A drilling equipment operation status monitoring and early warning method and system

By monitoring the drilling resistance and speed of drilling equipment in real time, identifying abnormal conditions and automatically adjusting operating parameters, the problem of drill bit sticking or empty drilling is solved, the service life of the equipment is extended and safety is improved.

CN116006151BActive Publication Date: 2024-10-29HUNAN SANY PETROLEUM TECH
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202211684670.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-27
Publication Date
2024-10-29
Estimated Expiration
2042-12-27

AI Technical Summary

Technical Problem

Existing drilling equipment lacks real-time monitoring and early warning when the drill bit gets stuck or drills out, resulting in equipment damage and shortened service life.

Method used

By obtaining the drilling resistance and speed parameters of the drilling equipment in real time, it can determine whether its operating status is abnormal, generate early warning information, automatically adjust the operating parameters to prevent drilling from sticking or drilling out, and promptly notify the staff for human intervention.

Benefits of technology

Effective early warning and prevention can avoid equipment damage, extend service life, and improve the safety and stability of drilling equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116006151B_ABST
    Figure CN116006151B_ABST
Patent Text Reader

Abstract

The present invention provides a method and system for monitoring and warning the operation status of drilling equipment, which relates to the field of geological exploration, and obtains the operation parameters of the drilling equipment; and determines whether the operation parameters of the drilling equipment are abnormal according to the drilling resistance and / or the drilling speed. By monitoring the operation status of the drilling equipment, the drilling resistance and drilling speed of the drilling equipment are collected in real time, and whether the operation parameters of the drilling equipment are abnormal is determined according to the drilling resistance and / or the drilling speed, the current operation status of the drilling equipment is identified, and early warning and prevention are carried out when the drilling equipment is about to operate abnormally, and the actuator in the drilling equipment is automatically controlled to adjust the operation parameters of the drilling equipment, so that the drilling equipment can pass through special areas in the formation safely, and the drilling equipment is prevented from being damaged and the service life is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of geological exploration technology, and in particular to a method and system for monitoring and warning the operation status of drilling equipment. Background Art

[0002] A drilling rig is a kind of drilling equipment, which is mainly used for drilling and mining of resources such as coalbed methane, shale gas, shallow oil, geothermal energy, groundwater, etc. It can also be used for drilling mine supply holes, rescue holes, exploration holes, and geophysical holes. The power head of the drilling rig is a rotary power output device, which drives the drill string and drill bit to rotate; the feed device drives the power head to move up and down, and the driving device of the power head is a hydraulic motor.

[0003] When the hydraulic motor drives the drill string, the motor's driving torque represents the motor's load, and the motor's driving pressure represents the motor's driving torque. When the rotational resistance of the drill bit changes, the motor's pressure changes accordingly. The drill bit may get stuck or drill through during the drilling process. When the drill bit gets stuck, the drill bit resistance increases, the drill bit speed decreases, and the drilling work becomes difficult to continue, causing damage to the drill bit and drill rod and other components, thereby affecting the life, reliability and work quality of the drilling rig. When drilling through occurs, the drill bit resistance drops to a very small level, which can cause abnormal conditions such as overspeeding of the power head motor and loss of drilling fluid.

[0004] For abnormal operating conditions such as drill bit sticking or drilling hollow, some measures are taken to remedy the situation only when it occurs, but at this time the impact on the drilling equipment itself or surrounding equipment has already occurred, which will still shorten the service life of the drilling equipment and reduce its work quality. Summary of the invention

[0005] The problem to be solved by the present invention is how to monitor and warn of abnormal operating conditions of drilling equipment.

[0006] To solve the above problems, on the one hand, the present invention provides a method for monitoring and warning the operation status of drilling equipment, comprising:

[0007] Acquiring operating parameters of the drilling equipment, wherein the operating parameters are drilling resistance and / or drilling speed of the drilling equipment;

[0008] Determining whether the operating state of the drilling equipment is abnormal according to the drilling resistance and / or the drilling speed;

[0009] When it is determined that the operating state of the drilling equipment is abnormal, early warning and prevention information is generated and sent to an execution mechanism, wherein the early warning and prevention information is used to control the execution mechanism to adjust the operating parameters of the drilling equipment.

[0010] Further, judging whether the operating state of the drilling equipment is abnormal according to the drilling resistance includes:

[0011] Determining whether the absolute value of the change rate of the drilling resistance is greater than a preset resistance change rate;

[0012] When the absolute value of the change rate of the drilling resistance is greater than the preset resistance change rate, it is determined that the operating state of the drilling equipment is abnormal.

[0013] Further, the determining whether the absolute value of the change rate of the drilling resistance is greater than a preset resistance change rate includes:

[0014] Determining whether the rate of change of the drilling resistance is positive or negative;

[0015] When the change rate of the drilling resistance is a positive value, determining whether the change rate of the drilling resistance is greater than a first preset resistance change rate;

[0016] When the change rate of the drilling resistance is greater than the first preset resistance change rate, it is determined that the drilling equipment is in an abnormal operating state of a drill stuck;

[0017] When the change rate of the drilling resistance is a negative value, determining whether the change rate of the drilling resistance is less than a second preset resistance change rate;

[0018] When the change rate of the drilling resistance is less than the second preset resistance change rate, it is determined that the drilling equipment is in an abnormal operating state of drilling empty.

