Method for calculating static pressure in hydraulic fractures and minimum horizontal principal stress of formations
By pre-embedding fluid pressure monitoring sensors in horizontal well drilling construction, combined with horizontal well segmented multi-cluster hydraulic fracturing construction, real-time monitoring of the static pressure in the hydraulic fractures and the minimum horizontal principal stress of the formation solves the problem of in-situ stress measurement in the existing technology. The problem of low accuracy and efficiency has been solved, and the optimized design of hydraulic fracturing construction has been realized.
Patent Information
- Application Number
- CN202211702941.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-28
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2042-12-28
AI Technical Summary
The existing technology has problems of low accuracy, low efficiency and high cost in measuring the in-situ stress of oil and gas reservoirs and geothermal reservoirs. Especially in the design of hydraulic fracturing reservoir stimulation, it is difficult to accurately measure the size and distribution of the in-situ stress field. .
Embedded fluid pressure monitoring sensors during the drilling process of horizontal wells are used, combined with the segmented multi-cluster hydraulic fracturing construction of horizontal wells. By monitoring the static pressure in the hydraulic fractures and the minimum horizontal principal stress of the formation, the static pressure in the fractures and the relationship between fracturing and fracturing are established. The relationship between construction fluid injection pressure, real-time monitoring and calculation of formation pressure, and improvement of the efficiency and accuracy of in-situ stress testing.
It realizes real-time monitoring and calculation of formation pressure during hydraulic fracturing construction, reduces the complexity and cost of in-situ stress testing, improves the efficiency and accuracy of in-situ stress testing of reservoirs, and guides the optimal design of hydraulic fracturing.
Smart Images

Figure CN115807665B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of hydraulic fracturing reservoir reconstruction, and in particular to a method for calculating the static pressure in a hydraulic fracture and the minimum horizontal principal stress of a formation based on field monitoring data. Background Art
[0002] Hydraulic fracturing reservoir transformation technology is widely used in oil and gas field production increase and geothermal field permeability improvement. There are many factors that affect the design of hydraulic fracturing reservoir transformation, and one of the most important factors is geostress. Usually, the size and direction of reservoir geostress determine a series of hydraulic fracturing design work, such as the arrangement of fracturing wells, the size of the fracturing cluster spacing, the selection of proppants and fracturing fluids, etc. At the same time, geostress also affects the geometry of the fractures caused by fracturing to a great extent.
[0003] When oil and gas reservoirs or geothermal reservoirs are subjected to forces such as compression, stretching, and knobs, the underground reservoirs are in a very complex natural stress state. This stress is collectively referred to as geostress. Field testing of reservoir geostress has been developing along with reservoir development. Commonly used methods for testing geostress include: data analysis method, Kessel effect method for core analysis, borehole hydraulic fracturing method, and borehole wall collapse method. For details, see "Chen Mian, Jin Yan, Zhang Guangqing in Petroleum Engineering Rock Mechanics. Science Press, July 2008, P69)". Although predecessors have done a lot of work, accurately testing reservoir geostress is still a challenging task, and there is still a lot of work to be improved.
[0004] The data analysis method mainly relies on the geological data of the reservoir area to analyze the geostress field. For example, through the interpretation of earthquake focal mechanism, the distribution of geostress field can be qualitatively given. However, this method is difficult to accurately measure the size of the stress field. Borehole hydraulic fracturing is the most widely used method, which can accurately measure reservoir geostress. However, this method has a relatively complicated process, the testing work takes a long time, and the testing cost is expensive. During the operation of the Kessel effect method based on core analysis, it is difficult to calibrate the orientation of the core in the borehole.
