A working method of a pressure relief device for a blowing tank of a blast furnace intelligent blowing system
By designing multiple parallel pressure relief pipes and blowing tank pressure relief devices for emergency pressure relief pipes, the problem of pressure relief pipe blockage and system impact in the blast furnace intelligent blowing system has been solved, automatic pressure relief and blockage removal have been achieved, and the efficiency has been improved. System stability and accuracy.
Patent Information
- Application Number
- CN202310551550.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-16
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2043-05-16
AI Technical Summary
In the intelligent injection system of a large blast furnace, the blockage of the pressure relief pipe of the injection tank caused the intelligent program to be interrupted, requiring manual intervention. Furthermore, the influence of the pressure relief pipe and the relief pipe between the valves caused the injection tank weighing system to be inaccurate.
A blast furnace intelligent injection system injection tank pressure relief device is designed, including multiple parallel pressure relief pipelines and emergency pressure relief pipelines. The pressure relief channels are adjusted in real time through pressure detection and control valve groups to achieve automated pressure relief and cleaning. Blockage treatment to avoid the impact of blockage of the pressure relief system on the intelligent injection system.
It effectively reduces the impact of pressure relief system failures on the operation of the blast furnace intelligent injection system, realizes automatic emergency treatment and clearing of pressure relief pipeline blockages, and minimizes the impact of manual intervention and system failures.
Smart Images

Figure CN116497165B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a blast furnace coal injection system, in particular to a blast furnace intelligent injection system injection tank pressure relief device and a working method thereof. Background Art
[0002] The intelligent coal injection technology for large blast furnaces is becoming more and more mature, which greatly reduces the labor intensity of personnel. At present, intelligent injection often encounters blockage of the pressure relief pipe of the injection tank, which cannot be handled, resulting in the interruption of the intelligent program and manual intervention; or the pressure relief pipes between the injection tanks affect each other, and the pressure relief pipes and the relief pipes between valves affect the injection tank weighing system, which makes it impossible to achieve completely accurate intelligent operation. Summary of the invention
[0003] Purpose of the invention: The purpose of the present invention is to provide a pressure relief device for a blowing tank of a blast furnace intelligent blowing system and a working method thereof, so as to reduce the influence of blockage of the pressure relief system on intelligent blowing.
[0004] In order to achieve the above object, the present invention adopts the following technical solutions:
[0005] A blast furnace intelligent injection system injection tank pressure relief device, comprising a coal mill, a bag powder collector, a coal powder bin, a blowing tank, a pressure relief pipeline, a valve inter-valve release pipeline, and a purge gas source pipeline. The coal mill is connected to the bag powder collector through a mill outlet pipeline, the bag powder collector is connected to the coal powder bin, the coal powder bin is connected to the blowing tank through a powder loading pipeline, and the coal powder bin is provided with a bin top bag and a pressure detection element. The characteristic is that the pressure relief pipeline comprises a pressure relief main pipe, a first pressure relief pipeline, a second pressure relief pipeline, a third pressure relief pipeline, and an emergency pressure relief pipeline. The pressure relief main pipe is connected to the blowing tank, and the first pressure relief pipeline The first pressure relief pipe connects the pressure relief main pipe and the pulverized coal bin, the second pressure relief pipe connects the pressure relief main pipe and the bag powder collector, the third pressure relief pipe connects the pressure relief main pipe and the mill outlet pipe, the emergency pressure relief pipe connects the injection tank and the mill outlet pipe, the valve inter-release pipe connects the powder loading pipe and the mill outlet pipe, the purge air source pipe is respectively connected to the first pressure relief pipe and the second pressure relief pipe, the pressure relief main pipe is provided with a pressure detection element, and the pressure relief main pipe, the first pressure relief pipe, the second pressure relief pipe, the third pressure relief pipe, the emergency pressure relief pipe, the valve inter-release pipe and the purge air source pipe are all provided with control valve groups.
[0006] Furthermore, the number of the spray tanks is at least two, all the spray tanks are arranged in parallel, each spray tank corresponds to a group of pressure relief pipelines, and the groups of pressure relief pipelines are not connected to each other.
