A method for obtaining allowable VCG during ballasting / deballasting of a semi-submersible platform

By selecting the stored working conditions as the initial working conditions in the semi-submersible platform, using three-dimensional model and hydrostatic information, combining the stability radius, empirical formulas are used to obtain the VCG limit value and perform iterative calculations, the ballast on the semi-submersible platform is solved. The problem of obtaining VCG value during the ballast water discharge process is cumbersome, which realizes efficient and accurate acquisition of VCG value, ensuring platform stability and safety.

CN115783169BActive Publication Date: 2024-12-06DALIAN SHIPBUILDING INDUSTRY CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211561694.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-07
Publication Date
2024-12-06
Estimated Expiration
2042-12-07

AI Technical Summary

Technical Problem

In the prior art, it is cumbersome and time-consuming to obtain allowable VCG values ​​during ballast/discharging ballast water between different working conditions, and requires complex stability criterion analysis with commercial software, resulting in calculations. High cost and low efficiency.

Method used

By selecting the stored working conditions as the initial working conditions, using three-dimensional model and hydrostatic information, combining longitudinal and transverse stability radii, empirical formulas are used to obtain the VCG limit values ​​of typical and temporary working conditions, and ensuring each working condition through iterative calculations The VCG value under the VCG value meets the stability requirements and simplifies the acquisition of VCG value during ballast/discharge ballast process.

Benefits of technology

It greatly shortens the time for obtaining VCG value, improves efficiency, ensures that the platform's stability under different working conditions meets safety requirements, and reduces calculation costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure QLYQS_1
    Figure QLYQS_1
  • Figure BDA0003984969950000031
    Figure BDA0003984969950000031
  • Figure BDA0003984969950000061
    Figure BDA0003984969950000061
Patent Text Reader

Abstract

The present invention discloses a method for obtaining an allowable VCG during the ballasting / deballasting process of a semi-submersible platform. When the semi-submersible platform adjusts the operating conditions, the method is implemented by adjusting the amount of ballast water. Under the premise that the hydrostatic information of the platform and the ballast tank information and the amount of ballast water used to adjust the ballast water are known, the allowable VCG value of the platform during the ballast water adjustment process is obtained according to the required value of the minimum GM value of the platform. After obtaining the allowable VCG value, as long as the actual VCG value of the platform during the ballasting / deballasting process is less than the calculated allowable VCG value, it is considered that the stability of the platform during the entire ballasting / deballasting process meets the safety requirements. This method is used to calculate the allowable VCG during the ballasting / deballasting process of all semi-submersible platforms. The process is very simple and greatly improves work efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the determination of VCG (maximum allowable center of gravity height at various drafts of an offshore platform) during the design phase of an offshore engineering field, and more specifically, to a method for quickly obtaining the allowable VCG of a semi-submersible platform during ballasting / deballasting water. Background Art

[0002] Semi-submersible platforms mainly have three typical working conditions: towing condition, self-storage condition and operation condition. Each typical working condition corresponds to a typical draft of the platform (T 典型 ). When the platform is affected by operational requirements, environmental and meteorological conditions, etc., it is necessary to transition from one typical operating condition to another through ballasting / deballasting operations, that is, transition from one typical operating condition to another typical operating condition. According to the size of the draft, there are generally T for semi-submersible platforms. 作业 >T 自存 >T 拖航 The draft of the self-storage condition is the intermediate draft. Ballast water needs to be added when switching from the self-storage condition to the operation condition, and ballast water needs to be discharged when switching from the self-storage condition to the towing condition. Any draft between the typical working conditions is called the temporary working condition draft (T i ). During the design of a semi-submersible platform, it is necessary to ensure that the stability of the platform under all typical and temporary working conditions meets the safety requirements. For a semi-submersible platform, the current stability verification method is to obtain the allowable VCG value of the platform under various working conditions. As long as the actual VCG value of each typical and temporary working condition of the platform is less than the allowable VCG value, the platform stability is considered to meet the requirements.

