A comprehensive evaluation method for borehole quality of directional drilling rigs in coal mines
By introducing scientific evaluation indicators and scoring systems, and considering the unique and complex nature of directional drilling in coal mines, a comprehensive and accurate evaluation of borehole quality has been achieved. This has solved key issues in evaluating borehole quality in coal mines, and improved the safety and production efficiency of coal mines.
Patent Information
- Application Number
- CN202311044684.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-08-18
- Publication Date
- 2026-11-17
- Estimated Expiration
- 2043-08-18
AI Technical Summary
Existing technologies make it difficult to comprehensively and accurately evaluate the drilling quality of directional drilling rigs in coal mines, which may lead to accidents such as coal seam collapse, mine water leakage, and gas outbursts, affecting coal mine safety and efficiency.
A comprehensive evaluation method for borehole quality of directional drilling rigs in coal mines is adopted, which includes three stages: basic evaluation, process evaluation and result evaluation. Through scientific evaluation indicators and scoring system, key factors such as borehole location accuracy, diameter and verticality, and borehole wall quality are evaluated. The comprehensive evaluation concept is introduced to ensure the comprehensiveness and accuracy of the evaluation.
This improved the comprehensiveness and accuracy of borehole quality evaluation, enabled timely detection and resolution of problems, and enhanced the safety and production efficiency of coal mines.
Smart Images

Figure CN117108268B_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of comprehensive evaluation of borehole quality of directional drilling rigs, specifically a comprehensive evaluation method for borehole quality of directional drilling rigs in coal mines. Background Technology
[0002] The evaluation of the drilling quality of directional drilling rigs in coal mines is to ensure the quality of drilling and improve the efficiency and safety of coal mining.
[0003] Directional drilling in coal mines is an important underground engineering technology. It enables drilling underground to monitor information such as coal seam thickness, rock structure, and gas emission, providing the geological data required for coal mining.
[0004] However, the quality of boreholes drilled by directional drilling rigs in coal mines directly affects the safety and efficiency of the mine. Substandard borehole quality can lead to accidents such as coal seam collapses, mine water leaks, and gas outbursts, severely impacting normal mine production. Therefore, a comprehensive evaluation of the borehole quality from directional drilling rigs in coal mines can help identify and resolve problems promptly, ensuring the safe and efficient operation of the mine.
[0005] A comprehensive evaluation of the drilling quality of directional drilling rigs in coal mines requires consideration of multiple factors, including the accuracy of the borehole location, borehole diameter and verticality, and borehole wall quality. Evaluation methods can be completed through steps such as on-site inspection of the borehole, geological data analysis, and comprehensive assessment. Furthermore, scientific evaluation indicators and scoring systems can be employed to quantitatively evaluate various aspects of the borehole. These methods allow for a comprehensive and objective evaluation of the drilling quality of directional drilling rigs in coal mines, providing effective assurance for the safe and efficient operation of coal mines.
[0006] To improve the quality control of directional drilling and enhance the extraction effect of boreholes, a comprehensive evaluation method for the quality of directional drilling in coal mines is hereby formulated. Summary of the Invention
[0007] To improve the quality control of directional drilling and enhance the drilling extraction effect, this invention proposes a comprehensive evaluation method for the drilling quality of directional drilling rigs in coal mines.
[0008] The technical solution adopted by this application to solve its technical problem is: a comprehensive evaluation method for borehole quality of underground directional drilling rigs in coal mines, comprising the following steps: Step (1): The comprehensive evaluation method for borehole quality of directional drilling rigs in coal mines described in this application includes three stages: basic evaluation, process evaluation and result evaluation.
[0009] Step (2): The comprehensive evaluation method for borehole quality of a coal mine directional drilling rig described in this application includes a basic evaluation of the stability of the measurement system and an evaluation of the stability of the coal (rock) mass at the drilling site.
[0010] Step (3): The comprehensive evaluation method for borehole quality of a coal mine directional drilling rig described in this application includes process evaluation of borehole design quality, borehole opening and sealing quality, and drilling process quality.
[0011] Step (4): The comprehensive evaluation method for borehole quality of directional drilling rigs in coal mines described in this application includes borehole correlation evaluation and borehole concentration evaluation.
