A construction device and method for a bamboo-shaped underwater pile foundation

Through the construction device of the bamboo-shaped underwater pile foundation, the high-pressure liquid expansion bag is attached to the inner wall of the seabed pile foundation hole to form an annular depression, which solves the stability problem of the traditional pile foundation hole under complex loads at sea and achieves a better Strong pile foundation connection to the seabed and higher load carrying capacity.

CN116497857BActive Publication Date: 2024-10-29CHINA THREE GORGES CORPORATION
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310223351.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-03-08
Publication Date
2024-10-29
Estimated Expiration
2043-03-08

AI Technical Summary

Technical Problem

Traditional pile foundation holes cannot withstand the impact of complex loads during the installation of offshore wind power equipment, and their stability is poor. Especially when wave loads and wind turbine loads act together in deep water conditions, the dynamic effect of the structure is significant, and traditional pile foundations are difficult to meet complex offshore loads. requirements.

Method used

The bamboo-shaped underwater pile foundation construction device is used, and the bamboo expansion bag connected between the water surface working platform and the seabed pile foundation hole is used to use high-pressure liquid to make the annular protruding section fit the inner wall of the seabed pile foundation hole to form an annular depression, which increases the The connection area between the pile foundation and the seabed improves stability, and the expansion bag can be effectively tightened and moved through the tightening structure and hydraulic motor-driven winch.

Benefits of technology

The secondary formed underwater pile foundation increases the connection area with the seabed, can more effectively carry the load of wind turbines, improves the stability of the pile foundation, and adapts to the impact of complex offshore loads.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN116497857B_ABST
    Figure CN116497857B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of underwater pile foundation construction, and specifically to a construction device and a construction method for a bamboo-shaped underwater pile foundation. A construction device for a bamboo-shaped underwater pile foundation comprises: a surface working platform, which is arranged above the sea level, and the surface working platform is suitable for being arranged above the seabed pile foundation hole; a bamboo expansion bag, which comprises at least two annular protruding sections, one end of the bamboo expansion bag is connected to the surface working platform, and the other end is suitable for being arranged in the seabed pile foundation hole; an infusion structure, which comprises a pressure pump and an infusion tube connected by a pipeline, and the infusion structure is arranged on the surface working platform, and the infusion tube extends from the surface working platform into the bamboo expansion bag, and the pressure pump is suitable for conveying high-pressure liquid into the infusion tube; a tightening structure, which is arranged above the seabed pile foundation hole, and the tightening structure is sleeved on the outer periphery of the bamboo expansion bag. The present invention solves the problem that wind power piles established in traditional pile foundation holes cannot bear the impact of complex offshore loads and have poor stability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of underwater pile foundation construction, and in particular to a construction device and a construction method for a bamboo-shaped underwater pile foundation. Background Art

[0002] Under deepwater conditions, engineering geological surveys are significantly affected by waves, water depth, and water flow conditions. When traditional survey equipment is used, the exploration and collection samples are often subject to significant disturbances, making in-situ testing difficult, which brings great difficulties to the acquisition of geological parameters.

[0003] In addition, when installing wind turbines at sea, both wave and wind turbine loads are dynamic loads in the resonance zone, and wave and wind loads have a companion relationship. The two are coupled and become the main loads together. The heavier, larger, and taller the wind turbines are, the more obvious the structural dynamic effects will be. As the water depth increases, the wave loads will also become higher and higher. The wave loads are of the same magnitude as the wind turbine loads, and even the wave loads will exceed the wind turbine loads and become the main control loads. At the same time, the wave loads are dynamic loads, and their dynamic amplification effects need to be considered. The wind turbine piles built with traditional pile foundation holes cannot withstand the impact of complex loads at sea and have poor stability. Summary of the invention

[0004] Therefore, the technical problem to be solved by the present invention is to overcome the defects of wind power piles built with traditional pile foundation holes in the prior art that they cannot bear the impact of complex offshore loads and have poor stability, thereby providing a construction device and method for a bamboo-shaped underwater pile foundation.

[0005] In order to solve the above problems, the present invention provides a construction device for a bamboo-shaped underwater pile foundation, comprising:

[0006] The surface operation platform is located above the sea level and is suitable for being located on the seabed pile foundation.

