Composite structure foundation and construction method for eliminating drainage pipe connection misalignment

By arranging a cushion net, matrix and pavement layer at the connection point of the drainage pipe, and using the cooperation of the connecting frame and adjusting nut, the problem of uneven settlement and staggered opening of the drainage pipe under the soft soil layer is solved, and the connection of the drainage pipe is realized. Stability and proper operation of the interface.

CN116378190BActive Publication Date: 2024-10-18YANGTZE ECOLOGY & ENVIRONMENT CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310322164.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-29
Publication Date
2024-10-18
Estimated Expiration
2043-03-29

AI Technical Summary

Technical Problem

The joints of drainage pipes are prone to uneven settlement and misalignment under the influence of soft soil layers, which affects normal operation.

Method used

A composite architectural foundation is used, including cushion net, matrix, pavement layer and connecting frame. By adjusting the fit of nuts and connecting rods, it is ensured that the drainage pipe connection interfaces are at the same elevation, eliminating misalignment.

Benefits of technology

It effectively eliminates the misalignment of the drainage pipe connection, improves the foundation stability, and ensures the long-term stable operation of the drainage pipe.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116378190B_ABST
    Figure CN116378190B_ABST
Patent Text Reader

Abstract

The present invention provides a composite framework foundation and a construction method thereof for conveniently eliminating misaligned connection of drainage pipes. The composite framework foundation comprises a cushion net arranged at the lower side of a drainage pipe, a matrix body is covered on the cushion net, the matrix body covers the drainage pipe, a pavement layer is covered on the upper side of the matrix body, the pavement layer and the cushion net are connected by a connecting frame, a plurality of connecting frames are arranged along the length direction of the drainage pipe, two groups of connecting frames are arranged at both ends of each drainage pipe, and the connecting frames are arranged on both sides of the drainage pipe. The composite framework foundation and the construction method thereof realize that the connection interfaces of the drainage pipes are at the same elevation, and misaligned connection can be eliminated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of drainage pipe construction, and in particular to a composite framework foundation for eliminating drainage pipe connection misalignment and a construction method thereof. Background Art

[0002] The stability of the drainage pipe foundation is the key to the long-term stable operation of the drainage pipe. Soft soil layers such as silt and beach fill are very unfavorable to the construction of a stable drainage pipe foundation. In practice, it is generally adopted to replace high-quality soil or sand, drive piles into the bottom of the trench, or throw stones into the bottom of the trench to increase the strength of the soil layer. However, after a certain period of operation, the foundation of the drainage pipe will still be affected by the soft soil outside the trench, and displacement will occur, which will cause uneven settlement of the drainage pipe, and pipeline diseases such as misalignment will occur, affecting the normal operation of the drainage pipe. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide a composite structural foundation and a construction method thereof for eliminating misaligned connection of drainage pipes, so as to achieve that the connection interfaces of the drainage pipes are at the same elevation and eliminate misaligned connection.

[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a composite structural foundation for eliminating the misalignment of drainage pipe connections, including a cushion net arranged on the lower side of the drainage pipe, the cushion net is covered with a matrix body, the matrix body covers the drainage pipe, the upper side of the matrix body is covered with a pavement layer, the pavement layer and the cushion net are connected by a connecting frame, and multiple groups of connecting frames are arranged along the length direction of the drainage pipe, and two groups of connecting frames are arranged at both ends of each section of the drainage pipe, and the connecting frames are arranged on both sides of the drainage pipe.

[0005] In a preferred embodiment, the connecting frame includes a connecting rod, a connecting hook is provided at the lower end of the connecting rod, the connecting hook is connected to the cushion net, a lifting mechanism is provided at the upper end of the connecting rod, the lifting mechanism includes a supporting cylinder buried in the pavement layer, an adjusting nut is rotatably installed in the supporting cylinder, an external thread matching the adjusting nut is provided at the upper end of the connecting rod, and an operating hole corresponding to the connecting rod is provided in the pavement layer.