[0019] Further, judging whether the operating state of the drilling equipment is abnormal according to the drilling speed includes:

[0020] Determining whether the absolute value of the change rate of the drilling speed is greater than a preset speed change rate;

[0021] When the absolute value of the change rate of the drilling speed is greater than the preset speed change rate, it is determined that the operating state of the drilling equipment is abnormal.

[0022] Further, the determining whether the absolute value of the change rate of the drilling speed is greater than a preset speed change rate includes:

[0023] Determining whether the rate of change of the drilling speed is positive or negative;

[0024] When the change rate of the drilling speed is a positive value, determining whether the change rate of the drilling speed is greater than a first preset speed change rate;

[0025] When the change rate of the drilling speed is greater than the first preset speed change rate, it is determined that the drilling equipment will be in an abnormal operating state of drilling empty;

[0026] When the change rate of the drilling speed is a negative value, determining whether the change rate of the drilling speed is less than a second preset speed change rate;

[0027] When the change rate of the drilling speed is less than the second preset speed change rate, it is determined that the drilling equipment is in an abnormal operating state of a pipe stuck.

[0028] Further, judging whether the operating state of the drilling equipment is abnormal according to the drilling resistance and the drilling speed includes:

[0029] Determining the morphology of the stratum where the drilling equipment is currently located according to the geological characteristic parameters of the stratum reached by the drilling equipment, wherein the geological characteristic parameters include density, hardness, viscosity and water content;

[0030] According to the formation morphology in which the drilling equipment is currently located and the feed speed of the drilling equipment, combined with the drilling speed and the drilling resistance, determine the probability of abnormal operation of the drilling equipment;

[0031] When the abnormal operation probability is greater than a preset probability, it is determined that the operation state of the drilling equipment is abnormal.

[0032] Further, the determining of the probability of abnormal operation of the drilling equipment according to the current formation morphology of the drilling equipment and the feed speed of the drilling equipment, combined with the drilling speed and the drilling resistance, includes:

[0033] When it is determined that the formation morphology in which the drilling equipment is currently located is a solid morphology, the corresponding probability of the drilling equipment being stuck is queried in a preset relationship in combination with the drilling speed and the feed speed; the preset relationship includes a corresponding relationship between the historical operation data of the drilling equipment and different probabilities of being stuck;

[0034] When the probability of a drill bit being stuck is greater than a first preset probability, determining that the drilling equipment is in an abnormal operating state of a drill bit being stuck;

[0035] When it is determined that the formation morphology in which the drilling equipment is currently located is a solid-liquid two-phase mixed morphology, the corresponding drilling probability of the drilling equipment is queried in the preset relationship in combination with the drilling resistance and the feed speed; the preset relationship also includes the corresponding relationship between the historical operation data of the drilling equipment and different drilling probabilities;

[0036] When the drilling-hole probability is greater than a second preset probability, it is determined that the drilling equipment will be in an abnormal operating state of drilling-hole.

[0037] Further, when it is determined that the operating state of the drilling equipment is abnormal, generating early warning and prevention information, and sending the early warning and prevention information to an execution mechanism includes:

[0038] When it is determined that the drilling equipment is in an abnormal operating state of drill stuck, a preset drill stuck prevention scheme is called to generate the early warning and prevention information, wherein the preset drill stuck prevention scheme includes a drill bit lifting scheme, a drilling speed adjustment scheme, and a power head motor speed adjustment scheme, and the early warning and prevention information includes early warning information and control information corresponding to the drill stuck prevention scheme;

[0039] When it is determined that the drilling equipment is in an abnormal operating state of drilling out, a preset anti-drilling out plan is called to generate the early warning and prevention information, wherein the preset anti-drilling out plan includes a plan for adjusting the drilling speed, a plan for adjusting the speed of the power head motor, and a plan for backfilling the hole, and the early warning and prevention information includes the early warning information and the control information corresponding to the anti-drilling out plan;

[0040] The control information is sent to the execution mechanism, and the warning information is sent to the user end.

[0041] Furthermore, after sending the control information to the execution mechanism, the method further includes:

[0042] Determining whether the drilling resistance is less than a preset resistance;

[0043] When the drilling resistance is less than the preset resistance, it is determined that the drilling equipment has resumed normal operation.

[0044] On the other hand, the present invention also provides a drilling equipment operation status monitoring and early warning system, comprising:

[0045] A detection module, used for obtaining operating parameters of the drilling equipment, wherein the operating parameters are drilling resistance and / or drilling speed of the drilling equipment;

[0046] A control module is used to determine whether the operating state of the drilling equipment is abnormal based on the drilling resistance and / or the drilling speed; when it is determined that the operating state of the drilling equipment is abnormal, generate early warning and prevention information, and send the early warning and prevention information to an execution mechanism, wherein the early warning and prevention information is used to control the execution mechanism to adjust the operating parameters of the drilling equipment.