[0005] In view of the current problems and challenges in the field of geostress measurement in the development of oil and gas reservoirs and geothermal reservoirs, it is urgent to adopt multiple methods for joint observation, carry out technological innovation, develop new geostress testing methods, improve testing efficiency and reduce testing costs. Summary of the invention
[0006] In view of the deficiencies of the above-mentioned prior art, the purpose of the present invention is to provide a method for calculating the static pressure in hydraulic fractures and the minimum horizontal principal stress of the formation based on field monitoring data. The method integrates the process of calculating the static pressure in hydraulic fractures and the formation in-situ stress into the construction of horizontal well segmented multi-cluster hydraulic fracturing, and utilizes the mechanical connection between the segmented multi-cluster hydraulic fractures to establish the relationship between the static pressure in the fractures and the injection pressure of the fracturing construction, and solves the static pressure in the fractures and the minimum horizontal principal stress of the formation, so as to realize real-time monitoring and calculation of the formation pressure during the hydraulic fracturing construction, improve the efficiency and accuracy of in-situ testing of reservoir in-situ stress, and thus serve the optimization design of hydraulic fracturing.
[0007] To achieve the above object, the technical solution adopted by the present invention is:
[0008] The method for calculating the static pressure in a hydraulic fracture and the minimum horizontal principal stress of a formation comprises the following steps:
[0009] Step 1: During the on-site horizontal well drilling construction, a fluid pressure monitoring sensor 1 is pre-buried at the designed point of the wellbore, so that the pre-buried fluid pressure monitoring sensor 1 is located in a toe fracturing cluster 3 of one section of the horizontal well staged fracturing. The toe fracturing cluster 3 where the fluid pressure monitoring sensor 1 is located should be set close to the toe 4 of the horizontal well;
[0010] Step 2: Conduct multi-cluster fracturing construction in a horizontal well, perform fracturing at the toe fracturing cluster 3 where the pre-buried fluid pressure monitoring sensor 1 is located, and then use the packer 2 to seal the toe fracturing cluster 3;
[0011] Step 3: After the fracturing construction of the toe fracturing cluster 3 is completed, continue fracturing from the toe end 4 to the root end 5 of the horizontal well, and record the pressure value of the fracturing fluid pumped at the root fracturing cluster 6 during the hydraulic fracturing construction and the pressure value displayed by the fluid pressure monitoring sensor 1;
[0012] Step 4: Calculate the static pressure in the hydraulic fracture and the minimum horizontal principal stress of the reservoir based on the wellbore structure dimensions, the physical and mechanical properties of the formation, the spacing between fracturing clusters, and the fracturing monitoring data.
[0013] In step 1, the fluid pressure monitoring sensor 1 is pre-buried in the area near the toe 4 of the horizontal well during the horizontal well drilling construction process, and the toe fracturing cluster 3 area is set to cover the area where the pre-buried fluid pressure monitoring sensor 1 is located.
[0014] In step 2, when hydraulic fracturing construction is performed on the toe-end fracturing cluster 3 where the fluid pressure monitoring sensor 1 is located, the packer 2 is used to seal the toe-end fracturing cluster 3; after the fracturing construction is completed and the fracturing equipment is taken out, the toe-end fracturing cluster 3 is sealed again, so that the fracturing fluid in the area where the toe-end fracturing cluster 3 is located is sealed there.
[0015] In step 3, the hydraulic fracturing construction process of the fracturing cluster is to carry out fracturing from the toe end 4 area of the horizontal well to the root end 5 area. During the fracturing process, the pressure value of the fracturing fluid pumped at the root fracturing cluster 6 and the pressure value monitored by the fluid pressure monitoring sensor 1 are simultaneously recorded.
[0016] The steps for calculating the static pressure in the hydraulic fracture and the minimum horizontal principal stress of the reservoir in step 4 are as follows:
[0017] 1. Determine the morphology of hydraulic fractures based on field monitoring data. The morphology of hydraulic fractures can be approximately divided into plane strain type and circular type. Determine the length of plane strain type hydraulic fractures and the radius of circular hydraulic fractures based on the divided morphology.
