An NB-IoT smart water meter
By introducing a combination structure of spring and sealing ball into the smart water meter, the smart water meter can be quickly disassembled and installed, solving the problems of valve corrosion and water leakage during replacement in the existing technology, and improving the convenience of replacement and sealing performance.
Patent Information
- Application Number
- CN202311437192.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-01
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2043-11-01
AI Technical Summary
The replacement of existing NB-IoT smart water meters requires shutting off the water pipe valve, which can easily lead to valve corrosion and make the meters difficult to operate. In addition, the replacement process can easily cause water leakage and waste water resources.
A structure including a connecting component, a connecting component, a plugging component, and a blocking component is designed. Automatic sealing and unsealing are achieved using springs and sealing balls. The smart water meter can be quickly disassembled and installed by rotating the connecting sleeve, avoiding the need to adjust the water pipe valve.
It enables convenient disassembly and installation of smart water meters, avoids corrosion of water valves and waste of water resources, and ensures sealing and convenience during the replacement process.
Smart Images

Figure CN117629337B_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of smart water meter technology, and more specifically, to an NB-IoT smart water meter. Background Technology
[0002] Narrow Band Internet of Things (NB-IoT) has become an important branch of the Internet of Things. Built on cellular networks, NB-IoT consumes only about 180kHz of bandwidth and can be directly deployed on GSM, UMTS, or LTE networks to reduce deployment costs and enable smooth upgrades. NB-IoT is an emerging technology in the IoT field, supporting low-power devices for cellular data connections over wide-area networks, also known as Low Power Wide Area Network (LPWAN). NB-IoT supports efficient connections for devices with long standby times and high network connectivity requirements. It is said that NB-IoT devices can extend battery life by at least 10 years while providing very comprehensive indoor cellular data connectivity coverage. Smart water meters are a new type of water meter that uses modern microelectronics, modern sensing technology, and smart IC card technology to measure water consumption and transmit and settle water usage data.
[0003] Utility model patent CN110672177B discloses an NB-IoT smart water meter. This NB-IoT smart water meter reduces the stress at the connection between the connecting pipe and the fixed pipe through an auxiliary mechanism, preventing deformation of the threads that could affect the seal between the connecting pipe and the fixed pipe. Compared with existing auxiliary mechanisms, this auxiliary mechanism, through the cooperation of three auxiliary blocks and annular grooves, improves the stability of the connecting pipe installed on the fixed pipe based on the principle of triangle stability. Furthermore, a locking mechanism prevents water spraying during pressurized operation, thus avoiding moisture damage to surrounding objects. Compared with existing locking mechanisms, this locking mechanism uses water pressure as the driving force, employing a mechanical method, resulting in stronger anti-interference capabilities and higher practicality.
[0004] However, in actual use, although this structure improves the sealing and stability between the connecting pipe and the fixed pipe, when the water meter is damaged due to long-term use and needs to be replaced, the water in the water supply pipe needs to be shut off. Otherwise, water leakage will occur during the installation process. However, the valves on the water pipe are rarely adjusted, which makes them prone to corrosion. It is also difficult to operate when adjusting the opening and closing. Therefore, an NB-IoT Internet of Things smart water meter is proposed. Summary of the Invention
[0005] In order to overcome the above-mentioned defects of the prior art, the present invention provides an NB-IoT smart water meter to solve the problems mentioned in the background art.
[0006] To achieve the above objectives, the present invention provides the following technical solution: an NB-IoT smart water meter, comprising a smart water meter body and a display screen. The display screen is installed on the smart water meter body. Connectors are provided on both sides of the smart water meter body. Each connector is connected to a first connecting component. Each first connecting component is connected to a connecting component. A plug-in component is inserted into each connecting component. A blocking component is provided on one side of each connecting component. A connecting sleeve is sleeved on each blocking component. Each connecting sleeve is sleeved with one end of an adjacent connecting component. A second connecting component is connected to each blocking component. Springs are installed in both the connecting component and the blocking component. A sealing ball is welded to one end of each spring.
