A method for quickly laying pre-buried strain optical cable
Through the rapid laying method of pre-embedded strain optical cables, automatic groove opening of grooved parts and formwork trolleys is used, combined with pre-tensioning equipment and pre-mixed cement mortar fixed optical cables, the long construction period, high cost and structural stability in the existing technology are solved. The problem is that efficient and low-cost optical cable laying and tunnel structure protection have been achieved.
Patent Information
- Application Number
- CN202211406107.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-10
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2042-11-10
AI Technical Summary
The existing strain optical cable laying methods have a long construction period and high cost. Manual grooves lead to the inability to unify depth, elevation and flatness, which affects the stability and appearance of the tunnel structure.
The rapid laying method of pre-embedded strain optical cables is adopted. Through the cooperation of grooved fittings and formwork trolleys, the grooves and concrete pouring are automated to ensure that the optical cables naturally form grooves in the concrete, and fixed by pre-tensioning equipment and pre-mixed cement mortar. Optical cables are then backfilled to fix the optical cables, and finally waterproofing is performed.
The trough construction period is shortened, personnel and tools are invested in, the degree of trough formation is improved, the damage to the tunnel structure is reduced, the service life of optical cables is extended, and the stability and appearance of the tunnel structure are improved.
Smart Images

Figure CN115542494B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of a rapid laying method for a pre-buried strain sensing optical cable, and in particular to a rapid laying method for a pre-buried strain sensing optical cable. Background Art
[0002] With the rapid economic development in my country, various infrastructures have been continuously built and improved, resulting in a large number of railway tunnels, highway tunnels, subway tunnels and water diversion tunnels. At present, my country has become the country with the largest number of tunnels in the world. Due to the extremely complex natural geographical and geological conditions in my country, coupled with the frequent occurrence of natural disasters, the structural health and operation and maintenance of various tunnels are seriously threatened. Therefore, it is very important to build a health monitoring system for tunnels;
[0003] At present, in order to monitor the stress and strain changes of tunnel structures and the health conditions such as relaxation and cracking of tunnel surfaces, distributed strain sensing optical cables, as a type of optical fiber sensing technology, can test strain data along the entire optical cable line and realize distributed real-time monitoring of stress and strain on the tunnel surface. At present, when laying strain optical cables, clamps are usually used to fix the strain optical cables to the surface of the tunnel structure. This laying method has two disadvantages: one is that the clamps will affect the monitoring data; the other is that environmental factors have a greater impact on the service life of the clamps, which in turn affects the service life of the entire monitoring system.
[0004] The existing construction method of slotting and pre-embedded strain optical cables is: after the secondary lining concrete construction is completed, the slotting is performed manually by a slotting machine. This construction method takes a long time to slot, requires a lot of personnel and tools, and has a high cost. Due to manual slotting, the depth, elevation, flatness, etc. of the slotting are affected by external factors and cannot be standardized. Post-slotting will destroy the surface stability of the secondary lining, and may cause cracking, broken surfaces, etc., affecting the stability of the secondary lining structure and the appearance of the appearance. Summary of the invention
[0005] To this end, the present invention provides a method for quickly laying a pre-buried strain optical cable to solve the problems of long grooving period, large investment of manpower and tools, and high cost in the construction method; since the grooving is manual, the depth, elevation, flatness, etc. of the grooving are affected by external factors and cannot be standardized; the post-grooving will destroy the surface stability of the secondary lining, and cracks and broken surfaces may occur, affecting the stability of the secondary lining structure and the appearance of the appearance.
