A straightening method for high-grade sulfur-resistant drill pipe

Through the combination of high-temperature straightening and multiple sets of straightening rollers, the problem of corrosion and uneven straightening of high-grade sulfur-resistant drill pipes in a hydrogen sulfide environment is solved, and the straightness and service life of the drill pipe body are improved. Reduced risk of stress corrosion.

CN116689548BActive Publication Date: 2024-10-22SHANGHAI BAOSHAN DISTRICT HILONG PETROLEUM PIPE RESEARCH INSTITUTE +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310670332.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-06-07
Publication Date
2024-10-22
Estimated Expiration
2043-06-07

AI Technical Summary

Technical Problem

High-grade sulfur-resistant drill pipes are prone to hydrogen sulfide stress corrosion during the extraction of sulfur-containing oil and gas resources, resulting in a shorter service life of the drill pipe body, and the internal stress and residual tensile stress generated during the straightening process make the drill pipe body Easy to corrode.

Method used

Use high-temperature straightening method to remove the oxide scale on the surface of the drill pipe body. During straightening, the temperature of the drill pipe body is ≥400°C, and it is straightened by at least three sets of straightening rollers. They rotate during the cooling process to reduce bending and cycle. Water spray cooling to even out stress.

Benefits of technology

It improves the straightness accuracy and service life of the drill pipe body, reduces the risk of hydrogen sulfide stress corrosion, reduces residual stress, and extends the life of the straightening roller set.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure BDA0004272725170000051
    Figure BDA0004272725170000051
  • Figure BDA0004272725170000061
    Figure BDA0004272725170000061
  • Figure BDA0004272725170000071
    Figure BDA0004272725170000071
Patent Text Reader

Abstract

The present application discloses a straightening method for a high-grade sulfur-resistant drill pipe, and relates to the technical field of drill pipe straightening. The straightening method for a high-grade sulfur-resistant drill pipe in the present application comprises the following steps: S1, removing the surface oxide scale of the drill pipe body after heat treatment; S2, performing high-temperature straightening treatment on the drill pipe body, and the temperature of the drill pipe body during straightening is ≥400°C; S3, cooling the drill pipe body. The present application has the effect of reducing the internal stress generated by the straightening of the high-grade sulfur-resistant drill pipe body after heat treatment, so that the higher tensile stress on the surface of the pipe body is reduced and converted into compressive stress, ensuring the straightness of the pipe body, and improving the service life of the drill pipe body.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of drill pipe straightening, and in particular to a method for straightening a high-grade sulfur-resistant drill pipe. Background Art

[0002] Drilling is a commonly used method in the exploration and production of oil and gas.

[0003] During the exploitation of sulfur-containing oil and gas resources, the drill pipe is exposed to complex corrosive environments such as high temperature and pressure, high-mineralization mud, formation brine, and hydrogen sulfide. It is particularly prone to hydrogen sulfide stress corrosion cracking (SSC) or local surface corrosion, which can lead to brittle fracture of the drill pipe body and cause production accidents.

[0004] High-grade sulfur-resistant drill pipes are significantly effective in reducing brittle fracture problems, but are still prone to hydrogen sulfide stress corrosion during use, causing cracks in the drill pipe body and reducing the service life of the drill pipe body. Summary of the invention

[0005] In order to improve the service life of a drill pipe body, the present application provides a straightening method for a high-grade sulfur-resistant drill pipe.

[0006] The present application provides a method for straightening a high-grade sulfur-resistant drill pipe, which adopts the following technical solution:

[0007] A method for straightening a high-grade sulfur-resistant drill pipe comprises the following steps:

[0008] S1. Remove the surface oxide scale of the heat-treated drill pipe body;

[0009] S2. Perform high temperature straightening treatment on the drill pipe body. During straightening, the temperature of the drill pipe body is ≥400℃;

[0010] S3. Cool the drill pipe body.

