A method for rapid docking of large diameter steel pipes
By prefabricating compensation pipes and accessories, and using external pull rings and locking pipes to quickly seal gaps, the problem of complicated and slow repairs of large-diameter steel pipes is solved, and fast and effective emergency repairs are achieved.
Patent Information
- Application Number
- CN202211051116.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-08-31
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-08-31
AI Technical Summary
The existing repair methods for large-diameter steel pipes are complex and slow, and cannot quickly respond to breakage or leakage problems caused by vehicle collisions or excavation construction, affecting users' use.
Prefabricated compensation tubes, external pull rings, locking tubes, rubber rings, locking screws and other accessories are used. By cutting the damaged parts and installing the compensation tube, and using the external pull rings and locking tubes to quickly fix, the operation is simplified and the gaps are sealed. Quick repair.
It greatly simplifies the emergency repair steps, improves the repair speed, ensures the sealing effect, reduces the repair time, and is suitable for the rapid repair of large-diameter steel pipes.
Smart Images

Figure CN115388261B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method for butting large-diameter steel pipes, in particular to a method for quickly butting large-diameter steel pipes during emergency repairs. Background Art
[0002] It is known that the best way to transport liquids such as water, oil and gas across river basins is to transport them through large-diameter steel pipes, and to use a pressure station to pressurize the water or oil and gas to achieve the transportation purpose. This method has the lowest transportation cost. For the laying of large-diameter steel pipes, they are buried underground, overhead, set under a bridge when passing through a river, or laid on the ground. These unattended pipelines can only be maintained by regular inspections, which inevitably lead to problems such as accidental collisions by passing vehicles, digging or leaking during excavation construction, and leakage caused by the pipeline's own quality. All of these problems require rapid repair of the pipeline. The commonly used repair method is to replace the entire pipeline, locally use a kit to seal or cut off and then weld. The aforementioned method is relatively complicated and the repair progress is very slow, which seriously affects the user's use. Summary of the invention
[0003] In order to overcome the shortcomings of the background technology, the present invention discloses a method for rapid repair and docking of large-diameter steel pipes, which quickly fixes the compensation pipe through two outer pull rings and two locking pipes, effectively speeding up the progress of the repair.
[0004] The technical solution for implementing the present invention is as follows:
[0005] A method for repairing and quickly docking a large-diameter steel pipe, the method comprising the following steps: prefabricating a compensation pipe and required accessories, closing the valve of the large-diameter steel pipe, digging out a working foundation pit and cleaning up the accumulated liquid, cutting the large-diameter steel pipe at the damaged part, installing the compensation pipe and accessories, testing the pressure and filling the foundation pit;
[0006] A. Prefabricate the compensation pipe and necessary accessories:
[0007] According to the laid large-diameter steel pipe, matching compensation pipes, external pull ring A, external pull ring B, locking pipe A, locking pipe B, rubber ring A, rubber ring B, locking screws, nuts and jacking screws are made;
[0008] B. Close the valve of large diameter steel pipe:
[0009] Completely close the valves in the inlet and outlet directions according to the location of the damaged part of the large-diameter steel pipe;
[0010] C. Dig out the working pit and clean up the accumulated liquid:
[0011] After finding the damaged part of the large diameter steel pipe, dig a foundation pit around the damaged part to clean up the accumulated liquid in the foundation pit, and draw the size on both sides of the damaged part of the large diameter steel pipe according to the length of the compensation pipe;
[0012] D. Cutting the large diameter steel pipe at the damaged part:
[0013] Use cutting equipment to cut a section of large-diameter steel pipe slightly longer than the compensation pipe according to the length of the compensation pipe; evacuate the accumulated liquid in the large-diameter steel pipe to form large-diameter steel pipe A and large-diameter steel pipe B with a distance between them;
[0014] E. Install compensation pipe and accessories:
[0015] Put the locking tube A and rubber ring A on the large diameter steel tube A in sequence, and put the locking tube B and rubber ring B on the large diameter steel tube B in sequence, wherein the rubber ring A is close to the end of the large diameter steel tube A, and the rubber ring B is close to the end of the large diameter steel tube B; then put the compensation tube between the large diameter steel tube A and the large diameter steel tube B, pull the outer pull ring A outward so that the outer end of the inner raised ring A at the inner end of the inner wall of the outer pull ring A presses on the raised ring set on the outer edge of one end of the compensation tube, and the rubber ring A is in the middle of the inner wall of the outer pull ring A; then pull the outer pull ring B outward so that the outer end of the inner raised ring B at the inner end of the inner wall of the outer pull ring B presses on the raised ring set on the outer edge of the other end of the compensation tube, and the rubber ring B is in the middle of the inner wall of the outer pull ring B ; The inner end of the locking tube A is pressed against the outer end surface of the rubber ring A, and multiple locking screws are respectively passed through the light hole D of the flange A provided on the outer edge of the locking tube A and the light hole C of the flange B on the outer edge of the outer pull ring A, and then locked by nuts; The inner end of the locking tube B is pressed against the outer end surface of the rubber ring B, and another multiple locking screws are respectively passed through the light hole A of the flange C provided on the outer edge of the locking tube B and the light hole B of the flange D on the outer edge of the outer pull ring B, and then locked by nuts; Multiple jacking screws are respectively passed through the screw holes B on the outer side of the locking tube A and then pressed against the outer edge surface of the large-diameter steel pipe A; Another multiple jacking screws are respectively passed through the screw holes A on the outer side of the locking tube B and then pressed against the outer edge surface of the large-diameter steel pipe B;
[0016] F. Pressure test:
[0017] Open the valve in the direction of incoming liquid, and after confirming that there is no leakage, open the valve in the direction of outgoing liquid;
[0018] G. Landfill pit:
[0019] Fill the foundation pit with backfill soil and use a small tamping machine to compact the backfill soil through vibration compaction to finish the ground.
[0020] In the method for rapid docking of large-diameter steel pipes for repair, if the large-diameter steel pipe is overhead in step C, the dimensions are directly drawn on both sides of the damaged part of the large-diameter steel pipe according to the length of the compensation pipe, without the need to excavate a foundation pit; step G is omitted.
[0021] In the method for rapid repair of large-diameter steel pipes, the length of the compensation pipe is between thirty centimeters and one meter.
[0022] In the method for rapid docking of large-diameter steel pipes for repair, the length of the raised rings respectively arranged on the outer edge surfaces of both ends of the compensation pipe is between two centimeters and eight centimeters, the compensation pipe and the two raised rings are an integral structure, and the inner wall diameter of the compensation pipe is equal to or smaller than the inner wall diameter of the large-diameter steel pipe.
[0023] In the method for rapid docking of large-diameter steel pipes for emergency repair, the flange B of the outer pull ring A is arranged at the outer edge of the outer end of the outer pull ring A, and the inner raised ring A is arranged at the inner end of the inner wall of the outer pull ring A; at least three light holes C are arranged on the flange B, and at least three of the light holes C are arranged at equal intervals.
[0024] In the method for rapid docking of large-diameter steel pipes for emergency repair, the flange D of the outer pull ring B is arranged at the outer edge of the outer end of the outer pull ring B, and the inner raised ring B is arranged at the inner end of the inner wall of the outer pull ring B; at least three light holes B are arranged on the flange D, and at least three of the light holes B are arranged at equal intervals.
[0025] The method for rapid docking of large-diameter steel pipes for repair is as follows: a flange A is provided in the middle of the outer edge of a locking tube A, and at least three light holes D are provided on the flange A, and at least three of the light holes D are equidistantly arranged; the locking tube A on the inner side of the flange A forms a top ring A, and the inner surface of the top ring A is provided with an inner convex surface A, and the inner end of the top ring A is provided with a pointed edge A; a plurality of screw holes B arranged at intervals are provided on the outer side of the flange A of the locking tube A.
