Electricity-hydrogen-heat integrated energy system distribution and optimization method and device

By dividing the integrated electric-hydrogen-thermal energy system into different subjects and using distributed robust optimization models for interactive iterative parallel solution, the shortcomings of traditional robust optimization models in determining uncertain sets and the overall modeling ignores individual benefits. The problem is to achieve more economical and reliable energy system scheduling, while protecting the privacy of each entity.

CN117474148BActive Publication Date: 2024-11-08ELECTRIC POWER RES INST OF STATE GRID ZHEJIANG ELECTRIC POWER COMAPNY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311335809.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-10-13
Publication Date
2024-11-08
Estimated Expiration
2043-10-13

AI Technical Summary

Technical Problem

Traditional robust optimization models are difficult to determine the appropriate uncertainty set, resulting in the scheduling strategy being too conservative or radical, and modeling and solving electrical energy, hydrogen energy and thermal energy as a whole fail to consider the individual benefits of different energy operators and fail to meet the situation. Real demand.

Method used

Using a data-driven distribution robust optimization model, the electricity-hydrogen-thermal integrated energy system is divided into different subjects, and an optimization scheduling model for the power grid system, hydrogen network system and thermal network system is established, and the column constraint generation algorithm and alternating direction multiplication is carried out. The sub-method performs interactive iterative parallel solution to realize distributed parallel solution of multi-subject scheduling model.

Benefits of technology

It improves the operational economy and reliability of the Internet power grid, and protects the privacy of the information of each subject, making the scheduling of the electricity-hydrogen-thermal comprehensive energy system more practical.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117474148B_ABST
    Figure CN117474148B_ABST
Patent Text Reader

Abstract

The present invention discloses a distributed robust optimization method and device for an electric-hydrogen-heat integrated energy system, and belongs to the field of power system optimization operation. The method adopted by the present invention is: establishing a multi-agent optimization scheduling model for an electric-hydrogen-heat integrated energy system; using a data-driven distributed robust optimization model to describe the uncertainty of the source-load bilateral side of the main optimization scheduling model of the power grid system, establishing a three-layer two-stage power balance model of the power grid system, and using a column constraint generation algorithm for solving it; using an alternating direction multiplier method to interactively iterate the three-layer two-stage power balance model of the power grid system, the main optimization scheduling model of the hydrogen network system, and the main optimization scheduling model of the heat network system, to achieve distributed parallel solution of the multi-agent optimization scheduling model of the electric-hydrogen-heat integrated energy system. Compared with the prior art, the present invention interactively iteratively solves the scheduling schemes of each subject, while improving the operating economy and reliability of the interconnected power grid, protecting the privacy of each subject's information.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of power system optimization operation, and in particular relates to a distributed robust optimization method and device for an electric-hydrogen-heat integrated energy system. Background Art

[0002] With the development of energy internet and the increase in the penetration rate of renewable energy, the deep coupling of electricity, hydrogen and thermal energy has improved the economy, flexibility and reliability of the system, but also increased the difficulty of scheduling. At the same time, the inherent randomness, intermittency and volatility of renewable energy have increased the uncertainty factors faced by the system, increased the operating risk of the system, and reduced the absorption rate of renewable energy. In order to solve the above problems, scholars at home and abroad have also carried out relevant research on the optimization operation of the electric-hydrogen-heat integrated energy system. At present, most scholars use robust optimization models to deal with the uncertainty of renewable energy, and model and solve the electric-hydrogen-heat integrated energy system as a whole.

[0003] However, there are still two problems to be solved. On the one hand, it is difficult for traditional robust optimization models to determine the appropriate uncertainty set. When the uncertainty set set in advance is too large, the scheduling strategy will be very conservative; conversely, it will be too radical. On the other hand, modeling and solving electricity, hydrogen energy, and thermal energy as a whole does not conform to the current social reality and fails to consider the individual benefits of different energy operators. Summary of the invention

[0004] In order to solve the problems existing in the above-mentioned prior art, the present invention proposes a distributed robust optimization method and device for an electric-hydrogen-heat integrated energy system, which can interactively iterate and parallelly solve the scheduling plans of each subject, while improving the operating economy and reliability of the interconnected power grid and protecting the privacy of the information of each subject.

[0005] The present invention adopts the following technical solution:

[0006] In a first aspect of the present invention, a method for optimizing the distribution of an electric-hydrogen-heat integrated energy system is provided, which comprises:

[0007] Establish a multi-agent optimization dispatch model for the electricity-hydrogen-heat integrated energy system, including the optimization dispatch model for the power grid system, the optimization dispatch model for the hydrogen network system, and the optimization dispatch model for the heat network system;

[0008] A data-driven distributed robust optimization model is used to describe the uncertainty of the source and load sides of the main optimization dispatch model of the power grid system. A three-layer two-stage power balance model is established and solved by a column constraint generation algorithm.

