A decision-making aid method and device for eliminating local stable section over-limit

Through the load-side resource control optimization model, the constraint priority and penalty terms are used to accurately adjust load-side resources, solving the problem of local stable sections exceeding limits in the new energy development scenario, and ensuring safe and stable operation of the power grid.

CN115377989BActive Publication Date: 2024-10-01STATE GRID ZHEJIANG ELECTRIC POWER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210992935.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-08-18
Publication Date
2024-10-01
Estimated Expiration
2042-08-18

AI Technical Summary

Technical Problem

In the scenario of new energy development, cross-section violations occur frequently in some areas. Traditional adjustment methods are crude and inaccurate, and cannot effectively eliminate the problem of stable cross-section cross-limits.

Method used

The preset load-side resource control optimization model is used to obtain the load-side resource control strategy and based on the constraint priority and penalty terms, the load-side resources are accurately adjusted to eliminate local stable cross-section violations that cannot be eliminated by adjusting the power generation method.

Benefits of technology

It achieves precise adjustment of the local stable cross-section exceeding the limit, ensures the safe and stable operation of the power grid, and avoids unnecessary risks caused by rough adjustment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115377989B_ABST
    Figure CN115377989B_ABST
Patent Text Reader

Abstract

The present invention discloses an auxiliary decision-making method and device for eliminating local stable section exceeding the limit. When the local stable section exceeds the limit and the local stable section exceeding the limit cannot be eliminated after the power generation mode is adjusted, the present invention adopts a model considering the priority of constraint conditions with the goal of minimizing the load-side resource adjustment amount to obtain a load-side resource control strategy. Based on the load-side resource control strategy, the local stable section exceeding the limit that cannot be eliminated by adjusting the power generation mode is eliminated, and the adjustment is precise to ensure the safe, stable and economical operation of the power grid.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an auxiliary decision-making method and device for eliminating local stable section over-limit, belonging to the field of power system. Background Art

[0002] As the scale of cross-provincial and cross-regional power transmission continues to grow, the proportion of new energy continues to rise, and some areas have shown a high proportion of distributed new energy access. In the scenario of large-scale new energy development, the cross-sections in some areas are exceeding the limit more and more frequently. In the case of cross-section exceeding the limit, the traditional way is to first use conventional units to adjust the power generation method. If there is still an over-limit, adjust the load-side resources, generally by cutting off the load-side resources. However, the current adjustment method is relatively rough and not precise enough. Summary of the invention

[0003] The present invention provides an auxiliary decision-making method and device for eliminating local stable section over-limit, which solves the problems disclosed in the background technology.

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0005] An auxiliary decision-making method for eliminating local stable section exceeding the limit, comprising:

[0006] In response to the local stable section exceeding the limit, and the local stable section exceeding the limit cannot be eliminated after the power generation mode is adjusted, a preset load-side resource control optimization model is used to obtain a load-side resource control strategy; wherein the load-side resource control optimization model is a model that considers the priority of constraint conditions, takes the minimum load-side resource adjustment amount as the goal, and adds the constraint condition uncorrectable amount into the objective function by means of a penalty term;

[0007] Control load-side resources according to the load-side resource control strategy to eliminate local stable section violations that cannot be eliminated by adjusting the power generation mode.

[0008] Before obtaining the load-side resource control strategy, a step of determining whether a local stable section exceeds a limit is also included, and the step includes:

[0009] Obtain grid planning data, forecast data, and anticipated fault sets caused by extreme weather;

[0010] Generate future power grid operation trend section data using power grid planning data, forecast data and anticipated fault sets;

[0011] Verify the future operation trend section data of the power grid through power flow calculation to obtain continuous power grid operation trend data;

[0012] Based on the continuous power grid operation trend data, the local stable section that exceeds the limit is determined.

[0013] Through power flow calculation, the future operation trend section data of the power grid is verified to obtain continuous power grid operation trend data, including:

[0014] The future operation trend section data of the power grid is verified through power flow calculation. If the power balance condition is not met, the generator and load side resources are adjusted and this step is repeated until the power balance condition is met to obtain continuous power grid operation trend data.