[0003] At present, the acquisition of permissible VCG is mostly done by software. Due to the complex ship type of semi-submersible platform, the large draft span of each working condition, the many stability criteria that need to be met, and the complicated working conditions to be checked, it takes a lot of time and energy to perform stability check of semi-submersible platform, which is still time-consuming even with the help of commercial software. Summary of the invention

[0004] In the prior art, for a semi-submersible platform, obtaining the allowable VCG value under various working conditions is a very cumbersome and time-consuming problem, and there are many stability criterion requirements that need to be met, which requires the use of commercial software for analysis and acquisition. In addition, the larger the platform size, the more time it takes, and the greater the calculation cost. The present invention summarizes a more stringent numerical calculation stability criterion through the design experience of several semi-submersible platforms. Through the acquisition method of the present invention, the efficiency of obtaining the allowable VCG value during the ballasting / deballasting process of the semi-submersible platform is greatly improved.

[0005] In order to achieve the above object, the present invention provides a method for obtaining an allowable VCG during ballasting / deballasting of a semi-submersible platform, comprising the following steps:

[0006] a) Selection of working conditions

[0007] Since the draft of the semi-submersible platform's self-storage condition is the middle draft, the self-storage condition is selected as the initial condition; the draft corresponding to the initial condition is the initial condition T 自存 , discharge ballast water at this draft to reach the towing draft T 拖航 ; Add ballast water at the initial working draft to reach the working draft T 作业 ;

[0008] In the process of converting the three typical working conditions, the step length is selected and several intermediate temporary working conditions are set. i , represents the i-th working condition in sequence, i is 1, 2, 3...;

[0009] b) 3D model establishment and initial parameter selection

[0010] The three-dimensional model of the semi-submersible platform is established and the hydrostatic information and tank capacity information are obtained as follows:

[0011] T 拖航 / T 自存 / T 作业 / T i : Draft value for all working conditions, unit: meter;

[0012] Displacement Δ i : The displacement corresponding to the draft of all selected working conditions, unit: tons;

[0013] KML i : The longitudinal stability radius corresponding to all selected working conditions, unit: meter;

[0014] KMT i : Transverse stability radius corresponding to all selected working conditions, unit: meter;

[0015] VCG 压载 / 排压载 : The center of gravity height after adding or draining some ballast water, obtained from the tank capacity information, unit: meter;

[0016] c) Obtaining the VCG value of each operating condition’s experience limit

[0017] Formula 1 is used to determine the empirical limits VCG for three typical operating conditions:

[0018] VCG 经典imax =KM 经典imin -GM 经典imin (Formula 1)

[0019] in:

[0020] VCG 经典imax: The maximum value of the center of gravity height of the platform that can meet the stability requirements under the draft condition obtained based on experience under typical working conditions, unit: meter;

[0021] KM 经典imin : Corresponding to typical working conditions, KML mentioned in b) i and KMT i The smaller of the two, unit: meter;

[0022] GM 经典imin : Constant, ranging from 0.5 to 3 meters;

[0023] Formula 2 is used to determine the empirical limit VCG for intermediate temporary working conditions:

[0024] VCG 临时imax =KM 临时imin -GM 临时imin (Formula 2)

[0025] in:

[0026] VCG 临时imax : The maximum value of the center of gravity height of the platform that can meet the stability requirements under the draft condition obtained based on experience under each intermediate temporary working condition, unit: meter;

[0027] KM 临时imin : Corresponding to the intermediate temporary working condition, the KML mentioned in b) i and KMT i The smaller of the two, unit: meter;

[0028] GM 临时imin : Constant, 0.1~0.9 m;

[0029] d) Obtain the assumed VCG value for each working condition

[0030] When obtaining the assumed VCG for each working condition, select the typical working condition stored in the system, that is, T 自存 The draft condition is the initial condition, and the VCG under the self-storage draft obtained by the formula in c) is 经典imax The value is used as the assumed VCG value of the self-storage condition, named VCG 自存假定 ;

[0031] According to a), the VCG of each selected working condition is obtained by using formula 3:

[0032]

[0033] Δ 自存 : displacement under initial working condition (self-storage working condition), the displacement under self-storage working condition, the initial input parameters selected as described in b), unit: tons;

[0034] Δi : Displacement of any intermediate temporary working condition, as above Δ 自存 , is the initial input parameter described in b), the displacement of each selected working condition, unit: tons;

[0035] VCG 自存假定 : The initial working condition (self-storage working condition) assumes the center of gravity height value, and the VCG under the self-storage working condition draft obtained according to the formula in c) 经典imax The value is used as the assumed VCG value of the self-storage condition, named VCG 自存假定 , unit: meter;

