A kind of overhead power transmission line platform on water and construction method thereof

Through the combination of factory prefabricated bearings and on-site lifting, steel pipe piles and load-bearing components are used to solve the problems of complexity and low accuracy of overhead transmission lines on water, and a rapid and economical construction effect is achieved.

CN115961639BActive Publication Date: 2024-11-12POWERCHINA FUJIAN ELECTRIC POWER SURVEY & DESIGN INST CO LTD +1
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202310074957.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-01-30
Publication Date
2024-11-12
Estimated Expiration
2043-01-30

AI Technical Summary

Technical Problem

The construction methods of existing overhead power transmission lines are complex, with high technology, long construction period, large investment costs, and are not suitable for large-scale projects and have low construction accuracy.

Method used

The factory prefabricated bearing and on-site special lifting, high-strength grouting and splicing technology are adopted to realize the construction of the prefabricated bearing through the combination of steel pipe piles and bearing components, optimize the construction method and improve efficiency and accuracy.

Benefits of technology

It realizes rapid construction of overhead transmission lines on water, reduces construction costs and cycles, improves equipment quality, and is suitable for large-scale projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN115961639B_ABST
    Figure CN115961639B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of power transmission line technology, including iron tower legs, prefabricated pedestal bodies, steel pipe piles and load-bearing components; a plurality of vertically penetrating pipe pile holes are evenly spaced on the concrete pedestal body; the upper portion of the steel pipe pile is fixed in the pipe pile hole, and the lower portion is inserted into the water soil for fixation; at least three load-bearing components evenly surround the circumference of the pipe pile hole and are buried in the prefabricated pedestal body; the end of the load-bearing component passes through the wall of the pipe pile hole and is arranged close to the outer periphery of the steel pipe pile; the bottom of the iron tower legs is fixed to the top of the steel pipe pile. In the present invention, most of the pedestals are produced in advance by factory prefabrication, and the construction of prefabricated pedestals for overhead power transmission lines is realized through special on-site hoisting, high-strength grouting and splicing processes, thereby improving construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power transmission lines, and in particular to an assembled foundation of an overhead water power transmission line and a construction method thereof. Background Art

[0002] With the continuous development of offshore wind power, the electricity generated by wind power is generally transmitted through submarine cables, land cables or overhead transmission lines. At present, submarine cables and land cables are commonly used. The main reason is that the construction process of overhead transmission lines is high, the construction period is long, and the investment cost is high.

[0003] The Chinese invention patent with the patent publication number CN111980019A discloses a method for constructing a cofferdam of a main bridge pier with a locking steel pipe pile. In the method, the lower inner support is assembled on the steel casing, and then a lowering device is arranged on the steel casing to lower the lower inner support to an elevation position above the water surface, and then the locking steel pipe pile is installed along the edge of the lower inner support, that is, the lower inner support is used as a guide structure at this time, so as to ensure the driving depth and verticality of the locking steel pipe pile; a lowering device is installed on the steel casing to facilitate the lowering of the lower inner support to the designed elevation position, and mud is first sucked to a position below the bottom inner support before lowering the inner support, and mud is sucked while lowering the inner support to ensure the structural strength of the cofferdam. The cofferdam formed by the top inner support, the middle inner support, the bottom inner support and the locking steel pipe pile is fixed together, so as to ensure that the cofferdam formed by the locking steel pipe pile has better structural strength. In this method, the foundation structure is relatively complex, which is not conducive to rapid construction. In addition, the water surface construction environment is poor, and the more complex construction method will reduce the construction accuracy.

[0004] The Chinese invention patent with the patent publication number CN108265737A discloses a combined foundation and construction method of a prefabricated concrete cap and micro-pile, which is divided into two parts, the lower part is a micro-grouting steel pipe pile, and the upper part is a prefabricated concrete cap. The cap and the micro-grouting steel pipe pile are connected by grouting technology after the steel bars in the pile body are anchored into the reserved holes for anchor bolts. The double-layer bidirectional prestressing is arranged on site, and the prestressing is carried out twice, so that the prefabricated concrete cap has the advantages of high integrity and uniform force. However, this method is only suitable for the construction of micro-piles, not for the construction of large-scale projects. Summary of the invention

[0005] In order to overcome the above problems, the present invention proposes an overhead water transmission line platform and a construction method thereof, in which most of the pedestals are prefabricated in the factory, and the construction of the prefabricated pedestals for the overhead transmission lines is realized through special on-site lifting, high-strength grouting and splicing processes, thereby optimizing the construction method of the overhead water transmission lines, improving the construction efficiency and reducing the construction cost.

[0006] The technical solution of the present invention is as follows:

[0007] A water overhead power transmission line platform comprises an iron tower leg, a prefabricated pedestal body, steel pipe piles and load-bearing components; a plurality of vertically penetrating pipe pile holes are evenly spaced on the concrete pedestal body; the upper portion of the steel pipe pile is fixed in the pipe pile hole, and the lower portion is inserted into the soil in the water for fixation; at least three load-bearing components evenly surround the circumference of the pipe pile hole and are buried in the prefabricated pedestal body; the end of the load-bearing component passes through the wall of the pipe pile hole and is arranged closely to the outer circumference of the steel pipe pile; the bottom of the iron tower leg is fixed to the top of the steel pipe pile.

