A marine full-rotation electric propulsion installation process

Through detailed welding sequence and precision control methods, the problem of welding accuracy error in the installation of electric push equipment is solved, and the high-precision installation and stability of electric push equipment is achieved.

CN115432140BActive Publication Date: 2024-12-03ZHOUSHAN DAISHAN CHANGHONG SHIPBUILDING CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211099827.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-09
Publication Date
2024-12-03
Estimated Expiration
2042-09-09

Smart Images

  • Figure CN115432140B_ABST
    Figure CN115432140B_ABST
Patent Text Reader

Abstract

The purpose of the present invention is to provide a ship-borne full-rotation electric push installation process with effective welding sequence and precision control. In order to achieve the above-mentioned invention purpose, the ship-borne full-rotation electric push installation process of the present invention adopts the following technical scheme: a ship-borne full-rotation electric push installation process, step 1: symmetrically install two electric pushers on both sides of the 111 segment, position and rotate the 111 segment of the hull by 3°, so that the upper flange platform is in a horizontal state; step 2: install 4 angle steels with vertical baselines on the outer side of the outer plate of the segment as target rods, use a total station to scan a horizontal plane 4300mm away from the baseline, and mark four points A, A', B, B'.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of ships, and in particular to a ship-based full-rotation electric propulsion installation process. Background Art

[0002] The existing electric push equipment installation technology does not have a detailed welding sequence requirement, so it is difficult to control the installation accuracy error caused by welding shrinkage and welding deformation during the equipment assembly welding process. This process proposes a detailed and effective welding sequence and accuracy control method based on the thick plate welding process WPS and the accuracy control experience of similar equipment installation welding. Summary of the invention

[0003] The purpose of the invention is to provide a marine full-rotation electric push installation process with effective welding sequence and precision control.

[0004] In order to achieve the above-mentioned invention object, the marine full-rotation electric propulsion installation process of the present invention adopts the following technical solutions:

[0005] A marine full-rotation electric propulsion installation process, step 1: symmetrically install two electric propulsions on both sides of the 111 segment, and position and rotate the 111 segment of the hull by 3 degrees to make the upper flange platform in a horizontal state;

[0006] Step 2: Install 4 angle steels perpendicular to the baseline as target poles on the outer side of the segmented outer plate, use a total station to scan a horizontal plane 4300mm away from the baseline, and mark four points A, A', B, B';

[0007] Step 3: According to the center point of the upper flange of the electric pusher and the outer diameter of the actual equipment, draw the opening line on the platform according to the equipment size diameter D=2650mm, and then draw a reference circle that is 100mm larger than the diameter of the equipment flange for installing a fixed target. According to the center point of the upper flange, the center point of the lower flange can be obtained by a plumb bob, and the left and right sides are processed in the same way;

[0008] Step 4: Install and weld the fixed target and knock the crosshairs on the deck. The positioning of the fixed target should be confirmed by the precision personnel; the bevel and weld gap should be considered when opening the platform, and the same operation should be performed on the lower flange;

[0009] Step 5: Install the electric push base to the corresponding position, fill in the form for recording data before welding, and submit it to the manufacturer for confirmation;

[0010] Step 6: Before welding, install 4 dial indicators on the flange surface of the equipment to monitor the change of flange horizontality during welding;

[0011] Step 7: Electric push welding, welding sequence: elbow plate-upper flange-lower flange.

[0012] The welding of electric push elbow plates must comply with the WPS of 20 EH36; two welders must perform the welding symmetrically and mark the serial number before welding; each elbow plate is welded using the segmented back-welding method and is divided into 2 to 3 sections according to the length; for elbow plates with both fillet welds and butt welds, the butt seams are welded first.

[0013] The upper flange surface welding must comply with the WPS of 20 EH36; the circumference direction of the upper flange should be divided into multiple welding sections, and two welders should weld symmetrically; each section of the upper flange is about 600mm long; the welding sequence should be marked on the deck.