[0036] VCG 压载 / 排压载 : The center of gravity height value after adding or draining some ballast water; it is the initial input parameter described in b), unit: meter;

[0037] VCG i假定 : According to the initial working condition center of gravity height value, the assumed center of gravity height value of any selected working condition is obtained according to Formula 3, unit: meter;

[0038] e) Stability check and confirmation of allowable VCG values ​​for each selected operating condition

[0039] The assumed center of gravity height VCG of each typical working condition and intermediate temporary working condition is expressed in accordance with c) and d). i假定 And the empirical limit center of gravity height value VCG 经验imax Finally, by comparing the two, check whether each selected working condition meets the stability requirements; the specific process is as follows:

[0040] Order: a i =VCG 经验imax -VCG i假定

[0041] That is a i The difference between the empirical limit center of gravity height value and the assumed value under each selected working condition;

[0042] If any a i The values ​​satisfy a i ≥0

[0043] This indicates that during the entire ballast / deballast process, any selected working condition meets the stability requirements. At this time, the VCG under each selected working condition is i假定 That is, the allowable VCG value for each selected working condition;

[0044] If there is a certain working condition or conditions i Value appears a i <0

[0045] This indicates that during the entire ballasting / deballasting process, some selected working conditions do not meet the stability requirements and need to be iteratively calculated, as described in f) below.

[0046] f) Iterative calculation and reconfirmation of the allowable VCG value for each selected working condition

[0047] As described in e), for the occurrence of a i When <0, a second iteration calculation is required. When calculating, select a i The condition with the smallest value is taken as the initial condition, and the assumed center of gravity height value of this condition is reselected so that the VCG of this condition i假定 =VCG 经验imax Repeat step d) to obtain the assumed center of gravity height value of each selected working condition, and then perform stability check and allowable VCG value confirmation according to step e); until all working conditions are a i If all are greater than 0, the process ends. i假定 That is the allowable VCG value for this working condition;

[0048] g) After the above process, the allowable VCG values ​​of each typical operating condition and intermediate temporary operating condition are obtained.

[0049] In the preferred embodiment, in step a), when determining the intermediate temporary working condition, the step length is selected as 0.5m in the process of draft conversion of three typical working conditions; in step b), modeling and obtaining platform hydrostatic information are implemented by using NAPA software, COMPASS software, and MAXSURF software; in step b), VCG 压载 / 排压载 Take it as half of the ballast tank height, obtained from the tank capacity information, unit: meter; Step c) GM 临时imin Take it as 0.3 meters; Step c) GM 经典imin Take it as 1 meter.

[0050] In addition, in step g), when the actual center of gravity height value of the platform after loading in each working condition is less than the allowable VCG value, it is considered that the platform meets the stability requirements and the safety of the platform is ensured.

[0051] The present invention is a method for quickly obtaining the permissible VCG value of a semi-submersible platform during the entire process of mutual conversion through ballasting / deballasting operations in typical working conditions such as towing conditions, self-storage conditions, and operating conditions; thereby ensuring that the stability of the platform meets the regulatory requirements during the entire ballasting / deballasting process. The present invention uses the platform's hydrostatic information and cabin capacity information (both of which are determined by the ship type) to obtain the permissible VCG value of the platform during the entire ballasting and deballasting process. When there is a situation in which the stability does not meet the requirements during the entire ballasting / deballasting process, the present invention provides an iterative processing method until the entire draft adjustment process of the platform meets the stability requirements. When the actual center of gravity height value of the platform is less than the permissible VCG value determined by the method of the present invention, the platform meets the stability requirements.

[0052] The method for obtaining the allowable VCG value of a semi-submersible platform proposed by the present invention using design experience greatly shortens the acquisition cycle, and the obtained value is accurate and reliable. According to preliminary estimates, the acquisition time is shortened by 10-15 times. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] Figure 1 It is the information status of the initial parameters in one embodiment of the present invention.

