A method for establishing a production potential index for well location optimization

By establishing a production potential index in well location deployment and optimizing it using well perimeter average geological properties and Spearman coefficient, the problems of low efficiency and insufficient accuracy in well location deployment are solved, achieving efficient and accurate guidance for well location deployment, which is applicable to oil and gas fields with complex geological conditions.

CN117216942BActive Publication Date: 2026-11-17CHENGDU NORTH OIL EXPLORATION DEV TECH
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202310991121.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-08-08
Publication Date
2026-11-17
Estimated Expiration
2043-08-08

AI Technical Summary

Technical Problem

Existing technologies are inefficient, inaccurate, and have low interpretability in oil well location deployment, making them particularly difficult to apply in oilfields with complex geological conditions.

Method used

Through multiple numerical simulations at random well locations, the average geological properties around the well are calculated, a production potential index is established, and the Spearman coefficient is used to optimize well location deployment. Combining reservoir numerical simulation and data-driven algorithms, well location deployment is guided.

Benefits of technology

It significantly improves the efficiency and accuracy of well location optimization, can intuitively judge the production potential of oilfield work areas, effectively avoid low-yield well locations, and is suitable for oil and gas fields with complex geological conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117216942B_ABST
    Figure CN117216942B_ABST
Patent Text Reader

Abstract

This invention discloses a method for establishing a production potential index for well location optimization, including performing multiple numerical simulations at random well locations to obtain the cumulative production Q of any i-th well out of N wells in year Y. i The invention calculates the average geological properties around all well locations to obtain the independent variable / feature matrix X, then establishes a production potential index, and finally uses the production potential index planar distribution map to guide well location deployment. This invention establishes a production potential index applicable to oil and gas fields, which can intuitively judge the production potential of oilfield work areas according to the value, and can directly and effectively guide the well location deployment. Moreover, the high value range of the production potential index established by this invention can effectively avoid low-production well locations, has good interpretability, and significantly improves the efficiency and accuracy of well location optimization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of oil and gas field development, and more specifically to a method for establishing a production potential index for well location optimization. Background Technology

[0002] The location of oil wells plays a crucial role in the development of oil fields. Based on preliminary geological modeling, optimizing well placement schemes by comprehensively considering spatial information such as porosity, permeability, oil saturation, and the location of the oil-water interface can significantly improve the total production of oil fields.

[0003] Traditional methods involve reservoir engineers primarily considering oil abundance and structural location to select appropriate well locations on the oilfield plane. Then, they confirm the development effect through reservoir numerical simulation and gradually adjust the well locations based on feedback and experience. The entire process heavily relies on sufficient engineer experience and a large amount of research on alternative solutions, resulting in low efficiency and significant uncertainty.

[0004] Currently, some surrogate modeling techniques have emerged that use decline curve / water drive curve fitting to predict cumulative oil production. Although the process can be fully automated, the decline curve / water drive curve itself is a highly simplified empirical model and lacks numerical simulation as a basis. Therefore, it is only applicable to theoretical oilfield models with relatively simple geological conditions, and its interpretability is low, making it difficult to directly apply to oilfields with complex conditions. Summary of the Invention

[0005] This invention addresses the technical problems of low efficiency, low accuracy, and low interpretability in existing technologies for well location deployment in oil and gas fields. The aim is to provide a method for establishing a production potential index for well location optimization. This method establishes a production potential index applicable to oil and gas fields, which can intuitively determine the production potential of oilfield work areas based on the value. It can directly and effectively guide well location deployment. Furthermore, the high-value range of the production potential index established by this invention can effectively avoid low-yield wells, possesses good interpretability, and significantly improves the efficiency and accuracy of well location optimization.

[0006] This invention is achieved through the following technical solution:

[0007] A method for establishing a production potential index for well location optimization includes the following steps:

[0008] S1: Perform multiple numerical simulations at random well locations.

[0009] S11. Based on the actual three-dimensional geological model of the oilfield work area, set the minimum well spacing L. well and the number of well locations N wellK groups of well locations are randomly generated to establish the indicators. The requirement is to ensure that the well spacing within each group is maintained, and that no two well locations within the same group overlap. Therefore, there are a total of N = KN well locations. well One well location;

[0010] S12. Using the same geological model and the same development and production system, conduct reservoir numerical simulations for well locations in group K, and obtain the cumulative production Q of any well i in year Y among N wells. i Then, N wells form an ordered row vector Q = [Q1, Q2, ..., Q...]. N ];

[0011] S2: Calculate the average geological properties around all well locations.

