A fixed bed layer, preparation method, application and fixed bed for wastewater treatment

Through the preparation of a fixed bed layer of coal gangue-based zeolite membrane, the problem of removal of organic pollutants and heavy metal ions in industrial wastewater was solved, efficient separation and adsorption was achieved, and the wastewater treatment effect was demonstrated with low cost and simple operation.

CN116020403BActive Publication Date: 2024-10-18XIAN RES INST OF CHINA COAL TECH & ENG GRP CORP
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202211102681.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-09-09
Publication Date
2024-10-18
Estimated Expiration
2042-09-09

AI Technical Summary

Technical Problem

Existing technologies are difficult to effectively remove organic pollutants and heavy metal ions in industrial chemical wastewater, especially due to the complex structure and stability of these pollutants, which make them difficult to degrade in the environment, and the existing methods for preparing adsorbent materials are costly and complex to operate. problem.

Method used

Using coal gangue and hydrogen peroxide as raw materials, the coal gangue-based zeolite membrane mixed slurry is prepared through chemical excitation and autoclaved curing processes, and is spin-coated on a porous carrier to prepare an in-situ loaded fixed bed layer to form a fixed bed with efficient molecular channels. layer for wastewater disposal.

Benefits of technology

It achieves the screening performance of organic matter and efficient adsorption of heavy metal ions, with a separation efficiency greater than 95%. It also demonstrates high water flux and low-cost simplicity of operation, making it suitable for large-scale environmental remediation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116020403B_ABST
    Figure CN116020403B_ABST
Patent Text Reader

Abstract

The invention provides a fixed bed layer, a preparation method, an application and a fixed bed for wastewater treatment. The method comprises the following steps: step 1, mixing a formula amount of water, sodium hydroxide and water glass to obtain an alkaline activator; step 2, preparing a gangue-based zeolite membrane mixed slurry; the alkaline activator prepared in step 1 is mixed with a formula amount of gangue powder and hydrogen peroxide to obtain the gangue-based zeolite membrane mixed slurry; step 3, spin-coating the gangue-based zeolite membrane mixed slurry on the surface of a porous carrier, and then transferring the porous carrier to a fixed bed column for autoclaving curing. After the autoclaving curing is completed, a fixed bed layer in situ loaded with the gangue-based zeolite membrane is obtained; the autoclaving pressure of the autoclaving curing is 0.1MPa-1MPa, the autoclaving temperature is 100-180°C, and the autoclaving curing time is 1h-2h. The fixed bed layer with an obvious composite bed structure prepared by the present invention has organic matter screening performance, heavy metal adsorption performance and high water flux, and can be used to prepare a fixed bed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of environmental materials and relates to wastewater treatment, and in particular to a fixed bed layer, a preparation method, an application and a fixed bed for wastewater treatment. Background Art

[0002] Various industrial chemical wastes are often produced as byproducts during the production of industrial chemicals. For example, a large amount of organic pollutants are produced during the production of textiles, papermaking, wool dyeing and paint, which threaten not only the environment but also human health. Due to the complex aromatic molecular structure of these organic substances, they have high thermal and light stability and poor biodegradability, making them difficult to degrade in the environment. At present, ion exchange, chemical oxidation, biodegradation, extraction, coprecipitation / adsorption and other methods are mainly used to remove organic pollutants from wastewater, among which adsorption is considered to be a cheap, efficient and simple technical process. Elements with a specific gravity greater than 5 and an atomic weight between 63.5–200.6 are called heavy metals. Chromium (Cr), nickel (Ni), zinc (Zn), manganese (Mn), copper (Cu), cadmium (Cd), cobalt (Co) and lead (Pb) are the most common heavy metals in our environment. Due to their tendency to accumulate, stability and toxicity in the environment, they are dangerous to all organisms.

