An online real-time monitoring and early warning cloud platform for industrial boiler operation based on artificial intelligence

Through the online real-time monitoring and early warning cloud platform for industrial boiler operation based on artificial intelligence, pressure gauge, sensor and high-definition camera are used to monitor the operating status of steam boilers, calculate and evaluate coefficients and generate early warnings, which solves the ineffective monitoring of steam boilers during operation in the existing technology in the existing technology. The problem of the problem improves safety and monitoring accuracy.

CN115314498BInactive Publication Date: 2024-11-01NAT ENERGY BOXING POWER GENERATION CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202210979112.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-16
Publication Date
2024-11-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing technology lacks effective online real-time monitoring and early warning mechanisms during the operation of steam boilers, resulting in the subjectivity and instability of manual inspections, making it difficult to detect subtle problems in a timely manner, and may cause safety hazards for factories and workers.

Method used

Design an online real-time monitoring and early warning cloud platform for industrial boiler operation based on artificial intelligence. The first pressure gauge, temperature sensor and high-definition camera are used to monitor and analyze the boosting, steam consolidation and discharge processes of steam boilers, calculate the evaluation coefficients and generate them. Early warning, providing targeted analysis and early warning.

Benefits of technology

It greatly improves the response efficiency to abnormal operation of steam boilers, enhances monitoring efforts, reduces the harm caused to factories and workers by subtle problems, improves the reliability and accuracy of monitoring, and ensures environmental and personal safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115314498B_ABST
    Figure CN115314498B_ABST
Patent Text Reader

Abstract

The present invention discloses an online real-time monitoring and early warning cloud platform for industrial boiler operation based on artificial intelligence, including a steam boiler operation process acquisition module, a steam boiler boost monitoring and analysis module, a steam boiler steam monitoring and analysis module, a steam boiler sewage monitoring and analysis module, an early warning analysis module, an early warning terminal and a data storage module. The present invention monitors and analyzes the boost operation process corresponding to the steam boiler through a first pressure gauge, a temperature sensor and a high-definition camera, thereby obtaining a boost operation evaluation coefficient corresponding to the steam boiler, thereby analyzing the boost operation process corresponding to the steam boiler, greatly improving the response efficiency of the staff to the abnormal operation of the steam boiler during the boost operation process, enhancing the monitoring intensity corresponding to the boost operation process, reducing the possibility of minor problems of the steam boiler causing serious harm to the factory and workers, and ensuring the environmental safety of the factory and the personal safety of the workers.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of online real-time monitoring of industrial boiler operation, and in particular to an online real-time monitoring and early warning cloud platform for industrial boiler operation based on artificial intelligence. Background Art

[0002] As one of the core equipment in industrial production, industrial boilers have been widely used in chemical plants, food production and other fields. In order to ensure the safety of industrial boilers during operation, the importance of online real-time monitoring and early warning of industrial boiler operation is highlighted.

[0003] Steam boilers are one of the most widely used industrial boiler equipment among all industrial boilers. They have many excellent qualities such as wide coverage, low emission standards, and high degree of automation. Once a problem occurs during the operation of a steam boiler, it will cause serious losses to the factory and workers. At present, when monitoring and analyzing the operation process of steam boilers, there are usually deficiencies in the following aspects:

[0004] During the operation of the steam boiler, the status of each operating step of the steam boiler directly determines the operational safety of the steam boiler. Currently, the operating status of the steam boiler is mainly inspected and checked manually. Since manual inspection has certain subjectivity and instability, it is easy to ignore subtle problems of the steam boiler. As a large-scale industrial boiler, the steam boiler may also cause serious harm to the factory and workers due to subtle problems. The current monitoring efforts are not strong, which not only causes a waste of human and material resources, but also reduces the accuracy and reliability of steam boiler status monitoring and analysis. On another level, manual monitoring is somewhat one-sided and has high requirements for inspectors. It is impossible to monitor the comprehensiveness of boiler operation and improve the efficiency of detecting safety hazards during boiler operation, so that the stability and safety of boiler operation cannot be effectively guaranteed. Summary of the invention

[0005] In order to overcome the shortcomings of the background technology, an embodiment of the present invention provides an online real-time monitoring and early warning cloud platform for industrial boiler operation based on artificial intelligence, which can effectively solve the problems involved in the above-mentioned background technology.

[0006] The purpose of the present invention can be achieved by the following technical solutions:

[0007] An online real-time monitoring and early warning cloud platform for industrial boiler operation based on artificial intelligence, including:

[0008] The steam boiler operation process acquisition module is used to acquire the main operation process of the steam boiler, wherein the main operation process includes the boiler boosting operation process, the boiler steam parallel operation process and the boiler blowdown operation process;

[0009] The steam boiler pressure boost monitoring and analysis module is used to monitor and analyze the pre-boosting process and the pressure boosting process corresponding to the steam boiler, thereby obtaining the pressure boosting operation evaluation coefficient corresponding to the steam boiler. The steam boiler pressure boost monitoring and analysis module includes a pre-boosting process monitoring and analysis unit, a pressure boosting process monitoring and analysis unit, and a pressure boosting operation evaluation and analysis unit;

[0010] The steam boiler steam paralleling monitoring and analysis module is used to monitor and analyze the pre-steam paralleling process and the steam paralleling process corresponding to the steam boiler, thereby obtaining the steam paralleling operation evaluation coefficient corresponding to the steam boiler, wherein the steam boiler steam paralleling monitoring and analysis module includes a pre-steam paralleling process monitoring and analysis unit, a steam paralleling process monitoring and analysis unit and a steam paralleling operation evaluation and analysis unit;

[0011] The steam boiler blowdown monitoring and analysis module is used to monitor and analyze the boiler blowdown process corresponding to the steam boiler, thereby obtaining the blowdown operation evaluation coefficient corresponding to the steam boiler;

[0012] The early warning analysis module is used to analyze the pressure-boosting operation evaluation coefficient, the steam-coupling operation evaluation coefficient and the sewage discharge operation evaluation coefficient corresponding to the steam boiler to obtain the early warning operation process;

[0013] Early warning terminal, used to issue corresponding early warnings based on the early warning operation process;

[0014] The data storage module is used to store the length and diameter of the steam boiler pipe, store the specified heating time corresponding to various heating time evaluation indexes, and store the allowable heating time difference.

