A novel hybrid energy storage configuration method and system for black start power supply

Through probabilistic modeling and local mode decomposition methods, a typical black-start scenario is constructed to balance the fluctuations in new energy output and configure a hybrid energy storage system, which solves the problem of insufficient black-start power response capability in power systems with a high proportion of new energy and achieves Efficient and economical black-start power supply configuration reduces the risk of failure.

CN117650560BActive Publication Date: 2024-10-01DEZHOU POWER SUPPLY COMPANY OF STATE GRID SHANDONG ELECTRIC POWER +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410080268.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-18
Publication Date
2024-10-01
Estimated Expiration
2044-01-18

AI Technical Summary

Technical Problem

In power systems with a high proportion of new energy, when energy storage equipment is used as a black-start power supply, it is difficult to meet the requirements for fast response and frequency stability, resulting in an increased risk of black-start failure.

Method used

Using probabilistic modeling and local mode decomposition methods to construct a typical black start scenario, the hybrid energy storage system balances the fluctuations in new energy output, improves the load capacity and inertial response capabilities of the black start power supply, and configures the rated ratings of supercapacitors and lithium batteries. Power and capacity, virtual inertia control is introduced to improve system responsiveness.

Benefits of technology

It improves the utilization efficiency and technical economy of hybrid energy storage, reduces configuration costs, enhances the reliability and rapid response capabilities of black-start power supplies, and meets the black-start needs of new energy stations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117650560B_ABST
    Figure CN117650560B_ABST
Patent Text Reader

Abstract

The present invention discloses a hybrid energy storage configuration method and system for a novel black start power supply, including: collecting wind power and photovoltaic historical output data of new energy stations, dividing the output period and the black start execution period, and establishing a wind power and photovoltaic joint probability distribution model based on the Copula function; taking a typical black start scenario as the original input signal, and using the local mode decomposition method to obtain the RLMD decomposition of the new energy output; dividing the high-frequency and low-frequency boundaries of the decomposed signal under each single scenario, and calculating the hybrid energy storage value function; selecting the hybrid energy storage configuration scheme corresponding to the minimum value of the hybrid energy storage value function as the optimal power capacity configuration scheme; performing non-parametric kernel density modeling on the hybrid energy storage inertia response demand data, and determining the hybrid energy storage inertia demand configuration according to the cumulative probability distribution function curve. The present invention can improve the utilization efficiency of hybrid energy storage and reduce the configuration cost at the same time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of black start power supply planning, and in particular to a hybrid energy storage configuration method and system for a novel black start power supply. Background Art

[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.

[0003] In recent years, with the interconnection of large power grids, the connection between regional power grids has become increasingly close. After a power outage occurs, it is easy to cause chain failures, expand the scale of power outages, and aggravate social losses. At the same time, the penetration rate of new energy continues to increase, and the dynamic behavior of the power system is becoming more and more complex. Due to various factors such as natural disasters, equipment failures, operator misoperation, protection refusal and misoperation, and even network attacks, power outages are frequent, and the risk of large power outages continues to rise. As the main measure after a large power outage, power system restoration can quickly and effectively restore power supply and minimize the losses caused by power outages. Black start is the first link in power system restoration. The safe and rapid black start can effectively improve the recovery rate and reduce economic losses. Large hydropower units and pumped storage power stations can be used as black start power sources due to their large capacity and ability to start quickly. However, due to the uneven distribution of regional water resources and seasonal characteristics, hydropower units and pumped storage power stations have certain limitations as black start power sources and cannot meet the needs of flexible recovery; large thermal power units can also be used as conventional black start power sources, but their hot start time is long and cannot meet the needs of black start rapid recovery.

[0004] In areas where new energy accounts for a high proportion, new energy power generation such as wind power and photovoltaics have certain rapid self-starting capabilities with the assistance of energy storage equipment due to their own characteristics. Therefore, using large-scale new energy stations as black start power sources has become a development trend to build black start capabilities in power systems with a high proportion of new energy.

[0005] Energy storage equipment plays an extremely important role in starting the auxiliary loads of conventional thermal power units as a black start power source at large-scale new energy stations. Large-capacity energy storage can balance the fluctuations in new energy output and provide a stable power supply for black start loads; starting the auxiliary equipment of thermal power units will instantly generate a large unbalanced power, and the power grid using new energy generation as a black start power source lacks the physical inertia support of synchronous machines, making it difficult to respond quickly to frequency. The rapid drop in frequency will cause the relay protection device to operate, causing black start failure. Summary of the invention

[0006] In order to solve the above problems, the present invention proposes a hybrid energy storage configuration method and system for a new black start power supply, which considers the randomness of renewable energy power generation and the black start execution period, constructs a typical black start period scenario based on a probability modeling method, and adopts a local mode decomposition method to analyze the output characteristics of renewable energy power generation under multiple scenarios; considers the load capacity, balances the output fluctuation of renewable energy through a hybrid energy storage system, and improves the load capacity of the black start power supply; considers the inertial response capability, analyzes and configures the inertia demand of the hybrid energy storage system, and improves the inertial response capability of the black start power supply to the black start load.