[0026] The method for rapid docking of large-diameter steel pipes for repair is as follows: a flange C is provided in the middle of the outer edge of a locking tube B, at least three light holes A are provided on the flange C, and at least three light holes A are provided at equal intervals; the locking tube B on the inner side of the flange C forms a top ring B, the inner surface of the top ring B is provided with an inner convex surface B, and the inner end of the top ring B is provided with a pointed edge B; a plurality of screw holes A are provided on the outer side of the flange C of the locking tube B.
[0027] In the method for rapid repair of large-diameter steel pipes, a surrounding expansion groove A is provided in the middle of the outer end surface of the rubber ring A.
[0028] In the method for rapid repair of large-diameter steel pipes, a surrounding expansion groove B is provided in the middle of the outer end surface of the rubber ring B.
[0029] Through the above disclosure, the beneficial effects of the present invention are:
[0030] The large-diameter steel pipe emergency repair and rapid docking method described in the present invention utilizes prefabricated compensation pipes, external pull rings A, external pull rings B, locking pipes A, locking pipes B, rubber rings A, rubber rings B, locking screws, nuts and tightening screws. After a large-diameter steel pipe rupture accident occurs, the ruptured portion of the large-diameter steel pipe is cut to a length consistent with the compensation pipe, and the locking pipe A and rubber ring A are first put on the large-diameter steel pipe A, and the locking pipe B and rubber ring B are put on the large-diameter steel pipe B, and the compensation pipe is placed between the large-diameter steel pipe A and the large-diameter steel pipe B. The rubber ring A is then pushed inwardly by the external pull ring A and the locking pipe A and fixed with the locking screws and nuts. The rubber ring B is then pushed inwardly by the external pull ring B and the locking pipe B and fixed with the locking screws and nuts. In this way, the rubber ring A and the rubber ring B can block the gap between the compensation pipe and the large-diameter steel pipe A and the large-diameter steel pipe B, and the operation steps are simplified and the blocking effect is good. The present invention realizes rapid emergency repair of large-diameter steel pipes. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 It is an assembly structure diagram when the present invention is used;
[0032] Figure 2 It is a schematic diagram of the structure after repair of the present invention;
[0033] Figure 3 It is a schematic diagram of the three-dimensional structure of the compensation tube of the present invention;
[0034] Figure 4 It is a schematic diagram of the three-dimensional structure of the outer pull ring B of the present invention;
[0035] Figure 5 It is a schematic diagram of the three-dimensional structure of the outer pull ring A of the present invention;
[0036] Figure 6 It is a schematic structural diagram of the outer pull ring A of the present invention;
[0037] Figure 7 It is a schematic diagram of the three-dimensional structure of the locking tube B of the present invention;
[0038] Figure 8 It is a schematic diagram of the three-dimensional structure of the locking tube A of the present invention;
[0039] Fig. 9 It is a structural schematic diagram of the locking tube A of the present invention;
[0040] Fig.10 It is a schematic diagram of the three-dimensional structure of the rubber ring A of the present invention;
[0041] Fig.11 It is a schematic diagram of the three-dimensional structure of the rubber ring B of the present invention;
[0042] Fig.12 Schematic diagram of the expansion groove A structure of the rubber ring A of the present invention;
[0043] In the figure: 1. Large diameter steel pipe A; 2. Locking tube A; 3. Flange A; 4. Top ring A; 5. Rubber ring A; 6. Raised ring; 7. Compensating tube; 8. Flange B; 9. External pull ring A; 10. Internal raised ring A; 11. External pull ring B; 12. Rubber ring B; 13. Flange C; 14. Large diameter steel pipe B; 15. Locking screw; 16. Top screw; 17. Light hole A; 18. Screw hole A; 19. Flange D; 20. Nut; 21. Expansion groove A; 22. Sharp edge A; 23. Inner raised surface A; 24. Inner wall; 25. Inner raised ring B; 26. Light hole B; 27. Light hole C; 28. Inner raised surface B; 29. Locking tube B; 30. Top ring B; 31. Sharp edge B; 32. Screw hole B; 33. Light hole D; 34. Expansion groove B. DETAILED DESCRIPTION
