A method for controlling road engineering quality

Through the analysis and risk prediction of road drawing documents, the error problem caused by manual experience dependence is solved, and the quantitative control and safety improvement of road engineering quality are achieved.

CN117522226BActive Publication Date: 2024-11-22中路高科交通检测检验认证有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311642778.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-04
Publication Date
2024-11-22
Estimated Expiration
2043-12-04

AI Technical Summary

Technical Problem

In the prior art, road engineering quality control mostly relies on manual experience, and there are errors and difficult to quantify problems, resulting in slow construction progress and driving safety hazards.

Method used

By obtaining the road drawing documents, the areas with high construction difficulty and high incidence of accidents are analyzed. Based on these areas, construction risks and use risks are predicted. If the risk exceeds the threshold, a warning will be issued and the construction sequence or parameters will be adjusted to achieve control of road project quality.

Benefits of technology

Quantitative prediction and control of road engineering quality is achieved, manual errors are reduced, construction efficiency and safety are improved, and supervision and management resources are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117522226B_ABST
    Figure CN117522226B_ABST
Patent Text Reader

Abstract

The present application discloses a method for controlling the quality of road projects. Based on information such as the road structure indicated in the road drawing files, the construction risk and use risk of the road are predicted, and the engineering quality of the road is evaluated predictively based on the predicted results. Whether it is quality problems that may be caused by construction or risks that may be faced during use, they can all be reflected. In addition, the method in this case replaces manual experience through technical means such as algorithms and scripts, and can achieve unified standards and the same management for road project quality control, which is conducive to reducing manual errors. On the one hand, through data processing for the purpose of management and supervision, control based on construction quality and use risks is achieved. On the other hand, the risk prediction results obtained provide conditions for further reducing the consumption of supervision and management resources.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of data processing suitable for management, supervision or prediction purposes, and in particular to a method for controlling the quality of road engineering projects. Background Art

[0002] The construction of infrastructure such as roads has laid the foundation for the country's economic development to a certain extent. Road construction usually has problems such as slow construction speed and poor fault tolerance. If there is no reasonable foresight on the quality of road projects, and no corresponding control measures are taken for the quality of road projects, the progress of road construction may be further aggravated, and even in some cases, due to problems with road quality, there may be hidden dangers to driving safety on the road. In related technologies, the control of road project quality mostly adopts manual control methods. However, the scope of dissemination of expert experience is limited, and there may be errors or even mistakes caused by subjective factors of experts, which makes it difficult to quantify the quality of road projects, and then leads to the problem that the quality of road projects is difficult to control.

[0003] For example, the patent publication (announcement) number is CN115222241B, and the patent title is: "A method for detecting engineering quality" (main classification number: G06Q10 / 0639). The use of technical means can fully mobilize the enthusiasm of construction personnel to help each other, which is conducive to greatly improving the speed and quality of engineering construction. On the one hand, it can show that data processing technology for supervision or prediction purposes has great potential in the field of engineering quality related technology; on the other hand, it can also show that technical mining in this field still has a relatively broad prospect for expansion. Summary of the invention

[0004] The embodiments of the present application provide a method for controlling the quality of a road project to at least partially solve the above-mentioned technical problems.

[0005] The present application embodiment adopts the following technical solutions:

[0006] In a first aspect, an embodiment of the present application provides a method for controlling the quality of a road project, the method comprising:

[0007] Obtain the drawing file of the target road;

[0008] The drawing file is parsed to determine a first target area and a second target area of ​​the target road; the first target area is an area where the construction difficulty is greater than a preset difficulty coefficient; the second target area is an area where accidents are likely to occur due to road conditions when vehicles travel along the target road when the target road is built;

[0009] Based on the first target area, predict the construction risk of the target road; when the first target area is not unique, the construction risk is positively correlated with the concentration of the first target area in the target road, positively correlated with the proportion of the first target area in the target road, and negatively correlated with the degree of traffic smoothness provided by other roads connected to the target road for driving to the first target area and along the construction direction of the target road for driving to the first target area;

[0010] Based on the second target area, predicting the use risk of the target road; the use risk is positively correlated with the frequency of vehicle driving accidents on the road section with the same road condition as the second target area in history;

[0011] If the construction risk is greater than a preset first risk threshold, and the use risk is greater than a preset second risk threshold, it is determined that the road engineering quality of the target road is at high risk.