[0012] Step (5): The comprehensive evaluation method for borehole quality of directional drilling rigs in coal mines described in this application includes three stages: basic evaluation, process evaluation and result evaluation, each of which has a result application.
[0013] Preferably, the stability evaluation of the measurement system in step (2) includes: stability evaluation of the measurement while drilling device of a newly purchased directional drilling rig before it is put into use and stability evaluation of the measurement while drilling device of a directional drilling rig that has been used in the well for more than 12 months.
[0014] Preferably, the evaluation method for the stability evaluation of the measurement system in step (2) is the accuracy "targeting" test, that is: to complete a penetration borehole with a projection depth of more than 300 meters in the well, and compare the coordinates of the borehole opening point and penetration point measured by the total station with the data measured by the drilling measurement device.
[0015] Preferably, the stability evaluation of the coal (rock) body in step (2) is to conduct a targeted evaluation of the development of cracks in the coal wall and the coal wall of the nearby roadways and the condition of coal (rock) body fragmentation.
[0016] Preferably, the evaluation method for the stability evaluation of the coal (rock) body in the drilling site in step (2) is for the designers to go deep into the underground site to assess the development of cracks in the coal wall of the drilling site and the coal wall of the adjacent roadway, as well as the condition of the coal (rock) body fragmentation, which may affect the drilling construction and extraction effect.
[0017] Preferably, the drilling design quality evaluation in step (3) is to evaluate the hole spacing, number, hole bottom spacing, and drilling design trajectory.
[0018] Preferably, the evaluation method for borehole design quality evaluation in step (3) is for the reviewer to comprehensively examine the borehole spacing, number of boreholes, single borehole trajectory and borehole spacing by combining the borehole control range, regional coal seam geological conditions, planned extraction time and the completion trajectory of adjacent boreholes.
[0019] Preferably, the quality evaluation of opening and sealing in step (3) is to evaluate the actual parameters of the opening of the borehole, the length and quality of the sealing section of the opening section of the borehole during the drilling construction.
[0020] Preferably, the method for evaluating the quality of opening and sealing in step (3) is for the team leader to actually measure the position of the borehole opening and compare the relevant parameters with the borehole design parameters on site, and at the same time determine the actual sealing length and sealing quality based on the on-site measurement, observation and construction records.
[0021] Preferably, the quality evaluation of the drilling process in step (3) is to evaluate the quality of the actual drilling trajectory by combining the borehole design parameters, actual geological data and relevant regulations and requirements.
[0022] Preferably, the drilling process quality evaluation method in step (3) is as follows: the drilling personnel record the "Original Parameters of Drilling Construction" as required each shift; the designers review the "Original Parameters of Drilling Construction" each shift, compare and analyze the original parameters of drilling construction with the drilling design parameters, and the drilling personnel record the "Original Parameters of Drilling Construction" as required each shift; the designers compare and analyze the original parameters of drilling construction with the drilling design parameters every day.
[0023] Preferably, in step (4), the borehole correlation evaluation involves a comprehensive analysis and comparison of the borehole completion trajectory with parameters such as the completion trajectory of adjacent boreholes, the design control range, and the geological occurrence conditions.
[0024] Preferably, the borehole correlation evaluation method in step (4) involves the designer collecting and downloading borehole construction parameters after the borehole construction is completed, drawing the borehole completion trajectory, and evaluating the borehole completion trajectory in conjunction with the completion trajectories of adjacent boreholes, the design control range, geological occurrence conditions, etc. It is also necessary to confirm whether the borehole depth and borehole spacing meet the design requirements.
[0025] Preferably, in step (4), the borehole concentration evaluation is to measure and evaluate the high negative pressure borehole concentration with stable extraction by combining the borehole construction parameters.
[0026] Preferably, the borehole concentration evaluation method in step (4) is to have the detection and maintenance personnel manually measure the concentration of the high negative pressure borehole with stable extraction, and to conduct a comprehensive evaluation in combination with the borehole construction control range and the original gas content.
[0027] The beneficial effects of this application are:
[0028] The comprehensive evaluation method for borehole quality of directional drilling rigs in coal mines proposed in this application has significant advantages in improving the quality control of directional drilling rig boreholes and enhancing the borehole extraction effect.