[0006] In a preferred embodiment, the support cylinder comprises two groups of half cylinders, the inner wall of the half cylinder is provided with a rotation groove, the outer side of the adjustment nut is provided with an annular protrusion that cooperates with the rotation groove, and connecting plates are provided on both sides of the half cylinder. The connecting plates of the two groups of half cylinders are connected by bolts.

[0007] In a preferred solution, the pavement layer includes a structural skeleton and concrete wrapping the structural skeleton, the structural skeleton is arranged on the upper side of the matrix, and the end of the structural skeleton is inserted into the original structure of the pavement.

[0008] In a preferred embodiment, the structural skeleton includes transverse steel bars and longitudinal steel bars.

[0009] In a preferred embodiment, the matrix body includes a sand matrix arranged in a lower layer and a soil matrix covering an upper layer of the sand matrix.

[0010] The present invention also provides a construction method for a composite framework foundation for eliminating misalignment of drainage pipe connections, comprising the following steps:

[0011] S1. Delineate the scope of drainage pipe construction on the surface of the original road surface structure, divide the original road surface structure into a demolition area and a retention area, and after demolishing the original road surface structure in the demolition area, dig to the required depth for burying the drainage pipe;

[0012] S2. Lay the cushion net, and tie and anchor each piece of cushion net with steel wire to form a whole;

[0013] S3. The drainage pipe is placed on the cushion net and connected in sequence along the groove section by section;

[0014] S4. The connecting hook at the lower end of the connecting rod is inserted from above and hooked onto the cushion net, and then tied and anchored by steel wire or fixed by welding, and the lifting mechanism is threadedly connected to the upper end of the connecting rod;

[0015] S5. First fill in the sand matrix, the highest position of which is higher than the top of the drainage pipe, and then fill in the soil matrix until the elevation of the new road structure to be poured, and compact it to form a matrix body;

[0016] S6. The structural skeleton is suspended above the matrix body, the ends of the transverse steel bars in the matrix body are inserted into the original structure of the pavement, and concrete is poured to cover the structural skeleton and the matrix body to form a pavement layer, and operation holes are reserved when pouring concrete;

[0017] S7. When the drainage pipe sinks and the sections are misaligned, adjust the lifting mechanism on the connecting frame at the end of the sinking drainage pipe, turn the adjusting nut to move the connecting rod upward, and move the cushion net and the drainage pipe upward at the same time, so that the connection interfaces of the drainage pipes are at the same elevation and the connection misalignment is eliminated.

[0018] The present invention provides a composite framework foundation for eliminating misalignment of drainage pipe connections and a construction method thereof. A composite foundation structure is formed by interconnecting a cushion net, a connecting rod, an adjusting nut, and a pavement layer. The connecting rod is adjusted to descend and ascend by rotating the adjusting nut to achieve the same elevation of the drainage pipe connection interface, thereby eliminating misalignment at the connection of two pipe sections and having high industrial utilization value. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:

[0020] Figure 1 It is a longitudinal cross-sectional schematic diagram of the present invention;

[0021] Figure 2It is a transverse cross-sectional schematic diagram of the present invention;

[0022] Figure 3 It is a schematic diagram of the three-dimensional structure of the present invention;

[0023] Figure 4 It is a schematic diagram of the connection between the connecting frame and the lifting mechanism;

[0024] Figure 5 is a top view of the support tube;

[0025] Figure 6 for Figure 5 Section view along plane AA;

[0026] Figure 7 It is a cross-sectional view of the connection between the support tube and the adjusting nut;

[0027] In the figure: drainage pipe 1, connecting frame 2, pavement layer 3, cushion net 4, matrix body 5, support cylinder 6, adjustment nut 7, original pavement structure 8, connecting rod 201, connecting hook 202, structural skeleton 301, concrete 302, operating hole 303, sand matrix 501, soil matrix 502, half cylinder 601, rotating groove 602, connecting plate 603, annular protrusion 701. DETAILED DESCRIPTION

