Dock wall structure and dock

By adopting a dock wall structure composed of multiple steel pipe cylindrical structures, the problem of insufficient stability of the existing dock wall structure is solved, higher stability and service life are achieved, and construction costs and time are reduced.

CN115743468BActive Publication Date: 2025-04-18CCCC FIRST HARBOR ENGINEERING CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202211474475.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-11-23
Publication Date
2025-04-18
Estimated Expiration
2042-11-23

AI Technical Summary

Technical Problem

The existing dock wall structure is insufficient in its use, resulting in a short service life and it is difficult to meet the needs of long-term ship building.

Method used

A dock wall structure consisting of a plurality of steel pipe cylinder structures, each steel pipe cylinder structure consists of a first steel pipe, an I-shaped steel and a second steel pipe. Through these structures, a large diameter cylinder is surrounded by a cylinder, and a first baffle plate and a steel sheet pile are arranged outside, and the inner backfilling is formed into a backfilling part, and finally a surface layer is laid outside.

Benefits of technology

It improves the stability and firmness of the dock, extends the service life, reduces the construction cycle and cost, and enhances the water-stop effect of the dock wall.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115743468B_ABST
    Figure CN115743468B_ABST
Patent Text Reader

Abstract

The present application provides a dock wall structure, comprising a plurality of steel tube cylindrical structures; each steel tube cylindrical structure comprises a plurality of first steel tubes and an I-beam connecting two adjacent first steel tubes; a first baffle plate longitudinally arranged outside the steel tube cylindrical structure; the first baffle plates between two adjacent steel tube cylindrical structures are arranged opposite to each other, forming a post-casting strip therebetween; steel sheet piles are arranged between two adjacent steel tube cylindrical structures; a second backfill portion is located between the first baffle plate and the steel sheet piles; and a surface layer is arranged above the steel tube cylindrical structure and above the first baffle plate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the field of construction and relates to a dock wall structure and a dock. Background Art

[0002] A dock is a dock-type building used for ship repair and construction. It can allow ships to enter and exit after being filled with water, and can repair and build ships on a dry bottom after being drained. It is a working platform for repairing and building ships in a shipyard and a place for repairing and building ships. A dock is surrounded by dock walls, and the construction structure and quality of the dock walls affect the service life of the dock. Summary of the invention

[0003] The purpose of the present application is to provide a dock wall structure and a dock, the manufactured dock is stable and firm, and the service life is increased.

[0004] A first aspect of the present application provides a dock wall structure, comprising:

[0005] A plurality of steel tube cylindrical structures; each of the steel tube cylindrical structures comprises a plurality of first steel tubes and an I-beam connecting two adjacent first steel tubes; wherein the I-beam has two flanges parallel to each other and a web connecting the two flanges respectively, and both ends of each flange are respectively connected to the two adjacent first steel tubes; the plurality of first steel tubes and the plurality of I-beams connected therebetween surround the steel tube cylindrical structure;

[0006] The first baffle is longitudinally arranged outside the steel tube cylindrical structure; the first baffles between two adjacent steel tube cylindrical structures are arranged opposite to each other to form a post-casting strip therebetween;

[0007] Steel sheet piles are arranged between two adjacent steel tube cylindrical structures; wherein the first baffle is close to the inner side of the dock wall structure, and the steel sheet piles are close to the outer side of the dock wall structure;

[0008] A second backfill portion is located between the first baffle and the steel sheet pile;

[0009] The surface layer is arranged above the steel tube cylindrical structure and above the first baffle.

[0010] In one embodiment, the steel tube cylindrical structure further includes a second steel tube and a concrete cylinder; wherein the diameter of the second steel tube is smaller than that of the first steel tube, the number of the second steel tube is less than that of the first steel tube, and the second steel tube is arranged at intervals on the steel tube cylindrical structure, and is used to connect two adjacent first steel tubes to replace the I-beam there; the second steel tube has an extension portion longer than the first steel tube and the I-beam. The concrete cylinder is annular, and its outer diameter is roughly equal to the outer diameter of the steel tube cylindrical structure, and its thickness is roughly equal to the diameter of the first steel tube. It is provided with a plurality of long holes matching the extension portion of the second steel tube along the circumferential direction. The extension portion of the second steel tube is inserted into the long hole of the concrete cylinder, so that the concrete cylinder is installed above the first steel tube and the I-beam to form the steel tube cylindrical structure.