[0007] First, the connector welded to the end pipe of the closed valve is connected to the first connecting assembly. Then, the sealing ball with the welded spring is inserted into the first connecting assembly at one end of the spring. Then, the connecting assembly is sleeved on, so that the sealing ball is inserted into the first ball cavity to seal the first socket. After the above installation is completed at both ends of the smart water meter body, it is connected to the water pipe through the second connecting assembly. Then, the sealing ball with the welded spring is inserted into the second connecting assembly at one end of the spring. Then, the connecting blocking assembly is used to insert the sealing ball into the second ball cavity to seal the second socket. Then, the connecting sleeve is connected to the end of the connecting assembly to complete the installation of the water pipe and the meter, thus completing the first assembly. When the smart water meter body is damaged after long-term use and needs to be replaced, the connecting sleeve can be unscrewed to disconnect the connection of the connecting component. At this time, the sealing ball inside the blocking component is relieved by the force of the plug component, so that the spring returns to its original position and the sealing ball automatically seals the second plug hole, thereby automatically blocking the water transported in the water pipe. This eliminates the need to adjust the water valve on the water pipe, making disassembly more convenient. When replacing the smart water meter, close the valves installed on both end pipes. Then connect the connecting assembly and the first connecting assembly to the connector, aligning one end of the connecting assembly with one end of the blocking assembly. By rotating the connecting sleeve, the connecting sleeve is screwed onto the second locking tube, which moves closer to the second retaining ring, allowing the insertion tube to be inserted into the second socket. Both ends abut against the two sealing balls, and the two springs are compressed, thus connecting the first and second ball cavities through the insertion tube. After the smart water meter is installed, simply open the valve to use it. Throughout the replacement process, the water valve on the water pipe is not adjusted, making installation more convenient and ensuring reliable sealing to prevent leakage and thus avoid water waste.
[0008] Preferably, the first connecting component and the second connecting component have the same structure, and the first connecting component is used to connect and cooperate with one end of the smart water meter body, while the second connecting component is used to connect and cooperate with the water pipe.
[0009] Preferably, the first connecting component, the connecting component, the plugging component, the blocking component, the connecting sleeve, and the second connecting component together form a connecting mechanism, and the two connecting mechanisms are respectively connected and cooperated with both sides of the smart water meter body.
[0010] Preferably, the smart water meter body has end pipes on both sides, each end pipe has a connector welded to its end, each connector is connected to the corresponding first connecting component, and each end pipe has a valve installed on it.
[0011] Preferably, the first connecting component includes a connecting tube, one end of which is screwed into the connector.
[0012] A spiral tube, with one end welded to the other end of a connecting tube.
[0013] The first locking tube is welded to the other end of the spiral tube, and the first locking tube is connected and engaged with the connecting component.
[0014] Preferably, the connecting component includes a first sleeve, one end of which is fitted onto a first locking tube.
[0015] A connecting pipe, one end of which is welded to the other end of the first sleeve.
[0016] The second locking tube is welded at one end to the other end of the connecting tube, and the second locking tube is connected and fitted with the connecting sleeve.
[0017] Preferably, the insertion assembly includes a tube, which is inserted into the connecting pipe, and both ends of the tube have water inlets.
[0018] A baffle plate is welded to one end of the insertion tube inside the connecting tube.
[0019] The first retaining ring is welded to the insert inside the second locking tube.
[0020] Preferably, the blocking assembly includes a blocking tube, which is inserted into the connecting sleeve.
[0021] The second retaining ring is welded to one end of the blocking tube and is located inside the connecting sleeve.
[0022] The connector is welded to the middle of one end of the blocking tube and is inserted into the second locking tube.
[0023] The second sleeve is welded to the other end of the blocking tube, and the second sleeve is inserted into the second connecting assembly.