[0028] like Figures 1 to 7 As shown, a composite structural foundation for eliminating misaligned connections of drainage pipes includes a cushion net 4 arranged on the lower side of the drainage pipe 1, and the cushion net 4 is generally in the shape of a rectangular sheet. During on-site construction, the cushion net is cut longitudinally, and the transverse width of the cushion net after cutting is substantially equivalent to the cross-sectional width of the bottom of the trench. The cushion net is laid along the bottom of the trench, and each piece of cushion net is tied and anchored by steel wire to form a whole. The cushion net 4 is generally made of high-strength No. 10 steel wire woven or welded in a field shape. Four crisscrossed steel wires are generally woven to form a rectangular hole. The side length of the rectangular hole can generally be set at about 5 cm. The surface of the steel wire is wrapped with a plastic layer or the surface of the steel wire mesh is coated with an anti-corrosion coating as a whole.

[0029] The drainage pipe 1 is arranged on the upper side of the cushion net 4, and the drainage pipe 1 is connected in sequence one section at a time. The cushion net 4 is covered with a matrix body 5, and the matrix body 5 covers the drainage pipe 1.

[0030] Preferably, the matrix body 5 includes a sand matrix 501 disposed at the bottom layer and a soil matrix 502 covering the upper layer of the sand matrix 501. The sand matrix can generally be medium-coarse sand, and the soil matrix can generally be cultivated soil.

[0031] After the drainage pipe 1 is installed on the cushion net 4, the sand matrix 501 is first filled in. Generally, after it exceeds the top of the drainage pipe 1 by 30 cm, the soil matrix 502 is then filled in until the elevation of the new road surface structure is to be poured. After the sand matrix and soil matrix are filled in, they are compacted to a compaction degree of not less than 0.85 to form a covering matrix body 5.

[0032] The upper side of the matrix body 5 is covered with a pavement layer 3, and the pavement layer 3 includes a structural skeleton 301 and concrete 302 that wraps the structural skeleton 301, and the thickness is generally greater than 5 cm. The structural skeleton 301 is arranged on the upper side of the matrix body 5, and the structural skeleton 301 includes transverse steel bars and longitudinal steel bars, which are generally formed by steel bars with a diameter greater than 10 mm and tied in a field shape in the vertical and horizontal directions. The spacing between two connected steel bars can generally be set at about 20 cm, forming a rectangular hole with a side length of 20 cm. The end of the structural skeleton 301 is inserted into the original structure 8 of the pavement.

[0033] The pavement layer 3 and the cushion layer net 4 are connected by connecting frames 2. Multiple groups of connecting frames 2 are arranged along the length direction of the drainage pipe 1. At least two groups of connecting frames 2 are arranged at both ends of each section of the drainage pipe 1. The two groups of connecting frames 2 are arranged on both sides of the drainage pipe 1.

[0034] The connecting frame 2 is generally made of steel bars, the diameter of which is generally greater than 10 mm, and the surface is coated with an anti-corrosion coating. The connecting frame 2 includes a connecting rod 201, and a connecting hook 202 is provided at the lower end of the connecting rod 201. The connecting hook 202 is connected to the cushion net 4. Specifically, the connecting hook 202 at the lower end of the connecting rod 201 penetrates from above and hooks the cushion net 4, and then is tied and anchored by steel wire or fixed by welding.

[0035] A lifting mechanism is provided at the upper end of the connecting rod 201, and the lifting mechanism includes a support tube 6 buried in the pavement layer 3. The support tube 6 is buried in the concrete 302 in the pavement layer 3. The support tube 6 can also be welded to the structural frame 301 to ensure the supporting strength of the support tube 6.

[0036] The adjusting nut 7 is rotatably installed in the supporting tube 6 , the upper end of the connecting rod 201 is provided with an external thread matched with the adjusting nut 7 , and the pavement layer 3 is provided with an operating hole 303 corresponding to the connecting rod 201 .

[0037] Preferably, Figures 5 and 6 The support cylinder 6 includes two groups of half cylinders 601, the inner wall of the half cylinder 601 is provided with a rotation groove 602, the outer side of the adjusting nut 7 is provided with an annular protrusion 701 that cooperates with the rotation groove 602, and connecting plates 603 are provided on both sides of the half cylinder 601. The connecting plates 603 of the two groups of half cylinders 601 are connected by bolts.

