which this application belongs. The words "upper", "lower", "left", "right", "center", "vertical", "horizontal", "inside", "outside" and other words indicating orientation used in the description of this application are only used to indicate the relative direction or positional relationship, and do not imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. When the absolute position of the described object changes, its relative positional relationship may also change accordingly, so it cannot be understood as a limitation on this application. The "first", "second", "third" and similar terms used in the description of this application are only used for descriptive purposes to distinguish different components, and cannot be understood as indicating or implying relative importance. The similar words "one", "one" or "the" used in the description of this application should not be understood as an absolute limitation on quantity, but should be understood as the existence of at least one. The similar words "including" or "comprising" used in the description of this application mean that the elements or objects appearing in front of the word cover the elements or objects listed after the word and their equivalents, without excluding other elements or objects.
[0041] It should also be noted that, unless otherwise clearly specified and limited, the words "installed", "connected", "connected" and similar terms used in the description of this application should be understood in a broad sense. For example, the connection can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, an indirect connection through an intermediate medium, or the internal connection of two components. Technical personnel in the field can understand their specific meanings in this application according to the specific circumstances.
[0042] Example 1, the first composite transport riser for seabed mining.
[0043] like Figure 8 As shown, the composite transport riser for seabed mining of this embodiment includes a fixed flange 110, and a joint section 120 and a transport straight pipe 130 made of composite materials. The fixed flange 110 is compositely installed at one end of the joint section 120, and the other end of the joint section 120 is connected to the transport straight pipe 130. The transport straight pipe 130 can be inserted into the inner circle of the joint section 120 of another section of the transport riser to form a flexible connection.
[0044] The delivery riser 100 in this embodiment adopts a socket type to enhance the overall quick connection performance. The joint section 120 and the delivery straight pipe 130 are made of composite materials through integrated composite processing, and together constitute the riser body of the delivery riser. The fixing flange 110 can be a composite material or a metal material. In this embodiment, the fixing flange 110 is specifically a metal material.
[0045] Specifically, the joint section 120 and the conveying straight pipe 130 of this embodiment can be made of lightweight, high-strength, and corrosion-resistant composite materials such as fiberglass and carbon fiber. The composite material in this embodiment is illustrated using fiberglass as an example. The inner walls of the joint section 120 and the conveying straight pipe 130 can be provided with a wear-resistant layer to reduce the wear between the transported minerals and the inner wall and enhance the wear resistance of the conveying straight pipe 130.
[0046] Among them, the inner circle of the joint section 120 is provided with a flexible material layer 121, and the conveying straight pipe 130 can be inserted into the flexible material layer 121 of the joint section 120 of another conveying riser 100 to form a flexible connection. The flexible material layer 121 is specifically a rubber structure layer. When the conveying straight pipe 130 is inserted into the inner circle of the joint section 120 of another section of the conveying riser, a flexible connection is formed between the two conveying risers 100 and a seal is formed.
[0047] It should be noted that the spatial positions of the fixed flange 110 of the delivery riser 100 and the delivery straight pipe 130 can be changed up and down, and the position and shape of the flange through hole will be changed accordingly.
[0048] The composite material delivery riser for seabed mining of this embodiment has a joint section 120 and a delivery straight pipe 130 made of glass fiber reinforced plastics, and a fixing flange 110 made of metal material, which can greatly reduce the overall mass of the delivery riser 100 while ensuring the overall strength of the delivery riser 100; the delivery riser 100 is connected by socket connection to form a flexible sealing connection, which is used to withstand the bending moment between the delivery risers 100, so that the bending moment between the delivery risers 100 can be released to a certain extent to avoid bending damage; the connection of the delivery riser 100 is achieved by plugging, so that the disassembly and assembly efficiency of the delivery riser 100 is higher.
[0049] Example 2, a second composite transport riser for seabed mining.
[0050] like Fig.10 As shown, the difference between this embodiment and embodiment 1 is that: the inner ring of the joint section 120 is not provided with a flexible material layer 121. In this embodiment, a plurality of flexible material rings 131 are provided on the outside of the lower end of the conveying straight pipe 130. When the conveying straight pipe 130 is inserted into the inner ring of the joint section 120 of another conveying riser, the flexible material rings 131 abut against the inner ring of the joint section 120 to form a flexible connection.
