A special hanger for repairing container ship lashing bridge and its assembly method

By designing a special hanger for container ship lashing bridge maintenance, and using components such as balance beams, plate bridge units, and traction chains, the problems of long erection cycles and high labor intensity are solved, achieving efficient erection and reuse of components, and reducing maintenance costs. cost and safety hazards.

CN115783184BActive Publication Date: 2024-10-11QINGDAO BEIHAI SHIPBUILDING HEAVY IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202211553629.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-06
Publication Date
2024-10-11
Estimated Expiration
2042-12-06

AI Technical Summary

Technical Problem

During the maintenance and construction of container ship lashing bridges, there are problems such as long erection cycle, high labor intensity, many erection parts, and difficulty in reuse, resulting in high maintenance costs and safety hazards.

Method used

Design a special hanger for container ship lashing bridge maintenance, including several scaffolding units, which can be quickly erected and disassembled through components such as balance beams, plate bridge units, traction chains and fixed round pipes, using gantry crane hoisting and connecting plate overlapping methods , improve erection efficiency and reduce labor intensity.

Benefits of technology

The efficient erection of container ship lashing bridge maintenance is achieved, which reduces the labor intensity of workers, allows the hanger components to be reused, and improves erection efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115783184B_ABST
    Figure CN115783184B_ABST
Patent Text Reader

Abstract

The present invention discloses a special hanger for repairing a lashing bridge of a container ship and an assembly method thereof, which relates to the technical field of construction of repair operations of a lashing bridge of a container ship, and comprises a plurality of scaffolding units, wherein the scaffolding unit comprises a balance beam, a shackle is arranged on the top of the balance beam, a plate bridge unit is hoisted on the balance beam, the plate bridge unit comprises a plurality of layers of bridge plates connected up and down, the upper and lower adjacent bridge plates are connected by a towing chain, the lowermost bridge plate is detachably fixedly connected to a hull or a lashing bridge, the scaffolding unit is detachably fixedly connected to the lashing bridge, and the bridge plates corresponding to adjacent scaffolding units are overlapped by connecting plates. By splicing a plurality of scaffolding units, the assembly of the hanger can be facilitated, and the scaffolding unit has strong versatility, thereby reducing the production cost; by arranging a balance beam above the scaffolding unit, a shackle is arranged above the balance beam, and a plurality of layers of bridge plates are hoisted below the balance beam, the overall hoisting of the scaffolding is realized, and the work efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of container ship lashing bridge maintenance construction operations, and in particular to a special hanger for container ship lashing bridge maintenance and an assembling method thereof. Background Art

[0002] In order to prevent and fix containers, container ships need to carry container ship lashing bridges. When the container ship lashing bridge is carrying out high-pressure water injection, rust removal, paint spraying and riveting and welding operations, it is necessary to set up a steel pipe scaffolding for construction before and after the lashing bridge. The scaffolding is composed of steel pipes, pipe clamps, bridge plates and other main materials. It takes about 20 people to set up a scaffolding for the maintenance and construction of the container lashing bridge, and the erection cycle is about 1 day. It takes at least half a month to complete the erection of a container ship consisting of 12-18 lashing bridges. There is a large workload, a large amount of labor and engineering materials, and a long erection cycle. There are safety hazards, which conflict with the "short, flat and fast" work requirements of the ship repair industry. In addition, there are many scaffolding parts, which are easy to lose and very inconvenient to disassemble, which greatly reduces the reusability of the scaffolding and increases the maintenance cost. Summary of the invention

[0003] The purpose of the present invention is to provide a special hanger for repairing a container ship lashing bridge, which has high erection efficiency, low labor intensity for workers, and disassembled hanger parts that can be reused.

[0004] In order to achieve the above object, the technical solution of the present invention is:

[0005] A special hanger for repairing a container ship lashing bridge comprises a plurality of scaffolding units, wherein the scaffolding unit comprises a balance beam, a shackle is arranged on the top of the balance beam, a plate bridge unit is suspended on the balance beam, the plate bridge unit comprises a plurality of layers of bridge plates connected up and down, the upper and lower adjacent bridge plates are connected by a towing chain, the lowermost bridge plate is detachably fixedly connected to a hull or a lashing bridge, the scaffolding unit is detachably fixedly connected to the lashing bridge, and the bridge plates corresponding to adjacent scaffolding units are overlapped by connecting plates.