[0015] Screening of grid operation risk points based on continuous grid operation trend data, including:

[0016] A risk point screening model based on relaxed equality constraints is used to screen the risk points of power grid operation from continuous power grid operation trend data;

[0017] Among them, the risk point screening model relaxes the constraints by introducing node active imbalance and node reactive imbalance. The objective function of the risk point screening model is:

[0018]

[0019] in, is the active unbalance of node i, is the reactive unbalance amount of node i;

[0020] The constraints are:

[0021] P ij,min ≤P ij ≤P ij,max

[0022]

[0023]

[0024] V i min ≤V i ≤V i max

[0025] Among them, P ij =V i V j (G ij cosθ ij +B ij sinθ ij )-G ij V i 2 is the active power transmitted by the line connecting node i and node j, P G,i is the active output of the generator connected to node i, P L,i is the active load on node i, Vi is the voltage amplitude of node i, V j is the voltage amplitude of node j, j∈i represents the node j connected to node i, G ij is the mutual conductance between node i and node j, B ij is the mutual susceptance between node i and node j, θ ij is the phase difference between the voltages at nodes i and j, Q G,i is the reactive power output of the generator connected to node i, Q L,i is the reactive load on node i, P ij,min P ij The lower limit of P ij,max P ij The upper limit of is the active output of the generator connected to node i under the benchmark dispatch, Q G,i The lower limit of Q G,i The upper limit, V i min V i The lower limit, V i max V i upper limit.

[0026] The objective function of the load side resource control optimization model is:

[0027]

[0028] Among them, n ct is the number of adjustable load-side resources, n ov is the number of devices that exceed the limit, c i′ is the control cost coefficient of the i′th adjustable load side resource, Δu i′ is the actual adjustment amount of the i′th adjustable load side resource, m j′ is the uncorrectable amount of the j′th over-limit device, M j′ is the penalty factor corresponding to the constraint priority of the j′th out-of-limit device;

[0029] The load-side resource control optimization model determines the priority of the constraint conditions according to the size of the local stable section over-limit, the adjustable amount and adjustment rate of the load-side resources;

[0030] The constraints are:

[0031]

[0032] p i′,min <p i′ <p i′,max

[0033]

[0034] Among them, p i′ is the action amount of the i′th adjustable load side resource, p i′,min For p i′ The lower limit of p i′,max For p i′ The upper limit, S i′j′ is the sensitivity of the j′th over-limit device to the i′th adjustable load-side resource, P j′0 is the current power flow of the j′th out-of-limit device, P j′min is the lower limit of the power flow of the j′th over-limit device, P j′max is the upper limit of the power flow of the j′th out-of-limit device.

[0035] An auxiliary decision-making device for eliminating local stable section over-limit, comprising:

[0036] The strategy acquisition module, in response to the local stable section exceeding the limit and the local stable section exceeding the limit cannot be eliminated after the power generation mode is adjusted, adopts a preset load side resource control optimization model to obtain the load side resource control strategy; wherein the load side resource control optimization model is a model that considers the priority of constraint conditions, takes the minimum load side resource adjustment amount as the goal, and adds the constraint condition uncorrectable amount into the objective function by means of a penalty term;

[0037] The control module controls the load-side resources according to the load-side resource control strategy to eliminate the local stable section exceeding the limit that cannot be eliminated by adjusting the power generation mode.

[0038] It also includes a local stable section over-limit judgment module;

[0039] The local stable section over-limit judgment module obtains the power grid planning data, forecast data and expected fault sets caused by extreme weather, uses the power grid planning data, forecast data and expected fault sets to generate the power grid future operation trend section data, verifies the power grid future operation trend section data through power flow calculation, obtains continuous power grid operation trend data, and judges the over-limit local stable section based on the continuous power grid operation trend data.