[0009] The alternating direction multiplier method is used to interactively iterate the three-layer two-stage power balance model of the power grid system, the main body optimization scheduling model of the hydrogen network system, and the main body optimization scheduling model of the heat network system to realize the distributed parallel solution of the multi-agent optimization scheduling model of the electricity-hydrogen-heat integrated energy system.

[0010] Furthermore, the multi-agent optimization scheduling model of the electricity-hydrogen-heat integrated energy system includes:

[0011] (1.1) Optimal dispatch model of power grid system

[0012] The goal of the optimization dispatching model of the power grid system is to optimize the output of each device in the power grid system and the sales volume of hydrogen and heat produced by electricity, so as to maximize the operating benefits of the power grid system.

[0013] (1.2) Hydrogen network system optimization dispatch model

[0014] The goal of the optimization scheduling model of the main body of the hydrogen network system is to optimize the output of each device in the hydrogen network system, the amount of electricity purchased by the electric hydrogen production device and the amount of hydrogen sold by the hydrogen fuel cell, so as to minimize the main operating cost of the hydrogen network system;

[0015] (1.3) Optimal dispatch model of heating network system

[0016] The goal of the main optimization scheduling model of the heating network system is to optimize the output of each device in the heating network system and the power purchase of the electric heating device, and minimize the main operating cost of the heating network system.

[0017] Furthermore, according to the structural characteristics of the distributed robust optimization model, a three-layer two-stage power balance model of the power grid system is established, and the column constraint generation algorithm is used to iteratively solve the two-stage main and sub-problems, where the sub-problems can be solved in parallel, including:

[0018] (2.1) Three-layer two-stage power balance model

[0019] (2.1.1) The first stage model is the main optimization dispatch model of the power grid system, which is the first layer of the three-layer two-stage power balance model;

[0020] (2.1.2) The second-stage model includes the second and third layers of the three-layer two-stage power balance model. The second layer minimizes the expected adjustment cost of the output of each device in the power grid system under different source-load probability distributions. The third layer finds the probability distribution of the worst source-load discrete scenario based on the optimization results of the second layer.

[0021] Furthermore, the content of the column constraint generation algorithm is as follows:

[0022] (2.2.1) Initialization: Set the number of iterations m = 1;

[0023] (2.2.2) Solve the main problem of the first stage and obtain the control variables of the main problem;

[0024] (2.2.3) Solve the second-stage sub-problems in parallel based on the control variables obtained from solving the main problem to obtain the probability distribution constraints of the worst source-load discrete scenario;

[0025] (2.2.4) Convergence judgment: If the convergence criterion is met, the problem converges and the iteration stops; otherwise, the probability distribution constraint of the worst source-load discrete scenario is added to the main problem of the first stage, and the iteration continues, m=m+1, and returns to (2.2.2).

[0026] Furthermore, the alternating direction multiplier method is used to interactively and iteratively solve the three-layer two-stage power balance model of the power grid system, the main optimization dispatch model of the hydrogen network system, and the main optimization dispatch model of the heat network system in parallel, including:

[0027] (3.1) Initialization: Set the number of iterations n = 1; initialize the average value of the transaction electricity between the main body of the power grid system, the main body of the hydrogen network system, and the main body of the heat network system, that is, the average value of the coupling variable;

[0028] (3.2) Interactively solve the three-layer two-stage power balance model of the power grid system, the subject optimization scheduling model of the hydrogen network system, and the subject optimization scheduling model of the heat network system to obtain the scheduling plan of each subject and the amount of electricity traded between subjects;

[0029] (3.3) The main body of the power grid system, the main body of the hydrogen network system and the main body of the heat network system exchange the latest transaction electricity and recalculate the average value of the coupling variables and the algorithm parameters;

[0030] (3.4) Judgment: If the convergence criterion is met, the iteration stops and the optimal scheduling solution is obtained; otherwise, continue the iteration, n=n+1, and return to (3.2).

[0031] A second aspect of the present invention provides a device for optimizing the distribution of electric-hydrogen-heat integrated energy systems, comprising:

[0032] The multi-agent model generation module of the electric-hydrogen-heat integrated energy system is used to establish the multi-agent optimization dispatching model of the electric-hydrogen-heat integrated energy system, including the main optimization dispatching model of the power grid system, the main optimization dispatching model of the hydrogen network system and the main optimization dispatching model of the heat network system;

[0033] The power grid system main source and load uncertainty solving module is used to describe the source and load uncertainty of the main optimization scheduling model of the power grid system by using a data-driven distributed robust optimization model, establish a three-layer two-stage power balance model, and solve it using a column constraint generation algorithm;

[0034] The multi-agent model solving module of the electric-hydrogen-heat integrated energy system is used to interactively iterate the three-layer two-stage power balance model of the power grid system, the main optimization scheduling model of the hydrogen network system and the main optimization scheduling model of the heat network system using the alternating direction multiplier method, so as to realize the distributed parallel solution of the multi-agent optimization scheduling model of the electric-hydrogen-heat integrated energy system.