[0007] above the hole;

[0008] A bamboo expansion bag comprises at least two annular protruding sections, one end of which is connected to the surface working platform and the other end is suitable for being arranged in a seabed pile foundation hole;

[0009] The infusion structure includes a pressure pump and an infusion tube connected by a pipeline, the infusion structure is arranged on the surface working platform, the infusion tube extends from the surface working platform into the bamboo expansion bag, and the pressure pump is suitable for conveying high-pressure liquid into the infusion tube;

[0010] The tightening structure is arranged above the seabed pile foundation hole, and the tightening structure is sleeved on the outer periphery of the bamboo expansion bag.

[0011] Optionally, the bamboo expansion bag further includes a cylindrical section, adjacent annular protruding sections are arranged at intervals, and a cylindrical section is provided between adjacent annular protruding sections.

[0012] Optionally, the outer diameter of the annular protruding section gradually decreases from the middle to both sides.

[0013] Optionally, a counterweight block is provided at the lower end of the infusion tube, and the counterweight block drives the infusion tube to maintain a vertical state.

[0014] Optionally, at least two pressure sensors are provided on the periphery of the bamboo expansion bag, and the pressure sensors are arranged in a one-to-one correspondence with the annular protruding segments.

[0015] Optionally, a winch is further included, one end of the bamboo expansion bag is fixed on the winch, and the winch is connected to a hydraulic motor.

[0016] Optionally, the tightening structure includes a first pull rope and a second pull rope, the first pull rope and the second pull rope are both "U"-shaped, and the openings of the first pull rope and the second pull rope are opposite.

[0017] Optionally, it also includes a first force-applying member connected to the two open ends of the first pull rope respectively and a second force-applying member connected to the two open ends of the second pull rope. The first force-applying member and the second force-applying member are both arranged on a support plate, and the support plate is provided with a guide cylinder, and the guide cylinder is suitable for accommodating a bamboo expansion bag.

[0018] Optionally, a controller is further included, and the controller is communicatively connected with the first force applying member, the second force applying member, and the pressure pump respectively.

[0019] A construction method for a bamboo-shaped underwater pile foundation construction device comprises the following steps: in an expanded state, a tightening structure tightens a bamboo expansion bag, a pressure pump delivers high-pressure liquid into the bamboo expansion bag through an infusion tube, and an annular protruding section of the bamboo expansion bag fits with the inner wall of a seabed pile foundation hole until an annular recessed portion is formed on the inner wall of the seabed pile foundation hole to form a bamboo-shaped underwater pile foundation.

[0020] The technical solution of the present invention has the following advantages:

[0021] 1. The construction device of the bamboo-shaped underwater pile foundation provided by the present invention, after the infusion tube is inserted into the bamboo-shaped expansion bag, the bamboo-shaped expansion bag is tightened by the tightening structure to allow only the infusion tube to pass through. In the expanded state, the tying structure is inserted to tighten the bamboo-shaped expansion bag, and the pressure pump delivers high-pressure liquid into the bamboo-shaped expansion bag through the infusion tube. The high-pressure liquid slowly fills the bamboo-shaped expansion bag, and because the tightening structure cannot overflow out of the bamboo-shaped expansion bag, the high-pressure liquid slowly increases in the limited space of the bamboo-shaped expansion bag, so that the annular protruding section of the bamboo-shaped expansion bag fits with the inner wall of the seabed pile foundation hole, until an annular recessed portion is formed on the inner wall of the seabed pile foundation hole, so as to form a bamboo-shaped underwater pile foundation, so that the underwater pile foundation after secondary molding has a different shape, thereby increasing the connection area between the pile foundation and the seabed to make the connection more firm, so that the pile foundation bears more loads of the wind turbine set, and improves the stability of the pile foundation in use.

[0022] 2. The construction device of the bamboo-shaped underwater pile foundation provided by the present invention, the bamboo-joint expansion bag also includes a cylindrical section, adjacent annular protruding sections are arranged at intervals, and cylindrical sections are arranged between adjacent annular protruding sections, so that the underwater pile foundation after secondary molding has different shapes.

[0023] 3. In the construction device of the bamboo-shaped underwater pile foundation provided by the present invention, the outer diameter of the annular protruding section gradually decreases from the middle to both sides, so that the cross-section of the annular protruding section is wedge-shaped, increasing the contact area between the pile foundation and the seabed, and improving the stability of the pile foundation during use.