[0007] Furthermore, the main pressure relief pipe includes a primary pressure relief pipeline and a secondary pressure relief pipeline which are arranged in parallel, and the primary pressure relief pipeline and the secondary pressure relief pipeline have different pipe diameters.
[0008] Furthermore, the control valve groups of the pressure relief main pipe, the first pressure relief pipeline, the second pressure relief pipeline, the third pressure relief pipeline, the emergency pressure relief pipeline, and the inter-valve relief pipeline all adopt wear-resistant pneumatic valves.
[0009] Furthermore, outer walls of the main pressure relief pipe, the first pressure relief pipe, the second pressure relief pipe, the third pressure relief pipe, and the emergency pressure relief pipe are all covered with an insulation layer.
[0010] Furthermore, the purge gas source pipeline is connected to an inert gas source, and the control valve group of the purge gas source pipeline adopts a pneumatic valve.
[0011] The working method of the above-mentioned blast furnace intelligent injection system injection tank pressure relief device comprises:
[0012] According to the pressure value of the pulverized coal bin and the operation of the bag filters on the top of the silo, the first pressure relief pipe or the second pressure relief pipe is used as the pressure relief channel, and the gas in the injection tank is discharged to the bag collector or the pulverized coal bin through the pressure relief channel. During the gas discharge process, the pressure values of the pulverized coal bin, the pressure relief main pipe and the injection tank are detected in real time, and the pressure relief channel is adjusted and optimized in real time according to the pressure value.
[0013] Furthermore, when the bag filters on the silo top are in operation and the pressure in the pulverized coal bin reaches a first set value, the control valve group of the first pressure relief pipe is opened, and the control valve groups of the second pressure relief pipe, the third pressure relief pipe, the inter-valve relief pipe, and the emergency pressure relief pipe are closed, and the first pressure relief pipe is used as a pressure relief channel; when the bag filters on the silo top are not in operation or the pressure in the pulverized coal bin does not reach the first set value, the control valve group of the second pressure relief pipe is opened, and the control valve groups of the first pressure relief pipe, the third pressure relief pipe, the inter-valve relief pipe, and the emergency pressure relief pipe are closed, and the second pressure relief pipe is used as a pressure relief channel.
[0014] Furthermore, when the first pressure relief pipeline is used as a pressure relief channel, the pressure values of the pulverized coal bin and the pressure relief main pipe are detected in real time. When the pressure value of the pulverized coal bin is significantly reduced and the pressure value of the pressure relief main pipe is significantly increased, it is determined that the pressure relief channel has a tendency to be blocked. At this time, the control valve group of the third pressure relief pipeline is opened, and the third pressure relief pipeline and the first pressure relief pipeline are used together as pressure relief channels, and the pressure relief channel is auxiliaryly emergency-decompressed through the third pressure relief pipeline;
[0015] When the second pressure relief pipe is used as the pressure relief channel, the pressure value of the real-time pressure relief main pipe is measured. When the pressure value of the pressure relief main pipe reaches the second set value, it is judged that the pressure relief pipe has a tendency to be blocked. At this time, the control valve group of the third pressure relief pipe is opened, and the third pressure relief pipe and the second pressure relief pipe are used as the pressure relief channel together, and the pressure relief channel is assisted in emergency pressure relief through the third pressure relief pipe;
[0016] During the auxiliary emergency pressure relief process of the third pressure relief pipeline, the pressure values of the pressure relief main pipe and the spray tank are detected in real time. If the pressure value of the pressure relief main pipe or the pressure value of the spray tank does not drop to the third set value within the set time, the control valve group of the emergency pressure relief pipeline is opened to perform emergency pressure relief on the pressure relief channel through the emergency pressure relief pipeline;
[0017] After the auxiliary emergency pressure relief is completed, the pressure relief pipeline is purged through the purge air source pipeline.
