A commercial aerospace measurement and control service management system based on cloud platform
Through the commercial aerospace measurement and control service management system based on the cloud platform, ground station status data are collected for risk assessment and interference analysis, which solves the problem of accuracy and stability of ground station measurement and control data, achieves more efficient data supervision and interference processing, and improves The overall performance of the measurement and control system.
Patent Information
- Application Number
- CN202311454323.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-03
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2043-11-03
Smart Images

Figure CN117498970B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of commercial aerospace measurement and control services, and in particular to a commercial aerospace measurement and control service management system based on a cloud platform. Background Art
[0002] The space tracking and control network is a comprehensive electronic system that completes the tasks of tracking and measuring the orbit of launch vehicles and spacecraft, receiving and processing telemetry signals, and sending remote control signals. Due to the influence of the earth's curvature, the tracking and control system based on radio microwave propagation cannot achieve full-range observation of launch vehicles and spacecraft using a ground station at one location. It requires multiple ground stations distributed in different locations to "relay" and connect to complete the tracking and control tasks;
[0003] However, during the operation of existing ground stations, it is impossible to supervise and warn the operation of each ground station, which affects the accuracy and effectiveness of the ground station's measurement and control data. It is also impossible to supervise the ground station's measurement and control data transmission in combination with the equipment's own operation and maintenance, which affects the stability and security of the ground station's measurement and control data transmission, and thus affects the accuracy of subsequent measurement and control analysis results. It is also impossible to verify the measurement and control data, which poses a risk of error and invalidity.
[0004] In view of the above technical defects, a solution is now proposed. Summary of the invention
[0005] The purpose of the present invention is to provide a commercial aerospace measurement and control service management system based on a cloud platform to solve the technical defects mentioned above. The present invention collects the status data of the ground station and performs operation risk assessment and analysis to improve the effectiveness and safety of the measurement and control of the ground station, and performs impact risk assessment and analysis on the interference data of the risk ground station through information feedback, so as to timely deal with the interference factors to reduce the impact of the interference factors on the ground station, and performs self-inspection verification and evaluation analysis on the self-inspection data to ensure the accuracy and effectiveness of the measurement and control, improve data support for the measurement and control analysis, and ensure the accuracy of the analysis results. The transmission data of the normal ground station is subjected to transmission supervision and analysis through in-depth data analysis to provide data support for the operation, inspection and maintenance of the ground station, and ensure the measurement and control transmission effect, which helps to improve the stability of the measurement and control information transmission of the ground station, and helps to reflect the operational safety and measurement and control accuracy of the ground station from the side.
[0006] The object of the present invention can be achieved by the following technical solutions: A commercial aerospace measurement and control service management system based on a cloud platform, including a service management platform, a measurement and control supervision unit, an early warning management unit, an environmental impact unit, a verification and analysis unit, and a transmission supervision unit;
[0007] When the service management platform generates an operation management instruction, it sends the operation management instruction to the measurement and control supervision unit. After receiving the operation management instruction, the measurement and control supervision unit immediately collects the status data of the ground station, the status data includes the display risk value and the operation risk value, and performs operation risk assessment analysis and in-depth comparison analysis on the status data, sends the obtained normal signal to the transmission supervision unit, and sends the obtained risk signal to the early warning management unit, the environmental impact unit and the verification and analysis unit;
[0008] After receiving the risk signal, the environmental impact unit immediately collects the interference data of the ground station, which includes the environmental interference value and the equipment risk value, and performs an impact risk assessment and analysis on the interference data. The obtained feedback signal is sent to the early warning management unit through the measurement and control supervision unit;
[0009] After receiving the risk signal, the verification and analysis unit immediately collects the self-test data of the ground station, which indicates the operating voltage of each sensor, and performs self-test verification, evaluation and analysis on the self-test data, and sends the obtained abnormal signal to the early warning management unit;
[0010] After receiving the normal signal, the transmission supervision unit immediately collects the transmission data of the ground station, which includes the average packet loss value and the transmission bandwidth value, and performs transmission supervision analysis on the transmission data. The obtained optimized signal is sent to the early warning management unit via the measurement and control supervision unit.