[0047] Compared with the prior art, the present invention has the following beneficial effects:

[0048] The present invention provides a drilling equipment operation status monitoring and early warning method and system, which monitors the operation status of the drilling equipment, collects the drilling resistance or drilling speed of the drilling equipment in real time, and determines whether the operation status of the drilling equipment is abnormal based on the drilling resistance and / or the drilling speed, identifies the current operation status of the drilling equipment, and gives early warning and prevention when the drilling equipment is about to operate abnormally, automatically controls the actuators in the drilling equipment, adjusts the operating parameters of the drilling equipment, and allows the drilling equipment to pass through special areas in the formation safely, and promptly notifies the staff to strengthen the manual observation of the drilling equipment and perform manual intervention when necessary, thereby further ensuring the safety and stability of the drilling equipment and avoiding damage to the drilling equipment and shortening its service life. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] Figure 1 A flow chart showing a method for monitoring and warning the operation status of drilling equipment in an embodiment of the present invention is shown;

[0050] Figure 2 A flow chart showing monitoring and judging of drilling resistance in an embodiment of the present invention is shown;

[0051] Figure 3 A flow chart showing monitoring and judging of drilling speed in an embodiment of the present invention is shown;

[0052] Figure 4 A schematic diagram of the structure of a drilling equipment operation status monitoring and early warning system in an embodiment of the present invention is shown. DETAILED DESCRIPTION

[0053] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0054] Figure 1 A flowchart of a method for monitoring and warning the operation status of drilling equipment in an embodiment of the present invention is shown. The method for monitoring and warning the operation status of drilling equipment includes:

[0055] S100: Acquire operating parameters of the drilling equipment, wherein the operating parameters are drilling resistance and / or drilling speed of the drilling equipment.

[0056] It should be noted that the above-mentioned drilling equipment may refer to a drilling rig, wherein the drilling resistance and drilling speed of the drilling equipment refer to the drilling resistance and drilling speed of the drill bit in the drilling rig, and the drilling speed here refers to the rotation speed of the drill bit, not the feed speed of the drill bit.

[0057] S200: Determine whether the operating state of the drilling equipment is abnormal according to the drilling resistance and / or the drilling speed.

[0058] When monitoring the operating status, judgment can be made based on one operating parameter, or two or more operating parameters can be used for separate and parallel monitoring. As long as any one of the operating parameters is abnormal, the drilling equipment is judged to be operating abnormally, so that the monitoring range is wide; when the requirements for the construction of drilling equipment are high during the implementation of the project, it is necessary to ensure that the drilling equipment does not go wrong during the construction process. At this time, a comprehensive judgment can be made based on two or more operating parameters, and adjustments can be made according to actual conditions. Multiple operating parameters can be combined and verified with each other to judge whether the drilling equipment is operating abnormally. In this way, the judgment accuracy is high, the construction safety of the drilling equipment can be guaranteed, and the drilling equipment can also be guaranteed to move accurately without abnormal conditions.

[0059] S300: When it is determined that the operating state of the drilling equipment is abnormal, early warning and prevention information is generated and sent to the actuator, wherein the early warning and prevention information is used to control the actuator to adjust the operating parameters of the drilling equipment. In addition, the early warning and prevention information is also used to remind the user to pay attention to the operating state of the drilling equipment. When automatic adjustment is not feasible, manual intervention is carried out in time to prevent irreversible damage to the drilling equipment. The actuator includes an electro-hydraulic control valve, an electro-hydraulic control pump or a motor inverter. By controlling the actuator, the drilling speed of the drill bit in the drilling rig or the speed of the power head motor is further changed, thereby adjusting the operating parameters of the drilling equipment.

[0060] In this embodiment, the operating status of the drilling equipment is monitored, the drilling resistance and drilling speed of the drilling equipment are collected in real time, and whether the operating status of the drilling equipment is abnormal is determined based on the drilling resistance or the drilling speed, and the current operating status of the drilling equipment is identified. When the drilling equipment is about to operate abnormally, early warning and prevention are carried out in advance, the actuators in the drilling equipment are automatically controlled, and the operating parameters of the drilling equipment are adjusted to allow the drilling equipment to pass through special areas in the formation safely. The staff is notified in time to strengthen the manual observation of the drilling equipment and perform manual intervention when necessary, thereby further ensuring the safety and stability of the drilling equipment and avoiding damage to the drilling equipment and shortening its service life.

[0061] In an embodiment of the present invention, judging whether the operating state of the drilling equipment is abnormal according to the drilling resistance includes:

[0062] S210: Determine whether the absolute value of the change rate of the drilling resistance is greater than the preset resistance change rate. When the drilling resistance decreases rapidly, the change rate is a negative value; when the drilling resistance increases rapidly, the change rate is a positive value. When monitoring the drilling resistance, since a rapid decrease or increase in the drilling resistance may represent an abnormality of the drilling equipment, both of these situations need to be included in the identification and monitoring range during monitoring. When the drilling resistance decreases rapidly or increases rapidly, the absolute value of the change rate of the drilling resistance is relatively large.