[0015] As a further improvement of the present invention, the pre-pressurization process monitoring and analysis unit is used to monitor and analyze the pre-pressurization process corresponding to the steam boiler, and the specific monitoring and analysis steps are as follows:

[0016] A1: The detection points are evenly arranged on the steam boiler according to the preset method, and the temperature corresponding to each detection point on the steam boiler is detected by the temperature sensor to obtain the temperature corresponding to each detection point on the steam boiler, and the highest temperature and the lowest temperature are selected from them, which are recorded as T respectively. 高 and T 低 ;

[0017] A2: Based on the formula Calculate the temperature uniformity index corresponding to the steam boiler, W represents the temperature uniformity index corresponding to the steam boiler, e represents the natural constant, T' represents the set reference temperature value, a1 and a2 represent the influence factors corresponding to the set maximum temperature and minimum temperature respectively;

[0018] A3: The steam pressure inside the steam boiler is monitored by a first pressure gauge to obtain the internal steam pressure corresponding to the steam boiler, and the internal steam pressure corresponding to the steam boiler is compared with the set first standard steam pressure threshold. If the internal steam pressure corresponding to the steam boiler is equal to the first standard steam pressure threshold, after performing the corresponding flushing operation, the internal water level of the steam boiler is monitored in real time by a high-definition camera to obtain an internal water level image of the steam boiler, from which the internal water level corresponding to the steam boiler before and after the corresponding flushing operation is respectively obtained, which are recorded as G respectively. 前 and G 后 , and then comprehensively analyze it with the flushing time to obtain the corresponding water level growth rate inside the steam boiler, recorded as v;

[0019] A4: Based on the formula Calculate the water level growth matching index corresponding to the steam boiler, V represents the water level growth matching index corresponding to the steam boiler, v′ represents the set reference water level growth rate, Δv represents the set allowable water level growth rate difference, ΔG represents the set standard water level growth difference, a3 and a4 represent the set water level growth rate and the correction factor corresponding to the water level growth;

[0020] A5: Compare the internal steam pressure corresponding to the steam boiler with the set second standard steam pressure threshold. If the internal steam pressure corresponding to the steam boiler is equal to the second standard steam pressure threshold, after performing the corresponding flushing operation, obtain the corresponding steam pressure inside the steam boiler through the first pressure gauge, which is recorded as q, and read the steam pressure value of the second pressure gauge at the same time, which is recorded as q′;

[0021] A6: Based on the formula Calculate the steam pressure matching index corresponding to the steam boiler, where Q represents the steam pressure matching index corresponding to the steam boiler, Δq represents the preset allowable steam pressure difference, and a5 represents the correction factor corresponding to the preset steam pressure;

[0022] A7: A comprehensive analysis is performed on the temperature uniformity index, water level growth matching index and steam pressure matching index corresponding to the steam boiler to obtain the pre-boosting compliance index corresponding to the steam boiler. The specific calculation formula is δ=W*b1+V*b2+Q*b3, where δ represents the pre-boosting compliance index corresponding to the steam boiler, and b1, b2 and b3 represent the weight factors corresponding to the set temperature uniformity index, water level growth matching index and steam pressure matching index, respectively.

[0023] As a further improvement of the present invention, the monitoring and analysis unit in the pressure-boosting process is used to monitor and analyze the pressure-boosting process corresponding to the steam boiler, and the specific monitoring and analysis steps are as follows:

[0024] The internal steam pressure corresponding to the steam boiler is compared with the set working steam pressure. If the internal steam pressure corresponding to the steam boiler is equal to the set working steam pressure, the steam temperature corresponding to the steam boiler is monitored by the temperature sensor to obtain the steam temperature corresponding to the steam boiler, which is recorded as T 蒸汽 ;

[0025] According to the formula Calculate the evaluation index of the heating time corresponding to the steam boiler, γ is the evaluation index of the heating time corresponding to the steam boiler, L 管道 , D represent the stored steam boiler pipe length and pipe diameter respectively, T′ 蒸汽 , L′ 管道 , D′ represent the set reference steam temperature, reference pipe length, and reference pipe diameter, respectively; b4, b5, and b6 represent the influence factors corresponding to the set steam temperature, pipe length, and pipe diameter, respectively;

[0026] Match the pipe heating time evaluation index corresponding to the steam boiler with the designated pipe heating time corresponding to various stored pipe heating time evaluation indexes to obtain the designated pipe heating time corresponding to the steam boiler, recorded as t′;

[0027] The heating time of the steam boiler is monitored by a high-definition camera, and the heating time of the steam boiler is obtained, which is recorded as t, and then according to the formula The pressure increase index corresponding to the steam boiler is calculated, ε is represented by the pressure increase index corresponding to the steam boiler, and Δt is represented by the stored allowable pipe heating time difference.

[0028] As a further improvement of the present invention, the boost operation evaluation and analysis unit is used to calculate the boost operation evaluation coefficient corresponding to the steam boiler, and the specific calculation formula is η=δ*c1+ε*c2, η is represented by the boost operation evaluation coefficient corresponding to the steam boiler, c1 and c2 are respectively represented by the weight factors corresponding to the set pre-boost compliance index and boost compliance index.