[0038] By setting the support tube 6 as two groups of half-tube 601 structures, it is convenient to install the adjusting nut 7 in the support tube 6. By limiting the adjusting nut 7 through the rotating groove 602, when the adjusting nut 7 rotates, the adjusting nut 7 is restricted from moving up and down, so that it can only rotate in the support tube 6.

[0039] During specific use, the adjusting nut 7 is rotated by rotating the adjusting nut 7 to make it rotate in the supporting tube 6. Due to the limitation of the supporting tube 6 on the adjusting nut 7, the adjusting nut 7 can only rotate but cannot move up and down. Under the cooperation of the threads of the connecting rod 201 and the adjusting nut 7, the connecting rod 201 can move up and down. Therefore, when the end interface positions of the two sections of the drainage pipe 1 are misaligned, the connecting rod 201 can be moved upward to pull the cushion net 4 and the drainage pipe 1 to move upward synchronously to eliminate the misalignment of the interface.

[0040] A construction method for a composite framework foundation that is convenient for eliminating misalignment of drainage pipe connections comprises the following steps:

[0041] S1. Delineate the scope of drainage pipe construction on the surface of the original road surface structure 8, divide the original road surface structure 8 into a demolition area and a retention area, and after demolishing the original road surface structure 8 in the demolition area, dig to the depth required for burying the drainage pipe 1.

[0042] S2. Lay the cushion layer net 4. Each cushion layer net 4 is tied and anchored by steel wires to form a whole.

[0043] S3. The drainage pipe 1 is placed on the cushion net 4 and connected in sequence along the groove section by section.

[0044] S4, the connecting hook 202 at the lower end of the connecting rod 201 penetrates from above and hooks the cushion net 4, and then is tied and anchored by steel wire or fixed by welding, and the lifting mechanism is threadedly connected to the upper end of the connecting rod 201.

[0045] S5, first fill in the sand matrix 501, the highest position of the sand matrix 501 is higher than the top of the drainage pipe 1, and then fill in the soil matrix 502 until the elevation of the new road surface structure to be poured, and tamp to form a matrix body 5.

[0046] S6, the structural skeleton 301 is suspended above the matrix body 5, the end of the transverse steel bar in the matrix body 5 is inserted into the original pavement structure 8, and concrete 302 is poured to cover the structural skeleton 301 and the matrix body 5 to form the pavement layer 3. When pouring the concrete 302, an operation hole 303 is reserved to facilitate the operation of the adjustment nut 7. After the construction is completed, a cover plate can be installed on the upper end of the operation hole 303 to prevent rainwater or mud and sand from entering the operation hole 303.

[0047] S7. When the drainage pipe 1 settles and the drainage pipe 1 is misaligned between sections, the lifting mechanism on the connecting frame 2 at the end of the settled drainage pipe 1 is adjusted. Specifically, the adjusting nut 7 is turned to move the connecting rod 201 upward, so that the cushion net 4 and the drainage pipe 1 move upward at the same time, so that the connection interface of the drainage pipe 1 is at the same elevation and the connection misalignment is eliminated. After the interface misalignment adjustment is completed, if the upper end of the connecting rod 201 exceeds the elevation of the pavement layer 3, the exceeding part is cut off.

[0048] The composite framework foundation utilizes the interconnection of cushion net, connecting rods and adjusting nuts, and pavement structure to form a composite foundation structure. The descent and rise of the connecting rods are adjusted by rotating the adjusting nuts to achieve the same elevation of the drainage pipe connection interfaces, which can eliminate the misalignment of the connection between the two pipe sections and has high industrial utilization value.