[0011] In one embodiment, the first baffle is located outside the concrete cylinder, and the two are integrally formed.

[0012] In one embodiment, the outer diameter of the steel tube cylindrical structure is 15-30 mm, the diameter of the first steel tube is 400-600 mm, and the diameter of the second steel tube is 200-300 mm.

[0013] In one embodiment, the center of the first steel tube, the center of the second steel tube and the center of the I-beam are located on the same circumference of the steel tube cylindrical structure.

[0014] In one embodiment, a cross beam is provided on the upper portion of the steel tube cylindrical structure and is connected to the surface layer to bear the pressure loaded by the surface layer.

[0015] In one embodiment, the interior of each steel tube cylindrical structure is backfilled to form a first backfill portion. In the second backfill portion, a water-stop curtain is provided between two adjacent steel tube cylindrical structures; the water-stop curtain is formed by mixing piles or rotary jet piles.

[0016] In one embodiment, a prefabricated plate is laid on top of the steel tube cylindrical structure; a second baffle extending longitudinally downward is provided on the inner side of the prefabricated plate.

[0017] In one embodiment, a stopper and a pipe culvert are provided above the prefabricated plate, wherein the stopper is located above the second stopper and is used to limit the position of the pipe culvert. Above the prefabricated plate, the outer side of the pipe culvert is backfilled to form a third backfill portion of the same height as the pipe culvert; the surface layer is located above the pipe culvert and the third backfill portion.

[0018] A second aspect of the present application provides a dock, which includes a dock wall structure as described in any of the above embodiments, wherein the dock wall structure is respectively connected to two dock gate piers, and a dock gate is provided between the dock gate piers.

[0019] A third aspect of the present application provides a construction method for a dock, comprising the following steps:

[0020] Assembly of steel tube cylindrical structure: The assembled steel tube cylindrical structure is cylindrical, and has multiple first steel tubes and an I-beam connecting two adjacent first steel tubes on its circumference; wherein the I-beam has two flanges parallel to each other and a web connecting the two flanges respectively, and the two ends of each flange are respectively connected to the two adjacent first steel tubes.

[0021] Construction of steel tube cylinder structure: Mark the construction position of the steel tube cylinder structure; use vibration sinking equipment to drive the steel tube cylinder structure to the construction position, and vibrate and sink it to the designed depth of the steel tube cylinder structure. Then drive the next steel tube cylinder structure, so that the first baffles of two adjacent steel tube cylinder structures are arranged oppositely, and a post-casting strip is formed between them. Repeat the above steps to complete the construction of the steel tube cylinder structure.

[0022] Steel sheet pile construction: Drive steel sheet piles between two adjacent steel pipe cylindrical structures on the outside of the dock; insert the bottom of the steel sheet piles into the soil and the top of the steel sheet piles out of the water.

[0023] Construction of dock gate structure: The dock gate structure includes two dock gate piers; the first and last two steel pipe cylindrical structures are respectively connected to the two dock gate piers to form a closed dock.

[0024] Dock wall connection: drain the water in the dock, cast the post-cast strip between the two first baffles arranged opposite to each other, and backfill between the first baffle and the steel sheet pile to form a second backfill part.

[0025] Surface layer construction: The surface layer is formed by constructing above the steel pipe cylindrical structure, above the first baffle and above the second backfill part.

[0026] As an embodiment, the construction steps of the steel tube cylinder structure more specifically include: calibrating the construction position of the steel tube cylinder structure; installing the replacement assembly on the top of the steel tube cylinder structure, using the vibrating sinking equipment to drive the steel tube cylinder structure to the construction position through the replacement assembly, and vibrating and sinking to the designed depth of the steel tube cylinder structure; removing the replacement assembly. Then, the next steel tube cylinder structure is driven, so that the first baffles between the two adjacent steel tube cylinder structures are relatively arranged. Repeat the above steps to complete the construction of the steel tube cylinder structure.