[0054] Figure 2 The method of the present invention is Figure 1 The result of information processing. DETAILED DESCRIPTION

[0055] In order to achieve the above-mentioned rapid forecasting purpose, the present invention adopts the following technical solutions:

[0056] a) Selection of working conditions

[0057] Since the draft of the semi-submersible platform's self-storage condition is the intermediate draft, the self-storage condition is generally selected as the initial condition. The initial condition draft T 自存 , discharge ballast water at this draft, and the towing draft can be achieved. 拖航 (i.e. typical working condition - towing condition); adding ballast water at the initial working condition draft can reach the working condition draft T 作业 (i.e. typical working condition - operating condition). In the process of converting the three typical working conditions, a certain step length is selected (0.5m is accepted by the industry) and several intermediate temporary working conditions are set. i .

[0058] b) 3D model establishment and initial parameter selection

[0059] The acquisition method of the present invention needs to use the platform hydrostatic information as the initial parameter to participate in the calculation. The stability calculation software such as NAPA software, COMPASS software, MAXSURF software, etc. can be used to establish a three-dimensional model of the semi-submersible platform and obtain hydrostatic information and tank capacity information, mainly to obtain the displacement, longitudinal stability radius, lateral stability radius information under each draft condition selected in a) above, as well as the tank capacity and center of gravity information of all ballast tanks of the platform. The main initial parameters are selected as follows:

[0060] T 拖航 / T 自存 / T 作业 / T i :a) Draft values ​​of all working conditions selected in working condition selection, unit: meter;

[0061] Displacement Δ i : The displacement corresponding to the draft of all selected working conditions, unit: tons;

[0062] KML i : The longitudinal stability radius corresponding to all selected working conditions, unit: meter;

[0063] KMT i : Transverse stability radius corresponding to all selected working conditions, unit: meter;

[0064] VCG 压载 / 排压载 : The center of gravity height value when adding or discharging part of the ballast water is usually taken as half of the ballast tank height, which can be obtained from the tank capacity information, unit: meter.

[0065] c) Obtaining the VCG value of each selected working condition’s experience limit

[0066] Formula 1 is used to obtain the empirical limits VCG of three typical working conditions:

[0067] VCG 经典imax =KM 经典imin -GM 经典imin (Formula 1)

[0068] in:

[0069] VCG 经典imax : Under typical working conditions, the platform can meet the requirements of stability under the draft condition obtained based on experience.

[0070] The maximum center of gravity height required by the sex, unit: meter;

[0071] KM 经典imin : Corresponding to typical working conditions, KML mentioned in b) i and KMT i The smaller of the two,

[0072] Unit: meter;

[0073] GM 经典imin :For typical working conditions, GM 经典imin Take it as 1 meter.

[0074] Formula 2 is used to obtain the intermediate temporary working condition experience limit VCG:

[0075] VCG 临时imax =KM 临时imin -GM 临时imin (Formula 2)

[0076] in:

[0077] VCG 临时imax : The platform can obtain the following information based on experience under each intermediate temporary working condition:

[0078] The maximum value of the center of gravity height that meets the stability requirements, unit: meter;

[0079] KM 临时imin : Corresponding to the intermediate temporary working condition, the KML mentioned in b) i and KMT i The smaller of the two

[0080] Unit: meter;

[0081] GM 临时imin :For each intermediate temporary working condition, GM 经典min Take it as 0.3 meters.

[0082] d) Obtain the assumed VCG value for each selected working condition

[0083] When obtaining the assumed VCG for each selected working condition, select the typical working condition stored in the system, that is, T 自存 The draft condition is the initial condition, and the VCG under the self-storage draft obtained by the formula in c) is 经典imax The value is used as the assumed VCG value of the self-storage condition, named VCG 自存假定 .

[0084] According to a), the platform draft can be changed by adding ballast water and draining ballast water from the self-existing working condition, thereby achieving any selected working condition. Formula 3 is used to assume VCG for each selected working condition to obtain:

[0085]

[0086] Δ 自存 : displacement under initial working condition (self-storage working condition), the displacement under self-storage working condition, the initial input parameters selected as described in b), unit: tons;

[0087] Δ i : Displacement of any intermediate temporary working condition, as above Δ 自存 , is the initial input parameter described in b), the displacement of each selected working condition, unit: tons;

[0088] VCG 自存假定 : The initial working condition (self-storage working condition) assumes the center of gravity height value, and the VCG under the self-storage working condition draft obtained according to the formula in c) 经典imax The value is used as the assumed VCG value of the self-storage condition, named VCG 自存假定 , unit: meter;

[0089] VCG 压载 / 排压载 : The center of gravity height value after adding or draining some ballast water; it is the initial input parameter described in b), unit: meter;

[0090] VCG i假定: Based on the initial working condition center of gravity height value, the assumed center of gravity height value of any selected working condition is obtained according to Formula 3, unit: meter.