[0006] Among them, a group of the slab bridge units are hoisted at both ends of the balance beam respectively, the two groups of the slab bridge units are symmetrically arranged and are respectively located on both sides of the tying bridge, and a group of the balance beams are correspondingly arranged at both ends of the slab bridge unit.

[0007] The two groups of symmetrical board bridge units are fixedly connected via a plurality of balancing rods, and the balancing rods are fixed on the lashing bridge.

[0008] Among them, a plurality of short cross bars are also arranged between the traction chain and the lashing bridge.

[0009] Wherein, a guardrail and a straight ladder passage are also arranged above the bridge deck.

[0010] Among them, a plurality of fixing rings are arranged at the bottom of the bridge plate, and support rods are slidably installed in the fixing rings. The fixing rings between adjacent scaffolding units are arranged correspondingly, and the support rods slide into the fixing rings of adjacent scaffolding units.

[0011] Among them, four fixed circular tubes are arranged on each of the balance beams, and the fixed circular tubes are fixed nearby to the eye plates of the lashing bridge.

[0012] Wherein, the balance beam includes an upper cross support and a base, the upper cross support is located above the tying bridge, and a group of the board bridge units are hoisted at both ends of the upper cross support, and the base is fixed on the top of the tying bridge.

[0013] A method for assembling a special hanger for repairing a container ship lashing bridge, comprising the following steps: S1: determining a plan; S2: assembling a scaffolding unit under the ship; S3: hoisting the scaffolding unit onto the ship with a gantry crane; S4: fixing the scaffolding unit to the lashing bridge; S5: laying a connecting plate; S6: after the tooling frame is used, removing the connecting plate, then hoisting the scaffolding unit with the gantry crane, fixing and removing the scaffolding from the lashing bridge, and hoisting the scaffolding unit off the ship with the gantry crane.

[0014] Among them, the scaffolding and the lashing bridge described in S4 are fixed in the following order: fixing of the balance beam, fixing of the lower end of the towing chain to the hull or the railing of the lashing bridge, and fixing of the scaffolding to other parts of the lashing bridge.

[0015] After adopting the above technical solution, the beneficial effects of the present invention are:

[0016] The present invention discloses a special hanger for repairing a lashing bridge of a container ship, comprising a plurality of scaffolding units, wherein the scaffolding unit comprises a balance beam, a shackle is arranged on the top of the balance beam, a plate bridge unit is suspended on the balance beam, the plate bridge unit comprises a plurality of layers of bridge plates connected up and down, upper and lower adjacent bridge plates are connected by towing chains, the lowest bridge plate is detachably fixedly connected to a ship body or a lashing bridge, the scaffolding unit is detachably fixedly connected to the lashing bridge, and the bridge plates corresponding to adjacent scaffolding units are overlapped by connecting plates. By splicing a number of scaffolding units together, the assembly of the hanger can be facilitated, and the scaffolding units have strong versatility, which greatly reduces the production cost; by arranging a balance beam above the scaffolding unit, a shackle is arranged above the balance beam, and a number of bridge plates are hoisted below the balance beam, the overall hoisting of the scaffolding is realized, which greatly improves the work efficiency; the scaffolding unit is detachably fixedly connected to the lashing bridge at multiple locations, which makes it easy to disassemble and fix, and the disassembled scaffolding unit can be reused; after being hoisted onto the ship, the lowest bridge plate can be detachably fixed to the hull or the railing of the lashing bridge, thereby ensuring the verticality of the scaffolding unit up and down, and ensuring that the position is stable and reliable during subsequent fixation; by overlapping the bridge plates corresponding to adjacent scaffolds through connecting plates, the installation of hangers of various widths can be realized, thereby improving the installation efficiency and reducing the labor intensity.

[0017] A group of slab bridge units are hoisted at both ends of the balance beam, and the two groups of slab bridge units are symmetrically arranged and located on both sides of the tying bridge respectively. A group of balance beams are arranged at both ends of the slab bridge unit respectively, and the two groups of slab bridge units are hoisted at the same time by the same balance beam, so that the hangers on both sides of the tying bridge can be installed at the same time, thereby greatly improving work efficiency.

[0018] By fixing two groups of symmetrical slab bridge units through a plurality of balance bars, which are fixed on the lashing bridge, the slab bridge units on the left and right sides and the lashing bridge can be fixed as a whole, thereby greatly improving the firmness of the hanger.

[0019] A number of short cross bars are arranged between the traction chain and the lashing bridge, thereby achieving the fixation of the board bridge unit and the lashing bridge.