[0051] Specifically, the flexible material ring 131 at the lower end of the conveying straight pipe 130 can be set to any number according to needs. In this embodiment, two flexible material rings are taken as an example for explanation, and the flexible material ring 131 is specifically a rubber ring, which is arranged at the lower end of the conveying straight pipe 130, so that the conveying straight pipe 130 can be directly plugged into the joint section 120, so that a flexible connection is formed between the two conveying risers 100 and a seal is formed.
[0052] The composite material transport riser for seabed mining of this embodiment is provided with two rubber rings at the lower end of the transport riser 100, so that when the transport straight pipe 130 is inserted into the joint section 120 of another section of the transport riser 100, the rubber ring abuts against the inner wall of the joint section 120, so that the transport straight pipe 130 and the joint section 120 form a flexible sealing connection, which is used to withstand the bending moment between the transport risers 100, so that the bending moment between the transport risers 100 is released to a certain extent, and bending damage is avoided; the connection of the transport risers 100 is achieved by plugging, so that the disassembly and assembly efficiency of the transport risers 100 is higher.
[0053] Example 3, a third composite transport riser for seabed mining.
[0054] like Fig.11 As shown, the difference between this embodiment and embodiment 1 is that: the inner circle of the joint section 120 is not provided with a flexible material layer 121. In this embodiment, it also includes a flexible material section 140. The flexible material section 140 is installed between the joint section 120 and the fixed flange 110. The conveying straight pipe 130 is inserted into the flexible material section 140 of another conveying riser and the inner circle of the joint section 120, so that the two conveying risers 100 form a flexible connection.
[0055] Specifically, in this embodiment, the flexible material segment 140 is made of rubber material, the flexible material segment 140 is installed at the end of the joint segment 120 away from the conveying straight pipe 130, the fixing flange 110 is installed at the end of the flexible material segment 140, and the conveying straight pipe 130 is inserted into the inner circle of the flexible material segment 140 and the joint segment 120 of another section of the conveying riser 100, so that the conveying straight pipe 130 abuts against the flexible material segment 140 made of rubber material, so that a flexible connection and a seal are formed between the two conveying risers 100 after socketing.
[0056] The composite material delivery riser for seabed mining of this embodiment is provided with a flexible material section 140 made of rubber between the joint section 120 and the fixed flange 110, so that the delivery straight pipe 130 is inserted into the inner circle of the flexible material section 140 and the joint section 120 of another section of the delivery riser 100. The delivery straight pipe 130 and the joint section 120 after socketing form a flexible sealing connection for bearing the bending moment between the delivery risers 100, so that the bending moment between the delivery risers 100 is released to a certain extent, and bending damage is avoided; the connection of the delivery risers 100 is achieved by plugging, so that the disassembly and assembly efficiency of the delivery risers 100 is higher.
[0057] Example 4, a fourth composite transport riser for seabed mining.
[0058] like Fig. 9 As shown, the difference between this embodiment and embodiment 1 or embodiment 2 or embodiment 3 is that, in the composite material conveying riser for seabed mining in this embodiment, the fixed flange 110 can be simultaneously compositely connected to one end of multiple joint segments 120, and the other ends of the multiple joint segments 120 are respectively connected to the ends of multiple conveying straight pipes 130.
[0059] In this embodiment, the example in which the fixed flange 110 is simultaneously connected to the ends of two joint sections 120 is used for explanation. By adopting this socket-and-spigot method, two transport risers 100 can be socket-and-spigot connected together after being consolidated, which greatly reduces the connection, deployment and recovery time of the transport risers 100.
[0060] The composite material transport riser for seabed mining of this embodiment has two joint sections 120 and two transport straight pipes 130 provided on the fixing flange 110 of each transport riser 100, so that each transport riser 100 is bundled with two transport pipelines. The two transport pipelines are connected simultaneously during each installation, thereby improving the installation efficiency.
[0061] like Figure 1 As shown, the riser deployment and recovery system for seabed mining of this embodiment comprises: a plurality of transport risers 100, a mining ship 200 and a riser deployment and recovery platform 300 arranged on the mining ship 200, a plurality of steel cable through holes 111 are arranged on the fixing flange 110, the riser deployment and recovery platform 300 comprises a plurality of winches 320 for releasing or winding up the steel cables 310 and a tower 360 for transporting the transport risers 100, a connecting piece 311 corresponding to the position of the fixing flange 110 of each section of the transport riser 100 is fixed on the steel cable 310, the diameter of the steel cable connecting piece 311 is larger than the steel cable through hole 111, when the transport riser 100 is deployed or recovered, the connecting piece 311 abuts against the lower part of the fixing flange 110, so that the steel cable 310 bears the weight of each section of the transport riser 100.