[0029] First, this evaluation method introduces scientific evaluation indicators and a scoring system, making the evaluation process more objective and accurate. Through quantified indicators and a system, various aspects of the borehole are assessed, ensuring that the borehole quality not only meets design requirements but also satisfies the actual needs of coal mining. Evaluation indicators include location accuracy, borehole diameter and verticality, and borehole wall quality, covering key elements of the borehole and improving the comprehensiveness and reliability of the evaluation.
[0030] Secondly, this evaluation method fully considers the unique and complex nature of directional drilling in coal mines. By combining coal seam geological exploration and design requirements, it assesses the accuracy of borehole location. Through measurement and testing, the diameter and verticality of the borehole are monitored and evaluated. Simultaneously, through observation, inspection, and measurement, the quality of the borehole wall is comprehensively evaluated. Through targeted evaluation indicators and methods, this method effectively solves key issues in the quality evaluation of directional drilling in coal mines, improving the accuracy and practicality of the evaluation.
[0031] Third, this evaluation method also incorporates the concept of comprehensive assessment, cross-referencing multiple evaluation indicators to conduct a holistic evaluation. Through comprehensive assessment, the quality of boreholes can be evaluated more comprehensively and objectively, and substandard boreholes can be rectified and improved. This allows for the timely detection and resolution of borehole quality problems, improving coal mine safety and production efficiency.
[0032] In summary, the comprehensive evaluation method for borehole quality of underground directional drilling rigs in coal mines proposed in this application, by introducing scientific indicators and a scoring system, takes into account the special characteristics and complexity of underground directional drilling in coal mines, thereby improving borehole quality control and enhancing borehole extraction efficiency. This method has significant practical implications, as it can effectively improve the quality of underground directional drilling in coal mines, thereby increasing the efficiency and safety of coal mining. Attached Figure Description
[0033] The present application will be further described below with reference to the accompanying drawings and embodiments.
[0034] Figure 1 This is a schematic diagram of the main process of this application; Figure 2 This is a schematic diagram of the basic evaluation process for this application; Figure 3 This is a schematic diagram of the evaluation process for this application; Figure 4 This is a schematic diagram of the evaluation process for the results of this application; Figure 5 This is a schematic diagram of the evaluation method for the stability evaluation of the measurement system in this application; Figure 6 This is a schematic diagram of the evaluation method for assessing the stability of coal (rock) mass in the drilling site in this application; Figure 7This is a schematic diagram of the evaluation method for borehole design quality assessment in this application; Figure 8 This is a schematic diagram of the evaluation method for the opening and sealing quality assessment of this application; Figure 9 This is a schematic diagram of the evaluation method for the drilling process quality assessment in this application; Figure 10 This is a schematic diagram of the evaluation method for borehole correlation assessment in this application; Figure 11 This is a schematic diagram of the evaluation method for borehole concentration evaluation in application 2. Detailed Implementation
[0035] To make the technical means, creative features, objectives and effects of this application easier to understand, the following describes this application in conjunction with specific implementation methods. Example:
[0036] like Figures 1-4 As shown in the figure, the comprehensive evaluation method for borehole quality of directional drilling rigs in coal mines described in this application includes the following steps: Step (1): The comprehensive evaluation method for borehole quality of directional drilling rigs in coal mines described in this application includes three stages: basic evaluation, process evaluation and result evaluation.
[0037] Step (2): The comprehensive evaluation method for borehole quality of a coal mine directional drilling rig described in this application includes a basic evaluation of the stability of the measurement system and an evaluation of the stability of the coal (rock) mass at the drilling site.
[0038] Step (3): The comprehensive evaluation method for borehole quality of a coal mine directional drilling rig described in this application includes process evaluation of borehole design quality, borehole opening and sealing quality, and drilling process quality.
[0039] Step (4): The comprehensive evaluation method for borehole quality of directional drilling rigs in coal mines described in this application includes borehole correlation evaluation and borehole concentration evaluation.
[0040] Step (5): The comprehensive evaluation method for borehole quality of directional drilling rigs in coal mines described in this application includes three stages: basic evaluation, process evaluation and result evaluation, each of which has a result application.