[0003] Gangue is the waste generated during coal mining and washing. With the mining of coal, a large amount of gangue is produced in my country every year, most of which are not reasonably utilized, causing environmental pollution and waste of resources. Therefore, how to process gangue to produce high value-added products has certain economic and environmental benefits. By modifying the chemical properties of carbon, silicon, aluminum, iron, calcium, magnesium, etc. in gangue, adsorption materials with excellent adsorption performance can be prepared. However, there are few reports in the prior art on the preparation of organic pollutants and heavy metal ion adsorbents using solid waste, especially gangue, as raw materials. Summary of the invention

[0004] In view of the defects and shortcomings of the prior art, the object of the present invention is to provide a fixed bed layer, a preparation method, an application and a fixed bed for wastewater treatment.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions to achieve the above problems:

[0006] A method for preparing a fixed bed layer for wastewater treatment, the method comprising using coal gangue and hydrogen peroxide as raw materials, preparing a coal gangue-based zeolite membrane mixed slurry by chemical excitation and autoclave curing process, and then spin-coating the prepared coal gangue-based zeolite membrane mixed slurry on a porous carrier to prepare a fixed bed layer in situ loaded with coal gangue-based zeolite membrane.

[0007] The present invention also has the following technical features:

[0008] Specifically, the method comprises the following steps:

[0009] Step 1, mixing the formulated amount of water, sodium hydroxide and water glass to prepare an alkaline activator;

[0010] Step 2, preparing a coal gangue-based zeolite membrane mixed slurry;

[0011] The alkaline activator prepared in step 1 is stirred and mixed with the formulated amount of coal gangue powder and hydrogen peroxide to obtain a mixed slurry for preparing a coal gangue-based zeolite membrane;

[0012] Step 3, spin-coating the gangue-based zeolite membrane mixed slurry on the surface of the porous carrier, and then transferring the porous carrier to a fixed bed column for autoclaving and curing. After the autoclaving and curing, a fixed bed layer loaded with the gangue-based zeolite membrane in situ is obtained;

[0013] The autoclave pressure of the autoclave curing is 0.1MPa-1MPa, the autoclave temperature is 100-180°C, and the autoclave curing time is 1h-2h.

[0014] Preferably, in step 4, the autoclave pressure of the autoclave curing is 0.5 MPa, the autoclave temperature is 150° C., and the autoclave curing time is 0.5 h.

[0015] Preferably, the gangue-based zeolite membrane mixed slurry described in step 2 comprises the following raw material components in mass percentage: 40.2% to 45.8% gangue, 7.6% to 10.1% sodium hydroxide, 28.8% to 40.2% water glass, 10.6% to 18.3% water and 0.2-0.5% hydrogen peroxide, and the mass percentages of the components together are 100%.

[0016] Preferably, the water glass is Na2O·nSiO2, wherein n is 2.42; and the concentration of the hydrogen peroxide is 35wt%.

[0017] Specifically, the porous carrier described in step 2 is a cylindrical porous carrier, including a porous inert ceramic carrier, a stainless steel sieve carrier and a porous silica carrier, and the average pore size of the porous carrier is 100nm to 1000nm, and the porosity is 50% to 80%.

[0018] Furthermore, the zeolite membrane is analcime membrane, Na-P type membrane zeolite and X type zeolite membrane. Furthermore, the mass percentage of zeolite in the zeolite membrane is 30-35%.

[0019] The present invention also protects a fixed bed layer for wastewater treatment, which is prepared by the above-mentioned method for preparing a fixed bed layer for organic wastewater treatment, and comprises a porous carrier and a gangue-based zeolite membrane attached to the surface of the porous carrier.

[0020] The present invention also protects a fixed bed for wastewater treatment, comprising a fixed bed column provided with an inner cavity, wherein a plurality of the above-mentioned fixed bed layers are radially arranged in the fixed bed column.

[0021] The present invention also protects the use of the above-mentioned fixed bed for removing organic pollutants and heavy metal ions from wastewater; the organic pollutants include tetracycline, p-nitrophenol, oxytetracycline, methylene blue, rhodamine B, and Congo red, and the heavy metal ions include lead ions, copper ions, cadmium ions, and zinc ions.