[0007] In some embodiments, the following technical solutions are adopted:

[0008] A novel hybrid energy storage configuration method for a black start power supply, comprising:

[0009] Collect historical output data of wind power and photovoltaic power plants at new energy stations, divide the output period and black start execution period, and establish a joint probability distribution model of wind power and photovoltaic power plants based on Copula function;

[0010] The wind power and photovoltaic output data included in the black start execution period are time-series arranged and combined and scene clustered to obtain a typical black start scenario;

[0011] The typical black start scenario is used as the original input signal, and the local mode decomposition method is used to obtain the RLMD decomposition of the renewable energy output;

[0012] For each single scenario, the RLMD decomposition signal is divided into high-frequency and low-frequency boundaries, the rated power and capacity of the supercapacitor are determined based on the high-frequency part, the rated power and capacity of the lithium battery are determined based on the low-frequency part, and the hybrid energy storage value function is calculated; the hybrid energy storage configuration scheme corresponding to the minimum value of the hybrid energy storage value function is selected as the optimal power capacity configuration scheme;

[0013] Determine the hybrid energy storage inertia response demand, perform non-parametric kernel density modeling on the hybrid energy storage inertia response demand data, and determine the hybrid energy storage inertia demand configuration based on the cumulative probability distribution function curve.

[0014] In other embodiments, the following technical solutions are adopted:

[0015] A new type of hybrid energy storage configuration system for black start power supply, including:

[0016] The data acquisition module is used to collect historical output data of wind power and photovoltaic power plants at new energy stations, divide the output period and black start execution period, and establish a joint probability distribution model of wind power and photovoltaic power plants based on Copula functions;

[0017] The scenario clustering module is used to perform time series arrangement and scenario clustering on the wind power and photovoltaic output data included in the black start execution period to obtain a typical black start scenario;

[0018] The data decomposition module is used to use the typical black start scenario as the original input signal and use the local mode decomposition method to obtain the RLMD decomposition of the new energy output;

[0019] The hybrid energy storage capacity configuration module is used to divide the high-frequency and low-frequency boundaries of the RLMD decomposition signal in each single scenario, determine the rated power and capacity of the supercapacitor based on the high-frequency part, determine the rated power and capacity of the lithium battery based on the low-frequency part, and calculate the hybrid energy storage value function; select the hybrid energy storage configuration scheme corresponding to the minimum value of the hybrid energy storage value function as the optimal power capacity configuration scheme;

[0020] The hybrid energy storage inertia configuration module is used to determine the hybrid energy storage inertia response demand, perform non-parametric kernel density modeling on the hybrid energy storage inertia response demand data, and determine the hybrid energy storage inertia demand configuration according to the cumulative probability distribution function curve.

[0021] In other embodiments, the following technical solutions are adopted:

[0022] A terminal device comprises a processor and a memory, wherein the processor is used to implement instructions; the memory is used to store a plurality of instructions, wherein the instructions are suitable for being loaded by the processor and executing the hybrid energy storage configuration method of the black start power supply.

[0023] In other embodiments, the following technical solutions are adopted:

[0024] A computer-readable storage medium stores a plurality of instructions, wherein the instructions are suitable for being loaded by a processor of a terminal device and executing the above-mentioned hybrid energy storage configuration method for a black start power supply.

[0025] Compared with the prior art, the present invention has the following beneficial effects:

[0026] (1) Aiming at the problem of insufficient power support capacity of large-scale new energy stations transformed into black start power sources, the present invention considers the randomness of new energy power generation, constructs typical wind and solar output scenarios based on the probabilistic modeling method, and adopts the local mode decomposition method to analyze the new energy output characteristics; this process fully considers the randomness of new energy output and the uncertainty of the black start period, so that the energy storage configuration is more in line with the black start requirements of new energy stations; by constructing the RLMD decomposition set of typical scenarios, high-frequency and low-frequency power components are decomposed therefrom, and the power capacity of hybrid energy storage is configured accordingly, which can improve the utilization efficiency of hybrid energy storage, reduce the configuration cost, and improve the technical and economic performance while ensuring reliability.

[0027] (2) The present invention takes into account the system load capacity requirements, balances the fluctuation of new energy output through a hybrid energy storage system, and improves the load capacity of the black start power supply; takes into account the system inertial response requirements, analyzes the inertial response requirements of the hybrid energy storage, introduces virtual inertia control to the hybrid energy storage system, and improves the inertial response capability of the black start power supply to the black start load.

