A high-efficiency shunting control module and intelligent shunting method

By introducing mutual alternatives between STP system and existing vehicle system in the CTC system, combining train number tracking and station status, intelligent preparation and dynamic routing of shunting plans are realized, and the low degree of shunting automation in the existing technology is solved. The problem of insufficient support in complex scenarios improves the efficiency and safety of shunting operations.

CN116080721BActive Publication Date: 2024-11-08SIGNAL & COMM RES INST OF CHINA ACAD OF RAILWAY SCI +3
View PDF 16 Cites 0 Cited by

Patent Information

Application Number
CN202211729527.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-30
Publication Date
2024-11-08
Estimated Expiration
2042-12-30

AI Technical Summary

Technical Problem

The existing CTC system has low automation during the preparation and execution of the shunting plan, simple logic for shunting and road queuing, and many interruptions in operation. It has failed to realize complex scene functions such as mid-way turnover and old road reuse, and the shunting instructions are cleared. The logic is unreasonable, with safety hazards and inefficiency problems.

Method used

Design an efficient shunting control module to obtain basic data of shunting plan through the mutual alternative between the STP system and the existing car system, combine the real-time status of the station and the number of train tracking results to dynamically divide shunting routes to realize intelligent road placing , and optimize the logic of clearing shunting instructions to reduce manual intervention.

Benefits of technology

Improve the automation and informatization of the preparation of shunting plans, realize intelligent shunting and road scheduling, reduce manual intervention, improve work efficiency and safety, adapt to complex scenarios such as mid-way turnover and old road reuse, and rationalize shunting instructions. The logic of clearing out.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116080721B_ABST
    Figure CN116080721B_ABST
Patent Text Reader

Abstract

The present invention discloses an efficient shunting control module and an intelligent shunting method, which: by expanding the STP system access, the automation and informationization of shunting plan compilation are improved, the interface function of the interface server or the vehicle terminal is integrated, the data processing and directional distribution capabilities are realized, and the occupancy rate of network resources and computing resources is reduced; and the shunting routing logic is more intelligent, which can realize the intelligent shunting routing function, and finally reduce the manual intervention link, greatly improving the work efficiency and driving operation safety. At the same time, the redesigned and deployed tracking server strengthens the information interaction with the vehicle terminal and the autonomous machine, realizes the train tracking function of the shunting locomotive, and further improves the intelligence of shunting routing and the safety of driving control. In addition, the clearing logic of the shunting instruction is more reasonable, which makes the overall state jump of the shunting operation sheet more reasonable, and further reduces the manual intervention link.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of railway transportation technology, and in particular to an efficient shunting control module and an intelligent shunting method. Background Art

[0002] The centralized dispatching system (CTC system) centrally controls the signal equipment in the section, unifies the command and management of the train / shunting transportation organization process, realizes the train dispatching and safety control functions, and is the command center of the daily organization of railway transportation. In the railway transportation production process, except for the arrival, departure, passing and running of trains at the station, all the purposeful movements of locomotives and vehicles are collectively called shunting, which is the movement of locomotives and vehicles on the station line or other lines for the purpose of dismantling and marshaling trains, uncoupling, transferring, whole yard, shifting, picking up and delivering vehicles, and the alignment, line change, and entry and exit of locomotives. Shunting operations are an important component and one of the basic contents of railway transportation operations. The shunting operation is prepared by the station duty officer according to the relevant operation plan (including stage plan, etc.), combined with the current actual situation of the station (including the arrival train confirmation, the use of the shunting yard line and the current train situation in the shunting area, etc.), and the hook plan for each shunting operation is issued to the station autonomous machine module in the form of a shunting operation order; the station autonomous machine receives the shunting operation order and performs the effectiveness, correctness and safety inspection of the shunting operation, and is the execution unit and guarantee unit of the safety and efficiency of the station shunting operation. With the promotion of the centralized dispatching system on conventional lines, the demand for the system shunting operation function has increased.

[0003] The preparation and implementation process of the shunting plan requires:

[0004] 1. Comply with the relevant provisions of train formation assembly, train operation diagram and "Technical Regulations" to ensure shunting operations and personnel safety.

[0005] 2. Rationally utilize the access routes to the station with the goal of "fewer hooks, shorter journeys, less line occupation and convenient operation".

[0006] 3. The execution of the work order requires no omissions, no errors and few changes.

[0007] Compared with train routing operations, shunting routing operations have the following characteristics:

[0008] 1. In order to ensure driving safety, shunting routes generally follow the principle of "sufficiency and safety" without affecting the shunting plans of other trains, expand the shunting plan route range as much as possible, and reserve a safe buffer driving range.

[0009] 2. Under the influence of the above characteristics, the shunting locomotive may not be able to completely occupy and clear the planned shunting route. In the same shunting operation order, the uncleared part of the previous shunting plan may cause the corresponding shunting route to be unable to be fully interlocked and opened when the next shunting plan arranges the associated shunting route. In this scenario, it is necessary to reasonably set the clearing logic of the previous shunting plan and the route arrangement logic of the next shunting plan.

[0010] 3. In scenarios such as mid-course turnaround and reuse of old routes, the locomotive is located in the middle of the next planned route. In this scenario, it is necessary to intelligently determine the locomotive position and select the route object based on the position.

[0011] In the CTC system, the existing shunting module structure designed to realize the shunting function is as follows Figure 1 shown.

[0012] As an important part of the CTC system, the shunting module completes the shunting control and route scheduling functions. The implementation units involved mainly include station extensions, train terminals and autonomous machines, and the associated interactive systems include wireless communication systems and interlocking systems.

[0013] The typical shunting operation process of the existing CTC system (referred to as the existing technical solution 1) mainly includes:

[0014] 1. The train operation terminal manually compiles the shunting plan based on the daily train shunting plan, station storage plan, train formation and dismantling plan, etc., and sends it to the station's autonomous machine in the form of a shunting operation sheet through the station extension.

[0015] 1) Execute the "Create a New Shunting Work Order" operation in the station vehicle terminal interface, enter the number of planned operation hooks and other information, click Save, and a shunting plan will be generated.

[0016] 2) After the shunting operation order is generated, select the operation order plan in the index tree of the vehicle operation terminal operation interface to display the editing view of the operation order. In this view, the detailed information of the operation order can be edited, including "train number" (the train number of the shunting operation can be empty), "locomotive number" (the 8-digit locomotive number of the shunting operation), "operation item" (description information of the shunting operation), "control mode" ("automatic" and "interactive"), and shunting unit information.

[0017] 3) For this shunting operation, input the shunting route information through the interface operation. The interface display example of the final shunting operation list is as follows: Figure 2 shown.

[0018] 4) Click Issue to send the shunting work order to the station autonomous machine via the extension using a proprietary protocol.

[0019] The existing CTC system shunting operation operation terminal, i.e., the train terminal, issues shunting plans (shunting work orders) through predefined protocol messages. Each shunting work order plan contains several shunting hook plans, and each hook plan contains several shunting routes (shunting trips). The autonomous machine constructs a shunting instruction for each shunting route in each hook plan. All shunting instructions constructed by each order are stored in the instruction set (repList) of the shunting order, and repList is associated one by one with the shunting work order. The single plans created by all shunting orders of a single station are stored in the shunting work order set (sheetList), and sheetList is associated one by one with the station.

[0020] 2. The autonomous machine generates a set of shunting instructions based on the shunting operation sheet and executes them in sequence. After receiving the shunting route application sent by the locomotive through the wireless communication network or the manual route operation of the vehicle terminal, the autonomous machine checks the driving safety control conditions of the shunting instructions to be executed according to various rules and regulations, static configuration requirements and the current real-time status of the station. After the inspection is passed, the autonomous machine sends the route application of the complete shunting plan route to the interlocking system through the extension and waits for the interlocking receipt. Specific:

[0021] 1) After receiving the shunting operation order, the station autonomous machine generates a shunting instruction for each shunting route plan according to the principle of "one route, one instruction" and waits for the next manual trigger operation.

