A method for upgrading a steel mesh flexible manufacturing production line equipment
By structurally modifying the equipment of the flexible manufacturing production line for steel mesh, the problems of wasted space and operational difficulties under different bridge tower sizes were solved, improving the applicability and construction efficiency of the equipment, and ensuring construction safety and quality.
Patent Information
- Application Number
- CN202310442045.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-23
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2043-04-23
AI Technical Summary
Existing flexible steel mesh manufacturing production line equipment suffers from problems such as wasted land area, difficulty in maintaining the gantry track foundation, complex control circuits, and difficulty in manually dragging long stirrups when the bridge tower size is different, which affects construction efficiency and safety.
By modifying the structure of the equipment, including changing the gantry structure to a frame structure, optimizing the control circuit, adding an auxiliary wire threading mechanism, and adjusting the position and length of each mechanism according to the size of the bridge tower, the space utilization and ease of operation of the equipment are optimized.
This reduced the waste of equipment on the site, improved the applicability of the equipment and construction efficiency, and ensured construction safety and quality.
Smart Images

Figure CN116422815B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the technical field of upgrading flexible manufacturing production lines for steel mesh, specifically to a method for upgrading and transforming equipment in such production lines. Background Technology
[0002] Concrete bridge towers are widely used in cable-stayed bridge systems due to their high rigidity, good corrosion resistance, and reasonable cost. As bridge spans increase, concrete bridge tower structures are evolving towards higher, larger, and more challenging construction conditions.
[0003] The most common method for bridge tower reinforcement construction is to process unit components in the field and then manually tie them on-site. This is a labor-intensive, high-altitude operation with high labor intensity, low construction efficiency, and difficulty in guaranteeing quality. In recent years, with the development of prefabricated buildings, bridge tower reinforcement construction has also entered a new stage of modular construction technology. Flexible manufacturing production lines for steel mesh are used to process the reinforcement at centralized distribution centers, shifting the manual tying of reinforcement from the field to mechanized production in the factory, using machines to replace manual labor to the greatest extent possible. This highly integrates industrialization, intelligence, informatization, and standardization into bridge construction, changing the traditional construction mode of tower reinforcement, significantly improving construction efficiency and quality, and effectively ensuring construction safety.
[0004] The flexible manufacturing production line for steel mesh is the first specialized equipment in China for the integral forming of ultra-large steel mesh. Its structure is as follows: Figure 1 , Figure 2 As shown, the production line is 72m long, 14.5m wide, and 4m high, capable of producing steel mesh with stirrup lengths up to 27m and main reinforcement lengths up to 6m. It comprises seven main components: a stirrup material feeding mechanism, a long stirrup material placement and initial positioning mechanism, a stirrup traction and welding gantry mechanism, a main reinforcement material placement gantry mechanism, a main reinforcement material replenishment gantry mechanism, a primary planar bending mechanism, and a secondary three-dimensional bending mechanism. This production line features key functions such as unmanned stirrup feeding, automatic main reinforcement placement, automatic robotic welding and binding, and three-dimensional bending of the steel mesh, enabling automated forming of ultra-large bridge tower steel mesh with millimeter-level precision. However, due to the varying sizes of bridge towers, without proper modification, its large footprint would waste on-site work space. Furthermore, on-site use reveals problems such as difficult maintenance of the gantry track foundation, complex control circuitry hindering maintenance, and difficulty in manually dragging stirrups. Therefore, to improve the equipment's applicability, it is urgent to propose an upgrade and modification method for the flexible steel mesh manufacturing production line to meet actual production needs. Summary of the Invention
[0005] The main objective of this invention is to provide a method for upgrading and transforming equipment in a flexible manufacturing production line for steel mesh, thereby solving the problems mentioned in the background art.
[0006] To solve the above-mentioned technical problems, the technical solution adopted by the present invention is as follows: it includes determining the minimum longitudinal dimension of the production line based on the steel mesh stirrups of different lengths, using the position and length of the long stirrup preparation area as a benchmark to back-calculate the position and length of each mechanism, and then modifying the structure of each mechanism to meet the size requirements, including the modification of the mesh production area, the modification of the long stirrup preparation area, the modification of the long stirrup stepped feeding mechanism, the modification of the long stirrup conveying mechanism, and the modification of the long stirrup length fixing mechanism; Based on the initial performance of the equipment, the gantry, control circuit, and long stirrup threading were upgraded, and an auxiliary threading mechanism was added.
