Air conditioning intelligent control method and device based on peak-valley optimization

Through the intelligent air conditioning regulation method based on peak and valley optimization, air conditioning equipment is regulated according to the type of electricity consumption during the peak electricity consumption, the problem of increasing energy consumption in central air conditioners is solved, and the effect of reducing energy consumption and electricity bills is achieved, ensuring the stability of the power system run.

CN115930372BActive Publication Date: 2024-11-22SHENZHEN COMTOP INFORMATION TECH
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202310024172.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-01-09
Publication Date
2024-11-22
Estimated Expiration
2043-01-09

AI Technical Summary

Technical Problem

The energy consumption of central air conditioners during peak electricity consumption increases, resulting in an increase in the operating load of distribution equipment, affecting the safety and stability of the power system and resource utilization rate, and the electricity bill soars, so intelligent regulation methods are needed to reduce energy consumption.

Method used

Using the intelligent air conditioner regulation method based on peak and valley optimization, determine whether the control operation needs to be performed by determining the current working period type, and determine the control parameters according to the period type, and regulate the working parameters of air conditioning equipment such as chillers, water pumps, wind hoods and cooling towers. , to optimize energy consumption during peak and valley periods of electricity consumption.

Benefits of technology

Reduce the operating load of power distribution equipment, improve the safety and stability of the power system and resource utilization rate, reduce the energy consumption and electricity bill of air conditioners, and realize intelligent electricity consumption control.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115930372B_ABST
    Figure CN115930372B_ABST
Patent Text Reader

Abstract

The present invention discloses an intelligent air conditioning control method and device based on peak-valley optimization, the method comprising: determining the current working period of the air conditioning used for control, and determining the period type to which the current working period belongs according to the current working period of the air conditioning; judging whether it is necessary to perform a control operation on the air conditioning according to the period type to which the current working period belongs, and if so, determining the control parameters required for controlling the air conditioning based on the period type to which the current working period belongs, and performing a control operation on the air conditioning according to the control parameters. It can be seen that the implementation of the present invention can control the air conditioning based on the period type to which the current working period of the air conditioning belongs, so that the air conditioning can be intelligently controlled during different peak and valley periods of electricity consumption, which is not only conducive to reducing the operating load of the distribution equipment to ensure the safe and stable operation of the power system, but also conducive to improving the utilization rate of the distribution equipment, thereby reducing the energy consumption of the air conditioner and the required electricity bill.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of air conditioning, and in particular to an intelligent air conditioning control method and device based on peak-valley optimization. Background Art

[0002] Central air conditioning, as a large-scale air temperature regulation system, has been widely used in various industrial refrigeration places and various public buildings such as office buildings, shopping malls, rail transit, airports, hospitals, etc., providing people with a good and comfortable living environment.

[0003] At present, with the continuous construction of various industrial refrigeration sites and various public buildings, the demand for central air conditioners has increased sharply, making the energy consumption of central air conditioners increasingly severe. Especially during the peak period of electricity consumption, the centralized use of central air conditioners not only increases the operating load of distribution equipment, affects the safe and stable operation of the power system, but also reduces the utilization rate of distribution equipment, resulting in waste of resources and soaring electricity bills, which brings huge challenges to the energy saving and consumption reduction of central air conditioners. It can be seen that it is particularly important to provide a new intelligent control method for central air conditioners to reduce the energy consumption of central air conditioners. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a method and device for intelligent air conditioning control based on peak-valley optimization, which is not only conducive to reducing the operating load of the distribution equipment to ensure the safe and stable operation of the power system, but also conducive to improving the utilization rate of the distribution equipment, thereby reducing the energy consumption of the air conditioner and the required electricity bill.

[0005] In order to solve the above technical problems, the first aspect of the present invention discloses an intelligent air conditioning control method based on peak-valley optimization, the method comprising:

[0006] Determine the current working period of the air conditioner used for regulation, and determine the period type to which the current working period belongs according to the current working period of the air conditioner; the period type includes a first period type and a second period type, a first electrical parameter corresponding to the first period type is less than a second electrical parameter corresponding to the second period type, and the first electrical parameter and the second electrical parameter both include corresponding power supply parameters and / or electricity fee parameters;

[0007] According to the period type to which the current working period belongs, determining whether it is necessary to perform a control operation on the air conditioner;

[0008] When the judgment result is yes, based on the period type to which the current working period belongs, the control parameters required for controlling the air conditioner are determined, and the control operation is performed on the air conditioner according to the control parameters.

[0009] As an optional implementation, in the first aspect of the present invention, judging whether it is necessary to perform a control operation on the air conditioner according to the period type to which the current working period belongs includes:

[0010] Determine basic air conditioning parameters of the air conditioner; the basic air conditioning parameters of the air conditioner include at least one of the current chiller operating parameters, the current water pump operating parameters, the current wind cabinet operating parameters and the current cooling tower operating parameters of the air conditioner;

[0011] Determining a current chiller outlet water temperature parameter of the air conditioner according to the basic air conditioning parameters of the air conditioner;

[0012] Determine the target chiller outlet water temperature parameter of the air conditioner according to the period type to which the current working period belongs, and calculate the temperature parameter difference between the current chiller outlet water temperature parameter and the target chiller outlet water temperature parameter according to the current chiller outlet water temperature parameter and the target chiller outlet water temperature parameter;

[0013] Determining whether the temperature parameter difference is within a preset temperature parameter difference range;

[0014] When it is determined that the temperature parameter difference is not within the preset temperature parameter difference range, determining that a control operation needs to be performed on the air conditioner;

[0015] When it is determined that the temperature parameter difference is within the preset temperature parameter difference range, it is determined that there is no need to perform a control operation on the air conditioner.

[0016] As an optional implementation, in the first aspect of the present invention, determining the target chiller outlet water temperature parameter of the air conditioner according to the period type to which the current working period belongs includes:

[0017] When the period type to which the current working period belongs is the first period type, determining the freezing working condition of the water system of the air conditioner; the freezing working condition of the water system of the air conditioner includes at least one of the freezing working condition of the chiller of the air conditioner, the freezing working condition of the freezing water pump, the cooling working condition of the cooling water pump and the cooling working condition of the cooling tower;

[0018] Determine the minimum outlet water temperature parameter of the chiller of the air conditioner according to the refrigeration working condition of the water system, and determine the minimum outlet water temperature parameter as the target outlet water temperature parameter of the chiller of the air conditioner;

[0019] When the period type to which the current working period belongs is the second period type, determining a target comfortable room temperature parameter of the user based on the current activity of the user of the air conditioner;

[0020] According to the user's target comfortable room temperature parameter, an expected water outlet temperature parameter of the chiller of the air conditioner is determined, and the expected water outlet temperature parameter is determined as the target water outlet temperature parameter of the chiller of the air conditioner.

[0021] As an optional implementation, in the first aspect of the present invention, determining the control parameters required for controlling the air conditioner based on the period type to which the current working period belongs includes:

[0022] According to the basic air conditioning parameters of the air conditioner, all target refrigeration working equipment that can be regulated are determined from all refrigeration working equipment included in the air conditioner; all the refrigeration working equipment included in the air conditioner includes at least one of a chiller, a refrigeration water pump, a cooling water pump, a cooling tower and a wind cabinet;

[0023] According to the target chiller outlet water temperature parameter determined based on the period type to which the current working period belongs, the equipment control parameters corresponding to each target refrigeration working equipment are determined, and the equipment control parameters corresponding to all the target refrigeration working equipment are determined as the control parameters required to control the air conditioner.

