A biogas liquid sealing mechanism and integrated water removal equipment

By combining the vacuum pump, control valve, vibration motor and limit inflation structure in the biogas liquid sealing mechanism, the compatibility problem of biogas liquid sealing and water removal is solved, the liquid sealing effect and equipment stability are improved, and efficient biogas Handling and conveying.

CN117662802BActive Publication Date: 2024-10-18北京朝阳环境集团有限公司
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202311664850.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-06
Publication Date
2024-10-18
Estimated Expiration
2043-12-06

AI Technical Summary

Technical Problem

The existing biogas liquid sealing mechanism cannot carry out liquid sealing at different positions in integrated biogas treatment, and is incompatible with the water removal structure, resulting in a decrease in liquid sealing effect and equipment stability.

Method used

A biogas liquid sealing mechanism including a liquid sealing component and a water removal component is designed. The liquid sealing effect is achieved through the use of a vacuum pump and a control valve. During the water removal process, a vibration motor and a vacuum pump are used to improve the water removal effect, combined with a limit position. The mechanism and inflatable structure improve the stability of biogas transportation.

Benefits of technology

The liquid sealing treatment at different positions in the integrated biogas treatment is realized, which improves the liquid sealing effect and equipment stability. It also improves the water removal effect and biogas transportation stability, avoiding resource waste and leakage problems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117662802B_ABST
    Figure CN117662802B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of integrated water removal equipment, and in particular to a biogas liquid seal mechanism and integrated water removal equipment. It comprises a liquid seal component, the liquid seal component comprises a receiving tray, a desulfurization tray is arranged at the bottom of the receiving tray, a plurality of groups of receiving tubes are connected in a circular array at the bottom of the receiving tray, the other end of each group of the receiving tubes is connected to the top of the desulfurization tray, a group of fifth control valves are installed at the junction of each group of the receiving tubes and the receiving tray, a group of liquid seal rings are sleeved on the outer wall of each group of the receiving tubes, a group of second vacuum pumps are installed on the outer wall of each group of the liquid seal rings, a plurality of groups of seventh control valves are distributed in a circular array on the inner wall of the liquid seal ring, and the output end of each group of the seventh control valves is installed on the outer wall of the receiving tube. This embodiment improves the liquid seal effect while improving the stability of the operation of the biogas integrated treatment equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of integrated water removal equipment, and in particular relates to a biogas liquid sealing mechanism and integrated water removal equipment. Background Art

[0002] The main components of biogas include methane, carbon dioxide and hydrogen sulfide. Since biogas usually carries a large amount of water vapor after it is produced, the water vapor condenses to form droplets due to the drop in temperature during transportation. If it is not discharged in time, water accumulation will easily occur.

[0003] After searching, in the prior art, Chinese Patent Publication No.: CN214618009U, Publication Date: 2021-11-05, discloses a biogas liquid seal-water removal integrated device, including a liquid seal tank body, the liquid seal tank body contains liquid for liquid sealing, and an air inlet and an air outlet are arranged on the liquid seal tank body from bottom to top, and the air inlet is connected to a biogas transmission pipeline. The above embodiment achieves the purpose of biogas water removal while realizing water sealing and pressure stabilization.

[0004] However, the device still has the following defects: the biogas liquid sealing mechanism cannot perform liquid sealing treatment at different positions during integrated biogas treatment, and cannot be used in conjunction with the water removal structure during liquid sealing treatment, thereby reducing the liquid sealing effect and the stability of the working operation of the biogas integrated equipment. Summary of the invention

[0005] In view of the above problems, the present invention provides a biogas liquid sealing mechanism. It includes a liquid sealing component, which includes a receiving tray, a desulfurization tray is arranged at the bottom of the receiving tray, and a plurality of receiving tubes are connected in a circular array at the bottom of the receiving tray, and the other end of each receiving tube is connected to the top of the desulfurization tray, and a fifth control valve is installed at the junction of each receiving tube and the receiving tray, a liquid sealing ring is sleeved on the outer wall of each receiving tube, and a second vacuum pump is installed on the outer wall of each liquid sealing ring, and a plurality of seventh control valves are distributed in a circular array on the inner wall of the liquid sealing ring, and the output end of each seventh control valve is installed on the receiving tube. On the outer wall of the receiving tube; each group of the liquid sealing rings is connected to a group of conversion tubes on the outer wall, each group of the conversion tubes is installed at the junction of the liquid sealing rings with a group of sixth control valves, the other end of each group of the conversion tubes passes through the liquid sealing rings and is connected to the outer wall of the receiving tube, each group of the conversion tubes is installed on the outer wall of the conversion tubes, a group of third vacuum pumps are installed, a number of groups of eighth control valves are distributed in a circular array at the bottom of the desulfurization disk, a sixth electric push rod is installed on the inner wall of the bottom of the desulfurization disk, a third motor is installed on the output end of the sixth electric push rod, and a desulfurization mechanism is transmission-connected to the output end of the third motor.