[0014] Beneficial effects: This process uses the flange surface on the electric push equipment as the horizontal base surface to locate the sections and close the total section. When the equipment is installed and welded, the upper and lower flanges are always in the horizontal plane, which is beneficial to the hoisting, positioning and welding accuracy control of the equipment. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 The 111 segment is in normal state;

[0016] Figure 2 It is the state of 111 segment rotation 3°;

[0017] Figure 3 Schematic diagram for setting the target;

[0018] Figure 4 Schematic diagram of the installation base for the general assembly stage;

[0019] Figure 5 is the upper flange plane;

[0020] Figure 6 It is the middle section of the equipment;

[0021] Figure 7 The upper flange surface;

[0022] Figure 8 This is the installation diagram of the electric push base;

[0023] Fig. 9 It is a 100% installation diagram;

[0024] Fig.10 This is a schematic diagram of electric push toggle plate welding;

[0025] Fig.11 This is a schematic diagram of the welding sequence of the upper flange surface;

[0026] Fig.12 This is the schematic diagram of the 11A general section;

[0027] Fig.13 This is the status diagram of the 111 segment. DETAILED DESCRIPTION

[0028] The present invention is further explained below in conjunction with specific implementation methods. It should be understood that these implementation methods are only used to illustrate the present invention and are not used to limit the scope of the present invention. After reading the present invention, various equivalent forms of modifications to the present invention by those skilled in the art all fall within the scope defined by the claims attached to this application.

[0029] The installation process of the fully rotating electric propulsion system for a 7500 cubic meter LNG bunkering transport ship mainly includes the installation of two fully rotating electric propulsion systems in sections, the method of achieving the installation accuracy requirements after the entire section is loaded, and the welding sequence and accuracy control of the upper and lower flanges, brackets and hull structures of the electric propulsion equipment body. The specific installation process is as follows:

[0030] like Figure 1 and Figure 2 As shown, two electric pushers are symmetrically installed on both sides of the 111 segment. Under normal circumstances, the segment construction is horizontally positioned. In order to facilitate the electric pusher lifting and welding, the 111 segment is rotated 3° during positioning to make the upper flange platform horizontal. This can be achieved through a laser total station and the flatness of the platform is detected at the same time. After the 111 segment pier is positioned and adjusted to the level, the center points of the flanges on the left and right push equipment are found according to the theoretical position and marked.

[0031] like Figure 3 , 4 As shown, four angle steels perpendicular to the baseline are installed on the outer side of the segmented outer plate as target poles. A total station is used to scan a horizontal plane 4300mm away from the baseline and mark four points A, A', B, B':

[0032] A: FR-6-150, 2800 off CL, 4300ABL

[0033] B:FR3, 2800 off CL, 4300ABL

[0034] A': FR-6-150, -2800 off CL, 4300ABL

[0035] B':FR3, -2800 off CL, 4300ABL

[0036] Theoretically, the distance between A and B, and A' and B' is 6600mm.

[0037] like Figure 4 As shown in the figure, when the length is 6600mm, the height difference caused by 3° is 346mm. Mark points below points A, A' and name them C, C'. The distance between A and C is 346mm.

[0038] That is, when installing the base at the assembly stage, the height values ​​of the four points B, B', A, and A' must be the same, and when the base is installed and loaded in sections, C, C'B, and B' must be on a horizontal plane 4300mm above the baseline. (Meet the tolerance requirements for thruster installation, a maximum of 0.3°, that is, a height difference of 5.2mm per meter).

[0039] like Figure 5 As shown, according to the center point of the electric push flange and the outer diameter of the actual equipment, draw the opening line on the platform according to the equipment size diameter D=2650mm (without cutting). Draw a reference circle 100mm larger than the equipment flange diameter (D=2750mm) for installing the fixed target.

[0040] like Figure 6 As shown, according to the center point of the upper flange, the center point of the lower flange can be obtained by means of a plumb bob, and the left and right sides are processed in the same way.

[0041] like Figure 7 As shown, weld the fixed target and knock the crosshairs on the deck. The positioning of the fixed target should be confirmed by the precision personnel. The bevel and weld gap should be considered when opening the platform. The same operation should be performed on the lower flange.

[0042] like Figure 8 As shown, install the electric push base to the corresponding position, fill in the form for recording data before welding, and submit it to the manufacturer for confirmation.

[0043] like Fig. 9 As shown in the figure, before welding, four dial indicators are installed on the flange surface of the equipment to monitor the change of flange horizontality during welding. The maximum acceptable horizontal deformation of the equipment is 0.2mm.

[0044] The data of the dial indicator should be recorded after each stage of welding: after each butt welding of the elbow plate, after each section welding of the upper flange, and after each section welding of the lower flange.

