Method and system for identifying weak links in power grids in areas with high proportion of new energy
By comparing the capacity and flow direction of the power grid, the weak links of the power grid after the large-capacity thermal power units are connected solve the problem of low identification efficiency in the existing technology, achieve efficient stability control analysis and implementation of measures, and improve the stability of the power grid. sex and safety.
Patent Information
- Application Number
- CN202310881149.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-07-18
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2043-07-18
AI Technical Summary
Existing technology is difficult to quickly identify weak links in the power grid after large-capacity thermal power units are connected, especially when the characteristics of new energy clusters and traditional thermal power units are inconsistent, resulting in low efficiency and quality of stability control analysis.
By comparing the strength and capacity of the regional power grid connected to large-capacity thermal power units and the external power grid, combined with the grid structure and power flow direction within the regional power grid, fault locations and types that can easily cause transient stability and overload problems are identified, and stability control calculations are used Identify weak links and take corresponding stabilization and control measures.
It improves the efficiency and quality of power grid stability control analysis, can quickly and systematically identify weak links, and ensures the stability and security of the power grid.
Smart Images

Figure CN117117829B_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the technical field of safe and stable control of new energy power grids, and in particular to a method and system for quickly identifying weak links in a power grid when a large-capacity thermal power unit is newly connected to the power grid in a region containing a high proportion of new energy. Background Art
[0002] In recent years, the construction of power grids has developed rapidly. Not only have a large number of new energy bases been built, but also some traditional thermal power units have been built in key parts of the grid in order to cope with the rapid growth of electricity load and the stable regulation of the power grid. When these new thermal power units are connected to the regional power grid, they will not only affect the grid structure, but also greatly change the stability control system of the regional power grid. How to conduct stability control analysis on the power grid after the large-capacity thermal power units are connected and quickly identify the weak links of the power grid are challenges that the power grid often faces.
[0003] In the prior art, there are many methods for identifying weak links in power grids. Prior art 1 (CN114119287A) proposes a method and system for quickly locating expected faults in power grids. In the current calculation cycle, the method and system obtain the power grid operation status and its related data, and calculate the real-time failure rate of the faulty equipment corresponding to each preset expected fault and the severity function value corresponding to the power grid operation status. However, the parameter design of the preset expected fault has a great impact on the accuracy of fault location; Prior art 2 (CN114240066A) proposes an intelligent diagnosis and decision-making method and system based on power grid big data analysis, which conducts diagnostic analysis on the power grid to find the safety hazards and weak links in the power grid. This method needs to be based on a large amount of power grid operation data, and it is impossible to diagnose and analyze power grid equipment that is still in the design stage or construction stage, especially large-capacity thermal power units built in stages. Prior art 3 uses a dynamic evaluation method for weak links in the power system, establishes multiple evaluation indicators for different aspects of system operation characteristics, identifies and selects important equipment in the distribution network, and prevents potential risks. This method focuses on the weak links in the power grid caused by hardware equipment failures, but cannot identify and evaluate the weak links in the power grid operation caused by the power grid structure and operating conditions. Specifically, prior art 4 (CN115588979A) targets the weak links of the power grid after the access of new energy, based on the short-circuit ratio of multiple stations of each new energy station in the evaluated power grid, and identifies the weak links of the power grid in the evaluated power grid through the sensitivity of each new energy station to the strength of the cluster access to the power grid. The new energy cluster has output uncertainty and timing, and the new energy is very sensitive to the strength of the regional power grid, which is inconsistent with the characteristics of large-capacity thermal power units accessing the regional power grid and the characteristics of the output of thermal power units. Summary of the invention
[0004] In order to solve the deficiencies in the prior art, the present invention provides a method and system for identifying weak links in power grids in areas with a high proportion of new energy. By comparing the strength and capacity of the regional power grid to which large-capacity thermal power units are connected with the external power grid and the direction of the inter-regional flow, and combining the grid structure and flow within the regional power grid, the fault locations and types that are prone to cause transient stability and overload problems are proposed, and the weak links in the power grid are found, so that the subsequent stability control analysis becomes targeted, fast and feasible, greatly improving the efficiency and quality of the stability control analysis.