[0006] Furthermore, the desulfurization mechanism includes a fixed disc, the bottom of which is transmission-connected to the output end of the third motor, and the top of the fixed disc is provided with a plurality of groups of second slide grooves in a circular array, each group of the second slide grooves is provided with a group of second screw rods, each group of the second screw rods is rotatably connected in the second slide grooves, each group of the second screw rods is threadedly connected to a group of second sliding plates, and each group of the second sliding plates is slidably connected in the second slide grooves.

[0007] Furthermore, a group of connecting rods is installed on the top of each group of the second sliding plates, and a number of air holes are opened on the outer wall of each group of the connecting rods in a circular array. A group of clamping tubes are connected to the top of each group of the connecting rods, and a group of desulfurization plates are arranged in each group of the clamping tubes. The outer wall of each group of the clamping tubes is movably clamped with the inner wall of the receiving tube; a number of fourth motors are distributed in a circular array on the outer wall of the fixed disc, and the output end of each group of the fourth motors passes through the fixed disc and is transmission-connected to one of the second screw rods.

[0008] A dewatering integrated device comprises a dewatering component, the dewatering component is arranged just above a liquid seal component, a mounting component is arranged on one side wall of the dewatering component, the dewatering component comprises a dewatering box, a first electric push rod is mounted on the top inner wall of the dewatering box, a push plate is mounted on the output end of the first electric push rod, the outer wall of the push plate is slidably fitted on the inner wall of the dewatering box, a first dewatering plate is mounted on the bottom inner wall of the dewatering box, a second conveying pipe is connected to the bottom of the dewatering box, the top of the receiving tray is connected to the second conveying pipe, a second electric push rod is mounted on the inner wall of one side of the dewatering box, a first push block is mounted on the output end of the second electric push rod, and the bottom of the first push block is slidably fitted on the top of the first dewatering plate; A threshing box is connected to a side wall of the dewatering box away from the first push block, a first control valve is installed at the junction of the threshing box and the dewatering box, a limiting clamp ring is installed on the inner wall of the threshing box, a rectangular plate is arranged in the threshing box, a dewatering screen is sleeved on the outer wall of the rectangular plate, the outer wall of the dewatering screen is clamped in the limiting clamp ring, a vibration motor is connected to the bottom of the rectangular plate, a fourth electric push rod is installed on the inner wall of the threshing box away from the first control valve, a second push block is installed on the output end of the fourth electric push rod, the second push block is located directly above the dewatering screen, a third electric push rod is installed on the top inner wall of the threshing box, a pressing block is installed on the output end of the third electric push rod, and the pressing block is located directly above the dewatering screen.

[0009] Furthermore, a fixed box is connected to the bottom of the threshing box, a second control valve is installed at the junction of the fixed box and the threshing box, a second dewatering plate is arranged in the fixed box, a first delivery pipe is connected to a side wall of the fixed box close to the second delivery pipe, the first delivery pipe is located below the second dewatering plate, the other end of the first delivery pipe passes through the fixed box and is connected to the second delivery pipe, a third control valve is installed at the junction of the first delivery pipe and the second delivery pipe, and a first vacuum pump is installed on the outer wall of the first delivery pipe.

[0010] Furthermore, the installation assembly includes an air supply pipe, a fourth control valve is installed at the junction of the air supply pipe and the water removal tank, and a limiting mechanism is sleeved on the outer wall of the air supply pipe; the limiting mechanism includes an annular body, and a plurality of sliding cavities are opened in a circular array on a side wall of the annular body away from the water removal tank, and a group of threaded rods are arranged in each group of the sliding cavities, and each group of the threaded rods are rotatably connected in the sliding cavity.

[0011] Furthermore, a plurality of groups of second motors are distributed in a circular array on the outer wall of the circular body, and the output ends of each group of the second motors pass through the circular body and are transmission-connected to one of the groups of threaded rods, and each group of the threaded rods is threadedly connected to a group of sliding blocks, and each group of the sliding blocks is slidably connected in the sliding cavity, and a group of limiting parts are installed on the side wall of each group of sliding blocks away from the water removal tank.