[0018] Furthermore, when the pressure relief pipeline is purged, the control valve groups of the first pressure relief pipeline, the second pressure relief pipeline, and the third pressure relief pipeline are closed, and the control valve groups of the pressure relief main pipeline, the emergency pressure relief pipeline, and the purge gas source pipeline are opened. The pressure relief main pipeline is purged and unblocked through the purge gas source pipeline, and the unblocking condition of the pressure relief main pipeline is judged by detecting the pressure value of the pressure relief main pipeline. After the pressure relief main pipeline is unblocked, the control valve group of the emergency pressure relief pipeline is closed, and the control valve groups of the first pressure relief pipeline, the second pressure relief pipeline, and the third pressure relief pipeline are opened in turn, and the first pressure relief pipeline, the second pressure relief pipeline, and the third pressure relief pipeline are purged and unblocked, respectively.
[0019] Beneficial effect: The pressure relief device and working method of the present invention will solve various operating conditions and emergencies that may occur during the pressure relief operation of the current large-scale blast furnace intelligent injection system, and can perform emergency treatment and automatic clearing of blockages in the pressure relief pipeline, thereby minimizing the impact of pressure relief system failures on the operation of the large blast furnace intelligent injection system. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a structural schematic diagram of the pressure relief device of the injection tank of the blast furnace intelligent injection system of the present invention.
[0021] In the figure: 1-spray tank; 2-emergency pressure relief pipeline; 3-mill outlet pipeline; 4-valve release pipeline; 5-third pressure relief pipeline; 6-powder loading pipeline; 7-pressure relief main pipe; 8-second pressure relief pipeline; 9-bag powder collector; 10-coal powder bin; 11-first pressure relief pipeline; 12-purge air source pipeline. DETAILED DESCRIPTION
[0022] The present invention will be further explained below in conjunction with the accompanying drawings.
[0023] like Figure 1 As shown, a pressure relief device for an injection tank of an intelligent injection system of a blast furnace of the present invention comprises a coal mill (not shown in the figure), a bag powder collector 9, a pulverized coal bin 10, an injection tank 1, a pressure relief pipeline, a valve inter-valve release pipeline 4, and a purge air source pipeline 12. The coal mill is connected to the bag powder collector 9 through a mill outlet pipeline 3, the bag powder collector 9 is connected to the pulverized coal bin 10, the pulverized coal bin 10 is connected to the injection tank 1 through a powder loading pipeline 6, and the pulverized coal bin 10 is provided with a bin top bag and a pressure detection element.
[0024] The pressure relief pipeline includes a pressure relief main pipe 7, a first pressure relief pipeline 11, a second pressure relief pipeline 8, a third pressure relief pipeline 5, and an emergency pressure relief pipeline 2. The pressure relief main pipe 7 is connected to the spray tank 1, the first pressure relief pipeline 11 connects the pressure relief main pipe 7 and the coal powder bin 10, the second pressure relief pipeline 8 connects the pressure relief main pipe 7 and the bag powder collector 9, the third pressure relief pipeline 5 connects the pressure relief main pipe 7 and the mill outlet pipeline, the emergency pressure relief pipeline 2 connects the spray tank 1 and the mill outlet pipeline 3, the valve inter-release pipeline 4 connects the powder loading pipeline 6 and the mill outlet pipeline 3, the purge air source pipeline 12 is respectively connected to the first pressure relief pipeline 11 and the second pressure relief pipeline 8, the pressure relief main pipe 7 is provided with a pressure detection element, and the pressure relief main pipe 7, the first pressure relief pipeline 11, the second pressure relief pipeline 8, the third pressure relief pipeline 5, the emergency pressure relief pipeline 2, the valve inter-release pipeline 4, and the purge air source pipeline 12 are all provided with control valve groups. The inter-valve relief pipe 4 is not connected to the pressure relief pipe to reduce the impact of pressure relief on the spray tank weighing system.
[0025] In the present invention, the inter-valve release pipe 4 is connected between the powder loading pipe 6 and the mill outlet pipe 3. After the spray tank is loaded with powder, the control valve group of the inter-valve release pipe 4 is automatically opened. When the spray tank is working normally, if the control valve group of the powder loading pipe 6 is not tightly sealed and leaks, it is easy to cause a sharp change in the weight of the spray tank, affecting the spraying accuracy. At this time, due to the existence of the inter-valve release pipe, the leaked gas can be discharged to the mill outlet pipe 3 in time to avoid affecting the spraying accuracy.