[0044] The present invention is further described below in conjunction with embodiments; the following embodiments are not intended to limit the present invention, but are merely used as a means to support the implementation of the present invention, and any equivalent structural replacement within the technical framework disclosed in the present invention is within the protection scope of the present invention;
[0045] Combined with Figures 1 to 12 The method for repairing and quickly docking a large-diameter steel pipe as described in the invention comprises the following steps: prefabricating a compensation pipe and required accessories, closing the valve of the large-diameter steel pipe, digging out the working foundation pit and cleaning up the accumulated liquid, cutting the large-diameter steel pipe at the damaged part, installing the compensation pipe and accessories, testing the pressure and filling the foundation pit;
[0046] A. Prefabricate the compensation pipe and necessary accessories:
[0047] According to the diameter of the laid large-diameter steel pipe, a compensation pipe 7 of the same diameter is made. The compensation pipe 7 can be made into a variety of models with a length of 30 cm, 50 cm, 80 cm and 1 m, so that the model size to be used can be selected according to the accident situation; when making the compensation pipe 7, the attached Figure 1 , 2 , 4, 5 and 6, first make an outer pull ring A9 and an outer pull ring B11, the outer pull ring B11 has the same structure as the outer pull ring A9, and two are made according to the same structure; specifically, for making the outer pull ring A9, a steel plate is selected, the width of the steel plate is about five centimeters, and the steel plate is pressed into a steel ring with an annular structure by a rounding device, the inner diameter of the steel ring is slightly larger than the outer edge diameter of the compensation tube 7, and then the steel ring is welded to the inner wall of the inner end of the outer pull ring A9, and then a flange B8 with a light hole C27 is welded to the outer wall of the outer end of the outer pull ring A9; combined with the attached Figure 1 , 2Or 3, the diameter of the inner wall 24 of the compensation tube 7 is preferably consistent with the inner wall diameter of the large diameter steel pipe, a raised ring 6 is first welded on one end of the compensation tube 7, and then the outer pull ring B11 and the outer pull ring A9 are put on the compensation tube 7, and a raised ring 6 is welded on the other end of the compensation tube 7 for standby use;
[0048] Combined with Figure 1 , 2 , 7, 8 or 9, the locking tube A2 and the locking tube B29 have the same structure, and two are made according to the same structure; wherein the locking tube A2 is made by first making a screw hole B32 on the locking tube A2, using a steel plate with a width of about five centimeters to press the steel plate into a steel ring with an annular structure through a rounding device, and then welding the flange A3 to the outer edge of the inner end of the locking tube A2, using the equipment to chamfer the upper and lower sides of another steel plate to form a sharp edge A22, and then pressing the other steel plate into a steel ring with an annular structure, putting it into the inner end of the inner surface of the locking tube A2 and welding it to form a top ring A4 at the inner end of the locking tube A2, and the inner surface of the top ring A4 also forms an inner convex surface A23;
[0049] Combined with Figure 1 , 2 , 10, 11 or 12, the rubber ring A5 has the same structure as the rubber ring B12 and is customized by the rubber company;
[0050] B. Close the valve of large diameter steel pipe:
[0051] Completely close the valves in the inlet and outlet directions according to the location of the damaged part of the large-diameter steel pipe;
[0052] C. Dig out the working pit and clean up the accumulated liquid:
[0053] 1) After finding the damaged part of the large diameter steel pipe, dig a foundation pit around the damaged part to make it possible to work, clean up the accumulated liquid in the foundation pit, and draw the dimensions on both sides of the damaged part of the large diameter steel pipe according to the length of the compensation pipe 7;
