Permeable brick performance testing device

By designing a rotatable placement rack and multiple side hole structures, the problem of inaccurate testing in the existing permeable brick performance testing device is solved, enabling more accurate testing of permeable brick performance and simulation of immersion conditions in rainy days, and enhancing detection flexibility and accuracy.

CN115452678BActive Publication Date: 2024-10-25DONGZHI ANDONG XIANGYUAN NEW BUILDING MATERIALS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211228864.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-09
Publication Date
2024-10-25
Estimated Expiration
2042-10-09

AI Technical Summary

Technical Problem

In the existing permeable brick performance testing device, there is only one water outlet between the permeable brick and the measuring cylinder, resulting in inaccurate testing and inability to effectively simulate soaking conditions in rainy days.

Method used

A testing device is designed that includes a base, a measuring cylinder, a water pipe and a rotatable placement rack. The rotation of the rotating plate controls the overlap of multiple side holes to form a water path suitable for permeable bricks of different specifications. It combines an adjustable weighing device and The funnel structure ensures testing area and water source control, increasing the accuracy and flexibility of testing.

Benefits of technology

It achieves a more accurate test of the performance of permeable bricks, can adjust the water flow position and area according to permeable bricks of different specifications, enhances the accuracy of the test, simulates soaking conditions in rainy days, and provides a wider range of testing conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115452678B_ABST
    Figure CN115452678B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of permeable bricks, and in particular to a permeable brick performance testing device, which includes: a base, a measuring cylinder, a water supply pipe, a fixed frame arranged on the upper surface of the base, and a placement frame. Specifically, the placement frame includes a fixed support plate and a rotatable rotating plate. The surface of the support plate is provided with a plurality of first side holes, and the surface of the rotating plate is provided with a plurality of second side holes. The rotating plate rotates to control the plurality of first side holes to overlap with the second side holes and cover the lower surface of the permeable brick. The present invention can control the position where the first side hole overlaps with the second side hole by rotating the rotating plate through the first side hole and the second side hole provided. When the two side holes overlap, a passage can be formed. In this way, the position of water flow can be controlled, and it can be adjusted according to permeable bricks of different specifications to control the overlap of a plurality of side holes, thereby controlling the test area of ​​water permeability, and making the test effect of the permeable brick more accurate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of permeable bricks, and in particular to a permeable brick performance testing device. Background Art

[0002] The main raw material of permeable bricks is concrete, which is made by mixing river sand, cement and water and then adding permeable agents. It is generally used in the renovation of urban roads. Rainwater falling on rainy days will flow in from the micropores on the surface of the permeable bricks and flow out from the micropores on the other side. This can make the road surface paved with permeable bricks smooth, and at the same time, the rainwater can be directed to the bottom by paving permeable bricks, so that water will not accumulate on the road surface.

[0003] Permeable bricks need to be tested for their permeability during research and development and preparation. A Chinese patent with announcement number CN217111975U discloses a device for testing the permeability of permeable bricks, which specifically discloses a structure in which water is poured into the upper part, water is collected through a measuring cylinder at the lower part, and the permeable bricks are placed in the middle for blocking. The water source that can be collected at the lower part is the permeability of the permeable bricks. The more water collected, the stronger the permeability. Although the performance test of the permeable bricks can be carried out, there is only one water outlet between the permeable bricks and the measuring cylinder, which results in that the part of the permeable brick that can actually pass water source is only the part covering the water outlet, which will cause inaccurate performance test of the permeable bricks. Summary of the invention

[0004] In view of the shortcomings of the prior art, the present invention provides a permeable brick performance testing device, and the specific technical solution is as follows:

[0005] A permeable brick performance testing device comprises: a base, a measuring cylinder, a water supply pipe, a fixing frame arranged on the upper surface of the base, and a placing frame.

[0006] Specifically, the placement rack is fixed inside the fixed rack, and the placement rack includes a fixed support plate and a rotatable rotating plate. The surface of the support plate is provided with a plurality of first side holes, and the surface of the rotating plate is provided with a plurality of second side holes. The rotating plate rotates to control the plurality of first side holes to overlap with the second side holes and cover the lower surface of the permeable brick.

[0007] As an improvement of the above technical solution, the support plate and the rotating plate are both circular plates, the upper surface of the support plate is provided with an inner groove, the rotating plate is placed inside the inner groove, and a penetrating center hole is provided at the center position of the rotating plate and the inner groove. The first side hole and the second side hole are several groups of through holes, each group has several through holes arranged in a straight line, the straight line where the through holes in each group are located does not pass through the center hole, and each group of through holes is evenly distributed in a circle with the center hole as the origin.

[0008] As an improvement of the above technical solution, there are several fixing frames, and one end of each fixing frame close to the base is connected to a telescopic rod, the telescopic rod is fixed to the upper surface of the base, and the water supply pipe is fixed to the other end of the fixing frame.