[0022] 2) After receiving the request from the station staff or locomotive maintenance staff, the autonomous machine triggers the shunting command trigger operation and performs various safety card control check logics such as the interlocking condition check and CTC condition check of the shunting command. All check conditions are based on the shunting route as the object to be checked. If the check fails, the error message receipt is fed back to the trigger operation sending end, and the trigger operation process ends; if the check succeeds, the autonomous machine sends the complete shunting route routing command information to the interlocking through the extension, and waits for the interlocking routing result.

[0023] 3) After the interlocking route is successfully arranged, the autonomous machine monitors the station information sent by the interlocking and updates the status of the shunting order (waiting, successful route arrangement, occupied, cleared, etc.). When there is an unfinished shunting route, the section route needs to be manually unlocked so that the shunting order can be cleared normally without affecting the execution of the subsequent shunting plan.

[0024] 3. After the route is arranged successfully, the locomotive enters the shunting route as planned. When the locomotive cannot completely occupy and clear the shunting route, manual intervention is required to cancel the arranged route so that the shunting instructions inside the autonomous machine can be cleared normally.

[0025] At present, the shunting function of the decentralized autonomous dispatching centralized system has the following problems or needs to be improved in actual field applications:

[0026] 1. The preparation of shunting plans (shunting work orders) failed to effectively utilize input from external information systems, but relied entirely on manual input by station train personnel, resulting in low work efficiency, low degree of automation and high risk of errors.

[0027] 2. The shunting and routing logic is simple and crude, with many operation interruptions and manual intervention links, low routing efficiency, and failure to realize typical shunting and routing operation scenarios such as mid-route reversal, reuse of old roads, and reversal after branching.

[0028] 3. Lack of shunting tracking function. The tracking server located in the center does not receive the shunting plan from the station vehicle terminal, and the existing CTC system uses the train number as the main tracking basis, while the shunting locomotive normally has no train number, only the corresponding locomotive number. As a result, the vehicle personnel can only determine the locomotive position based on the station area occupancy information, which poses certain safety risks.

[0029] 4. The clearing logic of shunting instructions is not set properly. The existing logic requires that the shunting route be completely cleared, which is inconsistent with the actual shunting operation. It further introduces more manual intervention operations, reduces work efficiency, and increases the workload.

[0030] In addition, there is currently a technical solution (called the second prior art solution), namely the Chinese patent application with publication number CN114394132A, "An Improved Method, Equipment and Medium for Handling Shunting Routes in a Dispatching Centralized System", which interconnects the current vehicle system with the CTC system, and the current vehicle system provides basic shunting plan data to the CTC system. Specifically: in the CTC system railway bureau center, an interface server is deployed to realize the interconnection between the CTC system and the current vehicle system, and receive a large amount of indiscriminate shunting data. The central server of the CTC system broadcasts the shunting plan data to the vehicle service terminals of each station, which are screened and filtered by the station itself, and finally sent to the station self-discipline machine. Compared with the first prior art solution, the second prior art solution improves and optimizes the "shunting plan preparation and issuance" process. After obtaining the basic shunting data from the current vehicle system, more information such as shunting direction, automatic / manual trigger identification, etc. is added, and more abundant shunting route information (such as the current shunting route, the next shunting route to be executed, etc.) is displayed on the interface display. In the subsequent "shunting command triggering and execution" logic, the prior art solution two is exactly the same as the prior art solution one.

[0031] The second existing technical solution partially solves the problem of low automation and information level of plan preparation in the first existing technical solution (i.e. the first technical problem mentioned above), but there are still two major problems: 1) When there is no existing vehicle system to connect, the source of the shunting plan is lost and it is restored to the manual mode of the first technical solution; 2) The shunting plan is intervened by the center and broadcast to each station, which is very likely to cause information storms, waste precious network resources and station computing resources, and interfere with normal train operations. In addition, the second existing technical solution still has the subsequent second, third and fourth technical problems mentioned in the first existing technical solution. Summary of the invention

[0032] The purpose of the present invention is to provide an efficient shunting control module and an intelligent shunting method, which can improve the automation and information level of shunting plan preparation, realize more intelligent shunting routing logic and shunting locomotive train tracking function, and make the clearing logic of shunting instructions more reasonable.

[0033] The objective of the present invention is achieved through the following technical solutions:

[0034] An efficient shunting control module and an intelligent shunting method, comprising:

[0035] A shunting control module is set up, including: a station extension, and a tracking server, a vehicle operation terminal and an autonomous machine connected to the station extension respectively. The STP system and the current vehicle system are used as an alternative to each other. The basic data of the shunting plan is directly obtained from the station STP system through the STP interface function embedded in the vehicle operation terminal; or, the current vehicle system interface server deployed in the railway bureau center receives the basic data of the shunting plan from the current vehicle system, and transmits it to the vehicle operation terminal in sequence through the CTC application server, the communication server and the station extension; after the vehicle operation terminal obtains the basic data of the shunting plan, it compiles the shunting plan;

[0036] The shunting plan is transmitted to the tracking server and the autonomous machine via the station extension. The tracking server realizes real-time dynamic tracking of the shunting locomotive number. The autonomous machine generates a shunting instruction according to the shunting plan, and combines the real-time status of the station and the real-time dynamic tracking results of the shunting locomotive number to dynamically divide the shunting route indicated by the shunting plan into the part that cannot be routed, the part that does not need to be routed, and the part that can be routed, and intelligently generates the actual command set corresponding to the shunting instruction to realize intelligent shunting. For the shunting instruction that is currently in an occupied state, it is determined whether the current shunting instruction has been transferred to the clearing state based on whether the relevant shunting route has been cleared, or whether the trigger operation command of the next hook shunting instruction has been received.

[0037] It can be seen from the technical solutions provided by the present invention that: 1. By expanding the access to the STP system, the CTC system or the shunting control module does not need to rely on the current vehicle system at a single point to obtain the shunting plan; the overall access to the current vehicle system or the STP system improves the automation and informationization of the shunting plan compilation; the interface function of the redesigned interface server or the vehicle terminal integration enables the system to have data processing and directional distribution capabilities, reducing the occupancy rate of network resources and computing resources. 2. The shunting route scheduling logic is more intelligent. The autonomous machine can dynamically divide the part that cannot be scheduled, the part that does not need to be scheduled, and the part that is actually scheduled according to the original shunting plan, the real-time status of the station, and the results of the train tracking, to realize the intelligent shunting route scheduling function, ultimately reducing the manual intervention link, greatly improving work efficiency and driving operation safety. 3. The redesigned and deployed tracking server strengthens the information interaction with the vehicle terminal and the autonomous machine, realizes the train tracking function of the shunting locomotive, and further improves the intelligence of the shunting route scheduling and the safety of driving control. 4. The clearing logic of the shunting instruction is more reasonable, making the overall state jump of the shunting operation sheet more reasonable. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0039] Figure 1 A schematic diagram of the structure of an existing CTC system shunting module provided as the background technology of the present invention;

[0040] Figure 2 A schematic diagram showing an example of an existing shunting operation list interface display provided as the background technology of the present invention;

[0041] Figure 3 A flow chart of an efficient shunting control module and an intelligent shunting method provided by an embodiment of the present invention;

[0042] Figure 4 A schematic diagram of a shunting control module provided in an embodiment of the present invention;

[0043] Figure 5 A schematic diagram of the internal unit of the current vehicle system interface server provided in an embodiment of the present invention;

[0044] Figure 6 A schematic diagram of the correspondence between the shunting instruction, nominal command, and actual command provided in an embodiment of the present invention;

[0045] Figure 7A flow chart of intelligent shunting in a single mid-route reversal scenario, or a scenario where a branch reversal and a mid-route reversal occur simultaneously, provided by an embodiment of the present invention;

[0046] Figure 8 A flowchart of intelligent shunting in a single old road reuse scenario, or a scenario where branching and reversing and old road reuse occur simultaneously, provided by an embodiment of the present invention;

[0047] Fig. 9 A logic flow chart for clearing shunting instructions provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0048] The following is a clear and complete description of the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the protection scope of the present invention.