[0011] Preferably, the operation risk assessment and analysis process of the measurement, control and supervision unit is as follows:
[0012] The duration of a period of time during the operation of the ground station is collected and marked as a time threshold. The time threshold is divided into o sub-time periods, where o is a natural number greater than zero, and the display risk value and operation risk value of the ground station in each sub-time period are obtained, wherein the display risk value represents the sum of the portion of the average operating temperature of the measurement and control element that exceeds the stored preset average operating temperature threshold and the portion of the average operating voltage that exceeds the stored preset average operating voltage after data normalization processing; the operation risk value refers to the sum of the portion of the average reactive power value of the internal line of the ground station that exceeds the preset average reactive power value threshold and the resistance change value of the line port after data normalization processing, and the display risk value and operation risk value of the ground station in each sub-time period are labeled XFo and YFo, respectively.
[0013] Preferably, the in-depth comparison and analysis process of the measurement, control and supervision unit is as follows:
[0014] According to the formula The measurement and control risk assessment coefficient of the ground station in each sub-time period is obtained, wherein a1 and a2 are preset weight factor coefficients of the display risk value and the operation risk value, respectively, and a1 and a2 are both positive numbers greater than zero, a3 is a preset correction factor coefficient, and its value is 1.662, Ho is the measurement and control risk assessment coefficient of the ground station in each sub-time period, and a rectangular coordinate system is established with time as the X-axis and the measurement and control risk assessment coefficient Ho as the Y-axis, and a measurement and control risk assessment coefficient curve is drawn by plotting points, and at the same time, a preset measurement and control risk assessment coefficient threshold curve stored is drawn in the coordinate system, and the total number of points on the measurement and control risk assessment coefficient curve that are above the preset measurement and control risk assessment coefficient threshold curve is obtained from the coordinate system, and it is marked as the measurement and control risk number, and the ratio of the measurement and control risk number to the total number of points drawn on the measurement and control risk assessment coefficient curve is marked as the operation measurement and control failure value, and then the operation measurement and control failure value is compared and analyzed with the preset operation measurement and control failure value threshold value stored in the internal entry:
[0015] If the operation measurement and control failure value is less than or equal to the preset operation measurement and control failure value threshold, a normal signal is generated;
[0016] If the operation measurement and control failure value is greater than the preset operation measurement and control failure value threshold, a risk signal is generated.
[0017] Preferably, the impact risk assessment analysis process of the environmental impact unit is as follows:
[0018] S1: Obtain the environmental interference value outside the ground station in each sub-time period. The environmental interference value refers to the product of the part of the maximum temperature change value that exceeds the stored preset maximum temperature change value and the electromagnetic interference change value after data normalization, so as to construct a set A of environmental interference values, and then obtain the mean value of the set A, and mark the mean value of the set A as the environmental risk value;
[0019] S12: Obtain the equipment risk value of the ground station within the time threshold, where the equipment risk value refers to the product of the sum of the number of ground station failures and the number of maintenances during the time from the time the equipment was put into use to the current time and the time from the time the most recent maintenance ended to the current time after data normalization processing;
[0020] S13: Compare and analyze the environmental risk value and the equipment risk value with the preset environmental risk value threshold and the preset equipment risk value threshold that are stored internally:
[0021] If the environmental risk value is less than the preset environmental risk value threshold, and the equipment risk value is less than the preset equipment risk value threshold, no signal is generated;
[0022] If the environmental risk value is greater than or equal to a preset environmental risk value threshold, or the equipment risk value is greater than or equal to a preset equipment risk value threshold, a feedback signal is generated.