[0009] As an improvement of the above technical solution, a plurality of ear plates are arranged on the outer side of the support plate, the fixing frame passes through the center position of the ear plate, the outer side of the fixing frame is threadedly connected with a nut, and the nut is arranged below the ear plate.

[0010] As an improvement of the above technical solution, a fixing frame is provided through the inner side of the fixing frame, a funnel is provided at the bottom of the fixing frame, and the lower end of the funnel is fixed to the water inlet of the measuring cylinder.

[0011] As an improvement of the above technical solution, a weighing device with adjustable height is provided at the bottom of the measuring cylinder.

[0012] As an improvement of the above technical solution, a screw is provided at the bottom of the weighing device, and the screw is threadedly connected to the base.

[0013] As an improvement of the above technical solution, the water delivery pipe includes an outer pipe, an inner pipe fixed inside the outer pipe, and a water storage pipe telescopically arranged inside the inner pipe. The inner pipe and the lower part of the water storage pipe are sealed, and a plurality of water leakage grooves are opened on the outside of the water storage pipe. The water storage pipe telescopes to control the water leakage grooves protruding from the inner pipe to control the amount of water overflow.

[0014] As an improvement of the above technical solution, the upper ends of the outer tube and the inner tube are sealed and connected, and a penetrating overflow hole is provided on the surface of the sealed connection between the outer tube and the inner tube.

[0015] Beneficial effects of the present invention:

[0016] By setting the first side hole and the second side hole, the overlapping position of the first side hole and the second side hole can be controlled by rotating the rotating plate. When the two side holes overlap, a passage can be formed. The water flow position is controlled in this way. It can be adjusted according to permeable bricks of different specifications and the overlap of several side holes can be controlled, so that the lower surface of the permeable brick can have uniform pores for water flow, and the test area of ​​water permeability can be controlled, so that the test effect of the permeable brick is more accurate. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a front view schematic diagram of the present invention;

[0018] Figure 2 This is a front view schematic diagram of the present invention after removing part of the fixing frame;

[0019] Figure 3 It is a cross-sectional schematic diagram of the placement rack of the present invention;

[0020] Figure 4 It is a structural schematic diagram of the support plate of the present invention;

[0021] Figure 5 It is a structural schematic diagram of the rotating plate of the present invention;

[0022] Figure 6 It is a cross-sectional schematic diagram of the water delivery pipe of the present invention;

[0023] Figure 7 It is a structural schematic diagram of the water storage pipe of the present invention.

[0024] Figure numerals: 10, base; 20, telescopic rod; 21, fixed frame; 22, placement frame; 221, support plate; 2211, inner groove; 2212, first side hole; 2213, ear plate; 222, rotating plate; 2221, second side hole; 23, fixed frame; 231, funnel; 24, nut; 30, measuring cylinder; 31, weighing device; 311, screw; 40, water supply pipe; 41, outer pipe; 42, inner pipe; 421, overflow hole; 43, water storage pipe; 431, leakage trough. DETAILED DESCRIPTION

[0025] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0026] A Chinese patent with announcement number CN217111975U discloses a device for testing the water permeability of permeable bricks, which specifically discloses a structure in which water is poured into the upper part, water is collected through a measuring cylinder at the lower part, and the permeable bricks are placed in the middle for blocking. Although the device can test the performance of the permeable bricks, there is only one water opening between the permeable bricks and the measuring cylinder, which results in the only part of the permeable brick that can actually pass water out is the part covering the water opening, which will lead to inaccurate performance testing of the permeable bricks.

[0027] To resolve this issue, see Figure 1-5 , a permeable brick performance testing device is provided, including: a base 10, a measuring cylinder 30, a water supply pipe 40, a fixing frame 21 and a placing frame 22 arranged on the upper surface of the base 10.

[0028] Specifically, the placement rack 22 is fixed inside the fixed rack 21, and the placement rack 22 includes a fixed support plate 221 and a rotatable rotating plate 222. A plurality of first side holes 2212 are opened on the surface of the support plate 221, and a plurality of second side holes 2221 are opened on the surface of the rotating plate 222. The rotating plate 222 rotates to control the plurality of first side holes 2212 to overlap with the second side holes 2221 and cover the lower surface of the permeable brick.

[0029] The permeable brick is directly placed on the surface of the rotating plate 222. According to the area and specifications of the permeable brick, the rotating plate 222 is rotated to control the number of overlaps between the first side hole 2212 and the second side hole 2221. The overlap of the first side hole 2212 and the second side hole 2221 is used to form a water passage, thereby achieving the purpose of adapting the permeable brick to the area of ​​the permeable brick. In this way, the water flow position can be freely controlled within a certain range, which is convenient for adjustment according to the permeable brick. The operation is convenient and the permeability test of the permeable brick is more accurate.