[0024] As an optional embodiment, in the first aspect of the present invention, the current chiller operating parameters, the current water pump operating parameters, the current wind cabinet operating parameters and the current cooling tower operating parameters of the air conditioner all include at least one of the corresponding working unit number parameters, working load parameters, working frequency parameters, working temperature parameters and working wind speed parameters;

[0025] Wherein, the step of determining all target refrigeration working equipment that can be regulated from all refrigeration working equipment included in the air conditioner according to the basic air conditioning parameters of the air conditioner includes:

[0026] According to the current working parameters of each refrigeration working device included in the air conditioner, the equipment control status of each refrigeration working device is determined; the current working parameters of all the refrigeration working devices belong to the basic air conditioning parameters of the air conditioner;

[0027] Calculating the degree of equipment control of each type of refrigeration equipment according to the equipment control situation of each type of refrigeration equipment;

[0028] According to the equipment control degree of each of the refrigerating working equipment, all the refrigerating working equipment whose equipment control degree is greater than or equal to a preset equipment control degree threshold are determined from all the refrigerating working equipment as all the target refrigerating working equipment that can be controlled.

[0029] As an optional embodiment, in the first aspect of the present invention, the method further comprises:

[0030] After the control operation is performed on the air conditioner, according to the period type to which the current working period belongs, a historical working period of the air conditioner associated with the current working period is determined;

[0031] Determine the first period electrical parameter of the current working period and the second period electrical parameter of the historical working period, and calculate the target electrical parameter of the air conditioner according to the period type to which the current working period belongs, the period type to which the historical working period belongs, the first period electrical parameter and the second period electrical parameter; the first period electrical parameter and the second period electrical parameter both include corresponding period electricity usage parameters and / or period electricity cost parameters, and the target electrical parameter includes target electricity usage parameters and / or target electricity cost parameters;

[0032] Calculating an electrical parameter difference between the target electrical parameter of the air conditioner and a preset electrical parameter according to the target electrical parameter of the air conditioner, and determining whether the electrical parameter difference is within a preset electrical parameter difference range;

[0033] When it is determined that the electrical parameter difference is not within the preset electrical parameter difference range, an abnormal control alarm prompt of the air conditioner is generated; the abnormal control alarm prompt is used to adjust the control operation of the air conditioner when the air conditioner is in a future working period.

[0034] As an optional implementation, in the first aspect of the present invention, the determining of the first period electrical parameter of the current working period and the second period electrical parameter of the historical working period includes:

[0035] Determine the first working parameters before and after adjustment of each of the refrigerating working devices included in the air conditioner in the current working period, and determine the second working parameters before and after adjustment of each of the refrigerating working devices in the historical working period;

[0036] Determine the first electrical parameters before and after adjustment of each type of the refrigeration equipment in the current working period according to the first working parameters before and after adjustment, and determine the second electrical parameters before and after adjustment of each type of the refrigeration equipment in the historical working period according to the second working parameters before and after adjustment;

[0037] The first period electrical parameters of the current working period are determined based on the first pre- and post-adjustment electrical parameters corresponding to all the refrigeration working equipment, and the second period electrical parameters of the historical working period are determined based on the second pre- and post-adjustment electrical parameters corresponding to all the refrigeration working equipment.

[0038] The second aspect of the present invention discloses an intelligent air conditioning control device based on peak-valley optimization, the device comprising:

[0039] A first determination module is used to determine the current working period of the air conditioner used for regulation, and determine the period type to which the current working period belongs according to the current working period of the air conditioner; the period type includes a first period type and a second period type, a first electrical parameter corresponding to the first period type is less than a second electrical parameter corresponding to the second period type, and the first electrical parameter and the second electrical parameter both include corresponding power supply parameters and / or electricity fee parameters;

[0040] A first judgment module, used for judging whether it is necessary to perform a control operation on the air conditioner according to the period type to which the current working period belongs;

[0041] A second determination module, configured to determine, when the determination result of the first determination module is yes, a control parameter required for controlling the air conditioner based on the period type to which the current working period belongs;

[0042] A control module is used to perform control operations on the air conditioner according to the control parameters.

[0043] As an optional implementation, in the second aspect of the present invention, the first judgment module determines whether it is necessary to perform a control operation on the air conditioner according to the period type to which the current working period belongs, specifically in the following manner:

[0044] Determine basic air conditioning parameters of the air conditioner; the basic air conditioning parameters of the air conditioner include at least one of the current chiller operating parameters, the current water pump operating parameters, the current wind cabinet operating parameters and the current cooling tower operating parameters of the air conditioner;

[0045] Determining a current chiller outlet water temperature parameter of the air conditioner according to the basic air conditioning parameters of the air conditioner;

[0046] Determine the target chiller outlet water temperature parameter of the air conditioner according to the period type to which the current working period belongs, and calculate the temperature parameter difference between the current chiller outlet water temperature parameter and the target chiller outlet water temperature parameter according to the current chiller outlet water temperature parameter and the target chiller outlet water temperature parameter;

[0047] Determining whether the temperature parameter difference is within a preset temperature parameter difference range;

[0048] When it is determined that the temperature parameter difference is not within the preset temperature parameter difference range, determining that a control operation needs to be performed on the air conditioner;

[0049] When it is determined that the temperature parameter difference is within the preset temperature parameter difference range, it is determined that there is no need to perform a control operation on the air conditioner.

[0050] As an optional implementation, in the second aspect of the present invention, the first judgment module determines the target chiller outlet water temperature parameter of the air conditioner according to the period type to which the current working period belongs in the following manner:

[0051] When the period type to which the current working period belongs is the first period type, determining the freezing working condition of the water system of the air conditioner; the freezing working condition of the water system of the air conditioner includes at least one of the freezing working condition of the chiller of the air conditioner, the freezing working condition of the freezing water pump, the cooling working condition of the cooling water pump and the cooling working condition of the cooling tower;

[0052] Determine the minimum outlet water temperature parameter of the chiller of the air conditioner according to the refrigeration working condition of the water system, and determine the minimum outlet water temperature parameter as the target outlet water temperature parameter of the chiller of the air conditioner;

[0053] When the period type to which the current working period belongs is the second period type, determining a target comfortable room temperature parameter of the user based on the current activity of the user of the air conditioner;

[0054] According to the user's target comfortable room temperature parameter, an expected water outlet temperature parameter of the chiller of the air conditioner is determined, and the expected water outlet temperature parameter is determined as the target water outlet temperature parameter of the chiller of the air conditioner.

[0055] As an optional implementation, in the second aspect of the present invention, the second determination module determines the control parameters required for controlling the air conditioner based on the period type to which the current working period belongs in the following manner:

[0056] According to the basic air conditioning parameters of the air conditioner, all target refrigeration working equipment that can be regulated are determined from all refrigeration working equipment included in the air conditioner; all the refrigeration working equipment included in the air conditioner includes at least one of a chiller, a refrigeration water pump, a cooling water pump, a cooling tower and a wind cabinet;

[0057] According to the target chiller outlet water temperature parameter determined based on the period type to which the current working period belongs, the equipment control parameters corresponding to each target refrigeration working equipment are determined, and the equipment control parameters corresponding to all the target refrigeration working equipment are determined as the control parameters required to control the air conditioner.

[0058] As an optional embodiment, in the second aspect of the present invention, the current chiller operating parameters, the current water pump operating parameters, the current wind cabinet operating parameters and the current cooling tower operating parameters of the air conditioner all include at least one of the corresponding working unit number parameters, working load parameters, working frequency parameters, working temperature parameters and working wind speed parameters;

[0059] The second determination module determines all target refrigeration working devices that can be controlled from all refrigeration working devices included in the air conditioner according to the basic air conditioning parameters of the air conditioner in the following manner:

[0060] According to the current working parameters of each refrigeration working device included in the air conditioner, the equipment control status of each refrigeration working device is determined; the current working parameters of all the refrigeration working devices belong to the basic air conditioning parameters of the air conditioner;

[0061] Calculating the degree of equipment control of each type of refrigeration equipment according to the equipment control situation of each type of refrigeration equipment;

[0062] According to the equipment control degree of each of the refrigerating working equipment, all the refrigerating working equipment whose equipment control degree is greater than or equal to a preset equipment control degree threshold are determined from all the refrigerating working equipment as all the target refrigerating working equipment that can be controlled.