[0012] Furthermore, a fifth electric push rod is installed on a side wall of the circular ring body close to the sliding cavity, a limiting circular ring is installed on the output end of the fifth electric push rod, a filling bag structure is provided on the inner wall of the limiting circular ring, the outer wall of the filling bag structure is slidably fitted on the outer wall of the second air supply pipe, an inflatable structure is installed on the outer wall of the limiting circular ring, and the output end of the inflatable structure passes through the limiting circular ring and is connected to the input end of the filling bag structure.

[0013] Furthermore, the limiting portion includes a connecting plate, a group of first sliding grooves are opened on the side wall corresponding to each group of the connecting plates, a group of first screw rods are arranged in each group of the first sliding grooves, each group of the first screw rods are rotatably connected to the inner wall of the first sliding groove, a group of first sliding plates are threadedly connected to each group of the first screw rods, each group of the first sliding plates are slidably connected in the first sliding groove, and a group of fixing blocks are installed on the side wall corresponding to each group of the first sliding plates.

[0014] Furthermore, two groups of limit blocks are symmetrically arranged at the edge of the side wall of each group of fixed blocks away from the first sliding plate, an elastic shaping plate is connected between the two groups of limit blocks, and a group of first motors are installed on the side wall of each group of connecting plates away from the circular ring body, and the output end of each group of the first motors passes through the connecting plate and is transmission-connected to the first screw rod.

[0015] The beneficial effects of the present invention are:

[0016] 1. The biogas after dehydration enters the desulfurization disk through the designated receiving pipe; when liquid seal control is required, the biogas is sucked into the liquid seal ring through the second vacuum pump to balance the pressure, and the sixth control valve is opened while the third vacuum pump is started to transport the biogas previously sucked into the liquid seal ring into the receiving pipe for pressure balance, so as to achieve the effect of liquid seal; the biogas liquid seal mechanism can perform liquid seal treatment at different positions during the integrated biogas treatment, thereby improving the liquid seal effect and the stability of the operation of the integrated biogas treatment equipment.

[0017] 2. After passing through the first dewatering plate, the biogas enters the second conveying pipe, and the dewatering effect is improved by the full contact between the first dewatering plate and the biogas; the first dewatering plate is pushed into the threshing box, and the dewatering screen is driven to vibrate by the vibration motor to shake off the particles in the first dewatering plate, and then the first dewatering plate is pressed to allow the residual biogas and moisture to be dewatered through the second dewatering plate, and the first vacuum pump is started to suck the dewatered biogas in the fixed box into the second conveying pipe through the first conveying pipe, thereby avoiding waste of resources and improving the dewatering effect of the device.

[0018] 3. Connect the air supply pipe with the biogas tank that needs to be dewatered, squeeze several groups of elastic plastic plates to limit them according to the width of the output pipe, and then drive the several groups of elastic plastic plates to move toward the air supply pipe, thereby reducing the labor intensity of assembling the air supply pipe and the output pipe on the biogas tank; drive the limiting ring to move to the junction of the air supply pipe and the output pipe, start the inflation structure to fill the filling bag structure, so that the filling bag structure fills the gap between the air supply pipe and the output pipe, avoiding the problem of biogas leakage due to air leakage, while improving the buffering effect of the device and the stability of biogas transportation.

[0019] 4. The biogas enters the desulfurization plate through the receiving pipe for desulfurization. The desulfurized biogas passes through the clamping pipe and the connecting rod in turn and is discharged through the air holes. Since the desulfurization plate will be blocked after working for a long time, in order to improve the desulfurization effect, the sixth electric push rod is started to drive the fixed disc to descend, and then the third motor is started to drive the fixed disc to rotate, so that the desulfurization plate that has not yet worked is located directly under the receiving pipe, and then the receiving pipe is driven to engage with the clamping pipe, which improves the desulfurization effect and speeds up the work progress.