[0024] 4. The construction device of the bamboo-shaped underwater pile foundation provided by the present invention has a counterweight block at the lower end of the infusion pipe, which drives the infusion pipe to maintain a vertical state so that the lower end of the bamboo expansion bag is aligned with the bottom of the pile foundation hole.

[0025] Bottom fit.

[0026] 5. The construction device of the bamboo-shaped underwater pile foundation provided by the present invention has at least two pressure sensors disposed on the periphery of the bamboo-shaped expansion bag. The pressure sensors are disposed one-to-one in correspondence with the annular protruding segments. The pressure sensors sense the pressure of the high-pressure liquid received by each annular protruding segment.

[0027] 6. The construction device of the bamboo-shaped underwater pile foundation provided by the present invention also includes a winch, one end of the bamboo expansion bag is fixed on the winch, the winch is connected to a hydraulic motor, the hydraulic motor drives the winch to rotate, and the rotation of the winch drives the bamboo expansion bag to move up and down.

[0028] 7. The construction device of the bamboo-shaped underwater pile foundation provided by the present invention, the tightening structure includes a first pull rope and a second pull rope, the first pull rope and the second pull rope are both "U"-shaped, the openings of the first pull rope and the second pull rope are opposite, the openings of the first pull rope and the second pull rope are opposite to form an overlapping area, and the bamboo expansion bag is arranged in the overlapping area.

[0029] 8. The construction device of the bamboo-shaped underwater pile foundation provided by the present invention also includes a first force-applying member connected to the two open ends of the first pull rope and a second force-applying member connected to the two open ends of the second pull rope, and the first force-applying member and the second force-applying member are both arranged on the support plate, and the first force-applying member and the second force-applying member apply force to reduce the overlapping area to achieve the tightening of the bamboo expansion bag. The support plate is provided with a guide cylinder, and the guide cylinder is suitable for accommodating the bamboo expansion bag to provide guidance for the bamboo expansion bag.

[0030] 9. The construction device of the bamboo-shaped underwater pile foundation provided by the present invention also includes a controller, which is respectively connected to the first force-applying member, the second force-applying member, and the pressure pump for communication to achieve control over the actions of the three. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0032] Figure 1 A schematic diagram of a bamboo expansion bag of a construction device for a bamboo-shaped underwater pile foundation provided in an embodiment of the present invention before it is unfolded;

[0033] Figure 2 A schematic diagram of a bamboo expansion bag of a bamboo-shaped underwater pile foundation construction device provided in an embodiment of the present invention after being unfolded;

[0034] Figure 3 A top view of a fastening structure provided in an embodiment of the present invention;

[0035] Figure 4 It is a front view of the fastening structure provided in the embodiment of the present invention.

[0036] Explanation of the accompanying drawings: 1. Controller; 2. Pressure pump; 3. Winch; 4. Hydraulic motor; 5. Tightening structure; 501. Guide cylinder; 502. Elastic member; 503. Support plate; 504. First force-applying member; 505. First pull rope; 506. Limiting sleeve; 507. Second pull rope; 508. Second force-applying member; 6. Surface working platform; 7. Seabed pile foundation hole; 8. Bamboo expansion bag; 801. Cylindrical section; 802. Annular protruding section; 9. Pressure sensor; 10. Infusion tube; 11. Counterweight. DETAILED DESCRIPTION

[0037] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0038] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0039] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the term "

[0040] "Installed", "connected" and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0041] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0042] Example 1

[0043] The construction device of the bamboo-shaped underwater pile foundation provided by the present invention comprises: a water surface working platform 6, which is arranged above the sea level, and the water surface working platform 6 is suitable for being arranged above the seabed pile foundation hole 7; a bamboo expansion bag 8, which comprises at least two annular protruding sections 802, one end of the bamboo expansion bag 8 is connected to the water surface working platform 6, and the other end is suitable for being arranged in the seabed pile foundation hole 7; an infusion structure, which comprises a pressure pump 2 and an infusion tube 10 connected by pipelines, and the infusion structure is arranged on the water surface working platform 6, and the infusion tube 10 extends from the water surface working platform 6 into the bamboo expansion bag 8, and the pressure pump 2 is suitable for conveying high-pressure liquid into the infusion tube 10; a tightening structure 5, which is arranged above the seabed pile foundation hole 7, and the tightening structure 5 is sleeved on the outer periphery of the bamboo expansion bag 8.