[0007] Preferably, the upgrade of the gantry is achieved by adding horizontal bracing between the gantry bottom beam and the gantry columns, changing the single-column load-bearing structure to a frame structure, and replacing the gantry track model and gantry wheels to increase the contact area between the gantry track and the gantry wheels.
[0008] Preferably, the upgrade of the control circuit involves setting up a separate control cabinet for the more complex circuit structure, and connecting it to the main control cabinet via network cables and power cables.
[0009] Preferably, if the length of the stirrup exceeds 29m, the long stirrup length-fixing mechanism, the long stirrup conveying mechanism, the long stirrup stepped feeding mechanism, the long stirrup material preparation area and the mesh production area need to be lengthened. Each mechanism is composed of unit components, and the length is increased by adding unit components and splicing them together. The length of each unit component can be customized and processed on site. If the length of the stirrup is 27~29m, the long stirrup preparation area and the mesh fabrication area need to be lengthened by adding unit components and splicing them together. The length of each unit component can be customized and processed on site. If the length of the stirrups is less than 27m, the working space in the production workshop is limited, and the equipment needs to be shortened. The length of the mesh production area and the long stirrup preparation area should be determined according to the length of the mesh stirrups.
[0010] Preferably, the mesh fabrication area is modified as follows: multiple composite beams are selected and combined according to the length of the mesh stirrups, and the remaining length is evenly laid through long bottom beams, with short bottom beams used at the tail end.
[0011] Preferred modification of the long stirrup preparation area: If the stirrup length is less than 14m, a set of lifting rollers will be used. The modification requires cutting the 9m section of the bottom beam and removing the excess chain frame. If the length of the stirrups is greater than 14m, two sets of lifting rollers are used. The second set of lifting rollers is customized to the appropriate length to adapt to the site conditions.
[0012] Preferably, the long stirrup stepped feeding mechanism, the long stirrup conveying mechanism, and the long stirrup length-fixing mechanism are all composed of multiple identical mechanisms. The modification is to make an adaptive modification by removing a single stirrup or customizing a required length according to the stirrup length.
[0013] Preferably, the auxiliary threading mechanism has a chain installed on the frame, and the moving working head moves along the chain via a traveling mechanism; When it is working, the moving working head first moves to the bottom of the stirrup to be inserted through the walking mechanism, and then lifts the stirrup conveying mechanism fixed to the support through the cylinder. After the stirrup is placed in the stirrup conveying mechanism, the conveying begins.
[0014] This invention provides a method for upgrading and transforming a flexible manufacturing production line for steel mesh. By analyzing the usage effect, applicable scope and structure of the flexible manufacturing production line for steel mesh, adaptive modifications are made to address the problems existing in the equipment. At the same time, the dimensions of some mechanisms of the equipment are adjusted according to the different sizes of bridge towers, thereby reducing the waste of on-site working space and improving the economic efficiency of use. Attached Figure Description
[0015] The present invention will be further described below with reference to the accompanying drawings and embodiments: Figure 1 This is a schematic diagram of the plan layout of the flexible manufacturing production line equipment for steel mesh of the present invention; Figure 2 This is the present invention. Figure 1 Elevation layout diagram; Figure 3 This is a view of the gantry structure of the present invention; Figure 4 This is a schematic diagram of the control circuit layout of the present invention; Figure 5 This is a front view of the auxiliary threading mechanism of the present invention; Figure 6 This is a structural view of the mobile working head of the present invention; Figure 7 This is a schematic view of the mesh fabrication area structure of the present invention; Figure 8 This is a structural view of the long stirrup preparation area of the present invention; Figure 9 This is a structural view of the long stirrup stepped feeding mechanism of the present invention; Figure 10 This is a structural view of the long stirrup conveying mechanism of the present invention; Figure 11 This is a structural view of the long stirrup length-fixing mechanism of the present invention; In the diagram: 1. Stirrup raw material storage rack; 2. Stirrup raw material feeding mechanism; 3. Butt welding machine; 4. Post-butt welding conveying mechanism; 5. Secondary bending mechanism; 6. Sequential planar bending mechanism; 7. Shearing mechanism; 8. Long stirrup length-fixing mechanism; 9. Auxiliary wire threading mechanism; 10. Long stirrup conveying mechanism; 11. Long stirrup stepped feeding mechanism; 12. Stirrup lifting roller; 13. Traction welding gantry; 14. Material placement gantry; 15. Material replenishment gantry; 16. Main reinforcement stepped feeding mechanism; gantry. 17. Bottom beam; 18. Gantry column; 19. Gantry track; 20. Horizontal brace; 21. One-time bending column; 22. Diagonal brace; 23. Frame; 24. Chain; 25. Moving work head; 26. Support; 27. Stirrup conveying mechanism; 28. Cylinder; 29. Walking mechanism; 30. 9.55m vertical bottom beam; 31. 5m section composite beam; 32. 7m section composite beam; 33. 1.2m vertical bottom beam; 34. 9m section bottom beam; 35. Lifting roller; 36. Chain frame. Detailed Implementation