[0006] In order to achieve the above object, the present invention provides the following technical solution: a method for quickly laying a pre-buried strain-sensitive optical cable, the specific steps are as follows:
[0007] S1. Construction preparation: preparation and commissioning of lighting equipment and safety equipment, determination of the height and position of the slot according to the design drawings, processing of slot accessories according to the size of the template trolley, and pre-opening of fixing screw holes on the trolley;
[0008] S2. Installation of slotted accessories:
[0009] a. First, determine the slotting position elevation according to the design drawing requirements, and drill holes and tap the corresponding positions on the trolley surface;
[0010] b. During the on-site assembly of the formwork trolley, the slotted accessories are fixed to the opening position of the trolley by screws, and the screws are added with thread fastening glue to ensure that the slotted accessories and the formwork trolley are firmly fixed;
[0011] c. Use the tape measure to check the elevation of the grooved accessories after installation, and use waterproof coating to seal and waterproof the grooved accessories around to prevent leakage;
[0012] S3. Secondary lining construction:
[0013] a. After the trough accessories are installed, brush the isolation oil on them synchronously with the secondary lining trolley;
[0014] b. The second lining concrete of the civil engineering is poured. As the pouring is completed, a groove for burying the strain optical cable is naturally formed;
[0015] c. After the second lining concrete is poured, the trolley moves to the next bin to check the elevation, size, straightness, etc. of the bin groove and perform groove trimming and repair;
[0016] S4, tank cleaning:
[0017] a. Use a wire brush or cement trowel to remove the larger pieces of gravel in the trough;
[0018] b. Use a high-pressure water gun to repeatedly rinse the tank 2-3 times to ensure that there is no gravel and dust in the tank;
[0019] c. After flushing, there should be no gravel and dust in the tank, and the tank body should be moist;
[0020] S5. Cable laying and pre-tensioning:
[0021] a. Place the optical cable reel on the pay-off rack, rotate the optical cable reel, and slowly release the optical cable;
[0022] b. The worker puts the optical cable straight into the cable duct, taking care not to bend it;
[0023] c. The worker puts one end of the optical cable into the groove, and then uses premixed cement mortar to backfill about 30cm to fix the optical cable;
[0024] d. Take 500 meters as a pre-tensioning unit. After straightening the optical cable, a certain tension is applied to the optical cable through a special pre-tensioning device. After the pre-tensioning is completed, the 500-meter optical cable is backfilled into the groove through concrete. After the concrete forms strength, the customized pre-tensioning device is removed;
[0025] e. The length of the optical cable laid out at one time should not exceed the length of the optical cable plugged on that day, so as to avoid accidental damage to the optical cables scattered on the ground;
[0026] S6, backfilling and sealing:
[0027] a. Before plugging, the water-cement ratio of premixed cement mortar should be tested according to the on-site construction environment to test its wall hanging and coagulation effects;
[0028] b. Take an appropriate amount of mortar from the ash bucket and place it on the ash receiving board. Use a cement trowel to fill the mortar into the groove and compact it firmly to fill it up.
[0029] c. When plugging, backfilling is required in three times. The first backfilling volume is about 1 / 2 of the tank capacity, which should be compacted firmly. The second backfilling volume is about the remaining 1 / 2 of the tank capacity, which should be compacted firmly. The third backfilling is to supplement the area that has not been backfilled after the first two backfillings to ensure that the structure after backfilling is flush with the structural surface.
[0030] d. After the groove is filled with mortar, use a cement trowel to finish it to ensure that the backfill surface is smooth, straight, and has no abnormal protrusions;
[0031] e. To ensure the quality of plugging, cement mortar should be used immediately after mixing;
[0032] S7, surface waterproof:
[0033] a. Take out the epoxy waterproof material and mix it;
[0034] b. Take an appropriate amount of epoxy waterproof material and apply it back and forth with a brush to ensure that the width and
[0035] The thickness achieves the expected waterproof effect;
[0036] c. During the coating process, there should be a blocking material below to prevent the epoxy material from falling into the water and causing pollution;
[0037] d. To ensure the waterproof effect, epoxy waterproofing should be used immediately after mixing.
[0038] Preferably, the preparation and review of the grooving accessories involved in step S1 include the size of the grooving accessories (20mm*20mm), the length (the same as the length of the template trolley), the position of the fixing screw holes corresponds to the position of the trolley holes, and the corresponding hole positions on the trolley are highly consistent with the design elevation requirements.
[0039] Preferably, in step S4, a high-pressure water gun is used to wash the opened grooves to clean small residues and dust, thereby ensuring the fit between the sealing material and the original structure without peeling or cracking.
[0040] Preferably, in step S5, a pay-off frame is used to pay out the strained optical cable from the optical cable drum along the slotting direction.
[0041] Preferably, in step S6, premixed cement mortar is used to seal the gaps between the pre-stressing fixing points.
[0042] Preferably, the finishing process in step S6 refers to repeatedly grinding the surface of the backfill mortar with a metal trowel.
[0043] Preferably, in step S7, the waterproof epoxy is evenly applied to the backfilled groove using a brush, and its width is preferably about 1 cm wider than the groove width (5 mm above and 5 mm below), and the thickness is preferably about 1 cm. After the application is completed, the surface of the waterproof layer should be polished smooth with a metal trowel, without abnormal protrusions and burrs.
[0044] Preferably, the cement mortar in step S6 is prepared by mixing ordinary Portland cement, asbestos fiber, 901 glue and an accelerating agent.