[0023] Preferably, the self-checking, verification, evaluation and analysis process of the verification and analysis unit is as follows:
[0024] The sub-time period is divided into k sub-time nodes, where k is a natural number greater than zero, and the operating voltage of the sensor in each sub-time node is obtained. A rectangular coordinate system is established with time as the X-axis and the operating voltage as the Y-axis. The operating voltage curve is drawn by plotting points, and a preset motion voltage interval curve is drawn in the coordinate axis system. Then, the ratio of the length value of the line segment of the operating voltage curve belonging to the preset motion voltage interval curve to the total length value of the operating voltage curve is obtained, and it is marked as a voltage stabilization safety value, and then a set B of voltage stabilization safety values in each sub-time period is constructed, and then the maximum subset and the minimum subset of the set B are obtained, and the difference between the maximum subset and the minimum subset of the set B is marked as a voltage stabilization risk value WY. At the same time, the environmental risk value and the equipment risk value are obtained from the environmental impact unit, and they are labeled HF and SF respectively;
[0025] The self-test evaluation coefficient G is obtained according to the formula, and the sensor is marked with g, where g is a natural number greater than zero, so as to obtain the self-test evaluation coefficient Gg of each sensor within the time threshold, and compare and analyze the self-test evaluation coefficient Gg with the preset self-test evaluation coefficient threshold value recorded and stored internally:
[0026] If the self-test evaluation coefficient Gg is less than the preset self-test evaluation coefficient threshold, no signal is generated;
[0027] If the self-check evaluation coefficient Gg is greater than or equal to the preset self-check evaluation coefficient threshold, an abnormal signal is generated.
[0028] Preferably, the transmission supervision analysis process of the transmission supervision unit is as follows:
[0029] SS1: Get the average packet loss value of the ground station in each sub-time period, compare and analyze the average packet loss value with the stored preset average packet loss value threshold. If the average packet loss value is greater than the preset average packet loss value threshold, then get the sum of the parts of the average packet loss value greater than the preset average packet loss value threshold within the time threshold, and mark it as the transmission damage value. It should be noted that the larger the value of the transmission damage value, the greater the risk of transmission abnormality.
[0030] SS12: Obtain the transmission bandwidth value of the ground station in each sub-time period, and then obtain the difference between the transmission bandwidth values in two connected sub-time periods, and mark it as the bandwidth floating value, obtain the maximum and minimum bandwidth floating values within the time threshold, mark the difference between the maximum and minimum bandwidth floating values as the floating risk value, and compare and analyze the transmission damage value and the floating risk value with the preset transmission damage value threshold and the preset floating risk value threshold that are entered and stored internally:
[0031] If the ratio between the transmission impairment value and the preset transmission impairment value threshold is less than 1, and the ratio between the floating risk value and the preset floating risk value threshold is less than 1, no signal is generated;
[0032] If the ratio between the transmission impairment value and the preset transmission impairment value threshold is greater than or equal to 1, or the ratio between the floating risk value and the preset floating risk value threshold is greater than or equal to 1, an optimization signal is generated.
[0033] The beneficial effects of the present invention are as follows:
[0034] The present invention collects the status data of the ground station and performs operation risk assessment and analysis to determine whether the operation status of the ground station is normal, so as to carry out early warning management in a timely manner to improve the effectiveness and safety of the ground station's measurement and control, and conducts impact risk assessment and analysis on the interference data of the risk ground station in the form of information feedback to determine whether the ground station has a failure caused by interference, so as to deal with the interference factors in a timely manner to reduce the impact of the interference factors on the ground station, and conducts self-inspection verification and assessment analysis on the self-inspection data to determine whether the data collected by each sensor is accurate and effective, so as to ensure the accuracy and effectiveness of measurement and control, improve data support for measurement and control analysis, and ensure the accuracy of the analysis results;
[0035] The present invention conducts transmission supervision and analysis on the transmission data of normal ground stations by means of in-depth data analysis, so as to provide data support for the operation, inspection and maintenance of the ground stations, while ensuring the measurement and control transmission effect, which helps to improve the measurement and control information transmission stability of the ground stations, and helps to reflect the operation safety and measurement and control accuracy of the ground stations from the side. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] The present invention will be further described below in conjunction with the accompanying drawings;
[0037] Figure 1 It is a flowchart of the system of the present invention;
[0038] Figure 2 It is a local analysis reference diagram of the present invention. DETAILED DESCRIPTION