[0063] As an optional implementation manner, in the second aspect of the present invention, the first determining module is further used to:

[0064] After the control module completes the control operation on the air conditioner, according to the period type to which the current working period belongs, the historical working period of the air conditioner associated with the current working period is determined; the first period electrical parameters of the current working period and the second period electrical parameters of the historical working period are determined;

[0065] And, the device also includes:

[0066] a calculation module, configured to calculate a target electrical parameter of the air conditioner according to the period type to which the current working period belongs, the period type to which the historical working period belongs, the first period electrical parameter, and the second period electrical parameter; the first period electrical parameter and the second period electrical parameter both include corresponding period electrical parameters and / or period electricity cost parameters, and the target electrical parameters include target electrical parameters and / or target electricity cost parameters; and calculate an electrical parameter difference between the target electrical parameters of the air conditioner and a preset electrical parameter according to the target electrical parameters of the air conditioner;

[0067] A second judgment module is used to judge whether the electrical parameter difference is within a preset electrical parameter difference range;

[0068] A prompt generation module is used to generate a control abnormality alarm prompt of the air conditioner when the second judgment module determines that the electrical parameter difference is not within the preset electrical parameter difference range; the control abnormality alarm prompt is used to adjust the control operation of the air conditioner when the air conditioner is in the future working period.

[0069] As an optional implementation, in the second aspect of the present invention, the first determination module determines the first period electrical parameter of the current working period and the second period electrical parameter of the historical working period in the following manner:

[0070] Determine the first working parameters before and after adjustment of each of the refrigerating working devices included in the air conditioner in the current working period, and determine the second working parameters before and after adjustment of each of the refrigerating working devices in the historical working period;

[0071] Determine the first electrical parameters before and after adjustment of each type of the refrigeration equipment in the current working period according to the first working parameters before and after adjustment, and determine the second electrical parameters before and after adjustment of each type of the refrigeration equipment in the historical working period according to the second working parameters before and after adjustment;

[0072] The first period electrical parameters of the current working period are determined based on the first pre- and post-adjustment electrical parameters corresponding to all the refrigeration working equipment, and the second period electrical parameters of the historical working period are determined based on the second pre- and post-adjustment electrical parameters corresponding to all the refrigeration working equipment.

[0073] The third aspect of the present invention discloses another intelligent air conditioning control device based on peak-valley optimization, the device comprising:

[0074] A memory storing executable program code;

[0075] a processor coupled to the memory;

[0076] The processor calls the executable program code stored in the memory to execute the air conditioning intelligent control method based on peak-valley optimization disclosed in the first aspect of the present invention.

[0077] The fourth aspect of the present invention discloses a computer storage medium, which stores computer instructions. When the computer instructions are called, they are used to execute the air conditioning intelligent control method based on peak-valley optimization disclosed in the first aspect of the present invention.

[0078] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:

[0079] In an embodiment of the present invention, the current working period of the air conditioner used for regulation is determined, and the period type to which the current working period belongs is determined according to the current working period of the air conditioner; according to the period type to which the current working period belongs, it is determined whether it is necessary to perform regulation operation on the air conditioner, and if so, based on the period type to which the current working period belongs, the regulation parameters required for regulating the air conditioner are determined, and the regulation operation is performed on the air conditioner according to the regulation parameters. It can be seen that the implementation of the present invention can regulate the air conditioner based on the period type to which the current working period of the air conditioner belongs. In this way, the air conditioner can be intelligently regulated during different peak and valley periods of electricity consumption, which is not only conducive to reducing the operating load of the power distribution equipment to ensure the safe and stable operation of the power system, but also conducive to improving the utilization rate of the power distribution equipment, thereby reducing the energy consumption of the air conditioner and the required electricity bill. BRIEF DESCRIPTION OF THE DRAWINGS

[0080] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0081] Figure 1 It is a flow chart of an air conditioning intelligent control method based on peak-valley optimization disclosed in an embodiment of the present invention;

[0082] Figure 2 It is a flow chart of another air conditioning intelligent control method based on peak-valley optimization disclosed in an embodiment of the present invention;

[0083] Figure 3 It is a structural schematic diagram of an air-conditioning intelligent control device based on peak-valley optimization disclosed in an embodiment of the present invention;

[0084] Figure 4 It is a structural schematic diagram of another air-conditioning intelligent control device based on peak-valley optimization disclosed in an embodiment of the present invention;

[0085] Figure 5 It is a structural schematic diagram of another air-conditioning intelligent control device based on peak-valley optimization disclosed in an embodiment of the present invention. DETAILED DESCRIPTION

[0086] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0087] The terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish different objects rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, device, product or end including a series of steps or units is not limited to the listed steps or units, but may optionally include steps or units that are not listed, or may optionally include other steps or units inherent to these processes, methods, products or ends.

[0088] Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present invention. The appearance of the phrase in various places in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.

[0089] The present invention discloses an air conditioning intelligent control method and device based on peak-valley optimization, which is not only conducive to reducing the operating load of the power distribution equipment to ensure the safe and stable operation of the power system, but also conducive to improving the utilization rate of the power distribution equipment, thereby reducing the energy consumption of the air conditioner and the required electricity cost. The following are detailed descriptions.

[0090] Embodiment 1

[0091] See also Figure 1 , Figure 1 : is a flow chart of an air conditioning intelligent control method based on peak-valley optimization disclosed in an embodiment of the present invention. Figure 1 The described air conditioning intelligent control method based on peak-valley optimization can be applied to control central air conditioning in various scenarios, such as various industrial refrigeration sites, various public buildings, etc., and the embodiments of the present invention do not limit this. Optionally, the method can be implemented by an air conditioning intelligent control system, which can be integrated in an air conditioning intelligent control device, or a local server or cloud server for processing the control process of the central air conditioning, and the embodiments of the present invention do not limit this. Figure 1 As shown, the air conditioning intelligent control method based on peak-valley optimization may include the following operations:

[0092] 101. Determine the current working period of the air conditioner used for control, and determine the period type to which the current working period belongs based on the current working period of the air conditioner.

[0093] In an embodiment of the present invention, optionally, the period type includes a first period type and a second period type. Specifically, the first electrical parameter corresponding to the first period type is less than the second electrical parameter corresponding to the second period type. Further optionally, both the first electrical parameter and the second electrical parameter include corresponding power supply parameters and / or electricity fee parameters. Further specifically, the first period type can be understood as a level period of electricity consumption for urban users or a valley period of electricity consumption for urban users, and the second period type can be understood as a peak period of electricity consumption for urban users or a peak period of electricity consumption for urban users; at the same time, the power supply / unit electricity fee of the distribution equipment corresponding to the first period type is less than the power supply / unit electricity fee of the distribution equipment corresponding to the second period type.

[0094] 102. Determine whether it is necessary to perform control operations on the air conditioner according to the period type to which the current working period belongs.

[0095] In the embodiment of the present invention, based on the period type to which the current working period of the air conditioner belongs, the target chiller outlet water temperature parameter corresponding to the current working period of the air conditioner can be determined (for example, when the period type is the first period type, the target chiller outlet water temperature parameter is t 1 , and when the period type is the second period type, the target chiller outlet water temperature parameter is t 2 ), and then based on the target chiller outlet water temperature parameter, determine whether it is necessary to perform control operations on the air conditioner.

[0096] 103. When the judgment result is yes, based on the period type to which the current working period belongs, the control parameters required for controlling the air conditioner are determined, and the control operation is performed on the air conditioner according to the control parameters.

[0097] In an embodiment of the present invention, the control operation performed on the air conditioner may optionally include at least one of the start-stop control operation of the target refrigeration working equipment of the air conditioner, the working temperature control operation, the working frequency control operation, the working wind speed control operation, and the workload control operation, so as to control the outlet water temperature of the air conditioner's chiller, thereby controlling the outlet temperature of the cold air of the air conditioner. For example, during the off-peak period of electricity consumption of urban users, the outlet water temperature of the air conditioner's chiller is lowered, and the cold water of the chiller is stored for recycling during the peak period of electricity consumption of urban users; and during the peak period of electricity consumption of urban users, the outlet water temperature of the air conditioner's chiller can be increased, and the cold water of the chiller stored during the off-peak period of electricity consumption of urban users can be used to ensure that the cold air of the air conditioner can be discharged normally, thereby reducing the energy consumption and electricity bill required for the air conditioner during the entire period of electricity consumption of urban users.