[0020] Guardrails and straight ladder passages are also set above the bridge deck, which ensure the safety and convenience of people climbing.

[0021] A plurality of fixing rings are arranged at the bottom of the bridge plate, and support rods are slidably installed in the fixing rings. The fixing rings between adjacent scaffolding units are arranged correspondingly, and the support rods slide into the fixing rings of adjacent scaffolding units, thereby ensuring that the support of the support rods to the connecting plates can save effort when laying the connecting plates.

[0022] In summary, the special hanger for repairing a container ship lashing bridge of the present invention solves the technical problems in the prior art that the special hanger for repairing a container ship lashing bridge has a long erection period, low erection efficiency, high labor intensity and cannot be reused of erection components. The special hanger for repairing a container ship lashing bridge of the present invention has high erection efficiency, low labor intensity for workers, and disassembled hanger components can be reused. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a front view of a special hanger for repairing a container ship lashing bridge according to the present invention;

[0024] Figure 2 yes Figure 1 Side view of

[0025] Figure 3 This is a schematic diagram of the bridge deck stacking;

[0026] Figure 4 It is the first solution to firmly support the scaffolding unit;

[0027] Figure 5 It is the second option to firmly support the scaffolding unit;

[0028] Figure 6 It is a schematic diagram of the installation structure of the scaffolding unit before lifting;

[0029] Figure 7 It is a schematic diagram of the installation structure of the scaffolding unit after lifting;

[0030] Figure 8 It is a schematic diagram of the installation structure of the balance beam;

[0031] Fig. 9 It is a schematic diagram of the installation structure of the balance bar;

[0032] Fig.10 It is a schematic diagram of the installation structure of the short cross bar;

[0033] Fig.11 It is a schematic diagram of the installation structure of the connecting plate and the bridge plate in the second embodiment;

[0034] In the figure: 1. scaffolding unit, 11. balance beam, 110. shackle, 111. fixed round pipe, 112. upper cross support, 113. base, 12. board bridge unit, 121. bridge board, 13. traction chain, 14. balance bar, 15. guardrail, 151. vertical bar, 152. cross bar, 16. short cross bar, 17. stable support, 2. tying bridge, 3. connecting plate, 51. fixing ring, 52. support rod. DETAILED DESCRIPTION

[0035] The present invention is further described below in conjunction with the accompanying drawings and embodiments.

[0036] The directions mentioned in this specification are based on the directions shown in the drawings and only represent relative positions, not absolute positions.

[0037] Embodiment 1:

[0038] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 , Figure 8 , Fig. 9 and Fig.10 As shown together, a special hanger for repairing a container ship lashing bridge includes a plurality of scaffolding units 1. In this embodiment, after measuring the length of the hanger, it is found that 24 meters are required to be erected, while the length of the scaffolding unit 1 is 10 meters. Therefore, in this embodiment, two scaffolding units 1 are provided. In actual applications, the number of scaffolding units 1 can be determined based on the length of the scaffolding unit 1 and the total length of the hanger, and there is no limitation on this in this embodiment.

[0039] The scaffolding unit 1 includes a balance beam 11, and a shackle 110 is provided on the top of the balance beam 11. The shackle 110 is used to hoist the balance beam 11. A board bridge unit 12 is hoisted on the balance beam 11. In this embodiment, in order to improve efficiency, a group of board bridge units 12 are hoisted at both ends of the balance beam 11, respectively. The extension direction of the balance beam 11 is perpendicular to the length direction of the board bridge unit 12. Two groups of board bridge units 12 are symmetrically arranged. A group of balance beams 11 is provided at both ends of the board bridge unit 12, respectively. The two groups of board bridge units 12 are hoisted between the two groups of balance beams 11, thereby realizing the simultaneous hoisting of the scaffolding units 1 on both sides of the lashing bridge 2. In actual applications, the scaffolding units 1 on both sides of the lashing bridge 2 can also be hoisted and installed separately as needed.