[0035] The technical solution provided by the present invention has the following beneficial effects:

[0036] The present invention divides the power grid system, hydrogen grid system and heat grid system in the electric-hydrogen-heat integrated energy system into different entities, adopts a data-driven distributed robust optimization model to describe the uncertainty on both the source and load sides of the main model of the power grid system, and adopts the alternating direction multiplier method to interactively iterate and parallelly solve the scheduling schemes of each entity. While improving the operating economy and reliability of the interconnected system, the privacy of the information of each entity is protected, making the scheduling of the electric-hydrogen-heat integrated energy system more realistic.

[0037] It should be noted that the above description and the following detailed description are exemplary and explanatory only and are not restrictive of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] The accompanying drawings, which are a part of the specification, illustrate embodiments of the present invention and, together with the description, serve to explain the principles of the present invention.

[0039] Figure 1 It is a flow chart of the method for optimizing the distribution of the electric-hydrogen-heat integrated energy system of the present invention;

[0040] Figure 2 It is a schematic diagram of the rod optimization device for the electricity-hydrogen-heat integrated energy system of the present invention. DETAILED DESCRIPTION

[0041] The technical solution in this embodiment is clearly and systematically introduced below in conjunction with the accompanying drawings of the present invention. However, the embodiment described in the present invention is only an example with better effects of the present invention. All relevant embodiments obtained by any technical personnel in this field without paying creative work are within the protection scope of the present invention.

[0042] Figure 1 This is a flow chart of a robust optimization method for an electric-hydrogen-heat integrated energy system. Figure 1 As shown, the present invention provides a method for optimizing the distribution of electricity-hydrogen-heat integrated energy system, which includes the following steps:

[0043] Step 1: Establish a multi-agent optimization dispatching model for the electricity-hydrogen-heat integrated energy system, including a main optimization dispatching model for the power grid system, a main optimization dispatching model for the hydrogen network system, and a main optimization dispatching model for the heat network system;

[0044] Step 2: Use a data-driven distributed robust optimization model to describe the uncertainty of the source and load sides of the main model of the power grid system, establish a three-layer two-stage power balance model, and use a column constraint generation algorithm to solve it;

[0045] Step 3, use the alternating direction multiplier method to interactively iterate the three-layer two-stage power balance model of the power grid system, the main optimization scheduling model of the hydrogen network system, and the main optimization scheduling model of the heat network system, to achieve distributed parallel solution of the multi-agent optimization scheduling model of the electricity-hydrogen-heat integrated energy system.

[0046] From the above, it can be seen that the present invention divides the power grid system, hydrogen grid system and heat grid system in the electric-hydrogen-heat integrated energy system into different entities, adopts a data-driven distributed robust optimization model to describe the source-load bilateral uncertainty of the main model of the power grid system, and adopts an interactive iterative method to solve the scheduling schemes of each entity in parallel. While improving the operating economy and reliability of the interconnected power grid system, it protects the privacy of the information of each entity, making the scheduling of the electric-hydrogen-heat integrated energy system more realistic.

[0047] In the specific implementation of step 1, a multi-agent optimization and dispatching model of the electricity-hydrogen-heat integrated energy system is established, including the main optimization and dispatching model of the power grid system, the main optimization and dispatching model of the hydrogen network system and the main optimization and dispatching model of the heat network system.

[0048] Optimal dispatch model of power grid system

[0049] The goal of the main optimization dispatching model of the power grid system is to optimize the output of each device in the power grid system and the sales volume of hydrogen production and heat production, so as to maximize the main operating benefits of the power grid system.

[0050] 1) Objective function

[0051]

[0052]

[0053]

[0054] Where: C E The total dispatch cost for the main body of the power grid system; is the fuel cost consumed by the traditional generator at time t; is the start-up and shutdown cost of the traditional generator at time t; is the energy storage cost of the electric energy storage equipment at time t; is the cost of wind and solar power abandonment by the main power grid system at time t; is the load abandonment cost of the main power grid system at time t; C is the electricity sales revenue of the power grid system at time t; OLThe load abandonment penalty coefficient of the main body of the power grid system; K is the load abandonment power of the main power grid system at time t; P The electricity sales price of the main power grid system; is the power consumption of the electrolytic hydrogen production device at time t; is the power consumption of the electric heating device at time t; is the output power of the hydrogen fuel cell at time t; N T Indicates the number of optimized scheduling periods.

