Cryogenic pump evacuation device and evacuation method thereof

By setting up branch pipeline components and main pipeline components in the cryopump system and controlling the valve opening with the controller, the problem of temperature exceeding the threshold when the cryopump is directly pumped, efficient vacuum acquisition is achieved and cost is reduced.

CN115628199BActive Publication Date: 2024-11-22VACREE TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211267329.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-10-17
Publication Date
2024-11-22
Estimated Expiration
2042-10-17

AI Technical Summary

Technical Problem

When the existing cryogenic pumps directly pump the air in the chamber, it is easy to cause the secondary cold plate temperature to exceed the threshold, resulting in the pump failure. A rough pump must be used for pre-vacuum, which increases the cost of vacuum acquisition.

Method used

By setting up branch pipeline components and main pipeline components, the controller controls the valve opening according to the chamber volume and the pressure value feedback from the vacuum gauge, reduces the gas thermal load of the cryopump, prevents the secondary cold plate temperature from exceeding the threshold, and thus directly attacks the atmosphere The chamber in the state is vacuum-extracted to avoid the use of a rough pump.

Benefits of technology

Direct vacuum extraction is achieved, the ultimate vacuum acquisition speed is improved, the vacuum acquisition cost is reduced, and the use of crude pumping is eliminated.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115628199B_ABST
    Figure CN115628199B_ABST
Patent Text Reader

Abstract

The present invention discloses a cryopump evacuation device and an evacuation method thereof, comprising a cryopump assembly, a branch line assembly, a main line assembly, a vacuum gauge, a controller, and a chamber, wherein the cryopump assembly is connected to the chamber through the main line assembly, and the cryopump assembly is also connected to the main line assembly through the branch line assembly, and the pipe diameter of the branch line assembly is smaller than the pipe diameter of the main line assembly. In the present invention, the pressure reduction of the atmosphere in the chamber can be achieved by setting the branch line assembly and its control valve, so that it meets the use conditions of the cryopump assembly and prevents the secondary cold plate temperature of the cryopump assembly from exceeding the threshold value. The controller can control the opening of the control valves on the main line assembly and the branch line assembly according to the volume of the chamber and the pressure value fed back by the vacuum gauge, and control the gas heat load of the cryopump assembly below the threshold value, so that the device can directly evacuate the chamber in the atmospheric state, and at the same time, the use of rough pumps such as dry pumps is eliminated, thereby reducing the cost of vacuum acquisition.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of vacuum acquisition devices, and more specifically to a cryogenic pump evacuation device and an evacuation method thereof. Background Art

[0002] Cryopumps are truly oil-free and clean based on the principles of cryogenic condensation and cryogenic adsorption. They are widely used in the fields of high vacuum and ultra-high vacuum, such as optical coating, integrated circuit PVD coating and ion implantation. Under the current use environment, it is generally required that the customer's chamber is pre-pumped to a rough vacuum through a rough pump / foreline pump before turning on the cryopump to further obtain a high vacuum environment for the chamber.

[0003] Due to the limitation of its working principle, cryopumps generally work in the high vacuum and ultra-high vacuum range. If the chamber atmosphere is directly pumped, the continuous excessive gas heat load (atmosphere relative to the gas in the cryopump) will easily cause the secondary cold plate temperature to exceed the threshold (>20K), thereby causing the cryopump to fail. The general solution is to use a roughing pump (dry pump or rotary vane pump, etc.) to pre-evacuate the chamber to below the starting pressure of the cryopump, and then use the cryopump to pump the chamber to the target vacuum (high vacuum or ultra-high vacuum).

[0004] The existing patent document with patent publication number CN113153714A discloses a method for controlling the operation of a cryopump assembly for a neutral beam injection system. The cryopump assembly includes a liquid nitrogen dewar, a liquid helium dewar, a molecular pump, a Roots pump, a cryopump, and a temperature measurement control device. The liquid nitrogen dewar is connected to a radiation-proof baffle in the cryopump, the liquid helium dewar is connected to a cryopump internal low-temperature adsorption surface, the cryopump has activated carbon and a heating wire on the cryopump, the temperature measurement control device is connected to the heating wire, and the molecular pump and the Roots pump are respectively connected to the cryopump; the method includes the following steps: cooling; steady-state operation; regeneration process; and temperature recovery.

