A dispatchable load scheduling method based on multi-object and multi-dimensional
Through the multi-object and multi-dimensional dispatchable load dispatching method, the problem of insufficient traditional power grid control means is solved, the power balance and allocation efficiency of the power grid are improved, and an effective means of peak shaving and valley filling is provided.
Patent Information
- Application Number
- CN202211161860.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-09-23
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2042-09-23
AI Technical Summary
The traditional source-with-load mode has insufficient power grid control methods. It cannot effectively utilize adjustable loads to balance power grid power, cannot regulate loads according to the actual operating conditions of the power grid, and cannot meet the needs of modern power systems.
Adopt a dispatchable load dispatching method based on multi-objects and multi-dimensions, and design a dispatchable load model library to calculate the real-time and future power gaps of the power grid, allocate the adjustment amount in proportion, form an auxiliary decision-making table, and publish dispatchable loads according to different regions and time dimensions Load information to aid decision-making.
It realizes a multi-dimensional controllable load dispatching strategy, provides peak-cutting and valley-filling methods for power grid dispatching through the load side, improves the power balance and allocation efficiency of the power grid, and has good application prospects.
Smart Images

Figure CN115395525B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of load control of electric power systems, and in particular to a dispatchable load dispatching method based on multiple objects and multiple dimensions. Background Art
[0002] With the development of power grids, modern power systems are undergoing a dual technological revolution in both source and load, especially the load side has undergone fundamental changes. With the diversification of load-side equipment, the extensive application of distributed generation, distributed energy storage, electric vehicles, etc., the traditional passive distribution network has generated a two-way flow, and source load nodes have appeared. Users are no longer just terminal power loads, and can interact with dispatching agencies through load-side demand management.
[0003] The energy transformation revolution and the future "clean, low-carbon, safe and efficient" energy system have put forward all-round requirements for the power grid to improve its power balance capability, power allocation efficiency, safe operation capability and supply and demand interaction capability. At present, the controllable means of the power grid in the traditional power generation tracking load mode have been almost exhausted. With the large-scale access of new energy-consuming equipment such as distributed power sources, microgrids, energy storage, and electric vehicles, the power grid has been provided with abundant adjustable resources. It is urgent to effectively expand the power grid regulation resources and innovate the dispatching and control mode.
[0004] Based on the above analysis, the traditional source-following load movement can no longer meet the current development needs. It is necessary to control the adjustable load to participate in the power balance of the power grid, and this case is generated. Summary of the invention
[0005] The purpose of the present invention is to propose a dispatchable load scheduling method based on multiple objects and multiple dimensions, in view of the fact that traditional loads do not participate in power grid scheduling and cannot regulate the dispatchable loads according to the actual operation of the power grid. The scheme of the present invention is easy to deploy, the display method is direct and clear, and it can be published regularly. It has the conditions for application in actual power systems and has good application prospects.
[0006] The technical solution adopted by the present invention is as follows:
[0007] The present invention is a dispatchable load scheduling method based on multiple objects and multiple dimensions, which specifically includes the following steps:
[0008] Step 1, taking each dispatchable load individual or its aggregate as the object, designing the dispatchable load model library of the above-mentioned use object;
[0009] Step 2, calculating the real-time power shortage of the power grid according to the total real-time load, system reserve, and real-time maximum adjustable power grid provided by the dispatcher;
[0010] Step 3: Calculate the power shortage of the power grid in the next 4 hours based on the ultra-short-term load forecast, system reserve, and maximum adjustable capacity of the power grid provided by the dispatcher;
[0011] Step 4, allocating the total power gap in proportion according to the size of the adjustment amount of each adjustable load in the dispatchable model library, obtaining the actual adjustment amount of each dispatchable load and forming an auxiliary decision table;
[0012] Step 5, forming two different time dimensions, namely, real-time state and future state, and generating the dispatchable load auxiliary decision information of the area according to the total power gap of different areas for regular or rolling release.
[0013] Furthermore, in step 1, a model is established according to different dispatchable loads such as the Internet of Vehicles platform, large users, virtual power plants, load aggregators, etc., including: the name of the area to which the dispatchable load belongs, the upper adjustment capability of the dispatchable load, the lower adjustment capability of the dispatchable load, and the real-time power of the dispatchable load;
[0014] Furthermore, in step 2, the real-time power shortage = the total real-time load + the system reserve - the real-time maximum adjustable power grid, and the system reserve is 5% of the real-time load or is set by the dispatcher.