[0029] As a further improvement of the present invention, the pre-steam combination process monitoring and analysis unit is used to monitor and analyze the pre-steam combination process corresponding to the steam boiler, and the specific monitoring and analysis process is as follows:

[0030] The internal water level of the steam boiler during the pre-steaming process is monitored by a high-definition camera, and the internal water level of the steam boiler during the pre-steaming process is obtained, which is denoted as G 预并汽 ;

[0031] The component types of steam corresponding to the steam boiler in the pre-steam process are detected by a component detector, and the content of each component type in the steam corresponding to the steam boiler is extracted, which is recorded as C i, i represents the number of each component type, i = 1, 2, ..., n, and the number of component types in the steam corresponding to the steam boiler and the corresponding content of each component type are comprehensively analyzed to obtain the steam quality evaluation index corresponding to the steam boiler, which is recorded as Z;

[0032] The first pressure gauge is used to monitor the internal steam pressure of the steam boiler and the main steam pressure of the steam boiler during the pre-steaming process, which are respectively denoted as q 锅炉 and q 母管 ;

[0033] According to the formula Calculate the pre-steam compliance index corresponding to the steam boiler, φ is represented by the pre-steam compliance index corresponding to the steam boiler, G′ 预并汽 It is expressed as the allowable water level of the steam boiler in the pre-steam process, ΔG 预并汽 It represents the set allowable water level difference, Z′ represents the reference steam quality evaluation index corresponding to the set steam boiler, and d1, d2, and d3 represent the influencing factors corresponding to the set water level, steam quality evaluation index, and steam pressure, respectively.

[0034] As a further improvement of the present invention, the monitoring and analysis unit in the steam paralleling process is used to monitor and analyze the steam paralleling process corresponding to the steam boiler, and the specific monitoring and analysis process is as follows:

[0035] The steam pressure of the steam boiler in the steam paralleling process is monitored by the first pressure gauge, and the steam pressure of the steam boiler in the steam paralleling process is obtained, which is recorded as q 蒸汽 ;

[0036] The internal water level of the steam boiler during the steam paralleling process is monitored by a high-definition camera, and the internal water level of the steam boiler during the steam paralleling process is obtained, which is denoted as G 并汽 ;

[0037] The steam temperature of the steam boiler in the steam paralleling process is monitored by the temperature sensor, and the steam temperature of the steam boiler in the steam paralleling process is obtained, which is recorded as T 并汽 ;

[0038] A comprehensive analysis is conducted on the steam pressure, internal water level and steam temperature of the steam boiler during the steam paralleling process to obtain the corresponding steam paralleling compliance index of the steam boiler, which is recorded as

[0039] As a further improvement of the present invention, the parallel steam operation evaluation and analysis unit is used to calculate the parallel steam operation evaluation coefficient corresponding to the steam boiler, and its specific calculation formula is: λ represents the steam parallel operation evaluation coefficient corresponding to the steam boiler, c3 and c4 represent the weight factors corresponding to the set pre-steam parallel operation compliance index and steam parallel operation compliance index respectively.

[0040] As a further improvement of the present invention, the boiler blowdown process corresponding to the steam boiler is monitored and analyzed, and the specific monitoring and analysis process is as follows:

[0041] The blowdown process corresponding to the steam boiler is monitored by a high-definition camera to obtain a blowdown process video corresponding to the steam boiler;

[0042] Extract the interval between the current blowdown operation and the last adjacent blowdown operation from the blowdown process video corresponding to the steam boiler, denoted as t 排污 ;

[0043] The number of intermittent discharges of the current discharge operation is extracted from the discharge process video corresponding to the steam boiler, and the discharge duration corresponding to each intermittent discharge is extracted, recorded as t j , j represents the number of each intermittent sewage discharge, j = 1, 2, ..., m;

[0044] Extract the sewage level corresponding to the steam boiler in each set time period during the current sewage operation process from the sewage discharge process video corresponding to the steam boiler, and record it as f represents the number of each set time period, f=1,2,......,x;

[0045] According to the formula Calculate the blowdown operation evaluation coefficient corresponding to the steam boiler, γ is expressed as the blowdown operation evaluation coefficient corresponding to the steam boiler, t′ 排污 ,t 0 Respectively represent the set standard sewage discharge operation interval and standard sewage discharge duration It is expressed as the standard sewage level corresponding to the steam boiler in the set time period f, ΔG 排污 It is represented by the set allowable sewage discharge level difference, and c5, c6, and c7 are respectively represented by the weight factors corresponding to the set sewage discharge operation interval, sewage discharge duration, and sewage discharge level.

[0046] As a further improvement of the present invention, the boost operation evaluation coefficient, the steam parallel operation evaluation coefficient and the sewage discharge operation evaluation coefficient corresponding to the steam boiler are analyzed, and the specific analysis steps are as follows:

[0047] The boost operation evaluation coefficient corresponding to the steam boiler is compared with the set boost operation evaluation coefficient threshold value. If the boost operation evaluation coefficient corresponding to the steam boiler is less than the boost operation evaluation coefficient threshold value, the boiler boost operation process is recorded as a warning operation process.

[0048] The parallel steam operation evaluation coefficient corresponding to the steam boiler is compared with the set parallel steam operation evaluation coefficient threshold value. If the parallel steam operation evaluation coefficient corresponding to the steam boiler is less than the parallel steam operation evaluation coefficient threshold value, the parallel steam operation process of the boiler is recorded as a warning operation process;

[0049] The sewage discharge operation assessment coefficient corresponding to the steam boiler is compared with the set sewage discharge operation assessment coefficient threshold. If the sewage discharge operation assessment coefficient corresponding to the steam boiler is less than the sewage discharge operation assessment coefficient threshold, the boiler sewage discharge operation process is recorded as a warning operation process.

[0050] Compared with the prior art, the embodiments of the present invention have at least the following advantages or beneficial effects:

[0051] 1. The present invention monitors and analyzes the pre-boosting process and the boosting process corresponding to the steam boiler through a first pressure gauge, a temperature sensor and a high-definition camera, thereby obtaining the pre-boosting compliance index and the boosting compliance index corresponding to the steam boiler, and then comprehensively analyzing to obtain the boosting operation evaluation coefficient corresponding to the steam boiler, thereby analyzing the boosting operation process corresponding to the steam boiler, greatly improving the response efficiency of the staff to the abnormal operation of the steam boiler during the boosting operation process, enhancing the monitoring intensity corresponding to the boosting operation process, reducing the possibility of minor problems of the steam boiler causing serious harm to the factory and workers, and to a great extent ensuring the environmental safety of the factory and the personal safety of the workers.

