A method for constructing a tuff cement stabilized layer
By arranging removable side pipes and closing components on the outside of the discharging hopper of the paving device, the discharging width is adjusted, which solves the problem of material waste in the existing technology, realizes construction suitable for different width positions, and improves construction efficiency. and applicability.
Patent Information
- Application Number
- CN202211443995.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-18
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2042-11-18
AI Technical Summary
When the existing water-stabilized layer rapid paving and forming construction device is constructed at narrow seams or road junctions, it is easy to waste materials and cannot effectively adjust the discharging width to adapt to construction locations with different widths.
By setting removable side pipes and closing components on the outside of the discharging hopper of the paving device, the discharging width is adjusted according to the width of the construction location, and the disassembly and control components are used to install and seal the side pipes to ensure that materials are evenly paved. .
It achieves flexible adjustment of the discharging width, reduces material waste, improves the applicability and efficiency of construction, and is suitable for construction locations with different widths.
Smart Images

Figure CN115821691B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of road construction, and in particular to a tuff cement stabilization layer construction method. Background Art
[0002] With the implementation of national ecological and environmental protection policies and related limestone mining, a large number of limestone manufacturers have closed down due to ecological and environmental protection issues such as dust pollution, resulting in increasingly serious contradictions between supply and demand of limestone materials. It is difficult to supply limestone with guaranteed quality and quantity. This problem has become one of the main problems currently plaguing highway projects in some provinces and cities.
[0003] At present, seeking a stone with abundant reserves, stable quality, excellent performance, and reasonable price that meets the requirements in all performance requirements to replace limestone for the construction of water-stable base is an effective means to solve the current shortage of limestone materials and ensure the progress of engineering projects and the quality of construction.
[0004] Tuff is a widely distributed volcanic clastic rock. Replacing limestone with tuff and adjusting different construction ratios to meet the strength requirements of the base and subbase is an important part of achieving sustainable development of my country's highway construction.
[0005] The existing Chinese patent with reference publication number CN113005858A discloses a water-stabilizing layer rapid paving and forming construction device and construction method, including a frame, a plurality of movable wheels rotatably connected to the bottom of the frame, a hopper arranged on the frame, a feeding box fixed on the frame and located below the hopper, and a blanking box fixed on the frame; the hopper is connected to the feeding box, the feeding box is connected to the blanking box, and the blanking box has an opening at one end away from the feeding box and faces the bottom of the frame; a plurality of augers are rotatably connected in the blanking box, the augers point to one side of the blanking box, and a driving mechanism for driving the plurality of augers to rotate synchronously is provided on the feeding box.
[0006] With respect to the above-mentioned related technologies, when this device is used to construct a narrow side seam or road junction, it will cause excess materials to fall outside the location where construction is required, resulting in waste. Summary of the invention
[0007] In order to adjust the discharge width to be suitable for construction at locations of different widths and to avoid material waste as much as possible, the present application provides a tuff cement stabilization layer construction method.
[0008] The present application provides a tuff cement stabilization layer construction method using the following technical solutions:
[0009] A tuff cement stabilization layer construction method comprises the following steps:
[0010] Crushing of tuff;
[0011] The crushed tuff is batched and mixed thoroughly;
[0012] A paving device is used to construct the location that needs paving; the paving device includes a vehicle body, a material box located on the vehicle body, a discharge hopper connected to the bottom of one side of the material box, and a control component installed on the material box and used to control the discharge; the discharge hopper includes a fixed pipe located in the middle of the side outlet of the material box, and a plurality of side pipes connected to the opposite sides of the fixed pipe, the fixed pipe and the side pipes are both connected to the side outlet of the material box, and a disassembly and assembly component for fixing the material box and each side pipe is provided between the material box and each side pipe, and a plurality of groups of closing components corresponding to the side pipes are provided outside the material box, and the closing components are used to close the side outlet of the material box at the side pipe corresponding to itself;
[0013] According to the width of the paving position to be required, remove or install the side pipes in order from the outside of the discharge hopper to the fixed pipe in advance to adjust the discharge width;
[0014] Rolling the paved road surface;
[0015] Maintain the road surface after rolling.
[0016] By adopting the above technical scheme, after the tuff is crushed and batched, the paving width of the material is first changed according to the width of the construction position, and the side pipes are disassembled and assembled from the outside to the inside in turn through the disassembly and assembly components. The side openings of the material box are closed by the closing components at the disassembled side pipes, and then the mixed materials are poured into the material box. The material is discharged while the vehicle body moves forward, so that the discharge width can be adjusted to suit the construction at locations of different widths, thereby avoiding material waste as much as possible.
