A slipform construction method for ultra-high inclined rigid columns
By adopting the sliding mold construction method on the ultra-high inclined strong column, rapid reinforcement is achieved using devices such as guide rods, sliding molds and jacks, the problems of inconvenience and difficulty of reinforcement in the existing technology are solved, and construction efficiency and safety are improved , suitable for the construction of rigid columns in complex spaces.
Patent Information
- Application Number
- CN202211454412.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-11-21
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2042-11-21
AI Technical Summary
In the construction of ultra-high inclined strong columns, the existing technology is difficult to effectively support and reinforce, resulting in inconvenience in construction, especially when the height is higher, the more difficult the operation is, the complex installation of the support system, which increases the difficulty and cost of construction.
Using the sliding mold construction method, the overall sliding lift and reinforcement are achieved by installing guide rods and guide tubes on the inclined strong columns, placing the tubular sliding mold and operating platform, and installing a through-heart-type jack, anti-capsulation device and balance device on it. , reduce high-altitude operations and simplify the establishment of support systems.
This method can quickly construct and effectively reinforce the inclined strong column, reducing construction difficulty and cost, improving construction efficiency, and is suitable for the rapid construction of ultra-high inclined strong columns, especially for the strong columns in large spaces of airports and stations.
Smart Images

Figure CN115898009B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of inclined rigid column construction, in particular to a super-high inclined rigid column slipform construction method. Background Art
[0002] At present, wooden formwork or standardized steel formwork is often used in the construction of inclined rigid columns, and ordinary steel pipes or disc-type scaffolding is used as the support system. However, for the construction of ultra-high inclined rigid columns, the higher the height, the more difficult the operation is, the higher the requirements for the support system, and the more difficult the support and reinforcement are, causing inconvenience in construction. Summary of the invention
[0003] In view of the above-mentioned prior art, the present invention proposes a super-high inclined rigid column slipform construction method.
[0004] The present invention provides a super-high inclined rigid column slipform construction method, comprising the following steps:
[0005] S1. Construction of the inclined rigid column in steps: When the inclined rigid column is constructed to a certain height, several guide rods are evenly buried at the upper end of the inclined rigid column, and guide tubes are put on the guide rods, and the inclined rigid column continues to be constructed to a certain height;
[0006] S2, installation of the sliding form and the operating platform: a tubular sliding form is placed along the periphery of the inclined rigid column; an operating platform is placed on the periphery of the sliding form, the operating platform is a three-dimensional frame structure, each side of the operating platform is vertically provided with a plurality of lifting columns, each of the lifting columns is provided with a plurality of lifting baffles, the peripheral wall of the sliding form is provided with a lifting plate corresponding to the lifting baffle, the lifting plate is placed on the upper side of the lifting baffle; a first roller is provided on the operating platform, the edge of the first roller is flush with the edge line of the inclined rigid column, and is used for the operating platform to slide along the inclined rigid column;
[0007] S3, jack installation: a through-type jack is respectively put on each of the guide tubes, and the through-type jack is installed on the operating platform;
[0008] S4, installation of anti-overturning device: installing an anti-overturning device on the operating platform; the anti-overturning device comprises an anti-overturning rod, one end of which is connected to the bottom of the operating platform, the other end of which extends to the top of the sliding formwork, and the other end of which is provided with a second roller, the edge of which is flush with the edge line of the steel frame of the inclined rigid column, so that the anti-overturning rod slides along the steel frame;
[0009] S5. Installation of balancing device: Install a balancing device on the operating platform; the balancing device includes a balancing bar, the two ends of which are respectively connected to the lower ends of the two sides of the operating platform, a counterweight mounting seat is installed on the balancing bar, and a plurality of third rollers are installed on the counterweight mounting seat, the edges of the third rollers are flush with the edge lines of the inclined rigid column, and are used for the counterweight mounting seat to slide along the inclined rigid column, and a counterweight is installed on the counterweight mounting seat;
[0010] S6. Jack test: After the assembly of each device is completed, the jack test is carried out. After the jack meets the requirements, the jack is tested for 2-3 jack strokes;
[0011] S7, overall sliding: turning on the through-type jack to climb upward along the guide tube, driving the operating platform to rise, and the operating platform drives the sliding formwork to rise through the lifting baffle, and after rising to a certain position, the inclined rigid column is continuously constructed through the sliding formwork;
[0012] S8, installation of additional steel frame: when the construction reaches the top, since the anti-overturning device has no place to bear force, additional steel frame plus plateau structural steel frame is installed, and a number of removal hooks are provided at the bottom of the additional steel frame;
[0013] S9. Removal of slipforms and operating platform: After the construction is completed, the slipforms and operating platform can be removed only after the concrete strength reaches a certain level.