[0024] Preferably, a first ball cavity is formed inside the connecting tube, a first insertion hole is formed at one end of the first ball cavity, a connecting groove is formed on one side of the first insertion hole, and a spring is inserted into the first ball cavity. The inner diameter of the first ball cavity is larger than the diameter of the sealing ball, the diameter of the sealing ball is larger than the diameter of the first insertion hole, and the insertion tube is inserted into the first insertion hole. The insertion connector is inserted into the connecting groove.
[0025] Preferably, a second ball cavity is formed inside the blocking tube, a second insertion hole is formed on one side of the second ball cavity, and a spring is inserted into the second ball cavity. The inner diameter of the second ball cavity is opposite to that of the first ball cavity, and the inner diameter of the second insertion hole is the same as that of the first insertion hole.
[0026] The technical effects and advantages of this invention are as follows: The smart water meter is connected and cooperated with the first connecting component, the connecting component, and the plugging component. The blocking component and the second connecting component are connected and cooperated with the water pipe. A matching connecting sleeve is installed between the connecting component and the blocking component. Compared with the prior art, when replacing the smart water meter, you only need to rotate the connecting sleeve to install the smart water meter on the water pipe for water usage detection. Disassembly is convenient and installation is simple. By installing springs and sealing balls inside the connecting and blocking components, and installing a plug-in component inside the connecting component, compared with the prior art, when the smart water meter is removed, the sealing ball inside the blocking component loses the force of the plug-in component, allowing the spring to rebound and support the sealing ball, thereby blocking the water transported in the water pipe. Therefore, when replacing the smart water meter, it is not necessary to adjust the water valve on the water pipe, thus avoiding the impact of water valve corrosion, improving the convenience of replacement, preventing water outflow, providing reliable sealing, and avoiding water waste. When installing the smart water meter, the plug-in component can connect the two sealing balls, so that the water pipe and the smart water meter are automatically connected, enabling the smart water meter to automatically detect water consumption. By installing valves on both ends of the smart water meter, compared with existing technologies, the installation process can avoid water being directly supplied to the water meter after installation on one end, and instead, water is discharged from the end pipe on the other end, thus preventing leakage and facilitating water use control. Attached Figure Description
[0027] Figure 1 This is a schematic diagram of the overall structure of the present invention.
[0028] Figure 2 This is a schematic diagram of the structure at both ends of the smart water meter of the present invention.
[0029] Figure 3 This is a schematic diagram of the overall structure of the connecting mechanism of the present invention.
[0030] Figure 4 This is a schematic diagram of the cross-sectional structure of the connection mechanism of the present invention.
[0031] Figure 5 This is a schematic diagram of the structure of the first connecting component of the present invention.
[0032] Figure 6 This is a schematic diagram of the cross-sectional structure of the connecting component of the present invention.
[0033] Figure 7 This is a schematic diagram of the cross-sectional structure of the blocking component of the present invention.
[0034] Figure 8 This is a schematic diagram of the plug-in assembly of the present invention.