[0018] 2 Calculate the static pressure in the hydraulic fracture according to the following formula:
[0019] Calculation of static pressure in plane strain hydraulic fractures:
[0020]
[0021] In the formula, h f is half of the fracture length, x is the distance from the root fracturing cluster 6 to the pressure monitoring sensor 1, and Δσ is the difference in pressure recorded by the fluid pressure monitoring sensor 1 before and after the construction of the root fracturing cluster 6;
[0022] Calculation of static pressure in circular hydraulic fractures:
[0023]
[0024]
[0025]
[0026]
[0027]
[0028]
[0029]
[0030]
[0031] Where ρ≈0,ξ=x / h f ,h f =r is the radius of the circular hydraulic fracture, x is the distance from the root fracturing cluster 6 to the pressure monitoring sensor 1, Δσ is the difference in pressure recorded by the fluid pressure monitoring sensor 1 before and after the construction of the root fracturing cluster 6;
[0032] 3 Calculate the minimum horizontal principal stress in the fracturing area according to the following formula:
[0033] σ hmin =p inj -p net
[0034] In the formula, p inj It is the pumping fracturing fluid pressure recorded during the construction of root fracturing cluster 6.
[0035] The beneficial effects of the present invention relative to the prior art are:
[0036] 1. The present invention meets the need for pressure monitoring in the later stage by pre-burying fluid pressure monitoring sensors during the horizontal well drilling construction process. There is no need to install pressure monitoring equipment when carrying out hydraulic fracturing, which reduces the complexity of the pressure monitoring process and improves its efficiency.
[0037] 2. The present invention monitors the dynamic mechanical changes of the stress shadow area of the hydraulic fracture during the fracturing process, and with the help of theoretical models, realizes the measurement of the static pressure inside the hydraulic fracture and the minimum horizontal principal stress of the reservoir during the hydraulic fracturing process, fully utilizes the mechanical response of the reservoir rock mass during hydraulic fracturing, and reduces the cost of ground stress measurement.
[0038] 3. The present invention uses pre-buried pressure monitoring sensors to monitor reservoir stress changes in real time during the fracturing process. By combining on-site pumping data with theoretical models, it can achieve real-time measurement of the evolution of ground stress in deep-buried oil and gas reservoirs, thereby guiding the optimization of hydraulic fracturing construction and improving the fracturing effect.
[0039] 4. The present invention organically combines hydraulic fracturing with geostress measurement methods, enriches the hydraulic fracturing reservoir transformation model, and provides a new idea for conducting geostress measurement in oil and gas reservoirs and geothermal reservoirs. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] Figure 1 Schematic diagram of multi-cluster hydraulic fracturing and field monitoring in a horizontal well.
[0041] Figure 2 =Δσ / p net and x / h f The function relationship curve of .
[0042] Figure 3 Schematic diagram of the relationship between the pumped fracturing fluid pressure, the minimum principal stress of the formation and the static pressure of the hydraulic fracture.
[0043] In the figure: 1—fluid pressure monitoring sensor; 2—packer; 3—toe fracturing cluster; 4—horizontal well toe; 5—horizontal well root; 6—root fracturing cluster. DETAILED DESCRIPTION
[0044] Embodiments of the present invention will be described in detail below with reference to the accompanying drawings.
[0045] The method for calculating the static pressure in a hydraulic fracture and the minimum horizontal principal stress of a formation comprises the following steps:
[0046] Step 1: Reference Figure 1 During the on-site horizontal well drilling construction, a fluid pressure monitoring sensor 1 is pre-buried at the setting point of the wellbore, so that the pre-buried fluid pressure monitoring sensor 1 is located in one of the toe fracturing clusters 3 of the horizontal well staged fracturing setting. The toe fracturing cluster 3 where the fluid pressure monitoring sensor is located should be set close to the toe 4 of the horizontal well;
[0047] Step 2: Conduct multi-cluster fracturing construction in a horizontal well, perform fracturing at the toe fracturing cluster 3 where the pre-buried fluid pressure monitoring sensor 1 is located, and then use the packer 2 to seal the toe fracturing cluster 3;
[0048] Step 3: After the fracturing construction of the toe fracturing cluster 3 is completed, continue fracturing from the toe end 4 to the root end 5 of the horizontal well, and record the pressure value of the fracturing fluid pumped at the root fracturing cluster 6 during the hydraulic fracturing construction and the pressure value displayed by the fluid pressure monitoring sensor 1;
[0049] Step 4: Calculate the static pressure in the hydraulic fracture and the minimum horizontal principal stress of the reservoir according to the wellbore structure size, the physical and mechanical properties of the formation, the spacing between the fracturing clusters, and the fracturing monitoring data. Specifically:
[0050] 1. Determine the morphology of hydraulic fractures based on field monitoring data. The morphology of hydraulic fractures can be approximately divided into plane strain type and circular type. Determine the length of plane strain type hydraulic fractures and the radius of circular hydraulic fractures based on the divided morphology.