[0017] Optionally, the closing assembly includes a fixing plate, a spring and a closing plate, the fixing plate is fixed to the outer wall of the material box, the spring is fixed to the lower surface of the fixing plate and is always in a compressed state, the closing plate is fixed to the bottom end of the spring and is slidably connected to the outer wall of the material box; after the side tube is removed, the bottom end of the closing plate is pressed tightly against the upper surface of the vehicle body, and the side opening of the material box corresponding to this side tube is closed.
[0018] By adopting the above technical solution, when the side tube is connected to the side opening of the material box, the bottom end of the closing plate is pressed against the side tube, which can provide assistance to the stability of the side tube; after the side tube is removed, the elastic force of the spring causes the closing plate to move down and press against the upper surface of the vehicle body to close the position corresponding to the side opening of the material box. The structure is simple and the operation is convenient.
[0019] Optionally, the disassembly and assembly components include a post plate, a hinged plate and a bolt. The post plate is fixed to the upper surface of the top end of the side tube and fits with the closing plate. The hinged plate is hinged to the outer wall of the material box and fits with the side wall of the post plate facing away from the closing plate. The bolt passes through the hinged plate and the post plate and is threadedly connected in the closing plate.
[0020] By adopting the above technical solution, after the side tube is installed on the side of the material box, the closing plate is pressed against the side tube, and the pasting plate fits with the closing plate. At this time, the hinged plate is rotated to fit with the pasting plate, and then the bolts are tightened to clamp the pasting plate between the closing plate and the hinged plate. The top end of the side tube can be fixed to the corresponding opening on the side of the material box, thereby improving the efficiency of disassembly and assembly of the side tube.
[0021] Optionally, the side walls between adjacent closing plates fit together, and the fitted side walls between adjacent closing plates are connected via a sliding groove and a sliding block.
[0022] By adopting the above technical solution, the stability of the closing plate when it is lifted up and down is improved.
[0023] Optionally, a slot is provided on the upper surface of the vehicle body, and a plug plate for inserting into the slot is fixed to the bottom of the top end of the side tube.
[0024] By adopting the above technical solution, the stability of the side pipe after installation is improved, thereby achieving a better paving effect of the material.
[0025] Optionally, the size of the bottom end of the plug board is consistent with the size of the bottom end of the closed board, and the slot is also for the bottom end of the closed board to be inserted.
[0026] By adopting the above technical solution, after the side tube is removed, the bottom end of the closing plate drops into the insertion slot, which can improve the sealing performance of the corresponding position of the side outlet of the material box and further avoid waste of materials.
[0027] Optionally, the control assembly includes a drive cylinder and a control board, wherein the drive cylinder is inverted and fixed on the top of the material box, the control board is located inside the material box and fixed on the bottom end of the drive cylinder piston rod, and the control board is used to close or open the opening of the side wall of the material box.
[0028] By adopting the above technical solution, the drive cylinder is started to lift the control panel, so that the side opening of the material box can be opened or closed, and the structure is simple and efficient.
[0029] Optionally, the fixed tube and the side tube are hinged with adjustment plates at the inner bottom walls near their bottom outlets, the hinge axes between adjacent adjustment plates are key-connected, a cylinder is hinged at the bottom end of the fixed tube, and the piston rod end of the cylinder is hinged to the adjustment plate.
[0030] By adopting the above technical solution, the cylinder is started to rotate the adjustment plate in the fixed tube, and the adjacent hinged shafts are rotated synchronously through key connections, so that all adjustment plates can rotate synchronously to control the flow at the outlet of the hopper and improve the paving effect.
[0031] Optionally, shielding plates for shielding the hinged joints of the corresponding adjustment plates are fixed on the inner bottom walls of the fixed tube and the side tube.
[0032] By adopting the above technical solution, the shielding plate can shield and protect the hinge of the adjustment plate, avoid the material from contacting the hinge of the adjustment plate as much as possible, and ensure movement stability.
[0033] Optionally, the tuff is crushed step by step using a jaw crusher, a hydraulic cone crusher and an impact crusher.
[0034] By adopting the above technical solution, the jaw crusher is mainly used for high-force tuff crushing, and then crushed in sequence by hydraulic cone crusher and impact crusher, which can meet more variety of particle size requirements and improve the crushing quality.