[0005] The present invention adopts the following technical solution.
[0006] The present invention proposes a method for identifying weak links in power grids in areas with a high proportion of new energy. The power grid is divided into a regional power grid and an external power grid according to the grid structure of the power grid. The regional power grid and the external power grid are connected through a tie line, and the regional power grid is connected to a high proportion of new energy cluster; the method comprises:
[0007] Obtain the capacity and short-circuit ratio of the regional power grid, the capacity and short-circuit ratio of the external power grid;
[0008] When the capacity of the regional power grid is of the same order of magnitude as that of the external power grid, and the short-circuit ratios of the regional power grid and the external power grid are both greater than 3, if there is DC current in the tie line, it is determined to be a cascading fault; if there is no DC current in the tie line, the number of faulty tie lines is reduced to perform stability control calculations, and the weak links of the regional power grid are determined based on the stability control calculation results;
[0009] When the capacity of the regional power grid is an order of magnitude smaller than that of the external power grid, grid stability calculations are performed based on the impact of the capacity of the thermal power units connected to the regional power grid on the power flow direction of the regional power grid, including: when the regional power grid transmits power to the external power grid, stability calculations are performed on transient power angle stability, main transformer or line overload, and transmission section checkpoints; when the regional power grid power flow is offline, stability calculations are performed on transient power angle stability, main transformer or line overload, offline section checkpoints, as well as transient voltage and steady-state voltage; and weak links in the regional power grid are determined based on the stability calculation results.
[0010] Reducing the number of faulty tie lines includes adjusting the original N-3 fault types to N-2 fault types, where N represents the total number of tie lines.
[0011] Based on the results of stability control calculations, the overloaded interconnection lines in the regional power grid are identified, and stability control measures such as generator output reduction and load shedding are adopted.
[0012] After the thermal power unit is connected to the main station of the regional power grid, for the interconnection lines connected to the main station, combined with the common pole situation of the transmission lines, in the order of heavy load first and light load later, high voltage level first and low voltage level later, N-3 fault type, N-2 fault type and N-1 fault type are selected respectively, and corresponding stability control calculations are performed, where N represents the total number of interconnection lines connected to the main station.
[0013] Based on the results of stability control calculations, the overloaded interconnection lines in the regional power grid are identified, and stabilization measures such as cutting off the generator or reducing the power generation at the sending end, or installing a disconnect device at the large-capacity thermal power unit are adopted.
[0014] After the thermal power unit is connected to the main station of the regional power grid, the main station is connected to another main station, and the other main station is also connected to the transmission line; the line set is composed of the connecting line connected to the main station, the transmission line connecting the main station to another main station, and the transmission line connected to another main station; for the line set, combined with the common pole situation of the transmission line, in the order of heavy load first and light load later, high voltage level first and low voltage level later, N-3 fault type, N-2 fault type and N-1 fault type are selected respectively, and the corresponding stability control calculation is performed, and N represents the total number of lines in the line set.
[0015] According to the results of stability control calculation, the overloaded interconnection lines in the regional power grid are determined, and stability control measures such as cutting off the generator at the sending end or reducing the power generation capacity are adopted.
[0016] After the thermal power unit is connected to the main station of the regional power grid, when the load of the main station is less than the installed capacity of new energy in the regional power grid, the overvoltage interconnection line in the regional power grid is determined according to the stability control calculation results, and the stability control measures of reactive power regulation are taken first. If there are still overvoltage interconnection lines, the stability control measures of limiting the output of new energy stations are taken.
[0017] When there are three lines on a common pole or two lines on a common pole and the transmission line is in maintenance state, it corresponds to N-3 fault type;
[0018] When there are two lines on the same pole in the transmission line, it corresponds to N-2 fault type.