[0030] In one embodiment, see Figure 3-5 The support plate 221 and the rotating plate 222 are both circular plates. An inner groove 2211 is provided on the upper surface of the support plate 221. The rotating plate 222 is placed inside the inner groove 2211. A penetrating center hole is provided at the center of the rotating plate 222 and the inner groove 2211. The first side hole 2212 and the second side hole 2221 are a plurality of groups of through holes, each group having a plurality of through holes arranged in a straight line. The straight line on which each group of through holes is located does not pass through the center hole. Each group of through holes is evenly distributed in a circle with the center hole as the origin.

[0031] That is, several through holes are arranged in a straight line and the center hole is used as the origin to form a circular array, forming a Figure 4 or Figure 5 As shown in the distribution state, when the rotating plate 222 is placed inside the inner groove 2211, it needs to be installed in reverse, that is, the through holes of the linear array rotate in the opposite direction with the center hole as the center, so that when the rotating plate 222 rotates, the outermost through holes will overlap first, and when it continues to rotate, the outer through holes will be staggered, and the inner through holes will overlap closely, thus achieving the purpose of controlling the water flow area in a rotating manner.

[0032] Figure 4 or Figure 5 The distribution state of the through holes shown is only one of the methods of the present application, and the present application is not limited to the distribution state shown in the figure.

[0033] In one embodiment, see Figure 1-2 There are several fixing frames 21 , and one end of each fixing frame 21 close to the base 10 is connected to a telescopic rod 20 , the telescopic rod 20 is fixed to the upper surface of the base 10 , and the water supply pipe 40 is fixed to the other end of the fixing frame 21 .

[0034] That is, the height of the fixing frame 21 is adjustable, so as to facilitate placing the permeable bricks from the side of the fixing frame 21 onto the rotating plate 222, and to facilitate removing the rotating plate 222 for cleaning and other operations. In addition, the height of the water supply pipe 40 can be adjusted through the fixing frame 21 to avoid the height between the water supply pipe 40 and the placement frame 22 being too high, causing the water source to impact the permeable bricks and produce water splashes.

[0035] To ensure that the height of the support plate 221 is adjustable, refer to Figure 1-4 A plurality of ear plates 2213 are arranged on the outer side of the support plate 221 , the fixing frame 21 passes through the center position of the ear plate 2213 , and a nut 24 is threadedly connected to the outer side of the fixing frame 21 , and the nut 24 is arranged below the ear plate 2213 .

[0036] By adjusting the height of the connection between the nut 24 and the fixing frame 21, a supporting effect is formed, that is, the ear plate 2213 is supported by the nut 24, and the ear plate 2213 limits the position of the support plate 221 at the side, forming a height-adjustable structure.

[0037] In one embodiment, see Figure 1 and Figure 2 A fixing frame 23 is provided on the inner side of the fixing frame 21 , and a funnel 231 is provided at the bottom of the fixing frame 23 . The lower end of the funnel 231 is fixed to the water inlet of the measuring cylinder 30 .

[0038] Since the support plate 221 drains water by the overlap of the first side hole 2212 and the second side hole 2221, its drainage area is uncertain. Therefore, a funnel 231 is used to collect water to ensure that the water leaking from the bottom of the support plate 221 is sent to the inside of the measuring cylinder 30. By observing the scale of the measuring cylinder 30, the water permeability of the permeable brick can be clearly determined.

[0039] In the prior art, it is usually necessary to calculate or remove the measuring cylinder 30 for weighing to obtain the weight of the water permeable brick. This method is relatively troublesome. Figure 2 A height-adjustable weighing device 31 is provided at the bottom of the measuring cylinder 30. Since the fixed frame 23 is not fixed, the funnel 231 as a whole can move vertically up and down on the fixed frame 21. In this case, the weighing device 31 is set below the measuring cylinder 30, and the height of the measuring cylinder 30 is controlled. The weight of the overall structure can be weighed, and the weight of the leaking water source can be obtained by subtracting the weight of the measuring cylinder 30, the fixed frame 23 and the funnel 231, which is more convenient to operate.

[0040] In one embodiment, see Figure 2 A screw 311 is provided at the bottom of the weighing device 31, and the screw 311 is threadedly connected to the base 10, that is, the height of the weighing device 31 is adjusted by rotating the screw 311 to control the screw 311 to be inserted into the base 10. In order to ensure the stability of lifting, the interface area of ​​the screw 311 is preferably larger than the weighing device 31, so as to ensure the stability of the weighing device 31 and avoid the problem of unstable shaking when the screw 311 rotates.

