Pulse jet flow rate adjustment device, adjustment method, and program
By using pressure sensors and storage processing of optimal pressure/filling time in the pulse jet flow adjustment device, the pulse jet method is optimized, and the problem of extended response time is solved, and fast and stable gas flow adjustment is achieved, suitable for high-temperature conditions .
Patent Information
- Application Number
- CN202180025151.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2020-03-30
- Filing Date
- 2021-03-02
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2041-03-02
AI Technical Summary
When the existing pulse jet flow adjustment device performs repeated pulse jetting, the response time becomes longer, making it difficult to quickly adjust the gas flow to the target flow.
In the pulse jet flow adjustment device, the pressure difference of the gas filling container is measured by using a pressure sensor, the opening and closing actions of the first and second stop valves are adjusted, and the pulse jet mode is optimized, combined with the storage processing of the optimal pressure and filling time. To improve the responsiveness of flow adjustments.
The response time from gas flow to target flow is significantly shortened, the stability and responsiveness of flow adjustment are improved, and the gas flow can be effectively controlled under high temperature conditions.
Smart Images

Figure CN115362426B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a pulse jet flow rate adjustment device, a pulse jet flow rate adjustment method, and a program for adjusting the volume flow rate of a gas. Background Art
[0002] In the past, in order to accurately control the gas flow rate in the gas supply system of semiconductor manufacturing equipment, for example, a thermal mass flow controller was used. However, in recent years, high-temperature gases above 100°C have become the control targets. Thermal mass flow controllers cannot cope with the control of such high-temperature gases.
[0003] For example, Patent Document 1 discloses a pulse jet flow control device capable of controlling the flow of high temperature gas. The pulse jet flow control device includes: a first stop valve connected to a gas source; a second stop valve connected to the first stop valve; a gas-filled container disposed between the first stop valve and the second stop valve; a pressure sensor for measuring the pressure of the gas-filled container; and a controller.
[0004] Controllers for pulse jet flow control devices, such as Figure 5 As shown, pulse injection is repeatedly performed, and the pulse injection causes the second stop valve to open and close after the first stop valve is opened and closed, and the controller uses a pressure sensor to change the filling time of the gas to maintain the opening action of the first stop valve in the next pulse injection according to the pressure difference D1 between the pressure of the gas filling container filled with gas after the first stop valve is opened and closed (pressure after filling) P1 and the pressure of the gas filling container discharged from the second stop valve after the second stop valve is opened and closed (pressure after discharge) P2, thereby changing the form of the pulse injection and adjusting the gas flow rate to the target flow rate.
[0005] Existing patent documents
[0006] Patent Documents
[0007] Patent Document 1: Japanese Patent No. 4197648 Summary of the invention
[0008] Problems to be solved by the present invention
[0009] However, there is a problem in the prior art. That is, in the conventional pulse jet type flow control device, for example, when the pulse jet is repeatedly performed to repeatedly supply gas, the gas use conditions may be different in each process. On the other hand, the conventional pulse jet type flow control device sets the initial pulse jet method of each process to be the same, and Figure 6As shown in FIG. 1 , the pulse jetting method is gradually changed according to the pressure difference D1 in the pulse jetting. Therefore, the conventional pulse jetting flow rate control device has a long response time from the start of the treatment to the adjustment of the gas flow rate to the target flow rate.
[0010] The present invention is used to solve the above problem, and aims to provide a technology that can improve the responsiveness of a pulse jet flow rate adjustment device that controls the flow rate of a gas to a target flow rate by repeatedly performing pulse jets.
[0011] Technical means of solving problems
[0012] One embodiment of the present invention has the following structure: (1) a pulse jet flow rate adjustment device, characterized in that it comprises: a first stop valve connected to a gas source; a second stop valve connected to the first stop valve; a gas filling container between the first stop valve and the second stop valve; and a pressure sensor for measuring the pressure of the gas filling container; performing a process of controlling the gas to a target flow rate multiple times; connecting the first stop valve, the second stop valve and the pressure sensor to a controller so as to be able to communicate, and the controller controls the operation of the pulse jet flow rate adjustment device; the controller performs a flow control process in each process, the flow control process repeatedly performs pulse jetting, and the pulse jet opens and closes the second stop valve after opening and closing the first stop valve, and calculates the volume flow rate of the gas discharged from the gas filling container based on the post-filling pressure and the post-discharge pressure, and the post-filling pressure is adjusted when the first stop valve is opened and closed. The pressure sensor is used to measure the post-discharge pressure after the gas filling container is filled with gas by opening and closing the second stop valve, and the post-discharge pressure is measured by the pressure sensor after the gas is discharged from the gas filling container by opening and closing the second stop valve. On the other hand, the volume flow rate is adjusted to the target flow rate by changing the method of repeating the pulse injection; the controller executes an optimal pressure storage process to store the post-filling pressure as the optimal pressure, and the post-filling pressure is measured by the pressure sensor when the pulse injection for adjusting the volume flow rate to the target flow rate has been performed in the flow control process; the controller executes a pressure control process, and the pressure control process is a process after the optimal pressure storage process has been performed. After the pressure of the gas filling container is controlled to the optimal pressure stored in the optimal pressure storage process before the initial pulse injection is performed, the second stop valve is opened and closed.
[0013] The pulse jet flow control device of the structure described above uses the post-filling pressure when the volume flow rate has been adjusted to the target flow rate in a certain process as the optimal pressure. In the subsequent processes, before the initial pulse jet is performed, the pressure of the gas filling container is controlled to the optimal pressure, and then the second stop valve is opened and closed. Therefore, the groove becomes the same as the state of the pulse jet in which the volume flow rate has been controlled to the target flow rate. Therefore, in the initial pulse jet, regardless of the change in the original pressure of the gas source, etc., the groove can be filled with gas in the same manner as when the volume flow rate has been adjusted to the target flow rate, and the possibility of adjusting the volume flow rate to the target flow rate is high. Therefore, if the flow control device of the structure described above is used, the response time from the start of the process to the stabilization of the gas flow rate at the target flow rate is shortened, and the responsiveness can be improved.
[0014] (2) In the pulse jet flow control device described in item (1), preferably, the optimal pressure storage process is performed in the first process after the power is turned on; and the pressure control process is performed before the initial pulse jet of the second or subsequent processes after the power is turned on.
[0015] The pulse jet flow rate control device having the above structure can improve the responsiveness in each process after the power is turned on by performing the optimum pressure storage process in the first process.
[0016] (3) In the pulse jet flow rate adjustment device described in item (2), preferably, the controller performs the optimal pressure storage process during the flow rate control process immediately after the pressure control process to update the optimal pressure.
[0017] In the pulse jet flow rate control device having the above structure, the optimum pressure is updated in each process. Since the optimum pressure becomes a value reflecting the disturbance, the possibility that the volume flow rate can be adjusted to the target flow rate or a value close to the target flow rate in the first pulse jet becomes higher.