[0019] The present invention also proposes a system for identifying weak links in power grids in areas with a high proportion of new energy, the system comprising: a collection module, an identification module;
[0020] A collection module is used to obtain the capacity and short-circuit ratio of the regional power grid and the capacity and short-circuit ratio of the external power grid;
[0021] The identification module is used for when the capacity of the regional power grid is of the same order of magnitude as that of the external power grid, and the short-circuit ratios of the regional power grid and the external power grid are both greater than 3, if there is a DC current in the interconnection line, it is determined to be a cascading fault; if there is no DC current in the interconnection line, the number of faulty interconnections is reduced to perform stability control calculations, and the weak links of the regional power grid are determined according to the stability control calculation results; when the order of magnitude of the capacity of the regional power grid is smaller than the order of magnitude of the capacity of the external power grid, the power grid stability control calculation is performed according to the influence of the capacity of the thermal power units connected to the regional power grid on the power flow direction of the regional power grid, including: when the regional power grid sends power to the external power grid, the stability control calculations of transient power angle stability, main transformer or line overload, and external transmission section checkpoint are performed; when the power flow of the regional power grid is offline, the stability control calculations of transient power angle stability, main transformer or line overload, offline section checkpoint, and transient voltage and steady-state voltage are performed; the weak links of the regional power grid are determined according to the stability control calculation results.
[0022] The beneficial effect of the present invention is that, compared with the prior art, the present invention provides a method for quickly, simply, and systematically identifying weak links in a regional power grid with a high proportion of new energy sources connected to a large-capacity thermal power unit. The method compares the strength and capacity of the regional power grid connected to the large-capacity thermal power unit and the external power grid, as well as the direction of the inter-regional flow, and combines the grid structure and flow within the regional power grid to propose the fault location and type that is prone to cause transient stability and overload problems, find the weak links of the power grid, and make the subsequent stability control analysis targeted, fast and feasible, greatly improving the efficiency and quality of the stability control analysis. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 A flow chart of the method for identifying weak links in power grids in areas with a high proportion of new energy proposed by the present invention;
[0024] Figure 2 It is a grid diagram of a regional power grid of 220 kV and above in an embodiment of the present invention. DETAILED DESCRIPTION
[0025] In order to make the purpose, technical scheme and advantages of the present invention clearer, the technical scheme of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. The embodiments described in this application are only embodiments of a part of the present invention, rather than all embodiments. Based on the spirit of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work belong to the protection scope of the present invention.
[0026] The present invention proposes a method for identifying weak links in power grids in areas with a high proportion of new energy. The power grid is divided into a regional power grid and an external power grid according to the grid structure of the power grid. The regional power grid and the external power grid are connected through a tie line, and the regional power grid is connected to a high proportion of new energy clusters. Figure 1 As shown, including:
[0027] Step 1, obtaining the capacity and short-circuit ratio of the regional power grid and the capacity and short-circuit ratio of the external power grid; comparing the capacity and short-circuit ratio of the regional power grid with the capacity and short-circuit ratio of the externally connected power grid according to the grid structure of the regional power grid and the connected external power grid.
[0028] The capacity of the power grid includes but is not limited to: main transformer capacity and line capacity.
[0029] Specifically, when the capacity of the regional power grid is smaller than that of the external power grid, such as at the end of the power grid, this interconnection can be defined as a weak (regional power grid) strong (external power grid) connection. When a regional power grid with a high proportion of new energy is connected to an external strong power grid, it is necessary to analyze the weak links of the power grid in combination with the direction of the flow and proceed to step 2.
[0030] Specifically, when the capacity of the regional power grid is of the same order of magnitude as that of the external power grid, and the short-circuit ratios of both the regional power grid and the external power grid are greater than 3, the capacity and strength of the regional power grid are equivalent to those of the external power grid. The two systems with equivalent power are connected through a stronger interconnection line. This interconnection can be defined as a strong (regional power grid) to strong (external power grid) connection.