[0012] S21. Set a slice index for any i-th well in N well locations, and obtain the average oil layer thickness h of any i-th well by grid volume weighting. i Average oil saturation s i Mean initial formation pressure p i The average oil-water interface distance is d i Average penetration rate k i Average porosity Recorded as:

[0013] S22. Arrange the N ordered vectors obtained in S21 in a row order to form a matrix of size (N×6), and normalize it using min-max to obtain the independent variable / feature matrix X;

[0014] S3: Establish a production potential index

[0015] S31. Define the parameter vector to be solved, denoted as a column vector matrix of size (6×1), as follows:

[0016] S32. Calculate the potential index row vector matrix Y arranged by well location: Y = XC;

[0017] S33. Calculate the Spearman coefficients of the trial potential index Y and the actual cumulative output Q, and obtain:

[0018] Among them, D i For Q i and Y i The absolute value of the difference between the rankings;

[0019] S34. Set C as the variable to be solved, where any C iThe search range is [-1, 1]. Using the simulated annealing algorithm, steps S31 to S33 are repeated, and a random perturbation method is used to solve for C that maximizes the Spearman coefficient. * , so that: C * =argmax(ρ(C));

[0020] S35, C * Normalization process is performed to obtain

[0021] S36. For any i-th effective grid in the oil layer of the entire three-dimensional geological model, calculate the spatial attribute value, i.e., the production potential index.

[0022] S4: Use the production potential index plane distribution map to guide well location deployment.

[0023] Furthermore, in step S12, each time a reservoir numerical simulation is performed, all wells are set as vertical wells that have encountered all oil layers and have been fully perforated.

[0024] Furthermore, in step S12, the value of Y year is 20 years.

[0025] Furthermore, step S21 specifically includes:

[0026] S211. Based on the plane coordinates of the well location, set the well in the geological model as a vertical well that encounters all oil layers;

[0027] S212, Indexing points on the plane that are less than L from the well. well All spatial three-dimensional meshes;

[0028] S213, Note J i The set consisting of _ grids is {G} i,j};

[0029] S214, Let G be the j-th grid. i,j The grid size is v i,j The oil layer thickness in the mesh is h. i,j The oil saturation is s i,j The initial formation pressure is p i,j The oil-water interface distance is d i,j The penetration rate is k i,j Porosity is

[0030] S215. Calculate the spatial volume weighted average attribute value of each grid based on the data obtained in S214, and obtain the average oil layer thickness h. i Average oil saturation s i Mean initial formation pressure p iThe average oil-water interface distance is d i Average penetration rate k i Average porosity

[0031] Furthermore, in step S213: remove invalid meshes, retain the valid mesh portions, and record all remaining J... i The set consisting of _ grids is {G} i,j}

[0032] Furthermore, in step S215:

[0033] Average oil layer thickness h i The calculation formula is:

[0034] Average oil saturation s i The calculation formula is:

[0035] Mean initial formation pressure p i The calculation formula is:

[0036] The average oil-water interface distance is d i The calculation formula is:

[0037] Average penetration rate k i The calculation formula is:

[0038] Average porosity The calculation formula is:

[0039] Furthermore, the Spearman coefficient ranges from [-1, +1], with negative values ​​indicating negative correlation and positive values ​​indicating positive correlation.

[0040] Furthermore, step S33 includes:

[0041] S331, For each sample data point Q i and Y i The data are arranged from smallest to largest according to their values ​​and labeled with 1, 2, 3...N. If there are data with the same value, the average ranking is taken.

[0042] S332, Calculate Q i and Y i The absolute value of the difference between the rankings is denoted as D. i ;

[0043] S333. Calculate the Spearman coefficient using the following formula:

[0044] Furthermore, in step S35, for C * Normalization process is performed to obtain The specific method is as follows:

[0045]

[0046] Furthermore, in step S4, the production potential index planar distribution map is used to guide well location deployment, specifically as follows:

[0047] Draw three-dimensional and two-dimensional planar distribution maps of the spatial attribute θ, and use them as a reference index for well location deployment, trying to select areas with high values.