[0018] (4) In the pulse injection flow control device described in any one of (1) to (3), preferably, the controller performs an optimal filling time storage process in the flow control process, and the optimal filling time storage process measures the opening action duration of the first stop valve during each pulse injection, and stores the opening action duration when the pulse injection that adjusts the volume flow to the target flow has been performed as the optimal filling time; further, the controller performs a filling time control process in the flow control process performed after the execution of the optimal filling time storage process when the initial pulse injection is performed, and the filling time control process uses the optimal filling time stored in the optimal filling time storage process to open and close the first stop valve.
[0019] In the pulse jet flow regulating device of the above structure, since it not only controls the pressure before processing but also controls the first stop valve according to the optimal filling time at the initial pulse jet of each processing, the probability of adjusting the volume flow rate to the target flow rate or a value close to the target flow rate from the initial pulse jet becomes higher, thereby improving the responsiveness.
[0020] (5) In the pulse jet flow rate adjustment device described in item (4), preferably, the optimal filling time storage process and the optimal pressure storage process are performed in the same process.
[0021] The pulse jet flow rate regulating device of the structure described above can save gas or time by storing the optimal pressure and the optimal filling time in the same process, eliminating the need to store the optimal filling time in a test mode different from the process.
[0022] (6) In the pulse jet flow control device described in item (4) or (5), preferably, the optimal filling time is stored during the first processing after the power is turned on, and is used in the second processing after the power is turned on.
[0023] In the pulse jet flow rate control device having the above structure, the optimum filling time storage process is performed in the first process after the power is turned on, so that the responsiveness can be improved in each process after the second time.
[0024] (7) In the pulse jet flow rate adjustment device described in any one of items (4) to (6), preferably, the controller performs the optimal filling time storage processing in the flow rate control processing during the filling time control processing to update the optimal filling time.
[0025] In the pulse jet flow rate control device with the above structure, by updating the optimal filling time at various locations, the optimal filling time becomes a value reflecting the disturbance, so the probability that the volume flow rate can be adjusted to the target flow rate or a value close to the target flow rate in the initial pulse jet becomes higher.
[0026] Another aspect of the present invention, (8) a pulse jet flow rate adjustment method, characterized in that: the pulse jet flow rate adjustment device is used to control the gas to a target flow rate for multiple times, and in each process, the following steps are performed, and the pulse jet flow rate adjustment device has: a first stop valve for connecting to a gas source; a second stop valve for connecting to the first stop valve; a gas filling container between the first stop valve and the second stop valve; and a pressure sensor for measuring the pressure of the gas filling container; and a controller connected to the first stop valve, the second stop valve and the pressure sensor to communicate with each other to control the action; a flow control step, repeatedly performing pulse jets, and the pulse jet causes the second stop valve to open and close after the first stop valve opens and closes, and the volume flow of the gas discharged from the gas filling container is calculated based on the post-filling pressure and the post-discharge pressure, and the filling The after-pressure is measured by the pressure sensor after the gas filling container is filled with gas by opening and closing the first stop valve, and the after-discharge pressure is measured by the pressure sensor after the gas is discharged from the gas filling container by opening and closing the second stop valve. On the other hand, the volume flow rate is adjusted to a target flow rate by changing the method of repeating the pulse injection; an optimal pressure storage step of storing the after-filling pressure as an optimal pressure, and the after-filling pressure is measured by the pressure sensor when the pulse injection for adjusting the volume flow rate to the target flow rate is performed in the flow control processing; and a pressure control step of performing a pressure control processing, and the pressure control processing is a processing after the processing of the optimal pressure storage processing, and the pressure of the gas filling container is controlled to the optimal pressure stored in the optimal pressure storage processing before the initial pulse injection is performed.
[0027] Furthermore, another aspect of the present invention relates to (9) a program installed in a controller for controlling the operation of a pulse jet flow control device, wherein the pulse jet flow control device comprises: a first stop valve connected to a gas source; a second stop valve connected to the first stop valve; a gas filling container between the first stop valve and the second stop valve; and a pressure sensor for measuring the pressure of the gas filling container; the program is characterized in that: when the pulse jet flow control device performs a process of controlling the gas to a target flow rate multiple times, a flow control process is executed in each process, and the flow control process repeatedly performs pulse jets, and the pulse jet opens and closes the second stop valve after the first stop valve is opened and closed, and the volume flow rate of the gas discharged from the gas filling container is calculated based on the post-filling pressure and the post-discharge pressure, and the post-filling pressure is when the first stop valve is opened and closed. The pressure sensor is used to measure the post-discharge pressure after the gas filling container is filled with gas by performing an opening and closing action, and the post-discharge pressure is measured by the pressure sensor after the gas is discharged from the gas filling container by performing an opening and closing action on the second shut-off valve. On the other hand, the volume flow rate is adjusted to a target flow rate by changing the way the pulse injection is repeated; the controller is caused to execute an optimal pressure storage process for storing the post-filling pressure as an optimal pressure, and the post-filling pressure is measured by the pressure sensor when the flow control process has performed a pulse injection for adjusting the volume flow rate to the target flow rate; and further, the controller is caused to execute a pressure control process, and the pressure control process is a process after the optimal pressure storage process has been executed, and before the initial pulse injection is performed, the pressure of the gas filling container is controlled to the optimal pressure stored in the optimal pressure storage process.
[0028] Effects of the Invention
[0029] According to the present invention, a pulse jet flow rate control device that controls the flow rate of a gas to a target flow rate by repeatedly performing pulse jets can be realized, thereby improving the responsiveness. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 is a schematic diagram of the structure of a pulse jet flow rate adjustment device according to an embodiment of the invention;
[0031] Figure 2 is a diagram illustrating pulse injection;
[0032] Figure 3 This is a conceptual diagram that explains flow rate changes and pressure changes;
[0033] Figure 4 is a flow chart illustrating the procedure of flow control processing;
[0034] Figure 5 It is a sequence diagram of an existing pulse jet flow regulating device;
[0035] Figure 6 This is a flow control diagram of an existing pulse jet flow control device.
[0036] Description of Reference Numerals
[0037] 1: Pulse jet flow adjustment device
[0038] 11: First stop valve
[0039] 12: Slot
[0040] 13: Second stop valve
[0041] 14: Pressure sensor
[0042] 15: Controller DETAILED DESCRIPTION
[0043] Hereinafter, embodiments of the pulse jet flow rate adjustment device, the pulse jet flow rate adjustment method, and the program according to the present invention will be described with reference to the accompanying drawings.
[0044] Schematic diagram of the pulse jet flow control device
[0045] like Figure 1 As shown, in this embodiment, the present invention is applied to a pulse jet flow rate control device (hereinafter referred to as a “flow rate control device”) for controlling the flow rate of gas supplied to the chamber 230 .
[0046] The chamber 230 is set to a vacuum environment by, for example, a vacuum pump 240, and then an atomic layer deposition (ALD) method is used to form a predetermined film on the wafer. In ALD, the film thickness of the film formed on the wafer can be adjusted in units of 0.1 μm by repeating the cycle of (a) introduction of a raw material gas, (b) flushing with an inert gas, (c) introduction of a reaction gas, and (D) flushing with an inert gas.
