Control method, processor, device and construction elevator for construction elevator
By determining the cycle and statistical duration of the operation process in the construction elevator, collecting operation data and limiting the stop of non-working floors, the problem of low operation efficiency of construction elevators on the construction site is solved, and more efficient construction elevator operation is achieved.
Patent Information
- Application Number
- CN202211461648.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-17
- Publication Date
- 2025-04-18
- Estimated Expiration
- 2042-11-17
AI Technical Summary
When existing construction elevators operate on construction sites, they will stop on any floor with call, resulting in low construction efficiency.
By determining the cycle of the operation process and the statistical duration of the working floor, collecting the operation data of the construction elevator, determining the docking data of each floor based on the data, and within the period and the statistical duration, construction elevators are prohibited from docking on non-working floors.
Reduce the docking time of non-working floors, reduce waiting time, significantly improve the operating efficiency of construction elevators, shorten the operating time of operation processes, and improve operation efficiency.
Smart Images

Figure CN115872249B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of engineering machinery, and in particular to a control method, a processor, a device and a construction elevator for a construction elevator. Background Art
[0002] Construction elevators are usually called construction hoists, but the definition of construction hoists is broader, and construction platforms also belong to the construction hoist series. A simple construction elevator is composed of several parts such as a car, a drive mechanism, a standard section, an attached wall, a chassis, a fence, and an electrical system. It is a manned and cargo-carrying construction machinery commonly used in construction. Due to its unique box structure, it is both comfortable and safe to ride. Construction elevators are usually used in conjunction with tower cranes on construction sites. The load capacity and operating speed depend on the situation. For example, the load capacity can be 0.3-3.6 tons, and the operating speed can range from 1-96M / min. At present, construction elevators mostly adopt the operation strategy of indoor elevators, and will stop at any floor with a call, resulting in low construction efficiency. Summary of the invention
[0003] In order to overcome the deficiencies in the prior art, embodiments of the present invention provide a control method, a processor, a device and a construction elevator for a construction elevator.
[0004] In order to achieve the above object, the present invention provides a control method for a construction elevator in a first aspect, comprising:
[0005] Determine the cycle of the operation process and the statistical duration of the operation floor, where the statistical time is less than the cycle;
[0006] Determine the setting standards of the operating floors according to the operating procedures;
[0007] Collect the operation data of the construction hoist within the statistical period;
[0008] Determine the stop data for each floor based on the operation data;
[0009] Determine the floors whose stop data do not meet the set standards as non-operating floors;
[0010] During the cycle and outside the statistical time, construction elevators are prohibited from stopping on non-working floors.
[0011] In an embodiment of the present invention, the control method further includes:
[0012] Determine the number of calls to non-operating floors within the cycle and outside the statistical duration;
[0013] A non-operating floor whose call times exceed a preset number is determined as an operating floor.
[0014] In an embodiment of the present invention, the control method further includes:
[0015] The floor whose docking data meets the set standards is determined as the operating floor;
[0016] When the number of working floors reaches the preset number, adding new working floors is prohibited.
[0017] In an embodiment of the present invention, the control method further includes:
[0018] After the cycle is reached, the settings of the working floor and the non-working floor are cleared.
[0019] In the embodiment of the present invention, the setting standard includes: the weight stop data of the floor exceeds a preset weight threshold and / or the number of people stop data of the floor exceeds a preset number threshold within the statistical time period.
[0020] In the embodiment of the present invention, determining the cycle of the operation process and the statistical duration of the operation floor includes:
[0021] Receive the type of work process and floor conditions;
[0022] Determine the cycle of the operation process according to the type and floor conditions;
[0023] Determine the statistical duration of the working floor based on the cycle.
[0024] In the embodiment of the present invention, the start time of the statistical duration is the same as the start time of the cycle.
[0025] A second aspect of the present invention provides a processor configured to execute the above-mentioned control method for a construction elevator.
[0026] A third aspect of the present invention provides a control device for a construction elevator, comprising:
[0027] A camera device, used to collect images inside the construction elevator and determine the number of people in the construction elevator based on the images;
[0028] Weighing device to determine the load-bearing weight of the construction hoist;
[0029] Positioning devices for determining the position of construction hoists; and
[0030] The processors described above.
[0031] A fourth aspect of the present invention provides a construction elevator, comprising the above-mentioned control device for a construction elevator.