[0040] In the local stable section over-limit judgment module, a risk point screening model based on relaxed equality constraints is used to screen the risk points of power grid operation from continuous power grid operation trend data;

[0041] Among them, the risk point screening model relaxes the constraints by introducing node active imbalance and node reactive imbalance. The objective function of the risk point screening model is:

[0042]

[0043] in, is the active unbalance of node i, is the reactive unbalance amount of node i;

[0044] The constraints are:

[0045] P ij,min ≤P ij ≤P ij,max

[0046]

[0047]

[0048] V i min ≤V i ≤V i max

[0049] Among them, P ij =V i V j (G ij cosθ ij +B ij sinθ ij )-G ij V i 2 is the active power transmitted by the line connecting node i and node j, P G,i is the active output of the generator connected to node i, P L,i is the active load on node i, V i is the voltage amplitude of node i, V j is the voltage amplitude of node j, j∈i represents the node j connected to node i, G ij is the mutual conductance between node i and node j, B ij is the mutual susceptance between node i and node j, θ ij is the phase difference between the voltages at nodes i and j, Q G,i is the reactive power output of the generator connected to node i, Q L,i is the reactive load on node i, P ij,min P ij The lower limit of P ij,max P ij The upper limit of is the active output of the generator connected to node i under the benchmark dispatch, Q G,i The lower limit Q G,i The upper limit, V i min V i The lower limit, V imax V i upper limit.

[0050] In the strategy acquisition module, the objective function of the load-side resource control optimization model is:

[0051]

[0052] Among them, n ct is the number of adjustable load-side resources, n ov is the number of devices that exceed the limit, c i′ is the control cost coefficient of the i′th adjustable load side resource, Δu i′ is the actual adjustment amount of the i′th adjustable load side resource, m j′ is the uncorrectable amount of the j′th over-limit device, M j′ is the penalty factor corresponding to the constraint priority of the j′th out-of-limit device;

[0053] The load-side resource control optimization model determines the priority of the constraint conditions according to the size of the local stable section over-limit, the adjustable amount and adjustment rate of the load-side resources;

[0054] The constraints are:

[0055]

[0056] p i′,min <p i′ <p i′,max

[0057]

[0058] Among them, p i′ is the action amount of the i′th adjustable load side resource, p i′,min For p i′ The lower limit of p i′,max For p i′ The upper limit, S i′j′ is the sensitivity of the j′th over-limit device to the i′th adjustable load-side resource, P j′0 is the current power flow of the j′th out-of-limit device, P j′min is the lower limit of the power flow of the j′th over-limit device, P j′max is the upper limit of the power flow of the j′th out-of-limit device.

[0059] A computer-readable storage medium storing one or more programs, wherein the one or more programs include instructions, which, when executed by a computing device, cause the computing device to execute an auxiliary decision-making method for eliminating local stable section violations.

[0060] The beneficial effects achieved by the present invention are as follows: When a local stable section exceeds the limit and the local stable section exceeding the limit cannot be eliminated after the power generation mode is adjusted, the present invention adopts a model that considers the priority of constraint conditions with the goal of minimizing the load-side resource adjustment amount to obtain a load-side resource control strategy. Based on the load-side resource control strategy, the local stable section exceeding the limit that cannot be eliminated by adjusting the power generation mode is eliminated, and the adjustment is precise, ensuring the safe, stable and economical operation of the power grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0061] Figure 1 It is a specific flow chart of the method of the present invention;

[0062] Figure 2 To provide a process for sensing future risk points in the power grid;

[0063] Figure 3 This is the load side resource control flow chart. DETAILED DESCRIPTION

[0064] The present invention will be further described below in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present invention, and cannot be used to limit the protection scope of the present invention.

[0065] An auxiliary decision-making method for eliminating local stable section over-limit, comprising the following steps:

[0066] Step 1: In response to the local stable section exceeding the limit, and the local stable section exceeding the limit cannot be eliminated after the power generation mode is adjusted, a preset load-side resource control optimization model is used to obtain a load-side resource control strategy; wherein the load-side resource control optimization model is a model that considers the priority of constraint conditions, takes the minimum load-side resource adjustment amount as the goal, and adds the constraint condition uncorrectable amount into the objective function in the form of a penalty term;

[0067] Step 2: Control the load-side resources according to the load-side resource control strategy to eliminate the local stable section exceeding the limit that cannot be eliminated by adjusting the power generation mode.