[0055] 2) Renewable and energy models

[0056] The cost of renewable energy curtailment includes wind curtailment and solar curtailment, and its cost function is:

[0057]

[0058] Where: and is the predicted value of photovoltaic and wind power on day t; and is the actual output of photovoltaic and wind power on day t; C LV is the light abandonment penalty coefficient; C LW is the penalty coefficient for wind abandonment.

[0059] Renewable energy output constraints:

[0060]

[0061] 3) Traditional generator model

[0062] Traditional generator cost function:

[0063]

[0064] Where: C O is the cost coefficient of the traditional generator; is the output of the traditional generator at time t.

[0065] Traditional generator start-up and shutdown costs:

[0066]

[0067] Where: is the no-load cost of traditional generator sets; The downtime cost of traditional generator sets; The downtime cost of conventional generators; and is a 0-1 integer variable; and Respectively represent the start-up state and shutdown state of the traditional generator; It is the start and stop state of the traditional generator.

[0068] Traditional generator start and stop constraints:

[0069]

[0070]

[0071]

[0072]

[0073]

[0074]

[0075] Where: and They are the initial startup and shutdown time periods of the traditional generator, respectively; and They are the minimum start-up and shutdown time of the unit respectively; and They are the time the unit needs to be continuously started and shut down respectively; Indicates the initial operating state of the traditional generator.

[0076] Traditional generator output upper and lower limits:

[0077]

[0078] Where: and They are respectively the maximum and minimum power of the traditional generator in the startup state.

[0079] Traditional generator climbing constraints:

[0080]

[0081] Where: It is the maximum climbing power of the traditional generator.

[0082] 4) Battery energy storage device model

[0083] Battery storage costs:

[0084]

[0085] Where: C ES is the electricity storage cost coefficient; η CE is the charging efficiency of the electrochemical energy storage device; η DE is the discharge efficiency of the electrochemical energy storage device; is the charging power of the battery energy storage device at time t; is the discharge power of the battery energy storage device at time t;

[0086] Electrochemical energy storage output constraints:

[0087]

[0088]

[0089]

[0090]

[0091] Where: is the charge of electrochemical energy storage at time t; and The lower and upper limits of the storage capacity of the electrochemical energy storage device; and The upper limit of the discharge and charging power of electrochemical energy storage devices; It is a 0-1 variable, indicating the charging and discharging status of the electric energy storage device; △t is the scheduling time interval.

[0092] The energy storage period of the electric energy storage device is short and needs to meet the energy balance within the dispatch period:

[0093]

[0094] 5) Power balance constraints

[0095]

[0096]

[0097] Where: is the load power of the power grid system at time t.

[0098] Hydrogen network system main model

[0099] The objective of the main model of the hydrogen network system is to optimize the output of each device in the hydrogen network system, the amount of electricity purchased by the hydrogen production device, and the amount of hydrogen sold by the hydrogen fuel cell, so as to minimize the main operating costs of the hydrogen network system.

[0100] 1) Objective function

[0101]

[0102]

[0103]

[0104] Where: C H The total cost of dispatching the main body of the hydrogen network system; The electricity purchase cost of the main body of the hydrogen network system at time t; is the energy storage cost of the hydrogen energy storage device at time t; is the load abandonment penalty for the main body of the hydrogen network system at time t; C HL is the load abandonment penalty coefficient of the main body of the hydrogen network system; Indicates the amount of load abandonment in the main hydrogen network system.

[0105] 2) P2H device model

[0106]

[0107]

[0108] Where: is the hydrogen production rate of the electric hydrogen production device at time t; η P2H The conversion efficiency of electricity to hydrogen; It is the upper limit of hydrogen production of the electric hydrogen production device at time t.

[0109] 3) Hydrogen fuel cell model

[0110]

[0111]

[0112] Where: is the hydrogen consumption rate of the hydrogen fuel cell at time t; η FC The conversion efficiency of hydrogen fuel cells; is the upper limit of the hydrogen fuel cell power at time t.

[0113] 4) Hydrogen energy storage model

[0114] Hydrogen energy storage device cost function:

[0115]

[0116] Where: C HS is the hydrogen storage cost coefficient; η CH is the hydrogen storage efficiency of the hydrogen energy storage device; η DH The hydrogen discharge efficiency of the hydrogen energy storage device; is the hydrogen charging power of the hydrogen energy storage device at time t; is the hydrogen discharge power of the hydrogen energy storage device at time t;

[0117] Output constraints of hydrogen energy storage devices:

[0118]

[0119] H min ≤H t ≤H max (34)

[0120]

[0121]

[0122]

[0123]

[0124] Where: H t is the hydrogen storage capacity of the hydrogen energy storage device at time t; H min and H max The lower and upper limits of the total amount of hydrogen stored in the hydrogen energy storage device; and Provide upper limits for discharging and recharging hydrogen for hydrogen energy storage devices; It is a 0-1 variable, indicating the charging and discharging status of the hydrogen energy storage device.