[0063] S220: When the absolute value of the change rate of the drilling resistance is greater than the preset resistance change rate, it is determined that the operating state of the drilling equipment is abnormal.

[0064] In this embodiment, the operating status of the drilling equipment is monitored only by one operating parameter, namely the drilling resistance.

[0065] Figure 2 A flow chart of monitoring and judging drilling resistance in an embodiment of the present invention is shown, wherein judging whether the absolute value of the change rate of the drilling resistance is greater than a preset resistance change rate includes:

[0066] S211: Determine whether the rate of change of the drilling resistance is positive or negative.

[0067] Since the absolute value summarizes both rapid decrease and rapid increase, a rapid decrease or increase in drilling resistance may indicate an abnormality in the drilling equipment. However, the abnormal operating conditions corresponding to a rapid decrease or increase in drilling resistance are different. Therefore, in order to more accurately determine what abnormal condition may occur in the drilling equipment, it is necessary to judge the positive and negative value of the change rate to distinguish whether the drilling resistance is rapidly decreasing or rapidly increasing.

[0068] S212: When the change rate of the drilling resistance is a positive value, determine whether the change rate of the drilling resistance is greater than a first preset resistance change rate. When the change rate of the drilling resistance is a positive value, it indicates that the drilling resistance is increasing rapidly.

[0069] S213: When the rate of change of the drilling resistance is greater than the first preset resistance change rate, it is determined that the drilling equipment is in an abnormal operating state of drill jam. In the drilling rig, the drilling resistance of the drill bit increases rapidly, the drill bit speed decreases, and the drilling work is difficult to continue. The drilling equipment may get stuck. In order to avoid drill jam, when the drilling resistance just starts to increase rapidly, this condition is identified and determined as a possible jam of the drilling equipment, and is fed back to the user end and the actuator. At this time, the drill bit in the drilling rig still maintains a certain speed, has not been jammed, and has not caused damage to the drilling rig.

[0070] S214: When the change rate of the drilling resistance is a negative value, determine whether the change rate of the drilling resistance is less than a second preset resistance change rate. When the change rate of the drilling resistance is a negative value, it indicates that the drilling resistance is decreasing rapidly.

[0071] S215: When the rate of change of the drilling resistance is less than the second preset resistance change rate, it is determined that the drilling equipment will be in an abnormal operating state of drilling hollow. In a drilling rig, when the drilling resistance of the drill bit is too low, drilling hollow may occur, that is, holes and cavities appear in the formation, the drill bit resistance drops to a very small level, and the drill bit speed becomes very high. At this time, the power head motor may overspeed, the drilling fluid may be lost, and other conditions may occur, which will not only damage the drilling equipment, but also affect the drilling and the construction environment around the drilling. Therefore, when the drilling resistance just shows a trend of rapid decrease, it is necessary to warn the operation of the drilling equipment and adjust the operating parameters of the drilling equipment in time to keep it within a safe working range.

[0072] In an embodiment of the present invention, judging whether the operating state of the drilling equipment is abnormal according to the drilling speed includes:

[0073] S230: Determine whether the absolute value of the change rate of the drilling speed is greater than the preset speed change rate. Similar to the above-mentioned drilling resistance, when the drilling speed decreases rapidly, the change rate is a negative value; when the drilling speed increases rapidly, the change rate is a positive value. When the drilling speed decreases rapidly or increases rapidly, it indicates that the drilling equipment may have an abnormal operation condition. Therefore, it is necessary to monitor the absolute value of the drilling speed to include both the rapid increase and the rapid decrease in the identification range. When the drilling speed decreases rapidly or increases rapidly, the absolute value of the change rate of the drilling speed is relatively large.

[0074] S240: When the absolute value of the change rate of the drilling speed is greater than the preset speed change rate, it is determined that the operating state of the drilling equipment is abnormal.

[0075] Figure 3A flow chart of monitoring and judging the drilling speed in an embodiment of the present invention is shown, wherein judging whether the absolute value of the change rate of the drilling speed is greater than the preset speed change rate includes:

[0076] S231: Determine whether the change rate of the drilling speed is positive or negative. Since the absolute value summarizes the two situations of rapid decrease and rapid increase, but the abnormal situations corresponding to the rapid increase and rapid decrease of the drilling speed are different, it is necessary to distinguish these two situations first, and then monitor and determine them one by one.

[0077] S232: When the change rate of the drilling speed is a positive value, determine whether the change rate of the drilling speed is greater than a first preset speed change rate. When the change rate of the drilling speed is a positive value, it indicates that the drilling speed is increasing rapidly.

[0078] S233: When the change rate of the drilling speed is greater than the first preset speed change rate, it indicates that the drilling speed of the drill bit is increasing rapidly, and it is determined that the drilling equipment is in an abnormal operating state of drilling out. In a drilling rig, the rapid increase in drilling speed indicates that the resistance to the drill bit is suddenly reduced. At this time, there may be a cavity or a similar cavity in the stratum. The drilling equipment is very likely to have an abnormal condition of drilling out. In addition, in combination with the above embodiment, when the drilling resistance of the drill bit has been rapidly reduced and the drilling speed has been rapidly increased, it can be further determined that drilling out has occurred.