[0016] Example 1 like Figures 1-11 As shown, a method for upgrading and transforming a flexible manufacturing production line for reinforcing mesh is presented. This flexible manufacturing production line is the first specialized equipment in China for the integral forming of ultra-large-sized reinforcing mesh. Its structure is as follows: Figure 1 , Figure 2 As shown, it comprises seven major components: a stirrup material feeding mechanism, a long stirrup material placement and initial positioning mechanism, a stirrup traction and welding gantry mechanism, a main reinforcement material placement gantry mechanism, a main reinforcement material replenishment gantry mechanism, a primary planar bending mechanism, and a secondary three-dimensional bending mechanism. Specifically, it includes a stirrup material storage rack 1, a stirrup material feeding mechanism 2, a butt welding machine 3, a post-butt welding conveying mechanism 4, a secondary bending mechanism 5, a sequential planar bending mechanism 6, a shearing mechanism 7, a long stirrup length-fixing mechanism 8, an auxiliary wire threading mechanism 9, a long stirrup conveying mechanism 10, a traction and welding gantry 13, a material placement gantry 14, a material replenishment gantry 15, and a main reinforcement stepped feeding mechanism 16.
[0017] The modification plan is as follows: 1. Regarding the difficulty in maintaining the foundation of the gantry track 19, it is analyzed that its structure is supported by a single column, which has poor stability and the track is narrow. During gantry operation, the unevenness of the gantry track 19 can easily cause derailment. Therefore, it is necessary to improve the structural stability of the gantry track 19 and replace it with a larger model and specification gantry track 19 and gantry traveling wheels. 2. To address the issue of complex control circuits, distribution control cabinets are set up for mechanisms with complex circuit structures. These cabinets are connected to the main control cabinet via network cables and power cables, thereby reducing the length of the circuits and improving maintenance efficiency. 3. To address the difficulty of manually dragging long stirrups, an auxiliary wire-threading mechanism has been added; 4. Determine the minimum longitudinal dimension of the production line based on the length of the steel mesh stirrups in the bridge tower. The dimensions are mainly determined by the length of the mesh processing area and the stirrup preparation area. 5. After the length of the equipment stirrup preparation area and the mesh processing area is determined, the position and length of each mechanism are calculated by reverse calculation based on the placement position and length of the stirrup preparation area, thereby reducing damage to this part of the mechanism; 6. After the minimum length of each mechanism is determined, it is disassembled and then reassembled to the required length based on the connection form and composition of each mechanism component. For some components that are integral structures, the bottom beam needs to be cut or the component needs to be remade.
[0018] Based on the initial performance of the equipment, the gantry, control circuitry, and long stirrup threading were upgraded, and an auxiliary threading mechanism 9 was added. Gantry Upgrade: Addressing the issue of difficult maintenance and easy deformation of the gantry track foundation (19), which leads to frequent derailment during gantry operation, such as... Figure 3 As shown, by adding a horizontal brace 20 between the gantry bottom beam 17 and the gantry column 18, and bending the column 21 and the gantry bottom beam 17 with a diagonal brace 22, the single column bearing structure is changed to a frame structure, which strengthens the foundation stability of the gantry track 19. In addition, the model of the gantry track 19 and the gantry traveling wheels are replaced, and the contact area between the gantry track 19 and the traveling wheels is increased to enhance its stability.
[0019] Control circuit upgrade: To address the issue of complex control circuits, a distribution control cabinet is installed for mechanisms with complex wiring structures. This cabinet is connected to the main control cabinet via network cables and power cables, thereby reducing wiring length and improving maintenance efficiency. The wiring layout is as follows: Figure 4 As shown.
