Method, device and air conditioning system for removing air conditioning condensate

By acquiring and processing the collected amount of air-conditioning condensate in real time, and controlling the atomization equipment to process it when it reaches the preset amount, the problem of complex structure and inconvenient installation caused by the liquid level switch in the existing technology is solved, and the efficiency of the condensate removal equipment is improved. Reliability and stability.

CN115325689BActive Publication Date: 2024-10-29GREE ELECTRIC APPLIANCE INC OF ZHUHAI
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211110967.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-13
Publication Date
2024-10-29
Estimated Expiration
2042-09-13

AI Technical Summary

Technical Problem

The existing air-conditioning condensate removal device requires a liquid level switch to detect the water level, which results in a complex structure and inconvenient installation. It is also prone to overflow of condensate water and abnormal shutdown of the air-conditioning unit due to failure.

Method used

By obtaining the condensed water generated by the contact between indoor air and the evaporator surface in real time, the real-time collection amount is determined by using the condensed water collection time, and the atomization equipment is controlled to turn on for atomization when the preset amount is reached, thus avoiding dependence on the liquid level switch.

Benefits of technology

The structure of the condensate removal equipment is simplified, reliability is improved, and the risk of condensate water overflow and abnormal shutdown of the air conditioning unit is avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115325689B_ABST
    Figure CN115325689B_ABST
Patent Text Reader

Abstract

The present application provides a method, device and air conditioning system for removing air conditioning condensate, the method comprising: obtaining the real-time collection amount of condensate, the condensate is generated by the contact between indoor air and the surface of the evaporator, the evaporator and the condensate collection device are arranged at intervals in a preset direction, and the evaporator is located on one side of the condensate collection device, the condensate collection device is used to collect condensate, and the real-time collection amount of condensate is determined by the condensate collection time; when the real-time collection amount of condensate reaches a preset amount, the atomizing device is controlled to be turned on to remove the condensate, the atomizing device is located at the bottom of the condensate collection device, and is used to atomize the condensate. The present application solves the problem that the condensate removal device in the prior art needs to use a liquid level switch to detect the water level in the collection device to control the start and stop of the atomizing device, and the structure is complex and inconvenient to install.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of air conditioning technology, and in particular to a method and device for removing air conditioning condensate and an air conditioning system. Background Art

[0002] At present, air conditioners have been widely used in various occasions, and the requirements for air conditioners in some special occasions are becoming higher and higher. For example, in data centers and computer rooms where it is inconvenient to set up drainage pipes, air conditioners are required to have no condensation water discharge. Current air conditioners will produce a large amount of condensation water during operation. The existing condensation water treatment method generally adds condensation water collection and atomization devices. The condensation water removal device proposed in the prior art requires a liquid level switch (water level sensor) to detect the water level in the collection device to control the start and stop of the atomization device. The structure is complex and the installation is inconvenient. In addition, when the liquid level switch (sensor) fails, it is easy to cause condensation water overflow and the air conditioning unit to shut down abnormally. Summary of the invention

[0003] The main purpose of the present application is to provide a method, device and air-conditioning system for removing air-conditioning condensate, so as to solve the problem that the condensate removal device in the prior art needs to use a liquid level switch to detect the water level in the collection device to control the start and stop of the atomization device, and has a complex structure and is inconvenient to install.

[0004] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a method for removing air-conditioning condensation water is provided, the method comprising: obtaining a real-time collection amount of condensation water, the condensation water is generated by the contact between indoor air and the surface of an evaporator, the evaporator and the condensation water collection device are spaced apart in a preset direction, and the evaporator is located on one side of the condensation water collection device, the condensation water collection device is used to collect the condensation water, and the real-time collection amount of condensation water is determined by the condensation water collection time; when the real-time collection amount of condensation water reaches a preset amount, controlling atomization equipment to turn on to remove the condensation water, the atomization equipment is located at the bottom of the condensation water collection device, and is used to atomize the condensation water.

[0005] Optionally, obtaining the real-time collected amount of condensed water includes: an obtaining step of obtaining the temperature of the return air outlet of the air conditioner, the humidity of the return air outlet of the air conditioner and the surface temperature of the evaporator, and determining the return air dew point temperature according to the temperature of the return air outlet of the air conditioner and the humidity of the return air outlet of the air conditioner; a controlling step of controlling the timing cycle of the timer to add 1 when the return air dew point temperature of the air conditioner is greater than or equal to the surface temperature of the evaporator, so as to obtain the condensed water collection time, wherein one timing cycle corresponds to one sub-timing time; a determining step of determining that the real-time collected amount of condensed water reaches the preset amount when the condensed water collection time reaches a preset time, wherein the condensed water collection time is determined based on the timing cycle and the sub-timing time; a looping step of executing the obtaining step, the controlling step and the determining step in sequence at least once when the condensed water collection time does not reach the preset time, until the condensed water collection time reaches the preset time.