[0022] Compared with the prior art, the present invention has the following beneficial technical effects:

[0023] (I) The present invention produces a fixed bed layer with an obvious composite bed structure. Due to the in-situ loading of the zeolite membrane on the substrate, a special molecular pore is formed on the fixed bed layer, so that the fixed bed layer has the performance of organic matter screening. With the synergistic effect of the body and the zeolite membrane, the organic matter separation efficiency of the fixed bed layer of the present invention is greater than 95%, and the fixed bed layer shows a high water flux (340-440L / m 2 ·h·MPa), and at the same time, since the zeolite membrane has a strong ion exchange capacity, the fixed bed layer prepared by the present invention can adsorb heavy metal ions in the wastewater.

[0024] (II) Compared with the general preparation method of adsorption separation materials, the preparation method of the present invention uses coal gangue as the main raw material and overcomes the disadvantage that the elements of coal gangue are difficult to dissolve by chemical excitation. In addition, various types of zeolite membranes can be prepared by controlling the autoclave conditions, thereby obtaining a fixed bed layer with different types of zeolite membranes.

[0025] (III) The fixed bed prepared by the present invention can be directly connected to a peristaltic pump and a liquid storage device through pipelines to form a separation and adsorption system for organic matter and heavy metal ions, thereby finally realizing the combination of material preparation and process equipment. The operation is simple, the cost is low, and the system has a strong value for promotion and use. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 Prepare processes for fixed bed columns for wastewater treatment;

[0027] Figure 2 Crystal phase analysis of the fixed bed zeolite membranes prepared in Examples 1 to 3 and Comparative Example 1;

[0028] Figure 3 The microstructure diagrams of the fixed beds prepared in Examples 1 to 3 at different scales;

[0029] Figure 4 Schematic diagram of fixed bed column separation adsorption system for wastewater treatment.

[0030] The technical solution of the present invention is further described below in conjunction with embodiments. DETAILED DESCRIPTION

[0031] The method of the present invention uses coal gangue and hydrogen peroxide as raw materials, utilizes chemical excitation and autoclave curing process to prepare coal gangue-based zeolite membrane mixed slurry, and then spin-coats the prepared coal gangue-based zeolite membrane mixed slurry on a porous carrier to prepare a fixed bed layer in situ loaded with coal gangue-based zeolite membrane. In situ loading means that the preparation and loading processes are carried out separately, and the existing state of the material is not changed. The loading is achieved only by changing the process.

[0032] A fixed bed provided with the fixed bed layer prepared by the present invention is connected to a peristaltic pump and a liquid storage device through pipelines to construct a fixed bed system for wastewater separation and adsorption. The obtained fixed bed system can be used for filtering, removing and adsorbing organic pollutants and heavy metal ions. The application of this system has the advantages of simple operation, low cost and large-scale environmental remediation.

[0033] The internal structure of the fixed bed prepared for wastewater treatment in the present invention is known in the prior art.

[0034] In accordance with the above technical scheme, specific embodiments of the present invention are given below. It should be noted that the present invention is not limited to the following specific embodiments, and all equivalent changes made on the basis of the technical scheme of this application fall within the protection scope of the present invention.

[0035] Embodiment 1:

[0036] This embodiment discloses a method for preparing a fixed bed for wastewater treatment, comprising the following steps:

[0037] Step 1, mixing the formulated amount of water, sodium hydroxide and water glass to prepare an alkaline activator;

[0038] Step 2, preparing a coal gangue-based zeolite membrane mixed slurry;

[0039] The alkaline activator prepared in step 1 is stirred and mixed with the formulated amount of coal gangue powder and hydrogen peroxide to obtain a mixed slurry for preparing a coal gangue-based zeolite membrane;

[0040] Step 3, spin-coating the gangue-based zeolite membrane mixed slurry on the surface of the porous carrier, and then transferring the porous carrier to a fixed bed column for autoclaving and curing. After the autoclaving and curing, a fixed bed layer loaded with the gangue-based zeolite membrane in situ is obtained;

[0041] The gangue-based zeolite membrane mixed slurry described in step 2 includes the following raw material components by mass percentage: 42.4% gangue, 7.9% sodium hydroxide, 36.9% water glass, 12.4% water, and 0.4% hydrogen peroxide;

[0042] The autoclave pressure of the autoclave curing in step 4 is 0.1 MPa, the autoclave temperature is 100° C., and the autoclave curing time is 1 h.