[0048] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0049] 1. Based on reservoir numerical simulation results and data-driven optimization algorithms, this invention establishes a highly practical process method that integrates complex spatial attributes such as porosity, permeability, oil saturation, and oil-water interface location of specific work areas into a production potential index applicable to oil and gas fields. This index can intuitively determine the production potential of oilfield work areas based on its value, and can directly and effectively guide well location deployment. This replaces the traditional workflow that solely considers oil abundance to directly guide well location deployment. Compared with traditional methods, this invention can effectively improve the speed and effectiveness of well location optimization.

[0050] 2. The high-value range of the production potential index established using the method of this invention can effectively avoid low-yield well locations, while traditional methods still have a large number of low-yield wells in their high-value range. The method of this invention not only has the good interpretability of traditional methods, but also significantly improves the efficiency and accuracy of well location optimization. It is applicable not only to oilfield well location deployment work, but also to gas fields.

[0051] 3. This invention characterizes the average spatial attributes of a well location by using a weighted average of the spatial attributes of the surrounding area. It fully considers the highly complex nonlinear relationship between the average spatial attributes of a well location and cumulative production. Therefore, the optimization object is determined as the Spearman coefficient between the potential index and cumulative production, rather than the traditional method of directly using the regression error of cumulative production values. This ensures rapid convergence of the mathematical optimization model and the generalization ability most important for field applications. Through multiple random well locations and numerical simulations, it is ensured that the established potential index has a significant positive correlation with cumulative production in a statistical sense, thus providing reservoir engineers with stable and reliable reference data for well location deployment. Attached Figure Description

[0052] To more clearly illustrate the technical solutions of the exemplary embodiments of the present invention, the accompanying drawings used in the embodiments will be briefly described below. It should be understood that the following drawings only show some embodiments of the present invention and should not be considered as a limitation of the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort. In the drawings:

[0053] Figure 1 A schematic diagram showing the relationship between the single-well production potential index and cumulative oil production established using the method of this invention;

[0054] Figure 2 This is a schematic diagram illustrating the relationship between single-well oil saturation and cumulative oil production in traditional oil-bearing systems.

[0055] Figure 3 This is a schematic diagram of an oilfield geological model (spatial attribute field).

[0056] Figure 4 A comparison of production curves corresponding to the initial and optimal drilling plans;

[0057] Figure 5 The objective function (Spearman coefficients) is an iterative optimization process.

[0058] Figure 6 A planar distribution map of the production potential index of an oilfield work area;

[0059] Figure 7 A schematic diagram illustrating the relationship between production potential index classification and cumulative output;

[0060] Figure 8 A plan view showing the distribution of production potential index types and well location deployment examples. Detailed Implementation

[0061] To make the objectives, technical solutions, and advantages of the present invention clearer, the present invention will be further described in detail below with reference to the embodiments and accompanying drawings. The illustrative embodiments and descriptions of the present invention are only used to explain the present invention and are not intended to limit the present invention.

[0062] Example 1

[0063] This embodiment takes the well location deployment of a certain oilfield development plan as an example to provide a method for establishing a production potential index for well location optimization, including the following steps:

[0064] S1: Perform multiple numerical simulations at random well locations.

[0065] S11. Based on the actual three-dimensional geological model of the oilfield area (such as...) Figure 3 As shown), set the minimum well spacing L. well = 400 meters, and the number of well locations Nwell =70, randomly generate K=20 groups of well locations for establishing indicators, requiring that while ensuring the well spacing within a group, no well locations between groups overlap, then there are a total of N=KN well =1400 well locations;

[0066] S12. For these 20 well locations, all were configured as vertical wells penetrating all oil layers, and production was carried out from month 1 until month 240. Reservoir numerical simulations were performed on each well, and the cumulative production curves of each of the 1400 wells were obtained. Figure 4 As shown. The cumulative production of each well in the 240th month is taken, resulting in the row vector Q = [Q1, Q2, ..., Q...]. N ].

[0067] S2: Calculate the average geological properties around all well locations.

[0068] S21. Calculate the average oil layer thickness h of any i-th well among 1400 well locations. i Average oil saturation s i Mean initial formation pressure p i The average oil-water interface distance is d i Average penetration rate k i Average porosity Recorded as:

[0069]

[0070] S22. Arrange the 1400 ordered vectors obtained in S21 in rows to form a matrix of size (1400×6), and normalize it using min-max to obtain the independent variable / feature matrix X.