[0091] e) Stability check and confirmation of allowable VCG values ​​for each selected operating condition

[0092] The assumed center of gravity height values ​​(VCG) for each typical working condition and intermediate temporary working condition are expressed in accordance with c) and d). i假定 ) and the empirical limit center of gravity height value (VCG 经验imax ), and then, by comparing the two, check whether each selected working condition meets the stability requirements. The specific comparison process is as follows:

[0093] Order: a i =VCG 经验imax -VCG i假定

[0094] That is a i It is the difference between the empirical limit center of gravity height value and the assumed value under each selected working condition.

[0095] If any a i The values ​​satisfy a i ≥0

[0096] This indicates that during the entire ballast / deballast process, any selected working condition meets the stability requirements. At this time, the VCG under each selected working condition is i假定 That is the allowable VCG value for each selected working condition.

[0097] If there is a certain working condition or conditions i Value appears a i <0

[0098] This indicates that during the entire ballasting / deballasting process, some selected working conditions do not meet the stability requirements and need to be iteratively calculated, as described in f) below.

[0099] f) Iterative calculation and reconfirmation of the allowable VCG value for each selected working condition

[0100] As described in e), for the occurrence of a i When <0, a second iteration calculation is required. When obtaining, select a i The condition with the smallest value is taken as the initial condition, and the assumed center of gravity height value of this condition is reselected so that the VCG of this condition i假定 =VCG 经验imax Repeat step d) to obtain the assumed center of gravity height value of each selected working condition, and then perform stability check and allowable VCG value confirmation according to step e). i If all are greater than 0, the calculation ends. i假定This is the allowable VCG value for this operating condition.

[0101] g) The significance of obtaining the allowable VCG value

[0102] After the above acquisition process, the allowable VCG value of each typical working condition and intermediate temporary working condition is obtained. This value can be used as the limit value of actual loading during the design and daily operation of the semi-submersible platform. That is, as long as the actual center of gravity height value of the platform after loading in each working condition is less than the allowable VCG value obtained under the working condition, it is considered that the platform meets the stability requirements and the safety of the platform is ensured.

[0103] The present invention is described below with reference to a semi-submersible platform as an example.

[0104] According to the above acquisition method, the permissible VCG value of a semi-submersible platform during the ballasting / deballasting process is obtained, and the self-storage condition (draft T = 14.20m) is used as the initial acquisition condition. The towing condition (draft T = 8.60m) is achieved by discharging ballast water, and the operating condition (draft T = 17.20m) is achieved by adding ballast water. The draft step length of the intermediate condition is taken as 0.5m, and the results are shown in the attached figure. Figure 1 The table shown, where:

[0105] Draft: Get the draft of each selected typical working condition and intermediate temporary working condition;

[0106] Displacement: Displacement of each selected working condition;

[0107] Displacement difference: the difference between the displacement at the current draft condition and the displacement at the initial draft condition;

[0108] Ballast water VCG: the center of gravity height of ballast / deballast water;

[0109] Platform assumption VCG: the assumed center of gravity height of the platform for each selected working condition;

[0110] KML / KMT: KML is the longitudinal stability radius, KMT is the lateral stability radius. When obtaining, the smaller value of KML / KMT is selected as the metacentric radius corresponding to the draft;

[0111] When GM=1.0m, the empirical limit VCG is the empirical limit VCG value of typical working conditions;

[0112] When GM=0.3m, the empirical limit VCG is the empirical limit VCG value of each intermediate temporary working condition;

[0113] Verification difference: the difference between the platform's empirical limit VCG value and the assumed VCG value of each platform working condition, that is, a i .

