A method for calculating the mixing of a flight mission of an auxiliary power unit
Patent Information
- Application Number
- CN202211440069.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-17
- Publication Date
- 2026-11-24
- Estimated Expiration
- 2042-11-17
AI Technical Summary
[0003]现有技术中,只提到了发动机飞行任务混频的计算方法,但没有文件详述辅助动力装置飞行任务混频的计算方法,本申请给出辅助动力装置飞行任务混频的计算方法
Smart Images

Figure CN115758574B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to a method for calculating the mixing frequency of auxiliary power unit flight missions, and more particularly to a method for calculating the mixing frequency of auxiliary power unit flight missions for helicopters. Background Technology
[0002] The frequency mixing of auxiliary power unit flight missions can accurately reflect the actual usage status of the auxiliary power unit and can help in the compilation and prediction of auxiliary power unit mission spectrum, which is of great significance in practical engineering.
[0003] In the prior art, only the calculation method of engine flight mission mixing is mentioned, but no document details the calculation method of auxiliary power unit flight mission mixing. This application provides a calculation method of auxiliary power unit flight mission mixing. Summary of the Invention
[0004] This application provides a method for calculating auxiliary power unit (APU) flight mission mixing. Based on the actual load requirements of the APU on the helicopter, the method further subdivides the typical operating conditions of the helicopter using the APU and the load requirements of the APU to obtain the APU flight mission mixing, thereby improving the accuracy of APU flight mission mixing.
[0005] Technical solution: A calculation method for frequency mixing in auxiliary power unit flight missions, the method comprising: S1: Based on the helicopter flight mission, analyze and determine the typical operating conditions of the helicopter using auxiliary power unit and the load requirements under the typical operating conditions according to each stage of a typical flight. S2: According to formula T m =T av ·η, calculate the operating time T of the auxiliary power unit under the typical operating condition of the m-th helicopter in a single sortie, under the same load requirements. m , among which, T av η represents the average operating time of a single helicopter under typical operating conditions in a single sortie under the same load requirements; η is the probability of a single helicopter under typical operating conditions occurring in a single sortie under the same load requirements. S3: According to the formula Calculate the working time T of the auxiliary power unit under a single load requirement for a single sortie, where m is the number of typical operating conditions for a single helicopter sortie with the same load requirement; S4: According to formula L n =A·T·ε, calculate the total working time L required by the nth type of load within the lifespan of the auxiliary power unit. n Where A is the number of flights within the lifetime, and ε is the probability of the required payload occurring within the lifetime; S5: According to the formula Calculate the percentage of working time required for a single load within the lifespan of the auxiliary power unit, ω. n , where n is the number of load requirements within the lifespan of the auxiliary power unit.
[0006] Specifically, a typical sortie includes the ground phase, takeoff phase, flight phase, approach phase, and landing phase.
[0007] Specifically, typical operating conditions for helicopters using auxiliary power units include: Engine cold start condition, engine dummy start condition, engine start condition, helicopter ground maintenance condition, in-flight engine start condition, in-flight auxiliary power supply condition.
[0008] Specifically, the load requirements under typical operating conditions include: When the engine is cold-starting, in a dummy start, or starting, the load requirements for the auxiliary power unit are as follows: under helicopter ground conditions, to provide compressed gas to the engine to meet the engine starting requirements, and to provide the auxiliary generator with input shaft power to meet the helicopter's requirements.
[0009] When providing bleed air for helicopter ground maintenance, the load requirement for the auxiliary power unit is: under helicopter ground conditions, provide compressed gas that meets the requirements of the helicopter's bleed air system.
[0010] When the helicopter ground maintenance operation is to provide auxiliary power, the load requirements of the auxiliary power unit are: under helicopter ground conditions, to provide the auxiliary generator with input shaft power that meets the requirements of the helicopter.
[0011] When starting the engine in the air, the load requirement for the auxiliary power unit is to provide compressed gas that meets the bleed air requirements of the helicopter within the helicopter envelope.
[0012] When providing shaft power to the auxiliary generator in the air, the load requirement of the auxiliary power unit is: within the helicopter envelope, to provide the auxiliary generator with input shaft power that meets the requirements of the helicopter.
[0013] Specifically, calculate T av The methods include: Extract T1, T2... T A Among them, T1, T2... T A The working time of a single helicopter under typical operating conditions under the same load requirements of the auxiliary power unit for the 1st, 2nd...Ath flights in the sampled data, where A is the number of flights sampled. According to T1, T2... T A Using formula T av =(T1+T2+… T A ) / A, calculate T av .
[0014] Specifically, methods for calculating η include: η is calculated using the formula η=s / A, where A is the number of selected flight sorties and s is the number of times a typical operating condition of a single helicopter occurs within A sorties under the same load requirements of the auxiliary power unit.
[0015] Specifically, the range of η is 0 to 1.