[0071] S3: Establish a production potential index

[0072] S31. Define the parameter vector to be solved, denoted as a column vector matrix of size (6×1), as follows:

[0073]

[0074] S32. Calculate the potential index row vector matrix Y arranged by well location:

[0075] Y = XC;

[0076] S33. Calculate the Spearman coefficients of the trial potential index Y and the actual cumulative output Q, including:

[0077] S331, For each sample data point Q i and Y iThe data are arranged from smallest to largest according to their values ​​and labeled with 1, 2, 3...N. If there are data with the same value, the average ranking is taken.

[0078] S332, Calculate Q i and Y i The absolute value of the difference between the rankings is denoted as D. i ;

[0079] S333. Calculate the Spearman coefficient using the following formula:

[0080]

[0081] S34. Set C as the variable to be solved, where any C i The search range is [-1, 1]. Using the simulated annealing algorithm, steps S31 to S33 are repeated, and a random perturbation method is used to solve for C that maximizes the Spearman coefficient. * The iterative process is as follows Figure 5 As shown, we can obtain:

[0082] C * = [0.4, 0.74, 0.1, 0.43, 0.11, 0.3];

[0083] The production potential index affects the average oil layer thickness h. i Weight 0.4, average oil saturation s i Weighted at 0.74, mean initial formation pressure p i With a weight of 0.1 and an average oil-water interface distance of d i Weighting at 0.43, average penetration rate k i Weight of 0.11, average porosity The weight is 0.3. The weight coefficients corresponding to each physical quantity are in good agreement with actual experience in oil and gas reservoir engineering, and have good interpretability.

[0084] S35, C * The weights after normalization are:

[0085]

[0086] S36. Calculate the production potential index θ for any i-th effective grid in the oil layer of the entire three-dimensional geological model. i :

[0087]

[0088] The planar distribution of the production potential index of the entire oilfield working area is as follows: Figure 6 As shown.

[0089] S4: Use production potential index plane distribution maps to guide well location deployment

[0090] Figure 1 This diagram illustrates the relationship between the single-well production potential index and cumulative oil production established using the method of this invention. As shown in the diagram, the well-circumference potential index established by the method of this invention has a significant positive correlation with cumulative oil production, and the high value range of the production potential index can effectively avoid low-production well locations. These are divided into five categories: Category 5 is below 0.5; Category 4 is between 0.5 and 0.6; Category 3 is between 0.6 and 0.7; Category 2 is between 0.7 and 0.8; and Category 1 is above 0.8.

[0091] Figure 2 This is a schematic diagram illustrating the relationship between single-well oil saturation and cumulative oil production in traditional methods. Figure 2 It can be seen that in areas with high average wellbore oil saturation, there are still a large number of low-production wells.

[0092] from Figure 1 and Figure 2 The comparison shows that the present invention combines reservoir numerical simulation and data-driven optimization algorithms to integrate complex spatial information such as porosity, permeability, oil saturation, and oil-water interface location of a specific work area into a production potential index applicable to the oilfield. This index can intuitively determine the production potential of an oilfield work area based on the value of the index, and can replace the traditional workflow that solely considers oil abundance to directly guide well location deployment. Compared with traditional methods, this invention can effectively improve the efficiency, effectiveness, and accuracy of well location optimization.

[0093] Figure 7 This is a diagram illustrating the relationship between production potential index classification and cumulative output. Figure 7 It can be seen that categories 4 (production potential index 0.5-0.6) and above can guarantee that the cumulative output is mostly above 180,000 barrels, almost eliminating dry wells, while categories 3, 2, and 1 can guarantee that the cumulative output is mostly above 500,000 barrels, proving that the production potential index of the present invention has high accuracy.

[0094] Figure 8 This is a plan view showing the distribution of production potential index types and well location deployment examples. Well location deployment design can be more intuitively performed on this type distribution plan view, based on... Figure 7 The conclusion is that the optimized well location deployment areas are classified as Class 1, 2, and 3, completely avoiding Class 4 and 5.

[0095] The specific embodiments described above further illustrate the purpose, technical solution, and beneficial effects of the present invention. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention.