[0015] Furthermore, in step 3, future gap = ultra-short-term load forecast + system reserve - maximum adjustable power grid, the system reserve is 5% of the ultra-short-term load forecast value or is given by the dispatcher.
[0016] Furthermore, in step 4, the real-time adjustment amount of the ith adjustable load = real-time gap / sum of the adjustable amounts of all adjustable loads * adjustable amount of the ith adjustable load,
[0017] The adjustment amount of the ith adjustable load at a future time point = the gap at the future time point / the sum of the predicted adjustable amounts of all adjustable loads at future time points * the predicted adjustable amount of the ith adjustable load at a future time point.
[0018] Furthermore, the dispatchable load auxiliary decision information generated in step 5 includes the adjustment demand side, issuance time, adjustment amount, adjustment time, load type, response time, adjustment aggregator and / or adjustment object.
[0019] In summary, due to the adoption of this technical solution, the beneficial effects of the present invention are:
[0020] The present invention is a dispatchable load dispatching method based on multiple objects and multiple dimensions. According to the characteristics of different adjustable loads and different spatial divisions, a dispatching strategy for multi-dimensional adjustable loads is formed, which includes calculating the total amount of electricity of the real-time gap in a specific area and the total gap in the next 4 hours. After the size of the adjustable capacity of different loads is obtained by modeling a variety of dispatchable loads, the total amount of regional electricity gaps is proportionally allocated to obtain the adjustment amount of each adjustable load, thereby forming an auxiliary decision for adjustable loads in real time and future states, and issuing it to each adjustable load for execution according to the rules. By calculating and distributing the auxiliary decision of dispatchable loads, an effective means is provided for power grid dispatchers to perform peak shaving and valley filling from the load side. Therefore, the method of the present invention is an important way for dispatchable loads to participate in power grid dispatching, which is easy to deploy, the display method is direct and clear, and can be published regularly. It has the conditions for application in actual power systems and has good application prospects. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments. It should be understood that the following drawings only show certain embodiments of the present invention and should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without creative work. The proportional relationship of each component in the drawings of this specification does not represent the proportional relationship in actual material selection and design, which is only a schematic diagram of the structure or position, where:
[0022] Figure 1 It is a schematic diagram of the process of the present invention. DETAILED DESCRIPTION
[0023] In order to make the purpose, technical scheme and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention, that is, the embodiments described are only part of the embodiments of the present invention, rather than all of the embodiments. The components of the embodiments of the present invention described and shown in the drawings herein can be arranged and designed in various different configurations.
[0024] It should be noted that the terms "comprises", "includes" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or apparatus that includes a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or apparatus.
[0025] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative work are within the scope of protection of the present invention.
[0026] All features disclosed in this specification, or steps in all methods or processes disclosed, except mutually exclusive features and / or steps, can be combined in any manner.
[0027] The present invention will be described in detail below in conjunction with the accompanying drawings.
[0028] The specific implementation example is as follows:
[0029] The present invention is a dispatchable load scheduling method based on multiple objects and multiple dimensions, such as Figure 1 As shown, the specific steps include:
[0030] Step 1, taking each dispatchable load individual or its aggregate as the object, designing the dispatchable load model library of the above-mentioned use object;
[0031] According to different dispatchable loads, such as Internet of Vehicles platform, large users, virtual power plants, load aggregators, etc., models are established, including: the name of the area to which the dispatchable load belongs, the upward adjustment capability of the dispatchable load, the downward adjustment capability of the dispatchable load, and the real-time power of the dispatchable load;
[0032] Step 2, calculating the real-time power shortage of the power grid according to the total real-time load, system reserve, and real-time maximum adjustable power grid provided by the dispatcher;
[0033] Real-time power shortage = real-time total load + system reserve - real-time maximum adjustable power grid.
[0034] The system reserve is 5% of the real-time load or as given by the dispatcher.
[0035] Step 3: Calculate the power shortage of the power grid in the next 4 hours based on the ultra-short-term load forecast, system reserve, and maximum adjustable capacity of the power grid provided by the dispatcher;
[0036] Future gap = ultra-short-term load forecast + system reserve - maximum adjustable power grid,
[0037] The system reserve is 5% of the ultra-short-term load forecast value or given by the dispatcher.
[0038] Step 4, allocating the total power gap in proportion according to the size of the adjustment amount of each adjustable load in the dispatchable model library, obtaining the actual adjustment amount of each dispatchable load and forming an auxiliary decision table;
[0039] The real-time adjustment amount of the ith adjustable load = real-time gap / sum of the adjustable amounts of all adjustable loads * adjustable amount of the ith adjustable load,
[0040] The adjustment amount of the ith adjustable load at a future time point = the gap at the future time point / the sum of the predicted adjustable amounts of all adjustable loads at future time points * the predicted adjustable amount of the ith adjustable load at a future time point.