[0125] 5) Constraints on hydrogen production and use balance

[0126]

[0127]

[0128] Where: is the hydrogen loading rate.

[0129] Heating network system main model

[0130] The main model of the heating network system aims to optimize the output of each device in the heating network system and the amount of electricity purchased by the electric heating device, and minimize the main operating cost of the heating network system.

[0131] 1) Objective function

[0132]

[0133]

[0134]

[0135] Where: C Q The total cost of dispatching the main heating network system; is the electricity purchase cost of the heating network system at time t; is the cost of the waste heat recovery device at time t; is the heat storage cost of the thermal energy storage device at time t; is the load abandonment penalty for the main body of the heating network system at time t; C is the power purchased by the heating network system at time t; QL It represents the penalty coefficient of load abandonment of the main body of the heating network system; Indicates the amount of load abandonment in the main heating network system.

[0136] 2) Electric heating device model

[0137]

[0138]

[0139] Where: is the heating power of the electric heating device at time t; η p is the conversion efficiency of the electric heating device; It is the upper limit of the heating capacity of the electric heating device.

[0140] 3) Heat recovery device model

[0141]

[0142]

[0143]

[0144] Where: The efficiency of the heat recovery unit in recovering waste heat from the P2H unit; the efficiency of recovering waste heat from hydrogen fuel cells for heat recovery devices; Indicates the waste heat recovery amount of the heat recovery device; Indicates the upper limit of waste heat recovery capacity of the heat recovery device; C R Represents the unit waste heat recovery cost coefficient.

[0145] 4) Thermal energy storage device constraints

[0146] Thermal storage costs:

[0147]

[0148] Where: C QS is the heat storage cost coefficient; η CQ Charging efficiency of thermal energy storage device; η DQ is the discharge efficiency of the thermal energy storage device; is the charging power of the thermal energy storage device at time t; is the heat release power of the thermal energy storage device at time t.

[0149] Thermal energy storage output constraints:

[0150]

[0151]

[0152]

[0153]

[0154] Where: The amount of heat stored in the thermal energy storage device at time t; and The lower and upper limits of the heat storage capacity of the thermal energy storage device; and Provide an upper limit on the power of discharging and charging heat for thermal energy storage devices; It is a 0-1 variable, indicating the charging and discharging state of the thermal energy storage device.

[0155] The thermal energy storage device has a short energy storage period and needs to meet the energy balance within the dispatch period:

[0156]

[0157] 5) Heat balance constraints

[0158]

[0159]

[0160] Where: is the heat load power.

[0161] In the specific implementation of step 2, a data-driven distributed robust optimization model is used to describe the uncertainty of the source and load sides of the main optimization scheduling model of the power grid system, a three-layer two-stage power balance model is established, and a column constraint generation algorithm is used to solve it.

[0162] The first-stage model of the three-layer two-stage power balance model is the main optimization dispatch model of the power grid system as described in step 1 as formulas (1)-(24); the second-stage model includes the second and third layers of the three-layer two-stage power balance model. The second layer is to minimize the expected adjustment cost of the output of each device in the power grid system under different source-load probability distributions, and the third layer is to find the probability distribution of the worst source-load discrete scenario based on the optimization results of the second layer. The objective function and constraints of the second-stage model are as follows:

[0163] 1) Objective function

[0164]

[0165] Where: superscript s represents the variables of the second-stage model, superscript n represents the nth discrete scenario, and the specific meaning of each variable is the same as that of the first-stage model; N S represents the number of discrete scenarios; p n represents the probability of occurrence of the nth discrete scenario; ψ is the confidence set of scenario probabilities obtained based on historical data.

[0166] 2) Constraints

[0167]

[0168]

[0169] 0≤P t PV,s,n ≤P t PV,y,s,n (60)

[0170] 0≤P t PW,s,n ≤P t PW,y,s,n (61)

[0171]

[0172]

[0173]

[0174]

[0175]

[0176]

[0177]

[0178]

[0179]

[0180]

[0181]

[0182] 0≤P t OL,s,n ≤P t L,s,n (73)

[0183] The column constraint generation algorithm defines the first-stage model as the main problem and the second-stage model as the subproblem, and solves it by iteratively solving the main and subproblems. The specific steps are as follows.

[0184] 1) Initialization: Set the number of iterations m=1.