[0026] In the present invention, there are at least two spray tanks 1, which are arranged in parallel. Each spray tank 1 corresponds to a group of pressure relief pipelines, and the groups of pressure relief pipelines are not connected to each other to prevent the pressure relief process of one of the spray tanks from affecting the weighing of other spray tanks.
[0027] In this embodiment, the pressure relief main pipe 7 includes a primary pressure relief pipeline and a secondary pressure relief pipeline which are arranged in parallel. The primary pressure relief pipeline and the secondary pressure relief pipeline have different pipe diameters.
[0028] In this embodiment, the control valve groups of the pressure relief main pipe 7, the first pressure relief pipeline 11, the second pressure relief pipeline 8, the third pressure relief pipeline 5, the emergency pressure relief pipeline 2, and the valve inter-valve release pipeline 4 all adopt wear-resistant pneumatic valves.
[0029] In this embodiment, the outer walls of the pressure relief main pipe 7 , the first pressure relief pipe 11 , the second pressure relief pipe 8 , the third pressure relief pipe 5 , and the emergency pressure relief pipe 2 are covered with a heat equalizing layer.
[0030] In this embodiment, the purge gas source pipeline 12 is connected to an inert gas source, the inert gas is nitrogen, and the control valve group of the purge gas source pipeline 12 adopts a pneumatic valve.
[0031] The working method of the pressure relief device of the injection tank of the above-mentioned intelligent injection system of the blast furnace comprises: according to the pressure value of the pulverized coal bin and the operation of the bag filter on the bin top, the first pressure relief pipe or the second pressure relief pipe is used as the pressure relief channel, and the gas in the injection tank is discharged to the bag filter collector or the pulverized coal bin through the pressure relief channel. During the gas discharge process, the pressure values of the pulverized coal bin, the pressure relief main pipe and the injection tank are detected in real time, and the pressure relief channel is adjusted and optimized in real time according to the pressure value;
[0032] In the working method of the present invention, when the bag filters on the silo top are running and the pressure in the pulverized coal bin reaches a first set value, the control valve group of the first pressure relief pipe is opened, and the control valve group of the second pressure relief pipe, the third pressure relief pipe, the inter-valve relief pipe, and the emergency pressure relief pipe are closed, and the first pressure relief pipe is used as a pressure relief channel; when the bag filters on the silo top are not running or the pressure in the pulverized coal bin does not reach the first set value, the control valve group of the second pressure relief pipe is opened, and the control valve group of the first pressure relief pipe, the third pressure relief pipe, the inter-valve relief pipe, and the emergency pressure relief pipe are closed, and the second pressure relief pipe is used as a pressure relief channel.
[0033] In the working method of the present invention, when the first pressure relief pipeline is used as the pressure relief channel, the pressure values of the pulverized coal bin and the pressure relief main pipe are detected in real time. When the pressure value of the pulverized coal bin is significantly reduced and the pressure value of the pressure relief main pipe is significantly increased, it is judged that the pressure relief channel has a tendency to be blocked. At this time, the control valve group of the third pressure relief pipeline is opened, and the third pressure relief pipeline and the first pressure relief pipeline are used together as the pressure relief channel, and the pressure relief channel is auxiliary emergency pressure relief through the third pressure relief pipeline;
[0034] When the second pressure relief pipe is used as the pressure relief channel, the pressure value of the real-time pressure relief main pipe is measured. When the pressure value of the pressure relief main pipe reaches the second set value, it is judged that the pressure relief pipe has a tendency to be blocked. At this time, the control valve group of the third pressure relief pipe is opened, and the third pressure relief pipe and the second pressure relief pipe are used as the pressure relief channel together, and the pressure relief channel is assisted in emergency pressure relief through the third pressure relief pipe;
[0035] During the auxiliary emergency pressure relief process of the third pressure relief pipeline, the pressure values of the pressure relief main pipe and the spray tank are detected in real time. If the pressure value of the pressure relief main pipe or the pressure value of the spray tank does not drop to the third set value within the set time, the control valve group of the emergency pressure relief pipeline is opened to perform emergency pressure relief on the pressure relief channel through the emergency pressure relief pipeline.