[0016] Specifically, methods for calculating ε include: Method 1: Calculate the system failure probability corresponding to the load requirement of the auxiliary power unit. For example, if the load requirement of the auxiliary power unit corresponds to the failure of a single engine of the helicopter, then ε can be the failure probability of a single engine of the helicopter; if the load requirement of the auxiliary power unit corresponds to the failure of a single main generator of the helicopter, then ε can be the failure probability of a single main generator of the helicopter.
[0017] Method 2: Calculate ε using the formula ε=p / A, where A is the number of selected flight sorties and p is the number of times the auxiliary power unit load is required to occur within sorties A.
[0018] In summary, the method for calculating auxiliary power unit flight mission mixing provided in this application subdivides the typical operating conditions and load requirements according to the actual load requirements of the auxiliary power unit on the helicopter to obtain the auxiliary power unit flight mission mixing, thereby improving the accuracy of auxiliary power unit flight mission mixing. Attached Figure Description
[0019] Figure 1 A flowchart illustrating the calculation method for frequency mixing in an auxiliary power unit flight mission provided in this application. Detailed Implementation
[0020] like Figure 1 As shown, this application provides a method for calculating the mixing frequency of an auxiliary power unit's flight mission, comprising: S1: Based on the helicopter flight mission, analyze and determine the typical operating conditions of the helicopter using auxiliary power unit and the load requirements under the typical operating conditions according to each stage of a typical flight. Specifically, a typical sortie includes the ground phase, takeoff phase, flight phase, approach phase, and landing phase.
[0021] Specifically, typical operating conditions for helicopters using auxiliary power units include: Engine cold start condition, engine dummy start condition, engine start condition, helicopter ground maintenance condition, in-flight engine start condition, in-flight auxiliary power supply condition.
[0022] Specifically, the load requirements under typical operating conditions include: When the engine is cold-starting, in a dummy start, or starting, the load requirements for the auxiliary power unit are as follows: under helicopter ground conditions, to provide compressed gas to the engine to meet the engine starting requirements, and to provide the auxiliary generator with input shaft power to meet the helicopter's requirements.
[0023] When providing bleed air for helicopter ground maintenance, the load requirement for the auxiliary power unit is: under helicopter ground conditions, provide compressed gas that meets the requirements of the helicopter's bleed air system.
[0024] When the helicopter ground maintenance operation is to provide auxiliary power, the load requirements of the auxiliary power unit are: under helicopter ground conditions, to provide the auxiliary generator with input shaft power that meets the requirements of the helicopter.
[0025] When starting the engine in the air, the load requirement for the auxiliary power unit is to provide compressed gas that meets the bleed air requirements of the helicopter within the helicopter envelope.
[0026] When providing shaft power to the auxiliary generator in the air, the load requirement of the auxiliary power unit is: within the helicopter envelope, to provide the auxiliary generator with input shaft power that meets the requirements of the helicopter.
[0027] S2: According to formula T m =T av ·η, calculate the operating time T of the auxiliary power unit under the typical operating condition of the m-th helicopter in a single sortie, under the same load requirements. m , among which, T av η represents the average operating time of a single helicopter under typical operating conditions in a single sortie under the same load requirements; η is the probability of a single helicopter under typical operating conditions occurring in a single sortie under the same load requirements.
[0028] Specifically, calculate T av The methods include: Extract T1, T2... T A Among them, T1, T2... T A The working time of a single helicopter under typical operating conditions under the same load requirements of the auxiliary power unit for the 1st, 2nd...Ath flights in the sampled data, where A is the number of flights sampled. According to T1, T2... T A Using formula T av =(T1+T2+… T A ) / A, calculate T av .
[0029] Specifically, methods for calculating η include: η is calculated using the formula η=s / A, where A is the number of selected flight sorties and s is the number of times a typical operating condition of a single helicopter occurs within A sorties under the same load requirements of the auxiliary power unit.
[0030] Specifically, the range of η is 0 to 1.
[0031] S3: According to the formula Calculate the working time T of the auxiliary power unit under a single load requirement for a single sortie, where m is the number of typical operating conditions for a single helicopter sortie with the same load requirement; S4: According to formula L n =A·T·ε, calculate the total working time L required by the nth type of load within the lifespan of the auxiliary power unit. n Where A is the number of flights within the lifetime, and ε is the probability of the required payload occurring within the lifetime.
[0032] Specifically, methods for calculating ε include: Method 1: Calculate the system failure probability corresponding to the load requirement of the auxiliary power unit. For example, if the load requirement of the auxiliary power unit corresponds to the use of in-flight engine restart when a single engine fails, then ε can be the single engine failure probability of the helicopter; if the load requirement of the auxiliary power unit corresponds to the use of providing shaft power to the auxiliary generator when a single main generator of the helicopter fails, then ε can be the single main generator failure probability of the helicopter.