[0098] It can be seen that the implementation of the embodiment of the present invention can regulate the air conditioner based on the period type to which the air conditioner is currently working. In this way, the air conditioner can be intelligently regulated during different peak and valley periods of electricity consumption, which is not only beneficial to reducing the operating load of the power distribution equipment to ensure the safe and stable operation of the power system, but also beneficial to improving the utilization rate of the power distribution equipment, thereby reducing the energy consumption of the air conditioner and the required electricity bill.

[0099] Embodiment 2

[0100] See also Figure 2 , Figure 2 : is a flow chart of an air conditioning intelligent control method based on peak-valley optimization disclosed in an embodiment of the present invention. Figure 2 The described air conditioning intelligent control method based on peak-valley optimization can be applied to control central air conditioning in various scenarios, such as various industrial refrigeration sites, various public buildings, etc., and the embodiments of the present invention do not limit this. Optionally, the method can be implemented by an air conditioning intelligent control system, which can be integrated in an air conditioning intelligent control device, or a local server or cloud server for processing the control process of the central air conditioning, and the embodiments of the present invention do not limit this. Figure 2 As shown, the air conditioning intelligent control method based on peak-valley optimization may include the following operations:

[0101] 201. Determine a current working period of an air conditioner used for control, and determine a period type to which the current working period belongs according to the current working period of the air conditioner.

[0102] 202. Determine the basic air conditioning parameters of the air conditioner.

[0103] In an embodiment of the present invention, optionally, the basic air conditioning parameters of the air conditioner include at least one of the current chiller working parameters, current water pump working parameters, current wind cabinet working parameters, and current cooling tower working parameters of the air conditioner. Further optionally, the current chiller working parameters, current water pump working parameters, current wind cabinet working parameters, and current cooling tower working parameters all include at least one of the corresponding working unit number parameters, workload parameters, working frequency parameters, working temperature parameters, and working wind speed parameters, such as the number of working units of the chiller, the working frequency of the refrigeration water pump, the working wind speed of the wind cabinet, and the like.

[0104] 203. Determine a current chiller outlet water temperature parameter of the air conditioner according to the basic air conditioning parameters of the air conditioner.

[0105] In the embodiment of the present invention, the current chiller outlet water temperature parameter of the air conditioner is determined based on the current working parameters of all refrigeration working devices included in the air conditioner, that is, the current working conditions.

[0106] 204. Determine a target chiller outlet water temperature parameter of the air conditioner according to the period type to which the current working period belongs, and calculate a temperature parameter difference between the current chiller outlet water temperature parameter and the target chiller outlet water temperature parameter according to the current chiller outlet water temperature parameter and the target chiller outlet water temperature parameter.

[0107] In the embodiment of the present invention, for example, when the period type to which the current working period belongs is the first period type, the target chiller outlet water temperature parameter of the air conditioner is t 1 , and based on the basic air conditioning parameters of the air conditioner, determine the current chiller outlet water temperature parameter of the air conditioner as t 3 , and then calculate that the temperature parameter difference between the current chiller outlet water temperature parameter and the target chiller outlet water temperature parameter is 5°C.

[0108] 205. Determine whether the temperature parameter difference is within a preset temperature parameter difference range.

[0109] In the embodiment of the present invention, when the judgment result of step 205 is no, step 206 to step 207 are triggered to be executed; when the judgment result of step 205 is yes, step 208 is triggered to be executed.

[0110] 206. Determine whether control operation needs to be performed on the air conditioner.

[0111] In the embodiment of the present invention, it is determined that the outlet water temperature of the chiller of the air conditioner needs to be regulated to regulate the outlet temperature of the cold air of the air conditioner.

[0112] 207. Based on the period type to which the current working period belongs, determine the control parameters required for controlling the air conditioner, and perform a control operation on the air conditioner according to the control parameters.

[0113] 208. Determine that no control operation is required on the air conditioner.

[0114] In the embodiment of the present invention, that is, determining to maintain the current chiller outlet water temperature parameter of the air conditioner, so as to maintain the current cold air outlet temperature of the air conditioner.

[0115] In the embodiment of the present invention, for other descriptions of step 201 and step 207, please refer to the detailed description of step 101 and step 103 in the first embodiment, and the embodiment of the present invention will not be repeated.

[0116] It can be seen that the implementation of the embodiment of the present invention can determine whether the air conditioner needs to be adjusted based on the temperature parameter difference between the current chiller water outlet temperature parameter of the air conditioner and the target chiller water outlet temperature parameter. This is conducive to improving the reliability and accuracy of the air conditioner control operation, and further conducive to accurately reducing the power consumption of the air conditioner while ensuring the normal operation of the air conditioner, thereby helping to reduce the electricity cost of the air conditioner and ensure the safe and stable operation of the power distribution equipment.

[0117] In an optional embodiment, the step 204 above determines the target chiller outlet water temperature parameter of the air conditioner according to the period type to which the current working period belongs, including:

[0118] When the period type to which the current working period belongs is the first period type, determining the freezing working condition of the water system of the air conditioner;

[0119] According to the refrigeration working condition of the water system, the minimum outlet water temperature parameter of the chiller of the air conditioner is determined, and the minimum outlet water temperature parameter is determined as the target outlet water temperature parameter of the chiller of the air conditioner;

[0120] When the period type to which the current working period belongs is the second period type, determining the user's target comfortable room temperature parameter based on the current activity of the user of the air conditioner;

[0121] According to the user's target comfortable room temperature parameter, an expected water outlet temperature parameter of a chiller of the air conditioner is determined, and the expected water outlet temperature parameter is determined as the target water outlet temperature parameter of the chiller of the air conditioner.

[0122] In this optional embodiment, the refrigeration working condition of the water system of the air conditioner optionally includes at least one of the refrigeration working condition of the air conditioner's chiller, the refrigeration working condition of the refrigeration water pump, the cooling working condition of the cooling water pump, and the cooling working condition of the cooling tower. Specifically, determining the minimum outlet water temperature parameter as the target outlet water temperature parameter of the air conditioner can be understood as lowering the cold air outlet temperature of the air conditioner as much as possible while ensuring the normal operation of the air conditioner; and the user's target comfortable room temperature parameter can be understood as the maximum room temperature parameter that the user feels comfortable with, that is, while ensuring the user's cooling needs, the cold air outlet temperature of the air conditioner is increased as much as possible.

[0123] It can be seen that this optional embodiment can intelligently determine the target chiller outlet water temperature parameters of the air conditioner based on the period type to which the current working period of the air conditioner belongs. This is conducive to improving the reliability and accuracy of the determined target chiller outlet water temperature parameters, and further conducive to improving the triggering reliability and accuracy of the air conditioner control operation, thereby facilitating precise control of the air conditioner, so as to reduce the energy consumption required for the air conditioner during the entire urban user electricity consumption period and ensure the safe and stable operation of the distribution equipment.

[0124] In another optional embodiment, the step 207 above, based on the period type to which the current working period belongs, determining the control parameters required for controlling the air conditioner includes:

[0125] According to the basic air-conditioning parameters of the air-conditioner, all target refrigeration working equipment that can be controlled are determined from all refrigeration working equipment included in the air-conditioner;

[0126] According to the target chiller outlet water temperature parameter determined based on the period type to which the current working period belongs, the equipment control parameters corresponding to each target refrigeration working equipment are determined, and the equipment control parameters corresponding to all target refrigeration working equipment are determined as the control parameters required for controlling the air conditioner.