[0011] By adopting the above technical solution, by removing the oxide scale on the surface of the drill pipe body, the interference of the oxide scale on the drill pipe straightening process can be reduced, and the accuracy of drill pipe straightening can be improved. During the straightening process, the temperature of the drill pipe body is ≥400°C, which can reduce the straightening load that needs to be applied to the drill pipe body, reduce the situation where the drill pipe body is straightened at a low temperature, resulting in excessive straightening load, excessive internal stress inside the drill pipe body, and bend again under the action of internal stress, thereby improving the straightening effect of the drill pipe body. In addition, a temperature greater than or equal to 400°C can make the surface stress of the drill pipe body after straightening more uniform, reduce the residual tensile stress on the surface of the drill pipe body, thereby reducing the corrosion of the surface of the drill pipe body when the drill pipe body is used in a wet hydrogen sulfide environment, causing fatigue failure of the drill pipe body and cracks, thereby improving the service life of the drill pipe.

[0012] Optionally, high pressure water is used in S1 to remove surface oxide scale.

[0013] By adopting the above technical solution, the surface oxide scale is removed by high-pressure water, which can reduce the damage to the metallographic structure of the drill pipe body and increase the service life of the drill pipe body.

[0014] Optionally, during the cooling process in S3, the drill pipe body is rotated around the drill pipe axis, and the rotation speed of the drill pipe body is ≥6 revolutions per minute.

[0015] By adopting the above technical solution, the drill pipe body is rotated during the cooling process and the rotation speed is not less than 6 revolutions per minute, which can reduce the bending of the drill pipe due to gravity or internal stress release during the cooling process.

[0016] Optionally, at least three straightening roller groups are used in S2 to straighten the drill pipe body, wherein the straightening roller groups include upper straightening rollers and lower straightening rollers, the upper straightening rollers of each straightening roller group are parallel to each other, and the lower straightening rollers of each straightening roller group are parallel to each other.

[0017] By adopting the above technical solution, by setting at least three groups of straightening roller groups, the straightening effect on the drill pipe body can be improved, and the upper straightening rollers of each straightening roller group are parallel to each other, and the lower straightening rollers are parallel to each other, so that the pressure of the straightening roller group on the drill pipe body is more uniform, thereby improving the straightening effect on the drill pipe body.

[0018] Optionally, the angle between the axis of the drill pipe body and the axis of the upper straightening roller is 25°-40°, and the angle between the axis of the drill pipe body and the axis of the lower straightening roller is (-40°)-(-25°).

[0019] By adopting the above technical solution, the straightening roller group can rotate and drive the drill pipe to rotate and move forward, while making the force uniform on the surface of the drill pipe body, making the stress on the surface of the drill pipe body more uniform, reducing the residual tensile stress on the surface of the drill pipe body, and improving the service life of the drill pipe.

[0020] Optionally, the distance between adjacent straightening roller groups is 400 mm-800 mm, and the rotation speed of the upper straightening roller and the lower straightening roller is the same and greater than 30 revolutions per minute.

[0021] By adopting the above technical solution, when the straightening roller group straightens the drill pipe body, each straightening roller group rolls the drill pipe body more evenly, and can improve the overall straightening effect of the drill pipe body. In addition, the number of straightening roller groups can be reduced, thereby reducing costs.

[0022] Optionally, adjacent straightening roller groups are staggered in the vertical direction and have a height difference of 3 mm-15 mm.

[0023] By adopting the above technical scheme, a straightening load can be applied to the drill pipe body through the height difference between adjacent straightening roller groups, thereby reducing the situation where the drill pipe body is partially not in contact with the straightening roller group during the straightening process, so that the residual stress of the drill pipe body after straightening is more uniform, and the service life of the drill pipe body is improved; the flattening amount of the drill pipe body by the straightening roller group is 1mm-8mm; by setting the flattening amount of the straightening roller group on the drill pipe body, the straightening roller group can roll the drill pipe body at various locations, thereby improving the indentation coverage rate of the drill pipe body after rolling, reducing the residual stress of the drill pipe body, and improving the straightness of the drill pipe body.