[0062] The transport riser 100 may be the transport riser 100 in any one of embodiments 1 to 4, such as Figure 8 As shown, the transport riser 100 in Embodiment 1 is specifically adopted in this embodiment.
[0063] like Figure 2 and Figure 3 As shown, in the marine riser deployment and recovery system of the present embodiment, the riser deployment and recovery platform 300 further includes a winch platform 330 and an operating platform 340. The passage space in the middle of the winch platform 330 is larger than the passage in the middle of the operating platform 340. The winch 320 is disposed on the winch platform 330. The steel cable 310 extending from the winch 320 passes through the guide pulley 350 and is placed in the steel cable through hole 111. The transport riser 100 passes through the passage in the middle of the operating platform 340.
[0064] The riser deployment and recovery platform 300 is located below the tower 360. The upper layer is a winch platform 330 for installing and controlling the winch 320. The lower layer is an operating platform 340 for assisting the connection between the transport risers 100 and the connection and fixation between the steel cables 310 and the fixing flange 110. The transport riser 100 is deployed and recovered through multiple steel cables 310. Each steel cable is connected to a winch. In this embodiment, the deployment through five steel cables 310 is specifically described as an example. The continuous and rapid deployment and recovery of the transport riser 100 can be achieved by synchronously controlling the actions of the five winches 320. Since the through hole in the middle of the winch platform 330 is larger than the through hole in the middle of the operating platform 340, the space of the transport riser 100 gradually decreases from top to bottom. The large opening at the upper end allows the transport riser 100 to enter better, and the small opening at the lower end can limit the position of the transport riser 100.
[0065] like Figure 4 and Figure 5As shown, the steel cable 310 of the winch 320 is replaceable. In the early stage of deployment, a steel cable 310 with a smaller diameter is used. As the deployment depth increases, the diameter of the steel cable 310 is gradually increased according to the load of the deployment system. Each steel cable 310 is provided with a connecting fixture 311 connected to the steel cable through hole 111. The connecting fixture 311 is a convex two-layer step structure. The diameter of the upper step of the connecting fixture 311 is smaller than the diameter of the steel cable through hole 111 and larger than the diameter of the opening of the steel cable through hole 111. The diameter of the lower step of the connecting fixture 311 is larger than the diameter of the steel cable through hole 111, so that the upper step cooperates with the steel cable through hole 111 to ensure that the steel cable 310 is fixed. The flange 110 is tightly connected; the lower step is mainly used to bear the axial force of the connected delivery riser 100, and the distance between adjacent connecting fixtures 311 is not less than the distance between adjacent fixed flanges 110, wherein the optimal distance is that the distance between adjacent connecting fixtures 311 is equal to the distance between adjacent fixed flanges 110. In this embodiment, in order to ensure a certain installation margin while ensuring the safety of the connection, the distance between adjacent connecting fixtures 311 is greater than the distance between adjacent fixed flanges 110, but the difference between the distance between adjacent connecting fixtures 311 and the distance between adjacent fixed flanges 110 cannot exceed the height of the connecting fixture 311.
[0066] It should be noted that, in other embodiments, a cylindrical connecting fixture 311 may also be used, and the diameter of the cylinder is larger than the diameter of the steel cable through hole 111. When the transport riser 100 sinks due to gravity, the connecting fixture 311 on the steel cable 310 directly abuts the lower end of the fixing flange 110, and the steel cable 310 can also bear the weight of each transport riser 100.
[0067] like Figure 6 As shown, in the marine riser deployment and recovery system of the present embodiment, an emergency detachable buoyancy block 400 capable of supporting the underwater weight of the entire riser is further included. The emergency detachable buoyancy block 400 is disposed in the center of the moon pool of the mining vessel 200 and below the riser deployment and recovery platform 300. The emergency detachable buoyancy block 400 is connected to a movable clamp ring on the moon pool wall via a fixed clamp on the outer surface.
[0068] The emergency detachable buoyancy block 400 structure is located in the center of the moon pool of the mining ship 200, below the riser placement and recovery platform 300. The emergency detachable buoyancy block 400 is mainly composed of buoyancy materials or hollow pontoons, wherein positioning devices and buoys are arranged after emergency dumping, so as to facilitate the positioning and finding of the delivery riser 100 after the emergency. The outer surface of the emergency detachable buoyancy block 400 has fixed bayonet holes, which are respectively fixed to the moon pool wall through movable clamp rings. In an emergency, the support of the delivery riser 100 is first transferred to the emergency detachable buoyancy block 400, and the upper end of the steel cable 310 is locked on the emergency detachable buoyancy block 400, and the connection between the steel cable 310 and the delivery riser 100 and the hull is released at the same time. The emergency detachable buoyancy block 400 can be quickly released by controlling the opening and closing of the clamp ring, so that the steel cable 310 and the delivery riser 100 are connected as a whole with the emergency detachable buoyancy block 400 and are disconnected from the mining ship 200, so as to realize the system emergency dumping.