[0041] Specifically, the stability evaluation of the measurement system in step (2) includes: stability evaluation of the measurement while drilling device of a newly purchased directional drilling rig before it is put into use, and stability evaluation of the measurement while drilling device of a directional drilling rig that has been used in the well for more than 12 months.
[0042] Specifically, the evaluation method for the stability evaluation of the measurement system in step (2) is the accuracy "targeting" test, that is: to complete a penetration borehole with a projection depth of more than 300 meters in the well, and compare the coordinates of the borehole opening point and penetration point measured by the total station with the data measured by the measurement while drilling device; the evaluation requirement is that each set of measurement while drilling device is repeated 3 times, and the horizontal error is ≤2 meters and the vertical error is ≤1 meter, and the evaluation is qualified; otherwise, the evaluation is unqualified, and the unqualified measurement while drilling device is returned to the factory for repair and is not used.
[0043] Specifically, in step (2), the stability evaluation of the coal (rock) body in the drilling site is to conduct a targeted evaluation of the development of cracks in the coal wall and the coal wall of the nearby roadways, as well as the fracturing of the coal (rock) body.
[0044] Specifically, in step (2), the evaluation method for the stability evaluation of the coal (rock) body in the drilling site is for the designers to go deep into the underground site to assess the development of cracks in the coal wall of the drilling site and the coal wall of the adjacent roadway, as well as the condition of the coal (rock) body fragmentation, which may affect the drilling construction and extraction effect. The evaluation requirements are that the coal (rock) body of the coal wall of the drilling site and the coal walls of the adjacent roadways on both sides has clear stratification, good integrity, no parasitic structure, and only a few cracks. Otherwise, the evaluation is unqualified. For unqualified drilling sites, the drilling site is improved by grouting reinforcement of the coal (rock) body. (The grouting reinforcement hole depth of the drilling site coal wall is generally controlled at 15-25 meters, and the spacing between rows is 2-3 meters).
[0045] Specifically, in step (3), the drilling design quality evaluation includes evaluating the hole spacing, number, hole bottom spacing, and drilling design trajectory.
[0046] Specifically, in step (3), the evaluation method for the borehole design quality evaluation is for the reviewers to comprehensively examine the borehole spacing, number of boreholes, single borehole trajectory and borehole spacing in combination with the borehole control range, regional coal seam geological conditions, planned extraction time and the completion trajectory of adjacent boreholes. The evaluation requirements are that the borehole spacing is ≥0.4 meters, the distance between the borehole and the completion trajectory of adjacent boreholes is less than 2 times the extraction radius, and the number and length of boreholes match the borehole coverage range. Otherwise, the evaluation is unqualified. For borehole designs that are unqualified, the designers are required to re-examine the site conditions, refer to the borehole data they have already obtained, and redesign the design.
[0047] Specifically, in step (3), the quality evaluation of opening and sealing the borehole involves evaluating the actual parameters of the borehole opening, the length and quality of the sealing section of the borehole opening during drilling.
[0048] Specifically, in step (3), the method for evaluating the quality of opening and sealing holes is for the team leader to actually measure the position of the borehole opening and compare the relevant parameters with the borehole design parameters on site, and at the same time determine the actual sealing length and sealing quality based on the on-site measurements, observations and construction records. The evaluation requirements are that the deviation between the opening position and the design value is less than 0.5 meters, the deviation between the opening inclination angle and the design value is less than 2°, and the deviation between the opening azimuth angle and the design value is less than 5°, then the opening quality is assessed as qualified; otherwise, it is assessed as unqualified.
[0049] The evaluation requirements are that the opening spacing is less than the allowable error of the designed opening spacing, the deviation between the opening inclination angle and the design value is less than 3°, and the deviation between the opening azimuth angle and the design value is less than 5°, then the opening quality is assessed as qualified; otherwise, it is assessed as unqualified.
[0050] The "two-sealing and one-grouting" hole sealing method is adopted. For a designed borehole depth of more than 50 meters, the hole sealing depth is ≥15 meters; for a designed borehole depth of less than 30 meters, the hole sealing depth is ≥9 meters; for a designed borehole depth of 30-50 meters, the hole sealing depth is ≥12 meters. The borehole is assessed as qualified; otherwise, it is assessed as unqualified. For boreholes with unqualified opening and sealing quality, the already constructed borehole shall be grouted and sealed, and the hole shall be re-opened and re-sealed in accordance with the design requirements.