[0079] S234: When the change rate of the drilling speed is a negative value, determine whether the change rate of the drilling speed is less than a second preset speed change rate. When the change rate of the drilling speed is a negative value, it indicates that the drilling speed is decreasing rapidly.

[0080] S235: When the rate of change of the drilling speed is less than the second preset speed change rate, it means that the drilling speed of the drill bit is rapidly decreasing, and it is determined that the drilling equipment will be in an abnormal operating state of drill jam. In a drilling rig, when the drilling speed is rapidly decreasing, it means that the drilling resistance suddenly increases. At this time, the drilling rig may encounter relatively hard formation rocks, etc., and the drill bit may be stuck in the rock, resulting in drill jam. However, at this time, the power motor is still in an energized working state, and the motor will heat up quickly and burn out easily. Therefore, when the rate of change of the drilling speed is less than the second preset speed change rate, it is determined that the drilling equipment may be stuck, and the working parameters and working mode of the drill bit are changed so that the drill bit passes through the hard rock area. In addition, in combination with the above embodiment, when the drill bit resistance has increased rapidly and the drilling speed has also decreased rapidly, it is determined that drill jam has occurred.

[0081] In an embodiment of the present invention, judging whether the operating state of the drilling equipment is abnormal according to the drilling resistance and the drilling speed includes:

[0082] S250: Determine the formation morphology of the current location of the drilling equipment according to the geological characteristic parameters of the formation reached by the drilling equipment, wherein the geological characteristic parameters include density, hardness, viscosity and water content. Different formation morphologies have different physical parameters, so the formation morphology of the environment where the drilling equipment is located can be determined according to some physical parameters. In addition, the formation morphology that the drilling equipment may be in can be determined according to the depth of the drill bit combined with the local formation historical materials, and then further combined with the geological characteristic parameters for a more accurate judgment. For example, at a depth of about 1000 meters, the formation components are rocks, the form is solid, its density is a1, hardness is b1, viscosity is c1, and water content is d1. Under this geological characteristic parameter, the probability of drill jam is high; at a depth of about 1500 meters, the formation components are mostly water and loose soil, the form is a solid-liquid two-phase mixed form, its density is a2, hardness is b2, viscosity is c2, and water content is d2. Under this geological characteristic parameter, the probability of drilling empty is high.

[0083] S260: determining the probability of abnormal operation of the drilling equipment according to the current formation morphology of the drilling equipment and the feed speed of the drilling equipment, combined with the drilling speed and the drilling resistance;

[0084] S270: When the probability of abnormal operation is greater than the preset probability, the operation state of the drilling equipment is determined to be abnormal. For example, when the formation is in a solid rock area, the feed speed of the drill bit is very high, and the drilling speed of the drill bit begins to decrease, and the drilling resistance continues to increase. At this time, the probability of the drilling equipment getting stuck is very high, because the high drilling speed increases the squeezing force between the drill bit and the formation. When the squeezing force increases, if the drill bit cannot easily break the rock, the drilling resistance will increase. If the resistance increases, the drilling speed will decrease accordingly. If this situation is allowed to continue to deteriorate, the drill bit will be forced to stop, that is, the drill is stuck.

[0085] In one embodiment of the present invention, the determining of the abnormal operation probability of the drilling equipment according to the current formation morphology of the drilling equipment and the feed speed of the drilling equipment, combined with the drilling speed and the drilling resistance, includes:

[0086] S261: When it is determined that the formation morphology currently located by the drilling equipment is a solid form, in combination with the drilling speed and the feed speed, the corresponding probability of the drilling equipment being stuck is queried in the preset relationship; the preset relationship includes the corresponding relationship between the historical operation data of the drilling equipment and different probabilities of being stuck. For example, when the formation morphology is a solid form: the drilling speed is e1, the feed speed is f1, and the probability of the drilling being stuck is h1; the drilling speed is e2, the feed speed is f2, and the probability of the drilling being stuck is h2; the drilling speed is e3, the feed speed is f3, and the probability of the drilling being stuck is h3, wherein e1, e2 and e3 and f1, f2 and f3 can be point values ​​or range values; the above e1<e2<e3, f1<f2<f3, h1<h2<h3, that is, when the formation morphology is a solid form, as the drilling speed and the feed speed increase, the probability of the drilling being stuck increases.

[0087] S262: When the probability of the drill bit being stuck is greater than a first preset probability, it is determined that the drilling equipment will experience an abnormal operation state of a drill bit being stuck. Since the probability of a drill bit being stuck is relatively high in a solid stratum, the abnormal operation state of a drill bit being stuck is monitored more heavily in a solid stratum.