[0027] As an embodiment, in the assembly step of the steel tube cylindrical structure, the steel tube cylindrical structure also includes a second steel tube and a concrete cylinder, wherein the diameter of the second steel tube is smaller than that of the first steel tube, the number of the second steel tube is less than that of the first steel tube, and the second steel tube is arranged on the steel tube cylindrical structure at intervals, and is used to connect two adjacent first steel tubes to replace the I-beam there; the second steel tube has an extension longer than the first steel tube and the I-beam. The concrete cylinder is annular, and its outer diameter is roughly equal to the outer diameter of the steel tube cylindrical structure, and its thickness is roughly equal to the diameter of the first steel tube; it is provided with a plurality of long holes matching the extension of the second steel tube along the circumferential direction. The construction step of the steel tube cylindrical structure also includes: after the steel tube cylindrical structure is vibrated to the designed depth, the concrete cylinder is hoisted above the first steel tube and the I-beam, so that the extension of the second steel tube is inserted into the long hole of the concrete cylinder.

[0028] As an embodiment, the construction steps of the steel tube cylinder structure more specifically include: installing a replacement assembly on the second steel tube; mutually supporting support rods are installed between the second steel tubes. Vibrating and sinking equipment is used to drive the steel tube cylinder structure to the construction position through the replacement assembly, and vibrating and sinking to the designed depth of the steel tube cylinder structure; removing the replacement assembly and support rods; and then hoisting the concrete cylinder above the first steel tube and the I-beam, so that the extension of the second steel tube is inserted into the long hole of the concrete cylinder.

[0029] As an embodiment, the construction method of the dock further includes: backfilling inside each steel tube cylindrical structure to form a first backfilling part. In the second backfilling part, between two adjacent steel tube cylindrical structures and inside the steel sheet piles, cement mixing piles or rotary jet piles are used to form a water-stop curtain.

[0030] As an embodiment, the surface layer construction step further includes: installing a prefabricated plate on the top of the steel tube cylindrical structure, and a second baffle extending longitudinally downward is provided on the inner side of the prefabricated plate. A baffle is installed above the second baffle, and a pipe culvert is installed above the prefabricated plate and outside the baffle to limit the position. A third backfilling part is formed above the prefabricated plate and outside the pipe culvert to form a third backfilling part that is roughly the same height as the pipe culvert. The surface layer construction is performed above the pipe culvert and the third backfilling part to complete the dock wall construction.

[0031] As an embodiment, the first baffle is located on the outer wall of the concrete cylinder and is at the same height as the concrete cylinder; the two are integrally formed; the first baffle is close to the inner side of the dock, and the steel sheet pile is close to the outer side of the dock.

[0032] In one embodiment, a cross beam is provided on the upper portion of the steel tube cylindrical structure and is connected to the surface layer.

[0033] Compared with the prior art, the beneficial effects of this application are:

[0034] The dock wall structure provided in at least one embodiment of the present application mostly uses prefabricated components. Once the construction conditions are met on site, construction work can be carried out quickly, greatly reducing the construction period.

[0035] The dock wall structure provided in at least one embodiment of the present application utilizes steel pipes and I-beams to form a large-diameter cylindrical structure, and the structure itself has good integrity, which can effectively overcome the problem of unclear state of existing steel cylindrical structures after installation.