[0051] Specifically, the quality evaluation of the drilling process in step (3) is to evaluate the quality of the actual construction trajectory of the borehole by combining the design parameters of the borehole, actual geological data and the requirements of relevant regulations and measures.
[0052] Specifically, the quality evaluation method for the drilling process in step (3) is as follows: the drilling personnel record the "Original Parameters of Borehole Construction" as required for each shift; the design personnel check the "Original Parameters of Borehole Construction" for each shift, compare and analyze the original borehole construction parameters with the borehole design parameters, the drilling personnel record the "Original Parameters of Borehole Construction" as required for each shift; the design personnel compare and analyze the original borehole construction parameters with the borehole design parameters every day; the evaluation requirements are that during the drilling process, the top is detected once every 80-120 meters, and the bottom is detected once every 60-100 meters; during the drill withdrawal process, the borehole must be flushed once every 30-50 meters, and the flushing time shall not be less than 10 minutes; during the drilling process, the deviation of the length of encountering gangue and coal from the design value is less than 5 meters (excluding abnormal geological changes), and the borehole trajectory deviation is less than or equal to 1 meter, then the borehole is assessed as qualified; otherwise, it is assessed as unqualified.
[0053] Specifically, the borehole correlation evaluation in step (4) is to comprehensively analyze and compare the completed trajectory of the borehole with parameters such as the completed trajectory of adjacent boreholes, the designed control range, and geological occurrence conditions.
[0054] Specifically, in step (4), the borehole correlation evaluation method involves the designer collecting and downloading borehole construction parameters after the borehole construction is completed, drawing the borehole completion trajectory, and evaluating the borehole completion trajectory in conjunction with the completion trajectories of adjacent boreholes, the design control range, and geological occurrence conditions. The borehole depth and spacing are confirmed to meet design requirements. The evaluation requirements are: the control range of the borehole completion trajectory meets design requirements; the spacing between the borehole trajectory and adjacent borehole trajectories meets the design extraction radius requirements; and the borehole trajectory uniformly controls the thickness of the entire coal seam. Otherwise, the evaluation is deemed unqualified.
[0055] Specifically, in step (4), the borehole concentration evaluation involves measuring and evaluating the concentration of the high negative pressure borehole with stable extraction based on the borehole construction parameters.
[0056] Specifically, in step (4), the borehole concentration evaluation method is to have the detection and maintenance personnel manually measure the high negative pressure borehole concentration for stable extraction, and conduct a comprehensive evaluation in combination with the borehole construction control range and the original gas content. The evaluation requirements are that the original gas content of the coal body is ≥10m³ / t, the borehole depth is more than 300 meters, and after 5-7 days of stable high negative pressure extraction, the borehole concentration is manually measured. If the concentration is ≥30%, the evaluation is qualified; otherwise, the evaluation is unqualified.
[0057] The foregoing has shown and described the basic principles, main features, and advantages of this application. Those skilled in the art should understand that this application is not limited to the above embodiments. The descriptions in the above embodiments and specification are merely illustrative of the principles of this application. Various changes and modifications can be made to this application without departing from the spirit and scope thereof, and all such changes and modifications fall within the scope of protection claimed in this application. The scope of protection of this application is defined by the appended claims and their equivalents.