[0127] In this optional embodiment, optionally, all refrigeration working equipment included in the air conditioner includes at least one of a chiller, a refrigeration water pump, a cooling water pump, a cooling tower and a wind cabinet. For example, if the air conditioner has multiple cooling towers, the operation of some cooling towers can be stopped according to actual needs; if the refrigeration water pump of the air conditioner is a variable frequency type, the operating frequency of the refrigeration water pump can also be adjusted according to actual needs, therefore, the cooling tower and the refrigeration water pump can be determined as target refrigeration working equipment that can be regulated.

[0128] It can be seen that this optional embodiment can intelligently determine the target refrigeration working equipment that can be controlled based on the basic air-conditioning parameters of the air-conditioner. In this way, the reliability and accuracy of the determined target refrigeration equipment can be improved, and then the reliability and accuracy of the air-conditioning control operation can be improved based on the target refrigeration equipment, thereby realizing precise energy consumption reduction control of the air-conditioner, which is beneficial to environmental protection.

[0129] In yet another optional embodiment, in the above step, all target refrigeration working devices that can be regulated are determined from all refrigeration working devices included in the air conditioner according to the basic air conditioning parameters of the air conditioner, including:

[0130] Determine the equipment control status of each refrigeration working device according to the current working parameters of each refrigeration working device included in the air conditioner;

[0131] Calculate the equipment control degree of each refrigeration working equipment according to the equipment control situation of each refrigeration working equipment;

[0132] According to the equipment control degree of each refrigerating working equipment, all refrigerating working equipment whose equipment control degree is greater than or equal to a preset equipment control degree threshold are determined from all refrigerating working equipment as all target refrigerating working equipment that can be controlled.

[0133] In this optional embodiment, the current working parameters of all refrigeration working equipment belong to the basic air conditioning parameters of the air conditioner, that is, the current chiller working parameters, current water pump working parameters, current wind cabinet working parameters and current cooling tower working parameters contained in the basic air conditioning parameters of the corresponding air conditioner. Optionally, the current chiller working parameters, current water pump working parameters, current wind cabinet working parameters and current cooling tower working parameters of the air conditioner all include at least one of the corresponding number of working units parameters, workload parameters, working frequency parameters, working temperature parameters and working wind speed parameters. Specifically, the equipment control situation of each refrigeration working equipment can be understood as whether the number of working units, workload, working frequency, working temperature and working wind speed of the refrigeration working equipment can be controlled. If the above parameters can be controlled and the controllable range is large, it can be determined that the equipment control degree of the refrigeration working equipment is greater than or equal to the preset equipment control degree threshold, so as to perform targeted control operations on it.

[0134] It can be seen that this optional embodiment can determine the target refrigeration working equipment in a targeted manner based on the equipment control conditions of all refrigeration working equipment, so as to control the target refrigeration working equipment. This is conducive to further improving the reliability and accuracy of the determined target refrigeration working equipment, and then to improving the reliability, accuracy and effectiveness of the control of the target refrigeration working equipment, thereby helping to reduce the energy consumption required for air conditioning during the overall urban users' electricity consumption period, which is beneficial to environmental protection.

[0135] In yet another optional embodiment, the method further comprises:

[0136] After the control operation is completed on the air conditioner, according to the period type to which the current working period belongs, the historical working period of the air conditioner associated with the current working period is determined;

[0137] Determine the first period electrical parameters of the current working period and the second period electrical parameters of the historical working period, and calculate the target electrical parameters of the air conditioner according to the period type to which the current working period belongs, the period type to which the historical working period belongs, the first period electrical parameters, and the second period electrical parameters;

[0138] Calculating an electrical parameter difference between the target electrical parameter of the air conditioner and a preset electrical parameter according to the target electrical parameter of the air conditioner, and determining whether the electrical parameter difference is within a preset electrical parameter difference range;

[0139] When it is determined that the electrical parameter difference is not within the preset electrical parameter difference range, an abnormal control alarm prompt of the air conditioner is generated.

[0140] In this optional embodiment, optionally, the first period electrical parameters and the second period electrical parameters both include corresponding period electrical usage parameters and / or period electricity cost parameters. Further optionally, the target electrical parameters include target electrical usage parameters and / or target electricity cost parameters. For example, if the period type to which the current working period belongs is the second period type, i.e., the peak period, then the historical working period adjacent to it and whose period type is the first period type (such as the valley period) can be determined as the historical working period of the air conditioner associated with the current working period, and then the power consumption of the current working period is determined to be Q. 1 , the power consumption during the historical working period is Q 2 , then the target power consumption of the air conditioner in these two periods is Q 1 +Q 2 , and the preset power consumption of the air conditioner, that is, the corresponding power consumption assuming no regulation is Q 3 , then the power consumption difference corresponding to the air conditioner is Q 3 -(Q 1 +Q 2 ); at the same time, the electricity cost difference corresponding to the air conditioner can also be calculated as (Q 31 -Q 1 )*Peak electricity price-(Q 2 -Q 32 )*Electricity price during off-peak period, where Q 31 and Q 32 The corresponding electricity consumption when the peak and valley periods of electricity consumption are not regulated.

[0141] Furthermore, the abnormal control alarm prompt is used to adjust the control operation of the air conditioner when the air conditioner is in the future working period. That is, the abnormal control alarm prompt is used to prompt that the control force of the air conditioner is too small, and there may be a situation where the refrigeration working equipment does not perform the corresponding control operation. At this time, the control operation of the air conditioner can be adjusted in the subsequent power consumption period.

[0142] It can be seen that this optional embodiment can determine whether it is necessary to generate an abnormal air conditioning control alarm based on the calculated air conditioning target electrical parameters. This is conducive to timely adjustment of the air conditioning control operation, and further helps to improve the reliability, accuracy and effectiveness of the air conditioning control operation, thereby facilitating precise energy consumption reduction control of the air conditioner and creating a green living environment for users.

[0143] In yet another optional embodiment, the step of determining the first period electrical parameters of the current working period and the second period electrical parameters of the historical working period in the above step includes:

[0144] Determine the first working parameters before and after adjustment of each refrigeration working device included in the air conditioner in the current working period, and determine the second working parameters before and after adjustment of each refrigeration working device in the historical working period;

[0145] Determine the first electrical parameters before and after adjustment of each refrigeration working device in the current working period according to the first working parameters before and after adjustment, and determine the second electrical parameters before and after adjustment of each refrigeration working device in the historical working period according to the second working parameters before and after adjustment;

[0146] The first period electrical parameters of the current working period are determined based on the first pre- and post-adjustment electrical parameters corresponding to all refrigeration working equipment, and the second period electrical parameters of the historical working period are determined based on the second pre- and post-adjustment electrical parameters corresponding to all refrigeration working equipment.

[0147] In this optional embodiment, the overall power consumption parameters or electricity cost parameters of all refrigeration working equipment in the corresponding power consumption period before and after the air conditioner is adjusted are calculated to obtain the period power consumption parameters or period electricity cost parameters of the corresponding power consumption period.

[0148] It can be seen that this optional embodiment can reasonably and specifically calculate the period electrical parameters of the corresponding power consumption period based on the electrical parameters of all refrigeration working equipment before and after adjustment in the corresponding power consumption period. In this way, the reliability and accuracy of the calculated period electrical parameters of the power consumption period can be improved, and then the reliability and accuracy of the generation of subsequent abnormal control alarm prompts can be improved, so that the control operation of the air conditioner can be reliably and effectively adjusted to achieve precise energy saving control.

[0149] Embodiment 3

[0150] See also Figure 3 , Figure 3 Schematic diagram of the structure of an air conditioning intelligent control device based on peak-valley optimization disclosed in an embodiment of the present invention. Figure 3 As shown, the air conditioning intelligent control device based on peak-valley optimization may include:

[0151] The first determination module 301 is used to determine the current working period of the air conditioner used for regulation, and determine the period type to which the current working period belongs according to the current working period of the air conditioner;

[0152] The first judgment module 302 is used to judge whether it is necessary to perform a control operation on the air conditioner according to the period type to which the current working period belongs;

[0153] The second determination module 303 is used to determine the control parameters required for controlling the air conditioner based on the period type to which the current working period belongs when the judgment result of the first judgment module 302 is yes;

[0154] The control module 304 is used to perform control operations on the air conditioner according to the control parameters.