[0040] The balance beam 11 includes an upper cross support 112 and a base 113. A group of slab bridge units 12 are hoisted at both ends of the upper cross support 112, and the base 113 is fixed on the top of the lashing bridge 2. When the scaffolding unit 1 is hoisted onto the ship, the base 113 is first set on the top of the lashing bridge 2, and the two groups of slab bridge units 12 on the balance beam 11 are respectively located on both sides of the lashing bridge 2, and then the balance beam 11 is fixed, and the fixing method is: four fixed circular tubes 111 are set on each balance beam 11, and the fixed circular tubes 111 are tilted downward, the upper ends of the fixed circular tubes 111 are fixed on the base 113, and the lower ends of the fixed circular tubes 111 are fixed on the eye plate of the lashing bridge 2, and the fixed circular tubes 111 and the eye plate of the lashing bridge 2 are fixed nearby. Each balance beam has four fixed circular tubes 111. The fixed circular tubes 111 are φ48*3.5 circular tubes. The fixed circular tubes 111 are connected and fixed to the eye plates of the lashing bridge 2 (the eye plates of the lashing bridge are within 1m from the balance beam) by spiral fasteners, or connected to the railings of the lashing bridge 2. When connected to the eye plates of the lashing bridge 2, they should also be as close to the balance beam 11 as possible.

[0041] The board bridge unit 12 includes several layers of bridge boards 121 connected up and down. In this embodiment, the length of the bridge board 121 is 10 meters. The upper and lower adjacent bridge boards 121 are connected by towing chains 13. Four towing chains 13 are arranged between adjacent bridge boards 121, respectively located at four corners, so that stable lifting can be achieved. In this embodiment, hooks are arranged at both ends of the two longest opposite surfaces of the bridge board 121, and four load-bearing hooks are arranged at the bottom of each balance beam 11. A towing chain 13 is arranged at the bottom of each load-bearing hook, and each towing chain 13 corresponds to a hook and is fixed to the corresponding hook. The bottom of the towing chain 13 can be detachably fixed to the hull or the railing of the lashing bridge 2. A shackle is arranged on the hull to fix the towing chain 13. The bottom of the towing chain 13 can also be fixed to the railing of the lashing bridge 2, thereby realizing the rooting and sealing of the bottom of the towing chain 13, and the towing chain 13 is in a tensioned state.

[0042] In this embodiment, the bridge deck 121 is provided with five layers. According to the requirements of the number of people and weight carried, the bridge deck 121 is provided with a maximum of six layers. Each 10m bridge deck can carry a maximum of 4 people / 330k at the same time. The number of layers and the number of people / weight carried are as follows:

[0043] Number of layers Number of people / weight carried on one side of a 10m bridge deck between two balance beams 1 3 people / 245kg 2 4 people / 330kg 3 4 people / 330kg 4 5 people / 410kg 5 5 people / 410kg 6 5 people / 410kg

[0044] In actual applications, the number of people who can be carried can be reset according to the length of the bridge deck 121, and this embodiment does not limit this.

[0045] The scaffolding units 1 are detachably fixedly connected to the tying bridges 2 at multiple locations, and the bridge plates 121 corresponding to adjacent scaffolds are overlapped by connecting plates 3. After the scaffolding units 1 are fixed, a suitable connecting plate 3 is selected according to the spacing between the scaffolding units 1 on both sides, and the connecting plate 3 is laid between the bridge plates 121 on the adjacent scaffolding units 1, so as to connect the two scaffolding units 1. After overlapping the connecting plates 3, the connecting plates 3 are fixed with iron wires. In this embodiment, the length of the connecting plate 3 is 4 meters.

[0046] A guardrail 15 and a straight ladder passage are also provided above each bridge deck 121. The guardrail 15 includes a vertical rod 151 and a horizontal rod 152 fixed on the outer side of each bridge deck 121 (the side away from the tying bridge 2). In this embodiment, two vertical rods 151 are provided on each bridge deck 121, and a horizontal rod 152 is fixed between the two vertical rods 151, thereby forming the guardrail 15. The vertical rod 151 is made of Φ48*3.5 round steel, and the horizontal rod 152 is made of Φ27*3 round steel. The vertical rod 151 and the horizontal rod 152 can be fixed by welding or by screwing, which is not limited in this embodiment. A safety net is also hung on the guardrail 15 to ensure safety.

[0047] The two groups of symmetrical board bridge units 12 are fixedly connected by a plurality of balance bars 14, which are Φ48*3.5 round tubes and fixed on the lashing bridge 2. The balance bars 14 and the traction chains 13 intersecting therewith are fastened by wires, and the balance bars 14 and the railings of the lashing bridge 2 are fixedly connected by spiral fasteners, so as to facilitate assembly and disassembly. A plurality of short cross bars 16 are also provided between the traction chains 13 and the lashing bridge 2. In this embodiment, a short cross bar 16 is added to the bridge plate 121 at intervals, and one end of the short cross bar 16 is connected to the traction chain 13, and the other end is connected to the railings of the lashing bridge 2.