[0024] Optionally, during the straightening process, there is circulating water in the upper straightening roller and the lower straightening roller. After each drill pipe body is straightened, the upper straightening roller and the lower straightening roller are sprayed with water to cool down.

[0025] By adopting the above technical solution, circulating water can reduce the temperature of the straightening roller group during the straightening process of the drill pipe body. After straightening a drill pipe body, the straightening roller group is sprayed with water to cool it down, which can further reduce the temperature of the straightening roller group and reduce the impact of high temperature on the service life of the straightening roller group.

[0026] Optionally, during the straightening process, the temperature of the straightening roller group and the drill pipe body is measured, and the flow rate of the circulating water is controlled. When the temperature of the straightening roller group rises, the flow rate of the circulating water is increased. When the temperature of the straightening roller group drops, the flow rate of the circulating water is reduced. When the temperature of the drill pipe body drops rapidly, the flow rate of the circulating water is reduced.

[0027] By adopting the above technical solution, the temperature of the straightening roller group can be reduced by increasing the flow rate of circulating water, thereby increasing the service life of the straightening roller group. By reducing the flow rate of circulating water, the temperature drop of the straightening roller group can be reduced, resulting in a rapid drop in the temperature of the drill pipe body, thereby affecting the quality of the drill pipe body.

[0028] In summary, the present application includes at least one of the following beneficial effects:

[0029] 1. After the process, the straightness deviation of the drill pipe body does not exceed 0.1% of the total length of the drill pipe body, and the surface of the drill pipe body is uniformly subjected to residual compressive stress or residual tensile stress ≤50MPa;

[0030] 2. The straightened drill pipe has high straightness, uniform residual stress, strong resistance to hydrogen sulfide stress corrosion and long service life;

[0031] 3. The drill pipe body rotates during cooling to reduce the bending of the drill pipe body under the action of gravity or internal stress release;

[0032] 4. Circulating water and surface water spraying can reduce the temperature of the straightening roller group and increase the service life of the straightening machine. DETAILED DESCRIPTION

[0033] The strength grades of the high-grade sulfur-resistant drill pipe in the present application include 120KSI, 125KSI, 130KSI and 135KSI (1KSI≈6.895Mpa, the strength grade refers to the minimum yield strength of the drill pipe body), and the wall thickness of the drill pipe body is ≤20mm.

[0034] The basic conditions for hydrogen sulfide stress corrosion of drill pipe body are metal materials, wet hydrogen sulfide environment and tensile stress. The residual tensile stress on the surface of drill pipe body is one of the main factors that promote hydrogen sulfide stress corrosion. When the drill pipe body with residual tensile stress is applied with external load, stress cracking is more likely to occur. In addition, when the stress on the surface of the drill pipe body is uneven (higher residual tensile stress and higher residual compressive stress are adjacent), local surface corrosion is prone to occur, which becomes the origin of cracks caused by fatigue failure of the drill pipe in severe cases.

[0035] The residual stress in the production process of drill pipe body is mainly generated in the straightening process. The drill pipe body is prone to uneven plastic deformation during the straightening process. The plastic deformation amounts at different positions on the surface of the drill pipe body are different, which causes relative compression or tensile deformation between different parts of the drill pipe body, thereby generating residual stress. Usually, the drill pipe body is straightened by rolling after the drill pipe body is tempered and heat treated. When the surface temperature of the drill pipe body drops below 200℃, the drill pipe body is straightened by rolling. After straightening, the residual stress on the surface of the rolled position and the non-rolled position is quite different. In addition, the straightening process is equivalent to applying a certain straightening load on the pipe body, so that the pipe body becomes straight under the action of the straightening load. Due to the low straightening temperature, a larger straightening load needs to be applied, which causes a larger internal stress inside the pipe body. In the subsequent cooling process, due to the stress recovery in the pipe body and the action of gravity, the drill pipe body is prone to bend again, resulting in poor straightness of the drill pipe body, affecting the coaxiality of the subsequent friction welding of the drill pipe body, and also causing problems such as eccentric wear of the drill pipe body and deviation of the wellbore from the trajectory during drilling.