[0045] The embodiments of the present invention have the following advantages:
[0046] The construction method of laying distributed strain optical cables in tunnels can solve the impact of installation fixtures on strain optical cable data collection. It has strong environmental applicability, the optical cable itself is not easily damaged, the survival rate and service life are greatly improved, the grooving degree is highly standardized, and it is less affected by external interference and has little impact on civil engineering. The grooving period is short, the investment in personnel and tools is small, and the cost is reduced. The depth, elevation, and flatness of the grooving can be standardized to avoid damaging the surface stability of the secondary lining and improve the stability of the secondary lining structure and the appearance. BRIEF DESCRIPTION OF THE DRAWINGS
[0047] In order to more clearly illustrate the implementation methods of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for the implementation methods or the description of the prior art. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other implementation drawings can be derived from the provided drawings without creative work.
[0048] The structures, proportions, sizes, etc. illustrated in this specification are only used to match the contents disclosed in the specification so as to facilitate understanding and reading by persons familiar with the technology. They are not used to limit the conditions under which the present invention can be implemented, and therefore have no substantial technical significance. Any structural modification, change in proportion or adjustment of size shall still fall within the scope of the technical contents disclosed in the present invention without affecting the effects and purposes that can be achieved by the present invention.
[0049] Figure 1 A cross-sectional view of the installation of the strain optical cable provided by the present invention;
[0050] Figure 2This is a complete construction drawing provided by the present invention.
[0051] 1. Structural secondary lining, 2. Strain optical cable, 3. Backfill sealing material, 4. Waterproof epoxy, 5. Reserved coil, 6. Cement mortar groove filling and sealing, 7. Clips, 8. Corner reservation. DETAILED DESCRIPTION
[0052] The following is a description of the implementation of the present invention by specific embodiments. People familiar with the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0053] Refer to the attached Figure 1-2 The present invention provides a method for quickly laying a pre-buried strain-sensitive optical cable, and the specific steps are as follows:
[0054] S1. Construction preparation: preparation and commissioning of lighting equipment and safety equipment, determination of the height and position of the slot according to the design drawings, processing of slot accessories according to the size of the template trolley, and pre-opening of fixing screw holes on the trolley;
[0055] S2. Installation of slotted accessories:
[0056] a. First, determine the slotting position elevation according to the design drawing requirements, and drill holes and tap the corresponding positions on the trolley surface;
[0057] b. During the on-site assembly of the formwork trolley, the slotted accessories are fixed to the opening position of the trolley by screws, and the screws are added with thread fastening glue to ensure that the slotted accessories and the formwork trolley are firmly fixed;
[0058] c. Use the tape measure to check the elevation of the grooved accessories after installation, and use waterproof coating to seal and waterproof the grooved accessories around to prevent leakage;
[0059] S3. Secondary lining construction:
[0060] a. After the trough accessories are installed, brush the isolation oil on them synchronously with the secondary lining trolley;
[0061] b. The second lining concrete of the civil engineering is poured. As the pouring is completed, a groove for burying the strain optical cable 2 is naturally formed;
[0062] c. After the second lining concrete is poured, the second lining structure 1 is formed, and the trolley moves into the next bin to check the elevation, size, straightness, etc. of the bin groove and perform groove trimming and repair;
[0063] S4, tank cleaning:
[0064] a. Use a wire brush or cement trowel to remove the larger pieces of gravel in the trough;
[0065] b. Use a high-pressure water gun to repeatedly rinse the tank 2-3 times to ensure that there is no gravel and dust in the tank;
[0066] c. After flushing, there should be no gravel and dust in the tank, and the tank body should be moist;
[0067] S5. Cable laying and pre-tensioning:
[0068] a. Place the optical cable reel on the pay-off rack, rotate the optical cable reel, and slowly release the optical cable;
[0069] b. The worker puts the optical cable straight into the cable duct, taking care not to bend it;
[0070] c. The worker puts one end of the optical cable into the groove, and then uses premixed cement mortar to backfill about 30cm to fix the optical cable;
[0071] d. Take 500 meters as a pre-tensioning unit. After straightening the optical cable, a certain tension is applied to the optical cable through a special pre-tensioning device. After the pre-tensioning is completed, the 500-meter optical cable is backfilled into the groove through concrete. After the concrete forms strength, the customized pre-tensioning device is removed;
[0072] e. The length of the optical cable laid out at one time should not exceed the length of the optical cable plugged on that day, so as to avoid accidental damage to the optical cables scattered on the ground;
[0073] S6, backfilling and sealing:
[0074] a. Before plugging, the water-cement ratio of premixed cement mortar should be tested according to the on-site construction environment to test its wall hanging and coagulation effects;
[0075] b. Take an appropriate amount of mortar from the ash bucket and place it on the ash receiving board. Use a cement trowel to fill the mortar into the groove and compact it firmly to fill it up.