Claims
1. A comprehensive evaluation method for drilling quality of a coal mine underground directional drilling machine, characterized in that, Includes the following steps: Step (1): Includes three stages: basic evaluation, process evaluation, and result evaluation; Step (2): The basic evaluation includes the stability evaluation of the measurement system and the stability evaluation of the coal or rock mass at the drilling site; Step (3): The process evaluation includes the quality evaluation of borehole design, the quality evaluation of opening and sealing boreholes, and the quality evaluation of the drilling process; Step (4): The result evaluation includes the borehole correlation evaluation and the borehole concentration evaluation; Step (5): Each of the three stages of basic evaluation, process evaluation, and result evaluation includes the application of results; The stability evaluation of the measurement system in step (2) includes: stability evaluation before the newly purchased directional drilling rig's measurement while drilling device is put into use and stability evaluation of the directional drilling rig's measurement while drilling device that has been used in the well for more than 12 months in total; the evaluation method for the stability evaluation of the measurement system in step (2) is the accuracy "targeting" test, that is: to complete a penetration borehole with a projection depth of more than 300 meters in the well, and compare the coordinates of the borehole opening point and penetration point measured by the total station with the data measured by the measurement while drilling device; In step (4), the borehole correlation evaluation involves a comprehensive analysis and comparison of the completed borehole trajectory with the completed trajectories of adjacent boreholes, the design control range, and the geological occurrence conditions. The borehole correlation evaluation method in step (4) is as follows: after the borehole construction is completed, the designers collect and download the borehole construction parameters, draw the completed borehole trajectory, and evaluate the completed borehole trajectory in combination with the completed trajectories of adjacent boreholes, the design control range, and the geological occurrence conditions. The borehole depth and borehole spacing are confirmed to meet the design requirements.
2. The comprehensive evaluation method for borehole quality of directional drilling rigs in coal mines according to claim 1, characterized in that: In step (2), the stability evaluation of the coal or rock mass in the drilling site is to conduct a targeted evaluation of the development of cracks in the coal wall and the coal wall of the nearby roadways, as well as the fracturing of the coal or rock mass.
3. The coal mine underground directional drilling rig drilling quality comprehensive evaluation method according to claim 1, characterized in that: In step (2), the evaluation method for the stability assessment of the coal or rock mass in the drilling site is for the designers to go deep into the underground site to assess the development of cracks in the coal wall and adjacent roadway coal wall, as well as the fracturing of the coal or rock mass, which may affect the drilling construction and extraction effect.
4. The coal mine underground directional drilling rig drilling quality comprehensive evaluation method according to claim 1, characterized in that: In step (3), the quality evaluation of borehole design is to evaluate the borehole opening spacing, number, bottom spacing, and borehole design trajectory. The evaluation method of borehole design quality evaluation in step (3) is for the reviewer to comprehensively examine the opening spacing, number of openings, single borehole trajectory, and borehole spacing of the designed boreholes in combination with the borehole control range, regional coal seam geological conditions, planned extraction time, and the completion trajectory of adjacent boreholes. In step (3), the quality evaluation of opening and sealing is to evaluate the actual parameters of borehole opening, the length and quality of sealing of the borehole opening section during borehole construction. The quality evaluation method of opening and sealing in step (3) is for the team leader to compare the actual position of the borehole opening and the relevant opening parameters with the borehole design parameters on site, and at the same time determine the actual sealing length and sealing quality based on the on-site measurement, observation, and construction records.
5. The coal mine underground directional drilling rig drilling quality comprehensive evaluation method according to claim 1, characterized in that: In step (3), the quality evaluation of the drilling process is to evaluate the quality of the actual drilling trajectory in combination with the borehole design parameters, actual geological data and relevant regulations and measures. The quality evaluation method of the drilling process in step (3) is that the drilling personnel record the "Original Parameters of Borehole Construction" as required each shift; the designers check the "Original Parameters of Borehole Construction" each shift and compare and analyze the original parameters of borehole construction with the borehole design parameters. The drilling personnel record the "Original Parameters of Borehole Construction" as required each shift; the designers compare and analyze the original parameters of borehole construction with the borehole design parameters every day.
6. The coal mine underground directional drilling rig drilling quality comprehensive evaluation method according to claim 1, characterized in that: In step (4), the borehole concentration evaluation is to measure and evaluate the high negative pressure borehole concentration with stable extraction in combination with the borehole construction parameters; the borehole concentration evaluation method in step (4) is to have the detection and maintenance personnel manually measure the high negative pressure borehole concentration with stable extraction, and to conduct a comprehensive evaluation in combination with the borehole construction control range and the original gas content.
Citation Information
Patent Citations
Coal face coal-rock interface detection directional hole designing construction and data processing method
CN111485825A
Gas extraction and regional outburst elimination method for stope face of broken and soft coal seam
CN116291686A