[0185] 2) Solve the main problem of the first stage and obtain the control variables of the main problem.

[0186] Specifically, in the jth iteration of the main and subproblems, the compact form model of the main problem is shown in Equations (74) and (75):

[0187]

[0188]

[0189] Where: x is the first-stage control variable; X is the first-stage constraint condition, equations (2)-(24); a T is the constant matrix of the first stage objective function formula (1); η is the second stage objective function value to be optimized; y n,j Y is the second-stage control variable in the j-th iteration and the n-th scenario; n is the constraint condition of the second stage, equations (58)-(73); b is the worst discrete scenario probability distribution solved for the jth iterative subproblem; T is the constant matrix of the second stage objective function (57).

[0190] 3) Solve the second-stage sub-problems in parallel based on the results of the main problem to obtain the probability distribution of the worst discrete scenario.

[0191] Specifically, the compact form model of the subproblem is shown in formula (76):

[0192]

[0193] Since the variable constraint ranges in the second stage of the distributed robust model sub-problem are independent of each other in different scenarios, Equation (76) can be solved in parallel.

[0194] 4) Convergence judgment: If the difference between η solved by the first-stage model and the objective function value of the second-stage model meets the convergence criterion, the problem converges and the iteration stops; otherwise, the probability distribution constraint (75) of the worst discrete scenario is added to the main problem, and the iteration continues, m=m+1, and return to 2).

[0195] In the specific implementation of step 3, the alternating direction multiplier method is used to interactively iterate the three-layer two-stage power balance model of the power grid system, the main optimization scheduling model of the hydrogen network system, and the main optimization scheduling model of the heat network system to achieve distributed parallel solution of the multi-agent optimization scheduling model of the electricity-hydrogen-heat integrated energy system.

[0196] Specifically, the power grid system, hydrogen grid system and heat grid system interact with each other. When the power grid system interacts with the hydrogen grid system and the heat grid system respectively, it is regarded as the supply-end system, and the hydrogen grid system and the heat grid system are regarded as the receiving-end system respectively; when the hydrogen grid system interacts with the heat grid system, it is regarded as the supply-end system, and the heat grid system is regarded as the receiving-end system. The present invention performs distributed parallel solution on the proposed multi-agent optimization scheduling model of the electricity-hydrogen-heat integrated energy system based on the alternating direction multiplier method, and the specific steps are as follows.

[0197] 1) Initialization: Set the number of iterations n = 1; initialize the average value of the coupling variable.

[0198] Specifically, the coupling variable between the power grid system and the hydrogen grid system (i.e., the amount of electricity traded) is P t FC With P t P2H , the coupling variable between the power grid system and the heat network system (i.e., the amount of electricity traded) is P t Q , the coupling variable between the hydrogen network system and the heat network system (i.e., the amount of electricity traded) is P t FC With P t P2H .

[0199] 2) Interactively solve the three-layer two-stage power balance model of the power grid system, the main optimization scheduling model of the hydrogen network system, and the main optimization scheduling model of the heat network system to obtain the scheduling plan of each entity and the transaction electricity between entities.

[0200] Specifically, each subject adds a corresponding penalty term to its objective function according to whether it is a supply-side system or a receiving-side system. In the nth iteration process, the objective functions of the supply-side system and the receiving-side system are shown in equations (77) and (78) respectively.

[0201]

[0202]

[0203] Where: the superscripts se and re represent the variables of the supply-end system and the receiving-end system respectively; θ is the objective function of the original model, which refers to the three-layer two-stage power balance model of the power grid system, the main optimization dispatch model of the hydrogen network system, and the main optimization dispatch model of the heat network system; λ P,t is the Lagrange multiplier corresponding to the coupling variable; ρ P is the corresponding penalty factor; P t is the coupling variable; is the average value of the coupling variable obtained after the n-1th iteration.

[0204] 3) The main body of the power grid system, the main body of the hydrogen network system and the main body of the heat network system exchange the latest coupling variables and recalculate their average values ​​and algorithm parameters.

[0205] Specifically, the average value of the coupling variable is calculated according to formula (79), and the algorithm parameters are calculated according to formula (80):

[0206]

[0207]

[0208] 4) Judgment: If the convergence criterion is met, the iteration stops and the optimal scheduling solution is obtained; otherwise, the iteration continues, n=n+1, and returns to 2).

[0209] Specifically, the convergence criterion is shown in formula (81):

[0210]

[0211] Where: gap F is the original residual, which indicates whether the coupling variable values ​​obtained by the connected subsystems are close enough, ε F is the original residual limit; gap D is the dual residual, which indicates whether the obtained result is stable. D is the dual residual limit.