[0035] The attached figures are labeled as follows: 1. Smart water meter body; 2. Display screen; 3. Connector; 4. First connecting component; 401. Connecting pipe; 402. Swivel pipe; 403. First locking pipe; 5. Connecting component; 501. First sleeve; 502. Connecting pipe; 503. Second locking pipe; 6. Insertion component; 601. Insertion pipe; 602. Baffle plate; 603. First retaining ring; 7. Blocking component; 701. Blocking pipe; 702. Second retaining ring; 703. Plug; 704. Second sleeve; 8. Connecting sleeve; 9. Second connecting component; 10. End pipe; 11. Valve; 12. Spring; 13. Sealing ball; 14. First ball cavity; 15. First insertion hole; 16. Connecting groove; 17. Second ball cavity; 18. Second insertion hole. Detailed Implementation
[0036] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0037] As attached Figure 1-8The NB-IoT smart water meter shown includes a smart water meter body 1 and a display screen 2. The display screen 2 is installed on the smart water meter body 1. Connectors 3 are provided on both sides of the smart water meter body 1. Each connector 3 is connected to a first connecting component 4. Each first connecting component 4 is connected to a connecting component 5. Each connecting component 5 has a plug-in component 6 inserted into it. Each connecting component 5 has a blocking component 7 on one side. Each blocking component 7 has a connecting sleeve 8 sleeved on it. Each connecting sleeve 8 is sleeved with one end of the adjacent connecting component 5. Each blocking component 7 is connected to a second connecting component 9. Springs 12 are installed in both the connecting component 5 and the blocking component 7. A sealing ball 13 is welded to one end of each spring 12. The first connecting component 4 and the second connecting component 9 are connected to each other. The connecting components 9 have the same structure, and the first connecting component 4 is used to connect and cooperate with one end of the smart water meter body 1, and the second connecting component 9 is used to connect and cooperate with the water pipe. The first connecting component 4, the connecting component 5, the plugging component 6, the blocking component 7, the connecting sleeve 8, and the second connecting component 9 together form a connecting mechanism. The two connecting mechanisms are respectively connected and cooperated with both sides of the smart water meter body 1. Both sides of the smart water meter body 1 are provided with end pipes 10, and each end pipe 10 is welded with a connector 3. Each connector 3 is respectively connected and cooperated with the corresponding first connecting component 4. A valve 11 is installed on each end pipe 10. By closing the valve 11, the connector 3 welded on the end pipe 10 is first connected to the first connecting component 4, and then the sealing ball 13 with the welded spring 12 is connected. One end of the spring 12 is inserted into the first connecting component 4, and then the connecting component 5 is sleeved on, so that the sealing ball 13 is inserted into the first ball cavity 14 to seal the first socket 15. After the above installation is completed at both ends of the smart water meter body 1, it is connected to the water pipe through the second connecting component 9. Then, the sealing ball 13 with the spring 12 welded on is inserted into the second connecting component 9 at one end of the spring 12. Then, with the cooperation of the connecting blocking component 7, the sealing ball 13 is inserted into the second ball cavity 17 to seal the second socket 18. Then, the connecting sleeve 8 is connected to the end of the connecting component 5 to complete the installation of the water pipe and the meter, thus completing the initial assembly. When the smart water meter body 1 is damaged and needs to be replaced after long-term use, the connecting sleeve 8 can be unscrewed directly. When the connection of the connecting component 5 is disconnected, the sealing ball 13 inside the blocking component 7 is relieved by the force of the insertion component 6, thereby causing the spring 12 to return to its original position. The sealing ball 13 automatically seals the second insertion hole 18, thus automatically blocking the water transported in the water pipe. This eliminates the need to adjust the water valve on the water pipe, making disassembly more convenient. When replacing the smart water meter, close the valves 11 installed on both end pipes 10, and then connect the connected component 5 and the first connecting component 4 to the connector 3. Align one end of the connecting component 5 with one end of the blocking component 7, and rotate the connecting sleeve 8 to screw it onto the second locking tube 503. The second locking tube 503 moves closer to the second retaining ring 702.This allows the insertion tube 601 to be inserted into the second socket 18, with both ends abutting against the two sealing balls 13. The two springs 12 are compressed, thus connecting the first ball cavity 14 and the second ball cavity 17 via the insertion tube 601. After the smart water meter is installed, it can be used simply by opening the valve 11. Throughout the entire replacement process, the water valve on the water pipe was not adjusted, making installation more convenient. Simultaneously, it ensures reliable sealing, preventing leakage and thus avoiding water waste.
[0038] As attached Figure 5 As shown, the first connecting component 4 includes a connecting tube 401, one end of which is screwed into the connector 3.
[0039] Rotary tube 402, one end of which is welded to the other end of connecting tube 401.