[0014] Preferably, in S2, the operating platform further includes a protective device, which is a steel plate mesh connected to the operating platform using self-tapping screws.
[0015] Preferably, in S3, the through-type jack is a GYD-60 through-type ball hydraulic jack.
[0016] Preferably, in S5, the counterweight block is a concrete counterweight block.
[0017] Preferably, in S7, the strength requirement of the concrete of the inclined rigid column during the rising of the sliding form is: the concrete strength in the middle of the sliding form needs to reach more than 2Mpa, and the concrete at the bottom of the sliding form needs to reach more than 5Mpa. After testing, it is found that the time for the concrete at the top of the sliding form to reach the middle of the sliding form at normal temperature is 12 hours, and the time to reach the bottom is 24 hours, which can meet the safety requirements of the concrete structure. Therefore, the lifting speed of the sliding form is controlled to 100mm / h, and it is lifted once every 2 hours, and each time it is lifted by 200mm.
[0018] Preferably, in S8, the removal hook is made of ø20 round steel.
[0019] Preferably, in S9, the specific operation of dismantling the slipform and the operating platform is as follows: specifically, installing an electric hoist on the dismantling hook to firmly fix the operating platform and the slipform, first dismantling the anti-overturning device and the through-type jack, slowly lowering the wire rope of the electric hoist by gravity, and dismantling the slipform and the operating platform on the ground.
[0020] Compared with the prior art, the beneficial effects of the present invention are as follows: the ultra-high inclined rigid column slipform construction method provided by the present invention can better adapt to the climbing construction of inclined rigid circular columns or inclined rigid rectangular columns, can quickly construct and effectively reinforce the rigid columns, reduces a large amount of high-altitude operations, avoids the erection of column support systems, reduces the construction difficulty of inclined rigid columns, speeds up construction efficiency, and reduces construction costs, and is particularly suitable for rigid columns in large spaces of airports and stations. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic structural diagram of an embodiment of the present invention.
[0022] In the figure: 1. inclined rigid column; 2. guide tube; 3. slip form; 4. operating platform; 5. lifting column; 6. lifting baffle; 7. lifting plate; 8. first roller; 9. through-type jack; 10. anti-overturning rod; 11. second roller; 12. steel frame; 13. balance rod; 14. counterweight mounting seat; 15. third roller; 16. concrete counterweight; 17. additional steel frame; 18. removal of hook. DETAILED DESCRIPTION
[0023] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below with reference to specific diagrams. Example
[0024] A super-high inclined rigid column slipform construction method, taking the inclined rigid rectangular column as an example, Figure 1 As shown, the following steps are included:
[0025] S1. The inclined rigid column is constructed in steps: when the inclined rigid column 1 is constructed to 1.5m, four guide rods are evenly buried at the upper end of the inclined rigid column 1, and a guide tube 2 is put on the guide rod, and the inclined rigid column 1 is continued to be constructed to 2m; wherein, the guide tube 2 is made of a ø60*5 round steel tube so that it can pass through the guide rod to fix its position, play a role in guiding and reducing the deflection of the guide rod, and the upper and lower ends of the guide tube 2 are both made into arc treatment to prevent the guide rod from being scratched.
[0026] S2. Installation of the sliding form and operating platform: A rectangular tubular sliding form 3 is placed along the outer periphery of the inclined rigid column 1 at the free end. The sliding form 3 uses a 10mm thick steel plate as a sliding surface and has a height of 2.25m. An operating platform 4 is placed on the outer periphery of the sliding form 3. The operating platform 4 is a three-dimensional frame structure made of several 50*50*3 square steel pipes bolted together along the circumferential direction. The spacing between adjacent square steel pipes is 250mm. Two 12# channel steels are vertically arranged on each side of the operating platform 4 as lifting columns 5. Three lifting baffles 6 are welded on each lifting column 5. The lifting baffle 6 uses 75*75*3 It is made of square steel pipe and used for lifting force. The outer peripheral wall of the sliding formwork 3 is provided with a lifting plate 7 corresponding to the lifting baffle 6, and the lifting plate 7 is placed on the upper side of the lifting baffle 6; a first roller 8 is provided on the operating platform 4, and the first roller 8 adopts a steel roller with a diameter of 200 and a width of 120. The edge of the first roller 8 is flush with the edge line of the inclined rigid column 1, and is used for the operating platform 4 to slide along the inclined rigid column 1, which is convenient for dismantling the operating platform 4; there is also a protective device on the operating platform 4, which is a 3mm thick steel plate mesh and is connected to the operating platform 4 with self-tapping screws, which can play a better protective role.