[0039] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Example
[0040] See also Figure 1 to Figure 2As shown, the present invention is a commercial aerospace measurement and control service management system based on a cloud platform, including a service management platform, a measurement and control supervision unit, an early warning management unit, an environmental impact unit, a verification and analysis unit, and a transmission supervision unit. The service management platform is connected to the measurement and control supervision unit and the transmission supervision unit in a two-way communication manner, the measurement and control supervision unit is connected to the environmental impact unit in a two-way communication manner, the measurement and control supervision unit is connected to the verification and analysis unit and the early warning management unit in a one-way communication manner, and the verification and analysis unit is connected to the early warning management unit in a one-way communication manner;
[0041] When the service management platform generates an operation management instruction, it sends the operation management instruction to the measurement and control supervision unit. After receiving the operation management instruction, the measurement and control supervision unit immediately collects the status data of the ground station. The status data includes the display risk value and the operation risk value, and performs an operation risk assessment and analysis on the status data to determine whether the operation status of the ground station is normal, so as to carry out early warning management in time to improve the effectiveness and safety of the ground station measurement and control. The specific operation risk assessment and analysis process is as follows:
[0042] The duration of a period of time during the operation of the ground station is collected and marked as a time threshold. The time threshold is divided into o sub-time periods, where o is a natural number greater than zero, and the display risk value and operation risk value of the ground station in each sub-time period are obtained, wherein the display risk value represents the sum of the part of the average operating temperature of the measurement and control element exceeding the stored preset average operating temperature threshold and the part of the average operating voltage exceeding the stored preset average operating voltage after data normalization processing, and the operation risk value refers to the sum of the part of the average reactive power value of the internal line of the ground station exceeding the preset average reactive power value threshold and the resistance change value of the line port after data normalization processing, and the display risk value and operation risk value of the ground station in each sub-time period are labeled as XFo and YFo respectively;
[0043] According to the formula The measurement and control risk assessment coefficient of the ground station in each sub-time period is obtained, wherein a1 and a2 are preset weight factor coefficients of the display risk value and the operation risk value, respectively, and a1 and a2 are both positive numbers greater than zero, a3 is a preset correction factor coefficient, and its value is 1.662, Ho is the measurement and control risk assessment coefficient of the ground station in each sub-time period, and a rectangular coordinate system is established with time as the X-axis and the measurement and control risk assessment coefficient Ho as the Y-axis, and a measurement and control risk assessment coefficient curve is drawn by plotting points, and at the same time, a preset measurement and control risk assessment coefficient threshold curve stored is drawn in the coordinate system, and the total number of points on the measurement and control risk assessment coefficient curve that are above the preset measurement and control risk assessment coefficient threshold curve is obtained from the coordinate system, and it is marked as the measurement and control risk number, and the ratio of the measurement and control risk number to the total number of points drawn on the measurement and control risk assessment coefficient curve is marked as the operation measurement and control failure value, and then the operation measurement and control failure value is compared and analyzed with the preset operation measurement and control failure value threshold value stored in the internal entry:
[0044] If the operation measurement and control failure value is less than or equal to the preset operation measurement and control failure value threshold, a normal signal is generated and sent to the transmission supervision unit;
[0045] If the operation measurement and control failure value is greater than the preset operation measurement and control failure value threshold, a risk signal is generated and sent to the early warning management unit, the environmental impact unit and the verification and analysis unit. After receiving the risk signal, the early warning management unit immediately marks the ground station corresponding to the risk signal in red on the display panel, so as to carry out fault early warning in time, improve the maintenance efficiency of the ground station, and help to improve the monitoring effectiveness and safety of the ground station, and at the same time help to improve the stability of the ground station's measurement and control;
[0046] After receiving the risk signal, the environmental impact unit immediately collects the interference data of the ground station. The interference data includes the environmental interference value and the equipment risk value, and performs an impact risk assessment analysis on the interference data to determine whether the ground station fails due to interference, so as to deal with the interference factors in a timely manner to reduce the impact of the interference factors on the ground station. The specific impact risk assessment analysis process is as follows:
[0047] Obtain the environmental interference value outside the ground station in each sub-time period. The environmental interference value refers to the product of the part of the maximum temperature change value that exceeds the stored preset maximum temperature change value and the electromagnetic interference change value after data normalization. This is used to construct a set A of environmental interference values, and then obtain the mean of the set A. The mean of the set A is marked as the environmental risk value. It should be noted that the larger the value of the environmental risk value, the greater the risk of the ground station being affected by the external environment;
[0048] The equipment risk value of the ground station within the time threshold is obtained. The equipment risk value refers to the product of the sum of the number of ground station failures and the number of maintenance times during the time from the time the equipment is put into use to the current time and the time from the time the most recent maintenance ends to the current time after data normalization. It should be noted that the larger the value of the equipment risk value, the greater the abnormal risk of the ground station;
[0049] Compare and analyze the environmental risk value and equipment risk value with the preset environmental risk value threshold and preset equipment risk value threshold that are stored internally:
[0050] If the environmental risk value is less than the preset environmental risk value threshold, and the equipment risk value is less than the preset equipment risk value threshold, no signal is generated;
[0051] If the environmental risk value is greater than or equal to the preset environmental risk value threshold, or the equipment risk value is greater than or equal to the preset equipment risk value threshold, a feedback signal is generated and sent to the early warning management unit via the measurement and control supervision unit. After receiving the feedback signal, the early warning management unit displays the early warning in the column of the ground station corresponding to the feedback signal with the word "maintenance" so as to deal with the interference factors in a timely manner, thereby reducing the impact of the interference factors on the ground station and improving the measurement and control accuracy of the ground station. Example
[0052] After receiving the risk signal, the verification and analysis unit immediately collects the self-test data from the ground station. The self-test data represents the operating voltage of each sensor, and performs self-test verification and evaluation analysis on the self-test data to determine whether the data collected by each sensor is accurate and effective, so as to ensure the accuracy and effectiveness of measurement and control, and provide data support for measurement and control analysis. The specific self-test verification and evaluation analysis process is as follows:
[0053] The sub-time period is divided into k sub-time nodes, where k is a natural number greater than zero, and the operating voltage of the sensor in each sub-time node is obtained. A rectangular coordinate system is established with time as the X-axis and the operating voltage as the Y-axis. The operating voltage curve is drawn by plotting points, and a preset motion voltage interval curve is drawn in the coordinate axis system. Then, the ratio of the length value of the line segment of the operating voltage curve belonging to the preset motion voltage interval curve to the total length value of the operating voltage curve is obtained, and it is marked as a voltage stabilization safety value, and then a set B of voltage stabilization safety values in each sub-time period is constructed, and then the maximum subset and the minimum subset of set B are obtained, and the difference between the maximum subset and the minimum subset of set B is marked as a voltage stabilization risk value, which is labeled WY. It should be noted that the larger the value of the voltage stabilization risk value, the greater the risk of sensor abnormality. At the same time, the environmental risk value and the equipment risk value are obtained from the environmental impact unit, and they are labeled HF and SF respectively;
[0054] According to the formula The self-test evaluation coefficient is obtained, where f1, f2 and f3 are preset proportional factor coefficients of the voltage stabilization risk value, environmental risk value and equipment risk value respectively. The proportional factor coefficient is used to correct the deviation of various parameters in the formula calculation process, so as to make the calculation result more accurate. f4 is the preset fault tolerance factor coefficient. f1, f2, f3 and f4 are all positive numbers greater than zero. G is the self-test evaluation coefficient. The sensor is marked with g, where g is a natural number greater than zero. Then, the self-test evaluation coefficient Gg of each sensor within the time threshold is obtained, and the self-test evaluation coefficient Gg is compared and analyzed with the preset self-test evaluation coefficient threshold value stored in the internal input:
[0055] If the self-test evaluation coefficient Gg is less than the preset self-test evaluation coefficient threshold, no signal is generated;
[0056] If the self-check evaluation coefficient Gg is greater than or equal to the preset self-check evaluation coefficient threshold, an abnormal signal is generated and sent to the early warning management unit. After receiving the abnormal signal, the early warning management unit immediately marks the ground station corresponding to the abnormal signal as yellow on the display panel, so as to timely maintain and manage the sensors in the ground station, improve the supervision effect of the ground station, and help ensure the accuracy and effectiveness of the ground station measurement and control, and improve data support for measurement and control analysis;