[0028] Other features and advantages of additional aspects of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] Figure 1 It is a flow chart of a hybrid energy storage configuration method of a black start power supply in an embodiment of the present invention;

[0030] Figure 2 A diagram of steps for generating a typical black start scenario in an embodiment of the present invention;

[0031] Figure 3 A schematic diagram of a black start execution period in an embodiment of the present invention;

[0032] Figure 4 This is a scene clustering flow chart in an embodiment of the present invention;

[0033] Figure 5 A flow chart of optimizing configuration of a hybrid energy storage system in an embodiment of the present invention;

[0034] Figure 6 A topological diagram of a black start system based on hybrid energy storage in an embodiment of the present invention;

[0035] Figure 7 It is a flow chart of inertia configuration of the hybrid energy storage system in an embodiment of the present invention. DETAILED DESCRIPTION

[0036] It should be noted that the following detailed descriptions are illustrative and are intended to provide further explanation of the present application. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present application belongs.

[0037] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0038] Embodiment 1

[0039] In one or more embodiments, a novel hybrid energy storage configuration method for a black start power supply is disclosed, combining Figure 1 , specifically including the following process:

[0040] S101: Collect historical output data of wind power and photovoltaic power plants at new energy stations, divide the output period and black start execution period, and establish a wind power and photovoltaic joint probability distribution model based on a hybrid Copula function;

[0041] Specifically, combined Figure 2 , collect historical output data of new energy stations, and divide them into time periods and black start execution stages.

[0042] Among them, the output time period is divided into i (i = 1, 2, ..., I), and only the output data corresponding to each time period is retained to form the output data set Φ[x i ,y i ], x i ,y i Represent the wind power and photovoltaic output vectors in time period i, N is the number of sampling days. The black start execution phase is divided into m (m = 1, 2, ..., M), each phase contains r output periods, and satisfies M × r = I, such as Figure 3 shown.

[0043] Probability distribution fitting is performed on the data in each time period, and the marginal probability distribution function is calculated based on the fitted marginal probability density function.

[0044]

[0045]

[0046] in, are the marginal probability density functions of wind power and photovoltaic power in time period i, They are the marginal probability distribution functions corresponding to wind power and photovoltaic power in time period i respectively.

[0047] In this embodiment, the process of selecting the optimal mixed Copula function is as follows:

[0048] S1011: Based on the scatter plot of wind power output and photovoltaic output, determine the symmetry of wind and photovoltaic output and make a preliminary selection of the full-time hybrid Copula function.

[0049] C(u i ,v i )=ω1C1(u i ,v i )+ω2C2(u i ,v i ) (3)

[0050] Among them, C(u i ,v i ) represents the candidate mixed Copula probability distribution function, u i ,v i They represent the normalized variables corresponding to wind power and photovoltaic power, respectively, C1(u i ,v i ), C2(u i ,v i ) represent the Copula functions in the elliptic cluster and the Archimedean cluster, ω1 and ω2 are the weights corresponding to C1 and C2, and ω1+ω2=1. By adjusting the values ​​of ω1 and ω2, the mixed Copula function can well describe different degrees of correlation.

[0051] S1012: Use the maximum likelihood estimation method to estimate the parameters of each selected Copula function.

[0052] The estimated function is:

[0053]

[0054] Where: θ is the Copula function parameter; T is the total number of samples, T = N × I; c(u i ,v i ; θ) is the candidate mixed Copula probability density function. The correlation control parameter θ of each Copula function is obtained through parameter estimation, and then the expression of each Copula function is obtained.

[0055] S1013: Calculate the Euclidean distance between the empirical Copula function and the candidate Copula function, and select the candidate Copula function with the smallest distance as the optimal fitting Copula function.

[0056]

[0057] in, is the empirical Copula function, which can be selected according to the needs; C(u i ,v i ) is a candidate Copula function.

[0058] S1014: Establishing a wind-solar joint probability distribution model based on the selected optimal hybrid Copula function.

[0059]

[0060] Among them, F i (x i ,y i) is the joint probability distribution function of wind power and photovoltaic power output in time period i, C(·) is the mixed Copula function, They are the marginal probability distribution functions corresponding to wind power and photovoltaic output respectively.

[0061] S102: performing time series arrangement and scene clustering on the wind power and photovoltaic output data included in the black start execution period to obtain a typical black start scene;

[0062] Specifically, combined Figure 4 , the wind power and photovoltaic output data in each time period are generated by the Monte Carlo sampling method. In each black start execution stage m, the wind power and photovoltaic output data in the included time period are arranged and combined in time series to generate a wind-solar joint output scenario.

[0063] The wind-solar joint output scenario set Ω generated during the black start execution phase is clustered, and finally a typical black start scenario set Γ is generated.

[0064] S103: taking a typical black start scenario as an original input signal, and using a local mode decomposition method to obtain an RLMD decomposition of the output of renewable energy;

[0065] In this embodiment, a typical wind and solar output scene is used as the original input signal, the original signal is segmented, and the signal is decomposed into a combination of local mode functions using a local mode decomposition method. The specific process is as follows:

[0066] S1031: taking each typical black start scenario as an original input signal;

[0067] S1032: Divide the input signal into segments, perform polynomial fitting on the signal in each local interval, and obtain the local trend of the local interval;

[0068] S1033: subtracting the local trend of the local interval from the original signal to obtain a local vibration mode in the local interval;

[0069] S1034: For each local vibration mode, repeat the above two steps until the local vibration mode becomes a stable signal, and obtain the local modal function in the local interval.