[0040] The first locking tube 403 is welded to the other end of the spiral tube 402, and the first locking tube 403 is connected and engaged with the connecting component 5.
[0041] The connecting pipe 401 is designed to connect with the connector 3, allowing the first connecting component 4 to communicate with the inside of the smart water meter. The rotating pipe 402 has a regular hexagonal structure on the outside, which facilitates the rotation of the first connecting component 4 and makes it easier to use tools, thus improving the stability of the installation of the first connecting component 4. The first locking pipe 403 is designed to connect and cooperate with the connecting component 5 and support one end of the spring 12, so that the spring 12 and the sealing ball 13 are installed inside the connecting component 5.
[0042] As attached Figure 6 As shown, the connecting component 5 includes a first sleeve 501, one end of which is sleeved on the first locking tube 403.
[0043] The connecting pipe 502 is welded at one end to the other end of the first sleeve 501.
[0044] The second locking tube 503 is welded at one end to the other end of the connecting tube 502, and the second locking tube 503 is connected and engaged with the connecting sleeve 8.
[0045] The first sleeve 501 is provided to connect and cooperate with the first locking tube 403, the connecting tube 502 is provided to hold the spring 12 and the sealing ball 13, and the second locking tube 503 is provided to connect and cooperate with the connecting sleeve 8, thereby connecting the connecting component 5 and the blocking component 7.
[0046] As attached Figure 8 As shown, the plug-in assembly 6 includes a plug tube 601, which is plugged into the connecting pipe 502, and both ends of the plug tube 601 are provided with water inlets.
[0047] A baffle plate 602 is welded to one end of the insertion tube 601 located inside the connecting tube 502.
[0048] The first retaining ring 603 is welded to the insertion tube 601 located inside the second locking tube 503.
[0049] By setting the insertion tube 601, when the connecting component 5 and the blocking component 7 are connected, the first retaining ring 603 can be moved by the pressure at one end of the blocking component 7, so that the sealing balls 13 connected at both ends are moved by force, thereby compressing the springs 12 connected to each other, so that the water pipe is connected to the smart water meter.
[0050] As attached Figure 7 As shown, the blocking component 7 includes a blocking tube 701, which is inserted into the connecting sleeve 8.
[0051] The second retaining ring 702 is welded to one end of the blocking tube 701 and is located inside the connecting sleeve 8.
[0052] The connector 703 is welded to the middle of one end of the blocking tube 701 and is inserted into the second locking tube 503.
[0053] The second sleeve 704 is welded to the other end of the blocking tube 701, and the second sleeve 704 is inserted into the second connecting component 9.
[0054] The second retaining ring 702 is designed so that when the connecting sleeve 8 is fitted onto the blocking tube 701 and connected to the second locking tube 503, the second retaining ring 702 can be squeezed to improve the sealing between the blocking tube 701 and the second locking tube 503, and at the same time improve the sealing between the connecting sleeve 8 and the second retaining ring 702. The plug connector 703 is designed so that the first retaining ring 603 can be squeezed and cooperate with the connecting groove 16, improving the sealing between the blocking component 7 and the connecting component 5, while allowing the plug tube 601 to move under force, so that both ends of the plug tube 601 can support the sealing ball 13. The second sleeve 704 is designed so that it can be connected and cooperated with the second connecting component 9, thereby connecting to the water pipe.
[0055] As attached Figure 4 , Figure 5 , Figure 6 , Figure 7 and Figure 8As shown, a first ball cavity 14 is formed inside the connecting tube 502. A first insertion hole 15 is formed at one end of the first ball cavity 14. A connecting groove 16 is formed on one side of the first insertion hole 15. A spring 12 is inserted into the first ball cavity 14. The inner diameter of the first ball cavity 14 is larger than the diameter of the sealing ball 13. The diameter of the sealing ball 13 is larger than the diameter of the first insertion hole 15. The insertion tube 601 is inserted into the first insertion hole 15. The insertion connector 703 is inserted into the connecting groove 16. A second ball cavity 17 is formed inside the blocking tube 701. A second insertion hole 18 is formed on one side of the second ball cavity 17. A spring 12 is inserted into the second ball cavity 17. The inner diameter of the second ball cavity 17 is opposite to the inner diameter of the first ball cavity 14. The inner diameter of the second insertion hole 18 is the same as that of the first insertion hole 15.