[0005] When pumping to the target vacuum, it is necessary to first perform rough pumping through a Roots pump and then pump to the target vacuum through a molecular pump. Due to the limitations of the working principle of the cryopump, it is necessary to use a rough pump for pre-vacuuming, which greatly increases the cost of obtaining vacuum. Summary of the invention

[0006] The technical problem to be solved by the present invention is how to avoid the use of roughing pumps such as dry pumps and reduce the cost of vacuum acquisition.

[0007] The present invention solves the above technical problems through the following technical means: a cryogenic pump evacuation device, including a cryogenic pump assembly, a branch pipeline assembly, a main pipeline assembly, a vacuum gauge, a controller, and a chamber. The cryogenic pump assembly is connected to the chamber through the main pipeline assembly, and the cryogenic pump assembly is also connected to the main pipeline assembly through the branch pipeline assembly, and the pipeline diameter of the branch pipeline assembly is smaller than the pipeline diameter of the main pipeline assembly. The branch pipeline assembly and the main pipeline assembly are both provided with control valves, and the control valve flow of the branch pipeline assembly is less than the maximum conductance value of the cryogenic pump assembly. The main pipeline assembly is also provided with a vacuum gauge, and the controller is electrically connected to the control valve and the vacuum gauge.

[0008] By setting the branch pipeline assembly and its control valve, the pressure of the atmosphere in the chamber can be reduced to meet the operating conditions of the cryopump assembly, preventing the temperature of the secondary cold plate of the cryopump assembly from exceeding the threshold value. The controller can control the opening of the control valves on the main pipeline assembly and the branch pipeline assembly according to the volume of the chamber and the pressure value fed back by the vacuum gauge, and control the gas heat load of the cryopump assembly to be below the threshold value, so that the device can directly evacuate the chamber in the atmospheric state, so that the cryopump assembly can be directly roughly evacuated. Compared with the roughing pump, the device has a high pumping speed and can obtain a higher ultimate vacuum. At the same time, the use of roughing pumps such as dry pumps is eliminated, thereby reducing the cost of vacuum acquisition.

[0009] As a preferred technical solution, the cryogenic pump assembly includes a cryogenic pump and a pump port cover. The pump port cover is fixed on the top of the cryogenic pump and encloses it to form a closed cavity structure. One end of the main line assembly is connected to the pump port cover, and the other end is connected to the chamber.

[0010] As a preferred technical solution, the cryopump includes a pump casing and a refrigerator cold head, a first-level cold screen, a second-level cold plate, and a first-level baffle located in the pump casing. The first-level cold screen, the second-level cold plate, and the first-level baffle are thermally connected to the refrigerator cold head. One end of the branch pipe assembly is connected to the cryopump, and the other end is connected to the main pipe assembly. The end of the branch pipe assembly connected to the cryopump extends into the pump casing.

[0011] As a preferred technical solution, the main line assembly includes a main line valve and a main line. The end of the branch line assembly connected to the main line assembly divides the main line into a first connecting line and a second connecting line. The first connecting line is connected to the chamber through the second connecting line. The first connecting line is provided with a main line valve.

[0012] As a preferred technical solution, the branch pipeline assembly includes a branch pipeline valve and a branch pipeline, the branch pipeline is provided with a branch pipeline valve, and the main pipeline has a larger diameter than the branch pipeline.

[0013] As a preferred technical solution, a valve is provided on the second connecting pipeline, and the valve is electrically connected to the controller.

[0014] As a preferred technical solution, a secondary temperature sensor is provided on the secondary cold plate, and the secondary temperature sensor is electrically connected to the controller.

[0015] As a preferred technical solution, the main line valve is a proportional valve.

[0016] As a preferred technical solution, the controller is an operation control unit.

[0017] A method for evacuating a cryogenic pump evacuation device comprises the following steps:

[0018] S1: Keep the main pipeline valve and branch pipeline valve in the closed state to establish the normal working state of the cryogenic pump;

[0019] S2: The numerical temperature T2 of the secondary temperature sensor of the secondary cold plate of the cryopump is collected through the controller, and the pipeline pressure value P is collected through the vacuum gauge to be used as an assessment of the gas heat load shock size, and finally as a criterion for switching the branch pipeline 32 to the main pipeline 42 for evacuation;

[0020] S3: Connect the chamber by opening the valve, open the valve and the branch line valve, wherein the flow of the branch line valve is less than the maximum conductance value C1 of the cryopump, and reduce the chamber pressure to P1, wherein the product of P1 and the chamber volume is less than the start-up switching value of the cryopump;

[0021] S4: Close the branch line valve and open the main line valve to allow the chamber to obtain the target vacuum environment;

[0022] S5: Close the main line valve and close the valve to complete the evacuation process.