[0027] S3. Jack installation: Put a through-type jack 9 on each guide tube 2 respectively. The through-type jack 9 uses the GYD-60 through-type ball hydraulic jack with a maximum lifting weight of 60KN. The through-type jack 9 is installed on the operating platform 4. Double-piece square steel pipes can be set on the operating platform 4 as the force point of the through-type jack 9.
[0028] S4. Installation of anti-overturning device: an anti-overturning device is installed on the operating platform 4 and located on the upper side of the inclined rigid column 1; the anti-overturning device includes two anti-overturning rods 10 made of 100*100*3 square steel pipes, one end of the anti-overturning rod 10 is connected to the bottom of the operating platform 4, and the other end of the anti-overturning rod 10 extends in a wave shape to the top of the sliding formwork 3, and the other end of the anti-overturning rod 10 is provided with a second roller 11, the edge of the second roller 11 is flush with the edge line of the steel frame 12 of the inclined rigid column 1, and is used for the anti-overturning rod 10 to slide along the steel frame 12.
[0029] S5. Installation of balancing device: install the balancing device on the operating platform 4; the balancing device includes two balancing bars 13 made of 100*100*3 square steel pipes, and the two ends of the balancing bars 13 are respectively connected to the lower bottom ends on both sides of the operating platform 4, a counterweight mounting seat 14 is installed on the two balancing bars 13, and four third rollers 15 are installed on the counterweight mounting seat 14, and the edges of the third rollers 15 are flush with the edge lines of the inclined rigid column 1. The four third rollers 15 are arranged in pairs in a row and opposite to each other. The two third rollers 15 in the same row are connected by rollers, which are used for the counterweight mounting seat 14 to slide along the inclined rigid column 1, and a concrete counterweight 16 is installed on the counterweight mounting seat 14.
[0030] S6. Jack test: After the assembly of each device is completed, the through-type jack 9 is tested. After the through-type jack 9 meets the requirements, a trial lifting of 2-3 jack strokes (80-100mm) is carried out.
[0031] S7. Overall sliding: Turn on the through-type jack 9 to climb upward along the guide tube 2, driving the operating platform 4 to rise. The operating platform 4 drives the sliding form 3 to rise by lifting the baffle 6. After rising to a certain position, the inclined rigid column 1 is continuously constructed through the sliding form 3. The strength requirements of the concrete of the inclined rigid column 1 during the rising of the sliding form 3 are as follows: the strength of the concrete in the middle of the sliding form must reach more than 2Mpa, and the concrete at the bottom of the sliding form must reach more than 5Mpa. According to the test, it takes 12 hours for the concrete at the top of the sliding form to reach the middle of the sliding form and 24 hours to reach the bottom at room temperature to meet the safety requirements of the concrete structure. Therefore, the lifting speed of the sliding form is controlled to be 100mm / h, and it is lifted once every 2h, with each lifting of 200mm.
[0032] S8. Installation of additional steel frames: When the construction reaches the top, since the anti-overturning device has no place to bear force, additional steel frames 17 are installed in addition to the original structural steel frames 12. The additional steel frames 17 are of the same model as the original structural steel frames 12. The two are connected by high-strength bolts to meet the construction needs of the top of the column. Four demolition hooks 18 are welded to the bottom of the additional steel frames 17. The demolition hooks 18 are made of ø20 round steel to facilitate the removal of the slipform 3 and the operating platform 4.
[0033] S9. Removal of the slipform and operating platform: After the construction is completed, the slipform 3 and the operating platform 4 can be removed only after the concrete strength reaches a certain strength of 10Mpa (about 48h); specifically, install an electric hoist (8t) on each of the four removal hooks 18 to firmly fix the operating platform 4 and the slipform 3, first remove the anti-overturning device and the through-type jack 9, cut off the redundant guide tube 2, remove the formwork, and slowly lower the wire rope of the electric hoist by gravity. First, slide down 400mm to put the first roller 8 and the third roller 15 in a stressed state, check the working condition of each roller, and when everything is normal, slowly slide down to the ground; remove the slipform 3 and the operating platform 4 on the ground, first remove the concrete counterweight block 16, and then remove the operating platform 4 from top to bottom. After the removal, clean the site and put the accessories into storage or transfer them to the next inclined rigid column construction.