[0049] First, the terms that may be used in this article are explained as follows:

[0050] The term “and / or” means that either or both of them can be realized at the same time. For example, X and / or Y means both “X” or “Y” and “X and Y”.

[0051] The terms "include", "comprises", "contains", "has" or other descriptions with similar semantics should be interpreted as non-exclusive inclusion. For example, including certain technical feature elements (such as raw materials, components, ingredients, carriers, dosage forms, materials, dimensions, parts, components, mechanisms, devices, steps, procedures, methods, reaction conditions, processing conditions, parameters, algorithms, signals, data, products or products, etc.) should be interpreted as including not only certain technical feature elements explicitly listed, but also other technical feature elements known in the art that are not explicitly listed.

[0052] In view of various technical problems existing in the prior art, the embodiments of the present invention provide an efficient shunting control module and an intelligent shunting method, which are improved in the following aspects: 1) Introduce an external information input system, combine the station storage plan, train stage plan, etc., to generate a basic and framework shunting plan; 2) Redesign an efficient shunting method that is intelligent and scenario-based, and adapt to typical shunting and routing operation scenarios such as mid-way reversal, old road reuse, and switch reversal; 3) Sort out and define the information flow of shunting operations, and the tracking server realizes the automatic tracking function of the shunting locomotive based on the shunting plan and station interlocking information; 4) Consider key external operation information such as triggering operations, cut off the previous shunting instructions, and more reasonably realize the clearing logic of shunting instructions. Through the above improvements, various deficiencies of the existing technical solutions are solved, and the actual application needs on site are met, which has become a prerequisite for the current CTC system to be promoted and applied in conventional lines, large marshaling yards, etc.

[0053] The following is a detailed description of an efficient shunting control module and an intelligent shunting method provided by the present invention. The contents not described in detail in the embodiments of the present invention belong to the prior art known to professional and technical personnel in the field. If no specific conditions are specified in the embodiments of the present invention, the conventional conditions in the field or the conditions recommended by the manufacturer shall be followed.

[0054] like Figure 3 As shown, an efficient shunting control module and an intelligent shunting method provided by an embodiment of the present invention mainly include: redesigning the shunting control module, and realizing intelligent shunting based on the shunting control module, which are mainly as follows:

[0055] 1. Redesign the shunting control module.

[0056] The shunting control module mainly includes: a station extension, and a tracking server, a vehicle terminal and an autonomous machine respectively connected to the station extension, wherein a solution in which the STP system and the current vehicle system are replaced with each other is used, and the basic data of the shunting plan is directly obtained from the station STP system through the STP interface function embedded in the vehicle terminal; or, the current vehicle system interface server deployed in the railway bureau center receives the basic data of the shunting plan from the current vehicle system, and transmits it to the vehicle terminal in turn through the CTC application server, the communication server and the station extension; after the vehicle terminal obtains the basic data of the shunting plan, it prepares a shunting plan.

[0057] 2. Realize intelligent shunting based on shunting control module.

[0058] The main scheme is as follows: the shunting plan is transmitted to the tracking server and the autonomous machine via the station extension, the tracking server realizes real-time dynamic tracking of the shunting locomotive number, the autonomous machine generates a shunting instruction according to the shunting plan, and combines the real-time status of the station and the real-time dynamic tracking results of the shunting locomotive number to dynamically divide the shunting route indicated by the shunting plan into the part that cannot be routed, the part that does not need to be routed, and the part that is actually routed, and intelligently generates the actual command set corresponding to the shunting instruction to realize intelligent shunting. For the shunting instruction that is currently in an occupied state, it is determined whether the shunting instruction should be transferred to a cleared state based on whether the relevant shunting route has been cleared, or whether the trigger operation command of the next hook shunting instruction has been received.

[0059] Those skilled in the art can understand that in static scenarios, the idle state and the cleared state have the same station appearance, that is, both indicate that there is no vehicle occupying the station access and no route is arranged. In dynamic scenarios, the idle state generally describes the state before route arrangement, indicating whether the route arrangement conditions are met; while the cleared state is generally used to describe the state after the route is occupied, indicating that the train / locomotive has left the route, the route is occupied, and becomes idle again.

[0060] The above method provided by the embodiment of the present invention mainly achieves the following beneficial effects:

[0061] 1. According to the type of external input information source (existing vehicle system or STP system, different information sources involve different interactive connection methods, communication protocols, etc.), interactive terminals are reasonably set up in the center or station; through data and service coordination, the impact range of shunting data is effectively controlled, and on the basis of improving the efficiency of external data utilization, the network resource occupation of shunting data and the station computing resource occupation are reduced.

[0062] 2. Reasonably deploy the tracking server location, redefine the data flow of shunting business, and realize the tracking function of shunting locomotives.

[0063] 3. Redesign and implement intelligent shunting and routing methods to effectively deal with typical shunting and routing operation scenarios such as mid-course reversal, reuse of old roads, and branch reversal, and minimize manual intervention.

[0064] 4. Make full use of manual intervention operations (i.e. the triggering operation command of the next hook shunting instruction) as the dividing mark of shunting operations to improve the clearing logic of shunting instructions.

[0065] In order to more clearly demonstrate the technical solution and technical effects provided by the present invention, the following is an introduction from four aspects: typical shunting operation scenario, shunting control module design, shunting tracking function implementation, and intelligent shunting solution.

[0066] 1. Typical shunting operation scenarios.

[0067] Shunting is an important and complex part of the railway transportation production process. Shunting operations are prone to inertia accidents such as collisions and derailments. They are also prone to problems such as train delays due to problems such as train marshaling. Shunting operations are complex to organize and the methods are flexible and diverse. The main operations include marshaling, unhooking, picking up and delivering. In order to make shunting operations scientific, reasonable, orderly and safe, the principles of fixed operating areas, fixed lines and fixed locomotive personnel are generally followed. Therefore, summarizing and arranging typical shunting operation scenarios and concentrating on solving related problems that account for the largest proportion and have the most prominent contradictions are the basis and prerequisite for the research of the technical solution of the present invention.

[0068] The typical shunting operation scenarios are summarized into three typical scenarios: mid-way turnaround, reuse of old routes, and turnaround by switching.

[0069] 1. Turn back halfway.

[0070] From a safety perspective, shunting routes (planned route range) generally cover and far exceed the actual routes in use. The previous shunting plan arranged a long route, and after completing the shunting operation in the middle of the route, the locomotive (in the direction of the original path) turned back. At this time, for the next shunting plan to be triggered, the locomotive is located in the middle of the route of this shunting plan, with an idle area in front of the front of the locomotive and a shunting sub-route remaining from the previous plan behind the rear of the locomotive. In this scenario, the idle area in front of the locomotive needs to perform route operations, and the locked area at the rear does not need and cannot open the signal (the signal in the remaining area of ​​the previous plan is still on, which conflicts with the route signal of this shunting plan).

[0071] In the mid-course reversal scenario, there may be a switch or no switch object between the actual position of the locomotive and the next shunting signal to be triggered. It is necessary to combine the switch pressing and reversing function (see the following description) to perform a single locking operation on the switch.

[0072] Those skilled in the art can understand that turnouts, non-turnouts and track sections are all track sections within a station. Since turnouts have the functions of determining the reverse direction and transferring the line, turnouts have a single lock operation in operation, while non-turnouts and track sections do not have this operation.

[0073] Scenario limitation 1: The planned route in the mid-route turnaround scenario must be a complex and long shunting route.

[0074] Scenario limitation 2: There must be a shunting route in front of the locomotive, and the shunting route must be in the state of interlocking idle + signal closed (the mid-way return scenario does not support the signal reopening operation of the shunting route); the locomotive is located in the middle of the shunting plan route; behind the locomotive tail, there must be a completely locked shunting route.