[0031] This grid structure is stable and strong, and it is not easy to have serious stability accidents. However, in serious chain failures, such as DC blocking, tie line overload or power angle loss may occur. The access of large-capacity thermal power units usually has little effect on the stability of the strongly connected power grid. It is mainly necessary to study the impact of the capacity of the connected thermal power units on the size of the tie line flow and adjust the number of faulty tie lines in the stability analysis. For example, after the access of large-capacity thermal power units, the original N-3 stability may drop to N-2 stability. When stability problems occur, measures such as reducing the output of generators and shedding loads are taken to reduce the load pressure on the tie lines.
[0032] When the capacity of the regional power grid is of the same order of magnitude as that of the external power grid, and the short-circuit ratios of the regional power grid and the external power grid are both greater than 3, if there is DC current in the tie line, it is determined to be a cascading fault; if there is no DC current in the tie line, the number of faulty tie lines is reduced for stability control calculation, and the weak link of the regional power grid is determined based on the stability control calculation results.
[0033] Furthermore, the overloaded interconnection lines in the regional power grid are determined based on the stability control calculation results, and stability control measures such as generator output reduction and load shedding are adopted.
[0034] Step 2, when the order of magnitude of the capacity of the regional power grid is smaller than the order of magnitude of the capacity of the external power grid, a power grid stability calculation is performed based on the impact of the capacity of the thermal power units connected to the regional power grid on the power flow direction of the regional power grid, including: when the regional power grid transmits power to the external power grid, a stability calculation of transient power angle stability, main transformer or line overload, and transmission section checkpoint is performed; when the power flow of the regional power grid is offline, a stability calculation of transient power angle stability, main transformer or line overload, offline section checkpoint, and transient voltage and steady-state voltage is performed; and the weak links of the regional power grid are determined based on the stability calculation results.
[0035] The present invention proposes to determine the fault location and type that is likely to cause stability problems after the connection of large-capacity thermal power units according to the flow direction of the regional power grid and the connected external power grid, determine the weak links of the regional power grid, and help formulate reasonable stability control analysis cases.
[0036] Specifically, if the regional power grid flow is mainly external transmission, when a heavy-load interconnection line fails and trips, it will cause other interconnection lines to overload, and the power output of large-capacity thermal power units will be blocked, resulting in an increase in the regional power grid frequency and causing oscillations in the power angle and power of the generator groups at both ends of the interconnection line.
[0037] Therefore, in this case, attention should be paid to the interconnection lines between the regional power grid and the external power grid. Combined with the situation of common poles in the transmission lines, the stability calculation cases of N-3 (three lines on a pole or two lines on a pole plus maintenance) and N-2 (two lines on a pole) are selected in the order of heavy load first, light load second, high voltage level first, and low voltage level second. The focus is on transient power angle stability, main transformer or line overload problems, and external transmission section card problems. Among them, the section card problem is mainly caused by small and medium cross-section conductors in the section. The capacity limitation of small cross-section conductors leads to the limitation of section capacity. The stabilization measures are to cut the machine or reduce the power generation at the sending end, or to take the interconnection line decoupling.
[0038] In this case, the weak links within the regional power grid are analyzed and the process proceeds to step 3.
[0039] Specifically, although in most cases, after the large-capacity thermal power units are connected, the regional power grid flow mainly presents power transmission, but during the high-load period in summer, the regional power grid flow may be disconnected. In this case, when the interconnection line fails, in addition to causing active power shortage and a sharp drop in frequency, the system power angle at both ends of the interconnection line is out of step, and the regional power grid may also cause voltage collapse due to a serious shortage of reactive power.
[0040] Similarly, in this case, attention should be paid to the interconnection lines between the regional power grid and the external power grid. Combined with the situation of common poles in the transmission lines, the stability control calculation cases of N-3 (three lines on a pole or two lines on a pole plus maintenance) and N-2 (two lines on a pole) should be selected in the order of heavy load first, light load second, high voltage level first, low voltage level second. In addition to paying attention to the transient power angle stability, main transformer or line overload problems, and grid section card problems, additional attention should be paid to transient voltage and steady-state voltage problems. The stability control measures are to quickly cut off the interconnection lines and cut the load at the receiving end. Therefore, low-frequency load reduction and low-voltage load reduction devices need to be installed in the stability control system.