Claims

1. Robust optimization method for electricity-hydrogen-heat integrated energy system. It is characterized in that include: Establish a multi-agent optimization dispatch model for the electricity-hydrogen-heat integrated energy system, including the optimization dispatch model for the power grid system, the optimization dispatch model for the hydrogen network system, and the optimization dispatch model for the heat network system; A data-driven distributed robust optimization model is used to describe the uncertainty of the source and load sides of the main optimization dispatch model of the power grid system. A three-layer two-stage power balance model is established and solved by a column constraint generation algorithm. The alternating direction multiplier method is used to interactively iterate the three-layer two-stage power balance model of the power grid system, the main optimization scheduling model of the hydrogen network system, and the main optimization scheduling model of the heat network system, to achieve distributed parallel solution of the multi-agent optimization scheduling model of the electricity-hydrogen-heat integrated energy system; According to the structural characteristics of the distributed robust optimization model, a three-layer two-stage power balance model of the power grid system is established, and the column constraint generation algorithm is used to iteratively solve the two-stage main and sub-problems, where the sub-problems can be solved in parallel, including: (2.1) Three-layer two-stage power balance model (2.1.1) The first stage model is the main optimization dispatch model of the power grid system, which is the first layer of the three-layer two-stage power balance model; (2.1.2) The second stage model includes the second and third layers of the three-layer two-stage power balance model. The second layer is to minimize the expected adjustment cost of the output of each device in the power grid system under different source-load probability distributions. The third layer finds the probability distribution of the worst source-load discrete scenario based on the optimization results of the second layer. The alternating direction multiplier method is used to interactively and iteratively solve the three-layer two-stage power balance model of the power grid system, the main optimization scheduling model of the hydrogen network system, and the main optimization scheduling model of the heat network system in parallel.

2. The method for optimizing the distribution of electricity-hydrogen-heat integrated energy system according to claim 1, It is characterized in that The multi-agent optimization scheduling model of the electricity-hydrogen-heat integrated energy system includes: (1.1) Optimal dispatch model of power grid system The goal of the optimization dispatching model of the power grid system is to optimize the output of each device in the power grid system and the sales volume of hydrogen and heat produced by electricity, so as to maximize the operating benefits of the power grid system. (1.2) Hydrogen network system optimization scheduling model The goal of the optimization scheduling model of the main body of the hydrogen network system is to optimize the output of each device in the hydrogen network system, the amount of electricity purchased by the electric hydrogen production device and the amount of hydrogen sold by the hydrogen fuel cell, so as to minimize the main operating cost of the hydrogen network system; (1.3) Optimal dispatch model of heating network system The goal of the main optimization scheduling model of the heating network system is to optimize the output of each device in the heating network system and the power purchase of the electric heating device, and minimize the main operating cost of the heating network system.

3. The method for optimizing the distribution of electricity-hydrogen-heat integrated energy system according to claim 1, It is characterized in that The contents of the column constraint generation algorithm are as follows: (2.2.1) Initialization: Setting the number of iterations m =1; (2.2.2) Solve the main problem of the first stage and obtain the control variables of the main problem; (2.2.3) Solve the second-stage sub-problems in parallel based on the control variables obtained from solving the main problem to obtain the probability distribution constraints of the worst source-load discrete scenario; (2.2.4) Convergence judgment: If the convergence criterion is met, the problem converges and the iteration stops; otherwise, the probability distribution constraint of the worst source-load discrete scenario is added to the main problem of the first stage and the iteration continues. m = m +1, back (2.2.2).

4. The method for optimizing the distribution of electricity-hydrogen-heat integrated energy system according to claim 1, It is characterized in that The method of using the alternating direction multiplier method to interactively iterate and parallelly solve the three-layer two-stage power balance model of the power grid system, the main optimization dispatch model of the hydrogen network system and the main optimization dispatch model of the heat network system specifically includes: (3.1) Initialization: Setting the number of iterations n =1; initialize the average value of the transaction electricity between the main body of the power grid system, the main body of the hydrogen network system and the main body of the heat network system, that is, the average value of the coupling variable; (3.2) Interactively solve the three-layer two-stage power balance model of the power grid system, the subject optimization scheduling model of the hydrogen network system, and the subject optimization scheduling model of the heat network system to obtain the scheduling plan of each subject and the amount of electricity traded between subjects; (3.3) The main body of the power grid system, the main body of the hydrogen network system and the main body of the heat network system exchange the latest transaction electricity and recalculate the average value of the coupling variables and the algorithm parameters; (3.4) Judgment: If the convergence criterion is met, the iteration stops and the optimal scheduling solution is obtained; otherwise, the iteration continues. n = n +1, returns (3.2).