[0032] In an embodiment of the present invention, the cycle of the operating process and the statistical duration of the operating floor are determined, wherein the statistical time is less than the cycle; the setting standard of the operating floor is determined according to the operating process; the operation data of the construction elevator is collected within the statistical duration; the stop data of each floor is determined according to the operation data; the floor whose stop data does not meet the set standard is determined as a non-operating floor; within the cycle and outside the statistical duration, the construction elevator is prohibited from stopping at the non-operating floor; the floor whose stop data meets the set standard is determined as the operating floor, and the construction elevator is only allowed to stop at the operating floor with a call.
[0033] In this way, the stop time on non-operating floors can be reduced, the waiting time can be reduced, the operation efficiency of the construction elevator can be significantly improved, and the efficient operation of the construction elevator can be ensured; thereby shortening the operation time of the entire operation process and improving the operation efficiency in the operation process. The internal logic operation of the construction elevator is used to automatically set the operating floor and the non-operating floor, with less human intervention, which can meet the actual operation needs. Only the software needs to be modified, and there is no need to add other hardware facilities to the construction elevator. It is very economical and cost-effective to implement. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] The accompanying drawings are used to provide a further understanding of the embodiments of the present invention and constitute a part of the specification. Together with the following specific implementations, they are used to explain the embodiments of the present invention, but do not constitute a limitation on the embodiments of the present invention. In the accompanying drawings:
[0035] Figure 1 A flow chart of a control method for a construction elevator according to an embodiment of the present invention is schematically shown. DETAILED DESCRIPTION
[0036] The specific implementation of the embodiment of the present invention is described in detail below in conjunction with the accompanying drawings. It should be understood that the specific implementation described here is only used to illustrate and explain the embodiment of the present invention, and is not used to limit the embodiment of the present invention.
[0037] It should be noted that if the implementation methods of the present application involve directional indications (such as up, down, left, right, front, back...), such directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0038] In addition, if there are descriptions involving "first", "second", etc. in the implementation methods of this application, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or suggesting their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various implementation methods can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by this application.
[0039] Figure 1 The flowchart of the control method for a construction elevator according to an embodiment of the present invention is schematically shown. Figure 1 As shown, in one embodiment of the present invention, a control method for a construction elevator is provided, comprising the following steps:
[0040] Step 101, determining the cycle of the operation process and the statistical duration of the operation floor, wherein the statistical time is less than the cycle;
[0041] Step 102, determining the setting standard of the operation floor according to the operation process;
[0042] Step 103, collecting operation data of the construction elevator within the statistical time period;
[0043] Step 104, determining the stop data of each floor according to the operation data;
[0044] Step 105, determining the floor whose parking data does not meet the set standard as a non-operating floor;
[0045] Step 106: During the period and outside the statistical time, the construction elevator is prohibited from stopping at non-operating floors.
[0046] For example, for a certain construction building, the operation process includes: (1) foundation steel bars and concrete; (2) floor; (3) roof; (4) wall construction; (5) water and electricity installation; (6) door and window installation; (7) interior and exterior wall decoration; (8) exterior floor, garden landscape, and fence; (9) acceptance. Most of the operation processes on the construction site have time continuity and generally last for more than one week. The cycle of the operation process and the setting of the statistical duration of the operation floor may be different depending on the type of operation process or the floor condition. In one embodiment, the cycle of the operation process is determined according to the type of operation process and the floor condition. For example, the cycle of the wall construction operation process is expected to be two weeks; the cycle of the water and electricity installation operation process is expected to be one week. In one embodiment, the statistical duration of the operation floor can be determined according to the cycle of the operation process, the statistical duration is less than the cycle, and the starting time of the statistical duration is the same as the starting time of the cycle. For example, in the process of wall construction, the statistical duration of the working floor can be set to the first 3 days in two weeks. During these first 3 days, the operation data of the construction elevator is collected. Then, in the last 11 days of these two weeks, the construction elevator is only allowed to stop at the working floor with calls, and the construction elevator is prohibited from stopping at non-working floors. Similarly, for example, in the process of water and electricity installation, the statistical duration of the working floor can be set to the first 1.5 days in a week.
[0047] In an embodiment of the present invention, within a cycle and outside the statistical time, the construction elevator is prohibited from stopping at non-operating floors, and is only allowed to stop at operating floors with calls. This can reduce the stop time at non-operating floors, reduce waiting time, significantly improve the operating efficiency of the construction elevator, and ensure the efficient operation of the construction elevator; thereby shortening the operating time of the entire operating process and improving the operating efficiency in the operating process. The internal logical operation of the construction elevator is relied on to automatically set the operating floor and non-operating floor, with less human intervention, and can meet actual operating needs. Only modifications need to be made to the software, and there is no need to add other hardware facilities to the construction elevator. It is very economical to implement and has high cost performance.