[0051] 2 Calculate the static pressure in the hydraulic fracture according to the following formula:
[0052] Calculation of static pressure in plane strain hydraulic fractures:
[0053]
[0054] In the formula, h f is half of the fracture length, x is the distance from the root fracturing cluster 6 to the pressure monitoring sensor 1, and Δσ is the difference in pressure recorded by the fluid pressure monitoring sensor 1 before and after the construction of the root fracturing cluster 6; Figure 2 As shown, Figure 2 The solid line in the middle shows the Δσ / p plotted using formula (1). net With x / h f The functional relationship curve of x / h can be obtained through the curve in the figure or formula (1): f The corresponding Δσ / p netThe value of Δσ is measured by the fluid pressure monitoring sensor, so the static pressure p in the plane strain hydraulic fracture can be obtained. ne t.
[0055] Calculation of static pressure in circular hydraulic fractures:
[0056]
[0057] Where ρ≈0,ξ=x / h f ,h f =r is the radius of the circular hydraulic fracture, x is the distance from the root fracturing cluster 6 to the pressure monitoring sensor 1, Δσ is the difference in pressure recorded by the fluid pressure monitoring sensor 1 before and after the construction of the root fracturing cluster 6, as shown in Figure 2 As shown, Figure 2 The dashed line in the middle shows the Δσ / p plotted using formula (2). net With x / h f The functional relationship curve of x / h can be obtained through the curve in the figure or formula (2). f The corresponding Δσ / p net The value of Δσ is measured by the fluid pressure monitoring sensor, so the static pressure p in the circular hydraulic fracture can be obtained. net ;
[0058] (3) Calculate the minimum horizontal principal stress in the fracturing area according to the following formula:
[0059] σ hmin =p inj -p net
[0060] In the formula, p inj is the pumped fracturing fluid pressure recorded during the construction of root fracturing cluster 6, Figure 3 The pumped fracturing fluid pressure p is shown. inj , minimum principal stress of the formation σ hmin and the hydraulic fracture static pressure p ent Relationship diagram.
[0061] Furthermore, in this embodiment, the fluid pressure monitoring sensor 1 is pre-buried in an area near the horizontal well toe 4 during the horizontal well drilling construction process, and the designed toe fracturing cluster 3 area covers the area where the pre-buried fluid pressure monitoring sensor 1 is located.
[0062] Furthermore, in this embodiment, when hydraulic fracturing construction is performed on the toe-end fracturing cluster 3 where the fluid pressure monitoring sensor 1 is located, the packer 2 is used to seal the toe-end fracturing cluster 3; after the fracturing construction is completed and the fracturing equipment is taken out, the toe-end fracturing cluster 3 is sealed again, so that the fracturing fluid in the area where the toe-end fracturing cluster 3 is located is sealed there.
[0063] Furthermore, in the present embodiment, the hydraulic fracturing construction process of the fracturing cluster is to carry out fracturing from the toe end 4 area of the horizontal well to the root end 5 area, and during the fracturing process, the pressure value of the fracturing fluid pumped at the root fracturing cluster 6 and the pressure value monitored by the fluid pressure monitoring sensor 1 are simultaneously recorded.
[0064] The present invention pre-buries a fluid pressure monitoring sensor during the horizontal well drilling construction process to monitor the mechanical response of the rock mass around the hydraulic fracture during the horizontal well segmented multi-cluster fracturing process, that is, to monitor the dynamic mechanical changes of the stress shadow area of the hydraulic fracture during the fracturing process. With the help of a theoretical analysis model, different types of hydraulic fractures are classified according to the morphology of the hydraulic fractures, and the static pressure in the hydraulic fracture that causes the mechanical response of the stress shadow area is calculated, and then the minimum horizontal principal stress of the fractured reservoir is further obtained, thereby achieving the minimum horizontal principal stress of the reservoir during the hydraulic fracturing process, and serving the optimal design of hydraulic fracturing.