5. Electricity-hydrogen-heat integrated energy system distribution rod optimization device, It is characterized in that include: The multi-agent model generation module of the electric-hydrogen-heat integrated energy system is used to establish the multi-agent optimization dispatching model of the electric-hydrogen-heat integrated energy system, including the main optimization dispatching model of the power grid system, the main optimization dispatching model of the hydrogen network system and the main optimization dispatching model of the heat network system; The power grid system main source and load uncertainty solving module is used to describe the source and load uncertainty of the main optimization scheduling model of the power grid system by using a data-driven distributed robust optimization model, establish a three-layer two-stage power balance model, and solve it using a column constraint generation algorithm; The multi-agent model solving module of the electric-hydrogen-heat integrated energy system is used to interactively iterate the three-layer two-stage power balance model of the power grid system, the main optimization scheduling model of the hydrogen network system, and the main optimization scheduling model of the heat network system using the alternating direction multiplier method to realize the distributed parallel solution of the multi-agent optimization scheduling model of the electric-hydrogen-heat integrated energy system; According to the structural characteristics of the distributed robust optimization model, a three-layer two-stage power balance model of the power grid system is established, and the column constraint generation algorithm is used to iteratively solve the two-stage main and sub-problems, where the sub-problems can be solved in parallel, including: (2.1) Three-layer two-stage power balance model (2.1.1) The first stage model is the main optimization dispatch model of the power grid system, which is the first layer of the three-layer two-stage power balance model; (2.1.2) The second stage model includes the second and third layers of the three-layer two-stage power balance model. The second layer is to minimize the expected adjustment cost of the output of each device in the power grid system under different source-load probability distributions. The third layer finds the probability distribution of the worst source-load discrete scenario based on the optimization results of the second layer. The alternating direction multiplier method is used to interactively and iteratively solve the three-layer two-stage power balance model of the power grid system, the main optimization scheduling model of the hydrogen network system, and the main optimization scheduling model of the heat network system in parallel.

6. According to the electric-hydrogen-heat integrated energy system distribution blue rod optimization device of claim 5, It is characterized in that The multi-agent optimization scheduling model of the electricity-hydrogen-heat integrated energy system includes: (1.1) Optimal dispatch model of power grid system The goal of the optimization dispatching model of the power grid system is to optimize the output of each device in the power grid system and the sales volume of hydrogen and heat produced by electricity, so as to maximize the operating benefits of the power grid system. (1.2) Hydrogen network system optimization scheduling model The goal of the optimization scheduling model of the main body of the hydrogen network system is to optimize the output of each device in the hydrogen network system, the amount of electricity purchased by the electric hydrogen production device and the amount of hydrogen sold by the hydrogen fuel cell, so as to minimize the main operating cost of the hydrogen network system; (1.3) Optimal dispatch model of heating network system The goal of the main optimization scheduling model of the heating network system is to optimize the output of each device in the heating network system and the power purchase of the electric heating device, and minimize the main operating cost of the heating network system.

7. The device for optimizing the distribution of electric-hydrogen-heat integrated energy system according to claim 5, It is characterized in that The contents of the column constraint generation algorithm are as follows: (2.2.1) Initialization: Setting the number of iterations m =1; (2.2.2) Solve the main problem of the first stage and obtain the control variables of the main problem; (2.2.3) Solve the second-stage sub-problems in parallel based on the control variables obtained from solving the main problem to obtain the probability distribution of the worst source-load discrete scenario; (2.2.4) Convergence judgment: If the convergence criterion is met, the problem converges and the iteration stops; otherwise, the probability distribution constraint of the worst source-load discrete scenario is added to the main problem and the iteration continues. m = m +1, back (2.2.2).

8. The electric-hydrogen-heat integrated energy system distribution and optimization device according to claim 5, It is characterized in that The method of using the alternating direction multiplier method to interactively iterate and parallelly solve the three-layer two-stage power balance model of the power grid system, the main optimization dispatch model of the hydrogen network system and the main optimization dispatch model of the heat network system specifically includes: (3.1) Initialization: Setting the number of iterations n =1; initialize the average value of the transaction electricity between the main body of the power grid system, the main body of the hydrogen network system and the main body of the heat network system, that is, the average value of the coupling variable; (3.2) Interactively solve the three-layer two-stage power balance model of the power grid system, the subject optimization scheduling model of the hydrogen network system, and the subject optimization scheduling model of the heat network system to obtain the scheduling plan of each subject and the amount of electricity traded between subjects; (3.3) The main body of the power grid system, the main body of the hydrogen network system and the main body of the heat network system exchange the latest transaction electricity and recalculate their average values ​​and algorithm parameters; (3.4) Judgment: If the convergence criterion is met, the iteration stops and the optimal scheduling solution is obtained; otherwise, the iteration continues. n = n +1, returns (3.2).