[0036] The present application is described in further detail below.

[0037] Embodiment 1:

[0038] The embodiment of the present application discloses a method for straightening a high-grade sulfur-resistant drill pipe, comprising the following steps:

[0039] S1. Remove the oxide scale on the surface of the drill pipe body after quenching and tempering heat treatment by high pressure water;

[0040] S2. Straighten the drill pipe body by at least three sets of straightening rollers, and the temperature of the drill pipe body during straightening is ≥400°C and lower than the heat treatment temperature;

[0041] The straightening roller group includes an upper straightening roller and a lower straightening roller. During the straightening process, circulating water is passed into the upper straightening roller and the lower straightening roller for cooling. After each drill pipe body is straightened, the straightening roller group is sprayed with water to cool down.

[0042] The upper straightening rollers of each straightening roller group are parallel to each other, and the lower straightening rollers of each straightening roller group are parallel to each other. During the straightening process, the angle between the axis of the drill pipe body and the axis of the upper straightening roller is 25°-40°, and the angle between the axis of the drill pipe body and the axis of the lower straightening roller is (-40°)-(-25°). The positive and negative signs of the angles represent the opposite sides of the axis of the drill pipe body.

[0043] The distance between adjacent straightening roller groups is 400mm-800mm, the rotation speed of the upper straightening roller and the lower straightening roller is the same and greater than 30 rpm, and the adjacent straightening roller groups are staggered in the vertical direction and the height difference is 3mm-15mm;

[0044] The flattening amount of the drill pipe body by the straightening roller group is 1mm-8mm;

[0045] S3. The drill pipe body is placed on a cooling bed for cooling in the air. During the cooling process, the drill pipe body is rotated at a speed of ≥6 rpm.

[0046] Removing the oxide scale on the surface of the drill pipe body can reduce the impact of the oxide scale on the straightening process and improve the straightness of the drill pipe body after straightening. Removing the oxide scale with high-pressure water can reduce the damage to the metallographic structure of the drill pipe body and increase the service life of the drill pipe body.

[0047] The temperature of the drill pipe body during straightening is ≥400°C, which can reduce the straightening load that the straightening roller group needs to apply to the drill pipe body and reduce the internal stress generated during straightening of the drill pipe body.

[0048] The straightening load can be applied to the drill pipe body through the height difference between adjacent straightening rollers. By controlling the angle between the axis of the drill pipe body and the axis of the upper straightening roller and the axis of the lower straightening roller, the distance between adjacent straightening roller groups, and the flattening amount of the drill pipe body by the straightening roller group, the indentation coverage rate of the drill pipe body by the straightening roller group can be improved, so that the indentation coverage rate in the straightening process reaches more than 70%, and at the same time, the straightness of the drill pipe body is improved, and the residual stress of the drill pipe body is made more uniform, so that the residual tensile stress on the surface of the pipe body disappears or is ≤50Mpa, the influence of residual stress on the corrosion resistance of the drill pipe body is reduced, and the service life of the drill pipe body is improved.

[0049] In the present application, the flattening amount of the drill pipe body by the straightening roller group is adjusted within the range of 1mm-8mm according to the specifications of the drill pipe body. For drill pipe bodies with thinner wall thickness and smaller specifications, bending is prone to occur during heat treatment, and the flattening amount is set to be larger; for drill pipe bodies with larger specifications (outer diameter above 127mm, wall thickness above 15mm), the possibility of bending during heat treatment of the pipe body is smaller, and the flattening amount is set to be smaller; when the straightness of part of the pipe body during the straightening process is difficult to meet the requirements, the flattening amount is appropriately increased so that the straightness deviation of the drill pipe body after straightening and cooling does not exceed 0.1% of the total length of the drill pipe body.