[0088] S263: When it is determined that the formation morphology in which the drilling equipment is currently located is a solid-liquid two-phase mixed form, the corresponding drilling probability of the drilling equipment is queried in the preset relationship in combination with the drilling resistance and the feed speed; the preset relationship also includes the corresponding relationship between the historical operation data of the drilling equipment and different drilling probability. The preset relationship can be a database, in which the historical operation data of the drilling equipment is stored, and the historical operation data is integrated into a query table, in which the comparison relationship between the formation morphology, the feed speed, the drilling speed or / and the drilling resistance and the probability of stuck drill and the probability of drilling without a hole is stored. These historical experience data can be used to further support the above judgment results, and it is also possible to directly determine whether the operating status of the drilling equipment is abnormal based on the historical experience data. For example, when the formation morphology is a solid-liquid two-phase mixed form: the drilling pressure is k1, the feed speed is f4, and the probability of drilling back is n1; the drilling pressure is k2, the feed speed is f5, and the probability of drilling back is n2; the drilling pressure is k3, the feed speed is f6, and the probability of drilling back is n3, wherein k1, k2 and k3 as well as f4, f5 and f6 can be point values ​​or range values; the above k1>k2>k3, f4<f5<f6, n1<n2<n3, that is, when the formation morphology is a solid-liquid two-phase mixed form, as the drilling pressure decreases and the feed speed increases, the probability of drilling back increases.

[0089] S264: When the drilling-out probability is greater than a second preset probability, it is determined that the drilling equipment will have an abnormal operation state of drilling-out. Since the probability of drilling-out is higher in a solid-liquid two-phase mixed stratum, the drilling-out abnormal condition is monitored more heavily in a solid-liquid two-phase mixed stratum.

[0090] It should be noted that the monitoring methods in the above embodiments can be implemented in combination with each other, for example, judging whether the drilling resistance increases rapidly, judging whether the drilling speed decreases rapidly, and judging whether the probability of the current drilling equipment getting stuck exceeds the standard, if all three of the above judgments are yes, then it is judged that the drilling equipment will get stuck. In addition, the operation of the drilling equipment can also be monitored in combination with the two judgment criteria.

[0091] In one embodiment of the present invention, when it is determined that the operating state of the drilling equipment is abnormal, generating early warning and prevention information, and sending the early warning and prevention information to an execution mechanism includes:

[0092] S310: When it is determined that the drilling equipment is in an abnormal operating state of being stuck, the preset anti-drilling stuck scheme is called to generate the early warning and prevention information, wherein the preset anti-drilling stuck scheme includes a drill bit lifting scheme, a drilling speed adjustment scheme, and a power head motor speed adjustment scheme, and the early warning and prevention information includes the early warning information sent to the user end and the control information corresponding to at least one of the anti-drilling stuck schemes, which can limit the drilling speed and the feed speed from increasing or reducing them appropriately. In the above scheme, the drill bit lifting scheme can be set to lift the drill bit 5 times, which can relieve the pressure of the drill bit and prevent the drill bit from being in a high-pressure state. In addition, by lifting and drilling again, the high-speed rotation force when the drill bit just contacts the formation can be used to slowly drill the formation. When lifting the drill bit, the feed device can be controlled to drive the drill bit to reciprocate; the drilling speed adjustment scheme can be set to reduce the drilling speed to 50% of the original, and control the power head to drive the rotation speed of the drill bit; the power head motor speed adjustment scheme can be set to reduce the power head motor speed to 70% of the original.

[0093] S320: When it is determined that the drilling equipment is about to enter an abnormal operating state of drilling out, the preset anti-drilling out scheme is called to generate the early warning and prevention information, wherein the preset anti-drilling out scheme includes a drilling speed adjustment scheme, a power head motor speed adjustment scheme, and a hole backfilling scheme, and the early warning and prevention information includes early warning information sent to the user end and control information corresponding to at least one of the anti-drilling out schemes. In the above schemes, the drilling speed adjustment scheme can be set to reduce the drilling speed; the power head motor speed adjustment scheme can be set to reduce the motor speed; the hole backfilling scheme can be set to stop the drilling operation first, and then prompt the staff to backfill the hole or cavity.

[0094] S330: Send the control information to the execution mechanism.

[0095] In an embodiment of the present invention, after sending the control information to the execution mechanism, the method further includes:

[0096] S400: Determine whether the drilling resistance is less than a preset resistance;

[0097] S500: When the drilling resistance is less than the preset resistance, it is determined that the drilling equipment has resumed normal operation.

[0098] In this embodiment, when it is determined that drill sticking is about to occur, a preset anti-drill sticking solution is executed, and the drilling resistance is detected. When the drilling resistance returns to within a normal range, the original drilling speed is restored.

[0099] Figure 4 The structure diagram of the drilling equipment operation status monitoring and early warning system in the embodiment of the present invention is shown. In order to support the smooth implementation of the above method, a drilling equipment operation status monitoring and early warning system is set in this embodiment, including:

[0100] The detection module 100 is used to obtain the operating parameters of the drilling equipment, wherein the operating parameters are the drilling resistance and / or drilling speed of the drilling equipment. The device for obtaining the drilling resistance is a pressure sensor of the power head motor; the device for obtaining the drilling speed is a speed sensor of the feed cylinder; and the geological characteristic parameters can be further obtained, and the device for obtaining the geological characteristic parameters is a preset data reading device.