[0048] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 and Figure 8 As shown in the figure, a method for assembling a special hanger for repairing a container ship lashing bridge comprises the following steps:

[0049] S1: Determine the plan.

[0050] After the ship enters the factory, actual survey is carried out on board to determine the following elements: the number and height of the bridge deck 121; the total length of the towing chain 13; the on-site fixing plan; and the objects that need to be temporarily removed on site;

[0051] S2: Assembling scaffolding unit 1 under the ship.

[0052] According to the determined plan, the 10-meter bridge deck 121 will be stacked neatly on the site, and the connecting bridge decks and the required steel pipes, fasteners, etc. will be placed between each layer in advance. All materials will be placed symmetrically in the center, and movable objects placed on the bridge deck will be fixed with wire.

[0053] The balance beam 11 is placed in place, and a stable support 17 is added. There are two support schemes for the stable support 17, respectively: Figure 3 and Figure 4 As shown in the figure, since it is already very clear in the figure, it will not be introduced in detail here. The balance beam 11 is connected to the 10-meter bridge deck through a shackle and a traction chain 13.

[0054] S3: Use a gantry crane to lift the scaffolding unit 1 onto the ship.

[0055] The wire rope under the lifting bar is connected to the balance beam 11 and slowly lifted. During the lifting process, the connection of each wire rope should be checked. When the wire rope is stressed, the stable support 17 is removed. The bridge board 121 in the scaffolding unit 1 is slowly unfolded. The scaffolding unit 1 is left to stand for observation for 5 minutes after it is 0.5 meters off the ground. After checking that there is no abnormality, continue lifting and hoist it onto the ship.

[0056] S4: Scaffolding unit 1 is fixed to lashing bridge 2;

[0057] The scaffolding unit 1 and the lashing bridge 2 are fixed in the following order: fixing the balance beam 11, fixing the lower end of the towing chain 13 to the hull or the railing of the lashing bridge 2, and fixing the scaffolding to other parts of the lashing bridge 2.

[0058] The fixing of the scaffolding to other parts of the lashing bridge 2 includes connecting the balance bar 14 and the short cross bar 16, adding a guardrail 15 and a straight ladder channel above the bridge deck 121, and hanging a safety net.

[0059] S5: Lay the connecting plate 3; and fix the connecting plate 3.

[0060] S6: After the tooling frame is used, the connecting plate 3 is removed, and then the scaffolding unit 1 is hoisted by the gantry crane, and the fixation between the scaffolding and the lashing bridge 2 is removed in turn, and the scaffolding unit 1 is hoisted off the ship by the gantry crane.

[0061] After the use of the tooling hanger, connect the scaffolding unit 1 with the lifting bar, remove the fixed steel pipes, pipe clamps, wires, shackles and other connectors between the traction chain 13 and the lashing bridge 2, remove the vertical ladders and guardrails on each floor; remove the connecting plate 3. The lifting bar works until the wire rope is stressed, and remove the fixed steel pipes, pipe clamps and other connectors between the balance beam 11 and the lashing bridge 2; check whether the scaffolding unit 1 is completely separated from the lashing bridge 2, and whether there are any unfixed items on the scaffolding unit 1. After ensuring safety, lift the scaffolding unit 1; operate slowly during the lifting process to prevent the scaffolding unit 1 from scratching the lashing bridge 2; lift the scaffolding unit 1 to the dock, and stack the 10-meter bridge deck layer by layer.

[0062] Embodiment 2:

[0063] like Fig.10 As shown, this embodiment is basically the same as the first embodiment, the only difference being that a plurality of fixing rings 51 are provided at the bottom of the bridge plate 121, and a support rod 52 is slidably installed in the fixing ring 51, and the sliding direction of the support rod 52 is consistent with the extension direction of the bridge plate 121, and the fixing rings 51 between adjacent scaffolding units 1 are correspondingly provided, and the support rod 52 slides into the fixing ring 51 of the adjacent scaffolding unit 1. A fastening bolt is provided in the fixing ring 51, and when the support rod 52 slides into the fixing ring 51 of the adjacent scaffolding unit 1, the fastening bolt is tightened to fix the support rod 52.