[0052] 2. The present invention monitors and analyzes the pre-steam connection process and the steam connection process corresponding to the steam boiler through a high-definition camera, a component detector, a first pressure gauge and a temperature sensor, thereby obtaining the pre-steam connection standard index and the steam connection standard index corresponding to the steam boiler, and then comprehensively analyzing to obtain the steam connection operation evaluation coefficient corresponding to the steam boiler, thereby conducting a targeted analysis of the steam connection operation process corresponding to the steam boiler, which not only makes up for the current deficiency of manual inspection and review, but also improves the reliability and credibility of the monitoring and analysis results of the boiler steam connection process, avoids the subjectivity and error caused by manual inspection and review, and provides strong data support for the steam boiler operation status monitoring to a large extent.

[0053] 3. The present invention monitors and analyzes the sewage discharge process corresponding to the steam boiler through a high-definition camera to obtain the sewage discharge operation evaluation coefficient corresponding to the steam boiler, which not only makes up for the waste of human and material resources caused by manual monitoring of the sewage discharge process of the steam boiler, but also greatly enhances the accuracy and scientific basis of the steam boiler sewage discharge status monitoring and analysis, making the steam boiler operation monitoring result more convincing. BRIEF DESCRIPTION OF THE DRAWINGS

[0054] The present invention is further described using the accompanying drawings, but the embodiments in the accompanying drawings do not constitute any limitation to the present invention. A person skilled in the art can obtain other drawings based on the following drawings without creative work.

[0055] Figure 1 It is a schematic diagram of the connection of the system modules of the present invention.

[0056] Figure 2 This is a connection diagram of the steam boiler boost monitoring and analysis module of the present invention.

[0057] Figure 3 It is a connection diagram of the steam boiler steam monitoring and analysis module of the present invention. DETAILED DESCRIPTION

[0058] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0059] Reference Figure 1 As shown, the present invention provides an online real-time monitoring and early warning cloud platform for industrial boiler operation based on artificial intelligence, including a steam boiler operation process acquisition module, a steam boiler boost monitoring and analysis module, a steam boiler steam parallel monitoring and analysis module, a steam boiler sewage monitoring and analysis module, an early warning analysis module, an early warning terminal and a data storage module.

[0060] The steam boiler operation process acquisition module is respectively connected to the steam boiler pressure boost monitoring and analysis module, the steam boiler steam parallel monitoring and analysis module and the steam boiler sewage monitoring and analysis module; the steam boiler pressure boost monitoring and analysis module is respectively connected to the early warning analysis module and the data storage module; the steam boiler steam parallel monitoring and analysis module is connected to the early warning analysis module; the steam boiler sewage monitoring and analysis module is connected to the early warning analysis module; and the early warning analysis module is connected to the early warning terminal.

[0061] The steam boiler operation process acquisition module is used to obtain the main operation process of the steam boiler, wherein the main operation process includes the boiler boosting operation process, the boiler steam parallel operation process and the boiler blowdown operation process.

[0062] Reference Figure 2 As shown, the steam boiler pressure boost monitoring and analysis module is used to monitor and analyze the pre-boosting process and the pressure boosting process corresponding to the steam boiler, thereby obtaining the pressure boosting operation evaluation coefficient corresponding to the steam boiler. The steam boiler pressure boost monitoring and analysis module includes a pre-boosting process monitoring and analysis unit, a pressure boosting process monitoring and analysis unit and a pressure boosting operation evaluation analysis unit.

[0063] As a further improvement of the present invention, the pre-pressurization process monitoring and analysis unit is used to monitor and analyze the pre-pressurization process corresponding to the steam boiler, and the specific monitoring and analysis steps are as follows:

[0064] A1: The detection points are evenly arranged on the steam boiler according to the preset method, and the temperature corresponding to each detection point on the steam boiler is detected by the temperature sensor to obtain the temperature corresponding to each detection point on the steam boiler, and the highest temperature and the lowest temperature are selected from them, which are recorded as T respectively. 高 and T 低 .

[0065] A2: Based on the formula The temperature uniformity index corresponding to the steam boiler is calculated, W is represented by the temperature uniformity index corresponding to the steam boiler, e is represented by the natural constant, T′ is represented by the set reference temperature value, a1 and a2 are represented by the influence factors corresponding to the set maximum temperature and minimum temperature respectively.

[0066] A3: The steam pressure inside the steam boiler is monitored by a first pressure gauge to obtain the internal steam pressure corresponding to the steam boiler, and the internal steam pressure corresponding to the steam boiler is compared with the set first standard steam pressure threshold. If the internal steam pressure corresponding to the steam boiler is equal to the first standard steam pressure threshold, after performing the corresponding flushing operation, the internal water level of the steam boiler is monitored in real time by a high-definition camera to obtain an internal water level image of the steam boiler, from which the internal water level corresponding to the steam boiler before and after the corresponding flushing operation is respectively obtained, which are recorded as G respectively. 前 and G 后 , and then comprehensively analyze it with the flushing time to obtain the corresponding water level growth rate inside the steam boiler, which is recorded as v.

[0067] It should be noted that the specific calculation formula for the water level growth rate inside the steam boiler is: t 冲洗 Indicates the flushing time corresponding to the steam boiler.

[0068] In a specific embodiment, if the water level growth rate is consistent with the set growth rate, it indicates that the water level meter is normal. Otherwise, it indicates that the water level meter is blocked and there is a hidden danger to operational safety.

[0069] A4: Based on the formula The water level growth matching index corresponding to the steam boiler is calculated, V is represented by the water level growth matching index corresponding to the steam boiler, v′ is represented by the set reference water level growth rate, Δv is represented by the set allowable water level growth rate difference, ΔG is represented by the set standard water level growth difference, a3 and a4 are represented by the set water level growth rate and the correction factor corresponding to the water level growth.

[0070] A5: Compare the internal steam pressure corresponding to the steam boiler with the set second standard steam pressure threshold. If the internal steam pressure corresponding to the steam boiler is equal to the second standard steam pressure threshold, after performing the corresponding flushing operation, obtain the corresponding steam pressure inside the steam boiler through the first pressure gauge, recorded as q, and at the same time read the steam pressure value of the second pressure gauge, recorded as q′.