[0012] In an optional embodiment of this specification, the method further includes:

[0013] The construction difficulty is negatively correlated with the minimum preset tolerance of the construction environment of the equipment used when constructing the first target area, negatively correlated with the estimated construction speed of the first target area, and positively correlated with the frequency of natural disasters in the geographical location of the first target area.

[0014] In an optional embodiment of this specification, the method further includes:

[0015] A portion of the road section in the drawing file, where the inclination angle of the road section is greater than a preset first angle threshold, or where the turning angle of the road section is greater than a preset second angle threshold, is determined as the second target area.

[0016] In an optional embodiment of this specification, the method further includes:

[0017] The degree of smoothness is positively correlated with the maximum load weight of vehicles allowed to pass through the road section, positively correlated with the maximum loading height of vehicles allowed to pass through the road section, positively correlated with the number of one-way lanes on the road section, negatively correlated with the maximum turning angle of the road section, and negatively correlated with the maximum inclination angle of the road section.

[0018] In an optional embodiment of this specification, the method further includes:

[0019] In the case where the first target area is unique, the construction risk is negatively correlated with the degree of traffic smoothness provided by the target road for driving to the first target area in the construction direction along the target road.

[0020] In an optional embodiment of this specification, the method further includes:

[0021] If the construction risk is not greater than the first risk threshold and the use risk is greater than the second risk threshold, a first alarm is issued; the first alarm is used to prompt adjustment of parameters for the target road.

[0022] In an optional embodiment of this specification, the method further includes:

[0023] If the construction risk is greater than the first risk threshold and the usage risk is not greater than the second risk threshold, a second alarm is issued; the second alarm is used to prompt the construction sequence adjustment for the target road; the construction sequence adjustment includes: at least one of: construction direction adjustment and construction sequence adjustment of road sections.

[0024] In an optional embodiment of this specification, the method further includes:

[0025] If the construction risk is not greater than the first risk threshold, and the use risk is not greater than the second risk threshold, determining whether the overlap between the first target area and the second target area is greater than a preset overlap threshold;

[0026] If yes, a third alarm is issued; the third alarm is used to prompt manual adjustment of the range of one of the first target area and the second target area, so as to re-perform risk prediction based on the adjusted result;

[0027] If not, it is determined that there is no high risk in the road engineering quality of the target road.

[0028] In a second aspect, an embodiment of the present application further provides a road engineering quality control device, the device comprising:

[0029] The acquisition module is configured to: acquire the drawing file of the target road;

[0030] The parsing module is configured to: parse the drawing file to determine a first target area and a second target area of ​​the target road; the first target area is an area where the construction difficulty is greater than a preset difficulty coefficient; the second target area is an area where accidents are likely to occur due to road conditions when vehicles travel along the target road when the target road is built;

[0031] A first prediction module is configured to: predict the construction risk of the target road based on the first target area; when the first target area is not unique, the construction risk is positively correlated with the concentration of the first target area in the target road, positively correlated with the proportion of the first target area in the target road, and negatively correlated with the degree of traffic smoothness provided by other roads connected to the target road for driving to the first target area and along the construction direction of the target road for driving to the first target area;

[0032] A second prediction module is configured to: predict the use risk of the target road based on the second target area; the use risk is positively correlated with the frequency of vehicle driving accidents on the road section with the same road condition as the second target area in history;

[0033] The judgment module is configured to: if the construction risk is greater than a preset first risk threshold, and the use risk is greater than a preset second risk threshold, determine that the road engineering quality of the target road is at high risk.

[0034] In a third aspect, an embodiment of the present application further provides an electronic device, including:

[0035] Processor; and

[0036] A memory arranged to store computer executable instructions which, when executed, cause the processor to perform the method steps described in the first aspect.

[0037] In a fourth aspect, an embodiment of the present application further provides a computer-readable storage medium, which stores one or more programs. When the one or more programs are executed by an electronic device including multiple applications, the electronic device executes the method steps described in the first aspect.