[0041] Step 5, forming two different time dimensions, namely, real-time state and future state, and generating the dispatchable load auxiliary decision information of the area according to the total power gap of different areas for regular or rolling release.
[0042] The dispatchable load auxiliary decision information generated in step 5 includes the adjustment demand side, issuance time, adjustment amount, adjustment time, load type, response time, adjustment aggregator and / or adjustment object.
[0043] The present invention aims at the traditional loads that do not participate in the grid dispatching. According to the characteristics of different adjustable loads and different spatial divisions, a multi-dimensional dispatching strategy for adjustable loads is formed, which includes calculating the total amount of electricity of the real-time gap in a specific area and the total gap in the next 4 hours. After the size of the adjustable capacity of different loads is obtained by modeling a variety of dispatchable loads, the total amount of regional electricity gaps is proportionally allocated to obtain the adjustment amount of each adjustable load, thereby forming an auxiliary decision for adjustable loads in real time and future states, and issuing it to each adjustable load for execution according to the rules. By calculating and distributing the auxiliary decision of dispatchable loads, an effective means is provided for grid dispatchers to perform peak shaving and valley filling from the load side. Therefore, the method of the present invention is an important way for dispatchable loads to participate in grid dispatching. It is easy to deploy, the display method is direct and clear, and it can be published regularly. It has the conditions for application in actual power systems and has good application prospects.
[0044] The above is only a preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be thought of by a person skilled in the art within the technical scope disclosed by the present invention without creative work should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope defined in the claims.
Claims
1. A dispatchable load scheduling method based on multi-object and multi-dimensional, characterized in that: The specific steps include: Step 1, taking each dispatchable load individual or its aggregate as an object, designing a dispatchable load model library of the object; Step 2, calculating the real-time power shortage of the power grid according to the total real-time load, system reserve, and real-time maximum adjustable power grid provided by the dispatcher; Step 3: Calculate the power shortage of the power grid in the next 4 hours based on the ultra-short-term load forecast, system reserve, and maximum adjustable capacity of the power grid provided by the dispatcher; Step 4, allocating the total power gap in proportion according to the size of the adjustment amount of each adjustable load in the dispatchable model library, obtaining the actual adjustment amount of each dispatchable load and forming an auxiliary decision table; Step 5: Form two different time dimensions, namely, real-time state and future state, and generate the dispatchable load auxiliary decision information of the area according to the total power gap of different areas for regular or rolling release; In step 2, the specific calculation method of the real-time power shortage of the power grid is as follows: Real-time power shortage = real-time total load + system reserve - real-time maximum adjustable power grid. The system reserve is 5% of the real-time load or specified by the dispatcher; In step 3, the specific calculation method of the power shortage in the power grid in the next 4 hours is as follows: Future gap = ultra-short-term load forecast + system reserve - maximum adjustable power grid, The system reserve is 5% of the ultra-short-term load forecast value or is set by the dispatcher; In step 4, The real-time adjustment amount of the ith adjustable load = the real-time gap / the sum of the adjustable amounts of all adjustable loads * the adjustable amount of the ith adjustable load, The adjustment amount of the i-th adjustable load at a future time point = the gap at the future time point / the sum of the predicted adjustable amounts of all adjustable loads at future time points * the predicted adjustable amount of the i-th adjustable load at a future time point.
2. The method for dispatching schedulable loads based on multiple objects and multiple dimensions according to claim 1 is characterized in that: The dispatchable load objects in step 1 include the Internet of Vehicles platform, large users, virtual power plants, and load aggregators.
3. The method for dispatching schedulable loads based on multiple objects and multiple dimensions according to claim 2 is characterized in that: The specific steps of step 1 are: establishing a model library according to different dispatchable load objects, and the model library includes: the name of the area to which the dispatchable load belongs, the upward adjustment capability of the dispatchable load, the downward adjustment capability of the dispatchable load and / or the real-time power of the dispatchable load.
4. The method for dispatching schedulable loads based on multiple objects and multiple dimensions according to claim 1 is characterized in that: The dispatchable load auxiliary decision information generated in step 5 includes the adjustment demand side, issuance time, adjustment amount, adjustment time, load type, response time, adjustment aggregator and / or adjustment object.