[0020] Upgraded long stirrup threading: To address the difficulty of dragging long stirrups, an auxiliary threading mechanism 9 has been added; its structure is as follows: Figure 5 , Figure 6 As shown, a chain 24 is provided on the frame 23. The moving working head 25 moves along the chain 24 via the traveling mechanism 29. When it is working, the moving working head 25 first moves to the bottom of the stirrup to be inserted via the traveling mechanism 29, and then lifts the stirrup conveying mechanism 27 fixed on the bracket 26 via the cylinder 28. After the stirrup is placed in the stirrup conveying mechanism 27, the conveying can begin.
[0021] To accommodate the different lengths of the stirrups in the steel mesh to be processed, the corresponding structures of the mechanism are modified, including the mesh production area, the long stirrup preparation area, the long stirrup stepped feeding mechanism 11, the long stirrup conveying mechanism 10, and the long stirrup length-fixing mechanism 8.
[0022] If the length of the stirrup exceeds 29m, the long stirrup length-fixing mechanism 8, the long stirrup conveying mechanism 10, the long stirrup stepped feeding mechanism 11, the long stirrup material preparation area and the mesh production area need to be lengthened. Each mechanism is composed of unit components, and the length is increased by adding unit components and splicing them together. The length of each unit component can be customized and processed on site. If the length of the stirrup is 27~29m, the long stirrup preparation area and the mesh fabrication area need to be lengthened by adding unit components and splicing them together. The length of each unit component can be customized and processed on site. If the length of the stirrups is less than 27m, the working space in the production workshop is limited, and the equipment needs to be shortened. The length of the mesh production area and the long stirrup preparation area should be determined according to the length of the mesh stirrups.
[0023] Renovation of the mesh production area: The structural components of the mesh production area are as follows Figure 7 The structure can be functionally divided into three zones: a front section consisting of four 9.55m vertical bottom beams (30) forming the initial parking area for the traction and welding gantry, with a length of 4m; a middle section consisting of four combined bottom beams forming the mesh forming area, with a length of 5m + 3*7m; and a rear section consisting of six 9.55m vertical bottom beams (30) and two 1.2m vertical bottom beams (33) forming the parking area for three gantry structures, with a length of 8m. During the renovation, combined beams are selected based on the length of the mesh stirrups. These combined beams include 5m segments of combined beam (31) and 7m segments of combined beam (32). The remaining length is then pieced together using individual 9.55m vertical bottom beams (30) spaced 1m apart. At the rear 2m end, the bottom beams should be composed of 1.2m vertical bottom beams (33) to avoid interference with the main reinforcement stepped feeding mechanism.
[0024] Renovation of the long stirrup preparation area: its structure is as follows Figure 8 As shown, before the modification, this section was 27m long and consisted of two sets of lifting rollers 35 and a chain frame 36. The lifting rollers 35 were independent mechanisms, not connected to the bottom beam, and each set was 13m long, sufficient for preparing 14m long stirrups. The chain frame 36 was installed on the bottom beam, which consisted of three 9m sections of bottom beam 34 on each side. Therefore, during the modification, when the stirrup length was within 14m, it was considered as one set of lifting rollers 35. The modification method was to cut the bottom beam and then remove the excess chain frame 36. When the stirrup length was greater than 14m, two sets of lifting rollers 35 were used. The second set could also be customized to fit the site conditions.
[0025] Modification of the long stirrup stepped feeding mechanism 11: After the modification of the long stirrup preparation area, modifications were carried out sequentially according to length. Before the modification, the long stirrup stepped feeding mechanism consisted of 3 independent long stirrup stepped feeding mechanisms 11, such as... Figure 9 As shown, the single-group long stirrup stepped feeding mechanism is 8.4m long and can meet the feeding of stirrups with a length of up to 10m. During the modification, the adaptive modification can be completed by removing a single one or customizing a required length.
[0026] Modification of the long stirrup conveying mechanism 10: such as Figure 10 As shown, the long stirrup conveying mechanism consists of 3 independent long stirrup conveying mechanisms 10, each 8.4m long, which can meet the conveying of stirrups up to 10m in length. During the modification, a single stirrup can be removed or a custom-made one of the required length can be made according to the stirrup length to complete the adaptive modification.
[0027] Modification of the long stirrup length-fixing mechanism 8: such as Figure 11 As shown, the long stirrup length-fixing mechanism consists of 3 independent long stirrup length-fixing mechanisms 8. Each stirrup length-fixing mechanism is 10m long and can meet the length-fixing function of stirrups within 10m. During the modification, a single one can be removed or a required length can be customized according to the length of the stirrup.