[0047] In ALD, different types of gases solidify when mixed. Therefore, a pipe 200 connected to a source gas source 211 of a raw gas, a pipe 300 connected to a source gas source 311 of a reaction gas, and a pipe 400 connected to a source gas source 411 of an inert gas are separately connected to the chamber 230 .
[0048] In addition, the raw material gas is, for example, TMA (Trimethyl Alumium). The reaction gas is, for example, H2O (water vapor). The inert gas is, for example, N2 gas. TAM is a solid material at room temperature, and is vaporized when supplied to the chamber 230 to become a high-temperature gas of more than 120°C.
[0049] When ALD is used for film formation, the supply amount of various gases is managed according to the supply time. In addition, in ALD, for example, the above-mentioned cycle (a) to (c) is repeated hundreds of times for each wafer. In this case, the supply time of (a) and (c) for supplying TMA and H2O to the chamber 230 is tens of milliseconds (msec), respectively, and the supply time (flushing time) of (b) and (d) for supplying N2 gas to the chamber 230 is several seconds (sec) to tens of seconds (sec), respectively. Therefore, the gas supplied to the chamber 230 needs to be controlled with high precision, high frequency and high speed. Therefore, flow adjustment devices 1A, 1B, 1C are arranged in the pipes 200, 300, 400, and the aforementioned flow adjustment devices 1A, 1B, 1C control the flow by opening and closing the first stop valve 11 and the second stop valve 13 alternately.
[0050] One side reference Figure 1 , the structure of the flow control device 1 is specifically described. Since the flow control devices 1A to 1C have the same structure, the following description will describe the flow control device 1A installed in the pipe 200. When no special distinction is made, they are collectively referred to as "flow control devices 1".
[0051] The flow control device 1 includes a first stop valve 11, a groove 12, a second stop valve 13 and a pressure sensor 14. The first stop valve 11 is arranged on the upstream side of the groove 12 and is connected to a pressurized gas source 211. The second stop valve 13 is arranged on the downstream side of the groove 12 and is connected to a chamber 230 set to a vacuum environment. The groove 12 becomes a closed space by closing the first stop valve 11 and the second stop valve 13. The groove 12 of this embodiment has a volume of, for example, 5 to 1000cc. The groove 12 is an example of a "gas-filled container". In addition, the groove 12 can also be replaced by a gas-filled container formed by piping. The pressure sensor 14 is a vacuum pressure gauge for high temperatures. The filter 16 is arranged on the upstream side of the first stop valve 11 and removes foreign matter from the gas flowing into the flow control device 1.
[0052] The first stop valve 11 and the second stop valve 13 are air pressure operated on-off valves. Moreover, the first stop valve 11 and the second stop valve 13 are valves that can be controlled even in high temperature gas above 120°C. In addition, the first stop valve 11 and the second stop valve 13 use high-speed valves that can perform opening and closing actions in, for example, a few milliseconds. Furthermore, the diameter of the valve used in the piping is generally one-quarter inch of the piping diameter. However, the first stop valve 11 and the second stop valve 13 are selected, for example, as stop valves with a diameter of three-eighths of the piping diameter, so that the Cv value becomes larger. The Cv value of the first stop valve 11 and the second stop valve 13 is, for example, 0.6. In this way, by arranging the first stop valve 11 and the second stop valve 13, which have a large Cv value and can operate at high speed and high frequency, on the upstream and downstream sides of the groove 12, the flow control device 1 suppresses the pulsation associated with the opening and closing actions of the first stop valve 11 and the second stop valve 13. In addition, the gas of the flow control device 1 flows more easily than that of a thermal mass flow controller having a throttle portion, and the gas can be quickly supplied to the chamber 230 .
[0053] During the process, the flow control device 1 repeatedly performs pulse injection at a high speed while controlling the gas to a target flow rate, and the aforementioned pulse injection causes the second stop valve 13 to open and close after the first stop valve 11 is opened and closed. In this patent specification, "target flow rate" is defined as the volume flow rate of the gas discharged from the second stop valve 13 per unit time. Therefore, the flow control device 1 is arranged near the cavity 230. For example, the second stop valve 13 is connected to the cavity 230 directly or via a pipe less than 2m. In addition, the first stop valve 11 and the second stop valve 13 are not limited to pneumatic opening and closing valves, and can also be electromagnetic opening and closing valves.
[0054] The flow rate regulating device 1 of this embodiment is controlled in operation by a controller 15. The controller 15 is communicably connected to the first stop valve 11, the second stop valve 13, and the pressure sensor 14. The controller 15 is an example of a "controller".
[0055] The controller 15 is a well-known microcomputer, and includes a CPU 21 and a memory 22. The memory 22 includes a non-volatile memory and a volatile memory. The CPU 21 temporarily stores data in the memory 22 while executing a program stored in the memory 22 to perform various processes.
[0056] For example, in the memory 22, there is a control program 31, which is used to control the operation of the flow control device 1. The control program 31 obtains the optimal pressure in a certain process, controls the pressure of the tank 12 to the optimal pressure before the next process, and then performs the flow control process for the next process. The flow control process will be described later. In addition, the control program 31 is an example of a "program".
[0057] In addition, data used by the control program 31 is stored in the non-volatile memory of the memory 22. For example, the memory 22 stores an optimal pressure, which indicates the pressure that is most suitable for adjusting the volume flow rate to the target flow rate. In addition, for example, the memory 22 stores an optimal filling time, which indicates the filling time that is most suitable for adjusting the volume flow rate to the target flow rate. The optimal pressure and the optimal filling time may store initial values when the control program 31 is installed, or may be blank. In addition, the optimal pressure and the optimal filling time may be set to blank when the power of the flow control device 1 is turned on or off. The optimal pressure and the optimal filling time are updated at any time when the processing is executed.
[0058] The controller 15 further includes a timing unit 23 for measuring time and a communication interface 24 (hereinafter referred to as "communication IF24") for controlling communication with the outside. The controller 15 is connected to the main controller 500 via the communication IF24 so as to be communicable, and the main controller 500 controls the operation of the semiconductor manufacturing device. The controller 15 can be connected to the main controller 500 by wire or wirelessly.
[0059] In such a flow control device 1, the filter 16, the first stop valve 11, the second stop valve 13, the pressure sensor 14, and the controller 15 are connected to each other and are built in a housing (not shown), thereby unitizing. In this case, the flow control device 1 is easy to handle, and there is no need to perform wiring work other than connecting the communication IF 24 to the main controller 500.
[0060] However, the controller 15 may also be assembled in an external controller such as the main controller 500 and located outside a housing (not shown). In addition, for example, by loading the control program 31 into the main controller 500, the main controller 500 may have the function of the controller 15, thereby making the main controller 500 a "controller for controlling the operation of the flow control device".