[0057] After receiving the normal signal, the transmission supervision unit immediately collects the transmission data of the ground station, including the average packet loss value and the transmission bandwidth value, and performs transmission supervision analysis on the transmission data to determine whether the working efficiency of the ground station is qualified, so as to provide data support for the operation, inspection and maintenance of the ground station, and ensure the measurement and control effect. The specific transmission supervision analysis process is as follows:
[0058] The average packet loss value of the ground station in each sub-time period is obtained, and the average packet loss value is compared and analyzed with the stored preset average packet loss value threshold. If the average packet loss value is greater than the preset average packet loss value threshold, the sum of the parts of the average packet loss value greater than the preset average packet loss value threshold within the time threshold is obtained, and it is marked as a transmission damage value. It should be noted that the larger the value of the transmission damage value, the greater the risk of transmission abnormality;
[0059] The transmission bandwidth value of the ground station in each sub-time period is obtained, and then the difference between the transmission bandwidth values in two connected sub-time periods is obtained, and it is marked as the bandwidth floating value. The maximum and minimum values of the bandwidth floating value within the time threshold are obtained, and the difference between the maximum and minimum values of the bandwidth floating value is marked as the floating risk value. It should be noted that the larger the floating risk value, the greater the transmission abnormality risk. The transmission damage value and the floating risk value are compared and analyzed with the preset transmission damage value threshold and the preset floating risk value threshold that are internally entered and stored:
[0060] If the ratio between the transmission impairment value and the preset transmission impairment value threshold is less than 1, and the ratio between the floating risk value and the preset floating risk value threshold is less than 1, no signal is generated;
[0061] If the ratio between the transmission impairment value and the preset transmission impairment value threshold is greater than or equal to 1, or the ratio between the floating risk value and the preset floating risk value threshold is greater than or equal to 1, an optimization signal is generated, and the optimization signal is sent to the early warning management unit via the measurement and control supervision unit. After receiving the optimization signal, the early warning management unit displays the early warning in the column of the ground station corresponding to the optimization signal with the word "optimization", which helps to improve the stability of the measurement and control information transmission of the ground station, and helps to reflect the operational safety and measurement and control accuracy of the ground station from the side;
[0062] In summary, the present invention collects the status data of the ground station and performs operation risk assessment and analysis to determine whether the operation status of the ground station is normal, so as to carry out early warning management in a timely manner to improve the effectiveness and safety of the ground station's measurement and control, and conducts impact risk assessment and analysis on the interference data of the risk ground station by means of information feedback to determine whether the ground station fails due to interference, so as to deal with the interference factors in a timely manner to reduce the impact of the interference factors on the ground station, and conducts self-inspection verification and evaluation analysis on the self-inspection data to determine whether the data collected by each sensor is accurate and effective, so as to ensure the accuracy and effectiveness of the measurement and control, improve data support for the measurement and control analysis, and ensure the accuracy of the analysis results, and conduct transmission supervision analysis on the transmission data of the normal ground station by means of in-depth data analysis to provide data support for the operation detection and maintenance of the ground station, and at the same time ensure the measurement and control transmission effect, which helps to improve the stability of the measurement and control information transmission of the ground station, and helps to reflect the operation safety and measurement and control accuracy of the ground station from the side.
[0063] The threshold is set to facilitate comparison. The size of the threshold depends on the amount of sample data and the number of bases set by technicians in this field for each group of sample data; as long as it does not affect the proportional relationship between the parameter and the quantized value.
[0064] The above formulas are obtained by collecting a large amount of data for software simulation and selecting a formula that is close to the actual value. The coefficients in the formula are set by technical personnel in this field according to actual conditions. The above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited to this. Any technical personnel familiar with the technical field within the technical scope disclosed by the present invention, according to the technical solution and the inventive concept of the present invention, make equivalent replacement or change, which should be covered within the protection scope of the present invention.