[0155] In the embodiment of the present invention, the period type includes a first period type and a second period type, the first electrical parameter corresponding to the first period type is less than the second electrical parameter corresponding to the second period type, and the first electrical parameter and the second electrical parameter both include corresponding power supply parameters and / or electricity fee parameters;

[0156] It can be seen that implementation Figure 3 The described air-conditioning intelligent control device based on peak-valley optimization can control the air-conditioning based on the period type to which the air-conditioning is currently working. In this way, the air-conditioning can be intelligently controlled during different peak and valley periods of electricity consumption. This is not only beneficial to reducing the operating load of the distribution equipment to ensure the safe and stable operation of the power system, but also beneficial to improving the utilization rate of the distribution equipment, thereby reducing the energy consumption of the air-conditioning and the required electricity bills.

[0157] In an optional embodiment, the first judgment module 302 judges whether it is necessary to perform a control operation on the air conditioner according to the period type to which the current working period belongs in the following manner:

[0158] Determine the basic air conditioning parameters of the air conditioner;

[0159] According to the basic air conditioning parameters of the air conditioner, determine the current chiller outlet water temperature parameters of the air conditioner;

[0160] Determine the target chiller outlet water temperature parameter of the air conditioner according to the period type to which the current working period belongs, and calculate the temperature parameter difference between the current chiller outlet water temperature parameter and the target chiller outlet water temperature parameter according to the current chiller outlet water temperature parameter and the target chiller outlet water temperature parameter;

[0161] Determine whether the temperature parameter difference is within a preset temperature parameter difference range;

[0162] When it is determined that the temperature parameter difference is not within the preset temperature parameter difference range, determining that a control operation needs to be performed on the air conditioner;

[0163] When it is determined that the temperature parameter difference is within the preset temperature parameter difference range, it is determined that there is no need to perform a control operation on the air conditioner.

[0164] In this optional embodiment, the basic air-conditioning parameters of the air conditioner include at least one of the current chiller operating parameters, the current water pump operating parameters, the current wind cabinet operating parameters and the current cooling tower operating parameters of the air conditioner.

[0165] It can be seen that implementation Figure 4The described air-conditioning intelligent control device based on peak-valley optimization can determine whether the air-conditioning needs to be controlled based on the temperature parameter difference between the current chiller water outlet temperature parameter of the air-conditioning and the target chiller water outlet temperature parameter. This is conducive to improving the reliability and accuracy of the air-conditioning control operation, and further conducive to accurately reducing the power consumption of the air-conditioning operation while ensuring the normal operation of the air-conditioning, thereby helping to reduce the electricity cost of the air-conditioning and ensure the safe and stable operation of the power distribution equipment.

[0166] In another optional embodiment, the first judgment module 302 determines the target chiller outlet water temperature parameter of the air conditioner according to the period type to which the current working period belongs in the following manner:

[0167] When the period type to which the current working period belongs is the first period type, determining the freezing working condition of the water system of the air conditioner;

[0168] According to the refrigeration working condition of the water system, the minimum outlet water temperature parameter of the chiller of the air conditioner is determined, and the minimum outlet water temperature parameter is determined as the target outlet water temperature parameter of the chiller of the air conditioner;

[0169] When the period type to which the current working period belongs is the second period type, determining the user's target comfortable room temperature parameter based on the current activity of the user of the air conditioner;

[0170] According to the user's target comfortable room temperature parameter, an expected water outlet temperature parameter of a chiller of the air conditioner is determined, and the expected water outlet temperature parameter is determined as the target water outlet temperature parameter of the chiller of the air conditioner.

[0171] In this optional embodiment, the freezing working condition of the air conditioner's water system includes at least one of the freezing working condition of the air conditioner's chiller, the freezing working condition of the freezing water pump, the cooling working condition of the cooling water pump, and the cooling working condition of the cooling tower.

[0172] It can be seen that implementation Figure 4 The described air-conditioning intelligent control device based on peak-valley optimization can intelligently determine the target chiller outlet water temperature parameters of the air-conditioning based on the period type to which the current working period of the air-conditioning belongs. This is conducive to improving the reliability and accuracy of the determined target chiller outlet water temperature parameters, and further conducive to improving the triggering reliability and accuracy of the air-conditioning control operation, thereby facilitating precise control of the air-conditioning, so as to reduce the energy consumption required for the air-conditioning during the entire urban user electricity consumption period and ensure the safe and stable operation of the distribution equipment.

[0173] In another optional embodiment, the second determining module 303 determines the control parameters required for controlling the air conditioner based on the period type to which the current working period belongs in the following manner:

[0174] According to the basic air-conditioning parameters of the air-conditioner, all target refrigeration working equipment that can be controlled are determined from all refrigeration working equipment included in the air-conditioner;

[0175] According to the target chiller outlet water temperature parameter determined based on the period type to which the current working period belongs, the equipment control parameters corresponding to each target refrigeration working equipment are determined, and the equipment control parameters corresponding to all target refrigeration working equipment are determined as the control parameters required for controlling the air conditioner.

[0176] In this optional embodiment, all refrigeration working equipment included in the air conditioner includes at least one of a chiller, a refrigeration water pump, a cooling water pump, a cooling tower and a wind cabinet.

[0177] It can be seen that implementation Figure 4 The described air-conditioning intelligent control device based on peak-valley optimization can intelligently determine the target refrigeration working equipment that can be controlled based on the basic air-conditioning parameters of the air-conditioner. In this way, the reliability and accuracy of the determined target refrigeration equipment can be improved, and then the reliability and accuracy of the air-conditioning control operation can be improved based on the target refrigeration equipment, thereby realizing precise energy consumption reduction control of the air-conditioner, which is beneficial to environmental protection.

[0178] In another optional embodiment, the second determination module 303 determines all target refrigeration working devices that can be regulated from all refrigeration working devices included in the air conditioner according to the basic air conditioning parameters of the air conditioner in the following manner:

[0179] Determine the equipment control status of each refrigeration working device according to the current working parameters of each refrigeration working device included in the air conditioner;

[0180] Calculate the equipment control degree of each refrigeration working equipment according to the equipment control situation of each refrigeration working equipment;

[0181] According to the equipment control degree of each refrigerating working equipment, all refrigerating working equipment whose equipment control degree is greater than or equal to a preset equipment control degree threshold are determined from all refrigerating working equipment as all target refrigerating working equipment that can be controlled.

[0182] In this optional embodiment, the current chiller operating parameters, current water pump operating parameters, current wind cabinet operating parameters and current cooling tower operating parameters of the air conditioner all include at least one of the corresponding working unit number parameters, working load parameters, working frequency parameters, working temperature parameters and working wind speed parameters; the current operating parameters of all refrigeration working equipment belong to the basic air conditioning parameters of the air conditioner.

[0183] It can be seen that implementation Figure 4The described air-conditioning intelligent control device based on peak-valley optimization can determine the target refrigeration working equipment in a targeted manner based on the equipment control conditions of all refrigeration working equipment, so as to control the target refrigeration working equipment. This is conducive to further improving the reliability and accuracy of the determined target refrigeration working equipment, and then to improving the reliability, accuracy and effectiveness of the control of the target refrigeration working equipment, thereby helping to reduce the energy consumption required for air conditioning during the overall urban users' electricity consumption period, which is beneficial to environmental protection.