[0041] In this case, the weak links within the regional power grid are analyzed and the process proceeds to step 3.
[0042] Step 3: Determine the weak links of the regional power grid based on the stability control calculation results and take corresponding stability control measures.
[0043] Specifically, after the thermal power unit is connected to the main station of the regional power grid, for the interconnecting lines connected to the main station, combined with the common pole situation of the transmission lines, in the order of heavy load first and light load later, high voltage level first and low voltage level later, N-3 fault type, N-2 fault type and N-1 fault type are selected respectively, and corresponding stability control calculations are performed, where N represents the total number of interconnecting lines connected to the main station.
[0044] In a non-limiting preferred embodiment, after the large-capacity thermal power unit is connected to the main station A of the regional power grid, the cross-sectional flow between the main station A and other parts of the regional power grid is likely to be reversed, and the size will also change greatly. When the heavy-load interconnection line of this section fails, the external power transmission of the large-capacity thermal power unit is compressed, and the frequency will increase due to the accumulation of power at the sending end, causing the transient power angle stability problem of the main station A. The load on the faulty interconnection line will quickly transfer to other interconnection lines, causing overload.
[0045] Therefore, when selecting stability calculation cases, the tie line connected to the main station A, combined with the situation of the common pole in the transmission line, selects N-3 (three lines on a common pole or two lines on a common pole plus maintenance), N-2 (two lines on a common pole), and N-1 (the largest capacity transmission line in the transmission section) stability calculation cases in the order of heavy load first, light load second, high voltage level first, and low voltage level second, focusing on transient power angle stability, main transformer or line overload problems, and transmission section card problems. The stability measures are to cut the machine or reduce the power generation at the sending end, or install a decoupling device at the large-capacity thermal power unit.
[0046] Specifically, after the thermal power unit is connected to the main station of the regional power grid, the main station is connected to another main station, and the other main station is also connected to the external transmission line; the line set is composed of the interconnection line connected to the main station, the transmission line connecting the main station and another main station, and the external transmission line connected to another main station; for the line set, combined with the common pole situation of the transmission line, in the order of heavy load first and light load later, high voltage level first and low voltage level later, N-3 fault type, N-2 fault type and N-1 fault type are selected respectively, and corresponding stability control calculations are performed, and N represents the total number of lines in the line set.
[0047] In a non-limiting preferred embodiment, in addition to considering only the transmission lines directly connected to the main station A, there are also fault combinations of these transmission lines and other lines of the regional power grid. These faults usually cause line overload problems caused by power flow transfer. Specifically, a large-capacity thermal power unit is connected to the main station A. It is assumed that the main station A is connected to the main station B and the main station C respectively. The main station B is mainly the power sending end, and the main station C is mainly the power receiving end. Then the transmission lines connected to the main station B and the main station A and the other external transmission lines of the main station B are combined. Combined with the situation of common poles in the transmission lines, in the order of heavy load first, light load second, high voltage level first, and low voltage level second, select N-3 (three lines on the same pole or two lines on the same pole plus maintenance) and N-2 (two lines on the same pole) stabilization calculation cases. For the overload problem, the stabilization measures are to cut the machine at the sending end or reduce the power generation.
[0048] Specifically, after the thermal power unit is connected to the main station of the regional power grid, when the load of the main station is less than the installed capacity of new energy in the regional power grid, the overvoltage interconnection line in the regional power grid is determined according to the stability control calculation results, and the stability control measures of reactive power regulation are taken first. If there are still overvoltage interconnection lines, the stability control measures of limiting the output of new energy stations are taken.
[0049] In a non-limiting preferred embodiment, the main station with large installed capacity of renewable energy in the regional power grid and small load often has overvoltage problems in the operation mode of renewable energy generation. If the overvoltage problem still exists after the reactive power regulation means are exhausted, measures to limit the output of renewable energy stations are required. The low voltage problem in the summer high-load operation mode will be alleviated in the main station at the edge of the regional power grid with heavy load due to the access of large-capacity thermal power units.