[0035] In summary, the present application includes at least one of the following beneficial technical effects:
[0036] 1. First, change the paving width of the material according to the width of the construction location. Disassemble and assemble the side pipes from the outside to the inside in sequence through the disassembly and assembly components. Use the closing components to close the side opening of the material box at the disassembled side pipes. The material is discharged while the vehicle body moves forward, so that the discharge width can be adjusted to suit the construction of locations with different widths, thus minimizing the waste of materials.
[0037] 2. After the side tube is installed on the side of the material box, the closing plate is pressed against the side tube, and the pasting plate fits with the closing plate. At this time, the hinged plate is rotated to fit with the pasting plate, and then the bolts are tightened to clamp the pasting plate between the closing plate and the hinged plate. The top end of the side tube can be fixed to the corresponding opening of the side of the material box, which improves the efficiency of disassembly and assembly of the side tube;
[0038] 3. Start the cylinder to rotate the adjustment plate in the fixed pipe. Adjacent hinged shafts are connected by keys to rotate synchronously. All adjustment plates can rotate synchronously to control the flow at the outlet of the hopper and improve the paving effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 It is a schematic diagram of the structure of an embodiment of the present application;
[0040] Figure 2 is a partial cross-sectional view of an embodiment of the present application;
[0041] Figure 3 It is a partial cross-sectional view to show the bolt;
[0042] Figure 4 It is a cross-sectional view showing the closing plate and the slider.
[0043] In the figure, 1, vehicle body; 11, slot; 2, material box; 21, dovetail groove; 3, discharge hopper; 31, fixed pipe; 32, side pipe; 321, plug plate; 4, control assembly; 41, drive cylinder; 42, control board; 5, closing assembly; 51, fixed plate; 52, spring; 53, closing plate; 531, dovetail block; 6, disassembly and assembly assembly; 61, pasting plate; 62, hinged plate; 63, bolt; 7, adjustment plate; 71, cylinder; 72, shielding plate. DETAILED DESCRIPTION
[0044] The following is combined with Figure 1-4 This application is described in further detail.
[0045] The embodiment of the present application discloses a tuff cement stabilization layer construction method.
[0046] A tuff cement stabilization layer construction method comprises the following steps:
[0047] The tuff is crushed step by step using jaw crusher, hydraulic cone crusher and impact crusher.
[0048] The crushed tuff is batched and mixed thoroughly.
[0049] refer to Figure 1 and Figure 2 , a paving device is used to construct the position where paving is required; the paving device includes a vehicle body 1, a material box 2 fixed on the upper surface of the vehicle body 1, a discharge hopper 3 connected to the bottom of one side of the material box 2 and located at the rear of the vehicle body 1, and a control component 4 installed on the material box 2 and used to control the opening and closing of the side opening of the material box 2; the inner bottom wall of the material box 2 is inclined, and the position of the inner bottom wall of the material box 2 at its own side opening is the bottom end. Pour the mixed material into the material box 2, open the side opening of the material box 2 through the control component 4, and the material enters the discharge port through the side opening along the inclined inner bottom wall of the material box 2, thereby improving the discharge efficiency.
[0050] refer to Figure 1 and Figure 2The discharge hopper 3 includes a fixed pipe 31 located in the middle of the side outlet of the material box 2, and a plurality of side pipes 32 connected to the opposite sides of the fixed pipe 31. The top ends of the fixed pipe 31 and the side pipes 32 are connected to the side outlet of the material box 2. The fixed pipe 31 and all the side pipes 32 have the same shape and size, that is, the shape and size of the internal space are also the same, which can make the material paving more uniform. The material box 2 is provided with a plurality of groups of closing components 5 corresponding to the side pipes 32 and used to close the side outlet of the material box 2 at the side pipes 32 corresponding to itself; a disassembly and assembly component 6 is provided between the material box 2 and each side pipe 32 to fix the two; the side pipes 32 are removed or installed in advance according to the width of the paving position required, from the outside of the discharge hopper 3 to the fixed pipe 31, in turn, to adjust the discharge width, which can be suitable for construction at positions of different widths, improve applicability, and avoid material waste as much as possible.
[0051] refer to Figure 2 The control assembly 4 includes a driving cylinder 41 invertedly fixed on the top of the material box 2, and a control board 42 located inside the material box 2 and used to close or open the side opening of the material box 2. The bottom end of the piston rod of the driving cylinder 41 is located inside the material box 2 and fixed to the control board 42. The driving cylinder 41 drives the control board 42 to move up and down to realize or stop discharging.