[0008] Furthermore, the load-bearing components include a jack, an embedded load-bearing member and a load-bearing pad; the embedded load-bearing member is embedded in the prefabricated base body; the jack is detachably fixed to the embedded load-bearing member; after the top rod of the jack passes through the wall of the pipe pile hole, the load-bearing pad is fixed thereto; the load-bearing pad is tightly attached to the outer periphery of the steel pipe pile.

[0009] Furthermore, the prefabricated foundation body is formed by splicing a plurality of prefabricated foundation splicing blocks; the prefabricated foundation splicing block is in a V-shaped structure; the prefabricated foundation splicing block includes a chamfered section and two connecting sections respectively fixed on both sides of the chamfered section; the pipe pile hole is located on the chamfered section; the end of the connecting section of one prefabricated foundation splicing block is fixedly connected to the end of the connecting section of another prefabricated foundation splicing block through a splicing seam.

[0010] Furthermore, an annular steel plate is fixed on the circumferential surface of the pipe pile hole; the steel pipe pile is fixed in the annular steel plate; the end of the load-bearing component passes through the side wall of the annular steel plate; the inner and outer circumferential surfaces of the annular steel plate are respectively and evenly spaced apart along the axial direction with multiple groups of key groups; the key groups include multiple shear keys radially arranged along the annular steel plate.

[0011] Furthermore, four load-bearing components are provided; two of the load-bearing components are fixed at the top of the pipe pile hole close to the outer side of the prefabricated pedestal body; and the other two load-bearing components are fixed at the bottom of the pipe pile hole close to the inner side of the prefabricated pedestal body.

[0012] A construction method for an overhead water transmission line platform comprises the following steps:

[0013] Step S100: Construction of steel pipe piles: using a pile-driving ship and pile-driving equipment, the steel pipe piles are driven into the underwater soil until the designed depth is reached;

[0014] Step S200: Hoisting of prefabricated cap splicing blocks: transport the prefabricated cap splicing blocks to the construction site, hoist the prefabricated cap splicing blocks to the top of the steel pipe piles by a hoisting ship, align the pile holes with the steel pipe piles, lower the prefabricated cap splicing blocks so that the steel pipe piles pass through the pile holes, and continue lowering until the prefabricated cap splicing blocks are hoisted to the designed elevation;

[0015] Step S300: Applying force to the load-bearing component: Install the jack on the embedded load-bearing component, and install the load-bearing pad at the front end of the jack's top rod; start the jack and apply force to the steel pipe pile according to the design; after the load of the jack is stable, fix the position of the jack and unload the force of the lifting ship;

[0016] Step S400: Assembling the prefabricated foundation body: repeating steps S100 to S300 until all the designed prefabricated foundation blocks are hoisted in place;

[0017] Step S500: Construction of the prefabricated cap body: fix the cast-in-place joint seams between two adjacent connection sections of two adjacent prefabricated cap blocks until all prefabricated cap blocks are fixed to form a complete prefabricated cap body;

[0018] Step S600: Fixing the prefabricated cap body: pouring adhesive material between the pipe pile hole and the steel pipe pile until the adhesive material is completely solidified;

[0019] Step S700: Assembling the platform: removing the jacks; installing and fixing the tower legs on the top of the steel pipe piles to complete the installation.

[0020] Furthermore, the step S600: fixing the prefabricated foundation body specifically includes the following steps:

[0021] Step S610: Installation of support components: the support components include a main support component and a secondary support component; the main support component includes a support beam, a main adjustment beam, a wing plate adjustment beam, and a main load-bearing prestressed cable; the secondary support component includes a secondary load-bearing prestressed cable; on the prefabricated pedestal body, the main adjustment beam is lowered and fixed on the side close to the pipe pile hole, and the wing plate adjustment beam is lowered and fixed on the side away from the pipe pile hole; then the support beam is lowered, the middle part of the support beam is fixed on the main adjustment beam and the steel pipe pile, one side is fixed on the wing plate adjustment beam, and the other side is suspended above the pipe pile hole; finally, the main load-bearing prestressed cable is passed through the support beam, the main adjustment beam and the prefabricated pedestal body in sequence, and the upper and lower ends of the main load-bearing prestressed cable are respectively fixed to the top of the support beam and the bottom of the prefabricated pedestal body; the secondary load-bearing prestressed cable is passed through the end of the support beam on the side away from the wing plate adjustment beam and the main adjustment beam and the prefabricated pedestal body in sequence, and the upper and lower ends of the secondary load-bearing prestressed cable are respectively fixed to the top of the support beam and the bottom of the prefabricated pedestal body;

[0022] Step S620: Aligning the steel pipe pile: adjusting the tension of the primary load-bearing prestressed cable and the secondary load-bearing prestressed cable to adjust the position of the steel pipe pile so that the center of the steel pipe pile is aligned with the center of the pipe pile hole;

[0023] Step S630: adjusting the distance of the load-bearing component: starting the jack, applying force to the steel pipe pile, and adjusting the position until the gap between the steel pipe pile and the pile hole is uniform and meets the design requirements;

[0024] Step S640: pouring of adhesive material: pouring adhesive material from bottom to top between the pipe pile hole and the steel pipe pile; after the adhesive material solidifies, the prefabricated cap body and the steel pipe pile form a complete whole;

[0025] Step S650: Removal of supporting components: After the prefabricated foundation body and the steel pipe piles are fixed, all supporting components are removed.