[0050] At present, the analysis of the stability limit of the power grid (including weak links) adopts massive and indiscriminate power flow simulation, that is, all line equipment faults are arranged and combined indiscriminately, and massive parallel simulation is performed. The advantage is that all possible faults are simulated, but the disadvantage is that a large amount of computing resources are consumed and lack of pertinence. For the scenario where large-capacity thermal power units are connected to the regional power grid, based on the understanding of the regional power grid and the external power grid, the ideas proposed in this invention can be used to efficiently and purposefully select the fault types and locations that need to be concerned and the power grid stability problems caused by them, and determine the weak links of the power grid.
[0051] In order to further understand the working principle and technical effect of the present invention, a simulation is performed below using a certain regional power grid as an example. Figure 2 As shown, the SZ power plant is a newly connected large-capacity thermal power unit.
[0052] The regional power grid is the next level of the provincial power grid, mainly the municipal and corresponding level power grids, which are under the unified management and dispatch of the provincial dispatch. Figure 2 As shown, the numbers in the figure represent the substation bus voltage (unit: kV), and the curve represents the cross-section of the connecting line between the regional power grid and the external power grid. Figure 2 The regional power grid includes: substation JL, substation LS, substation BZ, substation SX, substation SF, substation ZD, substation YY and power plant SZ. The bus voltage of substations and power plants in the regional power grid is 230kV; the external power grid includes: substation WL, substation YW, substation FC and substation XNS. The bus voltage of substation WL and substation YW is 230kV, and the bus voltage of substation FC and substation XNS is 525kV.
[0053] Furthermore, power plant SZ is a newly connected large-capacity thermal power unit.
[0054] The stability control calculation case 1 performed using the method proposed in the present invention is detailed in Table 1.
[0055] Table 1 Stability calculation case 1
[0056]
[0057]
[0058] In this example, the summer high-load interconnection line is not burdened much, and the main consideration is the stability issue under the operation mode of new energy generators.
[0059] Figure 2In the interconnection line connecting the power plant SZ and the substation ZD, combined with the situation of common poles in the transmission lines, the stability calculation cases N-3 (three lines on a common pole or two lines on a common pole plus maintenance) and N-2 (two lines on a common pole) are selected in the order of heavy load first and light load second, high voltage level first and low voltage level second, as shown in Table 2 for details.
[0060] Table 2 Stability calculation case 2
[0061] Fault type Fault line Stability issues 1 N-3 SX-ZD, ZD-FH, (BZ-ZD maintenance) Transient power angle problem 2 N-2 SX-ZD,ZD-FH BA-ZD Overload 3 N-2 SX-YY,ZD-FH SF-YY Overload
[0062] exist Figure 2 In the example, master station ZD is equivalent to master station A, master station FH is equivalent to master station B, and master station SX is equivalent to master station C. Under normal operating conditions, power is transmitted from A to C and from B to A. When N-2 fails, the line from master station A to C fails, and at the same time, other transmission lines of master station B fail (i.e., FH to YY), and other transmission lines of master station A will be overloaded, i.e., master station ZD to BZ and master station ZD to FC.
[0063] Since the installed capacity of new energy sources at YY Station, JL Station and LS Station is large, the voltage is high when the new energy source operates in a large-generation and small-load mode. The voltage at FH Station adjacent to YY is also high.
[0064] The present disclosure may be a system, a method and / or a computer program product. The computer program product may include a computer-readable storage medium carrying computer-readable program instructions for causing a processor to implement various aspects of the present disclosure.
[0065] A computer-readable storage medium may be a tangible device that can hold and store instructions used by an instruction execution device. A computer-readable storage medium may be, for example, but not limited to, an electrical storage device, a magnetic storage device, an optical storage device, an electromagnetic storage device, a semiconductor storage device, or any suitable combination of the foregoing. More specific examples of computer-readable storage media (a non-exhaustive list) include: a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), a static random access memory (SRAM), a portable compact disk read-only memory (CD-ROM), a digital versatile disk (DVD), a memory stick, a floppy disk, a mechanical encoding device, such as a punch card or a raised structure in a groove on which instructions are stored, and any suitable combination of the foregoing. As used herein, a computer-readable storage medium is not to be interpreted as a transient signal per se, such as a radio wave or other freely propagating electromagnetic wave, an electromagnetic wave propagating through a waveguide or other transmission medium (e.g., a light pulse through a fiber optic cable), or an electrical signal transmitted through a wire.