[0050] During the cooling process of the drill pipe body after straightening, the drill pipe body is rotated to reduce the bending of the drill pipe body due to gravity or internal stress release.

[0051] Taking high-grade sulfur-resistant drill pipe with a grade strength of 125KSI and a pipe wall thickness of 10.54mm as an example, 100 pieces were selected for straightening experiments.

[0052] In the embodiment of the present application, the tempering temperature before straightening is 650°C, and straightening is performed after cooling to 400°C in air. The height difference between adjacent straightening rollers is 10 mm, the angle between the axis of the upper straightening roller and the axis of the drill pipe body is 40°, the angle between the axis of the lower straightening roller and the axis of the drill pipe body is -40°, there are three pairs of straightening roller groups, the distance between adjacent straightening roller groups is 600 mm, the rotation speed of the upper and lower straightening rollers is 40 rpm, the flattening amount of the drill pipe body by the straightening roller group is 4 mm, and the indentation coverage rate is 100%.

[0053] After the drill pipe body is straightened and cooled at high temperature, the straightness of the entire length of all drill pipe bodies is tested; a drill pipe body is randomly selected, and a 100mm long pipe body is cut from the middle position for hydrogen sulfide corrosion immersion test. The immersion time is 720h, and the surface corrosion of the cut pipe body is observed; in addition, a 300mm long pipe body is cut, and axial and circumferential residual stress tests are performed on four different positions of the pipe body. The four positions are evenly spaced 90 degrees around the axis of the pipe body, and two points A and B are selected at each position for the experiment.

[0054] The experimental results are as follows:

[0055] 1. Drill pipe body straightness inspection, the deviation does not exceed 0.1% of the total length of the pipe body, and the qualified rate is 100%;

[0056] 2. After the drill pipe body was immersed in hydrogen sulfide environment for 720 hours, there was no corrosion pit on the surface, and no cracks on the cross section when it was cut open;

[0057] 3. The residual stress test results are shown in Table 1. It is easy to see from Table 1 that the residual stresses are all less than 0MPa, that is, they are all residual compressive stresses. The maximum residual stress difference is |(-214MPa)-(-162MPa)|=52MPa, and the residual stress on the surface of the drill pipe body is relatively uniform.

[0058] Table 1 Residual stress test table after straightening at 400℃

[0059]

[0060] Embodiment 2:

[0061] The difference between the embodiment of the present application and embodiment 1 is that straightening is performed after cooling to 450° C. in air.

[0062] The experimental results are as follows:

[0063] 1. Drill pipe body straightness inspection, the deviation does not exceed 0.1% of the total length of the pipe body, and the qualified rate is 100%;

[0064] 2. After the drill pipe body was immersed in hydrogen sulfide environment for 720 hours, there was no corrosion pit on the surface, and no cracks on the cross section when it was cut open;

[0065] 3. The residual stress test results are shown in Table 2. It is easy to see from Table 2 that the residual stresses are all less than 0MPa, all of which are residual compressive stresses. The maximum residual stress difference is |(-148MPa)-(-100MPa)|=48MPa, and the surface stress of the drill pipe body is relatively uniform.

[0066] Table 2 Residual stress test table after straightening at 450℃

[0067]

[0068] Embodiment 3:

[0069] The difference between the embodiment of the present application and embodiment 1 and embodiment 2 is that: during the straightening process, the temperature of the straightening roller group and the drill pipe body is measured, and the flow rate of the circulating water is controlled. When the temperature of the straightening roller group rises, the flow rate of the circulating water is increased. When the temperature of the straightening roller group drops, the flow rate of the circulating water is reduced. When the temperature of the drill pipe body drops rapidly, the flow rate of the circulating water is reduced.