[0026] Furthermore, step S300: applying force to the load-bearing component further includes the following steps:

[0027] Step S310: Adjustment of load-bearing components: adjust the direction of the prefabricated cap block by adjusting the acting force between multiple jacks on the same prefabricated cap block; after the two adjacent connection sections of the two adjacent prefabricated cap blocks are aligned, fix the jacks with locking nuts.

[0028] Furthermore, step S500: the construction of the prefabricated foundation body specifically includes the following steps:

[0029] S510: Casting of joints: butt the steel bars on the two connection sections, install the joint formwork, and cast concrete on site to form joints; after the curing period is over, the main construction of the prefabricated cap is completed;

[0030] S520: Removal of joint formwork: After the prefabricated foundation body is completed, the joint formwork is removed.

[0031] Furthermore, a support pad is fixed between the main adjustment beam and the prefabricated pedestal body; the main load-bearing prestressed cable passes through the support pad below the main adjustment beam; and a support pad is fixed between the wing plate adjustment beam and the prefabricated pedestal body.

[0032] The present invention has the following beneficial effects:

[0033] 1. Through special on-site lifting, high-strength grouting and splicing processes, the construction of prefabricated foundations for overhead transmission lines is realized, the construction method of overhead water transmission lines is optimized, the construction efficiency is improved, and the construction cost is reduced.

[0034] 2. Prefabricated caps can be manufactured in factories, and steel pipe piles can be constructed during the production of prefabricated caps. This method can reduce the overall construction period and cost.

[0035] 3. The environment for water construction is poor. If the on-site pouring method is adopted, the concrete needs to be vibrated. The appearance quality of the parts made in this way is worse than that of prefabricated rods. Therefore, the construction method provided by the present invention can improve the construction quality of the equipment.

[0036] 4. Through the coordination of temporary lifting structure and jack, the prefabricated cap can be adjusted at any time according to the demand, so that the connection between the prefabricated cap and the steel pipe pile is more accurate. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0038] Figure 2 It is a top view of the prefabricated foundation body;

[0039] Figure 3 for Figure 2 A cross-sectional view at AA;

[0040] Figure 4 It is a structural schematic diagram of the prefabricated cap splicing block;

[0041] Figure 5 It is a schematic diagram of the coordination between steel pipe piles and shear keys;

[0042] Figure 6 It is a schematic diagram of the coordination between the steel pipe pile and the pipe pile hole;

[0043] Figure 7 It is a schematic diagram of the coordination between the steel pipe pile and the load-bearing components;

[0044] Figure 8 for Figure 7 A cross-sectional view at BB;

[0045] Fig. 9 for Figure 7 A local enlarged view of point C;

[0046] Fig.10 A schematic diagram of the coordination between the main support component and the secondary support component;

[0047] Fig.11 for Fig.10 Cross-sectional view at DD.

[0048] The reference numerals in the figure are as follows:

[0049] 1. Tower legs; 11. Inserted angle steel; 2. Prefabricated pedestal body; 21. Prefabricated pedestal splicing block; 22. Splicing seam; 23. Chamfered section; 24. Connecting section; 25. Pipe pile hole; 26. Hollow part; 27. Annular steel plate; 28. Shear key; 3. Steel pipe pile; 31. Concrete in pile; 32. Dense sand filling; 33. Adhesive material; 4. Main support components; 41. Support beam; 42. Main adjustment beam; 43. Wing plate adjustment beam; 44. Main support point gasket; 45. Main load-bearing prestressed cable; 46. Rib plate; 47. Support pad; 5. Secondary support components; 51. Secondary support point gasket; 52. Secondary load-bearing prestressed cable; 6. Load-bearing components; 61. Jack; 62. Embedded load-bearing parts; 63. Load-bearing pad. DETAILED DESCRIPTION

[0050] The present invention will be described in detail below with reference to the accompanying drawings and specific embodiments.

[0051] In particular, as a preferred embodiment of the present invention, four iron tower legs 1, steel pipe piles 3 and prefabricated cap splicing blocks 21 are matched and arranged, and four load-bearing components 6 are arranged. The prefabricated cap splicing blocks 21 are L-shaped structures.