[0056] The working principle of this invention is as follows: When this NB-IoT smart water meter is installed on a water pipe, the connector 3 welded to the end pipe 10 of the closed valve 11 is first connected to the first connecting component 4. Then, the sealing ball 13 with the spring 12 welded to it is inserted into the first connecting component 4 at one end of the spring 12. Then, the connecting component 5 is sleeved on it, so that the sealing ball 13 is inserted into the first ball cavity 14, sealing the first socket 15. After the above installation is completed at both ends of the smart water meter body 1, it is connected to the water pipe through the second connecting component 9. Then, the sealing ball 13 with the spring 12 welded to it is inserted into the second connecting component 9 at one end of the spring 12. Then, the connecting blocking component 7 is used to insert the sealing ball 13 into the second ball cavity 17, sealing the second socket 18. Then, the connecting sleeve 8 is used to connect to the end of the connecting component 5 to complete the installation of the water pipe and the meter, thus completing the first assembly. When the smart water meter body 1 is damaged after long-term use and needs to be replaced, the connecting sleeve 8 can be unscrewed to disconnect the connection of the connecting component 5. At this time, the sealing ball 13 inside the blocking component 7 is relieved by the force of the plugging component 6, thereby causing the spring 12 to return to its original position. The sealing ball 13 automatically seals the second plug hole 18, thereby automatically blocking the water transported in the water pipe. This eliminates the need to adjust the water valve on the water pipe, making disassembly more convenient. When replacing the smart water meter, close the valves 11 installed on the two end pipes 10, then connect the connecting component 5 and the first connecting component 4 to the connector 3, align one end of the connecting component 5 with one end of the blocking component 7, and rotate the connecting sleeve 8 to screw it onto the second locking tube 503. The second locking tube 503 moves closer to the second retaining ring 702, so that the insertion tube 601 is inserted into the second insertion hole 18, with both ends pressing against the two sealing balls 13 respectively. The two springs 12 are compressed, so that the first ball cavity 14 and the second ball cavity 17 are connected by the insertion tube 601. After the smart water meter is installed, simply open the valve 11 to use it. Throughout the replacement process, the water valve on the water pipe is not adjusted, making the installation more convenient. At the same time, it can have reliable sealing to prevent leakage and thus avoid water waste.
[0057] This invention facilitates the disassembly and installation of smart water meters, thereby simplifying their maintenance. Furthermore, during installation, there is no need to adjust the water valves on the water pipes, preventing corrosion and adjustment difficulties caused by long-term installation. The invention also automatically blocks water flow within the pipes during installation, preventing leakage and water waste. These advantages make the smart water meter easy to maintain.