[0038] At least one of the above technical solutions adopted in the embodiments of the present application can achieve the following beneficial effects:

[0039] This specification provides a method for controlling the quality of road projects. Based on the road structure and other information indicated in the road drawing files, the construction risk and use risk of the road are predicted, and the engineering quality of the road is evaluated predictively based on the predicted results. Whether it is quality problems that may be caused by construction or risks that may be faced during use, they can all be reflected. In addition, the method in this case replaces manual experience through technical means such as algorithms and scripts, and can achieve unified standards and the same management for road project quality control, which is conducive to reducing manual errors. On the one hand, through data processing for the purpose of management and supervision, control based on construction quality and use risks is achieved. On the other hand, the risk prediction results obtained provide conditions for further reducing the consumption of supervision and management resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0041] Figure 1 A process diagram of a road engineering quality control method provided in an embodiment of this specification;

[0042] Figure 2 It is a schematic diagram of the structure of an electronic device in an embodiment of this specification. DETAILED DESCRIPTION

[0043] The present invention is further described in detail below by specific embodiments in conjunction with the accompanying drawings. Wherein similar elements in different embodiments adopt associated similar element numbers. In the following embodiments, many detailed descriptions are for making the present application better understood. However, those skilled in the art can easily recognize that some features can be omitted in different situations, or can be replaced by other elements, materials, methods. In some cases, some operations related to the present application are not shown or described in the specification, and this is to avoid the core part of the present application being overwhelmed by too much description, and for those skilled in the art, it is not necessary to describe these related operations in detail, and they can fully understand the related operations according to the description in the specification and the general technical knowledge in the art.

[0044] In addition, the features, operations or characteristics described in the specification can be combined in any appropriate manner to form various implementations. At the same time, the steps or actions in the method description can also be interchanged or adjusted in a manner that is obvious to those skilled in the art. Therefore, the various sequences in the specification and the drawings are only for the purpose of clearly describing a certain embodiment and are not meant to be a required sequence, unless otherwise specified that a certain sequence must be followed.

[0045] The serial numbers of the components in this document, such as "first", "second", etc., are only used to distinguish the objects described and do not have any order or technical meaning. The "connection" and "coupling" mentioned in this application, unless otherwise specified, include direct and indirect connections (couplings).

[0046] The technical solutions provided by various embodiments of the present application are described in detail below in conjunction with the accompanying drawings.

[0047] like Figure 1 As shown, the road engineering quality control method in this specification includes the following steps:

[0048] S100: Acquire a drawing file of a target road.

[0049] The drawing file in this manual is a digital file used to record and display the information of the target road, such as a CAD file, etc. The drawing file of the target road can be obtained by importing the file.

[0050] The road in this specification is composed of several road sections connected in sequence for vehicles to travel, and the target road is one of the roads. The target road in this specification is a road that has not yet been constructed or the construction has not been completed. At this stage, there is still the possibility of adjusting the structure and construction method of the road.

[0051] S102: Parse the drawing file to determine a first target area and a second target area of ​​the target road.

[0052] The area in this specification consists of one or more continuous road sections. The road sections can be divided manually or according to rules such as construction date, equal distance, etc.

[0053] The first target area in this specification is an area where the construction difficulty is greater than the preset difficulty coefficient. The construction difficulty in this specification is related to natural factors such as construction equipment, construction plan, and geographical environment. In an optional embodiment of this specification, the construction difficulty is negatively correlated with the lowest preset tolerance of the equipment used in the construction of the first target area to the construction environment (the tolerance can be determined according to the preset artificial rules, for example, according to the design of the target road, a certain section should be constructed using a crane, and the crane requires a certain arm space, so the tolerance of the construction environment is low. Another section uses a small excavator, and the small excavator does not require a large operating space, so the tolerance of the construction environment is high), negatively correlated with the construction speed expected in the first target area (the construction speed is set manually. For example, a certain section should be completed on a certain day, and the construction party can adjust the construction speed by adjusting the number of construction personnel, construction time, etc.), and positively correlated with the frequency of natural disasters in the geographical location of the first target area (the preset value can be obtained through historical observations, for example, the frequency of natural disasters in mountainous areas is relatively large). In this embodiment, information such as the degree of inclusion, construction speed, construction direction, and natural disaster frequency can be manually imported or read from other preset files.

[0054] The second target area in this specification is a high-incidence area of ​​accidents due to road conditions when the target road is built and the vehicle is traveling along the target road. For example, the frequency of accidents at the location of sharp turns will be relatively high. In an optional embodiment of this specification, the portion of the road section in the drawing file where the inclination angle is greater than a preset first angle threshold, or the turning angle of the road section is greater than a preset second angle threshold, can be determined as the second target area. In another optional embodiment of this specification, a road section with a high frequency of accidents in history can be determined as a high-risk road section, and the area where the road section in the target road has a similarity with the high-risk road section greater than a preset similarity threshold (which can be an empirical value) is located is used as a high-incidence area of ​​accidents.

[0055] The first target area determined by the method in this specification may not be unique, and the second target area may not be unique. The first target area and the second target area may or may not overlap.