[0052] See also Figure 1-Figure 11 , an overhead power transmission line platform on water, comprising a tower leg 1, a prefabricated cap body 2, a steel pipe pile 3 and a load-bearing component 6; the prefabricated cap body 2 is evenly spaced with a plurality of vertically penetrating pipe pile holes 25; the upper part of the steel pipe pile 3 is fixed in the pipe pile hole 25, and the lower part is inserted into the water soil for fixing; at least three load-bearing components 6 are evenly surrounded by the circumference of the pipe pile hole 25 and buried in the prefabricated cap body 2; the end of the load-bearing component 6 passes through the wall of the pipe pile hole 25 and is arranged close to the outer circumference of the steel pipe pile 3; the bottom of the tower leg 1 is fixed to the top of the steel pipe pile 3. The steel pipe pile 3 plays a supporting role, the lower part is inserted into the water soil for fixing, and the upper part fixes the prefabricated cap body 2; the tower leg 1 is fixed on the prefabricated cap body 2 to support the overhead power transmission line. The load-bearing components 6 are buried in the prefabricated foundation body 2 and are arranged around the pipe pile holes 25 to assist in fixing the steel pipe piles 3. The load-bearing components 6 are evenly arranged around the steel pipe piles 3. By applying loads to the load-bearing components 6, the friction force between the load-bearing components 6 and the load-bearing components 6 can support the deadweight of the prefabricated foundation body 2 and the construction load.

[0053] In particular, the tower leg 1 is fixedly connected to the steel pipe pile 3 through the inserted angle steel 11, the concrete in the pile 31 and the shear key 28. The tower leg 1 and the inserted angle steel 11 are connected by bolts, and the inserted angle steel 11 and the concrete in the pile 31 are connected by concrete bonding. In addition, the buried depth of the inserted angle steel 11 needs to meet the requirements of the bearing capacity calculation.

[0054] In particular, the steel pipe pile 3 is filled with dense sand 32 below the mud surface (i.e. the base surface of the soil in water), and the pile concrete 31 is filled above the mud surface, so that the upper part of the steel pipe pile 3 forms a steel pipe concrete composite section to improve the bearing capacity of the pile foundation.

[0055] Furthermore, the load-bearing component 6 includes a jack 61, a pre-embedded load-bearing member 62 and a load-bearing pad 63; the pre-embedded load-bearing member 62 is embedded in the prefabricated cap body 2; the jack 61 is detachably fixed to the pre-embedded load-bearing member 62; after the top rod of the jack 61 passes through the wall of the pipe pile hole 25, the load-bearing pad 63 is fixed; the load-bearing pad 63 is closely attached to the outer circumference of the steel pipe pile 3. After the prefabricated cap component is in place, loads are applied through four jacks 61, and under the action of the friction between the jacks 61 and the load-bearing pad 63, the deadweight and construction load of the prefabricated cap body 2 can be supported.

[0056] Furthermore, the prefabricated foundation body 2 is formed by splicing a plurality of prefabricated foundation splicing blocks 21; the prefabricated foundation splicing block 21 is in a V-shaped structure; the prefabricated foundation splicing block 21 includes a chamfered section 23 and two connecting sections 24 respectively fixed on both sides of the chamfered section 23; the pipe pile hole 25 is located on the chamfered section 23; the end of the connecting section 24 of one prefabricated foundation splicing block 21 is fixedly connected to the end of the connecting section 24 of another prefabricated foundation splicing block 21 through a splicing seam 22.

[0057] In particular, the chamfered sections 23 are arc chamfers set at the four corner points of the prefabricated pedestal body 2, which can reduce the impact energy of the ship load on the prefabricated pedestal body 2 at the corner points and optimize the engineering design. The middle part of the connecting section 24 is hollow, and the end of the connecting section 24 away from the chamfered section 23 is open and connected to the outside, forming a hollow part 26; while the end of the connecting section 24 close to the chamfered section 23 is solid. By setting the hollow part 26, the dead weight of the prefabricated pedestal body 2 can be reduced, and the design of the prefabricated pedestal body 2 can be optimized; and the solid part is located near the steel pipe pile 3, in order to improve the connection strength between the prefabricated pedestal splicing block 21 and the steel pipe pile 3, reduce the reinforcement ratio and the density of the shear key 28 setting, and the solid design near the steel pipe pile 3 has stronger reliability and feasibility.

[0058] Furthermore, an annular steel plate 27 is fixed to the circumference of the pipe pile hole 25; the steel pipe pile 3 is fixed in the annular steel plate 27; the end of the load-bearing component 6 passes through the side wall of the annular steel plate 27; the inner and outer circumferential surfaces of the annular steel plate 27 are respectively and evenly spaced along the axial direction. The key group includes a plurality of shear keys 28 arranged radially along the annular steel plate 27. The steel pipe pile 3 is connected to the prefabricated cap body 2 through a high-strength adhesive material 33 (such as high-strength cement, high-strength fine stone concrete, etc.) and shear keys 28. An annular steel plate 27 is embedded at the connection between the prefabricated cap body 2 and the steel pipe pile 3, and shear keys 28 are arranged on the inner and outer sides of the annular steel plate 27 to improve the bonding strength between the steel pipe pile 3 and the annular steel plate 27 and the prefabricated cap body 2.

[0059] In particular, the inner and outer circumferential surfaces of the steel pipe pile 3 are respectively provided with a plurality of key groups at even intervals along the axial direction to further improve the bonding strength.