[0036] The dock wall structure provided in at least one embodiment of the present application adopts a concrete cylinder at the upper portion, which can effectively reduce the amount of steel used and reduce the construction cost through calculation. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 is a schematic diagram of a dock structure in one embodiment;

[0038] Figure 2 is a three-dimensional diagram of a steel tube cylinder structure in one embodiment;

[0039] Figure 3 is an enlarged view of a steel tube cylinder structure in one embodiment;

[0040] Figure 4 is a three-dimensional diagram of a steel tube cylinder structure in one embodiment;

[0041] Figure 5 is a schematic diagram of a steel tube cylinder structure and a first baffle in one embodiment;

[0042] Figure 6 yes Figure 5 Side view of

[0043] Figure 7 is a schematic top view of a dock wall structure in one embodiment;

[0044] Figure 8 is a schematic side view of a dock wall structure according to an embodiment;

[0045] Fig. 9 is a schematic front view of a dock wall structure in one embodiment;

[0046] Fig.10 is a schematic diagram of a prefabricated panel in one embodiment;

[0047] Fig.11 It is a schematic diagram of laying out a steel tube cylinder structure in one embodiment;

[0048] Numbers in the figure: 1 steel tube cylindrical structure, 101 first steel tube, 102 I-beam, 1021 first flange, 1022 second flange, 1023 web, 103 second steel tube, 1031 extension, 104 concrete cylinder, 1041 long hole, 105 plug, 106 cross beam; 2 first baffle, 3 post-cast strip, 401 first backfill part, 402 second backfill part, 5 steel sheet piles, 6 water-stop curtain, 7 precast plate, 701 first precast plate, 702 second precast plate, 703 second baffle, 8 block, 9 culvert, 10 third backfill part, 11 surface layer, 12 wheel guard, 13 dock gate pier, 14 dock gate, 15 pump house, 16 replacement assembly, 17 support rod. DETAILED DESCRIPTION

[0049] The technical solution of the present application is described in detail below in conjunction with specific implementations. However, it should be understood that without further description, the elements, structures and features in one implementation may also be beneficially combined with other implementations.

[0050] In the description of this application, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Therefore, features defined as "first" and "second" may explicitly or implicitly include one or more of the features.

[0051] In the description of this application, it should be understood that the directional terms "upper" and "lower" mainly refer to the spatial position of the relevant components, and "inside" and "outside" are mainly relative to the inside and outside of the dock, with the direction close to the inside of the dock being "inside" and the direction away from the dock being "outside". In some cases, the directional terms are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation, and therefore cannot be understood as a limitation to this application.

[0052] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0053] like Figure 1 As shown, the first embodiment of the present application provides a dock wall structure, which includes a plurality of steel tube cylindrical structures 1. Figure 2-4As shown, each steel tube cylindrical structure 1 includes a plurality of first steel tubes 101 and an I-beam 102 connecting two adjacent first steel tubes 101. The plurality of first steel tubes 101 and the plurality of I-beams 102 surround a substantially circular steel tube cylindrical structure 1. The I-beam 102 has a first flange 1021 and a second flange 1022 that are substantially parallel to each other, and a web 1023 connecting the first flange 1021 and the second flange 1022, and the two ends of the first flange 1021 and the second flange 1022 are respectively connected to the two adjacent first steel tubes 101. At least the lower part of the steel tube cylindrical structure 1 is set in the soil, for example, 1 / 3-1 / 2 of the overall height of the steel tube cylindrical structure 1 is located in the soil.

[0054] The steel tube cylindrical structure 1 is a large diameter cylindrical structure, and its outer diameter is 15-30m (for example, 16m, 18m, 20m, 22m, 25m, 28m, etc.). The diameter of the first steel tube 101 is 400-600mm (for example, 420mm, 450mm, 480mm, 500mm, 520mm, 550mm, 580mm, etc.). The first steel tube 101 and the I-beam 102 can be fixedly connected by welding to form four roughly parallel vertical welds. In this embodiment, a double-layer circular structure is formed by the arrangement of the first steel tube 101 and the steel tube cylindrical structure 1, which stabilizes the entire steel tube cylindrical structure 1.