[0020] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures pointed out in the description, claims and drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0022] Figure 1 It shows a schematic diagram of the structure of an integrated device according to an embodiment of the present invention;

[0023] Figure 2 A schematic cross-sectional view of a water removal tank according to an embodiment of the present invention is shown;

[0024] Figure 3 A schematic cross-sectional view of a threshing box according to an embodiment of the present invention is shown;

[0025] Figure 4 It shows a schematic diagram of the structure of the installation assembly according to an embodiment of the present invention;

[0026] Figure 5 A schematic structural diagram of a liquid seal assembly according to an embodiment of the present invention is shown;

[0027] Figure 6 A schematic top view of a liquid sealing ring according to an embodiment of the present invention is shown;

[0028] Figure 7 A schematic cross-sectional view of a desulfurization disk according to an embodiment of the present invention is shown;

[0029] Figure 8 A top cross-sectional view of a limiting mechanism according to an embodiment of the present invention is shown;

[0030] Fig. 9 A schematic diagram of the structure of a desulfurization mechanism according to an embodiment of the present invention is shown;

[0031] Fig.10 A cross-sectional schematic diagram of a desulfurization mechanism according to an embodiment of the present invention is shown;

[0032] Fig.11 A top cross-sectional view of a limiting portion according to an embodiment of the present invention is shown.

[0033] In the figure: 1, dewatering assembly; 101, dewatering box; 102, first electric push rod; 103, push plate; 104, second electric push rod; 105, first push block; 106, first dewatering plate; 107, first control valve; 108, threshing box; 109, third electric push rod; 110, pressing block; 111, fourth electric push rod; 112, second push block; 113, limit clamp; 114, dewatering screen; 115, vibration motor; 116, second control valve; 117, Fixed box; 118, second dewatering plate; 119, first delivery pipe; 120, first vacuum pump; 121, second delivery pipe; 122, third control valve; 2, mounting assembly; 201, air delivery pipe; 202, fourth control valve; 203, limit mechanism; 2031, annular body; 2032, threaded rod; 2033, sliding cavity; 2034, sliding block; 2035, limit part; 20351, connecting plate; 20352, first screw rod; 20353, first slide groove ; 20354, first sliding plate; 20355, fixed block; 20356, limit block; 20357, elastic shaping plate; 20358, first motor; 2036, second motor; 204, fifth electric push rod; 205, inflatable structure; 206, limit ring; 207, filling bag structure; 3, liquid seal assembly; 301, receiving plate; 302, receiving tube; 303, fifth control valve; 304, liquid seal ring; 305, second vacuum pump; 306, conversion tube; 307. The third vacuum pump; 308. The sixth control valve; 309. The seventh control valve; 310. The desulfurization disk; 311. The eighth control valve; 312. The sixth electric push rod; 313. The third motor; 314. The desulfurization mechanism; 3141. The fixed disk; 3142. The second screw rod; 3143. The second slide groove; 3144. The second sliding plate; 3145. The connecting rod; 3146. The fourth motor; 3147. The clamping tube; 3148. The desulfurization plate; 3149. The air vent. DETAILED DESCRIPTION

[0034] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] The embodiment of the present invention provides a biogas liquid sealing mechanism and an integrated dewatering device. It includes a dewatering component 1, exemplarily, as Figure 1 As shown, a mounting assembly 2 is arranged on one side wall of the dewatering assembly 1 , and a liquid sealing assembly 3 is arranged at the bottom of the dewatering assembly 1 .

[0036] For example, Figure 2 and Figure 3 As shown, the dewatering assembly 1 includes a dewatering box 101, a first electric push rod 102 is installed on the top inner wall of the dewatering box 101, a push plate 103 is installed on the output end of the first electric push rod 102, the outer wall of the push plate 103 is slidably fitted on the inner wall of the dewatering box 101, a first dewatering plate 106 is installed on the bottom inner wall of the dewatering box 101, a second conveying pipe 121 is connected to the bottom of the dewatering box 101, a second electric push rod 104 is installed on one side of the inner wall of the dewatering box 101, a first push block 105 is installed on the output end of the second electric push rod 104, and the bottom of the first push block 105 is slidably fitted on the top of the first dewatering plate 106;

[0037] The water removal box 101 is connected to a threshing box 108 on one side wall away from the first push block 105. A first control valve 107 is installed at the junction of the threshing box 108 and the water removal box 101. A limit clamp ring 113 is installed on the inner wall of the threshing box 108. A rectangular plate is arranged inside the threshing box 108. A dewatering screen 114 is sleeved on the outer wall of the rectangular plate. The outer wall of the dewatering screen 114 is clamped in the limit clamp ring 113. The bottom of the rectangular plate is connected to a vibration motor 114. 15. A fourth electric push rod 111 is installed on the inner wall of the threshing box 108 away from the first control valve 107. A second push block 112 is installed on the output end of the fourth electric push rod 111. The second push block 112 is located directly above the dewatering screen 114. A third electric push rod 109 is installed on the top inner wall of the threshing box 108. A pressing block 110 is installed on the output end of the third electric push rod 109. The pressing block 110 is located directly above the dewatering screen 114.