[0060] In particular, the shear keys 28 of the inner and outer key groups at the same height on the annular steel plate 27 are staggered, and the shear keys 28 of the upper and lower adjacent key groups are staggered. The key groups on the steel pipe pile 3 are arranged with the annular steel plate 27.

[0061] Furthermore, four load-bearing components 6 are provided; two of the load-bearing components 6 are fixed at the top of the pipe pile hole 25 close to the outer side of the prefabricated foundation body 2; and the other two load-bearing components 6 are fixed at the bottom of the pipe pile hole 25 close to the inner side of the prefabricated foundation body 2.

[0062] In particular, when the load-bearing component 6 is arranged close to the upper and lower end surfaces of the prefabricated cap body 2, the embedded load-bearing component 62 is fixed in the prefabricated cap body 2, and the jack 61 is detachably fixed on the embedded load-bearing component 62, and is located outside the prefabricated cap body 2. At the same time, the load-bearing pad 63 is arranged on the end surface of the steel pipe pile 3 (annular steel plate 27).

[0063] A construction method for an overhead water transmission line platform comprises the following steps:

[0064] Step S100: Construction of steel pipe piles 3: using a pile driving ship and pile driving equipment, the steel pipe piles 3 are driven into the soil in the water until the designed depth is reached;

[0065] In addition, the prefabricated cap splicing blocks 21 can also be manufactured simultaneously at this time, and prefabrication can be carried out on a barge near the construction site to improve construction efficiency. After the manufacturing is completed, the strength of the prefabricated cap splicing blocks 21 needs to be tested, and the prefabricated cap splicing blocks 21 that meet the use requirements are retained.

[0066] Step S200: Hoisting of the prefabricated cap splicing block 21: transport the prefabricated cap splicing block 21 to the construction site, hoist the prefabricated cap splicing block 21 above the steel pipe pile 3 by a hoisting ship, align the pipe pile hole 25 with the steel pipe pile 3 (annular steel plate 27), lower the prefabricated cap splicing block 21 so that the steel pipe pile 3 passes through the pipe pile hole 25, and continue lowering until the prefabricated cap splicing block 21 is hoisted to the designed elevation;

[0067] The prefabricated cap splicing block 21 is hoisted to the designed elevation on the steel pipe pile 3 by a lifting vessel. In addition, starting from the second prefabricated cap splicing block 21, it is necessary to ensure that the connection section 24 of the prefabricated cap splicing block 21 is roughly aligned with the connection section 24 of the surrounding prefabricated cap splicing blocks 21 during hoisting, so as to facilitate subsequent adjustment work.

[0068] Step S300: Applying force to the load-bearing component 6: Install the jack 61 on the embedded load-bearing component 62, and install the load-bearing pad 63 at the front end of the top rod of the jack 61; start the jack 61 and apply force to the steel pipe pile 3 according to the design; after the load of the jack 61 is stable, fix the position of the jack 61 and unload the force of the lifting ship;

[0069] During the hoisting, the force of the jack 61 to be applied is finally determined by calculating the self-weight of the prefabricated cap block 21 and the construction load. The process of applying the force by the jack 61 also includes the process of fine-tuning the prefabricated cap block 21. The specific steps are as follows:

[0070] Step S310: Adjustment of the load-bearing component 6: By adjusting the acting force between multiple jacks 61 on the same prefabricated foundation block 21, the direction of the prefabricated foundation block 21 is adjusted; after the two adjacent connecting sections 24 on the two adjacent prefabricated foundation blocks 21 are aligned, the jacks 61 are fixed with locking nuts.

[0071] By balancing the forces between the four jacks 61, the direction of the prefabricated foundation block 21 is finely adjusted to ensure that the two adjacent connection sections 24 on the two adjacent prefabricated foundation blocks 21 are aligned with each other. After the direction adjustment is completed, the position of the jack 61 is fixed with a locking nut to prevent the prefabricated foundation block 21 from deviating from the direction.

[0072] When adjusting the direction, use the jack 61 to adjust the prefabricated foundation splicing block 21. First, apply a uniform force to the jack 61 on a certain straight line, and use a total station (not shown in the figure) to measure whether the structures on the straight line are on the same horizontal plane. After confirmation, apply a uniform force to the jack 21 on another straight line, and use the total station to measure whether the structures are on the same horizontal plane. Finally, select three points that are not on the same straight line to verify the construction accuracy of the entire plane.

[0073] Step S400: Assembling the prefabricated foundation body 2: repeating steps S100 to S300 until all the designed prefabricated foundation splicing blocks 21 are hoisted in place;

[0074] Step S500: Construction of the prefabricated cap body 2: fix the cast-in-place joint 22 between two adjacent connection sections 24 on two adjacent prefabricated cap blocks 21 until all prefabricated cap blocks 21 are fixed to form a complete prefabricated cap body 2; specifically, the following steps are included:

[0075] S510: Casting of the joint 22: butt the steel bars on the two connection sections 24, then install the joint template, and cast concrete on site to form the joint 22; after the curing period is over, the construction of the prefabricated foundation body 2 is completed;

[0076] S520: Removal of joint formwork: After the prefabricated foundation body 2 is completed, the joint formwork is removed.