[0114] From the results obtained in Table 1, it can be seen that the draft of the platform during the deballasting process does not meet the GM value requirements of the specification. Therefore, according to the acquisition method, the initial working condition of the ballast / deballasting process is re-selected for acquisition. According to the principle described in step f), the working condition with the minimum difference (draft T = 9.50m) is used as the initial working condition, and the ballast / deballasting in the conversion from the self-storage working condition to the towing working condition is iteratively calculated. The obtained results are shown in the attached figure. Figure 2 The table shown:

[0115] From the above table, we can see that the calibration difference a i All of them are positive values, that is, any draft condition during ballasting / deballasting meets the stability requirements. The platform assumes that the platform center of gravity height under each draft condition obtained by the VCG column is the allowable VCG value of the platform under each condition. End.

[0116] During the actual design and operation stage, if the actual center of gravity height of the platform in each working condition is guaranteed to be lower than the allowable VCG value of the platform at each draft, the platform is considered to meet the stability requirements and the safety of the platform is guaranteed.

[0117] The present invention discloses a method for obtaining the allowable VCG (maximum allowable center of gravity height of the platform) during the ballasting / deballasting process of a submersible platform. The main principle is that the semi-submersible platform adjusts the operating conditions (changes the draft) by adjusting the amount of ballast water. Under the premise of knowing the hydrostatic information of the platform and the ballast tank information and the amount of ballast water used to adjust the ballast water, the allowable VCG value of the platform during the ballast water adjustment process is obtained according to the required value of the minimum GM value (stability height value) of the platform. After obtaining the allowable VCG value, as long as the actual VCG value of the platform during the ballasting / deballasting process is less than the obtained allowable VCG value, it is considered that the stability of the platform during the entire ballasting / deballasting process meets the safety requirements. During the acquisition process, in order to ensure that the standard requirements are met during the entire load adjustment process, a secondary iterative calculation is required. The method is used to obtain the allowable VCG during the ballasting / deballasting process of all semi-submersible platforms. The process is very simple and greatly improves work efficiency.