[0069] like Figure 5 and Figure 7 As shown, in the marine riser deployment and recovery system of the present embodiment, a cable through hole 112 and a clamping ring 113 are further provided on the fixing flange 110. The cable through hole 112 has an opening for allowing the cable 500 to enter and exit. The clamping ring 113 is movably mounted on the fixing flange 110 and is used to open or close the opening of the cable through hole 112. After the cable 500 enters the cable through hole 112, the opening of the cable through hole 112 is closed by the clamping ring 113, so that the cable 500 can be prevented from floating away.
[0070] In this embodiment, the cable 500 may be an optical fiber or an electrical cable. One or more cables 500 may be laid together. The deformation of the riser may be measured through a special optical fiber, or the underwater equipment may be powered through the cable.
[0071] The marine riser deployment and recovery system of the present embodiment also includes a seabed tug 600 and a repeater 700. The seabed tug 600 is disposed on the seabed and connected to the repeater 700 via a steel rope 601. The repeater 700 is connected to the transport riser 100.
[0072] Since the transport riser 100 may be affected by strong ocean currents during operation, causing the transport riser 100 and the relay station 700 to drift in the direction of the ocean current, this embodiment arranges a submarine tug 600 on the seabed below the relay station 700. The submarine tug 600 is connected to the relay station 700 via a steel rope 601 to control the underwater position of the relay station 700. In other embodiments, the submarine relay station 700 may also be used.
[0073] In the present embodiment, the transport riser 100 is the transport riser 100 of Embodiment 1. The transport riser 100 in the present embodiment adopts a socket type to enhance the overall connection performance. The composite material of the joint section 120 and the transport straight pipe 130 is specifically glass fiber reinforced plastics. The inner walls of the joint section 120 and the transport straight pipe 130 are provided with a wear-resistant layer to reduce the wear between the transported minerals and the inner wall and enhance the wear resistance of the joint section 120 and the transport straight pipe 130. The flexible material layer 121 of the present embodiment is specifically a rubber layer, so that the joint section 120 becomes a moment release joint to reduce the influence of ocean currents and internal waves on the bending of the transport riser 100. The fixing flange 110 is made of metal material, and the joint section 120 and the transport straight pipe 130 are manufactured by integrated composite processing.
[0074] Working principle of this embodiment: In this embodiment, five steel cables 310 are used to continuously lay and recover the transport riser 100. The connection between the transport riser 100 and the steel cables 310 is connected by a connecting piece 311. The steel cables 310 apply an upward pulling force to the first transport riser 100 put into the sea, thereby preventing the weight of the transport riser 100 from being borne entirely by the upper transport riser 100. The transport riser 100 adopts a quick plug-in structure, which is convenient for quick connection and disassembly. The steel cables 310 and the connecting piece 311 are connected by crimping, which can be processed in advance. There is a rubber layer between the transport riser 100 to withstand the transport Bending moment between risers 100; along with the deployment of the transport riser 100, electrical cables and / or optical cables can be deployed simultaneously for underwater power supply or monitoring the shape of the transport riser 100 and communicating with the current speed measuring device; the transport riser 100 is deployed and recovered through the channel in the middle of the emergency detachable buoyancy block 400. When the sea condition is poor, emergency detachment can be performed, and the emergency detachable buoyancy block 400 can provide buoyancy for the transport pipeline, which is convenient for subsequent reconnection and operation; a seabed tug 600 that can be used for walking on the seabed is provided under the relay station 700, and the shape of the transport riser 100 can be dynamically adjusted according to the changes in the ocean current.
[0075] The marine riser deployment and recovery system of the present embodiment can allow each section of the transport riser 100 to bear only its own weight, thereby reducing the overall weight of the transport riser 100; the bending moment of the transport riser 100 is released to a certain extent to avoid bending damage; it can be quickly and continuously connected, installed and recovered; in the event of an emergency, the transport riser 100 can be safely and quickly released from the hull, and it is ensured that the transport riser 100 can be reconnected and used after the emergency.