[0038] The bottom of the threshing box 108 is connected to a fixed box 117, and a second control valve 116 is installed at the junction of the fixed box 117 and the threshing box 108. A second dewatering plate 118 is arranged in the fixed box 117. A first delivery pipe 119 is connected to a side wall of the fixed box 117 close to the second delivery pipe 121. The first delivery pipe 119 is located below the second dewatering plate 118. The other end of the first delivery pipe 119 passes through the fixed box 117 and is connected to the second delivery pipe 121. A third control valve 122 is installed at the junction of the first delivery pipe 119 and the second delivery pipe 121, and a first vacuum pump 120 is installed on the outer wall of the first delivery pipe 119.

[0039] Then the transportation starts, and when it enters the dewatering tank 101, the first electric push rod 102 is started to drive the push plate 103 to descend. During its descent, the biogas in the dewatering tank 101 is pressed, so that the biogas passes through the first dewatering plate 106 and enters the second transportation pipe 121. The dewatering effect is improved by the full contact between the first dewatering plate 106 and the biogas; after working for a long time, the first dewatering plate 106 will be blocked by moisture and particles. If it is not processed, it will greatly affect the subsequent dewatering effect of the biogas. The fourth control valve 202 is closed and the first control valve 107 is opened at the same time. The second electric push rod 104 is started to drive the first push block 105 to move toward the threshing box 108, thereby pushing the first dewatering plate 106 into the threshing box 108. , then close the first control valve 107, start the vibration motor 115, drive the dewatering screen 114 to vibrate, so as to shake off the particles in the first dewatering plate 106, then start the third electric push rod 109 to push the pressing block 110 to press the first dewatering plate 106, so that the residual biogas and moisture inside it pass through the dewatering screen 114 and are precipitated on the bottom inner wall of the threshing box 108, then open the first control valve 107 and the second control valve 116 at the same time, so that the residual biogas and moisture enter the fixed box 117, and are dewatered by the second dewatering plate 118, and at the same time start the fourth electric push rod 111 to push the second push block 112, and push the first dewatering plate 106 after threshing into the dewatering box 101 to continue the biogas dewatering work.

[0040] The third control valve 122 is opened, and the first vacuum pump 120 is started to suck the biogas dehydrated again in the fixed box 117 into the second delivery pipe 121 through the first delivery pipe 119, thereby avoiding waste of resources.

[0041] For example, Figure 4 , Figure 8 and Fig.11 As shown, the installation assembly 2 includes an air supply pipe 201, a fourth control valve 202 is installed at the junction of the air supply pipe 201 and the water removal tank 101, and a limiting mechanism 203 is sleeved on the outer wall of the air supply pipe 201;

[0042] The limiting mechanism 203 includes a circular ring body 2031, and a plurality of sliding cavities 2033 are provided in a circular array on a side wall of the circular ring body 2031 away from the water removal tank 101, and a group of threaded rods 2032 are arranged in each group of the sliding cavities 2033, and each group of the threaded rods 2032 are rotatably connected in the sliding cavities 2033. A plurality of second motors 2036 are distributed in a circular array on the outer wall of the circular ring body 2031, and the output end of each group of the second motors 2036 passes through the circular ring body 2031 and is transmission-connected to one of the groups of threaded rods 2032, and each group of the threaded rods 2032 is threadedly connected to a group of sliding blocks 2034, and each group of the sliding blocks 2034 is It is slidably connected in the sliding cavity 2033, and a group of limiting parts 2035 are installed on the side wall of each group of sliding blocks 2034 away from the water removal tank 101; the fifth electric push rod 204 is installed on the side wall of the annular body 2031 close to the sliding cavity 2033, and a limiting ring 206 is installed on the output end of the fifth electric push rod 204, and a filling bag structure 207 is arranged on the inner wall of the limiting ring 206, and the outer wall of the filling bag structure 207 is slidably fitted on the outer wall of the second air supply pipe 201, and an inflatable structure 205 is installed on the outer wall of the limiting ring 206, and the output end of the inflatable structure 205 passes through the limiting ring 206 and is connected to the input end of the filling bag structure 207.