Claims
1. A commercial aerospace measurement and control service management system based on a cloud platform, characterized in that: It includes service management platform, measurement and control supervision unit, early warning management unit, environmental impact unit, verification and analysis unit and transmission supervision unit; When the service management platform generates an operation management instruction, it sends the operation management instruction to the measurement and control supervision unit. After receiving the operation management instruction, the measurement and control supervision unit immediately collects the status data of the ground station, the status data includes the display risk value and the operation risk value, and performs operation risk assessment analysis and in-depth comparison analysis on the status data, sends the obtained normal signal to the transmission supervision unit, and sends the obtained risk signal to the early warning management unit, the environmental impact unit and the verification and analysis unit; After receiving the risk signal, the environmental impact unit immediately collects the interference data of the ground station, which includes the environmental interference value and the equipment risk value, and performs an impact risk assessment and analysis on the interference data. The obtained feedback signal is sent to the early warning management unit through the measurement and control supervision unit; After receiving the risk signal, the verification and analysis unit immediately collects the self-test data of the ground station, which indicates the operating voltage of each sensor, and performs self-test verification, evaluation and analysis on the self-test data, and sends the obtained abnormal signal to the early warning management unit; After receiving the normal signal, the transmission supervision unit immediately collects the transmission data of the ground station, including the average packet loss value and the transmission bandwidth value, and performs transmission supervision analysis on the transmission data, and sends the obtained optimization signal to the early warning management unit through the measurement and control supervision unit; The operation risk assessment and analysis process of the measurement, control and supervision unit is as follows: The duration of a period of time during the operation of the ground station is collected and marked as a time threshold. The time threshold is divided into o sub-time periods, where o is a natural number greater than zero, and the display risk value and operation risk value of the ground station in each sub-time period are obtained, wherein the display risk value represents the sum of the part of the average operating temperature of the measurement and control element exceeding the stored preset average operating temperature threshold and the part of the average operating voltage exceeding the stored preset average operating voltage after data normalization processing, and the operation risk value refers to the sum of the part of the average reactive power value of the internal line of the ground station exceeding the preset average reactive power value threshold and the resistance change value of the line port after data normalization processing, and the display risk value and operation risk value of the ground station in each sub-time period are labeled as XFo and YFo respectively; The in-depth comparison and analysis process of the measurement, control and supervision unit is as follows: According to the formula The measurement and control risk assessment coefficient of the ground station in each sub-time period is obtained, wherein a1 and a2 are preset weight factor coefficients of the display risk value and the operation risk value, respectively, and a1 and a2 are both positive numbers greater than zero, a3 is a preset correction factor coefficient, and its value is 1.662, Ho is the measurement and control risk assessment coefficient of the ground station in each sub-time period, and a rectangular coordinate system is established with time as the X-axis and the measurement and control risk assessment coefficient Ho as the Y-axis, and a measurement and control risk assessment coefficient curve is drawn by plotting points, and at the same time, a preset measurement and control risk assessment coefficient threshold curve stored is drawn in the coordinate system, and the total number of points on the measurement and control risk assessment coefficient curve that are above the preset measurement and control risk assessment coefficient threshold curve is obtained from the coordinate system, and it is marked as the measurement and control risk number, and the ratio of the measurement and control risk number to the total number of points drawn on the measurement and control risk assessment coefficient curve is marked as the operation measurement and control failure value, and then the operation measurement and control failure value is compared and analyzed with the preset operation measurement and control failure value threshold value stored in the internal entry: If the operation measurement and control failure value is less than or equal to the preset operation measurement and control failure value threshold, a normal signal is generated; If the operation measurement and control failure value is greater than the preset operation measurement and control failure value threshold, a risk signal is generated; The impact risk assessment analysis process of the environmental impact unit is as follows: S1: Obtain the environmental interference value outside the ground station in each sub-time period. The