[0068] When a local stable section exceeds the limit and the local stable section exceeding the limit cannot be eliminated after the power generation mode is adjusted, the above method adopts a model that considers the priority of constraint conditions with the goal of minimizing the load-side resource adjustment amount to obtain the load-side resource control strategy. Based on the load-side resource control strategy, the local stable section exceeding the limit that cannot be eliminated by adjusting the power generation mode is eliminated, and the adjustment is accurate to ensure the safe, stable and economical operation of the power grid.

[0069] The above method needs to first judge the local stable section exceeding the limit, and then use conventional units to adjust the power generation mode according to the section limit value and the exceeding amount. If the local stable section exceeding the limit cannot be eliminated, the load side resource control optimization model is further used to obtain the load side resource control strategy, and the load side resources are controlled according to the load side resource control strategy to eliminate the local stable section exceeding the limit that cannot be eliminated by adjusting the power generation mode.

[0070] Since there are many types and large number of dispatchable load monomer resources, and the monomer capacity / output is small, the basic monomer resources can be aggregated first, such as Figure 1 As shown in the figure, taking the response time of access single resource as the object, the load-side resources are aggregated according to spatial dimensions such as partition, region and whole network, and the load-side resources are aggregated according to different response time dimensions such as milliseconds, seconds, minutes and above, so as to provide a spatial aggregation basic model and a response time aggregation basic model for the power grid to monitor, analyze and control the load-side resources, that is, the load-side resources participate in the subsequent regulation links in this aggregated form; among them, the model aggregation attributes include: model type name, current active power, total capacity, upward regulation amount, downward regulation amount, responded amount, etc.

[0071] Obtain power grid planning data, forecast data and weather conditions; among them, planning data includes daily unit planning data and maintenance plans, forecast data includes load forecast data and new energy output forecast data, and weather conditions can be used to obtain the expected fault set caused by extreme weather. In view of the data differences caused by different sources, different time scales, and different quality of many data, the data is uniformly cleaned in time scale, and linear interpolation is used to fill in missing data with a time step of 5 minutes.

[0072] The sampling load proportional allocation method distributes the processed power grid planning data and forecast data to the generator nodes and load nodes of the power grid model, and removes or disconnects the equipment in the expected fault set to generate cross-sectional data on the future operation trend of the power grid.

[0073] Through the flow calculation, the future operation trend section data of the power grid is verified. If the power balance condition is not met, the generator and load side resources are adjusted and the steps are repeated until the power balance condition is met to obtain continuous power grid operation trend data. Figure 2 .

[0074] According to the continuous power grid operation trend data, a risk point screening model based on relaxed equality constraints is adopted to screen out the local stable sections that exceed the limit. Among them, the objective function of the risk point screening model is:

[0075]

[0076] Among them, dP iis the active unbalance of node i, dQ i is the reactive unbalance amount of node i;

[0077] The risk point screening model relaxes the constraints by introducing node active power imbalance and node reactive power imbalance. The unbalanced equations of node active power and reactive power are:

[0078]

[0079]

[0080] The line transmission power expression is:

[0081] P ij =V i V j (G ij cosθ ij +B ij sinθ ij )-G ij V i 2

[0082] Since the line power cannot exceed the limit, we have:

[0083] P ij,min ≤P ij ≤P ij,max

[0084] When screening risk points, the active output of the generator is the same as the generator output under the benchmark scheduling scheme, and its reactive output cannot exceed its constraint range. Therefore, the active and reactive output constraints of the generator are:

[0085]

[0086]

[0087] The node voltage cannot exceed the limit value of stable operation, so the node voltage constraint is:

[0088] V i min ≤V i ≤V i max

[0089] Among them, P ij is the active power transmitted by the line connecting node i and node j, P G,i is the active output of the generator connected to node i, P L,i is the active load on node i, V i is the voltage amplitude of node i, V jis the voltage amplitude of node j, j∈i represents the node j connected to node i, G ij is the mutual conductance between node i and node j, B ij is the mutual susceptance between node i and node j, θ ij is the phase difference between the voltages at nodes i and j, Q G,i is the reactive power output of the generator connected to node i, Q L,i is the reactive load on node i, P ij,min P ij The lower limit of P ij,max P ij The upper limit of is the active output of the generator connected to node i under the benchmark dispatch, Q G,i The lower limit of Q G,i The upper limit, V i min V i The lower limit, V i max V i upper limit.

[0090] When the local stable section still cannot eliminate the limit through conventional means, it is necessary to control the load side resources of each main transformer, see Figure 3 :

[0091] First determine the objective function;

[0092] For some local stable sections, there are few units and load-side resources that can support the adjustment of the section, and the sensitivity is also small. After the units and load-side resources reach the upper and lower limits, the section still exceeds the limit. At this time, the model has no solution because the constraints of the model are not met. In order to make the model solvable and expand the scope of use of the model, the model here puts the constraints that cannot be corrected into the objective function.

[0093] The objective function aims to minimize the load-side resource regulation, and comprehensively considers the priority of the constraints, adding the uncorrectable amount of the constraints into the objective function through the penalty term;

[0094] The objective function can be:

[0095]

[0096] Among them, n ct is the number of adjustable load-side resources, n ov is the number of devices that exceed the limit, c i′ is the control cost coefficient of the i′th adjustable load side resource, Δu i′ is the actual adjustment amount of the i′th adjustable load side resource, mj′ is the uncorrectable amount of the j′th over-limit device, M j′ is the penalty factor corresponding to the constraint priority of the j′th out-of-limit device, is the penalty term for the amount that cannot be corrected by the constraints.

[0097] Secondly, the load-side resources have different resource response times and regulation capabilities. The loads that can meet the regulation requirements are selected to participate in the regulation process. That is, a load model set is established based on the load resource response time and regulation capability, and the model that meets the load regulation requirements is included in the optimization model.

[0098] The load-side resource control optimization model determines the priority of the constraint conditions according to the size of the local stable section over-limit, the adjustable amount and adjustment rate of the load-side resources;

[0099] Constraints mainly include:

[0100] Power balance constraints:

[0101]

[0102] Upper and lower limit constraints of adjustable load side resource action amount:

[0103] P i′,min <P i′ <P i′,max

[0104] Branch and stable section constraints:

[0105]

[0106] Among them, P i′ is the action amount of the i′th adjustable load side resource, P i′,min P i′ The lower limit of P i′,max P i′ The upper limit, S i′j′ is the sensitivity of the j′th over-limit device to the i′th adjustable load-side resource, p j′0 is the current power flow of the j′th out-of-limit device, p j′min is the lower limit of the power flow of the j′th over-limit device, p j′max is the upper limit of the power flow of the j′th out-of-limit device.

[0107] The above model is used to obtain the load-side resource control strategy, and the load-side resources are controlled according to the load-side resource control strategy to eliminate the local stable section over-limit that cannot be eliminated by adjusting the power generation mode; the power generation and load-side resources can be quickly controlled through AGC one-click output increase, marketing load control and second-level load control.

[0108] The above method is beneficial for the power grid to accurately cut off relevant loads, eliminate cross-section exceeding limits, and ensure safe and stable operation of the power grid.

[0109] Based on the same technical solution, the present invention also discloses an auxiliary decision-making device for eliminating local stable section over-limit, comprising:

[0110] The local stable section over-limit determination module obtains the power grid planning data, forecast data and expected fault sets caused by extreme weather, uses the power grid planning data, forecast data and expected fault sets to generate the power grid future operation trend section data, verifies the power grid future operation trend section data through power flow calculation, obtains continuous power grid operation trend data, and screens out the local stable sections that exceed the limit based on the continuous power grid operation trend data.