[0071] It should be noted that the first pressure gauge is used to monitor the steam pressure parameters corresponding to the steam boiler, and the second pressure gauge is used to assist the first pressure gauge in calibration.

[0072] A6: Based on the formula The steam pressure matching index corresponding to the steam boiler is calculated, Q is represented by the steam pressure matching index corresponding to the steam boiler, Δq is represented by the preset allowable steam pressure difference, and a5 is represented by the correction factor corresponding to the preset steam pressure.

[0073] A7: A comprehensive analysis is performed on the temperature uniformity index, water level growth matching index and steam pressure matching index corresponding to the steam boiler to obtain the pre-boosting compliance index corresponding to the steam boiler. The specific calculation formula is δ=W*b1+V*b2+Q*b3, where δ represents the pre-boosting compliance index corresponding to the steam boiler, and b1, b2 and b3 represent the weight factors corresponding to the set temperature uniformity index, water level growth matching index and steam pressure matching index, respectively.

[0074] As a further improvement of the present invention, the monitoring and analysis unit in the pressure-boosting process is used to monitor and analyze the pressure-boosting process corresponding to the steam boiler, and the specific monitoring and analysis steps are as follows:

[0075] The internal steam pressure corresponding to the steam boiler is compared with the set working steam pressure. If the internal steam pressure corresponding to the steam boiler is equal to the set working steam pressure, the steam temperature corresponding to the steam boiler is monitored by the temperature sensor to obtain the steam temperature corresponding to the steam boiler, which is recorded as T 蒸汽 .

[0076] According to the formula Calculate the evaluation index of the heating time corresponding to the steam boiler, γ is the evaluation index of the heating time corresponding to the steam boiler, L 管道 , D represent the stored steam boiler pipe length and pipe diameter respectively, T′ 蒸汽 , L′ 管道 , D′ represent the set reference steam temperature, reference pipeline length, and reference pipeline diameter, respectively; b4, b5, and b6 represent the influencing factors corresponding to the set steam temperature, pipeline length, and pipeline diameter, respectively.

[0077] The pipe heating time evaluation index corresponding to the steam boiler is matched with the designated pipe heating time corresponding to various stored pipe heating time evaluation indexes to obtain the designated pipe heating time corresponding to the steam boiler, which is recorded as t′.

[0078] The heating time of the steam boiler is monitored by a high-definition camera, and the heating time of the steam boiler is obtained, which is recorded as t, and then according to the formula The pressure increase index corresponding to the steam boiler is calculated, ε is represented by the pressure increase index corresponding to the steam boiler, and Δt is represented by the stored allowable pipe heating time difference.

[0079] It should be noted that the monitoring of the pipe heating time corresponding to the steam boiler is mainly carried out by monitoring the time points when the workers perform the pipe heating operation and the time points after the pipe heating operation is completed through high-definition cameras, and then obtaining the pipe heating time corresponding to the steam boiler.

[0080] As a further improvement of the present invention, the boost operation evaluation and analysis unit is used to calculate the boost operation evaluation coefficient corresponding to the steam boiler, and the specific calculation formula is η=δ*c1+ε*c2, η is represented by the boost operation evaluation coefficient corresponding to the steam boiler, c1 and c2 are respectively represented by the weight factors corresponding to the set pre-boost compliance index and boost compliance index.

[0081] Reference Figure 3 As shown, the steam boiler steam parallel monitoring and analysis module is used to monitor and analyze the pre-steam parallel process and the steam parallel process corresponding to the steam boiler, thereby obtaining the steam parallel operation evaluation coefficient corresponding to the steam boiler, wherein the steam boiler steam parallel monitoring and analysis module includes a pre-steam parallel process monitoring and analysis unit, a steam parallel process monitoring and analysis unit and a steam parallel operation evaluation and analysis unit.

[0082] As a further improvement of the present invention, the pre-steam combination process monitoring and analysis unit is used to monitor and analyze the pre-steam combination process corresponding to the steam boiler, and the specific monitoring and analysis process is as follows:

[0083] The internal water level of the steam boiler during the pre-steaming process is monitored by a high-definition camera, and the internal water level of the steam boiler during the pre-steaming process is obtained, which is denoted as G 预并汽 .

[0084] The component types of steam corresponding to the steam boiler in the pre-steam process are detected by a component detector, and the content of each component type in the steam corresponding to the steam boiler is extracted, which is recorded as C i , i represents the number of each component type, i = 1, 2, ..., n, and at the same time, the number of component types in the steam corresponding to the steam boiler and the corresponding content of each component type are comprehensively analyzed to obtain the steam quality evaluation index corresponding to the steam boiler, which is recorded as Z.

[0085] It should be noted that the specific calculation formula for the steam quality evaluation coefficient corresponding to the steam boiler is: N represents the number of components in the steam corresponding to the steam boiler, N' represents the number of specified components, C' i It is expressed as the specified content of the i-th component type in the steam of the set steam boiler, ΔC i It is expressed as the specified content difference corresponding to the set i-th component type, τ1 and τ2 represent the influencing factors corresponding to the set number of component types and the content of component types, respectively.

[0086] The first pressure gauge is used to monitor the internal steam pressure of the steam boiler and the main steam pressure of the steam boiler during the pre-steaming process, which are respectively denoted as q 锅炉 and q 母管 .

[0087] According to the formula Calculate the pre-steam compliance index corresponding to the steam boiler, φ is represented by the pre-steam compliance index corresponding to the steam boiler, G′ 预并汽 It is expressed as the allowable water level of the steam boiler in the pre-steam process, ΔG 预并汽 It represents the set allowable water level difference, Z′ represents the reference steam quality evaluation index corresponding to the set steam boiler, and d1, d2, and d3 represent the influencing factors corresponding to the set water level, steam quality evaluation index, and steam pressure, respectively.