[0101] The control module 200 is used to determine whether the operating state of the drilling equipment is abnormal according to the drilling resistance and / or the drilling speed; when it is determined that the operating state of the drilling equipment is abnormal, it generates early warning and prevention information, and sends the early warning and prevention information to the execution mechanism, wherein the early warning and prevention information is used to control the execution mechanism to adjust the operating parameters of the drilling equipment. The control module 200 includes a centralized controller, a distributed controller or a remote controller; the execution mechanism includes an electro-hydraulic control valve, an electro-hydraulic control pump or a motor inverter.

[0102] The detection module 100 is connected to the control module 200, and the control module 200 is connected to the actuator. During operation, the detection module 100 outputs the detected information to the control module 200, and the control module 200 processes the received information, generates early warning and prevention information, and outputs it to the actuator, and the actuator executes the early warning and prevention information. The system realizes real-time monitoring of drilling equipment operating parameters, prediction and identification of drilling gap and stuck pipe conditions, immediate early warning when drilling gap and stuck pipe occur, and prompts to take measures, thereby improving the life, reliability and working quality of the drilling rig and protecting oil and gas wells.

[0103] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein; and these modifications or substitutions do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for monitoring and early warning the operation status of drilling equipment, characterized in that: include: Acquiring operating parameters of the drilling equipment, wherein the operating parameters are drilling resistance and / or drilling speed of the drilling equipment; Determining whether the operating state of the drilling equipment is abnormal according to the drilling resistance and / or the drilling speed; When it is determined that the operating state of the drilling equipment is abnormal, early warning and prevention information is generated, and the early warning and prevention information is sent to the execution mechanism, wherein the early warning and prevention information is used to control the execution mechanism to adjust the operating parameters of the drilling equipment; The determining whether the operating state of the drilling equipment is abnormal according to the drilling resistance and the drilling speed comprises: Determining the morphology of the stratum where the drilling equipment is currently located according to the geological characteristic parameters of the stratum reached by the drilling equipment, wherein the geological characteristic parameters include density, hardness, viscosity and water content; When it is determined that the formation morphology in which the drilling equipment is currently located is a solid morphology, the corresponding probability of the drilling equipment being stuck is queried in a preset relationship in combination with the drilling speed and the feed speed of the drilling equipment; the preset relationship includes the corresponding relationship between the historical operation data of the drilling equipment and different probabilities of being stuck; When the probability of a drill bit being stuck is greater than a first preset probability, determining that the drilling equipment is in an abnormal operating state of a drill bit being stuck; When it is determined that the operating state of the drilling equipment is abnormal, generating early warning and prevention information, and sending the early warning and prevention information to an execution mechanism includes: When it is determined that the drilling equipment is in an abnormal operating state of drill sticking, calling a preset drill sticking prevention scheme to generate the early warning prevention information, wherein the early warning prevention information includes early warning information and control information corresponding to the drill sticking prevention scheme; The control information is sent to the execution mechanism, and the warning information is sent to the user end.

2. The drilling equipment operation status monitoring and early warning method according to claim 1 is characterized in that: The determining whether the operating state of the drilling equipment is abnormal according to the drilling resistance includes: Determining whether the absolute value of the change rate of the drilling resistance is greater than a preset resistance change rate; When the absolute value of the change rate of the drilling resistance is greater than the preset resistance change rate, it is determined that the operating state of the drilling equipment is abnormal.

3. The drilling equipment operation status monitoring and early warning method according to claim 2 is characterized in that: The determining whether the absolute value of the change rate of the drilling resistance is greater than a preset resistance change rate comprises: Determining whether the rate of change of the drilling resistance is positive or negative; When the change rate of the drilling resistance is a positive value, determining whether the change rate of the drilling resistance is greater than a first preset resistance change rate; When the change rate of the drilling resistance is greater than the first preset resistance change rate, it is determined that the drilling equipment is in an abnormal operating state of a drill stuck; When the change rate of the drilling resistance is a negative value, determining whether the change rate of the drilling resistance is less than a second preset resistance change rate; When the change rate of the drilling resistance is less than the second preset resistance change rate, it is determined that the drilling equipment is in an abnormal operating state of drilling empty.

4. The drilling equipment operation status monitoring and early warning method according to claim 1 is characterized in that: The determining whether the operating state of the drilling equipment is abnormal according to the drilling speed includes: Determining whether the absolute value of the change rate of the drilling speed is greater than a preset speed change rate; When the absolute value of the change rate of the drilling speed is greater than the preset speed change rate, it is determined that the operating state of the drilling equipment is abnormal.