[0066] The computer-readable program instructions described herein can be downloaded from a computer-readable storage medium to each computing / processing device, or downloaded to an external computer or external storage device via a network, such as the Internet, a local area network, a wide area network, and / or a wireless network. The network can include copper transmission cables, optical fiber transmissions, wireless transmissions, routers, firewalls, switches, gateway computers, and / or edge servers. The network adapter card or network interface in each computing / processing device receives the computer-readable program instructions from the network and forwards the computer-readable program instructions for storage in the computer-readable storage medium in each computing / processing device.
[0067] The computer program instructions for performing the operation of the present disclosure may be assembly instructions, instruction set architecture (ISA) instructions, machine instructions, machine-related instructions, microcode, firmware instructions, state setting data, or source code or object code written in any combination of one or more programming languages, including object-oriented programming languages, such as Smalltalk, C++, etc., and conventional procedural programming languages, such as "C" language or similar programming languages. Computer-readable program instructions may be executed completely on a user's computer, partially on a user's computer, as an independent software package, partially on a user's computer, partially on a remote computer, or completely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer via any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., using an Internet service provider to connect via the Internet). In some embodiments, an electronic circuit, such as a programmable logic circuit, a field programmable gate array (FPGA), or a programmable logic array (PLA), may be customized by utilizing the state information of the computer-readable program instructions, and the electronic circuit may execute the computer-readable program instructions, thereby realizing various aspects of the present disclosure.
[0068] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents, and any modifications or equivalent replacements that do not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A method for identifying weak links in power grids in areas with a high proportion of new energy, wherein the power grid is divided into a regional power grid and an external power grid according to the grid structure of the power grid, the regional power grid and the external power grid are connected through a tie line, and the regional power grid is connected to a high proportion of new energy cluster; characterized in that: include: Obtain the capacity and short-circuit ratio of the regional power grid, the capacity and short-circuit ratio of the external power grid; When the capacity of the regional power grid is of the same order of magnitude as that of the external power grid, and the short-circuit ratios of the regional power grid and the external power grid are both greater than 3, if there is DC current in the tie line, it is determined to be a cascading fault; if there is no DC current in the tie line, the number of faulty tie lines is reduced to perform stability control calculations, and the weak links of the regional power grid are determined based on the stability control calculation results; When the capacity of the regional power grid is smaller than that of the external power grid, the power grid stability calculation is performed based on the impact of the capacity of the thermal power units connected to the regional power grid on the power flow direction of the regional power grid, including: when the regional power grid transmits power to the external power grid, the transient power angle stability, main transformer or line overload, and external transmission section checkpoint stability calculation are performed; When the regional power grid is offline, stability calculations are performed on transient power angle stability, main transformer or line overload, offline section checkpoints, and transient and steady-state voltages; weak links in the regional power grid are determined based on the stability calculation results.
2. The method for identifying weak links in power grids in areas with a high proportion of new energy according to claim 1 is characterized in that: Reducing the number of faulty tie lines includes adjusting the original N-3 fault types to N-2 fault types, where N represents the total number of tie lines.
3. The method for identifying weak links in power grids in areas with a high proportion of new energy according to claim 2 is characterized in that: Based on the results of stability control calculations, the overloaded interconnection lines in the regional power grid are identified, and stability control measures such as generator output reduction and load shedding are adopted.
4. The method for identifying weak links in power grids in areas with a high proportion of new energy according to claim 1 is characterized in that: After the thermal power unit is connected to the main station of the regional power grid, for the interconnection lines connected to the main station, combined with the common pole situation of the transmission lines, in the order of heavy load first and light load later, high voltage level first and low voltage level later, N′-3 fault type, N′-2 fault type and N′-1 fault type are selected respectively, and corresponding stability control calculations are performed, where N′ represents the total number of interconnection lines connected to the main station.