[0075] 2. Reuse of old roads.

[0076] Considering the scenario of reusing old routes, the remaining shunting routes (route objects are locked and signals are open) in the previous shunting plan may be part of the routes in the subsequent shunting plan. In this case, the subsequent shunting plan route scheduling operation only needs to perform route scheduling or signal reopening operations on other routes that need to be opened and are currently not open, and the remaining shunting routes in the previous plan can be directly reused (without performing any route scheduling or signal reopening operations).

[0077] Scenario limitation 1: The planned route in the old road reuse scenario must be a complex and long shunting route.

[0078] Scenario limitation 2: The reused old road must be located at the end of the shunting plan route and must be continuous.

[0079] Reusing old routes and turning back midway are two completely different shunting operation scenarios. The main difference is that the application scenario of turning back midway is generally a closely adjacent shunting plan (there is no other shunting plan between the two plans). The locomotive travels halfway along the route of the previous plan, ends the operation of the previous plan, turns around and turns back. After the locomotive turns around, the area ahead must be an idle area. The application scenario of reusing old routes is generally a shunting plan that is adjacent but not closely adjacent (there are other shunting plans between the two plans): the locomotive reuses the remaining part of the route of the previous plan, and the remaining part must be a locked route with a signal open route.

[0080] 3. Press the branch and turn back.

[0081] Because the locomotive is too long and / or the parking position is not suitable, before the shunting route is triggered, the locomotive has occupied the head object of the shunting route, resulting in the head area of ​​the shunting route (this area can be a sub-route of the complete shunting route, or it can be the complete shunting route) cannot open the signal. In this scenario, it is necessary to add a single lock to the turnout in the shunting route that cannot open the signal.

[0082] Scenario limitation 1: The planned route in the switch-return scenario can be a complex and long shunting route or a simple shunting route.

[0083] Scenario limitation 2: When the previous object of the shunting plan route is not empty, it must be in an occupied state; the occupied object in the switch return must be located at the head of the shunting plan route.

[0084] The above three typical scenarios can occur alone, and the switch-back and mid-way turn-back can occur at the same time, the switch-back and the reuse of the old road can occur at the same time, but the mid-way turn-back and the reuse of the old road cannot occur at the same time.

[0085] In the embodiments of the present invention, simple shunting routes and complex long shunting routes are special terms in this field, wherein a section of shunting route protected by a shunting signal is called a simple shunting route (or short shunting route); a shunting route composed of two or more simple shunting routes is called a long shunting route. Compared with a short shunting route, a long shunting route contains more signals and relatively more route objects, and therefore, it is also called a complex long shunting route.

[0086] 2. Design of shunting control module.

[0087] 1. Shunting control module structure.

[0088] The existing technical solutions have the problems of low automation level in preparing shunting plan (shunting operation plan) and difficulty in tracking shunting locomotives. Therefore, the present invention redesigns a new shunting control module structure to solve the related problems.

[0089] In order to solve the problem of low automation level in shunting plan preparation, all technical stations of domestic railways have basically installed the stock car system to realize the automation, informatization and integration of shunting work order preparation. In the railway bureaus and stations where the stock car system is installed, the existing central connection method is maintained, but the connected interface server will add filtering, positioning and directional distribution functions; in the railway bureaus and stations where the stock car system is not installed, the station vehicle terminal is considered to be directly connected to the railway wireless shunting locomotive signal and monitoring system (STP) to realize the real-time transmission of shunting plans.

[0090] In order to solve the problem of difficulty in tracking shunting locomotives, the central tracking server of the railway bureau is moved forward to the station; the shunting plan information flow is regenerated (i.e., regenerated) at the station extension end, so that the station tracking server can receive and process the shunting plan; the station tracking server realizes the tracking function of shunting locomotives by integrating the internal shunting plan and interlocking station status display of the CTC system.

[0091] Finally, the design realizes the shunting control module structure Figure 4 As shown, it includes the station extension and autonomous machine in the existing scheme 1, the vehicle service terminal integrating the STP system interface function, the newly added current vehicle system interface server and the tracking server of the migration position within the CTC system; specifically, the STP interface function of the current vehicle system interface server and the vehicle service terminal are both for obtaining the basic data of the shunting plan, and the two are mutually replaceable. Therefore, one of the functions can be selected for deployment according to the actual situation on site. For example, when the station is online with the STP system, the vehicle service terminal turns on the STP interface function, and there is no need to set up the current vehicle system interface server in the railway bureau center; when the station is not online with the STP system and the current vehicle system is deployed, the basic data of the shunting plan is obtained through the current vehicle system interface server and then transmitted to the vehicle service terminal.

[0092] 2. Design of information input for shunting plan.

[0093] In the embodiment of the present invention, the redesigned shunting control module integrates the current vehicle system interface server into the shunting control module compared to the existing technical solutions, thereby enhancing the integration and exclusivity of the shunting control module; the single message receiving and sending and protocol conversion functions of the existing current vehicle system interface server are changed, and the filtering and processing, data regularization and directional distribution functions of external disordered shunting data are added; and through the internal service coordination unit of the interface server, the resource utilization efficiency and data processing efficiency of the interface server are improved, thereby further enhancing the data connection and service connection between the CTC system and the current vehicle system.

[0094] In stations where the current vehicle system is not set up or cannot be connected, the vehicle service terminal with integrated interface function can be used to achieve data interconnection with the STP system in various ways such as Socket network communication, serial port communication or USB communication, so that the CTC system can obtain the shunting work order preparation information from the STP system in time, making up for the lack of shunting plan source caused by the lack of the current vehicle system.

[0095] The basic data of shunting plan received by the current car system interface server from the current car system or the train terminal from the STP system includes field operation information, shunting hook plan information, track current car information, current car arrival report and message sending information, etc. The CTC system sends information to the current car system through the current car system interface server or to the STP system through the train terminal, including message receipt information, shunting operation execution result information and arrival message sending point information, etc.

[0096] The schematic diagram of the internal unit design of the redesigned existing vehicle system interface server is as follows: Figure 5 As shown, it mainly includes:

[0097] 1) Service coordination unit, used to realize the coordinated scheduling of various resources and services within the current vehicle system interface server;

[0098] 2) The original data transceiver unit (located at the bottom layer) is used to realize the reception of customized original data streams and bidirectional data transmission, which refers to the transmission of the original data stream from the current vehicle system to the data filtering and processing unit, and the transmission of data from the CTC application server to the current vehicle system. This unit shields the bottom layer connection mode to provide the reception and transmission functions of customized original data streams, and provides structured data to the upper layer.

[0099] 3) Data filtering and processing unit, used to filter and regularize shunting data according to static configuration data, and process the original data stream. The static configuration data here is mainly used to illustrate the data forwarding flow and processing rules.

[0100] 4) Data directional distribution unit, used to send the basic data of the shunting plan processed by the data filtering and processing unit to the station extension of the designated station through the CTC application server and the communication server in turn according to the source and purpose.

[0101] 3. The shunting tracking function is realized.

[0102] In the embodiment of the present invention, the deployment location of the tracking server is changed from a centralized central setting to a station distribution setting, which also improves the redundancy and reliability of the tracking service to a certain extent. The tracking server adds the function of receiving and processing the shunting plan integrated and issued by the vehicle service terminal, and on the basis of ensuring the existing train tracking logic, the shunting locomotive tracking function is designed and implemented.

[0103] The tracking server realizes the real-time dynamic tracking of the train number of the shunting locomotive, including: the tracking server receives the shunting plan, and automatically adds the preset train number in the non-centralized area and the locomotive depot port according to the information in the shunting plan and the real-time status information of the station; according to the existing station type statistics, the object outside the port may be a non-branch, section or auxiliary line. In order to unify the operation, the port outside will no longer track the train number, and the preset train number will be uniformly displayed on the shunting signal in the port area. Afterwards, according to the information in the shunting plan, the interlocking routing information and the autonomous machine shunting instructions, the real-time dynamic tracking function of the shunting locomotive is realized with the support of its own route static configuration data. The route static configuration data here refers to the configuration information of the route, which is data that has been prepared in advance before the system is run.