[0055] In another embodiment, the steel tube cylindrical structure 1 further includes a second steel tube 103 and a concrete cylinder 104. Wherein:

[0056] like Figure 2 and Figure 3 As shown, the diameter of the second steel pipe 103 is smaller than that of the first steel pipe 101, which is 200-300 mm (e.g., 220 mm, 250 mm, 280 mm, etc.), and the number is less than that of the first steel pipe 101, and the second steel pipe 103 is arranged at intervals on the steel pipe cylindrical structure 1, and is used to connect two adjacent first steel pipes 101 to replace the I-beam 102 there. The second steel pipe 103 has an extension 1031 that is longer than the first steel pipe 101 and the I-beam 102. The steel pipe cylindrical structure 1 has both the I-beam 102 and the second steel pipe 103; the center of the first steel pipe, the center of the second steel pipe and the center of the I-beam (web) are located on the same circumference of the steel pipe cylindrical structure 1.

[0057] like Figure 4As shown, the concrete cylinder 104 is annular, and its outer diameter is substantially equal to the outer diameter of the steel tube cylindrical structure 1, and its thickness is substantially equal to the diameter of the first steel tube 101; it is provided with a plurality of long holes 1041 that match the extension 1031 of the second steel tube along the circumferential direction, which can be through holes. The extension 1031 of the second steel tube is inserted into the long holes 1041 of the concrete cylinder, so that the concrete cylinder 104 is stably installed above the first steel tube 101 and the I-beam 102, forming the steel tube cylindrical structure 1.

[0058] When the second steel pipe 103 and the concrete cylinder 104 are provided, the first steel pipe 101 and the I-beam 102 of the steel pipe cylindrical structure 1 are driven into the soil, and the extension portion 1031 of the second steel pipe and the concrete cylinder 104 are located on the soil surface.

[0059] In this embodiment, the upper and lower parts of the steel tube cylindrical structure 1 are coaxially arranged and have approximately the same thickness. By arranging the concrete cylinder 104, the steel tube cylindrical structure 1 is a composite structure of steel tube and concrete. When the overall height is the same, the concrete cylinder is partially replaced, which can save the length of the first steel tube 101 and the I-beam 102, thereby saving metal steel; while ensuring the engineering strength, its economy is also improved.

[0060] like Figure 8 and Fig. 9 As shown, a conical plug 105 is provided at the bottom of the first steel pipe 101 , and the upper diameter of the plug 105 is slightly larger than the diameter of the first steel pipe 101 , thereby reducing resistance and facilitating the installation of the steel pipe cylindrical structure 1 .

[0061] like Figure 5-7 As shown, a cross beam 106 is provided on the upper part of the steel tube cylindrical structure 1, which is connected to the subsequent prefabricated plate 7 and is used to bear the force from above. When the steel tube cylindrical structure 1 has a second steel tube 103 and a concrete cylinder 104, the cross beam 106 is located on the upper part of the concrete cylinder 104. The cross beam 106 can be integrally formed with the steel tube cylindrical structure 1, which is convenient for transportation and installation.

[0062] like Figure 5-8 As shown, each steel tube cylindrical structure 1 is longitudinally provided with a first baffle 2 protruding outward; the first baffles 2 of two adjacent steel tube cylindrical structures 1 are arranged opposite to each other, and a post-cast strip 3 is formed therebetween. After the dock is drained, cement or concrete can be poured in the post-cast strip 3 to fill and seal the post-cast strip 3, so that each first baffle 2 forms a barrier layer together with the post-cast strip 3 to prevent external water from penetrating into the dock. The first baffle 2 can be arranged on the concrete cylinder 104 and arranged at the same height as the concrete cylinder 104, so that it can be integrally formed with the concrete cylinder 104.

[0063] like Figure 7As shown, in the dock wall structure, a steel sheet pile 5 is arranged between two adjacent steel tube cylindrical structures 1. The steel sheet pile 5 is roughly arc-shaped and arranged on the outside. The steel sheet pile 5 is driven into the soil and is located in the water, with its upper part exposed above the water surface, and can be used for temporary water stopping.