[0048] In one embodiment, the setting standard includes: the weight stop data of the floor exceeds a preset weight threshold and / or the number of people stop data of the floor exceeds a preset number threshold within the statistical time. The operating floor and the non-operating floor are determined according to the weight stop data and the number of people stop data within the statistical time, so as to ensure the efficient operation of the subsequent construction elevator. In the embodiment of the present invention, the setting standard can also be other ways.
[0049] Continuing with the above example, assume that in the wall-laying operation process, the setting standard for the operating floor is: the weight stop data of the floor exceeds A kg within the statistical duration. The cycle of the wall-laying operation process is expected to be two weeks, and the statistical duration of the operating floor is set to the first three days of the two weeks. During these three days, the floors with weight stop data exceeding A kg are set as operating floors, and the floors with weight stop data not exceeding Akg are set as non-operating floors.
[0050] Assume that in the water and electricity installation operation process, the setting standard for the operation floor is: the number of people stopping at the floor exceeds B people within the statistical time. The cycle of the water and electricity installation operation process is expected to be one week, and the statistical time for the operation floor is set to the first 1.5 days of the week. During these 1.5 days, the floors with more than B people stopping at the floor are set as operation floors, and the floors with less than B people stopping at the floor are set as non-operation floors.
[0051] In one embodiment, the control method further includes: determining the number of calls to the non-operating floors within the cycle and outside the statistical duration; and adding the non-operating floors with a number of calls exceeding a preset number as operating floors. Continuing with the above example, the cycle of the wall-laying operation process is expected to be two weeks. In these two weeks, the first three days are the statistical duration, and the last 11 days are within the cycle and outside the statistical duration. If the number of calls to the non-operating floors exceeds the preset number within the last 11 days, it means that these non-operating floors have a strong demand for the use of the construction elevator. In this way, the non-operating floors with too many calls can be added as operating floors to meet their strong demand for use.
[0052] In this way, there are two ways to set the working floor. One is that within the statistical time, the floor whose stop data meets the set standard is determined as the working floor; the other is that within the cycle of the working process and outside the statistical time, the non-working floor whose call times exceed the preset number is added as the working floor. In one embodiment, when the number of working floors reaches the preset number, it is prohibited to add a new working floor. For example, two situations are introduced. Assuming that the preset number is C, (1) within the statistical time, the floor whose stop data first meets the set standard is determined as the working floor. If the number of working floors that first meet the set standard has reached C, the subsequent data can no longer be counted, and the other floors are all non-working floors; (2) within the statistical time, the number of working floors is less than C, then within the cycle of the working process and outside the statistical time, the non-working floor whose call times first exceed the preset number is added as the working floor, until the number of working floors reaches C, and no additional working floors are set subsequently. Limit the number of working floors to avoid too many working floors, avoid the construction elevator stopping at too many floors, reduce the total stop time of the construction elevator, reduce the waiting time of the working floors, give priority to meeting the floors with strong usage demand, improve the operating efficiency of the construction elevator, and thereby improve the operating efficiency in the working process.
[0053] It should be noted that in the method of setting the working floor and the non-working floor, the working floor can be set first instead of the non-working floor. After the working floor is set, the other floors automatically become non-working floors. For example, the floors whose parking data meet the set standards are determined as working floors, and the parking data of other floors naturally do not meet the set standards and can be automatically determined as non-working floors. This can be well applied to the situation where the construction floors are high and the working floors are less than the non-working floors, and the calculation load can be greatly reduced.
[0054] In a specific embodiment, the following settings are required before using the construction elevator: (1) Statistical duration: set a single statistical time, and the floors that meet the conditions within this time range will be set as "operating floors"; (2) Weight threshold: set the weight standard that needs to be met for "operating floors"; (3) Number of people threshold: set the number of people standard that needs to be met for "operating floors"; (4) Call quantity threshold: the number of calls required to add a "non-operating floor" as an "operating floor"; (5) Number of operating floors: set the preset number of operating floors.
[0055] In one embodiment, after the function of selectively docking floors is enabled, the construction elevator will calculate the weight docking data of each floor according to the weight value fed back by the weighing device, and calculate the number of people docking data of each floor according to the number of people fed back by the crowd recognition camera. For example, if the number of people on the bottom floor is 5 and 2 people leave the 3rd floor, the number of people on the 3rd floor will be recorded as 2; for example, if the weight of the bottom floor is 700kg and 400kg is unloaded on the 4th floor, the weight of the 4th floor will be recorded as 400kg; and so on. When the weight and / or number of people exceeds the corresponding threshold within the statistical time, the floor is set as the working floor. When the number of working floors reaches the preset number, these working floors will be officially confirmed. At this time, the construction elevator will only dock these working floors, and other floors will be temporarily blocked. When the number of calls to a non-working floor in the construction elevator reaches the preset number, the floor can be added as an operating floor. When there are not enough working floors within the statistical time, the system will maintain the previously set working floors.