[0070] S1035: Add the local modal functions in all local intervals to obtain the RLMD decomposition of the input signal:

[0071]

[0072] Among them, P w-pv (t) Contribute to new energy, PF i (t) is the ith modal signal after decomposition, and r(t) is the decomposition remainder.

[0073] Repeat the above decomposition steps for each typical scene to obtain the RLMD decomposition set of the typical scene.

[0074] S104: Divide the high-frequency and low-frequency boundaries of the RLMD decomposition signal in each single scenario, determine the rated power and capacity of the supercapacitor based on the high-frequency part, determine the rated power and capacity of the lithium battery based on the low-frequency part, and calculate the hybrid energy storage value function; select the hybrid energy storage configuration scheme corresponding to the minimum value of the hybrid energy storage value function as the optimal power capacity configuration scheme; construct an RLMD decomposition set of typical scenarios, decompose the high-frequency and low-frequency power components therefrom, and configure the hybrid energy storage power capacity accordingly, so as to improve the utilization efficiency of the hybrid energy storage and reduce the configuration cost at the same time.

[0075] In this embodiment, combined with Figure 5 , divide the high-frequency and low-frequency boundaries j of the RLMD decomposition signal in a single scene;

[0076] Determine the rated power of the supercapacitor based on the maximum power of the high-frequency part:

[0077]

[0078] Among them, P SC,k is the rated power of the supercapacitor under typical scenario k, PF i (t) is the i-th modal signal after decomposition, j is the dividing point between high frequency and low frequency power, η SC is the charging and discharging efficiency of the supercapacitor.

[0079] Determine the rated capacity of the supercapacitor based on the high-frequency energy demand during the black start process:

[0080]

[0081] Among them, E SC,k is the rated capacity of the supercapacitor under typical scenario k, T B is the black start duration, PF i (t) is the i-th modal signal after decomposition, j is the power dividing point between high frequency and low frequency, SOC SC,max , SOC SC,min are the maximum and minimum state of charge constraints of the supercapacitor, respectively.

[0082] Determine the rated power of lithium batteries based on the low-frequency partial power and minimum black start load technical standards:

[0083]

[0084] Among them, P B,k is the rated power of the lithium battery in typical scenario k, P w-pv(t) Contribute to new energy, PF i (t) is the i-th modal signal after decomposition, j is the dividing point between high frequency and low frequency power, P load is the black start load requirement proposed by NGESO, η B It is the charging and discharging efficiency of lithium battery.

[0085] Determine the rated capacity of the lithium battery based on the energy demand during the black start process:

[0086]

[0087] Among them, E B,k is the rated capacity of the lithium battery under typical scenario k, T B is the black start duration, P w-pv (t) Contribute to new energy, PF i (t) is the i-th modal signal after decomposition, j is the dividing point between high frequency and low frequency power, P load Black start load requirements for NGESO, SOC B,max , SOC B,min They are the maximum and minimum state of charge constraints for lithium batteries respectively.

[0088] The above process is repeated for the typical scenario RLMD decomposition set to obtain a multi-scenario hybrid energy storage configuration data set.

[0089] According to the hybrid energy storage value function, the minimum function value in the multi-scenario hybrid energy storage configuration data set is calculated to obtain the corresponding optimal hybrid energy storage configuration solution [P SC ,E SC ],[P B ,E B ].

[0090] The hybrid energy storage value function is expressed as:

[0091] minF=λ1W1+λ2W2 (12)

[0092] Among them, F is the hybrid energy storage value function, λ1 and λ2 are weight coefficients, λ1+λ2=1, W1 is the hybrid energy storage investment cost, and W2 is the hybrid energy storage electricity balance index.

[0093] The investment cost W1 of hybrid energy storage is as follows:

[0094] W1=C SC,P P SC +C SC,E E SC +C B,P P B +C B,E E B (13)

[0095] Among them, W1 is the investment cost of hybrid energy storage, C SC,P is the unit supercapacitor power cost, C SC,E is the unit supercapacitor capacity cost, C B,P Unit lithium battery power cost, C B,E Unit lithium battery capacity cost, P SC , P B are the rated power of supercapacitor and lithium battery respectively, E SC ,E B They are the rated capacities of supercapacitor and lithium battery respectively.

[0096] The hybrid energy storage power balance index W2 is specifically:

[0097]

[0098] Among them, W2 is the hybrid energy storage power balance indicator, △SOC B,k , △SOC SC,k are the maximum change of the supercapacitor / lithium battery energy storage state of charge under scenario k, SOC B,max , SOC B,min They are the maximum and minimum state of charge limits of lithium batteries, SOC SC,max , SOC SC,min are the maximum and minimum state of charge limits of the supercapacitor respectively, and m is the number of typical black start scenarios.