[0044] After the infusion tube 10 is inserted into the bamboo expansion bag 8, the bamboo expansion bag 8 is tightened by the tightening structure 5 to allow only the infusion tube 10 to pass through. In the expanded state, the tying structure tightens the bamboo expansion bag 8, and the pressure pump 2 delivers high-pressure liquid to the bamboo expansion bag 8 through the infusion tube 10. The high-pressure liquid slowly fills the bamboo expansion bag 8, and because the tightening structure 5 cannot overflow out of the bamboo expansion bag 8, the high-pressure liquid slowly increases in the limited space of the bamboo expansion bag 8, so that the annular protruding section 802 of the bamboo expansion bag 8 fits with the inner wall of the seabed pile foundation hole 7, until an annular recessed portion is formed on the inner wall of the seabed pile foundation hole 7, so as to form a bamboo-shaped underwater pile foundation, so that the underwater pile foundation after secondary molding has a different shape, thereby increasing the connection area between the pile foundation and the seabed to make the connection more firm, so that the pile foundation bears more loads of the wind turbine, and improves the stability of the pile foundation in use.

[0045] Example 2

[0046] like Figure 1 - Figure 4 A specific embodiment of the construction device of the bamboo-shaped underwater pile foundation shown in the figure comprises: a seabed pile foundation hole 7 arranged on the seabed, and a surface working platform 6 arranged above the sea level, wherein the surface working platform 6 is suitable for being arranged directly above the seabed pile foundation hole 7, and an infusion structure is provided on the surface working platform 6.

[0047] like Figure 1 , Figure 2 As shown, the infusion structure includes a pressure pump 2 and an infusion tube 10 connected by pipelines. In order to facilitate the changes in the inner wall of the seabed pile foundation, it also includes a bamboo expansion bag 8, one end of which is connected to the surface working platform 6 and the other end is suitable for being set in the seabed pile foundation. Figure 1 , Figure 2 As shown, the bamboo expansion bag 8 extending into the seabed pile foundation hole 7 includes three annular protrusions 802 arranged at intervals, and a cylindrical section 801 is provided between adjacent annular protrusions 802, and the outer diameter of the annular protrusions 802 gradually decreases from the middle to both sides, that is, the cross-section of the annular protrusions 802 is wedge-shaped. In order to drive the bamboo expansion bag 8 to move up and down, a winch 3 is provided on the surface working platform 6, and the bamboo expansion bag 8 is fixed on the rotating wheel of the winch 3. In order to drive the winch 3 to rotate, the winch 3 is connected to a hydraulic motor 4, and the hydraulic motor 4 is arranged above the surface working platform 6. As shown in FIG. Figure 1 , Figure 2As shown, one end of the infusion tube 10 is connected to the pressure pump 2, and the other end enters the bamboo expansion bag 8 through the water surface operation platform 6 until it reaches the bottom of the bamboo expansion bag 8. In order to keep the infusion tube 10 in a vertical state, a counterweight 11 is arranged below the infusion tube 10. In order to sense the pressure of the bamboo expansion bag 8, a pressure sensor 9 is arranged on the outer periphery of the annular protruding section 802 of each bamboo expansion bag 8, that is, the pressure sensor 9 is arranged one by one with the annular protruding section 802.

[0048] To prevent the high-pressure liquid from flowing out of the bamboo expansion bag 8 when the pressure pump 2 inputs the high-pressure liquid into the infusion tube 10, Figure 1 , Figure 2 As shown, a tightening structure 5 is provided between the upper part of the horizontal working platform and the lower part of the winch 3, and the tightening structure 5 is sleeved on the outer periphery of the bamboo expansion bag 8. Figure 4 As shown, the fastening structure 5 includes a guide tube 501 fixedly connected to the water surface working platform 6, the guide tube 501 is suitable for accommodating the bamboo expansion bag 8, and a support plate 503 is provided on the outer periphery of the end of the guide sleeve away from the water surface working platform 6. Figure 4 As shown, the first force applying member 504 and the second force applying member 508 are arranged opposite to each other at the two ends above the support plate 503. Specifically, the first force applying member 504 and the second force applying member 508 are hydraulic cylinders. Figure 3 As shown, the fastening structure 5 further includes a first pull rope 505 and a second pull rope 507, and the first pull rope 505 and the second pull rope 507 are both "U" shaped.