[0111] In the local stable section over-limit determination module, according to the continuous power grid operation trend data, a screening risk point model based on relaxed equality constraints is adopted to screen out the local stable sections that have exceeded the limit;

[0112] Among them, the risk point screening model relaxes the constraints by introducing node active imbalance and node reactive imbalance. The objective function of the risk point screening model is:

[0113]

[0114] in, is the active unbalance of node i, is the reactive unbalance amount of node i;

[0115] The constraints are:

[0116] P ij,min ≤P ij ≤P ij,max

[0117]

[0118]

[0119] V i min ≤V i ≤V i max

[0120] Among them, P ij =V i V j (G ij cosθ ij +B ij sinθ ij )-G ij V i2 is the active power transmitted by the line connecting node i and node j, P G,i is the active output of the generator connected to node i, P L,i is the active load on node i, V i is the voltage amplitude of node i, V j is the voltage amplitude of node j, j∈i represents the node j connected to node i, G ij is the mutual conductance between node i and node j, B ij is the mutual susceptance between node i and node j, θ ij is the phase difference between the voltages at nodes i and j, Q G,i is the reactive power output of the generator connected to node i, Q L,i is the reactive load on node i, P ij,min P ij The lower limit of P ij,max P ij The upper limit of is the active output of the generator connected to node i under the benchmark dispatch, Q G,i The lower limit of Q G,i The upper limit, V i min V i The lower limit, V i max V i upper limit.

[0121] The strategy acquisition module, in response to the local stable section exceeding the limit and the local stable section exceeding the limit cannot be eliminated after the power generation mode is adjusted, adopts a preset load-side resource control optimization model to obtain the load-side resource control strategy; wherein, the load-side resource control optimization model is a model that considers the priority of constraint conditions, takes the minimum load-side resource adjustment amount as the goal, and adds the constraint condition that cannot be corrected into the objective function by means of a penalty term.

[0122] In the strategy acquisition module, the objective function of the load-side resource control optimization model is:

[0123]

[0124] Among them, n ct is the number of adjustable load-side resources, n ov is the number of devices that exceed the limit, c i′ is the control cost coefficient of the i′th adjustable load side resource, Δu i′ is the actual adjustment amount of the i′th adjustable load side resource, m j′ is the uncorrectable amount of the j′th over-limit device, M j′is the penalty factor corresponding to the constraint priority of the j′th out-of-limit device;

[0125] The load-side resource control optimization model determines the priority of the constraint conditions according to the size of the local stable section over-limit, the adjustable amount and adjustment rate of the load-side resources;

[0126] The constraints are:

[0127]

[0128] p i′,min <p i′ <p i′,max

[0129]

[0130] Among them, p i′ is the action amount of the i′th adjustable load side resource, p i′,min For p i′ The lower limit of p i′,max For p i′ The upper limit, S i′j′ is the sensitivity of the j′th over-limit device to the i′th adjustable load-side resource, P j′0 is the current power flow of the j′th out-of-limit device, P j′min is the lower limit of the power flow of the j′th over-limit device, P j′max is the upper limit of the power flow of the j′th out-of-limit device.

[0131] The control module controls the load-side resources according to the load-side resource control strategy to eliminate the local stable section exceeding the limit that cannot be eliminated by adjusting the power generation mode.

[0132] Based on the same technical solution, the present invention also discloses a computer-readable storage medium storing one or more programs, wherein the one or more programs include instructions, which, when executed by a computing device, enable the computing device to execute an auxiliary decision-making method for eliminating local stable section violations.

[0133] Based on the same technical solution, the present invention also discloses a computing device, including one or more processors, one or more memories and one or more programs, wherein the one or more programs are stored in the one or more memories and are configured to be executed by the one or more processors, and the one or more programs include instructions for executing an auxiliary decision-making method for eliminating local stable section violations.

[0134] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0135] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0136] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0137] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0138] The above are merely embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention are included in the scope of the claims of the present invention to be approved.