[0034] The above are only implementation modes of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure made using the contents of the present invention's specification and drawings, directly or indirectly used in other related technical fields, are also within the patent protection scope of the present invention.
Claims
1. A super-high inclined rigid column slipform construction method, characterized in that: The following steps are involved: S1. Construction of the inclined rigid column in steps: When the inclined rigid column is constructed to a certain height, several guide rods are evenly buried at the upper end of the inclined rigid column, and guide tubes are put on the guide rods, and the inclined rigid column continues to be constructed to a certain height; S2, installation of the sliding form and the operating platform: a tubular sliding form is placed along the periphery of the inclined rigid column; an operating platform is placed on the periphery of the sliding form, the operating platform is a three-dimensional frame structure, each side of the operating platform is vertically provided with a plurality of lifting columns, each of the lifting columns is provided with a plurality of lifting baffles, the peripheral wall of the sliding form is provided with a lifting plate corresponding to the lifting baffle, the lifting plate is placed on the upper side of the lifting baffle; a first roller is provided on the operating platform, the edge of the first roller is flush with the edge line of the inclined rigid column, and is used for the operating platform to slide along the inclined rigid column; S3, jack installation: a through-type jack is respectively put on each of the guide tubes, and the through-type jack is installed on the operating platform; S4, installation of anti-overturning device: installing an anti-overturning device on the operating platform; the anti-overturning device comprises an anti-overturning rod, one end of which is connected to the bottom of the operating platform, the other end of which extends to the top of the sliding formwork, and the other end of which is provided with a second roller, the edge of which is flush with the edge line of the steel frame of the inclined rigid column, so that the anti-overturning rod slides along the steel frame; S5. Installation of balancing device: Install a balancing device on the operating platform; the balancing device includes a balancing bar, the two ends of which are respectively connected to the lower ends of the two sides of the operating platform, a counterweight mounting seat is installed on the balancing bar, and a plurality of third rollers are installed on the counterweight mounting seat, the edges of the third rollers are flush with the edge lines of the inclined rigid column, and are used for the counterweight mounting seat to slide along the inclined rigid column, and a counterweight is installed on the counterweight mounting seat; S6. Jack test: After the assembly of each device is completed, the jack test is carried out. After the jack meets the requirements, the jack is tested for 2-3 jack strokes; S7, overall sliding: turning on the through-type jack to climb upward along the guide tube, driving the operating platform to rise, and the operating platform drives the sliding formwork to rise through the lifting baffle, and after rising to a certain position, the inclined rigid column is continuously constructed through the sliding formwork; S8, installation of additional steel frame: when the construction reaches the top, since the anti-overturning device has no place to bear force, additional steel frame plus plateau structural steel frame is installed, and a number of removal hooks are provided at the bottom of the additional steel frame; S9. Removal of the slipform and operating platform: After the construction is completed, the slipform and operating platform can be removed only after the concrete strength reaches a certain level. The specific operation of removing the slipform and operating platform is as follows: install an electric hoist on the removal hook to firmly fix the operating platform and the slipform, first remove the anti-overturning device and the through-type jack, slowly lower the wire rope of the electric hoist by gravity, and remove the slipform and operating platform on the ground.
2. The super-high inclined rigid column slipform construction method according to claim 1, characterized in that: In S2, the operating platform also has a protective device, which is a steel plate mesh and is connected to the operating platform using self-tapping screws.
3. The super-high inclined rigid column slipform construction method according to claim 1 or 2, characterized in that: In S3, the through-type jack is a GYD-60 through-type ball hydraulic jack.
4. The super-high inclined rigid column slipform construction method according to claim 1 or 2, characterized in that: In S5, the counterweight block is a concrete counterweight block.
5. The super-high inclined rigid column slipform construction method according to claim 1 or 2, characterized in that: In S7, the strength requirement of the concrete of the inclined rigid column during the rising of the sliding form is: the concrete strength in the middle of the sliding form needs to reach more than 2Mpa, and the concrete strength at the bottom of the sliding form needs to reach more than 5Mpa. After testing, it is found that the time for the concrete at the top of the sliding form to reach the middle of the sliding form at normal temperature is 12 hours, and the time for reaching the bottom is 24 hours, which can meet the safety requirements of the concrete structure. Therefore, the lifting speed of the sliding form is controlled to 100mm / h, and it is lifted once every 2 hours, and each time it is lifted by 200mm.
6. The super-high inclined rigid column slipform construction method according to claim 1 or 2, characterized in that: In S8, the removal hook is made of ø20 round steel.