[0077] Step S600: Fixing the prefabricated foundation body 2: pouring the adhesive material 33 between the pipe pile hole 25 and the steel pipe pile 3 until the adhesive material 33 is completely solidified; specifically, the following steps are included:

[0078] Step S610: Installation of support components: The support components include a main support component 4 and a secondary support component 5; the main support component 4 includes a support beam 41, a main adjustment beam 42, a wing plate adjustment beam 43, and a main load-bearing prestressed cable 45; the secondary support component 5 includes a secondary load-bearing prestressed cable 52; on the prefabricated foundation body 2, the main adjustment beam 42 is lowered and fixed on the side close to the pipe pile hole 25, and the wing plate adjustment beam 43 is lowered and fixed on the side away from the pipe pile hole 25; then the support beam 41 is lowered, and the middle part of the support beam 41 is fixed on the main adjustment beam 42 and the steel pipe pile 3, and one side is fixed on the wing plate adjustment beam 43; The main bearing prestressed cable 45 is passed through the support beam 41, the main adjusting beam 42 and the precast platform body 2 in sequence, and the upper and lower ends of the main bearing prestressed cable 45 are respectively fixed to the top of the support beam 41 and the bottom of the precast platform body 2; the secondary bearing prestressed cable 52 is passed through the end of the support beam 41 away from the wing plate adjusting beam 43 and the main adjusting beam 42 and the precast platform body 2 in sequence, and the upper and lower ends of the secondary bearing prestressed cable 52 are respectively fixed to the top of the support beam 41 and the bottom of the precast platform body 2;

[0079] The supporting components are used for temporary support and hoisting, and include a main supporting component 4 and a secondary supporting component 5. The main supporting component 4 includes a supporting beam 41, a main adjusting beam 42, a wing plate adjusting beam 43, and a main load-bearing prestressed cable 45; the secondary supporting component 5 includes a secondary load-bearing prestressed cable 52. The main adjusting beam 42 and the wing plate adjusting beam 43 are arranged in parallel and fixed on the prefabricated pedestal body 2; the supporting beam 41 is vertically fixed to the upper ends of the main adjusting beam 42 and the wing plate adjusting beam 43, and the three form a "earth"-shaped structure. The main load-bearing prestressed cable 45 and the secondary load-bearing prestressed cable 52 pass through the supporting beam 41 and the prefabricated pedestal body 2 respectively to fix the supporting beam 41 and the prefabricated pedestal body 2.

[0080] Particularly, the main load-bearing prestressed cable 45 and the secondary load-bearing prestressed cable 52 are both screws, and the upper and lower ends of the two are fixed to the top of the support beam 41 and the bottom of the prefabricated foundation body 2 through nuts.

[0081] In particular, the main support component 4 further includes a main support point gasket 44; the secondary support component 5 further includes a secondary support point gasket 51; the main support point gasket 44 and the secondary support point gasket 51 are both fixed between the support beam 41 and the steel pipe pile 3. The main support point gasket 44 is located on the side of the steel pipe pile 3 close to the wing plate adjustment beam 43, and the secondary support point gasket 51 is located on the side of the steel pipe pile 3 close to the secondary load-bearing prestressed cable 52. The main support point gasket 44 and the secondary support point gasket 51 provide protection for the support beam 41. When the support beam 41 undergoes a slight deformation, the main support point gasket 44 and the secondary support point gasket 51 can prevent the support beam 41 from plastic deformation and damage.

[0082] Particularly, the length direction of the support beam 41 is arranged along the radial direction of the chamfered section 23 to obtain the best support effect.

[0083] Particularly, the support beam 41 , the main adjustment beam 42 , and the wing plate adjustment beam 43 are all I-beams.

[0084] A support pad 47 is fixed between the main adjustment beam 42 and the prefabricated pedestal body 2; the main load-bearing prestressed cable 45 is arranged through the support pad 47 below the main adjustment beam 42; and a support pad 47 is fixed between the wing plate adjustment beam 43 and the prefabricated pedestal body 2. The support pad 47 is used for real-time adjustment of the hoisting height and fixation.

[0085] In particular, in order to ensure the bearing capacity requirement, ribs 46 may be provided on the support beam 41 to ensure that the support beam 41 does not yield locally under the action of concentrated force.

[0086] Step S620: Aligning the steel pipe pile 3: adjusting the tension of the primary load-bearing prestressed cable 45 and the secondary load-bearing prestressed cable 52 to adjust the position of the steel pipe pile 3 so that the center of the steel pipe pile 3 is aligned with the center of the pipe pile hole 25;

[0087] The center point of the prefabricated foundation body 2 is set with the center point of the total station (not shown in the figure). By adjusting the tension of the main load-bearing prestressed cable 45 and the secondary load-bearing prestressed cable 52, the outer corner point, the inner corner point and the center point of the pipe pile hole 25 of the prefabricated foundation body 2 are made to be located on the same horizontal straight line, and the relative distance is the same as the design distance in the drawing, thus completing the adjustment of the steel pipe pile 3.