[0006] Optionally, obtaining the condensed water collection time includes: creating a timer; and using the timer to count to obtain the condensed water collection time.

[0007] Optionally, when the real-time collection amount of condensed water reaches a preset amount, after controlling the atomization device to turn on, the method also includes: receiving a feedback signal emitted by the atomization device, the feedback signal being a first level signal or a second level signal; when the first level signal is received, determining that the atomization device is capable of performing the atomization operation; when the second level signal is received, determining that the atomization device is unable to perform the atomization operation.

[0008] Optionally, when the second level signal is received, it is determined that the atomization device is unable to perform the atomization operation, including: determining whether the second level signal represents a water shortage alarm; when the second level signal represents a water shortage alarm and the number of times the second level signal is received within a preset time period reaches a predetermined number, it is determined that a mechanical failure of the atomization device occurs.

[0009] Optionally, when receiving the second level signal, after determining that the atomization device cannot perform the atomization operation, the method further includes: sending a prompt message to a display device to display the prompt message on the display device, wherein the prompt message is used to prompt that the atomization device cannot perform the atomization operation.

[0010] Optionally, the atomization device is located inside the condensate collection device.

[0011] According to another aspect of the present application, a device for removing air-conditioning condensed water is provided, the device comprising an acquisition unit and a removal unit, the acquisition unit being used to acquire a real-time collected amount of condensed water, the condensed water being generated by contact between indoor air and the surface of an evaporator, the evaporator and a condensed water collecting device being spaced apart in a preset direction, and the evaporator being located on one side of the condensed water collecting device, the condensed water collecting device being used to collect the condensed water, and the real-time collected amount of condensed water being determined by the condensed water collection time; the removal unit being used to control an atomizing device to turn on to remove the condensed water when the real-time collected amount of condensed water reaches a preset amount, the atomizing device being located at the bottom of the condensed water collecting device, and being used to atomize the condensed water.

[0012] According to another aspect of the present application, an air-conditioning system is provided, including a compressor, an evaporator, a condensation water removal device and a controller, wherein the condensation water removal device includes: a condensation water collection device and an atomization device; the condensation water collection device is used to collect the condensation water generated by the evaporator; the atomization device is used to atomize the condensation water; the controller communicates with the compressor, the evaporator and the condensation water removal device respectively, and the controller is used to execute any one of the methods described.

[0013] Optionally, no liquid level switch or water level sensor is installed in the condensate removal equipment.

[0014] By applying the technical solution of the present application, in the method of removing air-conditioning condensed water of the present application, first, condensed water generated by the contact between indoor air and the surface of the evaporator is obtained in real time, and then, when the real-time collected amount of condensed water reaches a preset amount, the atomizing device located at the bottom of the condensed water collecting device is controlled to be turned on, and the condensed water is atomized to remove the condensed water; compared with the condensed water removal device in the prior art, which requires a liquid level switch to detect the water level in the collection device to control the start and stop of the atomizing device, has a complex structure and is inconvenient to install, the real-time collected amount of condensed water of the present application is determined by the condensed water collection time, and there is no need to add a liquid level switch to detect the water level in the collection device to control the start and stop of the atomizing device. When the real-time collected amount of condensed water reaches a preset amount, the atomizing device is controlled to be turned on to remove the condensed water, thereby ensuring that the structure of the condensed water removal device is relatively simple, further avoiding the overflow of condensed water in the condensed water removal device, and making the condensed water removal device of the present application have higher reliability. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The drawings constituting part of the present application are used to provide a further understanding of the present application. The exemplary embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0016] Figure 1A schematic flow chart of a method for removing condensed water from an air conditioner according to an embodiment of the present application is shown;

[0017] Figure 2 A schematic diagram of a method for obtaining the real-time collection amount of condensed water according to an embodiment of the present application is shown;

[0018] Figure 3 A schematic diagram of a device for removing condensed water from an air conditioner according to an embodiment of the present application is shown;

[0019] Figure 4 A schematic diagram of a specific process for removing condensed water from air conditioners according to an embodiment of the present application is shown;

[0020] Figure 5 A schematic structural diagram of an air conditioning system according to an embodiment of the present application is shown.