[0064] In the dock wall structure, backfill soil is backfilled inside the steel tube cylindrical structure 1 and between the outer side of the first baffle 2 and the steel sheet pile 5 to form a first backfill part 401 and a second backfill part 402, respectively. Figure 7 As shown, the dock wall structure is more stable. In the second backfill part 402, a water-stop curtain 6 is also arranged between two adjacent steel tube cylindrical structures 1. The water-stop curtain 6 is close to the steel sheet piles 5 and can be formed in the second backfill part 402 using cement mixing piles or rotary jet pile construction technology. Together with the barrier layer formed by the first baffle 2 and the steel sheet piles 5, the water-stop effect of the dock wall structure is further improved.

[0065] like Figure 7-10 As shown, a prefabricated plate 7 is laid on the top of the steel tube cylindrical structure 1. When the diameter of the steel tube cylindrical structure 1 is too large, the prefabricated plate 7 can be divided into a first prefabricated plate 701 on the inner side and a second prefabricated plate 702 on the outer side, which are spliced ​​together as a whole. A second baffle 703 is provided on the inner side of the first prefabricated plate 701, and the second baffle 703 extends longitudinally downward and is roughly parallel to the axial direction of the steel tube cylindrical structure 1, and is used to protect the upper part of the steel tube cylindrical structure 1.

[0066] Furthermore, if Fig. 9 As shown, a stopper 8 and a culvert 9 are provided above the prefabricated plate 7. The stopper 8 is provided above the second baffle 703 to limit the position of the culvert 9. The culvert 9 can be any culvert in the prior art, preferably in a rectangular shape, and is mainly used for laying electric wires, water pipes, etc. Backfill is performed above the prefabricated plate 7 and outside the culvert 9 to form a third backfill portion 10 that is roughly the same height as the culvert 9. A surface layer 11 is laid above the culvert 9 and the third backfill portion 10 to form the surface of the dock wall structure. A protruding wheel guard 12 is provided on the inner side of the surface layer 11 to prevent people or vehicles from falling from the surface layer 11.

[0067] The second embodiment of the present application provides a dock, such as Figure 1 As shown, it includes the dock wall structure described in any of the above embodiments, and the dock wall structure is respectively connected to two dock gate piers 13, and a dock gate 14 is arranged between the dock gate piers 13. A pump room 15 can also be arranged at the dock gate piers 13 for pumping and draining water in the dock.

[0068] A third embodiment of the present application provides a construction method of a dock, comprising the following steps:

[0069] (1) Assembly of steel tube cylindrical structure: The steel tube cylindrical structure 1 includes a plurality of first steel tubes 101 and an I-beam 102 connecting two adjacent first steel tubes 101. The plurality of first steel tubes 101 and the plurality of I-beams 102 surround a substantially circular steel tube cylindrical structure 1. The I-beam 102 has a first flange 1021 and a second flange 1022 substantially parallel to each other, and a web 1023 connecting the first flange 1021 and the second flange 1022, and the two ends of the first flange 1021 and the second flange 1022 are respectively connected to the two adjacent first steel tubes 101.

[0070] The assembly steps of the steel tube cylinder structure can be completed in the factory by welding and other methods, and then transported to the construction site when it is ready for installation. Therefore, its construction is simpler, which provides great convenience for subsequent installation.

[0071] (2) Construction of steel tube cylinder structure

[0072] Install the replacement assembly 16 on the steel tube cylindrical structure 1; mark the construction position of the steel tube cylindrical structure 1; use a vibrating sinking device (such as a vibrating hammer group) to drive the steel tube cylindrical structure 1 to the construction position through the replacement assembly 16, and vibrate and sink to the designed depth of the steel tube cylindrical structure 1; remove the replacement assembly. Then, drive the next section of the steel tube cylindrical structure 1, so that the first baffles 2 between the two adjacent sections of the steel tube cylindrical structure 1 are arranged relatively; repeat the above steps to complete the construction of the steel tube cylindrical structure.

[0073] (3) Steel sheet pile construction:

[0074] Between two adjacent steel tube cylindrical structures 1, near the outer side of the dock, a steel sheet pile 5 is driven; its bottom is inserted into the soil and its upper part is exposed above the water surface; it is used for temporary water stopping between the two adjacent steel tube cylindrical structures 1.