Claims

1. A composite framework foundation for eliminating misalignment of drainage pipe connections, characterized in that: The invention comprises a cushion net (4) arranged at the lower side of a drainage pipe (1), the cushion net (4) being in the shape of a rectangular sheet. During on-site construction, the cushion net (4) is cut longitudinally, the transverse width of the cushion net (4) after cutting is equivalent to the cross-sectional width of the bottom of the groove, the cushion net (4) is laid along the bottom of the groove, and each cushion net (4) is tied and anchored by steel wires to form a whole; the cushion net (4) is covered with a matrix body (5), the matrix body (5) covers the drainage pipe (1), the upper side of the matrix body (5) covers a pavement layer (3), the pavement layer (3) and the cushion net (4) are connected by a connecting frame (2), a plurality of connecting frames (2) are arranged along the length direction of the drainage pipe (1), two groups of connecting frames (2) are arranged at both ends of each section of the drainage pipe (1), the connecting frames (2) are arranged on both sides of the drainage pipe (1), the connecting frames (2) comprise connecting rods (201), the lower ends of the connecting rods (201) are provided with A connecting hook (202) is provided, the connecting hook (202) is connected to the cushion layer net (4), a lifting mechanism is provided at the upper end of the connecting rod (201), the lifting mechanism comprises a support tube (6) buried in the pavement layer (3), an adjusting nut (7) is rotatably installed in the support tube (6), an external thread matching the adjusting nut (7) is provided at the upper end of the connecting rod (201), and an operating hole (303) corresponding to the connecting rod (201) is provided in the pavement layer (3); the pavement layer (3) comprises a structural skeleton (301) and concrete (302) wrapping the structural skeleton (301), the structural skeleton (301) is arranged on the upper side of a matrix body (5), and an end of the structural skeleton (301) is inserted into the original pavement structure (8); the matrix body (5) comprises a sand matrix (501) arranged in a lower layer and a soil matrix (502) covering the upper layer of the sand matrix (501).

2. A composite framework foundation for eliminating misaligned connection of drainage pipes according to claim 1, characterized in that: The support cylinder (6) comprises two groups of half cylinders (601), the inner wall of the half cylinder (601) is provided with a rotation groove (602), the outer side of the adjustment nut (7) is provided with an annular protrusion (701) that matches the rotation groove (602), and connecting plates (603) are provided on both sides of the half cylinder (601). The connecting plates (603) of the two groups of half cylinders (601) are connected by bolts.

3. A composite framework foundation for eliminating misalignment of drainage pipe connections according to claim 1, characterized in that: The structural frame (301) comprises transverse steel bars and longitudinal steel bars.

4. A construction method for a composite framework foundation for eliminating misalignment of drainage pipe connections according to any one of claims 1 to 3, characterized in that: The steps include: S1. Delineating the scope of drainage pipe construction on the surface of the original road surface structure (8), dividing the original road surface structure (8) into a demolition area and a retention area, and after demolishing the original road surface structure (8) in the demolition area, digging to the depth required for burying the drainage pipe (1); S2, laying the cushion layer net (4), each cushion layer net (4) is tied and anchored by steel wire to form a whole; S3, the drainage pipe (1) is placed on the cushion net (4), and is connected one section at a time along the groove in sequence; S4, the connecting hook (202) at the lower end of the connecting rod (201) penetrates from above and hooks the cushion layer net (4), and then is tied and anchored by steel wire or fixed by welding, and the lifting mechanism is threadedly connected to the upper end of the connecting rod (201); S5, first fill in the sand matrix (501), the highest position of the sand matrix (501) is higher than the top of the drainage pipe (1), and then fill in the soil matrix (502) until the elevation of the new road surface structure to be poured, and tamp to form a matrix body (5); S6, the structural skeleton (301) is suspended above the matrix (5), the ends of the transverse steel bars in the matrix (5) are inserted into the original pavement structure (8), concrete (302) is poured to cover the structural skeleton (301) and the matrix (5), and a pavement layer (3) is formed. When pouring the concrete (302), an operation hole (303) is reserved; S7. When the drainage pipe (1) sinks and the drainage pipe (1) between sections is misaligned, the lifting mechanism on the connecting frame (2) at the end of the sinking drainage pipe (1) is adjusted, and the adjusting nut (7) is turned to move the connecting rod (201) upward, so that the cushion net (4) and the drainage pipe (1) are moved upward at the same time, so that the connection interfaces of the drainage pipe (1) are at the same elevation and the connection misalignment is eliminated.