[0054] 2) If it is an overhead large-diameter steel pipe or a large-diameter steel pipe exposed on the ground, the size can be directly drawn on both sides of the damaged part of the large-diameter steel pipe according to the length of the compensation pipe 7, without the need to excavate the foundation pit;
[0055] D. Cutting the large diameter steel pipe at the damaged part:
[0056] Use cutting equipment to cut a section of large-diameter steel pipe slightly longer than the compensation pipe 7 according to the length of the compensation pipe 7; evacuate the accumulated liquid in the large-diameter steel pipe to form a large-diameter steel pipe A1 and a large-diameter steel pipe B14 with a distance between them;
[0057] E. Install compensation pipe and accessories:
[0058] Combined with Figure 1Or 2, put the locking tube A2 and the rubber ring A5 on the large diameter steel tube A1 in turn, and make the expansion groove A21 of the rubber ring A5 face outward, put the locking tube B29 and the rubber ring B12 on the large diameter steel tube B14 in turn, and make the expansion groove B34 of the rubber ring B12 face outward, then put the rubber ring A5 close to the end of the large diameter steel tube A1, and the rubber ring B12 close to the end of the large diameter steel tube B14; then put the compensation tube 7 between the large diameter steel tube A1 and the large diameter steel tube B14, at this time, the two ends of the compensation tube 7 are respectively matched with the gap between the large diameter steel tube A1 and the large diameter steel tube B14, and put the outer pull ring A9 Pull outwards so that the outer end of the inner raised ring A10 at the inner end of the inner wall of the outer pull ring A9 presses against the inner side surface of the raised ring 6 provided at the outer edge of one end of the compensation tube 7, and at this time the rubber ring A5 is in the middle of the inner wall of the outer pull ring A9; then pull the outer pull ring B11 outwards so that the outer end of the inner raised ring B25 at the inner end of the inner wall of the outer pull ring B11 presses against the inner side surface of the raised ring 6 provided at the outer edge of the other end of the compensation tube 7, and at this time the rubber ring B12 is in the middle of the inner wall of the outer pull ring B11; press the sharp edge A22 at the inner end of the top ring A4 of the locking tube A2 into the expansion groove A21 on the outer end surface of the rubber ring A5, and leave a gap between the inner raised surface A23 of the top ring A4 and the outer edge surface of the large-diameter steel tube A1, Use multiple locking screws 15 to pass through the light hole D33 of the flange A3 set on the outer edge of the locking tube A2 and the light hole C27 of the flange B8 on the outer edge of the outer pull ring A9, and then lock them with nuts 20. At this time, the rubber ring A5 squeezed by the sharp edge A22 completely closes the gap between the compensation tube 7 and the large-diameter steel pipe A1; the sharp edge B31 of the top ring B30 at the inner end of the locking tube B29 is pressed into the expansion groove B34 on the outer end face of the rubber ring B12, and a gap is left between the inner convex surface B28 of the top ring B30 and the outer edge face of the large-diameter steel pipe B14. Use another multiple locking screws 15 to pass through the flange C1 set on the outer edge of the locking tube B29 3 and the light hole A17 of the outer pull ring B11 and the light hole B26 of the flange D19 on the outer edge are locked by the nut 20. At this time, the rubber ring B12 squeezed by the sharp edge B31 completely closes the gap between the compensation tube 7 and the large-diameter steel pipe B14; a plurality of tightening screws 16 are respectively passed through the screw holes B32 on the outside of the locking tube A2 and then pressed against the outer edge surface of the large-diameter steel pipe A1; another plurality of tightening screws 16 are respectively passed through the screw holes A18 on the outside of the locking tube B29 and then pressed against the outer edge surface of the large-diameter steel pipe B14; the tightening screws 16 prevent leakage caused by the expansion and contraction of the large-diameter steel pipe A1 and the large-diameter steel pipe B14.