[0021] The above drawings include the following reference numerals:

[0022] 10. Compressor; 11. Evaporator; 12. Condensate removal equipment; 121. Condensate collection equipment; 122. Atomization equipment; 13. Controller. DETAILED DESCRIPTION

[0023] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0024] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0025] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0026] It should be understood that when an element (such as a layer, film, region, or substrate) is described as being "on" another element, the element may be directly on the other element, or there may be intermediate elements. Moreover, in the specification and claims, when an element is described as being "connected" to another element, the element may be "directly connected" to the other element, or "connected" to the other element through a third element.

[0027] As introduced in the background technology, the condensation water removal device in the prior art needs to use a liquid level switch to detect the water level in the collection device to control the start and stop of the atomization device. The structure is complex and the installation is inconvenient. To solve the above problems, the embodiments of the present application provide a method, device and air-conditioning system for removing air-conditioning condensation water.

[0028] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0029] Example 1

[0030] According to an embodiment of the present invention, a method embodiment for removing condensed water from air conditioners is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0031] Figure 1 FIG. 1 is a flow chart of a method for removing air conditioning condensate according to an embodiment of the present application. Figure 1 As shown, the method comprises the following steps:

[0032] Step S101, obtaining the real-time collection amount of condensed water, the condensed water is generated by the contact between indoor air and the surface of the evaporator, the evaporator and the condensed water collecting device are spaced apart in a preset direction, and the evaporator is located on one side of the condensed water collecting device, the condensed water collecting device is used to collect the condensed water, and the real-time collection amount of condensed water is determined by the condensed water collection time.

[0033] Specifically, in one embodiment, the evaporator mentioned above in the present application is located above the condensate collection device. With the horizontal plane as the reference, the positional relationship between the evaporator and the condensate collection device can be described in more detail as follows: the ratio of the projection of the evaporator on the condensate collection device to the total projection of the evaporator on the horizontal plane is greater than a preset value, wherein the preset value is specifically set to 0.9, which further ensures that the condensate collection device mentioned above in the present application can collect as much condensate generated on the surface of the evaporator as possible. Of course, the preset value mentioned above in the present application is not limited to 0.9 mentioned above in the present application, and those skilled in the art can flexibly set it according to actual conditions.

[0034] In another embodiment, the evaporator is connected to a water receiving pan directly below, and one end of the water receiving pan is connected to a water receiving conduit. Condensed water generated on the surface of the evaporator drops into the water receiving pan and flows into the condensed water collection device of the present application through the water receiving conduit, thereby ensuring that the condensed water generated in the air conditioner can be collected, avoiding overflow of the condensed water and causing abnormal shutdown of the air conditioning unit.

[0035] In step S101 of the present application, the specific process of obtaining the real-time collection amount of condensed water is as follows: Figure 2 As shown, the specific process is as follows:

[0036] Step S1011, an acquisition step, acquiring the temperature of the return air outlet of the air conditioner, the humidity of the return air outlet of the air conditioner, and the surface temperature of the evaporator, and determining the return air dew point temperature according to the temperature of the return air outlet of the air conditioner and the humidity of the return air outlet of the air conditioner;

[0037] Step S1012, a control step, in which, when the return air dew point temperature of the air conditioner is greater than or equal to the surface temperature of the evaporator, the timing cycle of the control timer is increased by 1 to obtain the condensed water collection time, wherein one timing cycle corresponds to one sub-timing time;

[0038] Step S1013, a determination step, in which, when the condensed water collection time reaches a preset time, it is determined that the real-time condensed water collection amount reaches the preset amount, wherein the condensed water collection time is determined according to the timing cycle and the sub-timing time;

[0039] Step S1014, a loop step, when the condensed water collection time does not reach the preset time, the acquisition step, the control step and the determination step are sequentially executed at least once until the condensed water collection time reaches the preset time.

[0040] Specifically, the condensation water collection time of the present application is equal to the product of the timing cycle and the sub-timing time. A sub-timing time corresponding to the above-mentioned timing cycle can be set to 1 minute. Of course, the above-mentioned sub-timing time is not limited to the above-mentioned 1 minute in the present application. Technical personnel in this field can flexibly set it according to actual conditions.

[0041] The present application compares the obtained return air dew point temperature of the air conditioner and the surface temperature of the evaporator, and when the return air dew point temperature of the air conditioner is greater than or equal to the surface temperature of the evaporator, determines that this moment is the moment when condensed water is generated, controls the timing cycle of the counter to increase by 1, and records the collection time of the generated condensed water until the collection time of the condensed water reaches a predetermined time. The collection time of the condensed water determines whether the condensed water has reached a preset amount, thereby ensuring that the condensed water collection device of the present application does not need to add a liquid level switch or a water level sensor, and can also measure the collection amount of condensed water.