[0088] As a further improvement of the present invention, the monitoring and analysis unit in the steam paralleling process is used to monitor and analyze the steam paralleling process corresponding to the steam boiler, and the specific monitoring and analysis process is as follows:

[0089] The steam pressure of the steam boiler in the steam paralleling process is monitored by the first pressure gauge, and the steam pressure of the steam boiler in the steam paralleling process is obtained, which is recorded as q 蒸汽 ;

[0090] The internal water level of the steam boiler during the steam paralleling process is monitored by a high-definition camera, and the internal water level of the steam boiler during the steam paralleling process is obtained, which is denoted as G 并汽 ;

[0091] The steam temperature of the steam boiler in the steam paralleling process is monitored by the temperature sensor, and the steam temperature of the steam boiler in the steam paralleling process is obtained, which is recorded as T 并汽 ;

[0092] A comprehensive analysis is conducted on the steam pressure, internal water level and steam temperature of the steam boiler during the steam paralleling process to obtain the corresponding steam paralleling compliance index of the steam boiler, which is recorded as

[0093] It should be noted that according to the formula Calculate the steam boiler corresponding to the steam standard index, q′ 蒸汽 , G′ 并汽 , T′ 并汽 They are respectively expressed as the allowable steam pressure, allowable internal water level, and allowable steam temperature corresponding to the set steam paralleling process, Δq 蒸汽 , ΔG 并汽 , ΔT 并汽 They respectively represent the allowable steam pressure difference, allowable internal water level difference, and allowable steam temperature difference corresponding to the set steam paralleling process. d4, d5, and d6 respectively represent the influencing factors corresponding to the set steam pressure, internal water level, and steam temperature.

[0094] As a further improvement of the present invention, the parallel steam operation evaluation and analysis unit is used to calculate the parallel steam operation evaluation coefficient corresponding to the steam boiler, and its specific calculation formula is: λ represents the steam parallel operation evaluation coefficient corresponding to the steam boiler, c3 and c4 represent the weight factors corresponding to the set pre-steam parallel operation compliance index and steam parallel operation compliance index respectively.

[0095] The steam boiler blowdown monitoring and analysis module is used to monitor and analyze the boiler blowdown process corresponding to the steam boiler, thereby obtaining the blowdown operation evaluation coefficient corresponding to the steam boiler.

[0096] As a further improvement of the present invention, the boiler blowdown process corresponding to the steam boiler is monitored and analyzed, and the specific monitoring and analysis process is as follows:

[0097] The blowdown process corresponding to the steam boiler is monitored by a high-definition camera to obtain a blowdown process video corresponding to the steam boiler;

[0098] Extract the interval between the current blowdown operation and the last adjacent blowdown operation from the blowdown process video corresponding to the steam boiler, denoted as t 排污 ;

[0099] The number of intermittent discharges of the current discharge operation is extracted from the discharge process video corresponding to the steam boiler, and the discharge duration corresponding to each intermittent discharge is extracted, recorded as t j , j represents the number of each intermittent sewage discharge, j = 1, 2, ..., m;

[0100] Extract the sewage level corresponding to the steam boiler in each set time period during the current sewage operation process from the sewage discharge process video corresponding to the steam boiler, and record it as f represents the number of each set time period, f=1,2,......,x;

[0101] According to the formula Calculate the blowdown operation evaluation coefficient corresponding to the steam boiler, γ is expressed as the blowdown operation evaluation coefficient corresponding to the steam boiler, t′ 排污 ,t 0 Respectively represent the set standard sewage discharge operation interval and standard sewage discharge duration It is expressed as the standard sewage level corresponding to the steam boiler in the set time period f, ΔG 排污 It is represented by the set allowable sewage discharge level difference, and c5, c6, and c7 are respectively represented by the weight factors corresponding to the set sewage discharge operation interval, sewage discharge duration, and sewage discharge level.

[0102] The early warning analysis module is used to analyze the pressure-boosting operation evaluation coefficient, the steam-coupling operation evaluation coefficient and the sewage discharge operation evaluation coefficient corresponding to the steam boiler to obtain the early warning operation process.

[0103] As a further improvement of the present invention, the boost operation evaluation coefficient, the steam parallel operation evaluation coefficient and the sewage discharge operation evaluation coefficient corresponding to the steam boiler are analyzed, and the specific analysis steps are as follows:

[0104] The boost operation evaluation coefficient corresponding to the steam boiler is compared with the set boost operation evaluation coefficient threshold value. If the boost operation evaluation coefficient corresponding to the steam boiler is less than the boost operation evaluation coefficient threshold value, the boiler boost operation process is recorded as a warning operation process.

[0105] The parallel steam operation evaluation coefficient corresponding to the steam boiler is compared with the set parallel steam operation evaluation coefficient threshold value. If the parallel steam operation evaluation coefficient corresponding to the steam boiler is less than the parallel steam operation evaluation coefficient threshold value, the parallel steam operation process of the boiler is recorded as a warning operation process;

[0106] The sewage discharge operation assessment coefficient corresponding to the steam boiler is compared with the set sewage discharge operation assessment coefficient threshold. If the sewage discharge operation assessment coefficient corresponding to the steam boiler is less than the sewage discharge operation assessment coefficient threshold, the boiler sewage discharge operation process is recorded as a warning operation process.

[0107] The early warning terminal is used to issue corresponding early warnings based on the early warning operation process.

[0108] The data storage module is used to store the length and diameter of the steam boiler pipe, store the specified heating time corresponding to various heating time evaluation indexes, and store the allowable heating time difference.

[0109] The above contents are merely examples and explanations of the structure of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the structure of the invention or exceed the scope defined by the claims, they should all fall within the protection scope of the present invention.