[0104] The tracking result of shunting locomotive number can be simply understood as the location of the train number. The tracking server intelligently and dynamically monitors the locomotive / train position according to the plan and real-time status of the station, and displays the tracking result to the outside in the form of train number information.

[0105] In the embodiment of the present invention, different tracking solutions are used for different shunting locomotive number tracking scenarios, including:

[0106] 1. Final arrival plan (removal): After the entry locomotive signal is triggered and opened, the locomotive will automatically generate the service locomotive number after pressing the shunting signal; the power attribute of the service locomotive number is consistent with that of the train; the shunting route is arranged to the entry line, and the track red disappears and the service locomotive number is deleted;

[0107] 2. Departure plan (heading): Preset the train number of the main locomotive at the port of the outbound line (shunting signal, configurable); input the train number in advance at the track; after the main locomotive tracks to the track, the train number of the main locomotive is automatically merged with the train number;

[0108] 3. Arrival and departure plan (removal): After the entry locomotive signal is triggered and opened, the locomotive will automatically generate the service locomotive number after the locomotive passes the shunting signal. The shunting route is arranged to the entry line, and the track red disappears and the service locomotive number is deleted;

[0109] 4. Arrival and departure plan (hanging): preset the locomotive number in advance at the outbound line port (shunting signal, configurable); the locomotive number and train number are automatically merged on the track;

[0110] 5. Turn back (change section): if the destination is the track, the original train's main locomotive number will be automatically generated and tracked after the locomotive leaves; the main locomotive number will be changed to the main locomotive number of the train after the coupling is changed; if the linkage plan is turned on for early verification, there is no need to modify it at this time, as it is already the updated main locomotive number, that is, the main locomotive number of the train after the coupling is changed; the main locomotive and the train number are automatically merged on the track.

[0111] Those skilled in the art will understand that a locomotive refers to a self-propelled vehicle (i.e., a locomotive) that pulls or pushes railway vehicles for operation but does not carry any commercial load itself. A main locomotive is a locomotive responsible for traction. A shunting locomotive is a locomotive used for shunting operations such as train marshaling, dismantling, line switching, and vehicle pickup and delivery. A train is a train of vehicles with locomotives attached.

[0112] During the shunting locomotive tracking process, if the corresponding positions of all switch objects in the shunting route are occupied or locked, the shunting route is considered to be locked. After the shunting route is locked, the first route object is occupied and the route status changes to occupied. After the route changes to occupied, all route objects are cleared or the autonomous machine receives the command clearing notification information, and the tracking server determines that the shunting route has been cleared. In addition, for the typical shunting operation switch reversal scenario, when the first section of the shunting route cannot be locked due to switch occupation and the signal cannot be opened, the shunting train number still needs to be tracked.

[0113] In addition, more abundant and easy-to-use interactive functions are added for the shunting tracking function to improve the system recovery capability under abnormal train tracking conditions. Specifically, the tracking server can also receive external input interactive information and adjust the relevant information in the real-time dynamic tracking process of the shunting locomotive, including:

[0114] 1. According to the interactive information input externally, add the shunting locomotive number to the track, and specify the locomotive power properties and track display position.

[0115] 2. According to the interactive information input from the outside, add the shunting locomotive number at the non-centralized area port and specify the locomotive power attributes.

[0116] 3. Based on the interactive information input from the outside, you can add the locomotive number of your own service at the locomotive depot port and specify the locomotive power properties.

[0117] 4. According to the interactive information input from the outside, modify the preset train number and power attributes of the shunting locomotive and the main locomotive displayed on the (non-centralized area or locomotive depot) port.

[0118] 5. According to the interactive information input externally, modify the shunting locomotive and main locomotive number, power attributes and track display position displayed on the track and shunting route objects.

[0119] 6. According to the interactive information input externally, delete the shunting locomotive numbers (shunting locomotive, main locomotive, occupied loss, preset) on the (non-centralized area or locomotive depot) ports, tracks and shunting route objects.

[0120] 4. Intelligent shunting solution.

[0121] 1. Route restrictions and noun definitions, and newly added nominal commands.

[0122] Before introducing the specific intelligent shunting solution, we will first explain the route restrictions, term definitions, and newly added nominal commands.

[0123] 1) Access restrictions and term definitions.

[0124] There are alternative train routes, and the configuration of various alternative train routes is relatively complete. For the determined start and end buttons, the shunting route is generally only configured with a single route. The alternative routes for complex and long shunting are generally not configured due to the huge workload of manual configuration. This leads to the concept of various routes in the actual execution stage of the shunting plan, including shunting routes, routes that cannot be arranged, routes that do not need to be arranged, and practical routes (collections). Specific:

[0125] The shunting route directly indicated by the shunting plan is recorded as PlanRoute.

[0126] In PlanRoute, the (starting) sub-route that cannot be routed due to branching or turning back in the middle is recorded as UsedRoute, which is the part that cannot be routed.

[0127] In PlanRoute, the (terminal) sub-route that does not require routing because it has been locked and opened due to a mid-way turn is recorded as ReadyRoute, which belongs to the part that does not require routing.

[0128] The part of PlanRoute excluding UsedRoute and ReadyRoute that actually needs to send a routing command or a signal reopening command is called a practical route, denoted as TriggerRoute, and belongs to the practical routing part; the practical route is a single shunting route or a collection of several sub-routes.

[0129] In addition, in the configuration file, a complex and long shunting route is composed of several simple shunting routes SubRoute combination.

[0130] 2) Added nominal command.

[0131] Under the new function, a single shunting route may correspond to M turnout locking commands and N shunting route routing commands, where M and N are zero or positive numbers. A single shunting instruction corresponds to M+N commands. Different commands may be in different states, especially after the "routing command depends on extension receipt" function is enabled, multiple commands need to go through the process of interaction between the autonomous machine and the extension in sequence. In order to ensure the principle of associating a single shunting instruction with a single command, the autonomous machine innovatively introduces the concept of nominal command and actual command; such as Figure 6 As shown, the correspondence between shunting instructions, nominal commands, and actual commands, wherein the nominal command and the shunting instruction are in a one-to-one relationship, the nominal command and the actual command are in a one-to-many relationship, and the turnout single locking command and the shunting routing command are both actual commands.

[0132] The processing logic of the nominal command (shunting assembly command) is as follows:

[0133] The logic for judging the success of the execution of a nominal command: if all actual commands under the nominal command have been executed successfully, the execution of the nominal command is successful; otherwise, the execution of the nominal command is unsuccessful.

[0134] The timeout judgment logic of the nominal command: if any actual command under the nominal command has timed out, then the nominal command has timed out; otherwise, the execution of the nominal command has not timed out yet.

[0135] The logic for judging whether a nominal command has ended: if all actual commands under the nominal command have ended, the nominal command has ended; or if the nominal command succeeds or times out, and the specified time has passed, the nominal command has ended; in other cases, the execution of the nominal command has not yet ended.

[0136] When the actual command has ended, the actual command will not be deleted. When the nominal command to which the actual command belongs has ended, all actual commands under the nominal command will be deleted, and then the nominal command itself will be deleted, and then the autonomous machine master-slave synchronization operation of the control command will be performed.

[0137] 2. Intelligent shunting methods in various scenarios.

[0138] In the embodiment of the present invention, three typical scenarios are also considered, namely, mid-way reversal, old road reuse, and fork-and-turn. For different scenarios, the autonomous machine uses different methods to intelligently generate actual command sets corresponding to shunting instructions to achieve intelligent shunting routing. Considering that the fork-and-turn scenario can be combined with the mid-way reversal scenario or the old road reuse scenario, the fork-and-turn scenario is introduced into the mid-way reversal scenario and the old road reuse scenario for introduction.