[0061] Pulse jet
[0062] Next, the pulse injection performed by the flow rate control device 1 will be described. Figure 2 2 is a diagram for explaining pulse injection. The flow control device 1 regards the period from the opening of the first stop valve 11 to the next opening of the first stop valve 11 as one cycle of pulse injection, and repeats the pulse injection. For example, when ALD is used to form a film on a wafer, the above-mentioned cycle (a) to (d) is repeated hundreds of times for a single wafer. In this case, for example, in the process of (a), TMA is supplied to the chamber 230 for tens of milliseconds each time.
[0063] In each pulse injection, the second stop valve 13 is closed, and the first stop valve 11 is opened, and the groove is filled with gas supplied from the gas source 211. When the first stop valve 11 is closed, the groove 12 becomes a sealed space that restricts the entry and exit of gas. Then, when the second stop valve 13 is opened and closed, the gas filled in the groove 12 is discharged from the second stop valve 13 and supplied to the cavity 230. The groove 12 is supplied with gas only from the first stop valve 11. Therefore, when the discharge time t3 for maintaining the opening action of the second stop valve 13 is fixed, the flow control device 1 can change the volume flow rate of the gas discharged from the second stop valve 13 by changing the filling time t1 for maintaining the opening action of the first stop valve 11.
[0064] The flow rate regulating device 1 adjusts the filling time t1 for each pulse injection according to the pressure difference between the post-filling pressure P1 and the post-discharging pressure P2, wherein the post-filling pressure P1 represents the pressure of the groove 12 after filling with gas, and the post-discharging pressure P2 represents the pressure of the groove 12 after discharging gas.
[0065] That is, the flow control device 1 measures the pressure of the tank 12 using the pressure sensor 14 after the first stop valve 11 is closed and before the second stop valve 13 is opened, and obtains the post-filling pressure P1. When the first stop valve 11 is closed, a response delay occurs. In addition, the pressure of the tank 12 immediately after the first stop valve 11 is closed is unstable due to adiabatic compression. Therefore, the flow control device 1 obtains the post-filling pressure P1 after the first stabilization time t2 has passed after the first stop valve 11 is closed.
[0066] In addition, the flow control device 1 measures the pressure of the groove 12 using the pressure sensor 14 after the second stop valve 13 is closed and before the first stop valve 11 is opened, and obtains the post-discharge pressure P2. When the second stop valve 13 is closed, a response delay occurs. In addition, the pressure of the groove 12 immediately after the second stop valve 13 is closed is unstable due to adiabatic compression. Therefore, the flow control device 1 obtains the post-discharge pressure P2 when the second stabilization time t4 has passed after the second stop valve 13 is closed.
[0067] The flow control device 1 calculates the current volume flow rate of the gas based on the pressure difference between the post-filling pressure P1 and the post-discharging pressure P2 obtained in this way. Then, the flow control device 1 adjusts the filling time t1 used in the next pulse injection based on the difference between the target flow rate of the gas indicated by the main controller 500 and the calculated current volume flow rate of the gas, thereby changing the pulse injection method.
[0068] When the volume flow rate of the flow control device 1 is less than the target flow rate, for example, the filling time t1 of the next pulse injection is lengthened. As a result, the gas filled into the slot 12 during the next pulse injection increases, and the volume flow rate increases. On the other hand, when the volume flow rate of the flow control device 1 is greater than the target flow rate, the filling time t1 of the next pulse injection is shortened. As a result, the gas filled into the slot 12 during the next pulse injection decreases, and the volume flow rate decreases. Furthermore, when the volume flow rate is consistent with the target flow rate, the filling time t1 of the next pulse injection is made the same as that of this pulse injection. As a result, the gas filled into the slot 12 during the next pulse injection is the same as that of this pulse injection, and the volume flow rate is maintained.
[0069] In the case of pulse injection, the pressure of the tank 12 will be uneven when the gas filling starts. If the filling time t1 is the same, the pressure P1 after filling will be uneven depending on the pressure at the beginning of the gas filling, and it will take time to adjust the volume flow rate to the target flow rate.
[0070] Therefore, in this method, for example Figure 3 As shown, the post-filling pressure P1 when the volume flow rate of the gas is adjusted to the target flow rate in a certain process is regarded as the optimal pressure Px and stored in the memory 22 (refer to the Y1 part). Before the initial pulse injection in the process performed after the aforementioned process, the pressure of the groove 12 is controlled to the optimal pressure (refer to the Y2 part), and the gas is discharged (refer to the Y3 part). As a result, in the initial pulse injection, the pressure of the groove 12 at the beginning of filling with gas will be the same as that in the case of the pulse injection in which the volume flow rate has been adjusted to the target flow rate. Therefore, in each process, the volume flow rate of the gas is not adjusted to the target flow rate in a stepwise manner from the beginning of the process, but the gas required to adjust the volume flow rate to the target flow rate is filled into the groove 12 at one time from the initial pulse injection, and the pressure of the groove 12 can be adjusted (refer to the Y4 part). Therefore, in each process, the gas is controlled to the target flow rate from the initial pulse injection and can be supplied to the cavity 230, thereby improving the responsiveness (refer to the Y5 part).
[0071] Operation description of pulse jet flow control device: control processing
[0072] Next, the procedure of flow rate control by the flow rate regulating device 1 will be described in detail. Figure 4 Flow control device 1 is a flowchart showing the flow control process. When the power is turned on, CPU 21 starts control program 31 and executes Figure 4 The flow control process shown.
[0073] The CPU 21 first determines whether a flow control start instruction has been received (S101). For example, the main controller 500 transmits a flow control start instruction to the flow control device 1A, and the process of supplying TMA to the chamber 230 starts. When the main controller 500 finishes film formation of a layer of a wafer, it transmits a flow control end instruction to the flow control device 1A, and ends the process. In addition, when the flow control device 1 has an operating unit, the CPU 21 receives a flow control start instruction or a flow control end instruction via the operating unit.
[0074] When the flow control start command is not received from the main controller 500, the CPU 21 of the flow control device 1 determines that the flow control start command is not accepted (S101: No) using the communication IF 24. In this case, the CPU 21 does not start the process but remains on standby.
[0075] On the other hand, when the flow control start command transmitted from the main controller 500 is received by the CPU 21, for example, using the communication IF 24, the CPU 21 determines that the flow control start command has been accepted (S101: Yes). In this case, after the power is turned on, the CPU 21 determines whether it is the first processing (S103). The CPU 21 has a function of counting the number of processing executed from the time the power is turned on to the time the power is turned off (hereinafter referred to as "processing execution number"), and the CPU 21 resets the processing execution number when the power is turned on or off, and counts the processing execution number each time the flow control start command is accepted. When the processing execution number is "1", the CPU 21 determines that it is the first process after the power is turned on (S103: Yes).