Claims
1. A method for measuring the static pressure in a hydraulic fracture and the minimum horizontal principal stress of a formation, characterized in that: The following steps are involved: Step 1: During the on-site horizontal well drilling construction, a fluid pressure monitoring sensor (1) is pre-buried at a setting point of the wellbore, so that the pre-buried fluid pressure monitoring sensor (1) is located in one of the toe fracturing clusters (3) of the horizontal well staged fracturing setting. The toe fracturing cluster (3) where the fluid pressure monitoring sensor (1) is located should be set close to the toe (4) of the horizontal well; Step 2: Conducting multi-cluster fracturing construction in a horizontal well, performing fracturing at the toe fracturing cluster (3) where the pre-buried fluid pressure monitoring sensor (1) is located, and then sealing the toe fracturing cluster (3) of this section with a packer (2); Step 3: After the fracturing construction of the toe fracturing cluster (3) is completed, continue fracturing from the toe end (4) of the horizontal well to the root end (5), and record the pressure value of the fracturing fluid pumped at the root fracturing cluster (6) during the hydraulic fracturing construction and the pressure value displayed by the fluid pressure monitoring sensor (1); Step 4: Calculate the static pressure in the hydraulic fracture and the minimum horizontal principal stress of the reservoir according to the wellbore structure size, the physical and mechanical properties of the formation, the spacing between the fracturing clusters, and the fracturing monitoring data. The specific steps are as follows: (4.1) Determine the morphology of hydraulic fractures based on field monitoring data. The morphology of hydraulic fractures can be roughly divided into plane strain type and circular type. Determine the length of plane strain type hydraulic fractures and the radius of circular hydraulic fractures based on the morphology. (4.2) The static pressure in the hydraulic fracture is calculated according to the following formula: Calculation of static pressure in plane strain hydraulic fractures: In the formula, h f is half of the fracture length, x is the distance from the root fracturing cluster (6) to the pressure monitoring sensor (1), and Δσ is the difference in pressure recorded by the fluid pressure monitoring sensor (1) before and after the construction of the root fracturing cluster (6); Calculation of static pressure in circular hydraulic fractures: Where ρ≈0,ξ=x / h f ,h f = r is the radius of the circular hydraulic fracture, x is the distance from the root fracturing cluster (6) to the pressure monitoring sensor (1), Δσ is the difference in pressure recorded by the fluid pressure monitoring sensor (1) before and after the construction of the root fracturing cluster (6); (4.3) The minimum horizontal principal stress in the fracturing area is calculated according to the following formula: σ hmin =p inj -p net In the formula, p inj It is the pumped fracturing fluid pressure recorded during the construction of the root fracturing cluster (6).
2. The method for calculating the static pressure in a hydraulic fracture and the minimum horizontal principal stress of a formation according to claim 1, characterized in that: In step 1, the fluid pressure monitoring sensor (1) is pre-buried in an area close to the toe (4) of the horizontal well during the horizontal well drilling construction process, and the toe fracturing cluster (3) area is set to cover the area where the pre-buried fluid pressure monitoring sensor (1) is located.
3. The method for calculating the static pressure in a hydraulic fracture and the minimum horizontal principal stress of a formation according to claim 1, characterized in that: In step 2, when hydraulic fracturing construction is carried out on the toe-end fracturing cluster (3) where the fluid pressure monitoring sensor (1) is located, a packer (2) is used to seal the toe-end fracturing cluster (3); after the fracturing construction is completed and the fracturing equipment is taken out, the toe-end fracturing cluster (3) is sealed again, so that the fracturing fluid in the area where the toe-end fracturing cluster (3) is located is sealed there.
4. The method for calculating the static pressure in a hydraulic fracture and the minimum horizontal principal stress of a formation according to claim 1, characterized in that: In step 3, the hydraulic fracturing construction process of the fracturing cluster is to carry out fracturing from the toe end (4) area of the horizontal well to the root end (5) area. During the fracturing process, the pressure value of the fracturing fluid pumped at the root fracturing cluster (6) and the pressure value monitored by the fluid pressure monitoring sensor (1) are simultaneously recorded.