[0184] In yet another optional embodiment, the first determining module 301 is further configured to:

[0185] After the control module 304 completes the control operation on the air conditioner, the historical working period of the air conditioner associated with the current working period is determined according to the period type to which the current working period belongs; the first period electrical parameters of the current working period and the second period electrical parameters of the historical working period are determined;

[0186] And, the device also includes:

[0187] The calculation module 305 is used to calculate the target electrical parameters of the air conditioner according to the period type to which the current working period belongs, the period type to which the historical working period belongs, the electrical parameters of the first period, and the electrical parameters of the second period; and calculate the electrical parameter difference between the target electrical parameters of the air conditioner and the preset electrical parameters according to the target electrical parameters of the air conditioner;

[0188] The second judgment module 306 is used to judge whether the electrical parameter difference is within a preset electrical parameter difference range;

[0189] The prompt generating module 307 is used to generate an abnormal control alarm prompt of the air conditioner when the second judging module 306 judges that the electrical parameter difference is not within the preset electrical parameter difference range.

[0190] In this optional embodiment, the first period electrical parameters and the second period electrical parameters both include corresponding period electricity usage parameters and / or period electricity charge parameters, and the target electrical parameters include target electricity usage parameters and / or target electricity charge parameters; the abnormal control alarm prompt is used to adjust the control operation of the air conditioner when the air conditioner is in the future working period.

[0191] It can be seen that implementation Figure 4 The described air-conditioning intelligent control device based on peak-valley optimization can determine whether it is necessary to generate an air-conditioning control abnormality alarm prompt based on the calculated air-conditioning target electrical parameters. This is conducive to timely adjustment of the air-conditioning control operation, and further helps to improve the reliability, accuracy and effectiveness of the air-conditioning control operation, thereby facilitating precise energy-saving control of the air-conditioning and creating a green living environment for users.

[0192] In another optional embodiment, the first determination module 301 determines the first period electrical parameters of the current working period and the second period electrical parameters of the historical working period in the following manner:

[0193] Determine the first working parameters before and after adjustment of each refrigeration working device included in the air conditioner in the current working period, and determine the second working parameters before and after adjustment of each refrigeration working device in the historical working period;

[0194] Determine the first electrical parameters before and after adjustment of each refrigeration working device in the current working period according to the first working parameters before and after adjustment, and determine the second electrical parameters before and after adjustment of each refrigeration working device in the historical working period according to the second working parameters before and after adjustment;

[0195] The first period electrical parameters of the current working period are determined based on the first pre- and post-adjustment electrical parameters corresponding to all refrigeration working equipment, and the second period electrical parameters of the historical working period are determined based on the second pre- and post-adjustment electrical parameters corresponding to all refrigeration working equipment.

[0196] It can be seen that implementation Figure 4 The described air-conditioning intelligent control device based on peak-valley optimization can reasonably and specifically calculate the periodic electrical parameters of the corresponding power consumption period based on the electrical parameters of all refrigeration working equipment before and after adjustment in the corresponding power consumption period. In this way, the reliability and accuracy of the calculated periodic electrical parameters of the power consumption period can be improved, and then the reliability and accuracy of the generation of subsequent control abnormal alarm prompts can be improved, so that the control operation of the air conditioner can be reliably and effectively adjusted to achieve precise energy saving control.

[0197] Embodiment 4

[0198] See also Figure 5 , Figure 5 FIG. 1 is a schematic diagram of the structure of another air conditioning intelligent control device based on peak-valley optimization disclosed in an embodiment of the present invention. Figure 5 As shown, the air conditioning intelligent control device based on peak-valley optimization may include:

[0199] A memory 401 storing executable program codes;

[0200] a processor 402 coupled to the memory 401;

[0201] The processor 402 calls the executable program code stored in the memory 401 to execute the steps of the air conditioning intelligent control method based on peak-valley optimization described in the first embodiment of the present invention or the second embodiment of the present invention.

[0202] Embodiment 5

[0203] An embodiment of the present invention discloses a computer storage medium, which stores computer instructions. When the computer instructions are called, they are used to execute the steps in the air conditioning intelligent control method based on peak-valley optimization described in Embodiment 1 or Embodiment 2 of the present invention.

[0204] Embodiment 6

[0205] An embodiment of the present invention discloses a computer program product, which includes a non-transitory computer-readable storage medium storing a computer program, and the computer program is operable to enable a computer to execute the steps of the air conditioning intelligent control method based on peak-valley optimization described in Example 1 or Example 2.

[0206] The device embodiments described above are only illustrative, wherein the modules described as separate components may or may not be physically separated, and the components displayed as modules may or may not be physical modules, i.e., they may be located in one place, or they may be distributed on multiple network modules. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Those of ordinary skill in the art may understand and implement it without creative work.

[0207] Through the specific description of the above embodiments, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on such an understanding, the above technical solution can be essentially or partly contributed to the prior art in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, and the storage medium includes a read-only memory (ROM), a random access memory (RAM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), a one-time programmable read-only memory (OTPROM), an electronically erasable rewritable read-only memory (EEPROM), a compact disc (CD-ROM) or other optical disc storage, magnetic disk storage, magnetic tape storage, or any other computer-readable medium that can be used to carry or store data.

[0208] Finally, it should be noted that the method and device for intelligent air conditioning control based on peak-valley optimization disclosed in the embodiment of the present invention disclose only the preferred embodiments of the present invention, which are only used to illustrate the technical scheme of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical schemes described in the aforementioned embodiments may still be modified, or some of the technical features thereof may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical schemes from the spirit and scope of the technical schemes of the various embodiments of the present invention.

Claims

1. An intelligent air conditioning control method based on peak-valley optimization, characterized in that: The method comprises: Determine the current working period of the air conditioner used for regulation, and determine the period type to which the current working period belongs according to the current working period of the air conditioner; the period type includes a first period type and a second period type, a first electrical parameter corresponding to the first period type is less than a second electrical parameter corresponding to the second period type, and the first electrical parameter and the second electrical parameter both include corresponding power supply parameters and / or electricity fee parameters; According to the period type to which the current working period belongs, determining whether it is necessary to perform a control operation on the air conditioner; When the judgment result is yes, determining the control parameters required for controlling the air conditioner based on the period type to which the current working period belongs, and performing a control operation on the air conditioner according to the control parameters; Wherein, judging whether it is necessary to perform a control operation on the air conditioner according to the period type to which the current working period belongs includes: Determine basic air conditioning parameters of the air conditioner; the basic air conditioning parameters of the air conditioner include at least one of the current chiller operating parameters, the current water pump operating parameters, the current wind cabinet operating parameters and the current cooling tower operating parameters of the air conditioner; Determining a current chiller outlet water temperature parameter of the air conditioner according to the basic air conditioning parameters of the air conditioner; Determine the target chiller outlet water temperature parameter of the air conditioner according to the period type to which the current working period belongs, and calculate the temperature parameter difference between the current chiller outlet water temperature parameter and the target chiller outlet water temperature parameter according to the current chiller outlet water temperature parameter and the target chiller outlet water temperature parameter; Determining whether the temperature parameter difference is within a preset temperature parameter difference range; When it is determined that the temperature parameter difference is not within the preset temperature parameter difference range, determining that a control operation needs to be performed on the air conditioner; When it is determined that the temperature parameter difference is within the preset temperature parameter difference range, determining that there is no need to perform a control operation on the air conditioner; Wherein, determining the target chiller outlet water temperature parameter of the air conditioner according to the period type to which the current working period belongs includes: When the period type to which the current working period belongs is the first period type, determining the freezing working condition of the water system of the air conditioner; the freezing working condition of the water system of the air conditioner includes at least one of the freezing working condition of the chiller of the air conditioner, the freezing working condition of the freezing water pump, the cooling working condition of the cooling water pump and the cooling working condition of the cooling tower; Determine the minimum outlet water temperature parameter of the chiller of the air conditioner according to the refrigeration working condition of the water system, and determine the minimum outlet water temperature parameter as the target outlet water temperature parameter of the chiller of the air conditioner; When the period type to which the current working period belongs is the second period type, determining a target comfortable room temperature parameter of the user based on the current activity of the user of the air conditioner; According to the user's target comfortable room temperature parameter, an expected water outlet temperature parameter of the chiller of the air conditioner is determined, and the expected water outlet temperature parameter is determined as the target water outlet temperature parameter of the chiller of the air conditioner.