[0099]

[0100] △SOC k =SOC k,max -SOC k,min (16)

[0101] Among them, SOC k , SOC k,0 are the state of charge and initial state of charge of the supercapacitor / lithium battery energy storage under scenario k, E k (t) is the energy released by the supercapacitor / lithium battery storage in scenario k, E N,k △SOC is the rated capacity of the supercapacitor / lithium battery energy storage configured in scenario k. k is the maximum change in the state of charge of the supercapacitor / lithium battery energy storage under scenario k, SOC k,max , SOC k,min They are the maximum and minimum state of charge of the supercapacitor / lithium battery energy storage under scenario k, respectively.

[0102] S105: Determine the hybrid energy storage inertia response demand, perform non-parametric kernel density modeling on the hybrid energy storage inertia response demand data, determine the hybrid energy storage inertia demand configuration based on the cumulative probability distribution function curve, and fully consider the historical operation characteristics of the new energy station. Under the premise of ensuring reliability, the energy storage inertia configuration demand can be minimized, thereby reducing costs.

[0103] In this embodiment, combined with Figure 7 , based on historical data, determine the inertia support capacity of new energy stations. Calculate the system inertia level according to the inertia online monitoring system, accurate to every hour in a year, as follows:

[0104] E w-pv (t) = ∑H i S i μ i (t) (17)

[0105] Among them, E w-pv (t) is the kinetic energy that the new energy station can respond to, H i is the inertia of unit i at time t, S i is the rated capacity of unit i, μ i (t) is a 0-1 variable used to determine the effectiveness of the inertia of unit i at time t.

[0106] Based on the black start power supply inertia response capability index proposed by NGESO and the inertia support capability of new energy stations, the hourly hybrid energy storage inertia response demand within one year is determined:

[0107] H E (t)S E =E kmin -E w-pv (t) (18)

[0108] Among them, H E is the energy storage inertia time constant, S E is the rated capacity of the configured hybrid energy storage, S E =E SC +E B , E kmin is the minimum black start inertial response energy, which is 800MVA.s, E w-pv (t) is the kinetic energy that the new energy station can respond to at time t.

[0109] The hybrid energy storage inertia response demand data H E (t) Perform nonparametric kernel density modeling.

[0110]

[0111] Among them, f H(·) is the probability density function of the hybrid energy storage inertia demand, N is the number of hours, h is the window width, t is the time, K(·) is the kernel function, H E (t) is the mixed energy storage inertia requirement at time t.

[0112] Integrating the probability density function gives the probability distribution function.

[0113]

[0114] Among them, F H (·) is the energy storage inertia demand probability distribution function, f H (·) is the probability density function of the hybrid energy storage inertia requirement

[0115] Given the confidence level α, the hybrid energy storage inertia requirement configuration is determined based on the cumulative probability distribution function curve.

[0116] F H (x) = α (21)

[0117]

[0118] Among them, F H (·) is the energy storage inertia demand probability distribution function, is the inverse function of the energy storage inertia demand probability distribution function, α is the confidence level, H E,opt It is the optimal energy storage inertia configuration.

[0119] According to the configured inertia value H E,opt , combined with Figure 6 , virtual inertia control is added to the energy storage DC / AC converter to provide inertia response for the system; the energy storage system and the new energy power generation system are interconnected through the PCC AC bus, and the power plant auxiliary equipment and thermal power units are started through the transmission line.

[0120] Embodiment 2

[0121] In one or more embodiments, a hybrid energy storage configuration system of a novel black start power supply is disclosed, comprising:

[0122] The data acquisition module is used to collect historical output data of wind power and photovoltaic power plants at new energy stations, divide the output period and black start execution period, and establish a joint probability distribution model of wind power and photovoltaic power plants based on Copula functions;

[0123] The scenario clustering module is used to perform time series arrangement and scenario clustering on the wind power and photovoltaic output data included in the black start execution period to obtain a typical black start scenario;

[0124] The data decomposition module is used to use the typical black start scenario as the original input signal and use the local mode decomposition method to obtain the RLMD decomposition of the new energy output;

[0125] The hybrid energy storage capacity configuration module is used to divide the high-frequency and low-frequency boundaries of the RLMD decomposition signal in each single scenario, determine the rated power and capacity of the supercapacitor based on the high-frequency part, determine the rated power and capacity of the lithium battery based on the low-frequency part, and calculate the hybrid energy storage value function; select the hybrid energy storage configuration scheme corresponding to the minimum value of the hybrid energy storage value function as the optimal power capacity configuration scheme;

[0126] The hybrid energy storage inertia configuration module is used to determine the hybrid energy storage inertia response demand, perform non-parametric kernel density modeling on the hybrid energy storage inertia response demand data, and determine the hybrid energy storage inertia demand configuration according to the cumulative probability distribution function curve.