[0023] The advantages of the present invention are:

[0024] (1) In the present invention, the pressure reduction of the atmosphere in the chamber can be achieved by setting the branch pipeline assembly and its control valve, so that it meets the operating conditions of the cryopump assembly and prevents the temperature of the secondary cold plate of the cryopump assembly from exceeding the threshold value. The controller can control the opening of the control valves on the main pipeline assembly and the branch pipeline assembly according to the volume of the chamber and the pressure value fed back by the vacuum gauge, and control the gas heat load of the cryopump assembly below the threshold value, so that the device can directly evacuate the chamber in the atmospheric state, so that the cryopump assembly can be directly roughly evacuated. Compared with the roughing pump, the device has a high pumping speed and can obtain a higher ultimate vacuum. At the same time, the use of roughing pumps such as dry pumps is eliminated, thereby reducing the vacuum acquisition cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 A schematic diagram of the structure of a cryopump evacuation device provided in Example 1 of the present invention;

[0026] Figure numbers: 10, cryopump; 11, refrigerator cold head; 12, pump housing; 13, primary cold screen; 14, secondary cold plate; 15, primary baffle; 16, secondary temperature sensor; 20, pump port cover; 30, branch pipeline assembly; 31, branch pipeline valve; 32, branch pipeline; 40, main pipeline assembly; 41, main pipeline valve; 42, main pipeline; 50, vacuum gauge; 60, operation control unit; 71, valve; 72, chamber. DETAILED DESCRIPTION

[0027] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in combination with the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0028] Example 1

[0029] See also Figure 1 The cryopump evacuation device includes a cryopump 10, a pump port seal 20, a branch pipeline assembly 30, a main pipeline assembly 40, a vacuum gauge 50, an operation control unit 60, a valve 71, a chamber 72, and a controller. The pump port seal 20 is fixedly arranged on the top of the cryopump 10 and encloses it to form a closed cavity structure. The pump port seal 20 and the cryopump 10 form a cryopump assembly. The pump port seal 20 is connected to the chamber 72 through the main pipeline assembly 40. The cryopump 10 is connected to the main pipeline assembly 40 through the branch pipeline assembly 30. One end of the branch pipeline assembly 30 is connected to the main pipeline assembly 40, and the other end is connected to the cryopump 10. One end of the branch pipeline assembly 30 is connected to the main pipeline assembly 40. The main pipeline 42 on the main pipeline assembly 40 is divided into a first connecting pipeline and a second connecting pipeline; a vacuum gauge 50 is provided on the second connecting pipeline, through which the pressure value P of the pipeline can be collected in real time for evaluation of the gas heat load impact. Preferably, the valve 71 is a manual valve; the pipeline diameter of the main pipeline assembly 40 is larger than the pipeline diameter of the branch pipeline assembly 30; the instantaneous gas flux inside the pipeline can be reduced by the branch pipeline assembly 30 and the control valve in the assembly, and the gas heat load impact on the secondary cold plate 14 of the cryopump 10 is reduced to meet the working condition requirements of the cryopump 10 and prevent the temperature of the secondary cold plate 14 of the cryopump 10 from exceeding the threshold value. It should be noted that the threshold value is generally about 20K;