[0139] 1) For a single mid-course turnaround scenario, or a scenario where a split turnaround and a mid-course turnaround occur simultaneously.

[0140] like Figure 7The figure shows the intelligent shunting flow chart for a single mid-way turnaround scenario, or a scenario where both the branch turnaround and the mid-way turnaround occur simultaneously, which mainly includes:

[0141] a) Determine whether to start the relevant intelligent shunting logic according to the shunting instruction; if so, enter step b); if not, exit the intelligent shunting logic.

[0142] b) Determine whether the following three conditions are met: the shunting route is a complex and long shunting route; the shunting instruction to be generated does not correspond to the first plan of the shunting plan; the shunting route is locked, occupied and idle in the order of locomotive travel, and there is at least one locked, occupied and idle object in the shunting route. Among them, the occupied, locked and idle of the station route and whether the signal is lit (open) are all real-time status of the station.

[0143] Here is a relevant scenario example: the locomotive runs from point A to point C via point B. When it runs to point B, it completes the task and returns to point A from point B. However, at this time, the shunting route is CBA. In terms of the station status, the route corresponding to point C is locked, the signal cannot be opened, point B is occupied, and point A is idle. There may be switches between BA that need to be locked. Point A needs to be rerouted. Therefore, a single lock command for 0 / 1 switches and a route rerouting command for the route corresponding to point C are issued.

[0144] c) If all conditions are met at the same time, a single nominal command corresponding to the shunting instruction is created, and actual commands under the nominal command are created. If there is a switch or no switch object between the actual position of the locomotive and the next shunting signal to be triggered, it means that the current scenario is that switch pressing and turning back and mid-way turning back occur at the same time, and several switch single locking commands (depending on the number of switches that need to be single locked) are generated and added to the nominal command list, and one or more shunting routing commands are generated and added to the nominal command list; if there is no switch or no switch object, one or more shunting routing commands are directly generated and added to the nominal command list; among them, the switch single locking command and shunting routing command added to the nominal command list are both actual commands.

[0145] d) Carry out shunting and routing inspection, including CTC condition inspection and interlocking condition inspection. After the inspection is passed, the autonomous machine sends all actual commands to the interlocking (including shunting and routing commands, and if a turnout single locking command is generated, it is also sent to the interlocking), sends the operation log to the maintenance station, and changes the corresponding shunting instructions to the triggered state; monitors and summarizes the execution status of each actual name through the nominal command, and judges the status of the nominal command according to the execution status of each actual name; if the status of the nominal command is successful execution, the shunting instruction is updated to the routing success state.

[0146] In the above process, if all conditions cannot be met at the same time, or if the inspection fails, it is determined whether it is an old road reuse scenario, thereby entering the intelligent shunting process of the corresponding scenario or the existing shunting complete routing process.

[0147] In the above scenario, in addition to PlanRoute, there is also the concept of TriggerRoute, that is, the shunting route (one or more simple shunting routes) that needs to be actually arranged in front of the locomotive head is the corresponding actual route in this shunting instruction. In the following situations, the monitoring and processing objects of the autonomous machine shunting instructions are all actual routes, not shunting routes: after the route is successfully arranged, it is judged that the locomotive has entered the route; after the route is successfully arranged, it is judged that the locomotive has not entered the route, but the signal is abnormally closed; after the route is occupied, it is judged that the route has been cleared. At the same time, the autonomous machine host synchronizes the actual route to the standby machine.

[0148] 2) For a single old route reuse scenario, or a scenario where branching and reversing occur simultaneously with old route reuse.

[0149] like Figure 8 The figure shows the intelligent shunting flow chart in a single old road reuse scenario, or in a scenario where the switchback and old road reuse occur simultaneously, which mainly includes:

[0150] a) Determine whether to start the relevant intelligent shunting logic according to the shunting instruction; if so, enter step b); if not, exit the intelligent shunting logic.

[0151] b) Determine whether PlanRoute is locked; if not, calculate the part of PlanRoute that cannot be routed and the part that does not need to be routed (i.e. UsedRoute and ReadyRoute); if locked, exit the intelligent shunting logic.

[0152] Specifically: b1) When calculating the part that cannot be routed, the shunting route that cannot be opened is required to meet the following requirements: several consecutive objects at the head of the route are in an occupied state; the part that cannot be routed is the shortest shunting route that contains the consecutive occupied objects. Objects in the part that cannot be routed can only be occupied or idle, and cannot be locked. The number of objects in the idle state can be 0; no matter whether the turnouts in the part that cannot be routed are occupied or idle, the turnout position is required to be consistent with the route configuration position, and the turnouts in the idle state cannot be closed alone. b2) When calculating the part that does not require routeing, traverse the sub-routes (i.e. SubRoute) of PlanRoute in reverse order, and require that the SubRoute is in a state where the route is locked and the signal is open.

[0153] c) Determine whether the parts that cannot be routed and the parts that do not need to be routed are both empty sets; if not, determine the actual route routing part (TriggerRoute) based on the parts that cannot be routed and the parts that do not need to be routed in PlanRoute, and the actual route routing part can be an empty set; if the parts that cannot be routed and the parts that do not need to be routed are both empty sets, exit the intelligent shunting logic. Here, when the parts that cannot be routed and the parts that do not need to be routed are both empty sets, it means that there is no need to turn around and reuse the old route at present, and the planned shunting and routing can be directly executed.

[0154] d) Create a single nominal command corresponding to the shunting instruction, generate a single switch locking command based on the part that cannot be routed and add it to the nominal command list, generate a shunting routing command based on the actual routing part and add it to the nominal command list, among which the single switch locking command and shunting routing command added to the nominal command list are both actual commands.

[0155] Here, when the actual operation routing part is not an empty set, for simplicity: d1) when the actual operation routing part can be combined into a single shunting route that actually exists in the configuration file, create a shunting routing command; d2) when the actual operation routing part is not configured in the route file, it is split into several simple shunting routes, and each simple shunting route corresponds to a shunting routing command.

[0156] e) Carry out shunting route inspection, including CTC condition inspection and interlocking condition inspection. After the inspection is passed: when the route arrangement command depends on the station extension receipt function, all actual commands are added to the autonomous machine and station extension interactive command chain list; when the route arrangement command depends on the station extension receipt function is not enabled, all actual commands are directly sent from the station extension to the interlocking and added to the interlocking command chain list; the nominal command is directly added to the interlocking command chain list.

[0157] Those skilled in the art will understand that the route scheduling command relies on the station extension receipt function, which requires the autonomous machine and the station extension to be turned on simultaneously. The opening of this function can ensure that the interlocking end processes the CTC control commands in sequence and in intervals, without causing the problem of command backlog.

[0158] f) Monitor and summarize the execution status of each actual name through nominal commands, and judge the status of the nominal command according to the execution status of each actual name; if the status of the nominal command is successful execution, update the shunting command to the successful route scheduling status; when the locomotive or train enters the route, the shunting command becomes occupied.

[0159] In the above scenario, there are nominal commands and actual commands. Due to the limitation that a shunting instruction can only be associated with one nominal command, only a single nominal command is created, and the autonomous machine determines whether the shunting route has the complete function of running the shunting locomotive based on the nominal command. Since the same shunting route operation may correspond to multiple actual commands and the number of buttons for a single package interlocking command is limited, it may be necessary to actually send multiple actual commands. The monitoring logic of actual commands and nominal commands has been explained in the aforementioned section on adding nominal commands, so it will not be repeated here.

[0160] In the above two scenarios, when the shunting instruction is in the state of successful route arrangement, the logic for judging whether the locomotive enters the shunting route is as follows: a) When the actual route is empty, pCheckRoute is PlanRoute; pCheckRoute indicates the route to be checked; b) When the actual route is not empty, pCheckRoute is the first sub-route to be arranged of the actual route. After finding pCheckRoute, it is necessary to perform logical checks such as signal light off and object occupation at both ends on pCheckRoute to determine whether to change the shunting instruction from the state of successful route arrangement to the state of occupation. Specifically: when judging the moment when the pCheckRoute signal turns off, and the objects at both ends are occupied or have been occupied in the recent period, it is determined that the locomotive enters the route, and the shunting instruction changes from the state of successful route arrangement to the state of occupation. Among them, the recent period refers to the period of time close to the moment when the signal turns off, which is generally configured by parameters, and the typical value is 6 seconds.