[0042] Specifically, the method for obtaining the condensed water collection time in this application includes:

[0043] Step S10131, creating a timer;

[0044] Step S10132: Use the above-mentioned timer to measure time to obtain the above-mentioned condensed water collection time.

[0045] The timer created by step S10131 controls the timing period of the timer to increase by 1 when the air conditioner meets the requirement of generating condensed water, and records the collection time of the condensed water, to ensure that the collection amount of the condensed water can be determined based on the collection time of the condensed water later. Compared with the prior art, the present application reduces the liquid level detection components, has a simpler structure and lowers the cost.

[0046] Step S1014, determining the real-time collection amount of the condensed water according to the condensed water collection time.

[0047] In another optional embodiment, the present application determines the moment when the return air dew point temperature of the air conditioner is greater than or equal to the surface temperature of the evaporator, determines the moment as the moment when condensed water is generated, records the collection time of the condensed water, and determines the real-time collection amount of condensed water when the collection time of the condensed water reaches the preset time, thereby ensuring that the present application can accurately measure the collection amount of condensed water without adding a liquid level switch or a water level sensor. Specifically, the above-mentioned preset time of the present application can be set to 6 hours. Of course, the above-mentioned preset time of the present application is not limited to the above-mentioned 6 hours, and technical personnel in this field can flexibly set it according to actual conditions.

[0048] Step S102, when the real-time collection amount of the above-mentioned condensed water reaches a preset amount, control the atomization device to turn on to remove the above-mentioned condensed water, and the above-mentioned atomization device is located at the bottom of the above-mentioned condensed water collection device, and is used to atomize the above-mentioned condensed water.

[0049] The atomizing device needs to be immersed in water to start normally, so the present application locates the atomizing device inside the condensate collecting device and at the bottom of the condensate collecting device to ensure that the amount of condensate collected can be accurately measured.

[0050] Specifically, the above-mentioned preset amount of the present application is set to 30% of the capacity of the condensate collection device. Of course, the above-mentioned preset amount of the present application is not limited to 30% of the above-mentioned capacity of the present application, and technical personnel in this field can flexibly set it according to actual conditions.

[0051] In the method for removing air-conditioning condensate water of the present application, first, condensate water generated by the contact between indoor air and the evaporator surface is obtained in real time. Then, when the real-time collected amount of condensate water reaches a preset amount, the atomizing device located at the bottom of the condensate collecting device is controlled to be turned on, and the condensate water is atomized to remove the condensate water. Compared with the condensate removal device in the prior art, which requires a liquid level switch to detect the water level in the collection device to control the start and stop of the atomizing device, the structure is complex and the installation is inconvenient, the real-time collected amount of condensate water of the present application is determined by the condensate collection time, and there is no need to add a liquid level switch to detect the water level in the collection device to control the start and stop of the atomizing device. When the real-time collected amount of condensate water reaches a preset amount, the atomizing device is controlled to be turned on to remove the condensate water, thereby ensuring that the structure of the condensate removal device is relatively simple, further avoiding the overflow of condensate water in the condensate removal device, and making the condensate removal device of the present application have higher reliability.

[0052] In the present application, when the real-time collected amount of condensed water reaches a preset amount, after controlling the atomization device to start, the method further includes:

[0053] Step S201, receiving a feedback signal sent by the atomization device, wherein the feedback signal is a first level signal or a second level signal;

[0054] Step S202, when receiving the first level signal, determining that the atomization device can perform an atomization operation;

[0055] Step S203: upon receiving the second level signal, determining that the atomization device is unable to perform the atomization operation.

[0056] It should be noted that, in the present application, the above-mentioned first level signal is a high level, and the second level signal is a low level. The above-mentioned atomization device can feedback a high level when it can atomize normally, and feedback a low level when the atomization device lacks water or stops atomizing. Of course, the present application can also be set to feedback a low level when the atomization device can atomize normally, and feedback a high level when the atomization device lacks water or stops atomizing. Technical personnel in this field can flexibly set it according to actual conditions.

[0057] In the above method of the present application, the working status of the atomization device can be known in time through the feedback signal of the atomization device, thereby avoiding abnormal operation of the air-conditioning unit.

[0058] In an optional embodiment, step S203 of the present application includes:

[0059] Step S2031, determining whether the second level signal indicates a water shortage alarm;

[0060] Step S2032, when the second level signal represents a water shortage alarm and the number of times the second level signal is received within a preset time period reaches a predetermined number of times, it is determined that a mechanical failure occurs in the atomizing device, wherein the mechanical failure includes damage to the internal circuit of the atomizing device, end of service life of the material, broken wiring, etc.