[0059] F. Pressure test:
[0060] Apply concentrated soapy water to all gaps, open the valve in the direction of incoming liquid, and check whether the residual air in the large-diameter steel pipe squeezed by the liquid has impacted the gaps and caused soapy water bubbles. After confirming that there is no leakage, open the valve in the direction of outflow;
[0061] G. Landfill pit:
[0062] 1) Fill the foundation pit with backfill soil and use a small compactor to compact the backfill soil by vibration compaction to trim the ground;
[0063] 2) If it is an overhead large-diameter steel pipe or a large-diameter steel pipe exposed on the ground, the operation is completed.
[0064] Parts of the present invention not described in detail are prior art.
Claims
1. A method for rapid docking of large diameter steel pipes, characterized by: The method comprises the following steps: prefabricating a compensation pipe and required accessories, closing the valve of a large-diameter steel pipe, digging out a working foundation pit and cleaning up the accumulated liquid, cutting the large-diameter steel pipe at the damaged part, installing the compensation pipe and accessories, testing the pressure and filling the foundation pit; A. Prefabricate the compensation tube and necessary accessories: According to the laid large-diameter steel pipe, a matching compensation pipe (7), an outer pull ring A (9), an outer pull ring B (11), a locking pipe A (2), a locking pipe B (29), a rubber ring A (5), a rubber ring B (12), a locking screw (15), a nut (20) and a tightening screw (16) are made; B. Close the valve of large diameter steel pipe: Completely close the valves in the inlet and outlet directions according to the location of the damaged part of the large-diameter steel pipe; C. Dig out the working pit and clean up the accumulated liquid: After finding the damaged part of the large diameter steel pipe, a foundation pit suitable for operation is dug around the damaged part, the accumulated liquid in the foundation pit is cleaned up, and the dimensions are drawn on both sides of the damaged part of the large diameter steel pipe according to the length of the compensation pipe (7); D. Cutting the large diameter steel pipe at the damaged part: Using a cutting device to cut a section of a large-diameter steel pipe slightly longer than the compensation pipe (7) according to the length of the compensation pipe (7); evacuating the accumulated liquid in the large-diameter steel pipe to form a large-diameter steel pipe A (1) and a large-diameter steel pipe B (14) with a distance between them; E. Install compensation pipe and accessories: Put the locking tube A (2) and the rubber ring A (5) on the large diameter steel tube A (1) in sequence, and put the locking tube B (29) and the rubber ring B (12) on the large diameter steel tube B (14) in sequence, wherein the rubber ring A (5) is close to the end of the large diameter steel tube A (1), and the rubber ring B (12) is close to the end of the large diameter steel tube B (14); then put the compensating tube (7) between the large diameter steel tube A (1) and the large diameter steel tube B (14), and pull the outer pull ring A (9) outward to make the outer pull ring The outer end of the inner protruding ring A (10) at the inner end of the inner wall of the pull ring A (9) is pressed against the protruding ring (6) provided on the outer edge of one end of the compensation tube (7). At this time, the rubber ring A (5) is located in the middle of the inner wall of the outer pull ring A (9); then, the outer pull ring B (11) is pulled outward so that the outer end of the inner protruding ring B (25) at the inner end of the inner wall of the outer pull ring B (11) is pressed against the protruding ring (6) provided on the outer edge of the other end of the compensation tube (7). At this time, the rubber ring B (12) is located in the middle of the inner wall of the outer pull ring B (11); the locking tube A The inner end of the locking tube B (29) is pressed against the outer end face of the rubber ring A (5), and a plurality of locking screws (15) are respectively passed through the light hole D (33) of the flange A (3) provided on the outer edge of the locking tube A (2) and the light hole C (27) of the flange B (8) provided on the outer edge of the outer pull ring A (9), and then locked by the nut (20); the inner end of the locking tube B (29) is pressed against the outer end face of the rubber ring B (12), and another plurality of locking screws (15) are respectively passed through the flange provided on the outer edge of the locking tube B (29) to tighten the locking tube B (29). The light hole A (17) of the plate C (13) and the light hole