Claims

1. An auxiliary decision-making method for eliminating local stable section exceeding the limit, characterized in that: include: In response to the local stable section exceeding the limit, and the local stable section exceeding the limit cannot be eliminated after the power generation mode is adjusted, a preset load side resource control optimization model is used to obtain a load side resource control strategy; Among them, the load-side resource control optimization model is a model that considers the priority of constraints, takes the minimum load-side resource adjustment amount as the goal, and adds the uncorrectable amount of constraints into the objective function through the penalty term; The objective function of the load side resource control optimization model is: Among them, n ct is the number of adjustable load-side resources, n ov is the number of devices that exceed the limit, c i′ is the control cost coefficient of the i′th adjustable load side resource, Δu i′ is the actual adjustment amount of the i′th adjustable load side resource, m j′ is the uncorrectable amount of the j′th over-limit device, M j′ is the penalty factor corresponding to the constraint priority of the j′th out-of-limit device; The load-side resource control optimization model determines the priority of the constraint conditions according to the size of the local stable section over-limit, the adjustable amount and adjustment rate of the load-side resources; The constraints are: p i′,min <p i′ <p i′,max Among them, p i′ is the action amount of the i′th adjustable load side resource, p i′,min For p i′ The lower limit of p i′,max For p i′ The upper limit, S i′j′ is the sensitivity of the j′th over-limit device to the i′th adjustable load-side resource, P j′0 is the current power flow of the j′th out-of-limit device, P j′min is the lower limit of the power flow of the j′th over-limit device, P j′max is the upper limit of the power flow of the j′th over-limit device; Control load-side resources according to the load-side resource control strategy to eliminate local stable section violations that cannot be eliminated by adjusting the power generation mode.

2. The auxiliary decision-making method for eliminating local stable section exceeding the limit according to claim 1, characterized in that: Before obtaining the load-side resource control strategy, a step of determining the local stable section over-limit is also included, which includes: Obtain grid planning data, forecast data, and anticipated fault sets caused by extreme weather; Generate future power grid operation trend section data using power grid planning data, forecast data and anticipated fault sets; Verify the future operation trend section data of the power grid through power flow calculation to obtain continuous power grid operation trend data; Based on the continuous power grid operation trend data, the local stable sections that exceed the limit are screened out.

3. The auxiliary decision-making method for eliminating local stable section exceeding the limit according to claim 2 is characterized in that: Through power flow calculation, the future operation trend section data of the power grid is verified to obtain continuous power grid operation trend data, including: The future operation trend section data of the power grid is verified through power flow calculation. If the power balance condition is not met, the generator and load side resources are adjusted and this step is repeated until the power balance condition is met to obtain continuous power grid operation trend data.

4. The auxiliary decision-making method for eliminating local stable section over-limit according to claim 2, characterized in that: Based on the continuous power grid operation trend data, the local stable sections that exceed the limit are screened out, including: According to the continuous power grid operation trend data, a risk point screening model based on relaxed equality constraints is adopted to screen out the local stable sections that exceed the limit; Among them, the risk point screening model relaxes the constraints by introducing node active imbalance and node reactive imbalance. The objective function of the risk point screening model is: in, is the active unbalance of node i, is the reactive unbalance amount of node i; The constraints are: P ij,min ≤P ij ≤P ij,max In i min ≤V i ≤V i max Among them, P ij =V i V j (G ij cosθ ij +B ij sinθ ij )-G ij V i 2 is the active power transmitted by the line connecting node i and node j, P G,i is the active output of the generator connected to node i, P L,i is the active load on node i, V i is the voltage amplitude of node i, V j is the voltage amplitude of node j, j∈i represents the node j connected to node i, G ij is the mutual conductance between node i and node j, B ij is the mutual susceptance between node i and node j, θ ij is the phase difference between the voltages at nodes i and j, Q G,i is the reactive power output of the generator connected to node i, Q L,i is the reactive load on node i, P ij,min P ij The lower limit of P ij,max P ij The upper limit of is the active output of the generator connected to node i under the benchmark dispatch, Q G,i The lower limit of Q G,i The upper limit, V i min V i The lower limit, V i max V i upper limit.