[0088] Step S630: adjusting the distance of the load-bearing component 6: starting the jack 61, applying a force to the steel pipe pile 3, and adjusting the position until the gap between the steel pipe pile 3 and the pile hole 25 is uniform and meets the design requirements;

[0089] Step S640: pouring the adhesive material 33: pouring the adhesive material 33 from bottom to top between the pipe pile hole 25 and the steel pipe pile 3; after the adhesive material 33 solidifies, the prefabricated cap body 2 and the steel pipe pile 3 form a complete whole;

[0090] Step S650: Removal of supporting components: After the prefabricated foundation body 2 and the steel pipe piles 3 are fixed, all supporting components are removed.

[0091] Step S700: Assembling the platform: removing the jack 61; installing and fixing the tower leg 1 on the top of the steel pipe pile 3 to complete the installation.

[0092] In particular, in order to simplify the process and improve the construction efficiency, the disassembly of the joint template, the supporting components and the jack 61 can be put together at the end, before the tower leg 1 is installed.

[0093] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. An overhead power transmission line platform above water, characterized in that: The invention comprises an iron tower leg (1), a prefabricated foundation body (2), a steel pipe pile (3) and a load-bearing component (6); the prefabricated foundation body (2) is provided with a plurality of vertically penetrating pipe pile holes (25) at even intervals; the upper part of the steel pipe pile (3) is fixed in the pipe pile hole (25), and the lower part is inserted into the soil in water for fixing; at least three load-bearing components (6) are evenly arranged around the circumference of the pipe pile hole (25) and buried in the prefabricated foundation body (2); the end of the load-bearing component (6) passes through the wall of the pipe pile hole (25) and is arranged close to the outer circumference of the steel pipe pile (3); the bottom of the iron tower leg (1) is fixed to the top of the steel pipe pile (3); The construction method of the overhead transmission line platform on water comprises the following steps: Step S100: Construction of steel pipe piles (3): using a pile-driving ship and pile-driving equipment, the steel pipe piles (3) are driven into the underwater soil until the designed depth is reached; Step S200: Hoisting of the prefabricated cap splicing block (21): transporting the prefabricated cap splicing block (21) to the construction site, hoisting the prefabricated cap splicing block (21) above the steel pipe pile (3) by a hoisting vessel, aligning the pipe pile hole (25) with the steel pipe pile (3), lowering the prefabricated cap splicing block (21) so that the steel pipe pile (3) passes through the pipe pile hole (25), and continuing to lower the prefabricated cap splicing block (21) until it is hoisted to the designed elevation; Step S300: applying force to the load-bearing component (6): installing the jack (61) on the embedded load-bearing component (62), and installing a load-bearing pad (63) at the front end of the top rod of the jack (61); starting the jack (61) to apply force to the steel pipe pile (3) according to the design; after the load of the jack (61) is stable, fixing the position of the jack (61) and unloading the force of the lifting ship; Step S400: Assembling the prefabricated foundation body (2): repeating steps S100 to S300 until all the designed prefabricated foundation splicing blocks (21) are hoisted in place; Step S500: Construction of the prefabricated cap body (2): fixing the cast-in-place joint seam (22) between two adjacent connection sections (24) on two adjacent prefabricated cap splicing blocks (21) until all the prefabricated cap splicing blocks (21) are fixed to form a complete prefabricated cap body (2); Step S600: fixing the prefabricated foundation body (2): pouring the adhesive material (33) between the pipe pile hole (25) and the steel pipe pile (3) until the adhesive material (33) is completely solidified; Step S700: assembling the platform: removing the jack (61); installing and fixing the tower leg (1) on the top of the steel pipe pile (3) to complete the installation; The step S600: fixing the prefabricated foundation body (2) specifically includes the following steps: Step S610: Installation of support components: the support components include a main support component (4) and a secondary support component (5); the main support component (4) includes a support beam (41), a main adjustment beam (42), a flange adjustment beam (43), and a main load-bearing prestressed cable (45); the secondary support component (5) includes a secondary load-bearing prestressed cable (52); on the prefabricated foundation body (2), the main adjustment beam (42) is lowered and fixed on the side close to the pipe pile hole (25), and the flange adjustment beam (43) is lowered and fixed on the side away from the pipe pile hole (25); then, the support beam (41) is lowered, and the middle part of the support beam (41) is fixed on the main adjustment beam (42) and the steel pipe pile (3), and then, the support beam (41) is lowered and the middle part of the support beam (41) is fixed on the main adjustment beam (42) and the steel pipe pile (3). One side of the main load-bearing prestressed cable (45) is fixed on the wing plate adjusting beam (43), and the other side is suspended above the pipe pile hole (25); finally, the main load-bearing prestressed cable (45) is passed through the support beam (41), the main adjustment beam (42) and the prefabricated pedestal body (2) in sequence, and the upper and lower ends of the main load-bearing prestressed cable (45) are respectively fixed to the top of the support beam (41) and the bottom of the prefabricated pedestal body (2); the secondary load-bearing prestressed cable (52) is passed through the end of the support beam (41) away from the wing plate adjusting beam (43) and the prefabricated pedestal body (2) in sequence, and the upper and lower ends of the secondary load-bearing prestressed cable (52) are respectively fixed to the top of the support beam (41) and the bottom of the prefabricated pedestal body (2); Step S620: Alignment of the steel pipe pile (3): by adjusting the tension of the primary load-bearing prestressed cable (45) and the secondary load-bearing prestressed cable (52), the position of the prefabricated foundation body (2) is adjusted so that the center of the steel pipe pile (3) is aligned with the center of the pipe pile hole (25); Step S630: adjusting the distance of the load-bearing component (6): starting the jack (61) to apply force to the steel pipe pile (3) and adjust the position until the gap between the steel pipe pile (3) and the pile hole (25) is uniform and meets the design requirements; Step S640: pouring the adhesive material (33): pouring the adhesive material (33) from bottom to top between the pipe pile hole (25) and the steel pipe pile (3); after the adhesive material (33) solidifies, the prefabricated foundation body (2) and the steel pipe pile (3) form a complete whole; Step S650: Removal of supporting components: After the prefabricated foundation body (2) and the steel pipe piles (3) are fixed, all supporting components are removed.