[0075] (4) Construction of dock door structure

[0076] DCM cement mixing piles can be used to treat the dock pit foundation first, and then a crushed stone cushion layer can be filled. A caisson can be used as the dock gate structure, and the prefabricated caisson can be transported to the dock entrance to complete the installation of the dock gate structure. The dock gate structure includes two dock gate piers 13, and a dock gate 14 is located between the dock gate piers 13. A pump room 15 is also provided at the dock gate piers 13 for pumping and draining water in the dock. The construction of the dock gate structure belongs to a relatively mature construction method in the art, and some solutions in the prior art can be used to construct the dock gate structure in this application.

[0077] The first steel tube cylinder structure and the last steel tube cylinder structure are connected to the two dock gate piers 13 respectively; that is, the head and tail of the dock wall structure are connected to the two dock gate piers 13 respectively; to form a surrounding dock, such as Figure 1 shown.

[0078] (5) Dock wall connection

[0079] Drain the water in the dock, tie the steel bars between the two opposite first baffles 2, set up the formwork, and pour concrete to fill the post-cast strip. Backfill the soil inside the steel tube cylindrical structure 1 to form a first backfill part 401; backfill the soil between the outer side of the first baffle 2 and the inner side of the steel sheet pile 5 to form a second backfill part 402.

[0080] (6) Water-stop curtain construction

[0081] In the second backfill portion 402 , between two adjacent steel tube cylindrical structures 1 , a water-stop curtain 6 is formed by using cement mixing piles or rotary jet grouting piles.

[0082] (7) Construction of the upper part of the dock wall

[0083] The prefabricated plate 7 is installed on the top of the steel tube cylindrical structure 1, and the second baffle 703 of the prefabricated plate 7 faces inward. The baffle 8 is installed above the second baffle 703, and the pipe culvert 9 is installed on the prefabricated plate 7 and outside the baffle 8. The third backfilling part 10 is formed by backfilling on the prefabricated plate 7 and outside the pipe culvert 9. The surface layer 11 is constructed above the pipe culvert 9 and the third backfilling part 10 to complete the dock wall construction.

[0084] The above steps are merely descriptive steps, and in actual construction, the order can be adjusted according to actual needs. Therefore, the order of the steps does not constitute an absolute limitation to the present application.

[0085] As an embodiment, in the assembly step of the steel tube cylindrical structure, the steel tube cylindrical structure 1 also includes a second steel tube 103 and a concrete cylinder 104. The diameter of the second steel tube 103 is smaller than that of the first steel tube 101, the number is less than that of the first steel tube 101, and the second steel tube 103 is arranged on the steel tube cylindrical structure 1 at intervals, and is used to connect two adjacent first steel tubes 101 to replace the I-beam 102 there. The second steel tube 103 has an extension 1031 that is longer than the first steel tube 101 and the I-beam 102. The steel tube cylindrical structure 1 has both the I-beam 102 and the second steel tube 103. The concrete cylinder 104 is annular, and its outer diameter is substantially equal to the outer diameter of the steel tube cylindrical structure 1, and its thickness is substantially equal to the diameter of the first steel tube 101; it is provided with a plurality of long holes 1041 along the circumferential direction to match the extension 1031 of the second steel tube. The construction steps of the steel tube cylindrical structure also include: the replacement assembly 16 is installed on the second steel tube 103; support rods 17 are installed between the second steel tubes 103 for mutual support between the second steel tubes 103 during installation (such as Fig.11When the steel tube cylindrical structure 1 is vibrated to the designed depth, the replacement assembly 16 and the support rod 17 are removed; then the concrete cylinder 104 is hoisted above the first steel tube 101 and the I-beam 102, so that the extension portion 1031 of the second steel tube is inserted into the long hole 1041 of the concrete cylinder.

[0086] The steel tube cylindrical structure 1 may also include any technical solution in the first embodiment, which will not be described in detail here.