5. The drilling equipment operation status monitoring and early warning method according to claim 4 is characterized in that: The determining whether the absolute value of the change rate of the drilling speed is greater than the preset speed change rate comprises: Determining whether the rate of change of the drilling speed is positive or negative; When the change rate of the drilling speed is a positive value, determining whether the change rate of the drilling speed is greater than a first preset speed change rate; When the change rate of the drilling speed is greater than the first preset speed change rate, it is determined that the drilling equipment will be in an abnormal operating state of drilling empty; When the change rate of the drilling speed is a negative value, determining whether the change rate of the drilling speed is less than a second preset speed change rate; When the change rate of the drilling speed is less than the second preset speed change rate, it is determined that the drilling equipment is in an abnormal operating state of a pipe stuck.

6. The drilling equipment operation status monitoring and early warning method according to claim 1 is characterized in that: The determining whether the operating state of the drilling equipment is abnormal according to the drilling resistance and the drilling speed comprises: According to the formation morphology in which the drilling equipment is currently located and the feed speed of the drilling equipment, combined with the drilling speed and the drilling resistance, determine the probability of abnormal operation of the drilling equipment; When the abnormal operation probability is greater than a preset probability, it is determined that the operation state of the drilling equipment is abnormal.

7. The drilling equipment operation status monitoring and early warning method according to claim 6 is characterized in that: The determining of the abnormal operation probability of the drilling equipment according to the current formation morphology of the drilling equipment and the feed speed of the drilling equipment, combined with the drilling speed and the drilling resistance, includes: When it is determined that the formation morphology in which the drilling equipment is currently located is a solid-liquid two-phase mixed morphology, the corresponding drilling probability of the drilling equipment is queried in the preset relationship in combination with the drilling resistance and the feed speed; the preset relationship also includes the corresponding relationship between the historical operation data of the drilling equipment and different drilling probabilities; When the drilling-hole probability is greater than a second preset probability, it is determined that the drilling equipment will be in an abnormal operating state of drilling-hole.

8. The drilling equipment operation status monitoring and early warning method according to claim 1 is characterized in that: When it is determined that the operating state of the drilling equipment is abnormal, generating early warning and prevention information, and sending the early warning and prevention information to an execution mechanism includes: When it is determined that the drilling equipment is in an abnormal operating state of drill bit sticking, a preset drill bit sticking prevention scheme is called to generate the early warning and prevention information, wherein the preset drill bit sticking prevention scheme includes a drill bit lifting scheme, a drilling speed adjustment scheme, and a power head motor speed adjustment scheme; When it is determined that the drilling equipment is in an abnormal operating state of drilling out, a preset anti-drilling out plan is called to generate the early warning and prevention information, wherein the preset anti-drilling out plan includes a plan for adjusting the drilling speed, a plan for adjusting the speed of the power head motor, and a plan for backfilling the hole, and the early warning and prevention information includes the early warning information and the control information corresponding to the anti-drilling out plan; The control information is sent to the execution mechanism, and the warning information is sent to the user end.

9. The drilling equipment operation status monitoring and early warning method according to claim 8, characterized in that: After sending the control information to the execution mechanism, the method further includes: Determining whether the drilling resistance is less than a preset resistance; When the drilling resistance is less than the preset resistance, it is determined that the drilling equipment has resumed normal operation.

10. A drilling equipment operation status monitoring and early warning system, characterized in that: include: A detection module, used for obtaining operating parameters of the drilling equipment, wherein the operating parameters are drilling resistance and / or drilling speed of the drilling equipment; a control module, configured to determine whether the operating state of the drilling equipment is abnormal according to the drilling resistance and / or the drilling speed; when it is determined that the operating state of the drilling equipment is abnormal, generate early warning and prevention information, and send the early warning and prevention information to an execution mechanism, wherein the early warning and prevention information is used to control the execution mechanism to adjust the operating parameters of the drilling equipment; The determining whether the operating state of the drilling equipment is abnormal according to the drilling resistance and the drilling speed comprises: Determining the morphology of the stratum where the drilling equipment is currently located according to the geological characteristic parameters of the stratum reached by the drilling equipment, wherein the geological characteristic parameters include density, hardness, viscosity and water content; When it is determined that the formation morphology in which the drilling equipment is currently located is a solid morphology, the corresponding probability of the drilling equipment being stuck is queried in a preset relationship in combination with the drilling speed and the feed speed of the drilling equipment; the preset relationship includes the corresponding relationship between the historical operation data of the drilling equipment and different probabilities of being stuck; When the probability of a drill bit being stuck is greater than a first preset probability, determining that the drilling equipment is in an abnormal operating state of a drill bit being stuck; When it is determined that the operating state of the drilling equipment is abnormal, generating early warning and prevention information, and sending the early warning and prevention information to an execution mechanism includes: When it is determined that the drilling equipment is in an abnormal operating state of drill sticking, calling a preset drill sticking prevention scheme to generate the early warning prevention information, wherein the early warning prevention information includes early warning information and control information corresponding to the drill sticking prevention scheme; The control information is sent to the execution mechanism, and the warning information is sent to the user end.

Citation Information

Patent Citations

  • Intelligent control device of full-hydraulic drilling machine

    CN111561307A

  • Automatic drilling method of rotary drilling rig, controller, storage medium and electronic equipment

    CN112855113A