[0049] The openings of the first pull rope 505 and the second pull rope 507 are opposite. To facilitate the application of force, the first force-applying member 504 is connected to the two open ends of the first pull rope 505, and the second force-applying member 508 is connected to the two open ends of the second pull rope 507, that is, both ends of the "U"-shaped opening of each pull rope are connected to the same force-applying end of the same force-applying member to form an "O" shape, so that the bamboo expansion bag 8 passes through the "O"-shaped pull rope. In order to prevent the first pull rope 505 and the second pull rope 507 from moving at will, two limiting sleeves 506 are also included that are sleeved on the outer periphery of the first pull rope 505 and the second pull rope 507, that is, each limiting sleeve 506 is connected to one end of the "U" shape of the pull rope.

[0050] To facilitate the automatic resetting of the pull rope, an elastic member 502 is respectively provided at the "U"-shaped bottom of the first pull rope 505 and the second pull rope 507, and the other end of the elastic member 502 is fixed on the support plate 503, so that after the first force member 504 and the second force member 508 are depressurized, the elastic member 502 drives the pull rope to reset.

[0051] In order to facilitate the control of the entire device, a controller 1 is also included on the surface working platform 6, wherein the controller 1 is communicatively connected with the first force applying member 504, the second force applying member 508, the pressure sensor 9, the pressure pump 2, and the hydraulic motor 4 respectively.

[0052] A construction method of a bamboo-shaped underwater pile foundation construction device comprises the following steps:

[0053] 1) After the drilling rig has completed drilling in the seabed area of ​​the seabed, an original seabed pile foundation hole 7 is formed. On-site personnel on the surface working platform 6 fix a pressure sensor 9 to the annular protruding section 802 of the bamboo expansion bag 8, and then the hydraulic motor 4 drives the winch 3 to release the bamboo expansion bag 8 and the infusion tube 10 from the surface working platform 6 into the seabed pile foundation hole 7. Due to the action of the counterweight block 11, the lower surface of the bamboo expansion bag 8 fits with the bottom surface of the seabed pile foundation hole 7;

[0054] 2) When the lower surface of the bamboo expansion bag 8 contacts the bottom of the seabed pile foundation hole 7, the winch 3 stops rotating to stop releasing the bamboo expansion bag 8;

[0055] 3) The controller 1 sends a signal to make the force-applying ends of the first force-applying member 504 and the second force-applying member 508 move in opposite directions, that is, the overlapping area between the first pull rope 505 and the second pull rope 507 is rapidly reduced, and after the force-applying ends move to the preset positions, the bamboo expansion bag 8 in the enclosed area is tightened;

[0056] 4) After the bamboo expansion bag 8 is tied up, the controller 1 controls the pressure pump 2 to inject high-pressure liquid into the bamboo expansion bag 8 through the infusion tube 10, so that the bamboo expansion bag 8 gradually expands. After the annular protruding section 802 of the bamboo expansion bag 8 is fitted with the inner wall of the seabed pile foundation hole 7, an annular recessed portion is slowly formed on the inner wall of the seabed pile foundation under the pressure of the high-pressure liquid to form a bamboo-shaped underwater pile foundation hole; at the same time, the pressure sensor 9 transmits the collected value to the controller 1 in real time, and the controller 1 compares it with the preset pressure value until the actual pressure values ​​of all pressure sensors 9 are greater than the preset pressure value, and then stops injecting high-pressure liquid into the bamboo expansion bag 8;

[0057] 5) After completing the secondary molding of the submarine pile foundation, the controller 1 controls the pressure pump 2 to extract the high-pressure liquid in the bamboo expansion bag 8 through the infusion tube 10. After the bamboo expansion bag 8 is depressurized, the overlapping area between the first pull rope 505 and the second pull rope 507 is increased through the action of the force-applying member, and then the winch 3 is used to retract the bamboo expansion bag 8, the infusion tube 10 and the counterweight block 11 upwards.

[0058] As an alternative embodiment, the number of the annular protruding segments 802 may be 2, 4, 5 or even more.

[0059] As an alternative embodiment, the cross section of the annular protruding segment 802 may also be an arc shape or other shapes.