[0127] The specific implementation of the above modules is the same as that in Example 1 and will not be described in detail.

[0128] Embodiment 3

[0129] In one or more embodiments, a terminal device is disclosed, including a server, the server including a memory, a processor, and a computer program stored in the memory and executable on the processor, and the processor implements the hybrid energy storage configuration method of the black start power supply in Embodiment 1 when executing the program. For the sake of brevity, it will not be described in detail here.

[0130] It should be understood that in this embodiment, the processor may be a central processing unit CPU, and the processor may also be other general-purpose processors, digital signal processors DSP, application-specific integrated circuits ASIC, off-the-shelf programmable gate arrays FPGA or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. The general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc.

[0131] The memory may include a read-only memory and a random access memory, and provide instructions and data to the processor. A portion of the memory may also include a non-volatile random access memory. For example, the memory may also store information about the device type.

[0132] In the implementation process, each step of the above method can be completed by an integrated logic circuit of hardware in a processor or an instruction in the form of software.

[0133] Embodiment 4

[0134] In one or more embodiments, a computer-readable storage medium is disclosed, in which a plurality of instructions are stored, wherein the instructions are suitable for being loaded by a processor of a terminal device and executing the hybrid energy storage configuration method for a black start power supply described in Embodiment 1.

[0135] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.

Claims

1. A novel hybrid energy storage configuration method for black start power supply, characterized in that: include: Collect historical output data of wind power and photovoltaic power plants at new energy stations, divide the output period and black start execution period, and establish a joint probability distribution model of wind power and photovoltaic power plants based on Copula function; The wind power and photovoltaic output data included in the black start execution period are time-series arranged and combined and scene clustered to obtain a typical black start scenario; The typical black start scenario is used as the original input signal, and the local mode decomposition method is used to obtain the RLMD decomposition of the renewable energy output; For each single scenario, the RLMD decomposition signal is divided into high-frequency and low-frequency boundaries, the rated power and capacity of the supercapacitor are determined based on the high-frequency part, the rated power and capacity of the lithium battery are determined based on the low-frequency part, and the hybrid energy storage value function is calculated; Select the hybrid energy storage configuration scheme corresponding to the minimum value of the hybrid energy storage value function as the optimal power capacity configuration scheme; Determine the hybrid energy storage inertia response demand, perform non-parametric kernel density modeling on the hybrid energy storage inertia response demand data, and determine the hybrid energy storage inertia demand configuration based on the cumulative probability distribution function curve; The hybrid energy storage value function is expressed as: minF=λ1W1+λ2W2 Among them, F is the hybrid energy storage value function, λ1, λ2 are weight coefficients, λ1+λ2=1, W1 is the hybrid energy storage investment cost, and W2 is the hybrid energy storage power balance index; The investment cost W1 of hybrid energy storage is as follows: W1=C SC,P P SC +C SC,E E SC +C B,P P B +C B,E E B Among them, W1 is the investment cost of hybrid energy storage, C SC,P is the unit supercapacitor power cost, C SC,E is the unit supercapacitor capacity cost, C B,P Unit lithium battery power cost, C B,E Unit lithium battery capacity cost, P SC , P B are the rated power of supercapacitor and lithium battery respectively, E SC ,E B They are the rated capacities of supercapacitor and lithium battery respectively; The hybrid energy storage power balance index W2 is specifically: Among them, W2 is the hybrid energy storage power balance indicator, ΔSOC B,k , ΔSOC SC,k are the maximum change of the supercapacitor / lithium battery energy storage state of charge under scenario k, SOC B,max , SOC B,min They are the maximum and minimum state of charge limits of lithium batteries, SOC SC,max , SOC SC,min are the maximum and minimum state of charge limits of the supercapacitor, respectively, and m is the number of typical black start scenarios; ΔSOC k =SOC k,max -SOC k,min Among them, SOC k , SOC k,0 are the state of charge and initial state of charge of the supercapacitor / lithium battery energy storage under scenario k, E k (t) is the energy released by the supercapacitor / lithium battery storage in scenario k, E N,k is the rated capacity of the supercapacitor / lithium battery energy storage configured in scenario k; ΔSOC k is the maximum change in the state of charge of the supercapacitor / lithium battery energy storage under scenario k, SOC k,max , SOC k,min They are the maximum and minimum state of charge of the supercapacitor / lithium battery energy storage under scenario k, respectively.

2. A hybrid energy storage configuration method for a novel black start power supply as claimed in claim 1, characterized in that: A wind power and photovoltaic joint probability distribution model based on Copula function is established, specifically: Among them, x i ,y i Represent the wind power and photovoltaic power output vectors in time period i, respectively, i (x i ,y i ) is the joint probability distribution function of wind power and photovoltaic power output in time period i, C(·) is the optimal Copula function, They are the marginal probability distribution functions corresponding to wind power and photovoltaic output respectively.