[0061] In another optional embodiment, when receiving the above-mentioned second level signal, after determining that the above-mentioned atomization device cannot perform the above-mentioned atomization operation, the above-mentioned method also includes: sending a prompt information to the display device to display the above-mentioned prompt information on the above-mentioned display device, and the above-mentioned prompt information is used to prompt that the atomization device cannot perform the atomization operation.

[0062] Specifically, when the atomizing device of the present application feeds back a second level signal indicating a water shortage alarm for more than a predetermined number of times after startup, it is determined that the atomizing device has failed, and a prompt message indicating that the atomizing device cannot perform atomizing operation is sent to the display device, so that the display device displays the above prompt message, further ensuring that the present application can remove condensed water more accurately and avoid condensed water overflow, which would cause abnormal shutdown of the air-conditioning unit.

[0063] In another optional embodiment, Figure 3 As shown, the present application obtains the temperature value and humidity value of the return air outlet of the air conditioner and the temperature value of the evaporator surface after the compressor of the air conditioner is started, determines the return air dew point temperature of the air conditioner, compares the return air dew point temperature value and the evaporator surface temperature value, and obtains the collection time of condensed water when the return air dew point temperature is greater than or equal to the evaporator surface temperature. Specifically, when the return air dew point temperature is greater than or equal to the evaporator surface temperature, it is determined that condensed water starts to be generated, and a timer is created to record it as the initial time of condensed water collection. The above counter periodically obtains the temperature of the return air outlet, the humidity of the return air outlet of the air conditioner and the evaporator surface temperature, and then The return air dew point temperature is calculated for comparison. If the conditions for generating condensed water are met, the cycle is increased by 1. If not met, the cycle remains unchanged. This is a cycle. When the condensed water collection time reaches the preset time, it is determined that the collected condensed water reaches the preset amount, and the atomizing device is started. After receiving the start signal, the atomizing device sends a feedback signal. When the signal fed back by the atomizing device is a first level signal, it indicates that the atomizing device can normally atomize the condensed water. When the signal fed back by the atomizing device is a second level signal, it indicates that the atomizing device cannot normally atomize the condensed water, and the recorded condensed water collection time needs to be reset to zero and retested.

[0064] Example 2

[0065] and Figure 1 Corresponding to the method shown, the embodiment of the present application also provides a device for removing air-conditioning condensed water. It should be noted that the device for removing air-conditioning condensed water in the embodiment of the present application can be used to execute the method for removing air-conditioning condensed water provided in the embodiment of the present application. The device for removing air-conditioning condensed water provided in the embodiment of the present application is introduced below.

[0066] Figure 4 Schematic diagram of a device for removing air conditioning condensate according to an embodiment of the present application. Figure 4 As shown, the device includes an acquisition unit 01 and a removal unit 02. The acquisition unit 01 is used to acquire the real-time collection amount of condensed water. The condensed water is generated by the contact between indoor air and the surface of the evaporator. The evaporator and the condensed water collecting device are spaced apart in a preset direction, and the evaporator is located on one side of the condensed water collecting device. The condensed water collecting device is used to collect the condensed water. The real-time collection amount of condensed water is determined by the condensed water collection time. The removal unit 02 is used to control the atomization device to turn on to remove the condensed water when the real-time collection amount of condensed water reaches a preset amount. The atomization device is located at the bottom of the condensed water collecting device and is used to atomize the condensed water.

[0067] In the device for removing air-conditioning condensate water of the present application, condensate water generated by the contact between indoor air and the evaporator surface is obtained in real time through an acquisition unit. Through the removal unit, when the real-time collected condensate water reaches a preset amount, the atomizing device located at the bottom of the condensate collecting device is controlled to be turned on, and the condensate water is atomized to remove the condensate water. Compared with the condensate removal device in the prior art, which requires a liquid level switch to detect the water level in the collection device to control the start and stop of the atomizing device, has a complex structure and is inconvenient to install, the real-time collected condensate water of the present application is determined by the condensate collection time, and there is no need to add a liquid level switch to detect the water level in the collection device to control the start and stop of the atomizing device. When the real-time collected condensate water reaches a preset amount, the atomizing device is controlled to be turned on to remove the condensate water, thereby ensuring that the structure of the condensate removal device is relatively simple, further avoiding the overflow of condensate water in the condensate removal device, and making the condensate removal device of the present application have higher reliability.