[0070] A first temperature sensor can be arranged inside the upper straightening roller and the lower straightening roller, and the temperature of the upper straightening roller and the lower straightening roller can be measured by the first temperature sensor. An electric valve is arranged on each upper straightening roller and each lower straightening roller to control the flow rate of circulating water. A control system is arranged and connected with the first temperature sensor and the electric valve. After the first temperature sensor measures the temperature of the upper straightening roller or the lower straightening roller, the measurement data is transmitted to the control system. The control system controls the electric valve according to the temperature measured by the first sensor. When the temperature measured by the first temperature sensor increases, the control system controls the electric valve located on the same upper straightening roller or the lower straightening roller as the first temperature sensor, so as to increase the flow rate of circulating water and improve the service life of the straightening roller group. When the temperature of the upper straightening roller decreases, the control system controls the electric valve located on the same upper straightening roller or the lower straightening roller as the first sensor, so as to increase the flow rate of circulating water and reduce the situation where the temperature of the upper straightening roller or the lower straightening roller is too low, resulting in a rapid decrease in the temperature of the drill pipe body, thereby affecting the straightening effect of the drill pipe body.

[0071] In addition, a second temperature sensor can be provided to measure the temperature of the drill pipe body during the straightening process. The second temperature sensor can be an infrared temperature sensor to reduce the influence on the rotation or movement of the drill pipe during the straightening process. The second temperature sensor is connected to the control system. A comparison temperature is preset in the control system. The comparison temperature is the drill pipe straightening temperature selected by the operator minus 10°C. The second temperature sensor transmits the measured temperature to the control system. The control system compares the temperature measured by the second temperature sensor with the comparison temperature. When the temperature measured by the second temperature sensor is lower than the comparison temperature, the control system controls all electric valves to reduce the circulating water flow rate in all upper straightening rollers and lower straightening rollers to reduce the temperature of the upper straightening roller or the lower straightening roller caused by the excessively fast circulating water flow rate, so that the temperature of the drill pipe body is lower during the straightening process, which affects the straightening of the drill pipe body, reduces the corrosion resistance of the drill pipe body, and affects the service life of the drill pipe. In addition, by controlling the temperature of the drill pipe body during the straightening process, the quality of the drill pipe body straightened at the same straightening temperature can be made more uniform.

[0072] In the embodiment of the present application, the control system has a higher priority for processing the temperature transmitted by the second temperature sensor than that transmitted by the first temperature sensor, that is, when the temperature transmitted by the second temperature sensor is lower than the comparison temperature, if the temperature measured by the first sensor decreases, the control system will still control all electric valves to reduce the flow rate of circulating water in all upper straightening rollers and all lower straightening rollers, so as to reduce the situation where the temperature of the drill pipe body continues to drop rapidly, thereby controlling the quality of the drill pipe body after straightening, and prolonging the service life of the straightening roller group without affecting the quality of the drill pipe body.

[0073] Comparative Example 1:

[0074] The difference between the embodiment of the present application and embodiment 1 and embodiment 2 is that straightening is performed after cooling to 300°C in air, the angle between the axis of the upper straightening roller and the axis of the drill pipe body is 35°, the angle between the axis of the lower straightening roller and the axis of the drill pipe body is -35°, the flattening amount of the drill pipe body by the straightening roller group is 5.5mm, and the indentation coverage rate is ≥85%.

[0075] The experimental results are as follows:

[0076] 1. Drill pipe body straightness inspection, the deviation shall not exceed 0.1% of the total length of the pipe body, and the qualified rate shall be 90%;

[0077] 2. After the drill pipe body was immersed in hydrogen sulfide environment for 720 hours, flaky corrosion morphology was produced locally on the surface, and no cracks were found in the cross section when it was removed for observation;

[0078] 3. The residual stress test results are shown in Table 3. It is easy to see from Table 3 that the residual stress has stresses less than 0MPa and greater than 0MPa, that is, there are residual compressive stress and residual tensile stress at the same time. The maximum stress difference is |(-289MPa)-132MPa|=421MPa, and the residual stress on the surface of the drill pipe body is uneven.