[0076] The CPU 21, which has determined that it is the first process, fills the tank 12 with gas (S105). That is, the first stop valve 11 and the second stop valve 13 are closed when the flow control start command is received. Therefore, the CPU 21 causes the first stop valve 11 to perform an opening action. The CPU 21 uses the timing unit 23 to measure the time for maintaining the opening action of the first stop valve 11 (hereinafter referred to as the "first opening action maintenance time"). The CPU 21 maintains the opening action of the first stop valve 11 until the first opening action maintenance time becomes the filling time t1. The filling time t1 of the first pulse injection of the first process is, for example, substituted into the optimal filling time tx stored in the memory 22. In addition, the aforementioned filling time t1 is a fixed value pre-recorded in the program control 31, or a variable value automatically set according to the target flow rate. In addition, the filling time t1 can also be a time received from the main controller 500, or a variable value of time input via the operating unit when the flow control device 1 has an operating unit. When the CPU 21 detects that the filling time t1 has passed using the timing unit 23, the first stop valve 11 performs a closing action. The CPU 21 resets the timer 23 simultaneously with the completion of gas filling.
[0077] The CPU 21 that has completed the filling of the gas determines whether the pressure of the tank 12 has stabilized (S107). That is, the CPU 21 determines whether the first stabilization time t2 has passed. In this form, the discharge time t3 and the second stabilization time t4 are set to fixed values. In addition, the pulse injection is set to a fixed value. Therefore, by determining the filling time t1, the first stabilization time t2 is automatically determined. After the CPU 21 closes the first stop valve 11, it uses the timing unit 23 to start measuring time. When the time measured by the timing unit 23 does not reach the first stabilization time t2, the CPU 21 determines that the pressure of the tank 12 is not stable (S107: No), and waits.
[0078] On the other hand, when the time measured by the timer 23 reaches the first stable time t2, the CPU 21 determines that the pressure of the tank 12 has stabilized (S107: Yes). Then, the CPU 21 obtains the post-filling pressure P1 (S109). That is, the CPU 21 uses the pressure sensor 14 to measure the pressure of the tank 12 when the first stable time t2 has passed, and temporarily stores the measured pressure in the memory 22 as the post-filling pressure P1.
[0079] The CPU 21 having obtained the post-filling pressure P1 discharges gas from the second stop valve 13 (S111). That is, after the CPU 21 obtains the post-filling pressure P1, it immediately opens the second stop valve 13. Moreover, the CPU 21 maintains the second stop valve 13 in an open state during the discharge time t3. The chamber 230 is set to a vacuum environment by the vacuum pump 240, and the pressure is lower than that of the groove 12. Therefore, the gas filled in the groove 12 is discharged from the groove 12 to the chamber 230 side at the same time as the opening action of the second stop valve 13. The discharge time t3 is predetermined as described above. The CPU 21 uses the timing unit 23 to measure the second opening action maintenance time, which is the time for maintaining the opening action of the second stop valve 13. The CPU 21 maintains the opening action of the second stop valve 13 until the second opening action maintenance time becomes the discharge time t3. When the discharge time t3 has passed, the CPU 21 closes the second stop valve 13 to end the discharge of the gas. The CPU 21 resets the timing unit 23 at the same time as the end of the discharge of the gas.
[0080] The CPU 21 that has finished discharging the gas determines whether the pressure of the tank 12 has stabilized (S113). That is, the CPU 21 determines whether the second stabilization time t4 has passed. After closing the second stop valve 13, the CPU 21 uses the timing unit 23 to start measuring time. If the time measured by the timing unit 23 does not reach the second stabilization time t4, the CPU 21 determines that the pressure is unstable and waits (S113: No).
[0081] On the other hand, when the time measured by the timer 23 reaches the second stable time t4, the CPU 21 determines that the pressure has stabilized (S113: Yes). Then, the CPU 21 obtains the post-discharge pressure P2 (S115). That is, the CPU 21 uses the pressure sensor 14 to measure the pressure of the groove 12 when the second stable time t4 has passed, and temporarily stores the measured pressure in the memory 22 as the post-discharge pressure P2.
[0082] Then, CPU 21 calculates the volume flow rate QA of the gas discharged from second stop valve 13 by the pulse injection (S117). For example, flow control device 1 uses equation 1 below to obtain the volume flow rate QA of the gas discharged from second stop valve 13 per unit time.
[0083] Mathematical formula 1
[0084] Volume flow rate = discharge volume × number of pulse injections
[0085] The number of pulse injections is determined by the processing time and the pulse injection cycle. The discharge volume is obtained according to the following mathematical formula 2. ΔP is the pressure difference. P is the atmospheric pressure (101.3 kPa). V is the container with groove 12 (cc). T is the fluid temperature (°C). T is the temperature of the gas supplied to the chamber 230.
[0086] Mathematical formula 2
[0087] Discharge volume = ΔP / P×V×273 / (273+T)
[0088] ΔP: Pressure difference = (P1-P2) [kPa]
[0089] P: atmospheric pressure = 101.3 [kPa]
[0090] V: container of the slot [cc]
[0091] T: Fluid temperature [℃]
[0092] In the flow control device 1, P and V are predetermined values. In addition, for example, when T is set to 20°C, the discharge amount is calculated by converting it from 20°C. The pressure difference ΔP is the difference between the post-filling pressure P1 obtained in S109 and the post-discharge pressure P2 obtained in S115. Therefore, the discharge amount changes according to the pressure difference ΔP between the post-filling pressure P1 and the post-discharge pressure P2.
[0093] The CPU 21 substitutes the post-filling pressure P1 and the post-discharging pressure P2 temporarily stored in the memory 22 in S109 and S115 into the above-mentioned mathematical formula 2 to obtain the discharge amount. The CPU 21 substitutes the number of pulse injections in the above-mentioned process into the number of pulse injections in mathematical formula 1, and multiplies it by the discharge amount obtained in mathematical formula 2 to calculate the volume flow rate QA.
[0094] Then, the CPU 21 calculates the deviation between the calculated volume flow rate QA and the target flow rate Q (S119). For example, the main controller 500 adds the target flow rate Q of the process to be executed to the flow control start command transmitted to the flow control device 1. The CPU 21 compares the target flow rate Q added to the flow control start command with the volume flow rate QA calculated in S117, and calculates the deviation between the volume flow rate QA and the target flow rate Q.
[0095] Then, the CPU 21 calculates the next filling time t1new by PID operation (S121). That is, the CPU 21 calculates the next filling time t1new by the following mathematical formula 3. Kp is a proportional constant. Ki is an integral constant. Kd is a differential constant. e(t) is the deviation this time. e(t-1) is the deviation last time.
[0096] Mathematical formula 3
[0097]
[0098] Kp: proportional constant
[0099] Ki: integration constant
[0100] Kd: differential constant
[0101] e(t): Deviation of this time
[0102] e(t-1): the last deviation
[0103] The amount of gas filled into the groove 12 is adjusted by the opening and closing action of the first stop valve 11. Therefore, when the discharge time t3 and the second stabilization time t4 are constant, the volume flow rate QA of the gas discharged from the second stop valve 13 can be adjusted by changing the filling time t1. Therefore, by calculating the next filling time t1new, the next pulse injection method is changed from the current pulse injection method, and the volume flow rate QA can be made closer to the target flow rate Q.