[0068] Based on the device provided in the above embodiment, the acquisition unit of the device includes:

[0069] A first acquisition module is used to acquire the temperature of the return air outlet of the air conditioner, the humidity of the return air outlet of the air conditioner and the surface temperature of the evaporator, and determine the return air dew point temperature according to the temperature of the return air outlet of the air conditioner and the humidity of the return air outlet of the air conditioner; a control module is used to control the timing cycle of the timer to add 1 when the return air dew point temperature of the air conditioner is greater than or equal to the surface temperature of the evaporator, so as to acquire the condensate collection time, wherein one timing cycle corresponds to one sub-timing time; a first determination module is used to determine that the real-time collection amount of the condensate reaches the preset amount when the condensate collection time reaches the preset time, wherein the condensate collection time is determined according to the timing cycle and the sub-timing time; a circulation module is used to execute the acquisition step, the control step and the determination step at least once in sequence when the condensate collection time does not reach the preset time until the condensate collection time reaches the preset time.

[0070] Based on the device provided in the above embodiment, the control module of the device includes: a creation submodule, which is used to create a timer; and an acquisition submodule, which is used to use the above timer to perform timing to obtain the above condensed water collection time.

[0071] Based on the device provided in the above embodiment, when the real-time collected amount of condensed water reaches a preset amount, after the atomization device is controlled to be turned on, the device further includes:

[0072] The receiving unit is used to receive a feedback signal sent by the atomization device, wherein the feedback signal is a first level signal or a second level signal; the first determining unit is used to determine that the atomization device can perform the atomization operation when the first level signal is received; and the second determining unit is used to determine that the atomization device cannot perform the atomization operation when the second level signal is received.

[0073] Based on the device provided in the above embodiment, the second determining unit includes:

[0074] The second determination module is used to determine whether the above-mentioned second level signal represents a water shortage alarm; the third determination module is used to determine that the above-mentioned atomization device has a mechanical failure when the above-mentioned second level signal represents a water shortage alarm and the number of times the above-mentioned second level signal is received within a preset time period reaches a predetermined number of times.

[0075] Based on the device provided in the above embodiment, the device further includes a sending unit, which is used to send prompt information to the display device so as to display the prompt information on the display device, and the prompt information is used to prompt that the atomization device cannot perform the atomization operation.

[0076] Example 3

[0077] According to an embodiment of the present application, a computer-readable storage medium is provided, and the computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the method for removing air-conditioning condensed water.

[0078] Step S101, obtaining a real-time collection amount of condensed water, the condensed water is generated by the contact between indoor air and the surface of the evaporator, the evaporator and the condensed water collecting device are arranged at intervals in a preset direction, and the evaporator is located on one side of the condensed water collecting device, the condensed water collecting device is used to collect the condensed water, and the real-time collection amount of condensed water is determined by the condensed water collection time;

[0079] Step S102, when the real-time collection amount of the above-mentioned condensed water reaches a preset amount, control the atomization device to turn on to remove the above-mentioned condensed water, and the above-mentioned atomization device is located at the bottom of the above-mentioned condensed water collection device, and is used to atomize the above-mentioned condensed water.

[0080] Example 4

[0081] An embodiment of the present invention provides an air conditioning system, such as Figure 5 As shown, it includes a compressor 10, an evaporator 11, a condensed water removal device 12 and a controller 13, wherein the condensed water removal device 12 includes: a condensed water collecting device 121 and an atomizing device 122; the condensed water collecting device 121 is used to collect the condensed water generated by the evaporator 11; the atomizing device 122 is used to atomize the condensed water; the controller 13 is respectively connected to the compressor 10, the evaporator 11 and the condensed water removal device 12, and the controller is used to execute any one of the above methods.

[0082] The air-conditioning system of the present application includes a compressor, an evaporator, a condensation water removal device and a controller. The above-mentioned controller is used to execute any one of the above-mentioned methods for removing condensation water of the air conditioner. First, the condensation water generated by the contact between the indoor air and the surface of the evaporator is obtained in real time. Then, when the real-time collection amount of the condensation water reaches a preset amount, the atomizing device located at the bottom of the condensation water collection device is controlled to be turned on, and the condensation water is atomized to remove the condensation water. Compared with the condensation water removal device in the prior art, which needs to use a liquid level switch to detect the water level in the collection device to control the start and stop of the atomizing device, the structure is complex and the installation is inconvenient, the real-time collection amount of the condensation water of the present application is determined by the condensation water collection time, and there is no need to add a liquid level switch to detect the water level in the collection device to control the start and stop of the atomizing device. When the real-time collection amount of the condensation water reaches a preset amount, the atomizing device is controlled to be turned on to remove the condensation water, thereby ensuring that the structure of the condensation water removal device is relatively simple, further avoiding the overflow of condensation water in the condensation water removal device, and making the condensation water removal device of the present application have higher reliability.