5. The method for identifying weak links in power grids in areas with a high proportion of new energy according to claim 4 is characterized in that: Based on the results of stability control calculations, the overloaded interconnection lines in the regional power grid are identified, and stabilization measures such as cutting off the generator or reducing the power generation at the sending end, or installing a disconnect device at the large-capacity thermal power unit are adopted.
6. The method for identifying weak links in power grids in areas with a high proportion of new energy according to claim 1 is characterized in that: After the thermal power unit is connected to the main station of the regional power grid, the main station is connected to another main station, and the other main station is also connected to the external transmission line; the line set is composed of the connecting line connected to the main station, the transmission line connecting the main station to another main station, and the external transmission line connected to another main station; for the line set, combined with the common pole situation of the transmission line, in the order of heavy load first and light load later, high voltage level first and low voltage level later, N″-3 fault type, N″-2 fault type and N″-1 fault type are selected respectively, and the corresponding stability control calculation is performed, and N″ represents the total number of lines in the line set.
7. The method for identifying weak links in power grids in areas with a high proportion of new energy according to claim 6 is characterized in that: According to the results of stability control calculation, the overloaded interconnection lines in the regional power grid are determined, and stability control measures such as cutting the machine at the sending end or reducing the power generation capacity are adopted.
8. The method for identifying weak links in power grids in areas with a high proportion of new energy according to claim 1 is characterized in that: After the thermal power unit is connected to the main station of the regional power grid, when the load of the main station is less than the installed capacity of new energy in the regional power grid, the overvoltage interconnection line in the regional power grid is determined according to the stability control calculation results, and the stability control measures of reactive power regulation are taken first. If there are still overvoltage interconnection lines, the stability control measures of limiting the output of new energy stations are taken.
9. The method for identifying weak links in power grids in areas with a high proportion of new energy according to claim 4 or 6, characterized in that: When there are three lines on a common pole or two lines on a common pole and the transmission line is in maintenance state, it corresponds to N-3 fault type; When there are two lines on the same pole in the transmission line, it corresponds to N-2 fault type.
10. A system for identifying weak links in power grids in areas with a high proportion of new energy, used to implement the method described in any one of claims 1 to 9, characterized in that: The system comprises: a collection module and an identification module; A collection module is used to obtain the capacity and short-circuit ratio of the regional power grid and the capacity and short-circuit ratio of the external power grid; The identification module is used for when the capacity of the regional power grid is of the same order of magnitude as that of the external power grid, and the short-circuit ratios of the regional power grid and the external power grid are both greater than 3, if there is a DC current in the interconnection line, it is determined to be a cascading fault; if there is no DC current in the interconnection line, the number of faulty interconnections is reduced to perform stability control calculations, and the weak links of the regional power grid are determined according to the stability control calculation results; when the order of magnitude of the capacity of the regional power grid is smaller than the order of magnitude of the capacity of the external power grid, the power grid stability control calculation is performed according to the influence of the capacity of the thermal power units connected to the regional power grid on the power flow direction of the regional power grid, including: when the regional power grid sends power to the external power grid, the stability control calculations of transient power angle stability, main transformer or line overload, and external transmission section checkpoint are performed; when the power flow of the regional power grid is offline, the stability control calculations of transient power angle stability, main transformer or line overload, offline section checkpoint, and transient voltage and steady-state voltage are performed; the weak links of the regional power grid are determined according to the stability control calculation results.
Citation Information
Patent Citations
Method and system for quickly positioning anticipated fault of power grid
CN114119287A
Intelligent diagnosis decision-making method and system based on power grid big data analysis
CN114240066A
Method and device for identifying weak link of power grid in new energy cluster access area
CN115588979A
Identification method of vulnerable nodes of distribution network
CN107871216A
Power grid vulnerability evaluation method under high-proportion renewable energy source access
CN110705879A