[0161] When the shunting instruction is in the successful route arrangement state and the locomotive has not entered the shunting route, the logic for judging whether the signal of the arranged shunting route is abnormally closed is as follows: a) When the actual route is empty, judge whether the PlanRoute signal is abnormally closed; b) When the actual route is not empty, judge whether any route signal of the actual route is abnormally closed; c) When any route signal of the actual route is abnormally closed, the shunting instruction changes from successful route arrangement to waiting state.

[0162] When the shunting instruction is in the occupied state, the logic for judging whether the route has been cleared is as follows: a) When the actual operation route is empty, judge whether the PlanRoute has been cleared. When the end object of the PlanRoute is a straight line object, the object is occupied or idle. When the end object of the PlanRoute is a turnout, the object is idle. All other non-end objects are idle. When the above conditions are met, the shunting instruction changes from occupied to cleared (defined as the shunting route clearing logic); b) The actual operation route contains only a single shunting route, or contains multiple simple shunting routes, and multiple simple shunting routes When they can be combined into a single complex long shunting route, the shunting route clearing logic is executed for the single shunting route or the combined complex long shunting route; c) When the actual operation route contains multiple simple shunting routes and cannot be combined into a single complex long shunting route, all non-terminal route objects are required to be in idle state, and the terminal simple shunting route executes the shunting route clearing logic; the shunting route clearing logic is: based on whether the relevant shunting routes have been cleared, or combined with whether the trigger operation command of the next hook shunting instruction is received, it is determined whether the current shunting instruction is transferred to the clearing state, which will be described in detail later.

[0163] 3) Logic for clearing shunting routes.

[0164] In the embodiment of the present invention, a more reasonable shunting route clearing logic is designed to make the overall state jump of the shunting operation sheet more reasonable, further reducing the manual intervention links.

[0165] like Fig. 9 As shown in the figure, the logical process of shunting route clearing mainly includes:

[0166] a) Determine whether the shunting instruction is in an occupied state; if so, proceed to step b); if not, exit the shunting route clearing logic.

[0167] b) Determine whether the relevant shunting route has been cleared; if so, the current shunting instruction is changed to a cleared state; if not, proceed to step c).

[0168] In the embodiment of the present invention, when the following conditions are met, it is determined that the relevant shunting route has been cleared: b1) All non-terminal objects of the relevant shunting route are idle; b2) When the terminal object of the relevant shunting route is a straight line object, it can be idle or occupied, and cannot be locked; b3) When the terminal object of the relevant shunting route is a turnout, it needs to be idle. Here, the relevant shunting route refers to the actual operation route (TriggerRoute) in the shunting route (PlanRoute) indicated by the shunting plan.

[0169] c) Determine whether the trigger operation command for the next hook shunting instruction is received. If so, the current shunting instruction is changed to the clearing state; if not, the current state is maintained unchanged.

[0170] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above embodiments can be implemented by software, or by means of software plus necessary general hardware platforms. Based on such understanding, the technical solutions of the above embodiments can be embodied in the form of software products, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.), including several instructions for enabling a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in the various embodiments of the present invention.

[0171] The above is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed in the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. An intelligent shunting method based on an efficient shunting control module, characterized in that: include: A shunting control module is set up, including: a station extension, and a tracking server, a vehicle operation terminal and an autonomous machine connected to the station extension respectively. The STP system and the current vehicle system are used as an alternative to each other. The basic data of the shunting plan is directly obtained from the station STP system through the STP interface function embedded in the vehicle operation terminal; or, the current vehicle system interface server deployed in the railway bureau center receives the basic data of the shunting plan from the current vehicle system, and transmits it to the vehicle operation terminal in sequence through the CTC application server, the communication server and the station extension; after the vehicle operation terminal obtains the basic data of the shunting plan, it compiles the shunting plan; The shunting plan is transmitted to the tracking server and the autonomous machine via the station extension. The tracking server realizes the real-time dynamic tracking of the train number of the shunting locomotive. The autonomous machine generates a shunting instruction according to the shunting plan, and combines the real-time status of the station and the real-time dynamic tracking result of the train number of the shunting locomotive to dynamically divide the shunting route indicated by the shunting plan into the part that cannot be routed, the part that does not need to be routed, and the part that is actually routed, and intelligently generates the actual command set corresponding to the shunting instruction to realize intelligent shunting. For the shunting instruction currently in the occupied state, it is judged whether the current shunting instruction has been transferred to the clearing state according to whether the relevant shunting route has been cleared, or combined with whether the triggering operation command of the next hook shunting instruction has been received; The dynamic division of the shunting route included in the shunting plan into the part that cannot be routed, the part that does not need to be routed, and the part that is actually routed includes: the planned shunting route included in the shunting plan is recorded as PlanRoute; in PlanRoute, the sub-route that cannot be routed due to pressure switching or midway reversal is recorded as UsedRoute, which belongs to the part that cannot be routed; in PlanRoute, the sub-route that does not need to be routed due to midway reversal has been locked and opened is recorded as ReadyRoute, which belongs to the part that does not need to be routed; in the part of PlanRoute excluding UsedRoute and ReadyRoute, the sub-route that actually needs to send a route scheduling command or a signal reopening command is called an actual route, recorded as TriggerRoute, which belongs to the actual route scheduling part; the actual route is a single shunting route or a collection of several sub-routes; Intelligently generate the actual command set corresponding to the shunting instruction to realize the intelligent shunting route scheduling, including: for different scenarios, the autonomous machine uses different methods to intelligently generate shunting instructions to realize intelligent shunting route scheduling, among which, for a single old road reuse scenario, or a scenario where switchback and old road reuse occur at the same time: determine whether PlanRoute is locked; wherein PlanRoute is the planned shunting route; if not, calculate the part that cannot be routed and the part that does not need to be routed in PlanRoute; determine whether the part that cannot be routed and the part that does not need to be routed are both empty sets; if not, determine the actual route scheduling part based on the part that cannot be routed and the part that does not need to be routed in PlanRoute; then, create a single nominal command corresponding to the shunting instruction, generate a single switch lock command based on the part that cannot be routed, add it to the nominal command linked list, and The generated shunting and routing commands are added to the nominal command chain list; wherein, the nominal command and the shunting instruction have a one-to-one relationship, and the nominal command and the actual command have a one-to-many relationship, and the turnout single locking command and the shunting and routing command added to the nominal command chain list are all actual commands; a shunting and routing inspection is carried out, and after the inspection is passed: when the routing command is dependent on the station extension receipt function, all actual commands are added to the autonomous machine and station extension interactive command chain list; when the routing command is dependent on the station extension receipt function is not enabled, all actual commands are directly sent from the station extension to the interlocking and added to the interlocking command chain list; the nominal command is directly added to the interlocking command chain list; the execution status of each actual name is monitored and summarized through the nominal command, and the status of the nominal command is judged according to the execution status of each actual name; if the status of the nominal command is successful execution, it is updated to the routing success status; When the shunting instruction is in the state of successful shunting, the logic for judging whether the locomotive enters the shunting route is as follows: when the actual route is empty, pCheckRoute is PlanRoute; when the actual route is not empty, pCheckRoute is the first sub-route to be shunted of the actual route; among them, PlanRoute is the planned shunting route, and pCheckRoute indicates the route that needs to be checked; when judging the moment when the pCheckRoute signal goes out, if the objects at both ends are occupied or have been occupied in the recent period, it is determined that the locomotive enters the route, and the shunting instruction changes from successful shunting to occupied status; When the shunting instruction is in the route arrangement success state and the locomotive has not entered the shunting route, the logic for judging whether the signal of the shunting route is abnormally closed is as follows: when the actual route is empty, judge whether the PlanRoute signal is abnormally closed; when the actual route is not empty, judge whether any route signal of the actual route is abnormally closed; when any route signal of the actual route is abnormally closed, the shunting instruction changes from route arrangement success to waiting state; When the shunting instruction is in the occupied state, the logic of judging whether the route is cleared: when the actual operation route is empty, judge whether the PlanRoute is cleared. When the end object of the PlanRoute is a straight line object, it is in the occupied or idle state. When the end object of the PlanRoute is a turnout, it is in the idle state. All other non-terminal objects are in the idle state. When the above conditions are met, the shunting instruction changes from occupied to cleared state; the actual operation route contains only a single shunting route, or contains multiple simple shunting routes, and multiple simple shunting routes can be combined into a single When there is a complex and long shunting route, the shunting route clearing logic is executed for the single shunting route or the combined complex and long shunting route; when the actual operation route contains multiple simple shunting routes and cannot be combined into a single complex and long shunting route, all non-terminal route objects are required to be in idle state, and the terminal simple shunting route executes the shunting route clearing logic; the shunting route clearing logic is: based on whether the relevant shunting routes have been cleared, or combined with whether the trigger operation command of the next hook shunting instruction is received, it is judged whether the current shunting instruction is transferred to the clearing state.