[0083] The devices in this article can be servers, PCs, PADs, mobile phones, etc.

[0084] Example 5

[0085] The present application also provides a computer program product, which, when executed on a data processing device, is suitable for executing a program for initializing at least the following method steps:

[0086] Step S101, obtaining a real-time collection amount of condensed water, the condensed water is generated by the contact between indoor air and the surface of the evaporator, the evaporator and the condensed water collecting device are arranged at intervals in a preset direction, and the evaporator is located on one side of the condensed water collecting device, the condensed water collecting device is used to collect the condensed water, and the real-time collection amount of condensed water is determined by the condensed water collection time;

[0087] Step S102, when the real-time collection amount of the above-mentioned condensed water reaches a preset amount, control the atomization device to turn on to remove the above-mentioned condensed water, and the above-mentioned atomization device is located at the bottom of the above-mentioned condensed water collection device, and is used to atomize the above-mentioned condensed water.

[0088] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0089] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0090] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0091] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0092] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0093] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0094] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0095] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0096] From the above description, it can be seen that the above embodiments of the present application achieve the following technical effects:

[0097] 1) In the method for removing air-conditioning condensate water of the present application, first, condensate water generated by the contact between indoor air and the surface of the evaporator is obtained in real time, and then, when the real-time collected amount of condensate water reaches a preset amount, the atomizing device located at the bottom of the condensate collecting device is controlled to be turned on, and the condensate water is atomized to remove the condensate water; compared with the condensate removal device in the prior art, which requires a liquid level switch to detect the water level in the collection device to control the start and stop of the atomizing device, the structure is complex and the installation is inconvenient, the real-time collected amount of condensate water of the present application is determined by the condensate collection time, and there is no need to add a liquid level switch to detect the water level in the collection device to control the start and stop of the atomizing device. When the real-time collected amount of condensate water reaches a preset amount, the atomizing device is controlled to be turned on to remove the condensate water, thereby ensuring that the structure of the condensate removal device is relatively simple, further avoiding the overflow of condensate water in the condensate removal device, and making the condensate removal device of the present application have higher reliability.

[0098] 2) In the device for removing air-conditioning condensate water of the present application, the condensate water generated by the contact between indoor air and the evaporator surface is obtained in real time through the acquisition unit. Through the removal unit, when the real-time collection amount of condensate water reaches a preset amount, the atomizing device located at the bottom of the condensate collection device is controlled to be turned on, and the condensate water is atomized to remove the condensate water. Compared with the condensate removal device in the prior art, which requires a liquid level switch to detect the water level in the collection device to control the start and stop of the atomizing device, the structure is complex and the installation is inconvenient, the real-time collection amount of condensate water of the present application is determined by the condensate collection time, and there is no need to add a liquid level switch to detect the water level in the collection device to control the start and stop of the atomizing device. When the real-time collection amount of condensate water reaches a preset amount, the atomizing device is controlled to be turned on to remove the condensate water, thereby ensuring that the structure of the condensate removal device is relatively simple, further avoiding the overflow of condensate water in the condensate removal device, and making the condensate removal device of the present application have higher reliability.

[0099] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A method for removing condensed water from air conditioners, characterized in that: include: Obtaining a real-time collection amount of condensed water, wherein the condensed water is generated by contact between indoor air and the surface of an evaporator, wherein the evaporator and a condensed water collecting device are spaced apart in a preset direction, and wherein the evaporator is located above the condensed water collecting device, and the condensed water collecting device is used to collect the condensed water, wherein the real-time collection amount of condensed water is determined by the condensed water collection time, wherein a ratio of a projection of the evaporator on the condensed water collecting device to a total projection of the evaporator on a horizontal plane is greater than a preset value; When the real-time collected amount of condensed water reaches a preset amount, controlling the atomizing device to start to remove the condensed water, the atomizing device being located at the bottom of the condensed water collecting device and being used to atomize the condensed water; Among them, obtaining the real-time collection amount of condensed water includes: An acquisition step, acquiring the temperature of the return air outlet of the air conditioner, the humidity of the return air outlet of the air conditioner, and the surface temperature of the evaporator, and determining the return air dew point temperature according to the return air outlet temperature of the air conditioner and the humidity of the return air outlet of the air conditioner; A control step, when the return air dew point temperature of the air conditioner is greater than or equal to the surface temperature of the evaporator, controlling the timing cycle of the timer to add 1 to obtain the condensed water collection time, wherein one timing cycle corresponds to one sub-timing time; A determining step, when the condensed water collection time reaches a preset time, determining that the real-time condensed water collection amount reaches the preset amount, wherein the condensed water collection time is determined according to the timing cycle and the sub-timing time; A cycle step, when the condensed water collection time does not reach the preset time, the acquisition step, the control step and the determination step are executed at least once in sequence until the condensed water collection time reaches the preset time.