[0060] Obviously, the above embodiments are merely examples for clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived from them are still within the protection scope of the invention.

Claims

1. A construction device for a bamboo-shaped underwater pile foundation, It is characterized in that include: A water surface operation platform (6) is arranged above the sea level, and the water surface operation platform (6) is suitable for being arranged above the seabed pile foundation hole (7); A bamboo expansion bag (8) comprising at least two annular protruding sections (802), one end of the bamboo expansion bag (8) being connected to a surface operation platform (6), and the other end being suitable for being arranged in a seabed pile foundation hole (7); The liquid infusion structure comprises a pressure pump (2) and a liquid infusion tube (10) connected by a pipeline, the liquid infusion structure is arranged on a water surface working platform (6), the liquid infusion tube (10) extends from the water surface working platform (6) into a bamboo expansion bag (8), and the pressure pump (2) is suitable for conveying high-pressure liquid into the liquid infusion tube (10); A tightening structure (5) is arranged above the seabed pile foundation hole (7), and the tightening structure (5) is sleeved on the outer periphery of the bamboo expansion bag (8); A counterweight (11) is provided at the lower end of the infusion tube (10), and the counterweight (11) drives the infusion tube (10) to maintain a vertical state; The tightening structure (5) comprises a first pull rope (505) and a second pull rope (507); the first pull rope (505) and the second pull rope (507) are both "U"-shaped; the openings of the first pull rope (505) and the second pull rope (507) are opposite; It also includes a first force-applying member (504) connected to the two open ends of the first pull rope (505) and a second force-applying member (508) connected to the two open ends of the second pull rope (507), respectively. The first force-applying member (504) and the second force-applying member (508) are both arranged on a support plate (503). The support plate (503) is provided with a guide cylinder (501). The guide cylinder (501) is suitable for accommodating a bamboo expansion bag (8). It also includes a controller (1), wherein the controller (1) is communicatively connected to the first force applying member (504), the second force applying member (508), and the pressure pump (2); The controller (1) sends a signal to cause the force-applying ends of the first force-applying member (504) and the second force-applying member (508) to move in opposite directions, that is, the overlapping area between the first pull rope (505) and the second pull rope (507) is rapidly reduced, and after the force-applying ends move to a preset position, the bamboo expansion bag (8) in the enclosed area is tightened.

2. The construction device for the bamboo-shaped underwater pile foundation according to claim 1, It is characterized in that The bamboo expansion bag (8) further comprises a cylindrical section (801), and adjacent annular protruding sections (802) are arranged at intervals, and a cylindrical section (801) is provided between adjacent annular protruding sections (802).

3. The construction device for the bamboo-shaped underwater pile foundation according to claim 2, It is characterized in that The outer diameter of the annular protruding section (802) gradually decreases from the middle to both sides.

4. The construction device for the bamboo-shaped underwater pile foundation according to claim 1, It is characterized in that At least two pressure sensors (9) are provided on the outer periphery of the bamboo expansion bag (8), and the pressure sensors (9) are arranged in a one-to-one correspondence with the annular protruding sections (802).

5. The construction device for the bamboo-shaped underwater pile foundation according to claim 1, It is characterized in that It also comprises a winch (3), one end of the bamboo expansion bag (8) being fixedly arranged on the winch (3), and the winch (3) being connected to a hydraulic motor (4).

6. A construction method for a construction device for a bamboo-shaped underwater pile foundation, using the construction device for a bamboo-shaped underwater pile foundation according to claim 1, It is characterized in that In the expanded state, the tightening structure (5) tightens the bamboo expansion bag (8), the pressure pump (2) delivers high-pressure liquid into the bamboo expansion bag (8) through the liquid infusion tube (10), and the annular protruding section (802) of the bamboo expansion bag (8) fits with the inner wall of the seabed pile foundation hole (7) until an annular recessed portion is formed on the inner wall of the seabed pile foundation hole (7), thereby forming a bamboo-shaped underwater pile foundation.

Citation Information

Patent Citations

  • Grouting device combining exhausting and grout backflow preventing functions and construction method of geotechnical engineering structural elements using the same

    CN102002951A

  • Construction method for bamboo joint piles based on sequential water drainage and grouting of spiral heat pipes and annular ribs

    CN109577318A