Claims

1. A method for establishing a production potential index for well location optimization, characterized in that, Includes the following steps: S1: Perform multiple numerical simulations at random well locations. S11. Based on the actual three-dimensional geological model of the oilfield work area, set the minimum well spacing L. well and the number of well locations N well If K groups of well locations are randomly generated to establish the indicators, then there are a total of N = KN. well One well location; S12. Perform reservoir numerical simulations on the K group of wells respectively to obtain the cumulative production Q of any i-th well in the N wells in year Y. i Then, N wells form an ordered row vector Q = [Q1, Q2, ..., Q...]. N ]; S2: Calculate the average geological properties around all well locations. S21. Set a slice index for any i-th well in N well locations, and obtain the average oil layer thickness h of any i-th well by grid volume weighting. i Average oil saturation s i Mean initial formation pressure p i The average oil-water interface distance is d i Average penetration rate k i Average porosity Recorded as: S22. Arrange the N ordered vectors obtained in S21 in a row order to form a matrix of size (N×6), and normalize it using min-max to obtain the independent variable / feature matrix X; S3: Establish a production potential index S31. Define the parameter vector to be solved as follows: S32. Calculate the potential index row vector matrix Y arranged by well location: Y = XC; S33. Calculate the Spearman coefficients of the trial potential index Y and the actual cumulative output Q, and obtain: Among them, D i For Q i and Y i The absolute value of the difference between the rankings; S34. Set C as the variable to be solved, where any C i The search range is [-1, 1]. Using the simulated annealing algorithm, steps S31 to S33 are repeated, and a random perturbation method is used to solve for C that maximizes the Spearman coefficient. * , so that: C * =argmax(ρ(C)); S35, C * Normalization process is performed to obtain S36. For any i-th effective grid in the oil layer of the entire three-dimensional geological model, calculate the spatial attribute value, i.e., the production potential index. S4: Use the production potential index plane distribution map to guide well location deployment.

2. The method for establishing a production potential index for well location optimization according to claim 1, characterized in that, In step S12, each time a reservoir numerical simulation is performed, all wells are set as vertical wells that have encountered all oil layers and have been fully perforated.

3. The method for establishing a production potential index for well location optimization according to claim 1, characterized in that, In step S12, the value of Y is 20 years.

4. The method for establishing a production potential index for well location optimization according to claim 1, characterized in that, Step S21 is as follows: S211. Based on the plane coordinates of the well location, set the well in the geological model as a vertical well that encounters all oil layers; S212, Indexing points on the plane that are less than L from the well. well All spatial three-dimensional meshes; S213, Note J i The set consisting of _ grids is {G} i,j }; S214, Let G be the j-th grid. i,j The grid size is v i,j The oil layer thickness in the mesh is h. i,j The oil saturation is s i,j The initial formation pressure is p i,j The oil-water interface distance is d i,j The penetration rate is k i,j Porosity is S215. Calculate the spatial volume weighted average attribute value of each grid based on the data obtained in S214, and obtain the average oil layer thickness h. i Average oil saturation s i Mean initial formation pressure p i The average oil-water interface distance is d i Average penetration rate k i Average porosity 5. The method for establishing a production potential index for well location optimization according to claim 4, characterized in that, In step S213: Remove invalid meshes, retain the valid mesh portions, and record all remaining J values. i The set consisting of _ grids is {G} i,j } 6. The method for establishing a production potential index for well location optimization according to claim 4, characterized in that, In step S215: Average oil layer thickness h i The calculation formula is: Average oil saturation s i The calculation formula is: Mean initial formation pressure p i The calculation formula is: The average oil-water interface distance is d i The calculation formula is: Average penetration rate k i The calculation formula is: Average porosity The calculation formula is:

7. The method for establishing a production potential index for well location optimization according to claim 1, characterized in that, The Spearman coefficient ranges from -1 to +1, with negative values ​​indicating negative correlation and positive values ​​indicating positive correlation.

8. The method for establishing a production potential index for well location optimization according to claim 1, characterized in that, Step S33 includes: S331, For each sample data point Q i and Y i The data are arranged from smallest to largest according to their values ​​and labeled with 1, 2, 3...N. If there are data with the same value, the average ranking is taken. S332, Calculate Q i and Y i The absolute value of the difference between the rankings is denoted as D. i ; S333. Calculate the Spearman coefficient using the following formula:

9. The method for establishing a production potential index for well location optimization according to claim 1, characterized in that, In step S35, for C * Normalization process is performed to obtain The specific method is as follows:

10. The method for establishing a production potential index for well location optimization according to claim 1, characterized in that, Step S4 uses a production potential index plane distribution map to guide well location deployment, specifically: Draw three-dimensional and two-dimensional planar distribution maps of the spatial attribute θ, and use them as a reference index for well location deployment, trying to select areas with high values.

Citation Information

Patent Citations

  • Well placement optimization design method based on reservoir static factors

    CN104331537A

  • Method for improving optimization efficiency of automatic well position optimization

    CN111259600A