[0079] Table 3 Residual stress test table after straightening at 300℃

[0080]

[0081]

[0082] Comparative Example 2:

[0083] The difference between the embodiment of the present application and embodiment 1, embodiment 2 and comparative example 1 is that straightening is performed after cooling to 200°C in air, the angle between the axis of the upper straightening roller and the axis of the drill pipe body is 40°, the angle between the axis of the lower straightening roller and the axis of the drill pipe body is -40°, the flattening amount of the drill pipe body by the straightening roller group is 7mm, and the indentation coverage rate is ≥70%.

[0084] The experimental results are as follows:

[0085] 1. Drill pipe body straightness inspection, the deviation shall not exceed 0.1% of the total length of the pipe body, and the qualified rate shall be 70%;

[0086] 2. After the drill pipe body was immersed in hydrogen sulfide environment for 720 hours, flaky corrosion morphology was produced locally on the surface, and cracks were found when observing the cross section;

[0087] 3. The residual stress test results are shown in Table 4. It is easy to see from Table 4 that the residual stress has stresses less than 0MPa and greater than 0MPa, that is, there are residual compressive stress and residual tensile stress at the same time. The maximum stress difference is |(-367MPa)-387MPa|=754MPa. The residual stress on the surface of the drill pipe body is extremely different.

[0088] Table 4 Residual stress test table after straightening at 200℃

[0089]

[0090] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A method for straightening a high-grade sulfur-resistant drill pipe, characterized in that: The following steps are involved: S1. Remove the surface oxide scale of the heat-treated drill pipe body; S2, cool the drill pipe body after heat treatment to 400°C in air and then straighten it, use three groups of straightening rollers to perform high-temperature straightening treatment on the drill pipe body, the straightening roller group includes an upper straightening roller and a lower straightening roller, the upper straightening rollers of each straightening roller group are parallel to each other, and the lower straightening rollers of each straightening roller group are parallel to each other; the angle between the axis of the drill pipe body and the axis of the upper straightening roller is 25°-40°, the angle between the axis of the drill pipe body and the axis of the lower straightening roller is (-40°)-(-25°), the distance between adjacent straightening roller groups is 600mm, the rotation speed of the upper straightening roller is the same as that of the lower straightening roller and is greater than 30 rpm; the first pair of straightening rollers is consistent in height with the third pair of straightening rollers, the height difference between the second pair of straightening rollers in the middle and the first pair of straightening rollers and the third pair of straightening rollers is 3-15mm, and the flattening amount of the drill pipe body by the straightening roller group is 1mm-8mm; S3. Cool the drill pipe body.

2. A method for straightening a high-grade sulfur-resistant drill pipe according to claim 1, characterized in that: In S1, high-pressure water is used to remove surface oxide scale.

3. A method for straightening a high-grade sulfur-resistant drill pipe according to claim 1, characterized in that: During the cooling process in S3, the drill pipe body is rotated around the drill pipe axis, and the rotation speed of the drill pipe body is ≥6 revolutions per minute.

4. A method for straightening a high-grade sulfur-resistant drill pipe according to claim 1, characterized in that: During the straightening process, there is circulating water in the upper and lower straightening rollers. After each drill pipe body is straightened, the upper and lower straightening rollers are sprayed with water to cool down.

5. A method for straightening a high-grade sulfur-resistant drill pipe according to claim 4, characterized in that: During the straightening process, the temperature of the straightening roller group and the drill pipe body is measured, and the flow rate of the circulating water is controlled. When the temperature of the straightening roller group rises, the flow rate of the circulating water is increased. When the temperature of the straightening roller group drops, the flow rate of the circulating water is reduced. When the temperature of the drill pipe body drops rapidly, the flow rate of the circulating water is reduced.