[0056] S104: Predicting the construction risk of the target road based on the first target area.

[0057] This step achieves the quantification of construction risks through technical means. In the case where the first target area is not unique, the construction risk is positively correlated with the concentration of the first target area in the target road (the concentration can be obtained by clustering, and the k-means clustering algorithm can be used. k takes a certain specific value, which can be positively correlated with the total length of the target road and the number of lanes on the road. The fewer clusters obtained by clustering, the higher the concentration. The higher the concentration, the more concentrated the high-risk construction, and the possibility of a chain reaction between several high-risk accidents), and is positively correlated with the proportion of the first target area in the target road (that is, the ratio of the distance of the section covered by the first target area to the total distance of the target area), and is negatively correlated with the degree of traffic smoothness provided by other roads connected to the target road for driving to the first target area and the target road in the construction direction along the target road for driving to the first target area (the degree of smoothness is used to characterize the difficulty of taking rescue measures in the event of a risk accident. The greater the degree of smoothness, the easier the rescue).

[0058] In an optional embodiment of the present specification, the degree of smoothness is positively correlated with the maximum load weight of vehicles allowed to pass through the road section, positively correlated with the maximum loading height of vehicles allowed to pass through the road section, positively correlated with the number of one-way lanes on the road section, negatively correlated with the maximum turning angle of the road section, and negatively correlated with the maximum inclination angle of the road section.

[0059] In a further optional embodiment of the present specification, when there is only one first target area, the construction risk is negatively correlated with the degree of traffic smoothness provided by the target road for driving to the first target area in the construction direction along the target road.

[0060] Since the first target area is not unique, the construction risk can be predicted for each first target area separately, and then summed up to serve as the construction risk of the target road.

[0061] S106: Predicting the use risk of the target road based on the second target area.

[0062] The use risk in this specification is positively correlated with the frequency of vehicle accidents on the road section with the same road condition as the second target area in history. The road condition in this specification can be characterized by factors such as the maximum speed limit, the number of lanes, whether it contains two-way lanes, the road type (for example, highways, bridges, tunnels, etc.), the road slope, the turning angle, etc. When a certain element characterizing the road condition fluctuates within a preset threshold range, the road condition is deemed to be the same. The threshold range can be determined based on experience.

[0063] In the related art, the technical means for determining similarity are applicable to this specification when conditions permit.

[0064] Since the second target area may not be unique, the construction risk can be predicted for each second target area separately, and then summed up to serve as the use risk of the target road.

[0065] S108: If the construction risk is greater than a preset first risk threshold, and the use risk is greater than a preset second risk threshold, it is determined that the road engineering quality of the target road is at high risk.

[0066] The road engineering quality in this specification refers to problems caused by road design and road use, but does not include problems caused by malicious acts such as cutting corners.

[0067] The first risk threshold and the second risk threshold in this specification can both be empirical values. There is a high risk in the quality of road engineering, which may lead to serious losses in both construction and use. In this case, it is necessary to start from the design stage and redesign the road. For example, a straight section of the road can be adjusted to a curved section with a smaller slope to achieve control of the quality of the road engineering.

[0068] This specification provides a method for controlling the quality of road engineering. Based on the road structure and other information shown in the road drawing files, the construction risk and use risk of the road are predicted. Based on the prediction results, the quality of the road engineering can be evaluated predictively, whether it is the quality problems that may be caused by the construction or the risks that may be faced during the use. In addition, the method in this case replaces manual experience through technical means such as algorithms and scripts, and can achieve unified standards and the same management for the quality control of road engineering, which is conducive to reducing manual errors.

[0069] In addition, in an optional embodiment of the present specification, if the construction risk is not greater than a preset first risk threshold and the usage risk is greater than a preset second risk threshold, a first alarm is issued; the first alarm is used to prompt adjustments to the parameters of the target road (for example, the inclination angle, the maximum turning angle, etc.).

[0070] If the construction risk is greater than a preset first risk threshold and the usage risk is not greater than a preset second risk threshold, a second alarm is issued; the second alarm is used to prompt the construction sequence adjustment for the target road; the construction sequence adjustment includes: construction direction adjustment (for example, for a certain section of road, the original construction direction is from south to north, which can be adjusted to from north to south), and construction sequence adjustment of sections (for example, the original construction sequence is section a, section b, section c, which can be adjusted to section b, section c, section a).