[0118] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A method for obtaining allowable VCG during ballasting / deballasting of a semi-submersible platform, characterized in that: The steps include: a) Selection of working conditions Since the draft of the semi-submersible platform's self-storage condition is the middle draft, the self-storage condition is selected as the initial condition; the draft corresponding to the initial condition is the initial condition T 自存 , discharge ballast water at this draft to reach the towing draft T 拖航 ; Add ballast water at the initial working draft to reach the working draft T 作业 ; In the process of converting the three typical working conditions, the step length is selected and several intermediate temporary working conditions are set. i , represents the i-th working condition in sequence, i is 1, 2, 3...; b) 3D model establishment and initial parameter selection The three-dimensional model of the semi-submersible platform is established and the hydrostatic information and tank capacity information are obtained as follows: T 拖航 / T 自存 / T 作业 / T i : Draft value for all working conditions, unit: meter; Displacement Δ i : The displacement corresponding to the draft of all selected working conditions, unit: tons; KML i : The longitudinal stability radius corresponding to all selected working conditions, unit: meter; KMT i : Transverse stability radius corresponding to all selected working conditions, unit: meter; VCG 压载 / 排压载 : The center of gravity height after adding or draining some ballast water, obtained from the tank capacity information, unit: meter; c) Obtaining the VCG value of each operating condition’s experience limit Formula 1 is used to determine the empirical limits VCG for three typical operating conditions: VCG 经典imax =KM 经典imin -GM 经典imin (Formula 1) in: VCG 经典imax : The maximum value of the center of gravity height of the platform that can meet the stability requirements under the draft under typical working conditions, obtained based on experience, unit: meter; KM 经典imin : Corresponding to typical working conditions, KML mentioned in b) i and KMT i The smaller of the two, Unit: meter; GM 经典imin : Constant, ranging from 0.5 to 3 meters; Formula 2 is used to determine the empirical limit VCG for intermediate temporary working conditions: VCG 临时imax =KM 临时imin -GM 临时imin (Formula 2) in: VCG 临时imax : The maximum value of the center of gravity height of the platform that can meet the stability requirements under the draft working condition obtained based on experience under each intermediate temporary working condition, unit: meter; KM 临时imin : Corresponding to the intermediate temporary working condition, the KML mentioned in b) i and KMT i The smaller of the two, unit: meter; GM 临时imin : Constant, 0.1~0.9 meters; d) Obtain the assumed VCG value for each working condition When obtaining the assumed VCG for each working condition, select the typical working condition stored in the system, that is, T 自存 The draft condition is the initial condition, and the VCG under the self-storage draft obtained by the formula in c) is 经典imax The value is used as the assumed VCG value of the self-storage condition, named VCG 自存假定 ; According to a), the VCG of each selected working condition is obtained by using formula 3: Δ 自存 : Displacement under initial working condition, displacement under self-storage working condition, unit: tons; Δ i : The displacement of any intermediate temporary working condition is the initial input parameter described in b), the displacement of each selected working condition, unit: tons; VCG 自存假定 : The initial working condition assumes the center of gravity height value, and the VCG under the self-storage working condition draft obtained according to the formula in c) 经典imax The value is used as the assumed VCG value of the self-storage condition, named VCG 自存假定 , unit: meter; VCG 压载 / 排压载 : The center of gravity height value after adding or draining some ballast water; it is the initial input parameter described in b), unit: meter; VCG i假定 : According to the initial working condition center of gravity height value, the assumed center of gravity height value of any selected working condition is obtained according to Formula 3, unit: meter; e) Stability check and confirmation of allowable VCG values ​​for each selected operating condition The assumed center of gravity height VCG of each typical working condition and intermediate temporary working condition is expressed in accordance with c) and d). i假定 And the empirical limit center of gravity height value VCG 经验imax Finally, by comparing the two, check whether each selected working condition meets the stability requirements; the specific process is as follows: Let: a i = VCG 经验imax - VCG i假定 That is a i The difference between the empirical limit center of gravity height value and the assumed value under each selected working condition; If any a i The values ​​satisfy a i ≥0 This indicates that during the entire ballast / deballast process, any selected working condition meets the stability requirements. At this time, the VCG under each selected working condition is i假定 That is, the allowable VCG value for each selected working condition; If there is a certain working condition or conditions i Value appears a i <0 This indicates that during the entire ballasting / deballasting process, some selected working conditions do not meet the stability requirements and need to be iteratively calculated, as described in f) below; f) Iterative calculation and reconfirmation of the allowable VCG value for each selected working condition As described in e), for the occurrence of a i When <0, a second iteration calculation is required; when calculating, select a i The condition with the smallest value is taken as the initial condition, and the assumed center of gravity height value of this condition is reselected so that the VCG of this condition i假定 =VCG 经验imax Repeat step d) to obtain the assumed center of gravity height value of each selected working condition, and then perform stability check and allowable VCG value confirmation according to step e); until all working conditions are a i are all greater than 0, then it ends; at this time, the VCG under each working condition i假定 That is the allowable VCG value for this working condition; g) After the above process, the allowable VCG values ​​of each typical operating condition and intermediate temporary operating condition are obtained.

2. The method for obtaining the allowable VCG during the ballasting / deballasting process of a semi-submersible platform according to claim 1 is characterized in that: In step a), when determining the intermediate temporary operating condition, a step length of 0.5 m is selected during the draft conversion process of three typical operating conditions.

3. The method for obtaining allowable VCG during ballasting / deballasting of a semi-submersible platform according to claim 1, characterized in that: In step b), NAPA software, COMPASS software, and MAXSURF software are used to model and obtain platform hydrostatic information.

4. The method for obtaining allowable VCG during ballasting / deballasting of a semi-submersible platform according to claim 1, characterized in that: In step b), VCG 压载 / 排压载 Taken as half of the ballast tank height, obtained from the tank capacity information, unit: meter.

5. The method for obtaining allowable VCG during ballasting / deballasting of a semi-submersible platform according to claim 1, characterized in that: Step c) GM 临时imin Take it as 0.3 meters.

6. The method for obtaining the allowable VCG during the ballasting / deballasting process of a semi-submersible platform according to claim 1 is characterized in that: Step c) GM 经典imin Take it as 1 meter.

7. The method for obtaining allowable VCG during ballasting / deballasting of a semi-submersible platform according to claim 1, characterized in that: Step g) When the actual center of gravity height value of the platform after loading in each working condition is less than the allowable VCG value, it is considered that the platform meets the stability requirements and the safety of the platform is ensured.

Citation Information

Patent Citations

  • Automation container boat, dock and using method of warehouse transportation system composing the automation container boat and dock

    CN101085658A

  • Semi-submersible type lifting platform ballast water system and operation method thereof

    CN105584601A