B (26) of the outer edge surface of the flange plate D (19) of the outer pull ring B (11) are locked by a nut (20); a plurality of jacking screws (16) are respectively passed through the screw holes B (32) on the outside of the locking tube A (2) and then pressed against the outer edge surface of the large-diameter steel pipe A (1); another plurality of jacking screws (16) are respectively passed through the screw holes A (18) on the outside of the locking tube B (29) and then pressed against the outer edge surface of the large-diameter steel pipe B (14); A flange A (3) is provided at the middle of the outer edge of the locking tube A (2), and at least three light holes D (33) are provided on the flange A (3), and the at least three light holes D (33) are arranged at equal intervals; the locking tube A (2) inside the flange A (3) forms a top ring A (4), the inner surface of the top ring A (4) is provided with an inner convex surface A (23), and the inner end of the top ring A (4) is provided with a sharp edge A (22); a plurality of screw holes B (32) arranged at intervals are provided on the outer side of the flange A (3) of the locking tube A (2); F. Pressure test: Open the valve in the direction of incoming liquid, and after confirming that there is no leakage, open the valve in the direction of outgoing liquid; G. Landfill pit: Fill the foundation pit with backfill soil and use a small tamping machine to compact the backfill soil through vibration compaction to finish the ground.
2. The method for rapid repair of large diameter steel pipes according to claim 1 is characterized by: In step C, if the large-diameter steel pipe is overhead, the dimensions are directly drawn on both sides of the damaged part of the large-diameter steel pipe according to the length of the compensation pipe (7), without the need to excavate the foundation pit; step G is omitted.
3. The method for rapid repair of large diameter steel pipes according to claim 1 is characterized by: The length of the compensating tube (7) is between thirty centimeters and one meter.
4. The method for rapid repair of large diameter steel pipes according to claim 1 or 3, characterized in that: The length of the raised rings (6) respectively arranged on the outer edge surfaces of both ends of the compensation tube (7) is between two centimeters and eight centimeters. The compensation tube (7) and the two raised rings (6) are an integral structure. The diameter of the inner wall (24) of the compensation tube (7) is equal to or smaller than the inner wall diameter of the large-diameter steel tube.
5. The method for rapid repair of large diameter steel pipes according to claim 1 is characterized by: The flange plate B (8) of the outer pull ring A (9) is arranged at the outer edge of the outer end of the outer pull ring A (9), and the inner protrusion ring A (10) is arranged at the inner end of the inner wall of the outer pull ring A (9); at least three light holes C (27) are arranged on the flange plate B (8), and the at least three light holes C (27) are arranged at equal intervals.
6. The method for rapid repair of large diameter steel pipes according to claim 1 is characterized by: The flange D (19) of the outer pull ring B (11) is arranged at the outer edge of the outer end of the outer pull ring B (11), and the inner protrusion ring B (25) is arranged at the inner end of the inner wall of the outer pull ring B (11); at least three light holes B (26) are arranged on the flange D (19), and the at least three light holes B (26) are arranged at equal intervals.
7. The method for rapid repair of large diameter steel pipes according to claim 1 is characterized by: A flange C (13) is provided at the middle of the outer edge of the locking tube B (29), and at least three light holes A (17) are provided on the flange C (13), and the at least three light holes A (17) are arranged at equal intervals; the locking tube B (29) inside the flange C (13) forms a top ring B (30), the inner surface of the top ring B (30) is provided with an inner convex surface B (28), and the inner end of the top ring B (30) is provided with a sharp edge B (31); and a plurality of screw holes A (18) arranged at intervals are provided on the outer side of the flange C (13) of the locking tube B (29).
8. The method for rapid repair of large diameter steel pipes according to claim 1 is characterized by: A surrounding expansion groove A (21) is provided in the middle of the outer end surface of the rubber ring A (5).
9. The method for rapid repair of large diameter steel pipes according to claim 1 is characterized by: A surrounding expansion groove B (34) is provided in the middle of the outer end surface of the rubber ring B (12).