2. The intelligent shunting method based on the efficient shunting control module according to claim 1 is characterized in that: The current vehicle system interface server includes: The service coordination unit is used to coordinate and dispatch various resources and services within the current vehicle system interface server; The original data transceiver unit is used to realize the reception of customized original data streams and bidirectional data transmission, wherein the bidirectional data transmission refers to transmitting the original data stream from the current vehicle system to the data filtering and processing unit, and transmitting the data from the CTC application server to the current vehicle system; The data filtering and processing unit is used to filter and regularize the shunting data according to the static configuration data and process the original data stream; The data directional distribution unit is used to send the basic data of the shunting plan processed by the data filtering and processing unit to the station extension of the designated station through the CTC application server and the communication server in turn according to the source and purpose.

3. The intelligent shunting method based on the efficient shunting control module according to claim 1 is characterized in that: The tracking server implements real-time dynamic tracking of shunting locomotives, including: The tracking server receives the shunting plan, and automatically adds preset train numbers in the non-centralized area and locomotive depot ports based on the information in the shunting plan and the real-time status information of the station. Afterwards, based on the information in the shunting plan, interlocking routing information and autonomous machine instruction status information, and with the support of its own route static configuration data, the real-time dynamic tracking function of the shunting locomotive is realized.

4. The intelligent shunting method based on the efficient shunting control module according to claim 1 or 3, characterized in that: Different tracking solutions are used for different shunting locomotive tracking scenarios, including: Final arrival plan: After the entry locomotive signal is triggered and opened, the locomotive will automatically generate the service locomotive number after pressing the shunting signal; the power attribute of the service locomotive number is consistent with that of the train; the shunting route is arranged to the entry line, and the track red disappears and the service locomotive number is deleted; Departure plan: pre-set the train number of the service locomotive at the port of the outbound line; input the train number in advance on the track; after the service locomotive tracks to the track, the service locomotive number and the train number are automatically merged; Arrival and departure plan: After the entry locomotive signal is triggered and opened, the locomotive will automatically generate the service locomotive number after pressing the shunting signal, and the shunting route will be arranged to the entry line. The track red disappears and the service locomotive number is deleted; Arrival and departure plan: pre-set the service locomotive number at the port of the outbound line; the service locomotive number and the train number are automatically merged on the track; Arrive and turn back: if the destination is the track, the original train's main locomotive number is automatically generated and tracked after the locomotive leaves; the main locomotive number is modified to the main locomotive number of the train after the coupling is changed; if the linkage plan is turned on for early verification, there is no need to modify it at this time, as it is already the updated main locomotive number, that is, the main locomotive number of the train after the coupling is changed; the main locomotive and the train number are automatically merged on the track.

5. The intelligent shunting method based on the efficient shunting control module according to claim 1 or 3, characterized in that: The tracking server can also receive external input interactive information and adjust relevant information in the real-time dynamic tracking process of the shunting locomotive, including: According to the interactive information input from the outside, add the shunting locomotive number to the track, and specify the locomotive power attributes and track display position; According to the interactive information input from the outside, add the shunting locomotive number at the non-centralized area port and specify the locomotive power attributes; According to the interactive information input from the outside, the locomotive number of the locomotive can be added at the locomotive depot port, and the locomotive power attributes can be specified; Modify the preset train numbers and power properties of the shunting locomotive and the main locomotive displayed on the port according to the interactive information input externally; Modify the shunting locomotive and service locomotive number, power attributes and track display position displayed on the track and shunting route objects according to the interactive information input externally; According to the interactive information input externally, delete the shunting locomotive number on the port, track and shunting route objects.

6. The intelligent shunting method based on the efficient shunting control module according to claim 1 is characterized in that: Intelligently generate the actual command set corresponding to the shunting instruction to realize the intelligent shunting route, including: For different scenarios, the autonomous machine uses different methods to intelligently generate the actual command set corresponding to the shunting instruction to realize intelligent shunting routing. For a single mid-way turnaround scenario, or a scenario where both the branch turnaround and the mid-way turnaround occur at the same time: Determine whether the following conditions are met: the planned shunting schedule is a complex and long shunting route; the shunting instruction to be generated does not correspond to the first plan of the shunting plan; the planned shunting route is locked, occupied and idle in the order of locomotive travel, and there is at least one locked, occupied and idle object in the planned shunting route; If all conditions are met at the same time, a single nominal command corresponding to the shunting instruction is created, and an actual command under the nominal command is created. If there is a switch or no switch object between the actual position of the locomotive and the next shunting signal to be triggered, it means that the current situation is a scene where the switch pressing and turning back and the midway turning back occur at the same time, and several switch single locking commands are generated and added to the nominal command chain list, and one or more shunting routing commands are generated and added to the nominal command chain list; if there is no switch or no switch object, one or more shunting routing commands are directly generated and added to the nominal command chain list; among them, the switch single locking command and shunting routing command added to the nominal command chain list are both actual commands; Carry out shunting and routing inspection. After the inspection is passed, the autonomous machine sends all actual commands to the interlocking, sends the operation log to the maintenance station, and changes the corresponding shunting instructions to the triggered state; monitors and summarizes the execution status of each actual name through nominal commands, and determines the status of the nominal command according to the execution status of each actual name; if the status of the nominal command is successful execution, update the shunting instruction to the successful routing status.

7. The intelligent shunting method based on the efficient shunting control module according to claim 1 or 6, characterized in that: The monitoring and summarizing the execution status of each actual name through the nominal command, and judging the status of the nominal command according to the execution status of each actual name includes: If all actual commands under the nominal command have been successfully executed, the nominal command is successfully executed; otherwise, the nominal command is not successfully executed; If any actual command under the nominal command has timed out, the nominal command has timed out; otherwise, the execution of the nominal command has not timed out yet; If all actual commands under the nominal command have been completed, the nominal command has been completed; or if the nominal command succeeds or times out, and the specified time has passed, the nominal command has been completed; in other cases, the execution of the nominal command has not yet been completed; When the actual command ends, the actual command will not be deleted. When the nominal command to which the actual command belongs ends, all actual commands under the nominal command will be deleted, and then the nominal command itself will be deleted.

Citation Information

Patent Citations

  • Improvement method and equipment for shunting route handling of centralized dispatching system and medium

    CN114394132A

  • CTC station autonomous controlling machine with self-learning system

    CN101513889A

  • Centralized dispatching system station self-regulatory machine

    CN102267479A

  • Distributed type station train number tracing logical method

    CN106394615A

  • Method and device realizing shunting route control by combining STP and CTC

    CN106553664A