[0030] The cryopump 10, the pump port seal 20, the main pipeline assembly 40, and the chamber 72 form a first evacuation pipeline. The cryopump 10, the branch pipeline assembly 30, the second connecting pipeline, and the chamber 72 form a second evacuation pipeline. The first evacuation pipeline is used to roughly evacuate the chamber 72, and the second evacuation pipeline is used to evacuate the chamber 72 to a target vacuum. The pressure P1 of the chamber 72 is used as a criterion for switching the branch pipeline 32 to the main pipeline 42 during the evacuation process. After switching to the first evacuation pipeline, a higher evacuation speed can be obtained. The combination of the first evacuation pipeline and the second evacuation pipeline ensures that the evacuation speed efficiency of the entire evacuation process is the highest. A temperature sensor is provided on the secondary cold plate 14 on the cryopump 10, and control sensors are provided on the branch pipeline assembly 30 and the first connecting pipeline. The control valve, the flow of the control valve on the branch line assembly 30 is less than the maximum conductance value C1 of the cryopump, a valve 71 is arranged on the second connecting line, the controller and the valve 71, the two control valves and the temperature sensor are all electrically connected, the controller can control the control valve on the first connecting line and the branch line assembly 30 and the state (opening) of the valve 71 according to the volume of the chamber 72 and the pressure value fed back by the pipeline vacuum gauge 50, and control the gas heat load of the cryopump 10 to be below the threshold, so that the device can directly evacuate the chamber 72 in the atmospheric state, so that the cryopump 10 can directly perform rough evacuation. Compared with the roughing pump, the device has a high pumping speed and can obtain a higher ultimate vacuum. At the same time, the use of roughing pumps such as dry pumps is eliminated, thereby reducing the cost of vacuum acquisition;

[0031] See also Figure 1 The cryopump 10 includes a refrigerator cold head 11, a pump housing 12, a first-level cold shield 13, a second-level cold plate 14, a first-level baffle 15, and a second-level temperature sensor 16. The refrigerator cold head 11 is used to provide a cold source for the entire cryopump 10. The first-level cold shield 13, the first-level baffle 15, and the second-level cold plate 14 are all connected to the refrigerator cold head 11 through thermal connection. The second-level temperature sensor 16 is arranged on the second-level cold plate 14. The second-level temperature sensor 16 is used to detect the temperature of the second-level cold plate 14. The first-level cold shield 13 and the first-level baffle 15 can reach extremely low temperatures below 100K, and the second-level cold plate 14 can reach gas capture below 20K, which is the cavity The chamber 72 creates a high vacuum and ultra-high vacuum environment; the main line assembly 40 includes a main line 42 and a main line valve 41, that is, the first connecting line is provided with a main line valve 41, and the branch line assembly 30 is provided with a branch line 32 and a branch line valve 31. The diameter of the main line 42 is larger than the diameter of the branch line 32. The main line valve 41 and the branch line valve 31 are evenly electrically connected to the controller. In this embodiment, the controller is the operation control unit 60. When the operation control unit 60 monitors that the temperature T2 of the secondary temperature sensor 16 on the secondary cold plate 14 of the cryopump 10 is greater than 20K, the main line valve 41 and the branch line valve 31 are closed.

[0032] The evacuation method comprises the following steps:

[0033] S1: Keep the main pipeline valve 41 and the branch pipeline valve 31 in a closed state, and establish that the cryopump 10 is in a normal working state. At this time, the temperature of the secondary cold plate 14 is generally 8-15K, and the cryopump 10 has a vacuum pumping capability;

[0034] S2: The numerical temperature T2 of the secondary temperature sensor 16 of the secondary cold plate 14 of the cryopump 10 is collected through the calculation control unit 60, and the pipeline pressure value P is collected in real time through the vacuum gauge 50 for evaluation of the gas heat load impact, and finally as a criterion for switching the branch pipeline 32 to the main pipeline 42 for evacuation;

[0035] S3: Connect the chamber 72 by opening the valve 71; open the valve 71 and the branch line valve 31, wherein the flow rate of the branch line valve 31 is less than the maximum conductance value C1 of the cryopump 10, so that the temperature of the secondary cold plate 14 of the cryopump 10 is less than 20K, and the pressure of the chamber 72 is reduced to P1 (the product of P1 and the volume of the chamber 72 is less than the start-up switching value of the cryopump 10);

[0036] S4: close the branch line valve 31, open the main line valve 41, make the main line 42 conductive, so that the chamber 72 obtains the target vacuum environment;

[0037] S5: Close the main line valve 41 and the valve 71 to complete the evacuation process.

[0038] Example 2

[0039] The difference between this embodiment and the first embodiment is that the branch pipeline assembly 30 is eliminated, and the main pipeline valve 41 in the main pipeline assembly 40 is replaced by a proportional valve to achieve the same effect.

[0040] Working principle: By adjusting the opening of the proportional valve, the pipeline conductance can be controlled to control the amount of gas entering the cryopump 10, so that the temperature of the secondary cold plate 14 of the cryopump 10 is always within the operating temperature range below 20K.