[0076] c. When plugging, it is necessary to backfill the plugging materials in 3 times. The first backfill volume is about 1 / 2 of the tank capacity, which should be compacted firmly. The second backfill volume is about the remaining 1 / 2 of the tank capacity, which should be compacted firmly. The third backfill is to supplement the area that has not been backfilled after the first two backfills to ensure that the structure after backfilling is flush with the structural surface.
[0077] d. Fill the groove with cement mortar and seal it. After the groove is filled with mortar, use a cement trowel to finish it to ensure that the backfill surface is smooth and straight without abnormal protrusions.
[0078] e. To ensure the quality of plugging, cement mortar should be used immediately after mixing;
[0079] S7, surface waterproof:
[0080] a. Take out the epoxy waterproof material and mix it;
[0081] b. Take an appropriate amount of epoxy waterproof material and apply it back and forth with a brush to ensure that the width of the 4 layers of waterproof epoxy is
[0082] The thickness achieves the expected waterproof effect;
[0083] c. During the coating process, there should be a blocking material below to prevent the epoxy material from falling into the water and causing pollution;
[0084] d. To ensure the waterproof effect, epoxy waterproofing should be used immediately after mixing;
[0085] In this embodiment, the preparation and review of the slotting accessories involved in step S1 include the size of the slotting accessories (20mm*20mm), the length (the same as the length of the template trolley), the position of the fixing screw hole corresponds to the position of the trolley hole, and the corresponding hole position on the trolley is highly consistent with the design elevation requirements; in step S4, a high-pressure water gun is used to wash the opened groove to clean small residues and dust to ensure the fit of the sealing material to the original structure without peeling or cracking; in step S5, a pay-off frame is used to release the strain optical cable 2 from the optical cable drum along the slotting direction; in step S6, a pay-off frame is used to release the strain optical cable 2 from the optical cable drum along the slotting direction; Premixed cement mortar is used to seal the gaps between the pre-stressing fixed points. The finishing process refers to repeatedly grinding the surface of the backfill mortar with a metal trowel. The cement mortar is mixed with ordinary silicate cement, asbestos fiber, 901 glue, and accelerator. In step S7, a brush is used to evenly apply the waterproof epoxy 4 on the backfilled groove. The width should be about 1 cm wider than the groove width (5 mm above and 5 mm below), and the thickness should be about 1 cm. After the coating is completed, the surface of the waterproof layer should be polished smooth with a metal trowel, without abnormal protrusions and burrs. The waterproof epoxy 4 layer should be composed of polyurea waterproof material.
[0086] Specifically, the construction preparation process is as follows:
[0087] Sealing cement: Premixed slightly expansive cement mortar with crack resistance and waterproof properties should be selected.
[0088] Grooving accessories: connected to the formwork trolley, directly forming a standardized groove that meets the design requirements as the secondary lining is poured.
[0089] Water storage tank: supplies water to the high-pressure water gun.
[0090] High-pressure water gun: tank cleaning and tank washing.
[0091] Other tools: extension strip, ash bucket, ash board, cement trowel, LED spotlight, headlight, steel measuring tape, tape measure, marker pen, etc.
[0092] The above is only a preferred embodiment of the present invention. Any person skilled in the art may modify the present invention by using the above technical solution or modify it into an equivalent technical solution. Therefore, any simple modification or equivalent replacement made according to the technical solution of the present invention shall fall within the scope of protection claimed by the present invention.