2. The air conditioning intelligent control method based on peak-valley optimization according to claim 1 is characterized in that: The determining, based on the period type to which the current working period belongs, the control parameters required for controlling the air conditioner includes: According to the basic air conditioning parameters of the air conditioner, all target refrigeration working equipment that can be regulated are determined from all refrigeration working equipment included in the air conditioner; all the refrigeration working equipment included in the air conditioner includes at least one of a chiller, a refrigeration water pump, a cooling water pump, a cooling tower and a wind cabinet; According to the target chiller outlet water temperature parameter determined based on the period type to which the current working period belongs, the equipment control parameters corresponding to each target refrigeration working equipment are determined, and the equipment control parameters corresponding to all the target refrigeration working equipment are determined as the control parameters required to control the air conditioner.

3. The air conditioning intelligent control method based on peak-valley optimization according to claim 2 is characterized in that: The current chiller operating parameters, current water pump operating parameters, current wind cabinet operating parameters and current cooling tower operating parameters of the air conditioner all include at least one of the corresponding working unit number parameters, working load parameters, working frequency parameters, working temperature parameters and working wind speed parameters; Wherein, the step of determining all target refrigeration working equipment that can be regulated from all refrigeration working equipment included in the air conditioner according to the basic air conditioning parameters of the air conditioner includes: According to the current working parameters of each refrigeration working device included in the air conditioner, the equipment control status of each refrigeration working device is determined; the current working parameters of all the refrigeration working devices belong to the basic air conditioning parameters of the air conditioner; Calculating the degree of equipment control of each type of refrigeration equipment according to the equipment control situation of each type of refrigeration equipment; According to the equipment control degree of each of the refrigerating working equipment, all the refrigerating working equipment whose equipment control degree is greater than or equal to a preset equipment control degree threshold are determined from all the refrigerating working equipment as all the target refrigerating working equipment that can be controlled.

4. The air conditioning intelligent control method based on peak-valley optimization according to claim 3 is characterized in that: The method further comprises: After the control operation is performed on the air conditioner, according to the period type to which the current working period belongs, a historical working period of the air conditioner associated with the current working period is determined; Determine the first period electrical parameter of the current working period and the second period electrical parameter of the historical working period, and calculate the target electrical parameter of the air conditioner according to the period type to which the current working period belongs, the period type to which the historical working period belongs, the first period electrical parameter and the second period electrical parameter; the first period electrical parameter and the second period electrical parameter both include corresponding period electricity usage parameters and / or period electricity cost parameters, and the target electrical parameter includes target electricity usage parameters and / or target electricity cost parameters; Calculating an electrical parameter difference between the target electrical parameter of the air conditioner and a preset electrical parameter according to the target electrical parameter of the air conditioner, and determining whether the electrical parameter difference is within a preset electrical parameter difference range; When it is determined that the electrical parameter difference is not within the preset electrical parameter difference range, an abnormal control alarm prompt of the air conditioner is generated; the abnormal control alarm prompt is used to adjust the control operation of the air conditioner when the air conditioner is in a future working period.

5. The air conditioning intelligent control method based on peak-valley optimization according to claim 4 is characterized in that: The determining of the first period electrical parameters of the current working period and the second period electrical parameters of the historical working period includes: Determine the first working parameters before and after adjustment of each of the refrigerating working devices included in the air conditioner in the current working period, and determine the second working parameters before and after adjustment of each of the refrigerating working devices in the historical working period; Determine the first electrical parameters before and after adjustment of each type of the refrigeration equipment in the current working period according to the first working parameters before and after adjustment, and determine the second electrical parameters before and after adjustment of each type of the refrigeration equipment in the historical working period according to the second working parameters before and after adjustment; The first period electrical parameters of the current working period are determined based on the first pre- and post-adjustment electrical parameters corresponding to all the refrigeration working equipment, and the second period electrical parameters of the historical working period are determined based on the second pre- and post-adjustment electrical parameters corresponding to all the refrigeration working equipment.

6. An intelligent air conditioning control device based on peak-valley optimization, characterized in that: The device comprises: A first determination module is used to determine the current working period of the air conditioner used for regulation, and determine the period type to which the current working period belongs according to the current working period of the air conditioner; the period type includes a first period type and a second period type, a first electrical parameter corresponding to the first period type is less than a second electrical parameter corresponding to the second period type, and the first electrical parameter and the second electrical parameter both include corresponding power supply parameters and / or electricity fee parameters; A first judgment module, used for judging whether it is necessary to perform a control operation on the air conditioner according to the period type to which the current working period belongs; A second determination module, configured to determine, when the determination result of the first determination module is yes, a control parameter required for controlling the air conditioner based on the period type to which the current working period belongs; A control module, used for performing a control operation on the air conditioner according to the control parameters; The first judgment module determines whether it is necessary to perform a control operation on the air conditioner according to the period type to which the current working period belongs, specifically in the following manner: Determine basic air conditioning parameters of the air conditioner; the basic air conditioning parameters of the air conditioner include at least one of the current chiller operating parameters, the current water pump operating parameters, the current wind cabinet operating parameters and the current cooling tower operating parameters of the air conditioner; Determining a current chiller outlet water temperature parameter of the air conditioner according to the basic air conditioning parameters of the air conditioner; Determine the target chiller outlet water temperature parameter of the air conditioner according to the period type to which the current working period belongs, and calculate the temperature parameter difference between the current chiller outlet water temperature parameter and the target chiller outlet water temperature parameter according to the current chiller outlet water temperature parameter and the target chiller outlet water temperature parameter; Determining whether the temperature parameter difference is within a preset temperature parameter difference range; When it is determined that the temperature parameter difference is not within the preset temperature parameter difference range, determining that a control operation needs to be performed on the air conditioner; When it is determined that the temperature parameter difference is within the preset temperature parameter difference range, determining that there is no need to perform a control operation on the air conditioner; The first judgment module determines the target chiller outlet water temperature parameter of the air conditioner according to the period type to which the current working period belongs in the following manner: When the period type to which the current working period belongs is the first period type, determining the freezing working condition of the water system of the air conditioner; the freezing working condition of the water system of the air conditioner includes at least one of the freezing working condition of the chiller of the air conditioner, the freezing working condition of the freezing water pump, the cooling working condition of the cooling water pump and the cooling working condition of the cooling tower; Determine the minimum outlet water temperature parameter of the chiller of the air conditioner according to the refrigeration working condition of the water system, and determine the minimum outlet water temperature parameter as the target outlet water temperature parameter of the chiller of the air conditioner; When the period type to which the current working period belongs is the second period type, determining a target comfortable room temperature parameter of the user based on the current activity of the user of the air conditioner; According to the user's target comfortable room temperature parameter, an expected water outlet temperature parameter of the chiller of the air conditioner is determined, and the expected water outlet temperature parameter is determined as the target water outlet temperature parameter of the chiller of the air conditioner.

7. An intelligent air conditioning control device based on peak-valley optimization, characterized in that: The device comprises: A memory storing executable program code; a processor coupled to the memory; The processor calls the executable program code stored in the memory to execute the air conditioning intelligent control method based on peak-valley optimization as described in any one of claims 1-5.

8. A computer storage medium, characterized in that: The computer storage medium stores computer instructions, and when the computer instructions are called, they are used to execute the air conditioning intelligent control method based on peak-valley optimization as described in any one of claims 1-5.

Citation Information

Patent Citations

  • Novel liquid desiccant dehumidification air conditioner system driven by heat pump

    AU2021104514A4

  • Ice storage cooling / room-heating / heating air conditioning system controlled by weather forecast, time, temperature, and liquid level

    CA3196048A1

  • Regulating and controlling method and device for air conditioner

    CN104019524A

  • Multi-working-condition double-storage air conditioning system

    CN112762539A

  • Air conditioner energy-saving optimization control method and device

    US20160109145A1