[0104] The CPU 21 which has calculated the next filling time t1new in S121 determines whether the volume flow rate QA calculated in S117 is equal to the target flow rate Q in the above-mentioned process (S123). When the CPU 21 determines that they are not equal (S123: No), it determines whether the flow control end instruction has been accepted (S129). When the CPU 21 uses the communication IF 24 and does not receive the flow control end instruction transmitted from the main controller 500, it determines that the flow control end instruction has not been accepted (S129: No). In this case, the CPU 21 changes the filling time t1 by substituting the next filling time t1new calculated in S121 into the filling time t1 (S131). Then, the CPU 21 returns to the process of S105 and performs the next pulse injection.
[0105] When the CPU 21 makes the volume flow rate QA equal to the target flow rate Q by repeatedly performing the processing from S105 to S131 (S123: Yes), the optimal pressure Px is stored in the memory 22 (S125). That is, the CPU 21 stores the post-filling pressure P1 measured by the pulse injection when the volume flow rate QA is adjusted to the target flow rate Q as the optimal pressure Px in the memory 22. That is, the post-filling pressure P1 measured by the aforementioned pulse injection is stored as the optimal pressure Px. In this case, for example, when the optimal pressure Px is already stored in the memory 22, the CPU 21 overwrites the post-filling pressure P1 on the existing optimal pressure Px. In addition, for example, when the optimal pressure Px of the memory 22 is set to blank when the power is turned on, the post-filling pressure P1 is newly stored as the optimal pressure Px.
[0106] Then, the CPU 21 stores the optimal filling time tx in the memory 22 (S127). The CPU 21 stores the filling time t1 used for the pulse injection when the volume flow rate QA has been adjusted to the target flow rate Q as the optimal filling time tx. That is, the filling time t1 used for the aforementioned pulse injection is stored as the optimal filling time tx. In this case, for example, when the memory 22 has already stored the optimal filling time tx, the CPU 21 writes the filling time t1 to the existing optimal filling time tx. In addition, for example, when the optimal filling time tx of the memory 22 is set to blank when the power is turned on, the filling time t1 is newly stored as the optimal filling time tx. In addition, the processing of S125 and S127 can also be reversed.
[0107] Then, the CPU 21 determines whether the flow control end instruction has been accepted (S129). When the CPU 21 receives the flow control end instruction transmitted from the upper controller 500 using the communication IF 24, it determines that the flow control end instruction has been accepted (S129: Yes), and returns to the processing of S101. That is, the next flow control start instruction is accepted, and the CPU 21 waits until the next processing starts.
[0108] After executing the initial processing, the CPU 21 determines that the flow control start command has been accepted (S101: Yes), and sets the number of processing executions to a positive integer greater than 2. In this case, after the CPU 21 turns on the power, it determines that this is not the first processing (S103: No), and then determines whether the pressure of the tank 12 is lower than the optimal pressure Px (S135). That is, the CPU 21 obtains the pressure measured by the pressure sensor 14 and compares it with the optimal pressure Px stored in the memory 22.
[0109] When the CPU 21 determines that the pressure of the tank 12 is lower than the optimal pressure Px (S135: YES), it opens the first stop valve 11 of the closed first stop valve 11 and the second stop valve 13 (S137). Thus, the tank 12 starts to be filled with the gas supplied from the gas source 211.
[0110] The CPU 21 that has opened the first stop valve 11 returns to the process of S135. The CPU 21 maintains the opening of the first stop valve 11 while the pressure of the tank 12 is lower than the optimum pressure Px (S135: Yes, S137). Thus, the tank 12 continues to be filled with gas, and the pressure of the tank 12 rises.
[0111] If the CPU 21 determines that the pressure is above the optimum pressure Px, and if it is determined that the pressure of the tank 12 is not lower than the optimum pressure Px (S135: No), the CPU 21 closes the first stop valve 11 (S139). As a result, the tank 12 becomes a closed space with no gas in or out, and the pressure of the tank 12 is adjusted to the optimum pressure Px regardless of the original pressure of the gas source 211.
[0112] Then, the CPU 21 performs the same processing from S147 to S161 as the processing from S107 to S121 described above, and discharges the gas filled in the groove 12 from the second shutoff valve 13. As a result, the groove 12 has the same pressure before the first pulse injection as after the pulse injection in which the volume flow rate QA is adjusted to the target flow rate Q.
[0113] The CPU 21 performs the processing of S163 to S169 in the same manner as S123 to S129, and then proceeds to the processing of S141. In addition, during pressure control, the processing of S163 to S169 may not be performed, and the processing may be proceeded to S141 after the processing of S161.
[0114] The CPU 21 that controls the pressure of the groove 12 and moves to S141 determines whether it is the initial pulse injection. The pulse injection performed after the pressure control of the groove 12 is performed by executing the processes of S135 to S139 and S147 to S169 is the initial pulse injection in the aforementioned processes. In this case (S141: Yes), the CPU 21 substitutes the optimal filling time tx stored in the memory 22 into the filling time t1 (S143). And, the CPU 21 fills the groove 12 with gas according to the filling time t1. Since the process of S145 is the same as that of S105, the description is omitted. The groove 12 is the same as the state after the pulse injection when the volume flow rate QA is adjusted to the target flow rate Q. And, the filling time t1 is the same as the filling time used in the aforementioned pulse injection. Therefore, it is highly likely that the groove 12 is filled with the gas required to adjust the volume flow rate QA to the target flow rate Q.
[0115] The CPU 21 that has completed the filling performs the processing of S147 to S169 in the same manner as the above-mentioned S107 to S129. Thus, the gas filled into the groove 12 in the first pulse injection is discharged from the second stop valve 13. It is highly likely that the groove 12 is filled with the gas required to adjust the volume flow rate QA to the target flow rate Q. Moreover, the discharge time t3 is a constant value. Therefore, it is highly likely that the volume flow rate QA can be adjusted to the target flow rate Q in the first pulse injection.
[0116] If the volume flow rate QA is the same as the target flow rate Q (S163: YES), the CPU 21 updates the optimal pressure Px using the post-filling pressure P1 of the pulse injection (S165). That is, when the process is executed for the second time or later, the optimal pressure Px is already stored in the memory 22. Therefore, the CPU 21 overwrites the existing optimal pressure Px stored in the memory 22 with the post-filling pressure P1 obtained by the pulse injection.
[0117] Furthermore, the CPU 21 updates the optimal filling time tx (S167) using the filling time t1 used in the pulse injection, and transfers to the processing of S169. That is, when the processing is executed for the second time or later, the optimal filling time tx is already stored in the memory 22. Therefore, the CPU 21 writes the filling time t1 used in the aforementioned pulse injection to the existing optimal filling time tx stored in the memory 22. In addition, the processing order of S165 and S167 may be reversed. In addition, the processing of S165 and S167 may be executed only when the filling time t1 used in the aforementioned pulse injection is different from the existing optimal filling time tx.