[0052] refer to Figure 2 A long slot 11 is provided on the upper surface of the vehicle body 1, and a plug plate 321 for inserting into the slot 11 is fixed at the bottom of the top of each side tube 32, which can preliminarily fix the side tube 32 and improve the firmness of the side tube 32 after being fixed.
[0053] refer to Figure 1 and Figure 2 The closing assembly 5 includes a fixing plate 51 fixed to the top of the outer wall of the material box 2 and located directly above the corresponding side tube 32, a spring 52 vertically fixed to the lower surface of the fixing plate 51, and a closing plate 53 vertically slidably connected to the outer wall of the material box 2. The top of the closing plate 53 is fixed to the bottom of the spring 52. A dovetail block 531 is fixed to the top of the closing plate 53 facing the material box 2. A dovetail groove 21 is vertically opened on the material box 2 for the dovetail block 531 to slide inside. The spring 52 is always in a compressed state, and the bottom end of the closing plate 53 is pressed tightly against the top of the side tube 32. After the side tube 32 is removed, the bottom end of the closing plate 53 is inserted into the slot 11, and the side opening position of the material box 2 corresponding to this side tube 32 is closed.
[0054] When the side tube 32 is installed on the side of the material box 2, the closing plate 53 is pressed against the top end of the side tube 32, thereby improving the installation stability of the side tube 32; after the side tube 32 is removed, the closing plate 53 automatically closes the exposed side opening of the material box 2, thereby improving the convenience of operation.
[0055] refer to Figure 2 and Figure 3 The disassembly and assembly component 6 includes a plate 61 vertically fixed on the upper surface of the top end of the side tube 32, a hinged plate 62 hinged on the outer wall of the material box 2 and located above the corresponding side tube 32, and a bolt 63 that passes through the hinged plate 62 and the plate 61 in sequence. The plate 61 is in contact with the side wall of the closing plate 53 toward the side wall of the material box 2, and the hinged plate 62 is rotated downward to be in contact with the side wall of the closing plate 53 away from the plate 61. One end of the bolt 63 passes through the hinged plate 62 and the plate 61 and is threadedly connected to the closing plate 53. When installing the side tube 32, first move the closing plate 53 upwards. After the side tube 32 is placed in the specified position, the plug plate 321 is located in the slot 11, and the closing plate 53 moves down to press the side tube 32, so that the side tube 32 can be preliminarily positioned. Then, rotate the hinge plate 62 to make the hinge plate 62 fit with the pasting plate 61, and then pass the bolt 63 through the hinge plate 62 and the pasting plate 61 and tighten it with the closing plate 53, so that the pasting plate 61 is fixed between the hinge plate 62 and the closing plate 53, so that the material box 2, the side tube 32 and the closing plate 53 can be fixed, thereby improving the fixing efficiency and fixing effect of the side tube 32.
[0056] refer to Figure 1 and Figure 4 The side walls of adjacent closing plates 53 are fitted together, and the side walls of adjacent closing plates 53 are connected by sliders and slide grooves, and the sliders are fixed on the side of the corresponding closing plate 53 away from the fixed tube 31. The setting of the sliders and slide grooves can improve the lifting stability of the closing plate 53, and after a side tube 32 is removed, the closing plate 53 above the side tube 32 is lowered, and the position of the slider can avoid interference with the adjacent side tube 32.
[0057] refer to Figure 2 The inner side walls of the bottom of the fixed tube 31 and all the side tubes 32 are hinged with an adjustment plate 7. The flow rate at the outlet of the fixed tube 31 and the side tube 32 can be adjusted by rotating the adjustment plate 7. The hinge shaft of the adjustment plate 7 passes through the corresponding side tube 32, and the hinge shafts of adjacent adjustment plates 7 are keyed. The bottom end of the fixed tube 31 is hinged with a cylinder 71, and the piston rod end of the cylinder 71 is hinged with the lower surface of the adjustment plate 7 in the fixed tube 31; the inner bottom wall of the fixed tube 31 and the inner bottom wall of the side tube 32 are both fixed with a shielding plate 72 for shielding the hinge of the adjustment plate 7. By starting the cylinder 71 to extend and retract, all the adjustment plates 7 can be rotated synchronously, which is convenient for adjusting the discharge flow and ensuring the uniformity of the discharge.
[0058] After paving is completed, the paved road surface is rolled.