[0058] Finally, the following points should be noted: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installation", "connection", and "linkage" should be interpreted broadly, and can be mechanical or electrical connections, or internal connections between two components, or direct connections. "Up", "down", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may change. Secondly: The accompanying drawings of the embodiments disclosed in this invention only involve the structures involved in the embodiments disclosed in this invention. Other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of this invention can be combined with each other. In conclusion, the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. An NB-IoT smart water meter, comprising a smart water meter body (1) and a display screen (2), wherein the display screen (2) is mounted on the smart water meter body (1), characterized in that: The smart water meter body (1) is provided with connectors (3) on both sides. Each connector (3) is connected to a first connecting component (4). Each first connecting component (4) is connected to a connecting component (5). Each connecting component (5) is inserted with a plug-in component (6). Each connecting component (5) is provided with a blocking component (7) on one side. Each blocking component (7) is fitted with a connecting sleeve (8). Each connecting sleeve (8) is fitted with one end of the adjacent connecting component (5). Each blocking component (7) is connected with a second connecting component (9). Each connecting component (5) and blocking component (7) is installed with a spring (12). Each end of the spring (12) is welded with a sealing ball (13). The first connecting component (4), the connecting component (5), the plugging component (6), the blocking component (7), the connecting sleeve (8) and the second connecting component (9) together form a connecting mechanism, and the two connecting mechanisms are respectively connected and cooperated with the two sides of the smart water meter body (1); The first connecting component (4) includes a connecting tube (401), one end of which is screwed into the connector (3); A spiral tube (402), one end of which is welded to the other end of a connecting tube (401); The first locking tube (403) is welded to the other end of the spiral tube (402), and the first locking tube (403) is connected and cooperated with the connecting component (5); The connecting component (5) includes a first sleeve (501), one end of which is sleeved on the first locking tube (403); A connecting pipe (502), one end of which is welded to the other end of the first sleeve (501); The second locking tube (503) is welded at one end to the other end of the connecting tube (502), and the second locking tube (503) is connected and cooperated with the connecting sleeve (8); The plug-in assembly (6) includes a plug tube (601), which is plugged into the connecting pipe (502), and both ends of the plug tube (601) are provided with water inlets; A baffle (602) is welded to one end of an insertion tube (601) located inside a connecting tube (502); The first retaining ring (603) is welded to the insertion tube (601) located inside the second locking tube (503); The blocking assembly (7) includes a blocking tube (701), which is inserted into the connecting sleeve (8); The second retaining ring (702) is welded to one end of the blocking tube (701) and is located inside the connecting sleeve (8); A plug (703) is welded to the middle of one end of the blocking tube (701) and is plugged into the second locking tube (503); The second sleeve (704) is welded to the other end of the blocking tube (701), and the second sleeve (704) is inserted into the second connecting assembly (9).
2. The NB-IoT smart water meter according to claim 1, characterized in that: The first connecting component (4) and the second connecting component (9) have the same structure. The first connecting component (4) is used to connect and cooperate with one end of the smart water meter body (1), and the second connecting component (9) is used to connect and cooperate with the water pipe.
3. The NB-IoT smart water meter according to claim 2, characterized in that: The smart water meter body (1) has end pipes (10) on both sides, and each end pipe (10) has a connector (3) welded to its end. Each connector (3) is connected to the corresponding first connection component (4), and each end pipe (10) has a valve (11) installed on it.
4. The NB-IoT smart water meter according to claim 3, characterized in that: The connecting tube (502) has a first ball cavity (14) inside, a first insertion hole (15) is provided at one end of the first ball cavity (14), a connecting groove (16) is provided on one side of the first insertion hole (15), and a spring (12) is inserted into the first ball cavity (14). The inner diameter of the first ball cavity (14) is larger than the diameter of the sealing ball (13), the diameter of the sealing ball (13) is larger than the diameter of the first insertion hole (15), and the insertion tube (601) is inserted into the first insertion hole (15). The insertion connector (703) is inserted into the connecting groove (16).
5. The NB-IoT smart water meter according to claim 4, characterized in that: The blocking tube (701) has a second ball cavity (17) inside, and a second insertion hole (18) is provided on one side of the second ball cavity (17). A spring (12) is inserted into the second ball cavity (17). The inner diameter of the second ball cavity (17) is opposite to the inner diameter of the first ball cavity (14). The inner diameter of the second insertion hole (18) is the same as that of the first insertion hole (15).
Citation Information
Patent Citations
An NB-IoT smart water meter
CN110672177B
Buffer water meter capable of resisting water hammer impact based on moving piston
CN114001788A
Water meter capable of automatic disconnection
CN208921216U
Intelligent water meter based on wireless communication
CN214200259U