[0071] If the construction risk is not greater than the preset first risk threshold, and the use risk is not greater than the preset second risk threshold, indicating that the design of the target road section is relatively reasonable, but the risk cannot be completely eliminated, then determine whether the overlap between the first target area and the second target area is greater than a preset overlap threshold (which can be an empirical value. Optionally, the overlap threshold can be positively correlated with the maximum distance between the cluster obtained by clustering the first target area and the cluster obtained by clustering the second target area. The larger the maximum distance, the smaller the correlation between construction and use). If so, a third alarm is issued; the third alarm is used to prompt manual adjustment of the range of one of the first target area and the second target area to reduce overlap, so as to re-predict the risk based on the adjusted result. If not, it is determined that there is no high risk in the road engineering quality of the target road.

[0072] The overlap between the first target area and the second target area may cause the risk of the overlapping area to be calculated repeatedly. This repeated calculation may cause the predicted risk to be too high, but it cannot completely rule out the possibility that the predicted risk is too low. The drawing file of the target road can be repeatedly modified through the road engineering quality control method in this specification to achieve the goal that the construction risk is not greater than the preset first risk threshold, the use risk is not greater than the preset second risk threshold, and the overlap between the first target area and the second target area is not greater than the preset overlap threshold.

[0073] Furthermore, this specification also provides a road engineering quality control device, the device comprising:

[0074] The acquisition module is configured to: acquire the drawing file of the target road;

[0075] The parsing module is configured to: parse the drawing file to determine a first target area and a second target area of ​​the target road; the first target area is an area where the construction difficulty is greater than a preset difficulty coefficient; the second target area is an area where accidents are likely to occur due to road conditions when vehicles travel along the target road when the target road is built;

[0076] A first prediction module is configured to: predict the construction risk of the target road based on the first target area; when the first target area is not unique, the construction risk is positively correlated with the concentration of the first target area in the target road, positively correlated with the proportion of the first target area in the target road, and negatively correlated with the degree of traffic smoothness provided by other roads connected to the target road for driving to the first target area and along the construction direction of the target road for driving to the first target area;

[0077] A second prediction module is configured to: predict the use risk of the target road based on the second target area; the use risk is positively correlated with the frequency of vehicle driving accidents on the road section with the same road condition as the second target area in history;

[0078] The judgment module is configured to: if the construction risk is greater than a preset first risk threshold, and the use risk is greater than a preset second risk threshold, determine that the road engineering quality of the target road is at high risk.

[0079] The device can execute the method in any of the aforementioned embodiments and can obtain the same or similar technical effects, which will not be described in detail here.

[0080] Figure 2 This is a schematic diagram of the structure of an electronic device according to an embodiment of the present application. Figure 2 At the hardware level, the electronic device includes a processor, and optionally also includes an internal bus, a network interface, and a memory. The memory may include a memory, such as a high-speed random access memory (RAM), and may also include a non-volatile memory (non-volatile memory), such as at least one disk storage. Of course, the electronic device may also include hardware required for other services.

[0081] The processor, network interface and memory can be interconnected through an internal bus, which can be an ISA (Industry Standard Architecture) bus, a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus. The bus can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 2 Only one bidirectional arrow is used in the diagram, but this does not mean that there is only one bus or only one type of bus.

[0082] The memory is used to store the program. Specifically, the program may include a program code, and the program code includes a computer operation instruction. The memory may include a memory and a non-volatile memory, and provides instructions and data to the processor.

[0083] The processor reads the corresponding computer program from the non-volatile memory into the memory and then runs it, forming a road engineering quality control device at the logical level. The processor executes the program stored in the memory and is specifically used to execute any of the above-mentioned road engineering quality control methods.

[0084] The above application Figure 1 A method for controlling the quality of road engineering disclosed in the illustrated embodiment can be applied to a processor or implemented by a processor. The processor may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by an integrated logic circuit of hardware in the processor or instructions in the form of software. The above processor may be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it may also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The methods, steps and logic block diagrams disclosed in the embodiments of the present application can be implemented or executed. The general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc. The steps of the method disclosed in conjunction with the embodiments of the present application can be directly embodied as being executed by a hardware decoding processor, or executed by a combination of hardware and software modules in a decoding processor. The software module can be located in a storage medium mature in the art such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory, or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory, and the processor reads the information in the memory and completes the steps of the above method in combination with its hardware.

[0085] The electronic device may also perform Figure 1 A road engineering quality control method is implemented Figure 1 The functions of the illustrated embodiment will not be described in detail in the embodiments of the present application.