[0059] Finally, the compacted road surface is maintained, and construction acceptance can be carried out after maintenance is completed; the use of tuff instead of limestone is of great significance in alleviating the shortage of limestone, reducing costs and increasing efficiency, and improving the ecological environment.
[0060] The embodiments of this specific implementation method are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore, all equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A method for constructing a tuff cement stabilization layer, Features: The following steps are involved: Crushing of tuff; The crushed tuff is batched and mixed thoroughly; A paving device is used to construct the position where paving is required; the paving device comprises a vehicle body (1), a material box (2) located on the vehicle body (1), a discharge hopper (3) connected to the bottom of one side of the material box (2), and a control component (4) installed on the material box (2) and used to control the discharge; the discharge hopper (3) comprises a fixed pipe (31) located in the middle of the side outlet of the material box (2), and a plurality of side pipes (32) connected to opposite sides of the fixed pipe (31); the fixed pipe (31) and the side pipes (32) are both connected to the side outlet of the material box (2); a disassembly assembly (6) for fixing the material box (2) and each side pipe (32) is provided between the material box (2) and each side pipe (32); a plurality of groups of closing assemblies (5) corresponding to the side pipes (32) are provided outside the material box (2); the closing assembly (5) is used to close the side outlet of the material box (2) at the side pipe (32) corresponding to itself; According to the width of the paving position to be required, the side pipes (32) are removed or installed in sequence from the outside of the discharge hopper (3) to the fixed pipe (31) in advance to adjust the discharge width; Rolling the paved road surface; Maintain the road surface after rolling; The closing assembly (5) comprises a fixing plate (51), a spring (52) and a closing plate (53); the fixing plate (51) is fixed to the outer wall of the material box (2); the spring (52) is fixed to the lower surface of the fixing plate (51) and is always in a compressed state; the closing plate (53) is fixed to the bottom end of the spring (52) and is slidably connected to the outer wall of the material box (2); after the side tube (32) is removed, the bottom end of the closing plate (53) is pressed tightly against the upper surface of the vehicle body (1) and closes the side opening of the material box (2) corresponding to the side tube (32); The disassembly assembly (6) comprises a plate (61), a hinged plate (62) and a bolt (63); the plate (61) is fixed to the upper surface of the top end of the side tube (32) and is in contact with the closing plate (53); the hinged plate (62) is hinged to the outer wall of the material box (2) and is in contact with the side wall of the plate (61) away from the closing plate (53); the bolt (63) passes through the hinged plate (62) and the plate (61) and is then threadedly connected to the closing plate (53); The side walls between adjacent closing plates (53) fit together, and the fitting side walls between adjacent closing plates (53) are connected via a sliding groove and a sliding block.
2. A tuff cement stabilization layer construction method according to claim 1, Features: The upper surface of the vehicle body (1) is provided with a slot (11), and a plug plate (321) for inserting into the slot (11) is fixed at the bottom of the top end of the side tube (32).
3. A tuff cement stabilization layer construction method according to claim 2, Features: The size of the bottom end of the inserting plate (321) is consistent with the size of the bottom end of the closing plate (53), and the slot (11) is also used for the bottom end of the closing plate (53) to be inserted.
4. A tuff cement stabilization layer construction method according to claim 1, Features: The control assembly (4) comprises a drive cylinder (41) and a control panel (42); the drive cylinder (41) is inverted and fixed on the top of the material box (2); the control panel (42) is located inside the material box (2) and fixed on the bottom end of the piston rod of the drive cylinder (41); the control panel (42) is used to close or open the side wall opening of the material box (2).
5. A tuff cement stabilization layer construction method according to claim 1, Features: The inner bottom walls of the fixed tube (31) and the side tube (32) are both hingedly connected with adjustment plates (7) at positions near their bottom end outlets, and the hinge shafts between adjacent adjustment plates (7) are key-connected. The bottom end of the fixed tube (31) is hingedly connected with a cylinder (71), and the piston rod end of the cylinder (71) is hingedly connected to the adjustment plate (7).
6. A tuff cement stabilization layer construction method according to claim 5, Features: A shielding plate (72) for shielding the hinged portion of the corresponding adjustment plate (7) is fixed on the inner bottom wall of each of the fixed tube (31) and the side tube (32).
7. A tuff cement stabilization layer construction method according to claim 1, Features: The tuff is crushed step by step using jaw crusher, hydraulic cone crusher and impact crusher.