[0056] In one embodiment, the control method further includes: after reaching the cycle of the previous operation process, clearing the settings of the operation floor and the non-operation floor in the operation process, resetting the settings in the previous operation process, resetting the operation floor and the non-operation floor in the next operation process, and re-counting the data in the next operation process. In an embodiment of the present invention, the operation floor set in the selective parking floor function will be displayed through the human-computer interaction interface, and sound and light reminders will be provided to prompt the operator to use the construction elevator according to the operation floor setting.
[0057] The construction elevator is the main tool for carrying and transporting personnel and goods on the construction site. The construction elevator involved in the embodiment of the present invention is an intelligent construction elevator. Different from the construction elevator that requires manual operation, the intelligent construction elevator does not require a driver or professional operator to operate. In the embodiment of the present invention, the new and efficient operation method of the intelligent construction elevator can solve the problem of too many invalid stops in the existing operation process.
[0058] The following introduces the hardware modules involved in the embodiments of the present invention, specifically, mainly involving an intelligent construction elevator, a weighing device, a floor call system, a signal transceiver system, a camera device, a positioning device and an Internet of Things module, etc.
[0059] The intelligent construction hoist control system includes a drive unit for directly driving the motor, a frequency conversion unit that provides the required frequency voltage for the drive unit, and a controller that processes external inputs, performs logical judgments, and sends various operating instructions. The weighing device includes a pin sensor installed at the connection point between the cage and the drive, which outputs voltage or current values to feedback the real-time load. The positioning device is mainly composed of an encoder and a controller. The encoder gives a response pulse as the motor rotates. After receiving the pulse, the controller converts the formula to obtain the specific position of the elevator, thereby achieving positioning.
[0060] The floor call system includes a floor caller and a floor display. Each floor caller is equipped with a button for controlling the up and down movements. When the button is pressed, the floor caller will send the corresponding floor information to the signal transceiver system in the form of a wired signal. At the same time, the operation status of the elevator is also displayed on the floor display for easy on-site use. The signal transceiver system includes a bottom-level transceiver station and a wireless communication system in the cage. As a communication transfer station, it transmits floor information, cage operation information, and various operation instructions in the entire intelligent construction elevator subsystem through wireless and wired methods.
[0061] The camera device includes a number recognition camera, a surveillance camera and an authority camera. The number recognition camera has its own number recognition algorithm, which can transmit the number of people in the cage to the controller via wired form; the surveillance camera plays the role of video surveillance; the authority camera is used for authority authentication of special set operations, and identifies the authority of the current operator by comparing facial data, thereby avoiding misoperation by non-professionals. Internet of Things module: Relying on mobile signals, the elevator controller and the network platform can be connected to obtain elevator operation data and issue elevator operation instructions.
[0062] In the embodiment of the present invention, local statistical data can be collected through the network, and then calculated through the cloud platform, which has stronger computing power and can set more complex operation floor judgment logic. The operation strategy is not only suitable for intelligent construction elevators, but also for ordinary construction elevators equipped with automatic operation functions and other forms of construction elevators that automatically respond to floor calls. In the embodiment of the present invention, the operation strategy of the intelligent construction elevator combines technologies such as cage load monitoring, number monitoring, display interface and network communication; the intelligent construction elevator supports network communication; and the intelligent construction elevator has a human-computer interaction interface.
[0063] By adopting the control method for construction elevators provided by the embodiment of the present invention, the operating efficiency of intelligent construction elevators can be maximized. The control method for construction elevators provided by the embodiment of the present invention has the following characteristics: (1) High efficiency: It can reduce stops at non-operating floors and reduce waiting time, thereby significantly improving the operating efficiency of intelligent elevators; (2) Convenience: Relying on the internal logic operation of the elevator, the operating floor is automatically set, with less human intervention, and can meet actual operating needs; (3) Safety: Adjusting the operating strategy requires personnel authority identification to avoid misoperation by non-professionals; (4) High cost performance: Only software modifications are required, and no other hardware facilities need to be added, which is very economical to implement.
[0064] An embodiment of the present invention provides a processor, which is configured to execute any one of the control methods for a construction elevator in the above embodiments.