environmental interference value refers to the product of the part of the maximum temperature change value that exceeds the stored preset maximum temperature change value and the electromagnetic interference change value after data normalization, so as to construct a set A of environmental interference values, and then obtain the mean value of the set A, and mark the mean value of the set A as the environmental risk value; S12: Obtain the equipment risk value of the ground station within the time threshold, where the equipment risk value refers to the product of the sum of the number of ground station failures and the number of maintenances during the time from the time the equipment was put into use to the current time and the time from the time the most recent maintenance ended to the current time after data normalization processing; S13: Compare and analyze the environmental risk value and the equipment risk value with the preset environmental risk value threshold and the preset equipment risk value threshold that are stored internally: If the environmental risk value is less than the preset environmental risk value threshold, and the equipment risk value is less than the preset equipment risk value threshold, no signal is generated; If the environmental risk value is greater than or equal to the preset environmental risk value threshold, or the equipment risk value is greater than or equal to the preset equipment risk value threshold, a feedback signal is generated; The self-checking, verification, evaluation and analysis process of the verification and analysis unit is as follows: The sub-time period is divided into k sub-time nodes, where k is a natural number greater than zero, and the operating voltage of the sensor in each sub-time node is obtained. A rectangular coordinate system is established with time as the X-axis and the operating voltage as the Y-axis. The operating voltage curve is drawn by plotting points, and a preset motion voltage interval curve is drawn in the coordinate axis system. Then, the ratio of the length value of the line segment of the operating voltage curve belonging to the preset motion voltage interval curve to the total length value of the operating voltage curve is obtained, and it is marked as a voltage stabilization safety value, and then a set B of voltage stabilization safety values in each sub-time period is constructed, and then the maximum subset and the minimum subset of the set B are obtained, and the difference between the maximum subset and the minimum subset of the set B is marked as a voltage stabilization risk value WY. At the same time, the environmental risk value and the equipment risk value are obtained from the environmental impact unit, and they are labeled HF and SF respectively; According to the formula The self-test evaluation coefficient G is obtained, where f1, f2 and f3 are preset proportional factor coefficients of the voltage stabilization risk value, the environmental risk value and the equipment risk value respectively, and f4 is a preset fault tolerance factor coefficient. f1, f2, f3 and f4 are all positive numbers greater than zero. The sensor is marked with g, where g is a natural number greater than zero, and the self-test evaluation coefficient Gg of each sensor within the time threshold is obtained. The self-test evaluation coefficient Gg is compared and analyzed with the preset self-test evaluation coefficient threshold value stored in the internal input: If the self-test evaluation coefficient Gg is less than the preset self-test evaluation coefficient threshold, no signal is generated; If the self-check evaluation coefficient Gg is greater than or equal to the preset self-check evaluation coefficient threshold, an abnormal signal is generated; The transmission supervision analysis process of the transmission supervision unit is as follows: SS1: Get the average packet loss value of the ground station in each sub-time period, compare and analyze the average packet loss value with the stored preset average packet loss value threshold. If the average packet loss value is greater than the preset average packet loss value threshold, then get the sum of the parts of the average packet loss value greater than the preset average packet loss value threshold within the time threshold, and mark it as the transmission damage value. It should be noted that the larger the value of the transmission damage value, the greater the risk of transmission abnormality. SS12: Obtain the transmission bandwidth value of the ground station in each sub-time period, and then obtain the difference between the transmission bandwidth values in two connected sub-time periods, and mark it as the bandwidth floating value, obtain the maximum and minimum bandwidth floating values within the time threshold, mark the difference between the maximum and minimum bandwidth floating values as the floating risk value, and compare and analyze the transmission damage value and the floating risk value with the preset transmission damage value threshold and the preset floating risk value threshold that are entered and stored internally: If the ratio between the transmission impairment value and the preset transmission impairment value threshold is less than 1, and the ratio between the floating risk value and the preset floating risk value threshold is less than 1, no signal is generated; If the ratio between the transmission impairment value and the preset transmission impairment value threshold is greater than or equal to 1, or the ratio between the floating risk value and the preset floating risk value threshold is greater than or equal to 1, an optimization signal is generated.