[0036] After the auxiliary emergency pressure relief is completed, the pressure relief pipeline is purged through the purge air source pipeline.
[0037] In the working method of the present invention, when the pressure relief pipeline is purged, the control valve groups of the first pressure relief pipeline, the second pressure relief pipeline and the third pressure relief pipeline are closed, and the control valve groups of the pressure relief main pipeline, the emergency pressure relief pipeline and the purge gas source pipeline are opened. The pressure relief main pipeline is purged and unblocked through the purge gas source pipeline, and the unblocking condition of the pressure relief main pipeline is judged by detecting the pressure value of the pressure relief main pipeline. After the pressure relief main pipeline is unblocked, the control valve group of the emergency pressure relief pipeline is closed, and the control valve groups of the first pressure relief pipeline, the second pressure relief pipeline and the third pressure relief pipeline are opened in sequence, and the first pressure relief pipeline, the second pressure relief pipeline and the third pressure relief pipeline are purged and unblocked respectively.
[0038] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A working method of a pressure relief device for a blast furnace intelligent injection system, the pressure relief device for a blast furnace intelligent injection system comprises a coal mill, a bag powder collector, a pulverized coal bin, a blast furnace, a pressure relief pipeline, a valve inter-valve release pipeline, and a purge gas source pipeline. The coal mill is connected to the bag powder collector through a mill outlet pipeline, the bag powder collector is connected to the pulverized coal bin, the pulverized coal bin is connected to the blast furnace through a powder loading pipeline, the pulverized coal bin is provided with a silo top bag and a pressure detection element, the pressure relief pipeline comprises a pressure relief main pipe, a first pressure relief pipeline, a second pressure relief pipeline, a third pressure relief pipeline, and an emergency pressure relief pipeline, and the pressure relief main pipe is connected to the blast furnace The first pressure relief pipe is connected to the pressure relief main pipe and the pulverized coal bin, the second pressure relief pipe is connected to the pressure relief main pipe and the bag powder collector, the third pressure relief pipe is connected to the pressure relief main pipe and the mill outlet pipe, the emergency pressure relief pipe is connected to the injection tank and the mill outlet pipe, the valve inter-release pipe is connected to the powder loading pipe and the mill outlet pipe, the purge air source pipe is respectively connected to the first pressure relief pipe and the second pressure relief pipe, the pressure relief main pipe is provided with a pressure detection element, and the pressure relief main pipe, the first pressure relief pipe, the second pressure relief pipe, the third pressure relief pipe, the emergency pressure relief pipe, the valve inter-release pipe, and the purge air source pipe are all provided with a control valve group; it is characterized in that, The working method includes: according to the pressure value of the pulverized coal bin and the operation of the bag filter on the top of the bin, the first pressure relief pipe or the second pressure relief pipe is used as a pressure relief channel, and the gas in the spray tank is discharged to the bag filter collector or the pulverized coal bin through the pressure relief channel. During the gas discharge process, the pressure values of the pulverized coal bin, the pressure relief main pipe and the spray tank are detected in real time, and the pressure relief channel is adjusted and optimized in real time according to the pressure value; When the bag filters on the top of the silo are in operation and the pressure in the pulverized coal silo reaches the first set value, the control valve group of the first pressure relief pipeline is opened, and the control valve groups of the second pressure relief pipeline, the third pressure relief pipeline, the inter-valve relief pipeline, and the emergency pressure relief pipeline are closed, and the first pressure relief pipeline is used as a pressure relief channel; when the bag filters on the top of the silo are not in operation or the pressure in the pulverized coal silo does not reach the first set value, the control valve group of the second pressure relief pipeline is opened, and the control valve groups of the first pressure relief pipeline, the third pressure relief pipeline, the inter-valve relief pipeline, and the emergency pressure relief pipeline are closed, and the second pressure relief pipeline is used as a pressure relief channel; When the first pressure relief pipeline is used as the pressure relief channel, the pressure values of the pulverized coal bin and the pressure relief main pipe are detected in real