[0118] When the CPU 21 determines that the volume flow rate QA is not equal to the target flow rate Q (S163: No), it does not perform the processes of S165 and S167 but performs the process of S169. When the flow control end instruction is not received (S169: No), the CPU 21 returns to the process of S141 and performs the next pulse injection.
[0119] The pulse injection performed in the above case is the second and subsequent pulse injections, not the initial pulse injection (S141: No). Therefore, the CPU 21 substitutes the next filling time t1new calculated in S161 into the filling time t1 (S171), and moves to the processing of S145. The CPU 21 performs the processing of S145 to S169, and exhausts the gas from the second shutoff valve 13.
[0120] Even if the volume flow rate QA cannot be adjusted to the target flow rate Q in the initial pulse injection, the initial pulse injection is performed under the same conditions as the pulse injection when the volume flow rate QA is adjusted to the target flow rate Q. Therefore, the volume flow rate QA of the initial pulse injection becomes a value close to the target flow rate Q, and it is highly likely that the volume flow rate QA can be made consistent with the target flow rate Q in the next pulse injection.
[0121] In the second and subsequent pulse injections, if the volume flow rate QA is the same as the target flow rate Q, the optimal pressure Px is updated using the post-filling pressure P1 obtained in the previous pulse injection, and the optimal filling time tx is updated using the filling time t1 used in the previous pulse injection (S165, S167). Therefore, the optimal pressure Px or the optimal filling time tx of the memory 22 is rewritten at any time to reflect the change in the initial pressure of the gas source 211.
[0122] When the CPU 21 receives the flow control end instruction (S169: YES), it returns to the process of S101. Then, the CPU 21 waits for acceptance of the flow control start instruction for the next process (S101: NO).
[0123] In the next processing, the processing from S135 to S169 is performed using the optimal pressure Px stored in the previous process memory 22, and the pressure of the groove 12 is set to the state after the pulse injection in which the volume flow rate QA is adjusted to the target flow rate Q before the first pulse injection. Therefore, in the next processing, it is highly likely that the volume flow rate QA can be adjusted to the target flow rate Q from the first pulse injection.
[0124] Furthermore, the processing of S125 and S165 is an example of "optimal pressure storage processing". The processing of S127 and S167 is an example of "optimal filling time storage processing". The processing of S135 to S139 and S147 to S161 is an example of "pressure control processing". The processing of S141 to S171 is an example of "flow rate control processing". The processing of S143 and S171 is an example of "filling time control processing".
[0125] As shown in the above description, the flow control device 1 of this method, for example, after the power is turned on, stores the post-filling pressure P1 when the volume flow QA has been adjusted to the target flow Q as the optimal pressure Px in the first process. Then, in the second and subsequent processes, before the initial pulse injection, the pressure of the groove 12 is controlled to the optimal pressure Px, and the second stop valve 13 is opened and closed. As a result, the groove 12 becomes the same state as after the pulse injection in which the volume flow QA has been controlled to the target flow Q. Therefore, in the initial pulse injection, regardless of the change in the original pressure of the gas source, etc., the groove 12 is filled with gas in the same manner as when the volume flow is adjusted to the target flow, and the volume flow is likely to be adjusted to the target flow. Therefore, if the flow control device 1 of this method is used, the response time from the start of the process to the stabilization of the volume flow QA of the gas at the target flow Q is shortened, and the responsiveness can be improved.
[0126] In addition, the present invention is not limited to the above-mentioned embodiment, and can be applied in various ways. A film can be formed on a wafer by a method other than ALD in the chamber 230. In addition, the flow rate adjustment device 1 is not limited to being applied to a semiconductor manufacturing device, and can be applied to other devices.
[0127] For example, you can also Figure 4 The judgment criterion in the process of S103 is not the first process after the power is turned on. That is, the optimal pressure storage process may not be performed in the first process after the power is turned on. However, as shown in the above method, after the power is turned on, by performing the optimal pressure storage process of S125 in the first process, the responsiveness can be improved in each process after the second time. In addition, as mentioned in the above method, after the power is turned on, by performing the optimal filling time storage process of S127 in the first process, the responsiveness can be improved in each process after the second time. This can contribute to the high production quantization of semiconductor manufacturing equipment.
[0128] For example, you can also omit Figure 4The optimal pressure Px is not updated during the flow control process. However, by performing the process of S165 of the above-mentioned method and updating the optimal pressure Px in each process, the optimal pressure Px becomes a value reflecting the disturbance, and therefore, the possibility that the volume flow rate QA can be adjusted to the target flow rate Q or a value close to the target flow rate Q in the first pulse injection becomes higher. In particular, as shown in the above-mentioned method, by updating the optimal pressure in each pulse injection, the optimization of the optimal pressure Px can be promoted.
[0129] For example, you can omit Figure 4 The processing of S127 in the above process is omitted, and the optimal filling time tx is not stored. In addition, the processing of S143 may be omitted, and the optimal filling time tx may not be used at the filling time t1 in the first pulse injection. However, as shown in the above-mentioned manner, the processing of S127 and S143 is performed, and not only the pressure control before the processing but also the first shutoff valve 11 is controlled to the optimal filling time tx in the first pulse injection of each processing, thereby increasing the probability that the volume flow rate QA is adjusted to the target flow rate Q or a value close to the target flow rate Q from the first pulse injection, thereby improving the responsiveness.
[0130] Can also be omitted Figure 4 In the process of S167 of the flow control process, the optimal filling time tx is not updated during the execution of the flow control process. However, as shown in the above-mentioned manner, by executing the process of S167 and updating the optimal filling time tx in each process, the optimal filling time tx becomes a value reflecting the disturbance, so the probability that the volume flow rate QA can be adjusted to the target flow rate Q or a value close to the target flow rate Q in the initial pulse injection becomes higher.
[0131] For example, you can also omit Figure 4 However, as shown in the above-mentioned manner, when the process of S125 is executed, that is, the process of S127 is executed in the first process after the power is turned on, the optimal pressure Px and the optimal filling time tx are stored in the same process, and it is not necessary to store the optimal filling time tx in a test mode different from the process, which can save gas or time.
[0132] Figure 4 The judgment processing of S107, S113, S147 and S153 is not limited to time, and judgment may be made based on the rate of change of the pressure measured by the pressure sensor 14. However, as shown in the above manner, by using the first stable time t2 or the second stable time t4 as a judgment reference, it is also easy to manage the timing of obtaining the post-filling pressure P1 or the post-discharge pressure P2 in the case of performing pulse injection at a high speed and high frequency.
[0133] Alternatively, the number of processing executions may be managed by the main controller 500, and the number of processing executions may be added to the flow control start instruction and provided to the flow control device 1. In this case, the flow control device 1 generates the processing executions based on the number of processing executions transmitted from the main controller 500. Figure 4 In the process of S103, it is sufficient to determine whether it is the first time processing.
[0134] Furthermore, the order of the processes in the flowcharts described in the above-described manner may be changed within a range where there is no contradiction. Furthermore, a storage medium storing the control program 31 is also a novel and useful invention.