[0064] When laying the connecting plate 3, since the connecting plate 3 is long and heavy, accidents are prone to occur during the overlap. Therefore, when laying the connecting plate 3, first slide the support rod 52 into the fixing ring 51 of the adjacent scaffolding unit 1, lock it, and then push the connecting plate 3 forward. The connecting plate 3 is supported by the support rod 52 to prevent it from falling until both sides are overlapped on the adjacent scaffolding unit 1. In order to ensure a good supporting effect, two or three support rods 52 can be arranged side by side, so that a better supporting effect can be achieved.

[0065] In addition, in order to ensure the flatness of the connecting plate 3 and the bridge plate 121, a groove is provided on the bridge plate 121. When the connecting plate 3 overlaps the bridge plates 121 on both sides, the connecting plate 3 can fall into the groove, thereby ensuring the flatness of the surface and preventing people from tripping due to protrusions.

[0066] The invention discloses a special hanger for repairing a container ship lashing bridge, which solves the technical problems in the prior art that the special hanger for repairing a container ship lashing bridge has a long erection period, low erection efficiency, high labor intensity and cannot be reused in erection parts. The special hanger for repairing a container ship lashing bridge disclosed by the invention has high erection efficiency, low labor intensity for workers and can reuse disassembled hanger parts.

[0067] The present invention is not limited to the above-mentioned specific implementation modes. Various changes made by ordinary technicians in this field based on the above-mentioned concepts without creative work are all within the protection scope of the present invention.

Claims

1. A special hanger for container ship lashing bridge maintenance, characterized in that: It comprises a plurality of scaffolding units, wherein the scaffolding units comprise a balance beam, a shackle is arranged on the top of the balance beam, a board bridge unit is suspended on the balance beam, the board bridge unit comprises a plurality of layers of bridge boards connected up and down, the upper and lower adjacent bridge boards are connected by towing chains, the lowermost bridge board is detachably fixedly connected to a hull or a lashing bridge, the scaffolding units are detachably fixedly connected to the lashing bridge, and the bridge boards corresponding to adjacent scaffolding units are overlapped by connecting plates; A group of the slab bridge units are hoisted at both ends of the balance beam, and the two groups of the slab bridge units are symmetrically arranged on both sides of the lashing bridge, and a group of the balance beams are arranged at both ends of the slab bridge units; The balance beam comprises an upper cross support and a base, wherein the upper cross support is located above the lashing bridge, and a group of the board bridge units are hoisted at both ends thereof respectively, and the base is fixed on the top of the lashing bridge.

2. A special hanger for repairing container ship lashing bridge according to claim 1, characterized in that: The two groups of symmetrical board bridge units are fixedly connected via a plurality of balancing rods, and the balancing rods are fixed on the lashing bridge.

3. A special hanger for repairing container ship lashing bridge according to claim 1, characterized in that: A plurality of short cross bars are also arranged between the traction chain and the lashing bridge.

4. A special hanger for repairing container ship lashing bridge according to claim 1, characterized in that: A guardrail and a straight ladder passage are also arranged above the bridge deck.

5. A special hanger for repairing container ship lashing bridge according to claim 1, characterized in that: A plurality of fixing rings are arranged at the bottom of the bridge plate, and support rods are slidably installed in the fixing rings. The fixing rings between adjacent scaffolding units are arranged correspondingly, and the support rods slide into the fixing rings of adjacent scaffolding units.

6. A special hanger for repairing container ship lashing bridge according to claim 1, characterized in that: Four fixed circular tubes are arranged on each of the balance beams, and the fixed circular tubes are fixed nearby to the eye plates of the lashing bridge.

7. An assembly method of a special hanger for repairing a container ship lashing bridge according to claim 1, characterized in that: The following steps are involved: S1: Determine the plan; S2: Under-ship assembly scaffolding unit; S3: Use a gantry crane to lift the scaffolding unit onto the ship; S4: Fix the scaffolding unit to the lashing bridge; S5: Laying the connecting plate; S6: After the tooling frame is used, the connecting plate is removed, and then the scaffolding unit is hoisted by the gantry crane, the scaffolding and the lashing bridge are fixed and removed, and the scaffolding unit is hoisted off the ship by the gantry crane.

8. The method for assembling a special hanger for repairing a container ship lashing bridge according to claim 7, characterized in that: The scaffolding and the lashing bridge described in S4 are fixed in the following order: fixing of the balance beam, fixing of the lower end of the towing chain to the hull or the railing of the lashing bridge, and fixing of the scaffolding and other parts of the lashing bridge.