3. A hybrid energy storage configuration method for a novel black start power supply as claimed in claim 2, characterized in that: The process of selecting the optimal Copula function is as follows: Based on the scatter plot of wind power output and photovoltaic output, the symmetry of wind and photovoltaic output is judged, and the full-time hybrid Copula function is preliminarily selected; The maximum likelihood estimation method is used to estimate the parameters of each selected Copula function, and the control parameters of each Copula function are obtained, thereby obtaining multiple candidate Copula functions; Calculate the Euclidean distance between each candidate Copula function and the empirical Copula function, and select the candidate Copula function with the smallest distance as the optimal Copula function.

4. A hybrid energy storage configuration method for a novel black start power supply as claimed in claim 1, characterized in that: The rated power of the supercapacitor is determined based on the maximum power of the high-frequency part, specifically: Among them, P SC,k is the rated power of the supercapacitor under typical scenario k, PF i (t) is the i-th modal signal after decomposition, j is the dividing point between high frequency and low frequency power, η SC It is the charging and discharging efficiency of supercapacitor; Determine the rated capacity of the supercapacitor based on the high-frequency energy demand during the black start process: Among them, E SC,k is the rated capacity of the supercapacitor under typical scenario k, T B is the black start duration, PF i (t) is the i-th modal signal after decomposition, j is the power dividing point between high frequency and low frequency, SOC SC,max , SOC SC,min are the maximum and minimum state of charge constraints of the supercapacitor, respectively.

5. A hybrid energy storage configuration method for a novel black start power supply as claimed in claim 1, characterized in that: The rated power of lithium batteries is determined based on the low-frequency partial power and the minimum black start load technical standards, specifically: Among them, P B,k is the rated power of the lithium battery in typical scenario k, P w-pv (t) Contribute to new energy, PF i (t) is the i-th modal signal after decomposition, j is the dividing point between high frequency and low frequency power, P load is the black start load requirement proposed by NGESO, η B It is the charging and discharging efficiency of lithium battery; The rated capacity of the lithium battery is determined based on the energy demand during the black start process, specifically: Among them, E B,k is the rated capacity of the lithium battery under typical scenario k, T B is the black start duration, P w-pv (t) Contribute to new energy, PF i (t) is the i-th modal signal after decomposition, j is the dividing point between high frequency and low frequency power, P load Black start load requirements for NGESO, SOC B,max , SOC B,min They are the maximum and minimum state of charge constraints for lithium batteries respectively.

6. A hybrid energy storage configuration method for a novel black start power supply as claimed in claim 1, characterized in that: Determine the hybrid energy storage inertia requirement configuration, specifically: Among them, α is the confidence level, H E,opt is the optimal energy storage inertia configuration, F H (x) is the energy storage inertia demand probability distribution function, f H (x) is the probability density function of hybrid energy storage inertia demand.

7. A new type of hybrid energy storage configuration system for black start power supply, characterized in that: include: The data acquisition module is used to collect historical output data of wind power and photovoltaic power plants at new energy stations, divide the output period and black start execution period, and establish a joint probability distribution model of wind power and photovoltaic power plants based on Copula functions; The scenario clustering module is used to perform time series arrangement and scenario clustering on the wind power and photovoltaic output data included in the black start execution period to obtain a typical black start scenario; The data decomposition module is used to use the typical black start scenario as the original input signal and use the local mode decomposition method to obtain the RLMD decomposition of the new energy output; The hybrid energy storage capacity configuration module is used to divide the high-frequency and low-frequency boundaries of the RLMD decomposition signal in each single scenario, determine the rated power and capacity of the supercapacitor based on the high-frequency part, determine the rated power and capacity of the lithium battery based on the low-frequency part, and calculate the hybrid energy storage value function; Select the hybrid energy storage configuration scheme corresponding to the minimum value of the hybrid energy storage value function as the optimal power capacity configuration scheme; The hybrid energy storage inertia configuration module is used to determine the hybrid energy storage inertia response demand, perform non-parametric kernel density modeling on the hybrid energy storage inertia response demand data, and determine the hybrid energy storage inertia demand configuration according to the cumulative probability distribution function curve; The hybrid energy storage value function is expressed as: minF=λ1W1+λ2W2 Among them, F is the hybrid energy storage value function, λ1, λ2 are weight coefficients, λ1+λ2=1, W1 is the hybrid energy storage investment cost, and W2 is the hybrid energy storage power balance index; The investment cost W1 of hybrid energy storage is as follows: W1=C SC,P P SC +C SC,E E SC +C B,P P B +C B,E E B Among them, W1 is the investment cost of hybrid energy storage, C SC,P is the unit supercapacitor power cost, C SC,E is the unit supercapacitor capacity cost, C B,P Unit lithium battery power cost, C B,E Unit lithium battery capacity cost, P SC , P B are the rated power of supercapacitor and lithium battery respectively, E SC ,E B They are the rated capacities of supercapacitor and lithium battery respectively; The hybrid energy storage power balance index W2 is specifically: Among them, W2 is the hybrid energy storage power balance indicator, ΔSOC B,k , ΔSOC SC,k are the maximum change of the supercapacitor / lithium battery energy storage state of charge under scenario k, SOC B,max , SOC B,min They are the maximum and minimum state of charge limits of lithium batteries, SOC SC,max , SOC SC,min are the maximum and minimum state of charge limits of the supercapacitor, respectively, and m is the number of typical black start scenarios; ΔSOC k =SOC k,max -SOC k,min Among them, SOC k , SOC k,0 are the state of charge and initial state of charge of the supercapacitor / lithium battery energy storage under scenario k, E k (t) is the energy released by the supercapacitor / lithium battery storage in scenario k, E N,k is the rated capacity of the supercapacitor / lithium battery energy storage configured in scenario k; ΔSOC k is the maximum change in the state of charge of the supercapacitor / lithium battery energy storage under scenario k, SOC k,max , SOC k,min They are the maximum and minimum state of charge of the supercapacitor / lithium battery energy storage under scenario k, respectively.