[0043] In this embodiment, after the curing is completed, the prepared fixed bed layer is named FB1, and the XRD crystal phase analysis of the zeolite membrane loaded thereon is as follows: Figure 2 The microstructure of the fixed bed is shown in Figure 3 shown.

[0044] Figure 3 The microscopic morphology of the fixed bed at different scales is listed in the figure, which is convenient for analyzing the morphology of the fixed bed from different angles and judging the real effect of the zeolite membrane loading.

[0045] In this embodiment, the prepared fixed bed layer is placed in a fixed bed column with a cavity set inside to form a fixed bed, and then a wastewater fixed bed separation adsorption system is constructed. The wastewater fixed bed separation adsorption system is composed of an organic sewage storage tank, a fixed bed, a peristaltic pump, a purified water storage tank and a delivery pipeline. The space between the fixed bed layers in the fixed bed column is filled with glass beads so that the adsorption solution can flow evenly from the inside. The structure of the wastewater fixed bed separation adsorption system is as follows: Figure 4 Then the wastewater fixed bed separation adsorption system is used to separate and adsorb organic pollutants and heavy metal ions from the wastewater. The specific method is as follows:

[0046] A mixed solution of tetracycline, p-nitrophenol, oxytetracycline methylene blue, rhodamine B, Congo red, lead ions, copper ions, cadmium ions and zinc ions of different concentrations is pumped to the bottom feed port of the fixed bed column by a peristaltic pump, and then the solution passes through the fixed bed layer upward, and finally completely passes through the fixed bed column and enters the purified water storage cabinet from the upper discharge port of the fixed bed column.

[0047] In this embodiment, the conditions in the fixed bed column include: solution pH 5-9, initial concentration 100-500 ppm, flow rate 1.0-3.0 L / h, and pH value is adjusted using 0.1 M HNO3 and 0.1 M NaOH solution.

[0048] The ability of the fixed bed column to separate and adsorb different organic pollutants and heavy metal ions is shown in Table 1.

[0049] Embodiment 2:

[0050] This embodiment discloses a method for preparing a fixed bed layer for wastewater treatment. The preparation steps and raw material components are the same as those in Example 1, except that the autoclave temperature in this embodiment is 150° C., the autoclave pressure is 0.5 MPa, and the time is 1 h.

[0051] In this embodiment, after the curing is completed, the prepared fixed bed layer is named FB2, and the XRD crystal phase analysis of the zeolite membrane loaded thereon is as follows: Figure 2 The microstructure of the fixed bed is shown in Figure 3 shown.

[0052] In this example, the prepared fixed bed column is used to separate organic pollutants and heavy metal ions from wastewater. The specific method is the same as that in Example 1. Its ability to separate and adsorb different organic pollutants and heavy metal ions is shown in Table 1.

[0053] Embodiment 3:

[0054] The preparation method of the fixed bed layer for wastewater treatment provided in this embodiment has the same preparation steps as those in Example 1 of the raw material components, except that the conditions for autoclaving are: the autoclaving pressure is 1 MPa, the autoclaving temperature is 180°C, and the autoclaving time is 1 h.

[0055] In this embodiment, after the curing is completed, the prepared fixed bed layer is named FB3, and the XRD crystal phase analysis of the zeolite membrane loaded thereon is as follows: Figure 2 The microstructure of the fixed bed is shown in Figure 3 shown.

[0056] In this example, the prepared fixed bed column is used to separate organic pollutants and heavy metal ions from wastewater. The specific method is the same as that in Example 1. Its ability to separate and adsorb different organic pollutants and heavy metal ions is shown in Table 1.

[0057] Comparative Example 1

[0058] This comparative example provides a fixed bed column for wastewater treatment. Steps 1 and 2 in the preparation process and the raw material components are the same as those in Example 1, with the only difference being that saturated steam is not introduced for autoclave curing.