Claims

1. An online real-time monitoring and early warning cloud platform for industrial boiler operation based on artificial intelligence, characterized in that: include: The steam boiler operation process acquisition module is used to acquire the main operation process of the steam boiler, wherein the main operation process includes the boiler boosting operation process, the boiler steam parallel operation process and the boiler blowdown operation process; The steam boiler pressure boost monitoring and analysis module is used to monitor and analyze the pre-boosting process and the pressure boosting process corresponding to the steam boiler, thereby obtaining the pressure boosting operation evaluation coefficient corresponding to the steam boiler. The steam boiler pressure boost monitoring and analysis module includes a pre-boosting process monitoring and analysis unit, a pressure boosting process monitoring and analysis unit, and a pressure boosting operation evaluation and analysis unit; The steam boiler steam paralleling monitoring and analysis module is used to monitor and analyze the pre-steam paralleling process and the steam paralleling process corresponding to the steam boiler, thereby obtaining the steam paralleling operation evaluation coefficient corresponding to the steam boiler, wherein the steam boiler steam paralleling monitoring and analysis module includes a pre-steam paralleling process monitoring and analysis unit, a steam paralleling process monitoring and analysis unit and a steam paralleling operation evaluation and analysis unit; The steam boiler blowdown monitoring and analysis module is used to monitor and analyze the boiler blowdown process corresponding to the steam boiler, thereby obtaining the blowdown operation evaluation coefficient corresponding to the steam boiler; The early warning analysis module is used to analyze the pressure-boosting operation evaluation coefficient, the steam-coupling operation evaluation coefficient and the sewage discharge operation evaluation coefficient corresponding to the steam boiler to obtain the early warning operation process; Early warning terminal, used to issue corresponding early warnings based on the early warning operation process; A data storage module, used to store the length and diameter of the steam boiler pipe, store the specified pipe heating time corresponding to various pipe heating time evaluation indexes, and store the allowable pipe heating time difference; The pre-pressurization process monitoring and analysis unit is used to monitor and analyze the pre-pressurization process corresponding to the steam boiler, and the specific monitoring and analysis steps are as follows: A1: The detection points are evenly arranged on the steam boiler according to the preset method, and the temperature corresponding to each detection point on the steam boiler is detected by the temperature sensor to obtain the temperature corresponding to each detection point on the steam boiler, and the highest temperature and the lowest temperature are selected and recorded as and ; A2: Based on the formula Calculate the temperature uniformity index corresponding to the steam boiler, It is expressed as the temperature uniformity index corresponding to the steam boiler, and e is expressed as a natural constant. Indicates the set reference temperature value, They represent the influence factors corresponding to the set maximum temperature and minimum temperature respectively; A3: The internal steam pressure of the steam boiler is monitored by a first pressure gauge to obtain the internal steam pressure corresponding to the steam boiler, and the internal steam pressure corresponding to the steam boiler is compared with the set first standard steam pressure threshold. If the internal steam pressure corresponding to the steam boiler is equal to the first standard steam pressure threshold, after performing the corresponding flushing operation, the internal water level of the steam boiler is monitored in real time by a high-definition camera to obtain an internal water level image of the steam boiler, from which the internal water level corresponding to the steam boiler before and after the corresponding flushing operation is respectively obtained, and recorded as and , and then comprehensively analyze it with the flushing time to obtain the corresponding water level growth rate inside the steam boiler, recorded as ; A4: Based on the formula Calculate the water level growth matching index corresponding to the steam boiler, It is expressed as the water level growth matching index corresponding to the steam boiler, Expressed as the growth rate of the set reference water level, It is expressed as the set allowable water level growth rate difference, It is expressed as the set standard water level growth difference, It is expressed as the set water level growth rate and the correction factor corresponding to the water level growth; A5: Compare the internal steam pressure corresponding to the steam boiler with the set second standard steam pressure threshold. If the internal steam pressure corresponding to the steam boiler is equal to the second standard steam pressure threshold, after performing the corresponding flushing operation, obtain the corresponding steam pressure inside the steam boiler through the first pressure gauge, and record it as , and read the steam pressure value of the second pressure gauge at the same time, recorded as ; A6: Based on the formula Calculate the steam pressure matching index corresponding to the steam boiler, It is expressed as the steam pressure matching index corresponding to the steam boiler, Expressed as the preset allowable steam pressure difference, Expressed as a correction factor corresponding to the preset steam pressure; A7: Comprehensively analyze the temperature uniformity index, water level growth matching index and steam pressure matching index corresponding to the steam boiler to obtain the pre-boosting compliance index corresponding to the steam boiler. The specific calculation formula is: , It is expressed as the pre-boost compliance index corresponding to the steam boiler. They are respectively expressed as the weight factors corresponding to the set temperature uniformity index, water level growth matching index, and steam pressure matching index; The monitoring and analysis unit in the pressure-boosting process is used to monitor and analyze the pressure-boosting process corresponding to the steam boiler, and the specific monitoring and analysis steps are as follows: The internal steam pressure corresponding to the steam boiler is compared with the set working steam pressure. If the internal steam pressure corresponding to the steam boiler is equal to the set working steam pressure, the steam temperature corresponding to the steam boiler is monitored by the temperature sensor to obtain the steam temperature corresponding to the steam boiler, which is recorded as ; According to the formula Calculate the heating time evaluation index corresponding to the steam boiler, It is expressed as the evaluation index of the heating time of the steam boiler. Respectively represent the stored steam boiler pipe length and pipe diameter, They represent the set reference steam temperature, reference pipe length, and reference pipe diameter respectively. They are respectively expressed as the influencing factors corresponding to the set steam temperature, pipeline length, and pipeline diameter; The pipe heating time evaluation index corresponding to the steam boiler is matched with the designated pipe heating time corresponding to various stored pipe heating time evaluation indexes to obtain the designated pipe heating time corresponding to the steam boiler, which is recorded as ; The heating time of the steam boiler is monitored by a high-definition camera, and the heating time of the steam boiler is obtained, which is recorded as , and then according to the formula Calculate the corresponding pressure rise index of the steam boiler. It is expressed as the pressure rise index corresponding to the steam boiler. Expressed as the difference in the allowed warm-up time for storage; The boost operation evaluation and analysis unit is used to calculate the boost operation evaluation coefficient corresponding to the steam boiler, and its specific calculation formula is: , It is expressed as the pressure-boosting operation evaluation coefficient corresponding to the steam boiler, They are respectively represented as weight factors corresponding to the set pre-boost target index and boost target index.