[0135] Here, the discharge time t3 is regarded as a fixed value, and the volume flow rate is controlled by adjusting the filling time t1 and changing the method of repeatedly performing pulse injection. Conversely, the filling time t1 can be regarded as a fixed value, and the discharge time t3 can be adjusted to change the method of repeatedly performing pulse injection to control the volume flow rate.
Claims
1. A pulse jet flow control device, characterized in that: have: a first stop valve connected to a gas source; a second stop valve connected to the first stop valve; a gas-filled container between the first shut-off valve and the second shut-off valve; as well as a pressure sensor to measure the pressure of the gas-filled container; The adjusting device performs a process of controlling the gas to a target flow rate multiple times; The first stop valve, the second stop valve and the pressure sensor are connected to a controller so as to be communicable, and the controller controls the action of the pulse jet flow regulating device; The controller performs a flow control process in each process, the flow control process repeatedly performs pulse injection, and the pulse injection causes the second stop valve to open and close after the first stop valve is opened and closed, and calculates the volume flow rate of the gas discharged from the gas filling container based on the post-filling pressure and the post-discharge pressure, and the post-filling pressure is measured using the pressure sensor after the gas filling container is filled with gas by causing the first stop valve to open and close, and the post-discharge pressure is measured using the pressure sensor after the gas filling container is discharged by causing the second stop valve to open and close, and on the other hand, the volume flow rate is adjusted to a target flow rate by changing the way the pulse injection is repeatedly performed; The controller performs an optimal pressure storage process for storing the post-filling pressure as an optimal pressure, wherein the post-filling pressure is measured by the pulse jet pressure sensor in which the flow control process has been performed to adjust the volume flow rate to the target flow rate; The controller performs a pressure control process, which is a process after the optimal pressure storage process has been performed, and before the initial pulse injection, controls the pressure of the gas filling container to the optimal pressure stored in the optimal pressure storage process, and then opens and closes the second shutoff valve.
2. The pulse jet flow rate adjustment device according to claim 1, characterized in that: The optimal pressure storage process is performed in the first process after the power is turned on. The pressure control process is executed after the power source is turned on and before the first pulse ejection of the second and subsequent processes.
3. The pulse jet flow rate adjustment device according to claim 2, characterized in that: The controller performs the flow control process immediately after the pressure control process, and executes the optimal pressure storage process to update the optimal pressure.
4. The pulse jet flow rate adjustment device according to any one of claims 1 to 3, characterized in that: The controller performs an optimal filling time storage process in the flow control process, the optimal filling time storage process measuring the opening action duration for which the opening action of the first shutoff valve is continued at each pulse injection, and storing the opening action duration when the pulse injection for adjusting the volume flow rate to the target flow rate is performed as the optimal filling time; Furthermore, in the flow control process performed by the controller after the optimal filling time storage process, when the initial pulse injection is performed, a filling time control process is executed, and the filling time control process uses the optimal filling time stored in the optimal filling time storage process to open and close the first shut-off valve.
5. The pulse jet flow rate adjustment device according to claim 4, characterized in that: The optimal filling time storage process and the optimal pressure storage process are performed in the same process.
6. The pulse jet flow rate adjustment device according to claim 4, characterized in that: The optimal filling time is stored in the first processing after the power is turned on, and is used in the second processing after the power is turned on.
7. The pulse jet flow rate adjustment device according to claim 4, characterized in that: The controller executes the optimal filling time storage process in the flow rate control process of the filling time control process to update the optimal filling time.
8. A pulse jet flow adjustment method, characterized in that: The pulse jet flow rate adjustment device is made to perform a process of controlling the gas to a target flow rate multiple times and perform the following steps, wherein the pulse jet flow rate adjustment device has: a first stop valve connected to a gas source; a second stop valve connected to the first stop valve; a gas-filled container between the first shut-off valve and the second shut-off valve; as well as a pressure sensor to measure the pressure of the gas-filled container; and controlling the action using a controller connected to communicate with the first stop valve, the second stop valve, and the pressure sensor; a flow control step, in each process, repeatedly performing pulse injection, wherein the pulse injection causes the second stop valve to open and close after the first stop valve is opened and closed, and the volume flow rate of the gas discharged from the gas filling container is calculated based on the post-filling pressure and the post-discharge pressure, wherein the post-filling pressure is measured using the pressure sensor after the gas filling container is filled with gas by causing the first stop valve to open and close, and the post-discharge pressure is measured using the pressure sensor after the gas filling container is discharged by causing the second stop valve to open and close, and on the other hand, the volume flow rate is adjusted to a target flow rate by changing the manner in which the pulse injection is repeatedly performed; an optimum pressure storing step of storing the post-filling pressure as an optimum pressure, wherein the post-filling pressure is measured by the pressure sensor when the pulse injection for adjusting the volume flow rate to the target flow rate has been performed in the flow control step; as well as A pressure control step is a step of controlling the pressure of the gas-filled container to the optimal pressure stored in the optimal pressure storage step before the first pulse injection is performed after the optimal pressure storage step has been performed.
9. A program, characterized in that A controller is installed to control the operation of a pulse jet flow rate regulating device, wherein the pulse jet flow rate regulating device has: a first stop valve connected to a gas source; a second stop valve connected to the first stop valve; a gas-filled container between the first stop valve and the second stop valve; as well as a pressure sensor to measure the pressure of the gas-filled container; When the pulse jet flow rate control device performs a process of controlling the gas to the target flow rate a plurality of times, in each process, executing a flow control process, the flow control process repeatedly performing pulse injection, wherein the pulse injection causes the second stop valve to open and close after the first stop valve is opened and closed, and calculating the volume flow rate of the gas discharged from the gas filling container based on the post-filling pressure and the post-discharge pressure, wherein the post-filling pressure is measured using the pressure sensor after the gas filling container is filled with gas by causing the first stop valve to open and close, and the post-discharge pressure is measured using the pressure sensor after the gas filling container is discharged by causing the second stop valve to open and close, and on the other hand, the volume flow rate is adjusted to a target flow rate by changing the manner in which the pulse injection is repeatedly performed; causing the controller to execute an optimal pressure storage process for storing the post-filling pressure as an optimal pressure measured by the pressure sensor when the flow control process has performed a pulse injection for adjusting the volume flow rate to the target flow rate; Furthermore, the controller is caused to execute a pressure control process, which is a process after the optimal pressure storage process has been executed, and controls the pressure of the gas filling container to the optimal pressure stored in the optimal pressure storage process before the initial pulse injection.
Citation Information
Patent Citations
Fuel injection controller and fuel injection control system
CN101245741A
Fuel cell operation with a failed open injector
CN103094589A
Fluid control apparatus, fluid control system, fluid control method, and program recording medium
CN109237102A
Pulse shot flow regulator and pulse shot flow regulating method
US20040244837A1
Method and Apparatus for Pulse Gas Delivery Using an External Pressure Trigger
US20200081459A1