[0065] Specifically, the processor may be configured to:
[0066] Determine the cycle of the operation process and the statistical duration of the operation floor, where the statistical time is less than the cycle;
[0067] Determine the setting standards of the operating floors according to the operating procedures;
[0068] Collect the operation data of the construction hoist within the statistical period;
[0069] Determine the stop data for each floor based on the operation data;
[0070] Determine the floors whose stop data do not meet the set standards as non-operating floors;
[0071] During the cycle and outside the statistical time, construction elevators are prohibited from stopping on non-working floors.
[0072] In this embodiment of the present invention, the processor is further configured to:
[0073] Determine the number of calls to non-operating floors within the cycle and outside the statistical duration;
[0074] A non-operating floor whose call times exceed a preset number is determined as an operating floor.
[0075] In this embodiment of the present invention, the processor is further configured to:
[0076] The floor whose docking data meets the set standards is determined as the operating floor;
[0077] When the number of working floors reaches the preset number, adding new working floors is prohibited.
[0078] In this embodiment of the present invention, the processor is further configured to:
[0079] After the cycle is reached, the settings of the working floor and the non-working floor are cleared.
[0080] In an embodiment of the present invention, the processor is configured to:
[0081] The setting criteria include: the weight stop data of the floor exceeds a preset weight threshold and / or the number of people stop data of the floor exceeds a preset number threshold within the statistical time period.
[0082] In an embodiment of the present invention, the processor is configured to:
[0083] Determine the cycle of the operation process and the statistical duration of the operation floor including:
[0084] Receive the type of work process and floor conditions;
[0085] Determine the cycle of the operation process according to the type and floor conditions;
[0086] Determine the statistical duration of the working floor based on the cycle.
[0087] In an embodiment of the present invention, the processor is configured to:
[0088] The start time of the statistical duration is the same as the start time of the period.
[0089] An embodiment of the present invention provides a control device for a construction elevator, comprising:
[0090] A camera device, used to collect images inside the construction elevator and determine the number of people in the construction elevator based on the images;
[0091] Weighing device to determine the load-bearing weight of the construction hoist;
[0092] Positioning devices for determining the position of construction hoists; and
[0093] The processors described above.
[0094] An embodiment of the present invention provides a construction elevator, comprising the above-mentioned control device for the construction elevator.
[0095] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0096] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0097] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0098] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0099] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0100] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0101] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0102] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0103] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.
Claims
1. A control method for a construction hoist, characterized in that: include: Determine the cycle of the operation process and the statistical duration of the operation floor, wherein the statistical duration is less than the cycle; Determining the setting standard of the operation floor according to the operation process; Collecting the operation data of the construction elevator within the statistical time period; Determine the stop data of each floor according to the operation data; Determine the floor whose parking data does not meet the set standard as a non-operation floor; During the period and outside the statistical time period, the construction elevator is prohibited from stopping at the non-operating floor.
2. The control method according to claim 1, characterized in that: Also includes: Determine the number of calls on the non-operation floor within the period and outside the statistical duration; The non-operation floor whose calling times exceeds a preset number is determined as the operation floor.
3. The control method according to claim 2, characterized in that: Also includes: Determine the floor where the parking data meets the set standard as the operating floor; When the number of the working floors reaches a preset number, adding a new working floor is prohibited.
4. The control method according to claim 3, characterized in that: Also includes: After the period is reached, the settings of the working floor and the non-working floor are cleared.
5. The control method according to claim 1, characterized in that: The set standard includes: the weight stop data of the floor exceeds a preset weight threshold and / or the number of people stop data of the floor exceeds a preset number threshold within the statistical time period.
6. The control method according to claim 1, characterized in that: The determination of the cycle of the operation process and the statistical duration of the operation floor includes: Receive the type of work process and floor conditions; Determining the cycle of the operation process according to the type and the floor condition; The statistical duration of the operating floor is determined according to the cycle.
7. The control method according to claim 1, characterized in that: The starting time of the statistical duration is the same as the starting time of the cycle.
8. A processor, characterized in that: The device is configured to execute the control method for a construction elevator according to any one of claims 1 to 7.
9. A control device for a construction elevator, characterized in that: include: A camera device, used to collect images inside the construction elevator and determine the number of people inside the construction elevator based on the images; a weighing device for determining the load-bearing weight of the construction hoist; A positioning device for determining the position of the construction elevator; as well as A processor according to claim 8.
10. A construction hoist, characterized in that: The invention comprises the control device for a construction elevator as claimed in claim 9.
Citation Information
Patent Citations
Intelligent elevator control method and system based on calculation of commuter traffic
CN111071872A
Method and elevator arrangement
US20220127113A1