Claims
1. A method for quickly laying a pre-buried strain-sensitive optical cable, characterized in that: The specific steps are as follows: S1. Construction preparation: preparation and commissioning of lighting equipment and safety equipment, determination of the height and position of the slot according to the design drawings, processing of slot accessories according to the size of the template trolley, and pre-opening of fixing screw holes on the trolley; S2. Installation of slotted accessories: a. First, determine the slotting position elevation according to the design drawing requirements, and drill holes and tap the corresponding positions on the trolley surface; b. During the on-site assembly of the formwork trolley, the slotted accessories are fixed to the opening position of the trolley by screws, and the screws are added with thread fastening glue to ensure that the slotted accessories and the formwork trolley are firmly fixed; c. Use the tape measure to check the elevation of the grooved accessories after installation, and use waterproof coating to seal and waterproof the grooved accessories around to prevent leakage; S3. Secondary lining construction: a. After the trough accessories are installed, brush the isolation oil on them synchronously with the secondary lining trolley; b. The second lining concrete of the civil engineering is poured. As the pouring is completed, a groove for burying the strain optical cable is naturally formed; c. After the second lining concrete is poured, the trolley moves to the next bin to check the elevation, size and straightness of the bin groove and perform groove trimming; S4, tank cleaning: a. Use a wire brush or cement trowel to remove the larger pieces of gravel in the trough; b. Use a high-pressure water gun to repeatedly rinse the tank 2-3 times to ensure that there is no gravel and dust in the tank; c. After flushing, there should be no gravel and dust in the tank, and the tank body should be moist; S5. Cable laying and pre-tensioning: a. Place the optical cable reel on the pay-off rack, rotate the optical cable reel, and slowly release the optical cable; b. Place the optical cable straight into the cable duct, taking care not to bend it; c. Place one end of the optical cable into the groove, and then use premixed cement mortar to backfill about 30cm to fix the optical cable; d. Take 500 meters as a pre-tensioning unit. After straightening the optical cable, a certain tension is applied to the optical cable through a special pre-tensioning device. After the pre-tensioning is completed, the 500-meter optical cable is backfilled into the groove through concrete. After the concrete has formed strength, the special pre-tensioning device is removed; e. The length of the optical cable laid out at one time should not exceed the length of the optical cable plugged on that day, so as to avoid accidental damage to the optical cables scattered on the ground; S6, backfill and seal the surface: a. Before plugging, the water-cement ratio of premixed cement mortar should be tested according to the on-site construction environment to test its wall hanging and coagulation effects; b. Take an appropriate amount of mortar from the ash bucket and place it on the ash receiving board. Use a cement trowel to fill the mortar into the groove and compact it firmly to fill it up. c. When plugging, backfilling is required in three times. The first backfilling volume is about 1 / 2 of the tank capacity, which should be compacted firmly. The second backfilling volume is about the remaining 1 / 2 of the tank capacity, which should be compacted firmly. The third backfilling is to supplement the area that has not been backfilled after the first two backfillings to ensure that the structure after backfilling is flush with the structural surface. d. After the groove is filled with mortar, use a cement trowel to finish it to ensure that the backfill surface is smooth, straight, and has no abnormal protrusions; e. To ensure the quality of plugging, cement mortar should be used immediately after mixing; S7, surface waterproof: a. Take out the epoxy waterproof material and mix it; b. Take an appropriate amount of epoxy waterproof material and apply it back and forth with a brush to ensure that the width and The thickness achieves the expected waterproof effect; c. During the coating process, there should be a blocking material below to prevent the epoxy material from falling into the water and causing pollution; d. To ensure the waterproof effect, epoxy waterproofing should be used immediately after mixing.
2. The method for quickly laying a pre-buried strain-sensitive optical cable according to claim 1, characterized in that: The preparation and review of the slotted accessories involved in step S1 include the size and length of the slotted accessories, the position of the fixing screw holes corresponds to the position of the holes in the trolley, and the height of the corresponding hole positions on the trolley meets the design elevation requirements.
3. The method for quickly laying a pre-buried strain-sensitive optical cable according to claim 1, characterized in that: In step S4, a high-pressure water gun is used to wash the opened grooves to clean small residues and dust, thereby ensuring the sealing material fits the original structure well without peeling or cracking.
4. The method for quickly laying a pre-buried strain-sensitive optical cable according to claim 1, characterized in that: In step S5, the strained optical cable is released from the optical cable drum along the slotting direction using a pay-off frame.
5. The method for rapid laying of a pre-buried strain-sensitive optical cable according to claim 1, characterized in that: In step S6, premixed cement mortar is used to seal the gaps between the pre-tensioning fixed points.
6. The method for quickly laying a pre-buried strain-sensitive optical cable according to claim 1, characterized in that: The plastering process in step S6 refers to repeatedly grinding the surface of the backfill mortar with a metal trowel.
7. The method for quickly laying a pre-buried strain-sensitive optical cable according to claim 1, characterized in that: In step S7, the waterproof epoxy is evenly applied to the backfilled groove using a brush. The width of the epoxy is preferably about 1 cm wider than the groove width and the thickness is preferably about 1 cm. After the application is completed, the surface of the waterproof layer should be polished smooth with a metal trowel without abnormal protrusions and burrs.
8. The method for quickly laying a pre-buried strain-sensitive optical cable according to claim 1, characterized in that: In step S6, the cement mortar is prepared by mixing ordinary Portland cement, asbestos fiber, 901 glue and an accelerating agent.
9. The method for quickly laying a pre-buried strain-sensitive optical cable according to claim 1, characterized in that: In step S7, the waterproof epoxy layer includes a waterproof material whose main component is polyurea.