[0076] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A composite material transport riser for seabed mining, characterized in that: The invention comprises a fixing flange (110), a joint section (120) and a conveying straight pipe (130) made of a composite material, wherein the fixing flange (110) is compositely mounted on one end of the joint section (120), the other end of the joint section (120) is connected to the conveying straight pipe (130), and the conveying straight pipe (130) can be inserted into the inner ring of the joint section (120) of another section of a conveying riser to form a flexible connection; the fixing flange (110) is compositely connected to one end of a plurality of joint sections (120) at the same time, and the other ends of the plurality of joint sections (120) are respectively connected to a plurality of conveying straight pipes (130); the inner ring of the joint section (120) is provided with a layer of flexible material (121), and the conveying straight pipe (130) can be inserted into another section of a conveying riser. The invention relates to a straight conveying pipe (130) having a plurality of flexible material rings (131) arranged on the outside of the lower end of the straight conveying pipe (130). When the straight conveying pipe (130) is inserted into the inner ring of the joint section (120) of another straight conveying pipe, the flexible material rings (131) abut against the inner ring of the joint section (120) of the other straight conveying pipe, so that the two straight conveying pipes are flexibly connected. The invention also comprises a flexible material section (140). The flexible material section (140) is installed between the joint section (120) and the fixing flange (110). The straight conveying pipe (130) is inserted into the inner ring of the flexible material section (140) and the joint section (120) of another straight conveying pipe, so that the two straight conveying pipes are flexibly connected.
2. A riser deployment and recovery system for seabed mining, characterized in that: include: A plurality of transport risers (100) as claimed in claim 1, a mining ship (200) and a riser deployment and recovery platform (300) arranged on the mining ship (200), the fixing flange (110) being provided with a plurality of steel cable through holes (111), the riser deployment and recovery platform (300) comprising a plurality of winches (320) for releasing or winding up the steel cables (310), the steel cables (310) being fixed with connecting pieces (311) corresponding to the positions of the fixing flanges (110) of each section of the transport riser (100), the diameter of the connecting pieces (311) being larger than the steel cable through holes (111), and the connecting pieces (311) being abutted against the lower part of the fixing flanges (110) when the transport riser (100) is deployed or recovered, so that the steel cables (310) bear the weight of each section of the transport riser (100).
3. A riser deployment and recovery system for seabed mining according to claim 2, characterized in that: The steel cable through hole (111) has an opening, and the diameter of the steel cable (310) is smaller than the diameter of the opening of the steel cable through hole (111).
4. A riser deployment and recovery system for seabed mining according to claim 3, characterized in that: The connecting fixture (311) is a convex-shaped two-layer step structure, the diameter of the upper step of the connecting fixture (311) is smaller than the diameter of the steel cable through hole (111) and larger than the diameter of the opening of the steel cable through hole (111), and the diameter of the lower step of the connecting fixture (311) is larger than the diameter of the steel cable through hole (111).
5. A riser deployment and recovery system for seabed mining according to claim 2, characterized in that: The fixing flange (110) is also provided with a cable through hole (112) and a clamping ring (113); the cable through hole (112) has an opening for allowing the cable (500) to enter and exit; the clamping ring (113) is movably mounted on the fixing flange (110) and is used to open or close the opening of the cable through hole (112).
6. A riser deployment and recovery system for seabed mining according to claim 2, characterized in that: It also includes an emergency detachable buoyancy block (400) capable of supporting the underwater weight of the entire riser. The emergency detachable buoyancy block (400) is arranged in the center of the moon pool of the mining ship (200) and below the riser deployment and recovery platform (300). The emergency detachable buoyancy block (400) is connected to a movable clamp ring on the moon pool wall via a fixed clamping socket on the outer surface.
7. A riser deployment and recovery system for seabed mining according to claim 2, characterized in that: The riser deployment and recovery platform (300) further comprises a winch platform (330) and a working platform (340). The passage space in the middle of the winch platform (330) is larger than the passage in the middle of the working platform (340). The winch (320) is arranged on the winch platform (330). The steel cable (310) extending from the winch (320) passes through a guide pulley (350) and is placed in the steel cable through hole (111). The transport riser (100) passes through the passage in the middle of the working platform (340).
8. A riser deployment and recovery system for seabed mining according to claim 2, characterized in that: It also includes a seabed tug (600) and a repeater (700), wherein the seabed tug (600) is disposed on the seabed and connected to the repeater (700) via a steel rope (601), and the repeater (700) is connected to the transport riser (100).