[0059] In this comparative example, after the curing is completed, the obtained fixed bed column is named BC, and the XRD crystal phase analysis of the zeolite membrane is as follows: Figure 2 The microscopic morphology of the fixed bed is shown in Figure 3 shown.

[0060] In this comparative example, the prepared fixed bed column was used to separate organic pollutants and heavy metal ions from wastewater. The specific method was the same as that in Example 1. Its ability to separate and adsorb different organic pollutants and heavy metal ions is shown in Table 1.

[0061]

[0062]

[0063]

[0064] Table 1. Process parameters and wastewater separation efficiency of the fixed bed prepared in Examples 1 to 3 and Comparative Example 1

[0065] It can be seen from Examples 1 to 3 and Comparative Example 1 that:

[0066] Combination Figure 2 , the crystal phases of the zeolite membrane on the fixed bed obtained in Examples 1 to 3 are analcime, Na-P zeolite, and Na-X zeolite; the Rietveld quantitative analysis results show that the analcime yield in Example 1 is 33wt%, the Na-P zeolite yield in Example 2 is 34wt%, and the Na-X zeolite yield in Example 3 is 31wt%. The chemical stimulants in the three groups of examples have the same ratio, and only the autoclave curing conditions are changed. Obviously: higher pressure and temperature are conducive to the synthesis of zeolite (analcime) with a high silicon-aluminum ratio, and Na-X zeolite with better performance can be synthesized under mild conditions of normal pressure and 100°C. The change of the type of zeolite membrane crystals by changing the saturated steam parameters can significantly reduce the difficulty of operation. Although Na-P zeolite and analcime require more stringent curing conditions, the synthesis of more zeolite types can increase the application range of fixed bed columns.

[0067] In Comparative Example 1, no zeolite phase was generated, and only a layer of geopolymer film was formed.

[0068] The microstructure analysis of the fixed bed obtained in Examples 1 to 3 is as follows: Figure 3 As shown, at the 1 micron scale, it can be clearly observed that the zeolite in the zeolite membrane presents an angular cubic structure; at the 3 micron scale, the morphology of the zeolite membrane layer in the fixed bed can be observed, and the zeolite membrane is about 11 microns thick; at the 15 micron scale, part of the morphology of the fixed bed can be observed, showing an obvious layered structure, with the upper layer being the zeolite membrane layer and the lower layer being the inert bed layer, and the zeolite membrane layer is tightly combined with the inert bed layer to form a unified whole.

[0069] This shows that the method of the present invention can combine the zeolite membrane and the porous inert carrier to form a new fixed bed layer.

[0070] The results of separating organic pollutants from wastewater are shown in Table 1. It can be seen from Table 1 that the fixed bed column with the fixed bed layer prepared by the present invention shows ultra-high separation and adsorption efficiency for organic matter and heavy metal ions in wastewater, reaching more than 90%. Different fixed bed separation parameters will change the separation efficiency. The lower the pH, initial concentration and flow rate, the more conducive to improving the separation efficiency of organic matter. For the adsorption of heavy metal ions, the higher the pH, the lower the initial concentration and the flow rate, the more conducive to improving the adsorption efficiency.

[0071] The difference between Examples 1 to 3 is that the types of zeolites loaded on the zeolite membranes are different. Different zeolites will also partially affect the separation efficiency. Under the same separation parameters, the separation effect of Na-X zeolite is the best.

[0072] The bed layer in Comparative Example 1 is mainly a membrane formed by geopolymer. Since the bed layer is not loaded with zeolite, the separation and adsorption efficiency of organic matter and heavy metal ions are both at a low level.

[0073] The preferred embodiments of the present disclosure are described in detail above in conjunction with the accompanying drawings; however, the present disclosure is not limited to the specific details in the above embodiments. Within the technical concept of the present disclosure, a variety of simple modifications can be made to the technical solution of the present disclosure, and these simple modifications all fall within the protection scope of the present disclosure.

[0074] It should also be noted that the various specific technical features described in the above specific embodiments can be combined in any suitable manner without contradiction. In order to avoid unnecessary repetition, the present disclosure will not further describe various possible combinations.