8. A hybrid energy storage configuration system for a novel black start power supply as claimed in claim 7, characterized in that: A wind power and photovoltaic joint probability distribution model based on Copula function is established, specifically: Among them, x i ,y i Represent the wind power and photovoltaic power output vectors in time period i, respectively, i (x i ,y i ) is the joint probability distribution function of wind power and photovoltaic power output in time period i, C(·) is the optimal Copula function, They are the marginal probability distribution functions corresponding to wind power and photovoltaic output respectively.

9. A hybrid energy storage configuration system for a novel black start power supply as claimed in claim 7, characterized in that: The process of selecting the optimal Copula function is as follows: Based on the scatter plot of wind power output and photovoltaic output, the symmetry of wind and photovoltaic output is judged, and the full-time hybrid Copula function is preliminarily selected; The maximum likelihood estimation method is used to estimate the parameters of each selected Copula function, and the control parameters of each Copula function are obtained, thereby obtaining multiple candidate Copula functions; Calculate the Euclidean distance between each candidate Copula function and the empirical Copula function, and select the candidate Copula function with the smallest distance as the optimal Copula function.

10. A hybrid energy storage configuration system for a novel black start power supply as claimed in claim 7, characterized in that: The rated power of the supercapacitor is determined based on the maximum power of the high-frequency part, specifically: Among them, P SC,k is the rated power of the supercapacitor under typical scenario k, PF i (t) is the i-th modal signal after decomposition, j is the dividing point between high frequency and low frequency power, η SC It is the charging and discharging efficiency of supercapacitor; Determine the rated capacity of the supercapacitor based on the high-frequency energy demand during the black start process: Among them, E SC,k is the rated capacity of the supercapacitor under typical scenario k, T B is the black start duration, PF i (t) is the i-th modal signal after decomposition, j is the power dividing point between high frequency and low frequency, SOC SC,max , SOC SC,min are the maximum and minimum state of charge constraints of the supercapacitor, respectively.

11. A novel hybrid energy storage configuration system for black start power supply as claimed in claim 7, characterized in that: The rated power of lithium batteries is determined based on the low-frequency partial power and the minimum black start load technical standards, specifically: Among them, P B,k is the rated power of the lithium battery in typical scenario k, P w-pv (t) Contribute to new energy, PF i (t) is the i-th modal signal after decomposition, j is the dividing point between high frequency and low frequency power, P load is the black start load requirement proposed by NGESO, η B It is the charging and discharging efficiency of lithium battery; The rated capacity of the lithium battery is determined based on the energy demand during the black start process, specifically: Among them, E B,k is the rated capacity of the lithium battery under typical scenario k, T B is the black start duration, P w-pv (t) Contribute to new energy, PF i (t) is the i-th modal signal after decomposition, j is the dividing point between high frequency and low frequency power, P load Black start load requirements for NGESO, SOC B,max , SOC B,min They are the maximum and minimum state of charge constraints for lithium batteries respectively.

12. A novel hybrid energy storage configuration system for black start power supply as claimed in claim 7, characterized in that: Determine the hybrid energy storage inertia requirement configuration, specifically: Among them, α is the confidence level, H E,opt is the optimal energy storage inertia configuration, F H (x) is the energy storage inertia demand probability distribution function, f H (x) is the probability density function of hybrid energy storage inertia demand.

13. A terminal device comprising a processor and a memory, wherein the processor is used to implement instructions; and the memory is used to store multiple instructions, characterized in that: The instructions are suitable for being loaded by a processor and executing the hybrid energy storage configuration method for a black start power supply according to any one of claims 1 to 6.

14. A computer-readable storage medium storing a plurality of instructions, characterized in that: The instruction is suitable for being loaded by a processor of a terminal device and executing the hybrid energy storage configuration method for a black start power supply according to any one of claims 1-6.