[0033] Method 2: Calculate ε using the formula ε=p / A, where A is the number of selected flight sorties and p is the number of times the auxiliary power unit load is required to occur within sorties A.
[0034] S5: According to the formula Calculate the percentage of working time required for a single load within the lifespan of the auxiliary power unit, ω. n , where n is the number of load requirements within the lifespan of the auxiliary power unit.
[0035] In summary, the method for calculating auxiliary power unit flight mission mixing provided in this application subdivides the typical operating conditions and load requirements according to the actual load requirements of the auxiliary power unit on the helicopter to obtain the auxiliary power unit flight mission mixing, thereby improving the accuracy of auxiliary power unit flight mission mixing.
Claims
1. A method for calculating the mixing frequency of an auxiliary power unit's flight mission, characterized in that, The methods include: Step 1: Based on the helicopter flight mission, analyze and determine the typical operating conditions of the helicopter using auxiliary power unit and the load requirements under the typical operating conditions according to each stage of a typical flight. Step 2: According to formula T m =T av ·η, calculate the operating time T of the auxiliary power unit under the typical operating condition of the m-th helicopter in a single sortie, under the same load requirements. m , among which, T av η represents the average operating time of a single helicopter under typical operating conditions in a single sortie under the same load requirements; η is the probability of a single helicopter under typical operating conditions occurring in a single sortie under the same load requirements. Step 3: According to the formula Calculate the working time T of the auxiliary power unit under a single load requirement for a single sortie, where m is the number of typical operating conditions for a single helicopter sortie with the same load requirement; Step 4: According to formula L n =A·T·ε, calculate the total working time L required by the nth type of load within the lifespan of the auxiliary power unit. n Where A is the number of flights within the lifetime, and ε is the probability of the required payload occurring within the lifetime; Step 5: According to the formula Calculate the percentage of working time required for a single load within the lifespan of the auxiliary power unit, ω. n , where n is the number of load requirements within the lifespan of the auxiliary power unit.
2. The calculation method according to claim 1, characterized in that, Calculate T in step 2 av The methods include: Extract T1, T2... T A Among them, T1, T2... T A The working time of a single helicopter under typical operating conditions under the same load requirements of the auxiliary power unit for the 1st, 2nd...Ath flights in the sampled data, where A is the number of flights sampled. According to T1, T2... T A Using formula T av =(T1+T2+… T A ) / A, calculate T av .
3. The calculation method according to claim 1, characterized in that, The methods for calculating η in step 2 include: η is calculated using the formula η=s / A, where A is the number of selected flight sorties and s is the number of times a typical operating condition of a single helicopter occurs within A sorties under the same load requirements of the auxiliary power unit.
4. The calculation method according to claim 1, characterized in that, The range of η is 0 to 1.
5. The calculation method according to claim 1, characterized in that, The methods for calculating ε in step 4 include: Based on the system failure probability corresponding to the load requirement of the auxiliary power unit, ε is obtained; Alternatively, ε can be calculated using the formula ε=p / A, where A is the number of selected flight sorties and p is the number of times the auxiliary power unit load is required to occur within sorties A.
6. The calculation method according to claim 1, characterized in that, The auxiliary power unit load requirements for helicopters under typical operating conditions include: When the engine is cold-starting, in a dummy start, or starting, the load requirements for the auxiliary power unit are as follows: When the helicopter is on the ground, it should provide compressed gas to the engine to meet the engine starting requirements, and at the same time provide the auxiliary generator with input shaft power to meet the helicopter requirements. When the helicopter ground maintenance operation is to provide environmental control bleed air, the load requirement of the auxiliary power unit is: under helicopter ground conditions, provide compressed gas that meets the requirements of the helicopter's environmental control bleed air. When the helicopter ground maintenance operation is to provide auxiliary power, the load requirements of the auxiliary power unit are: under helicopter ground conditions, to provide the auxiliary generator with input shaft power that meets the requirements of the helicopter; When the engine is started in the air, the load requirement of the auxiliary power unit is: to provide compressed gas that meets the requirements of the helicopter's environmental control bleed air within the helicopter envelope. When providing shaft power to the auxiliary generator in the air, the load requirement of the auxiliary power unit is: within the helicopter envelope, to provide the auxiliary generator with input shaft power that meets the requirements of the helicopter.
7. The calculation method according to claim 1, characterized in that, Typical operating conditions include: Engine cold start condition, engine dummy start condition, engine start condition, helicopter ground maintenance condition, in-flight engine start condition, in-flight auxiliary power supply condition.
8. The calculation method according to claim 1, characterized in that, A typical sortie includes the ground phase, takeoff phase, flight phase, approach phase, and landing phase.
Citation Information
Patent Citations
Method for calculating operation ratio of airborne equipment
CN112700120A
Method for calculating fatigue life of belt type CVT steel belt ring under high rotating speed condition
CN114722526A