5. An auxiliary decision-making device for eliminating local stable section exceeding the limit, characterized in that: include: The strategy acquisition module, in response to the local stable section exceeding the limit and the local stable section exceeding the limit cannot be eliminated after the power generation mode is adjusted, adopts a preset load side resource control optimization model to obtain the load side resource control strategy; wherein the load side resource control optimization model is a model that considers the priority of constraint conditions, takes the minimum load side resource adjustment amount as the goal, and adds the constraint condition uncorrectable amount into the objective function by means of a penalty term; In the strategy acquisition module, the objective function of the load-side resource control optimization model is: Among them, n ct is the number of adjustable load-side resources, n ov is the number of devices that exceed the limit, c i′ is the control cost coefficient of the i′th adjustable load side resource, Δu i′ is the actual adjustment amount of the i′th adjustable load side resource, m j′ is the uncorrectable amount of the j′th over-limit device, M j′ is the penalty factor corresponding to the constraint priority of the j′th out-of-limit device; The load-side resource control optimization model determines the priority of the constraint conditions according to the size of the local stable section over-limit, the adjustable amount and adjustment rate of the load-side resources; The constraints are: p i′,min <p i′ <p i′,max Among them, p i′ is the action amount of the i′th adjustable load side resource, p i′,min For p i′ The lower limit of p i′,max For p i′ The upper limit, S i′j′ is the sensitivity of the j′th over-limit device to the i′th adjustable load-side resource, P j′0 is the current power flow of the j′th out-of-limit device, P j′min is the lower limit of the power flow of the j′th over-limit device, P j′max is the upper limit of the power flow of the j′th over-limit device; The control module controls the load-side resources according to the load-side resource control strategy to eliminate the local stable section exceeding the limit that cannot be eliminated by adjusting the power generation mode.

6. The auxiliary decision-making device for eliminating local stable section over-limit according to claim 5, characterized in that: It also includes a local stable section over-limit determination module; The local stable section over-limit determination module obtains the power grid planning data, forecast data and expected fault sets caused by extreme weather, uses the power grid planning data, forecast data and expected fault sets to generate the power grid future operation trend section data, verifies the power grid future operation trend section data through power flow calculation, obtains continuous power grid operation trend data, and screens out the local stable sections that exceed the limit based on the continuous power grid operation trend data.

7. The auxiliary decision-making device for eliminating local stable section over-limit according to claim 6, characterized in that: In the local stable section over-limit determination module, according to the continuous power grid operation trend data, a screening risk point model based on relaxed equality constraints is adopted to screen out the local stable sections that have exceeded the limit; Among them, the risk point screening model relaxes the constraints by introducing node active imbalance and node reactive imbalance. The objective function of the risk point screening model is: in, is the active unbalance of node i, is the reactive unbalance amount of node i; The constraints are: P ij,min ≤P ij ≤P ij,max In i min ≤V i ≤V i max Among them, P ij =V i V j (G ij cosθ ij +B ij sinθ ij )-G ij V i 2 is the active power transmitted by the line connecting node i and node j, P G,i is the active output of the generator connected to node i, P L,i is the active load on node i, V i is the voltage amplitude of node i, V j is the voltage amplitude of node j, j∈i represents the node j connected to node i, G ij is the mutual conductance between node i and node j, B ij is the mutual susceptance between node i and node j, θ ij is the phase difference between the voltages at nodes i and j, Q G,i is the reactive power output of the generator connected to node i, Q L,i is the reactive load on node i, P ij,min P ij The lower limit of P ij,max P ij The upper limit of is the active output of the generator connected to node i under the benchmark dispatch, Q G,i The lower limit of Q G,i The upper limit, V i min V i The lower limit, V i max V i upper limit.

8. A computer-readable storage medium storing one or more programs, characterized in that: The one or more programs include instructions which, when executed by a computing device, cause the computing device to perform any one of the methods according to claims 1 to 4.