[0041] The typical working process is that when the chamber 72 at atmospheric pressure is first evacuated, the proportional valve opening is small and the pipeline conductance is small, so that the gas flow through the pipeline is small to maintain the temperature of the secondary cold plate 14 of the cryopump 10 less than 20K; as the evacuation process proceeds, the pressure value of the chamber 72 gradually decreases, and the proportional valve opening can be gradually increased. When the product of the pressure value collected by the vacuum gauge 50 and the volume of the chamber 72 meets the requirement of being less than the maximum conductance C1 of the cryopump, the proportional valve can be fully opened to obtain the maximum pumping speed.

[0042] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for evacuating a cryogenic pump, It is characterized in that The cryopump evacuation device comprises a cryopump assembly, a branch line assembly (30), a main line assembly (40), a vacuum gauge (50), a controller, and a chamber (72); the cryopump assembly is connected to the chamber (72) via the main line assembly (40); the cryopump assembly is also connected to the main line assembly (40) via the branch line assembly (30); the pipe diameter of the branch line assembly (30) is smaller than the pipe diameter of the main line assembly (40); the branch line assembly (30) and the main line assembly (40) are both provided with control valves; the flow rate of the control valve of the branch line assembly (30) is smaller than the maximum conductance value of the cryopump assembly; the main line assembly (40) is also provided with a vacuum gauge (50); the controller is electrically connected to the control valve and the vacuum gauge (50); The cryopump assembly comprises a cryopump (10) and a pump port seal (20), wherein the pump port seal (20) is fixedly arranged on the top of the cryopump (10) and encloses the cryopump (10) to form a closed cavity structure, and one end of the main pipeline assembly (40) is connected to the pump port seal (20) and the other end is connected to the chamber (72); The cryopump (10) comprises a pump housing (12) and a refrigerator cold head (11), a primary cold shield (13), a secondary cold plate (14), and a primary baffle (15) located in the pump housing (12); the primary cold shield (13), the secondary cold plate (14), and the primary baffle (15) are all thermally connected to the refrigerator cold head (11); one end of the branch pipe assembly (30) is connected to the cryopump (10), and the other end is connected to the main pipe assembly (40); the end of the branch pipe assembly (30) connected to the cryopump (10) extends into the pump housing (12); The main pipeline assembly (40) comprises a main pipeline valve (41) and a main pipeline (42); one end of the branch pipeline assembly (30) connected to the main pipeline assembly (40) divides the main pipeline (42) into a first connecting pipeline and a second connecting pipeline; the first connecting pipeline is connected to the chamber (72) via the second connecting pipeline; and the first connecting pipeline is provided with a main pipeline valve (41); The branch pipeline assembly (30) comprises a branch pipeline valve (31) and a branch pipeline (32); the branch pipeline (32) is provided with the branch pipeline valve (31); and the main pipeline (42) has a larger diameter than the branch pipeline (32); The second connecting pipeline is provided with a valve (71), and the valve (71) is electrically connected to the controller; The secondary cold plate (14) is provided with a secondary temperature sensor (16), and the secondary temperature sensor (16) is electrically connected to the controller; The evacuation method comprises the following steps: S1: Keep the main pipeline valve (41) and the branch pipeline valve (31) both in a closed state, and establish a normal working state of the cryogenic pump (10); S2: The numerical temperature T2 of the secondary temperature sensor (16) of the secondary cold plate (14) of the cryopump (10) is collected through the controller, and the pipeline pressure value P is collected through the vacuum gauge (50) to be used as an evaluation of the gas heat load impact size, and finally as a criterion for switching the branch pipeline (32) from evacuation to evacuation of the main pipeline (42); S3: connecting the chamber (72) by opening the valve (71), opening the valve (71) and the branch line valve (31), wherein the flow rate of the branch line valve (31) is less than the maximum conductance value C1 of the cryopump (10), and reducing the pressure of the chamber (72) to P1, wherein the product of P1 and the volume of the chamber (72) is less than the start-up switching value of the cryopump (10); S4: closing the branch line valve (31) and opening the main line valve (41) so that the chamber (72) obtains the target vacuum environment; S5: Close the main line valve (41), close the valve (71), and complete the evacuation process.

2. The evacuation method of the cryopump evacuation device according to claim 1, It is characterized in that The main pipeline valve (41) is a proportional valve.

3. The evacuation method of the cryopump evacuation device according to claim 1, It is characterized in that The controller is an operation control unit (60).