2. The method according to claim 1, characterized in that Get the condensate collection time, including: Create a timer; The timer is used to measure time to obtain the condensed water collection time.

3. The method according to claim 1, characterized in that When the real-time collected amount of condensed water reaches a preset amount, after controlling the atomization device to start, the method further includes: receiving a feedback signal sent by the atomization device, wherein the feedback signal is a first level signal or a second level signal; In case of receiving the first level signal, determining that the atomization device is capable of performing an atomization operation; When the second level signal is received, it is determined that the atomization device cannot perform the atomization operation.

4. The method according to claim 3, characterized in that In the case of receiving the second level signal, determining that the atomization device cannot perform the atomization operation includes: determining whether the second level signal represents a water shortage alarm; When the second level signal indicates a water shortage alarm and the number of times the second level signal is received within a preset time period reaches a predetermined number, it is determined that a mechanical failure occurs in the atomization device.

5. The method according to claim 3, characterized in that: In the case of receiving the second level signal, after determining that the atomization device cannot perform the atomization operation, the method further includes: The prompt information is sent to the display device so as to display the prompt information on the display device, wherein the prompt information is used to prompt that the atomization device cannot perform the atomization operation.

6. The method according to any one of claims 1 to 5, characterized in that The atomizing device is located inside the condensed water collecting device.

7. A device for removing condensed water from air conditioners, characterized in that: include: an acquisition unit, for acquiring a real-time collection amount of condensed water, wherein the condensed water is generated by contact between indoor air and a surface of an evaporator, wherein the evaporator and a condensed water collection device are spaced apart in a preset direction, and wherein the evaporator is located on one side of the condensed water collection device, wherein the condensed water collection device is used to collect the condensed water, and wherein the real-time collection amount of condensed water is determined by a condensed water collection time, wherein a ratio of a projection of the evaporator on the condensed water collection device to a total projection of the evaporator on a horizontal plane is greater than a preset value; A removal unit, used to control the atomization device to start when the real-time collection amount of the condensed water reaches a preset amount, so as to remove the condensed water, wherein the atomization device is located at the bottom of the condensed water collection device and is used to atomize the condensed water; Wherein, the acquisition unit includes a first acquisition module, a control module, a first determination module, and a circulation module, wherein the first acquisition module is used to execute the acquisition step, acquire the temperature of the return air outlet of the air conditioner, the humidity of the return air outlet of the air conditioner, and the surface temperature of the evaporator, and determine the return air dew point temperature according to the return air outlet temperature of the air conditioner and the humidity of the return air outlet of the air conditioner; the control module is used to execute the control step, and when the return air dew point temperature of the air conditioner is greater than or equal to the surface temperature of the evaporator, the timing cycle of the control timer is increased by 1 to obtain the condensed water collection time, wherein one timing cycle corresponds to one sub-timing time; the first determination module is used to execute the determination step, and when the condensed water collection time reaches the preset time, it is determined that the real-time condensed water collection amount reaches the preset amount, wherein the condensed water collection time is determined according to the timing cycle and the sub-timing time; the circulation module is used to execute the circulation step, and when the condensed water collection time does not reach the preset time, the acquisition step, the control step, and the determination step are executed at least once in sequence until the condensed water collection time reaches the preset time.

8. An air conditioning system, characterized in that: include: compressor; Evaporator; Condensate removal equipment, the condensate removal equipment comprising: a condensate collection device and an atomization device; the condensate collection device is used to collect the condensate generated by the evaporator; the atomization device is used to atomize the condensate; A controller communicates with the compressor, the evaporator and the condensed water removal equipment respectively, and the controller is used to execute the method described in any one of claims 1 to 6.

9. The air conditioning system according to claim 8, characterized in that: The condensate removal device is not equipped with a liquid level switch or a water level sensor.

Citation Information

Patent Citations

  • Condensate water treatment method of kitchen air conditioner and kitchen air conditioner

    CN112484247A

  • Non draining humidifying energy saving air conditioner

    CN2903761Y