[0086] An embodiment of the present application also proposes a computer-readable storage medium, which stores one or more programs, and the one or more programs include instructions. When the instructions are executed by an electronic device including multiple application programs, any one of the aforementioned road engineering quality control methods is executed.

[0087] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0088] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0089] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0090] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0091] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0092] The memory may include non-permanent storage in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0093] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0094] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0095] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.

[0096] The above is only an embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.

Claims

1. A method for controlling the quality of road engineering, characterized in that: The method comprises: Obtain the drawing file of the target road; The drawing file is parsed to determine a first target area and a second target area of ​​the target road; the first target area is an area where the construction difficulty is greater than a preset difficulty coefficient; the second target area is an area where accidents are likely to occur due to road conditions when vehicles travel along the target road when the target road is built; Based on the first target area, predict the construction risk of the target road; when the first target area is not unique, the construction risk is positively correlated with the concentration of the first target area in the target road, positively correlated with the proportion of the first target area in the target road, and negatively correlated with the degree of traffic smoothness provided by other roads connected to the target road for driving to the first target area and along the construction direction of the target road for driving to the first target area; Based on the second target area, predicting the use risk of the target road; the use risk is positively correlated with the frequency of vehicle driving accidents on the road section with the same road condition as the second target area in history; If the construction risk is greater than a preset first risk threshold, and the use risk is greater than a preset second risk threshold, it is determined that the road engineering quality of the target road is at high risk; The construction difficulty is negatively correlated with the minimum preset tolerance of the construction environment of the equipment used in the construction of the first target area, negatively correlated with the estimated construction speed of the first target area, and positively correlated with the frequency of natural disasters in the geographical location of the first target area; Determine, in the drawing file, a portion of the road section where the inclination angle is greater than a preset first angle threshold, or where the turning angle of the road section is greater than a preset second angle threshold, as the second target area; The degree of smoothness is positively correlated with the maximum load weight of vehicles allowed to pass on the road section, positively correlated with the maximum loading height of vehicles allowed to pass on the road section, positively correlated with the number of one-way lanes on the road section, negatively correlated with the maximum turning angle of the road section, and negatively correlated with the maximum tilt angle of the road section; If the construction risk is greater than the first risk threshold and the use risk is not greater than the second risk threshold, a second alarm is issued; the second alarm is used to prompt the construction sequence adjustment for the target road; the construction sequence adjustment includes: at least one of construction direction adjustment and construction sequence adjustment of road sections; If the construction risk is not greater than the first risk threshold, and the use risk is not greater than the second risk threshold, determining whether the overlap between the first target area and the second target area is greater than a preset overlap threshold; If yes, a third alarm is issued; the third alarm is used to prompt manual adjustment of the range of one of the first target area and the second target area, so as to re-perform risk prediction based on the adjusted result; If not, it is determined that there is no high risk in the road engineering quality of the target road.

2. The method according to claim 1, characterized in that: The method further comprises: In the case where the first target area is unique, the construction risk is negatively correlated with the degree of traffic smoothness provided by the target road for driving to the first target area in the construction direction along the target road.

3. The method according to claim 1, characterized in that: The method further comprises: If the construction risk is not greater than the first risk threshold and the use risk is greater than the second risk threshold, a first alarm is issued; the first alarm is used to prompt adjustment of parameters for the target road.

4. A road engineering quality control device, characterized in that: The device comprises: The acquisition module is configured to: acquire the drawing file of the target road; The parsing module is configured to: parse the drawing file to determine a first target area and a second target area of ​​the target road; the first target area is an area where the construction difficulty is greater than a preset difficulty coefficient; the second target area is an area where accidents are likely to occur due to road conditions when vehicles travel along the target road when the target road is built; A first prediction module is configured to: predict the construction risk of the target road based on the first target area; when the first target area is not unique, the construction risk is positively correlated with the concentration of the first target area in the target road, positively correlated with the proportion of the first target area in the target road, and negatively correlated with the degree of traffic smoothness provided by other roads connected to the target road for driving to the first target area and along the construction direction of the target road for driving to the first target area; A second prediction module is configured to: predict the use risk of the target road based on the second target area; the use risk is positively correlated with the frequency of vehicle driving accidents on the road section with the same road condition as the second target area in history; The judgment module is configured to: if the construction risk is greater than a preset first risk threshold, and the use risk is greater than a preset second risk threshold, determine that the road engineering quality of the target road is at high risk.

5. An electronic device, comprising: processor; as well as A memory arranged to store computer executable instructions, which when executed cause the processor to perform any of the methods of claims 1 to 3.