[0041] In existing equipment, water is usually sprayed directly through pipes. In this case, the water source is always in a flowing state. In life, water sources often soak permeable bricks, and the existing structure cannot provide such a detection environment. In order to solve this problem, please refer to Figure 6 and Figure 7 The water supply pipe 40 includes an outer pipe 41, an inner pipe 42 fixed inside the outer pipe 41, and a water storage pipe 43 telescopically arranged inside the inner pipe 42. The inner pipe 42 and the lower part of the water storage pipe 43 are sealed, and a plurality of leakage grooves 431 are opened on the outside of the water storage pipe 43. The water storage pipe 43 telescopes to control the leakage grooves 431 that protrude from the inner pipe 42 to control the overflow amount.

[0042] By controlling the height of the water storage pipe 43, the water leakage groove 431 is made to exceed the end of the inner tube 42, and water will leak out from the part of the water leakage groove 431 that exceeds the inner tube 42. In this case, the height of the water leakage groove 431 exceeding the inner tube 42 is the amount of water delivered to the placement rack 22. Under this structure, the water delivery pipe 40 can be controlled to deliver water at intervals and the amount of water delivered each time can be controlled. In addition, a water pipe can be connected to the end of the outer tube 41 to directly spray water. More detection conditions can be adjusted, the test range is wider, and the test results are more accurate.

[0043] In one embodiment, the outer tube 41 is sealed to the upper end of the inner tube 42, and a through overflow hole 421 is provided on the surface of the sealed connection between the outer tube 41 and the inner tube 42.

[0044] The overflow hole 421 allows part of the water leaking from the leakage groove 431 to overflow into the cavity between the outer tube 41 and the inner tube 42 , and the water flows along the lower opening of the outer tube 41 to the surface of the permeable brick in the middle of the placement rack 22 .

[0045] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. Permeable brick performance testing device, characterized in that: include: Base (10); measuring cylinder (30); water supply pipe (40); A fixing frame (21) disposed on the upper surface of the base (10); A placement rack (22), the placement rack (22) being fixed inside the fixed rack (21), the placement rack (22) comprising a fixed support plate (221) and a rotatable rotating plate (222), a surface of the support plate (221) being provided with a plurality of first side holes (2212), a surface of the rotating plate (222) being provided with a plurality of second side holes (2221), the rotating plate (222) being rotated to control the plurality of first side holes (2212) to overlap with the second side holes (2221) and cover the lower surface of the permeable brick; The support plate (221) and the rotating plate (222) are both circular plates, an inner groove (2211) is provided on the upper surface of the support plate (221), the rotating plate (222) is placed inside the inner groove (2211), a central hole is provided at the center of the rotating plate (222) and the inner groove (2211), the first side hole (2212) and the second side hole (2221) are a plurality of groups of through holes, each group has a plurality of through holes arranged in a straight line, the straight line on which the through holes of each group are located does not pass through the central hole, and each group of through holes is evenly distributed in a circle with the central hole as the origin; There are a plurality of fixing frames (21), and one end of each fixing frame (21) close to the base (10) is connected to a telescopic rod (20), the telescopic rod (20) is fixed to the upper surface of the base (10), and the water supply pipe (40) is fixed to the other end of the fixing frame (21); The water supply pipe (40) comprises an outer pipe (41), an inner pipe (42) fixed inside the outer pipe (41), and a water storage pipe (43) telescopically arranged inside the inner pipe (42); the inner pipe (42) and the lower part of the water storage pipe (43) are sealed; a plurality of water leakage grooves (431) are provided on the outer side of the water storage pipe (43); the water storage pipe (43) is telescopically controlled to protrude the water leakage grooves (431) of the inner pipe (42) so as to control the amount of water overflow; The outer tube (41) and the inner tube (42) are sealedly connected at their upper ends, and a penetrating overflow hole (421) is provided on the surface of the sealed connection between the outer tube (41) and the inner tube (42).

2. The permeable brick performance testing device according to claim 1, characterized in that: A plurality of ear plates (2213) are arranged on the outer side of the support plate (221); the fixing frame (21) passes through the center of the ear plate (2213); a nut (24) is threadedly connected to the outer side of the fixing frame (21); and the nut (24) is arranged below the ear plate (2213).

3. The permeable brick performance testing device according to any one of claims 1-2, characterized in that: A fixing frame (23) is provided on the inner side of the fixing frame (21), and a funnel (231) is provided at the bottom of the fixing frame (23). The lower end of the funnel (231) is fixed to the water inlet of the measuring cylinder (30).

4. The permeable brick performance testing device according to claim 3 is characterized in that: A weighing device (31) with adjustable height is arranged at the bottom of the measuring cylinder (30).

5. The permeable brick performance testing device according to claim 4, characterized in that: A screw rod (311) is provided at the bottom of the weighing device (31), and the screw rod (311) is threadedly connected to the base (10).