2. The above-water overhead power transmission line platform according to claim 1, characterized in that: The load-bearing component (6) comprises a jack (61), a pre-embedded load-bearing component (62) and a load-bearing pad (63); the pre-embedded load-bearing component (62) is embedded in the prefabricated foundation body (2); the jack (61) is detachably fixed to the pre-embedded load-bearing component (62); after the top rod of the jack (61) passes through the wall of the pipe pile hole (25), the load-bearing pad (63) is fixed thereto; the load-bearing pad (63) is closely attached to the outer periphery of the steel pipe pile (3).

3. The above-water overhead power transmission line platform according to claim 2, characterized in that: The prefabricated cap body (2) is formed by splicing a plurality of prefabricated cap splicing blocks (21); the prefabricated cap splicing block (21) is in a V-shaped structure; the prefabricated cap splicing block (21) comprises a chamfered section (23) and two connecting sections (24) respectively fixed on both sides of the chamfered section (23); the pipe pile hole (25) is located on the chamfered section (23); the end of the connecting section (24) of one prefabricated cap splicing block (21) is fixedly connected to the end of the connecting section (24) of another prefabricated cap splicing block (21) via a splicing seam (22).

4. The above-water overhead power transmission line platform according to claim 1, characterized in that: An annular steel plate (27) is fixed on the circumferential surface of the pipe pile hole (25); the steel pipe pile (3) is fixed in the annular steel plate (27); the end of the load-bearing component (6) passes through the side wall of the annular steel plate (27); the inner circumferential surface and the outer circumferential surface of the annular steel plate (27) are respectively provided with a plurality of key groups at even intervals along the axial direction; the key groups include a plurality of shear keys (28) arranged radially along the annular steel plate (27).

5. The above-water overhead power transmission line platform according to claim 1, characterized in that: Four load-bearing components (6) are provided; two of the load-bearing components (6) are fixed at the top of the pipe pile hole (25) close to the outside of the prefabricated foundation body (2); and the other two of the load-bearing components (6) are fixed at the bottom of the pipe pile hole (25) close to the inside of the prefabricated foundation body (2).

6. The above-water overhead power transmission line platform according to claim 1, characterized in that: Step S300: The force application of the load-bearing component (6) further includes the following steps: Step S310: Adjustment of the load-bearing component (6): by adjusting the acting force between the multiple jacks (61) on the same prefabricated foundation block (21), the direction of the prefabricated foundation block (21) is adjusted; after the positions of the two adjacent connection sections (24) on the two adjacent prefabricated foundation blocks (21) are aligned, the jacks (61) are fixed with locking nuts.

7. The above-water overhead power transmission line platform according to claim 1, characterized in that: Step S500: The construction of the prefabricated foundation body (2) specifically includes the following steps: S510: Casting of the joint (22): butting the steel bars on the two connection sections (24), installing the joint formwork, and casting concrete on site to form the joint (22); after the curing period is over, the construction of the prefabricated foundation body (2) is completed; S520: Removal of joint formwork: After the prefabricated foundation body (2) is completed, the joint formwork is removed.

8. The above-water overhead power transmission line platform according to claim 1, characterized in that: A support pad (47) is fixed between the main adjustment beam (42) and the prefabricated foundation body (2); the main load-bearing prestressed cable (45) is arranged through the support pad (47) below the main adjustment beam (42); and a support pad (47) is fixed between the wing plate adjustment beam (43) and the prefabricated foundation body (2).

Citation Information

Patent Citations

  • Assembled concrete pile cap and miniature pile combined foundation and construction method

    CN108265737A

  • Construction method of fore-shaft steel pipe pile cofferdam of main bridge bearing platform of grand bridge

    CN111980019A

  • Guide pipe rack and installation method thereof

    CN107700453A

  • Offshore overhead transmission line foundation structure and construction method thereof

    CN115467361A

  • Steel cushion cap on offshore wind power generation unit basis supports leveling system

    CN208415285U