[0075] In addition, various embodiments of the present disclosure may be arbitrarily combined, and as long as they do not violate the concept of the present disclosure, they should also be regarded as the contents disclosed by the present disclosure.

Claims

1. A method for preparing a fixed bed for wastewater treatment, characterized in that: The method comprises using coal gangue and hydrogen peroxide as raw materials, preparing a coal gangue-based zeolite membrane mixed slurry by chemical excitation and autoclave curing process, and then spin-coating the prepared coal gangue-based zeolite membrane mixed slurry on a porous carrier to prepare a fixed bed layer in situ loaded with a coal gangue-based zeolite membrane; The following steps are involved: Step 1, mixing the formulated amount of water, sodium hydroxide and water glass to prepare an alkaline activator; Step 2, preparing a coal gangue-based zeolite membrane mixed slurry; The alkaline activator prepared in step 1 is stirred and mixed with the formulated amount of coal gangue powder and hydrogen peroxide to obtain a mixed slurry for preparing a coal gangue-based zeolite membrane; Step 3, spin-coating the gangue-based zeolite membrane mixed slurry on the surface of the porous carrier, and then transferring the porous carrier to a fixed bed column for autoclaving and curing. After the autoclaving and curing, a fixed bed layer loaded with the gangue-based zeolite membrane in situ is obtained; The autoclave pressure of the autoclave curing is 0.1MPa-1MPa, the autoclave temperature is 100-180°C, and the autoclave curing time is 1h-2h; The gangue-based zeolite membrane mixed slurry described in step 2 includes the following raw material components by mass percentage: 40.2% to 45.8% gangue, 7.6% to 10.1% sodium hydroxide, 28.8% to 40.2% water glass, 10.6% to 18.3% water and 0.2-0.5% hydrogen peroxide, and the mass percentage of each component totals 100%; The porous carrier described in step 3 is a cylindrical porous carrier, including a porous inert ceramic carrier, a stainless steel sieve carrier and a porous silica carrier, and the average pore size of the porous carrier is 100nm to 1000nm, and the porosity is 50% to 80%.

2. The method for preparing a fixed bed for wastewater treatment according to claim 1, characterized in that: The gangue-based zeolite membrane mixed slurry described in step 2 includes the following raw material components by mass percentage: 42.4% gangue, 7.9% sodium hydroxide, 36.9% water glass, 12.4% water, and 0.4% hydrogen peroxide.

3. The method for preparing a fixed bed for wastewater treatment according to claim 1, characterized in that: The water glass is Na2O·nSiO2, wherein n is 2.42; the concentration of the hydrogen peroxide is 35wt%.

4. The method for preparing a fixed bed for wastewater treatment according to claim 1, characterized in that: The zeolite membrane is analcime membrane, Na-P type membrane zeolite and X type zeolite membrane.

5. The method for preparing a fixed bed for wastewater treatment according to claim 1, characterized in that: The mass percentage of zeolite in the zeolite membrane is 30-35%.

6. A fixed bed for wastewater treatment, characterized in that: The fixed bed is prepared by the method for preparing a fixed bed for wastewater treatment as described in any one of claims 1 to 5, wherein the fixed bed comprises a porous carrier and a gangue-based zeolite membrane attached to the surface of the porous carrier.

7. A fixed bed for wastewater treatment, comprising a fixed bed column provided with an inner cavity, characterized in that: A plurality of fixed bed layers as claimed in claim 6 are radially arranged in the fixed bed column.

8. Use of the fixed bed as claimed in claim 7 for removing organic pollutants and heavy metal ions from wastewater; the organic pollutants include tetracycline, p-nitrophenol, oxytetracycline, methylene blue, rhodamine B, Congo red, and the heavy metal ions include lead ions, copper ions, cadmium ions and zinc ions.

Citation Information

Patent Citations

  • Artificial zeolite prepared directionally by utilizing industrial solid waste and preparation method and application thereof

    CN105036150A

  • Zeolite nanofiltration membrane and preparation method thereof

    CN110508159A

  • Fly ash-based porous geopolymer-zeolite composite material, and preparation and application thereof

    CN114272910A