[0045] Electric push welding sequence: elbow plate-upper flange-lower flange;

[0046] The electric push toggle plate welding must comply with the WPS of 20 EH36; two welders must perform the welding symmetrically. The welding sequence is shown in Fig.10 , mark the serial number before welding; each bracket is welded by segmented back-welding method, divided into 2~3 sections according to the length; for brackets with both fillet welds and butt welds, the butt welds are welded first.

[0047] like Fig.11 As shown, the upper flange surface welding must comply with the WPS of 20 EH36; the circumference direction of the upper flange should be divided into multiple welding sections, and two welders should weld symmetrically during welding; each section of the upper flange is about 600mm long; the welding sequence is marked on the deck (arc length, number), and the lower flange surface refers to the upper flange surface, and each section is about 300mm long.

[0048] After the electric pusher base is assembled and welded on the 111 segment, the 181 and 191 segments are assembled on it to form the 11A segment.

[0049] like Fig.13 , when the 11A block is mounted, assembled and welded, the accuracy must be monitored throughout the process to ensure that C, C'B, B' are on a horizontal plane 4300mm above the baseline, and the centerline of the segment must be aligned with the centerline of the hull slipway, and the rib position line must also be aligned with the rib position line of the slipway. (To meet the tolerance requirements for propeller installation, the maximum is 0.3°, that is, a height difference of 5.2mm per meter). After the segment is mounted, sufficient rigid support must be installed to prevent deformation during mounting.

[0050] Advantages of this process:

[0051] 1. This process is suitable for the installation of marine full-rotation electric propulsion in the ship segment stage;

[0052] 2. This process includes two parts: segmented positioning and mounting according to the requirements of electric push installation, and electric push welding deformation accuracy control;

[0053] 3. This process is to complete the installation of the equipment in the segmented stage. During the installation, the flange surface of the equipment is used as the horizontal plane to locate the segment, install the equipment, close the whole segment, and then return the segment to normal state when the whole segment is loaded.

[0054] 4. The new process has formulated detailed welding procedures and precision control methods for welding equipment and hull structures;

[0055] 5. It can realize the precise installation of electric push equipment in advance.

[0056] The above description shows and describes the preferred embodiments of the present invention. As mentioned above, it should be understood that the present invention is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the invention concept described herein through the above teachings or the technology or knowledge of the relevant field. The changes and modifications made by those skilled in the art do not depart from the spirit and scope of the present invention, and should be within the scope of protection of the claims attached to the present invention.

Claims

1. A marine full-rotation electric propulsion installation process, characterized in that: Step 1: Install two electric thrusters symmetrically on both sides of the 111 segment, and rotate the 111 segment of the hull by 3° to make the upper flange platform horizontal; Step 2: Install 4 angle steels perpendicular to the baseline as target poles on the outer side of the segmented outer plate, use a total station to scan a horizontal plane 4300mm away from the baseline, and mark four points A, A', B, B'; Step 3: According to the center point of the upper flange of the electric push and the outer diameter of the actual equipment, draw the opening line on the platform according to the equipment size diameter D = 2650mm, and then draw a reference circle that is 100mm larger than the diameter of the equipment flange for installing the fixed target. According to the center point of the upper flange, the center point of the lower flange can be obtained by the plumb bob, and the left and right sides are processed in the same way; Step 4: Install and weld the fixed target and knock the crosshairs on the deck. The positioning of the fixed target should be confirmed by the precision personnel. The bevel and weld gap should be considered when opening the platform. The same operation should be performed on the lower flange. Step 5: Install the electric push base to the corresponding position, fill in the form for recording data before welding, and submit it to the manufacturer for confirmation; Step 6: Before welding, install 4 dial indicators on the equipment flange surface to monitor the change of flange horizontality during welding; Step 7: Electric push welding, welding sequence: elbow plate-upper flange-lower flange.

2. The marine full-rotation electric propulsion installation process according to claim 1 is characterized in that: The welding of electric push elbow plates must comply with the WPS of 20EH36; 2 welders must perform the welding symmetrically; each elbow plate is welded using the segmented back-welding method and is divided into 2 to 3 sections according to its length; for elbow plates that have both fillet welds and butt welds, the butt seams should be welded first.

3. The marine full-rotation electric propulsion installation process according to claim 1 is characterized in that: The upper flange surface welding must comply with the WPS of 20EH36; the circumference direction of the upper flange must be divided into multiple welding sections, and two welders must perform the welding symmetrically; each section of the upper flange is about 600mm long; the welding sequence must be marked on the deck.