[0087] The described implementation mode is only a description of the preferred implementation mode of the present application, and does not limit the scope of the present application. Without departing from the design spirit of the present application, various modifications and improvements made to the technical solution of the present application by ordinary technicians in this field should fall within the protection scope determined by the claims of the present application.

Claims

1. A dock wall structure, characterized in that: include: A plurality of steel tube cylindrical structures; each of the steel tube cylindrical structures comprises a plurality of first steel tubes and an I-beam connecting two adjacent first steel tubes; wherein the I-beam has two flanges parallel to each other and a web connecting the two flanges respectively, and both ends of each flange are respectively connected to the two adjacent first steel tubes; the plurality of first steel tubes and the plurality of I-beams connected therebetween surround the steel tube cylindrical structure; The first baffle is longitudinally arranged outside the steel tube cylindrical structure; the first baffles between two adjacent steel tube cylindrical structures are arranged opposite to each other to form a post-casting strip therebetween; Steel sheet piles are arranged between two adjacent steel tube cylindrical structures; wherein the first baffle is close to the inner side of the dock wall structure, and the steel sheet piles are close to the outer side of the dock wall structure; A second backfill portion is located between the first baffle and the steel sheet pile; and A surface layer, arranged above the steel tube cylindrical structure and above the first baffle; The steel tube cylindrical structure also includes a second steel tube and a concrete cylinder; wherein the second steel tube has a smaller diameter than the first steel tube, is less in number than the first steel tube, and is arranged at intervals on the steel tube cylindrical structure for connecting two adjacent first steel tubes to replace the I-beam there; the second steel tube has an extension portion longer than the first steel tube; the concrete cylinder is in a circular ring shape, with an outer diameter substantially equal to the outer diameter of the steel tube cylindrical structure, and a thickness substantially equal to the diameter of the first steel tube, and is provided with a plurality of long holes matching the extension portion of the second steel tube along the circumferential direction; the extension portion of the second steel tube is inserted into the long hole of the concrete cylinder, so that the concrete cylinder is installed above the first steel tube to form the steel tube cylindrical structure.

2. The dock wall structure according to claim 1, characterized in that: The first baffle is located outside the concrete cylinder, and the two are integrally formed.

3. The dock wall structure according to claim 1, characterized in that: The outer diameter of the steel pipe cylindrical structure is 15-30 mm; the diameter of the first steel pipe is 400-600 mm; and the diameter of the second steel pipe is 200-300 mm.

4. The dock wall structure according to claim 3, characterized in that: The center of the first steel pipe, the center of the second steel pipe and the center of the I-beam are located on the same circumference of the steel pipe cylindrical structure.

5. The dock wall structure according to any one of claims 1 to 4, characterized in that: A cross beam is provided on the upper part of the steel tube cylinder structure and is connected to the surface layer.

6. The dock wall structure according to any one of claims 1 to 4, characterized in that: The interior of each steel tube cylindrical structure is backfilled to form a first backfill portion; in the second backfill portion, a water-stop curtain is provided between two adjacent steel tube cylindrical structures; the water-stop curtain is formed by using mixing piles or rotary jet piles.

7. The dock wall structure according to claim 6, characterized in that: A prefabricated plate is laid on the top of the steel tube cylindrical structure; a second baffle extending longitudinally downward is provided on the inner side of the prefabricated plate.

8. The dock wall structure according to claim 7, characterized in that: A block and a culvert are provided above the prefabricated plate, wherein the block is located above the second block and is used to limit the culvert; above the prefabricated plate, the outer side of the culvert is backfilled to form a third backfill portion having the same height as the culvert; the surface layer is located above the culvert and the third backfill portion.

9. A dock, comprising the dock wall structure according to any one of claims 1 to 8, wherein the dock wall structure is respectively connected to two dock gate piers, and a dock gate is arranged between the dock gate piers.

Citation Information

Patent Citations

  • Dock gate for extra-large dock

    CN102582802A

  • Bank protection structure

    JP2003253644A

  • Steel pipe sheet pile method

    JP2003328357A