time. When the pressure value of the pulverized coal bin is significantly reduced and the pressure value of the pressure relief main pipe is significantly increased, it is judged that the pressure relief channel has a tendency to be blocked. At this time, the control valve group of the third pressure relief pipeline is opened, and the third pressure relief pipeline and the first pressure relief pipeline are used together as the pressure relief channel, and the pressure relief channel is assisted by the third pressure relief pipeline for emergency pressure relief; When the second pressure relief pipe is used as the pressure relief channel, the pressure value of the pressure relief main pipe is detected in real time. When the pressure value of the pressure relief main pipe reaches the second set value, it is judged that the pressure relief pipe has a tendency to be blocked. At this time, the control valve group of the third pressure relief pipe is opened, and the third pressure relief pipe and the second pressure relief pipe are used as the pressure relief channel together, and the third pressure relief pipe is used to perform auxiliary emergency pressure relief on the pressure relief channel; During the auxiliary emergency pressure relief process of the third pressure relief pipeline, the pressure values of the pressure relief main pipe and the spray tank are detected in real time. If the pressure value of the pressure relief main pipe or the pressure value of the spray tank does not drop to the third set value within the set time, the control valve group of the emergency pressure relief pipeline is opened to perform emergency pressure relief on the pressure relief channel through the emergency pressure relief pipeline; After the auxiliary emergency pressure relief is completed, the pressure relief pipeline is purged through the purge air source pipeline.
2. The working method of the pressure relief device of the blowing tank of the intelligent blowing system of a blast furnace according to claim 1 is characterized in that: The number of the spray tanks is at least two, all of which are arranged in parallel, each of which corresponds to a group of pressure relief pipelines, and the groups of pressure relief pipelines are not connected to each other.
3. The working method of the pressure relief device of the spray tank of the intelligent spray system of a blast furnace according to claim 1 is characterized in that: The main pressure relief pipe comprises a primary pressure relief pipeline and a secondary pressure relief pipeline which are arranged in parallel, and the primary pressure relief pipeline and the secondary pressure relief pipeline have different pipe diameters.
4. The working method of the pressure relief device of the blowing tank of the blast furnace intelligent blowing system according to claim 1 is characterized in that: The control valve groups of the pressure relief main pipe, the first pressure relief pipeline, the second pressure relief pipeline, the third pressure relief pipeline, the emergency pressure relief pipeline, and the inter-valve relief pipeline all adopt wear-resistant pneumatic valves.
5. The working method of the pressure relief device of the blowing tank of the intelligent blowing system of a blast furnace according to claim 1 is characterized in that: The outer walls of the main pressure relief pipe, the first pressure relief pipe, the second pressure relief pipe, the third pressure relief pipe and the emergency pressure relief pipe are all covered with an insulation layer.
6. The working method of the pressure relief device of the spray tank of the intelligent spray system of a blast furnace according to claim 1 is characterized in that: The purge gas source pipeline is connected to an inert gas source, and the control valve group of the purge gas source pipeline adopts a pneumatic valve.
7. The working method of the pressure relief device of the blowing tank of the intelligent blowing system of a blast furnace according to claim 1 is characterized in that: When purging the pressure relief pipeline, close the control valve groups of the first pressure relief pipeline, the second pressure relief pipeline, and the third pressure relief pipeline, open the control valve groups of the pressure relief main pipeline, the emergency pressure relief pipeline, and the purge gas source pipeline, purge and clear the blockage of the pressure relief main pipeline through the purge gas source pipeline, and judge the clearing condition of the pressure relief main pipeline by detecting the pressure value of the pressure relief main pipeline. After the pressure relief main pipeline is cleared, close the control valve group of the emergency pressure relief pipeline, open the control valve groups of the first pressure relief pipeline, the second pressure relief pipeline, and the third pressure relief pipeline in turn, and purge and clear the blockage of the first pressure relief pipeline, the second pressure relief pipeline, and the third pressure relief pipeline, respectively.