2. According to claim 1, an online real-time monitoring and early warning cloud platform for industrial boiler operation based on artificial intelligence is characterized by: The pre-steam process monitoring and analysis unit is used to monitor and analyze the pre-steam process corresponding to the steam boiler, and the specific monitoring and analysis process is as follows: The internal water level of the steam boiler during the pre-steaming process is monitored by a high-definition camera, and the internal water level of the steam boiler during the pre-steaming process is obtained, which is recorded as ; The component types of steam corresponding to the steam boiler in the pre-steam process are detected by a component detector, and the corresponding content of each component type in the steam corresponding to the steam boiler is extracted and recorded as , i represents the number of each component type, i=1,2,......,n, and the number of component types in the steam corresponding to the steam boiler and the corresponding content of each component type are comprehensively analyzed to obtain the steam quality evaluation index corresponding to the steam boiler, which is recorded as ; The first pressure gauge is used to monitor the internal steam pressure of the steam boiler and the main steam pressure of the steam boiler during the pre-steaming process, which are recorded as and ; According to the formula Calculate the pre-steam compliance index corresponding to the steam boiler, It is expressed as the pre-steam compliance index corresponding to the steam boiler, It is expressed as the allowable water level of the steam boiler in the pre-steam process. Expressed as the set allowable water level difference, It is expressed as the reference steam quality evaluation index corresponding to the set steam boiler. They are respectively represented by the influencing factors corresponding to the set water level, steam quality evaluation index, and steam pressure.

3. According to claim 2, an online real-time monitoring and early warning cloud platform for industrial boiler operation based on artificial intelligence is characterized by: The monitoring and analysis unit in the steam paralleling process is used to monitor and analyze the steam paralleling process corresponding to the steam boiler, and the specific monitoring and analysis process is as follows: The steam pressure of the steam boiler in the steam paralleling process is monitored by the first pressure gauge, and the steam pressure of the steam boiler in the steam paralleling process is obtained, which is recorded as ; The internal water level of the steam boiler during the steam paralleling process is monitored by a high-definition camera, and the internal water level of the steam boiler during the steam paralleling process is obtained, which is recorded as ; The steam temperature of the steam boiler in the steam parallel process is monitored by the temperature sensor, and the steam temperature of the steam boiler in the steam parallel process is obtained, which is recorded as ; A comprehensive analysis is conducted on the steam pressure, internal water level and steam temperature of the steam boiler during the steam paralleling process to obtain the corresponding steam paralleling compliance index of the steam boiler, which is recorded as .

4. According to claim 3, an online real-time monitoring and early warning cloud platform for industrial boiler operation based on artificial intelligence is characterized by: The parallel steam operation evaluation and analysis unit is used to calculate the parallel steam operation evaluation coefficient corresponding to the steam boiler, and its specific calculation formula is: , It is expressed as the evaluation coefficient of parallel steam operation corresponding to the steam boiler, They are respectively represented as the weight factors corresponding to the set pre-merger standard index and the merger standard index.

5. According to claim 4, an online real-time monitoring and early warning cloud platform for industrial boiler operation based on artificial intelligence is characterized by: The boiler blowdown process corresponding to the steam boiler is monitored and analyzed, and the specific monitoring and analysis process is as follows: The blowdown process corresponding to the steam boiler is monitored by a high-definition camera to obtain a blowdown process video corresponding to the steam boiler; The interval between the current blowdown operation and the last adjacent blowdown operation is extracted from the blowdown process video corresponding to the steam boiler and recorded as ; The number of intermittent discharges of the current discharge operation is extracted from the discharge process video corresponding to the steam boiler, and the discharge duration corresponding to each intermittent discharge is extracted and recorded as , j represents the number of each intermittent sewage discharge, j=1,2,......,m; Extract the sewage level corresponding to the steam boiler in each set time period during the current sewage discharge operation process from the sewage discharge process video corresponding to the steam boiler, and record it as , f represents the number of each set time period, f=1,2,......,x; According to the formula Calculate the blowdown operation evaluation coefficient corresponding to the steam boiler, It is expressed as the blowdown operation evaluation coefficient corresponding to the steam boiler, Respectively represent the set standard sewage discharge operation interval and standard sewage discharge duration It is expressed as the standard sewage level corresponding to the steam boiler in the set time period f, It is expressed as the set allowable sewage level difference, They are respectively represented as the weight factors corresponding to the set sewage discharge operation interval, sewage discharge duration, and sewage discharge level.

6. According to claim 1, an online real-time monitoring and early warning cloud platform for industrial boiler operation based on artificial intelligence is characterized by: The pressure-boosting operation evaluation coefficient, the steam-coupling operation evaluation coefficient and the sewage discharge operation evaluation coefficient corresponding to the steam boiler are analyzed, and the specific analysis steps are as follows: The boost operation evaluation coefficient corresponding to the steam boiler is compared with the set boost operation evaluation coefficient threshold value. If the boost operation evaluation coefficient corresponding to the steam boiler is less than the boost operation evaluation coefficient threshold value, the boiler boost operation process is recorded as a warning operation process. The parallel steam operation evaluation coefficient corresponding to the steam boiler is compared with the set parallel steam operation evaluation coefficient threshold value. If the parallel steam operation evaluation coefficient corresponding to the steam boiler is less than the parallel steam operation evaluation coefficient threshold value, the parallel steam operation process of the boiler is recorded as a warning operation process; The sewage discharge operation assessment coefficient corresponding to the steam boiler is compared with the set sewage discharge operation assessment coefficient threshold. If the sewage discharge operation assessment coefficient corresponding to the steam boiler is less than the sewage discharge operation assessment coefficient threshold, the boiler sewage discharge operation process is recorded as a warning operation process.

Citation Information

Patent Citations

  • Boiler Internet of Things monitoring system

    CN105721501A

  • Boiler multi-sensing compound data acquiring equipment based on internet of things

    CN106765029A

  • Boiler monitoring method and system based on Internet of Things

    CN107741008A

  • Boiler fault diagnosis method and system based on structural mechanism and operation data

    CN113011010A

  • Industrial boiler energy efficiency environment-friendly collaborative detection platform and method

    CN113757634A