[0028] The above embodiments are merely preferred technical solutions of the present invention and should not be considered as limitations on the present invention. The scope of protection of the present invention should be limited to the technical solutions described in the claims, including equivalent substitutions of the technical features described in the claims. That is, equivalent substitutions and improvements within this scope are also within the scope of protection of the present invention.
Claims
1. A method for upgrading and transforming a flexible manufacturing production line for steel mesh, the method comprising: determining the minimum longitudinal dimension of the production line based on the steel mesh stirrups of different lengths, using the position and length of the long stirrup preparation area as a benchmark, calculating the position and length of each mechanism, and then modifying the structure of each mechanism to meet the size requirements, including the transformation of the mesh production area, the transformation of the long stirrup preparation area, the transformation of the long stirrup stepped feeding mechanism (11), the transformation of the long stirrup conveying mechanism (10), and the transformation of the long stirrup length-fixing mechanism (8); Based on the initial performance of the equipment, the gantry, control circuit and long stirrup wire threading were upgraded, and an auxiliary wire threading mechanism (9) was added. The auxiliary threading mechanism (9) is a chain (24) installed on the frame (23). The moving working head (25) moves along the chain (24) through the walking mechanism (29). When it is working, the moving working head (25) moves to the bottom of the stirrup to be inserted through the walking mechanism (29), and lifts the stirrup conveying mechanism (27) fixed on the bracket (26) through the cylinder (28). After the stirrup is placed in the stirrup conveying mechanism (27), the conveying begins. If the length of the stirrup exceeds 29m, the long stirrup length-fixing mechanism (8), the long stirrup conveying mechanism (10), the long stirrup stepped feeding mechanism (11), the long stirrup material preparation area and the mesh production area need to be lengthened. Each mechanism is composed of unit components. The length is increased by adding unit components and splicing them together. The length of each unit component can be customized and processed on site. If the length of the stirrup is 27~29m, the long stirrup preparation area and the mesh fabrication area need to be lengthened by adding unit components and splicing them together. The length of each unit component can be customized and processed on site. If the length of the stirrup is less than 27m, the working space in the production workshop is limited, and the equipment needs to be shortened. The length of the mesh production area and the long stirrup preparation area should be determined according to the length of the mesh stirrup. Modification of the long stirrup preparation area: If the stirrup length is less than 14m, a set of lifting rollers (35) will be used. The modification requires cutting the 9m section of bottom beam (34) and removing the excess chain frame (36). If the length of the stirrup is greater than 14m, two sets of lifting rollers (35) are used. The second set of lifting rollers (35) is customized to adapt to the site conditions.
2. The method for upgrading and transforming the equipment of a flexible manufacturing production line for reinforcing steel mesh according to claim 1, characterized in that: The upgrade of the gantry is achieved by adding a cross brace (20) between the bottom beam (17) and the column (18) of the gantry, changing the single column bearing structure to a frame structure, and replacing the model of the gantry track (19) and the gantry wheels to increase the contact area between the gantry track (19) and the gantry wheels.
3. The method for upgrading and transforming the equipment of a flexible manufacturing production line for reinforcing steel mesh according to claim 1, characterized in that: Upgrading the control circuit involves setting up separate control cabinets for mechanisms with more complex circuit structures, and connecting them to the main control cabinet via network cables and power cables.
4. The method for upgrading and transforming the equipment of a flexible manufacturing production line for reinforcing mesh according to claim 1, characterized in that: Modification of the mesh fabrication area: Select multiple composite beams to combine according to the length of the mesh stirrups, and lay the remaining length evenly through long bottom beams, and lay short bottom beams at the tail end.
5. The method for upgrading and transforming the equipment of a flexible manufacturing production line for reinforcing steel mesh according to claim 1, characterized in that: The long stirrup stepped feeding mechanism (11), the long stirrup conveying mechanism (10) and the long stirrup length fixing mechanism (8) are all composed of multiple identical mechanisms. The modification is to make an adaptive modification by removing a single stirrup or customizing a required length according to the stirrup length.
Citation Information
Patent Citations
Gantry crane for cargo carrying
CN110407096A
Flexible production line and process for spatial three-dimensional reinforcing mes
CN110918838A
Sleeper reinforcement cage marshalling system
CN111346994A
Reinforcement cage forming device
CN208879590U