[0043] The limiting portion 2035 includes a connecting plate 20351, and a group of first sliding grooves 20353 are opened on the side wall corresponding to each group of the connecting plates 20351. A group of first screw rods 20352 are arranged in each group of the first sliding grooves 20353. Each group of the first screw rods 20352 are rotatably connected to the inner wall of the first sliding grooves 20353. Each group of the first screw rods 20352 is threadedly connected to a group of first sliding plates 20354. Each group of the first sliding plates 20354 is slidably connected in the first sliding grooves 20353. A group of fixed blocks 20355 are installed on the side wall corresponding to 20354, and two groups of limit blocks 20356 are symmetrically arranged at the edge of the side wall of each group of fixed blocks 20355 away from the first sliding plate 20354, and an elastic shaping plate 20357 is connected between the two groups of limit blocks 20356, and a group of first motors 20358 are installed on the side wall of each group of connecting plates 20351 away from the annular body 2031, and the output end of each group of the first motors 20358 passes through the connecting plate 20351 and is connected to the first screw rod 20352 through a transmission.

[0044] Before the integrated water removal equipment starts working, it is first connected to the biogas tank that needs to be dewatered through the air supply pipe 201, so that the output pipe on the biogas tank is located between the several groups of connecting plates 20351, and then the second motor 2036 is started to drive the threaded rod 2032 to rotate, and the threaded rod 2032 drives the sliding block 2034 to slide in the sliding cavity 2033, thereby driving the several groups of connecting plates 20351 to move toward the output pipe, and then the several groups of elastic shaping plates 20357 are attached to the outer wall of the output pipe, and the several groups of elastic shaping plates 20357 are limited according to the width of the output pipe by squeezing them, and then the first motor 20358 is started to drive the first screw rod 20352 to rotate, and the first screw rod 20352 drives the first sliding plate 20354 to slide in the first sliding groove 20353, thereby driving the several groups of elastic shaping plates 20357 to move toward the air supply pipe 201, thereby reducing the labor intensity of assembling the air supply pipe 201 and the output pipe on the biogas tank.

[0045] In order to improve the working stability and airtightness of the device, the fifth electric push rod 204 is started to drive the limiting ring 206 to move to the junction of the air supply pipe 201 and the output pipe, and then the inflation structure 205 is started to fill the filling bag structure 207, so that the filling bag structure 207 fills the gap between the air supply pipe 201 and the output pipe, thereby avoiding the problem of biogas leakage caused by air leakage, and improving the buffering effect of the device, thereby improving the stability of biogas transportation.

[0046] For example, Figure 5 and Figure 6 As shown, the liquid seal assembly 3 includes a receiving tray 301, the top of the receiving tray 301 is connected to the second delivery pipe 121, a desulfurization tray 310 is arranged at the bottom of the receiving tray 301, and a plurality of groups of receiving tubes 302 are connected in a circular array at the bottom of the receiving tray 301, and the other end of each group of the receiving tubes 302 is connected to the top of the desulfurization tray 310, and a group of fifth control valves 303 are installed at the junction of each group of the receiving tubes 302 and the receiving tray 301, and a group of liquid seal rings 304 are sleeved on the outer wall of each group of the receiving tubes 302, and a group of liquid seal rings 304 are installed on the outer wall of each group of the liquid seal rings 304. A second vacuum pump 305 is provided, and a plurality of seventh control valves 309 are distributed in a circular array on the inner wall of the liquid seal ring 304, and the output end of each group of the seventh control valves 309 is installed on the outer wall of the receiving tube 302; a group of conversion tubes 306 are connected to the outer wall of each group of the liquid seal ring 304, and a group of sixth control valves 308 are installed at the junction of each group of the conversion tubes 306 and the liquid seal ring 304, and the other end of each group of the conversion tubes 306 passes through the liquid seal ring 304 and is connected to the outer wall of the receiving tube 302, and a group of third vacuum pumps 307 are installed on the outer wall of each group of the conversion tubes 306.

[0047] In order to improve its liquid sealing effect, after the dehydrated biogas enters the receiving tray 301, the fifth control valve 303 is opened to allow the biogas to enter the desulfurization tray 310 through the designated receiving pipe 302. When liquid sealing control is required, the seventh control valve 309 is opened and the second vacuum pump 305 is started at the same time to suck the biogas into the liquid sealing ring 304 to balance the pressure. The sixth control valve 308 can be opened at the same time as the third vacuum pump 307 is started to transport the biogas previously sucked into the liquid sealing ring 304 into the receiving pipe 302 for balancing the pressure. The number of openings of the fifth control valve 303 can be freely selected according to the work progress and working environment. The biogas liquid sealing mechanism can perform liquid sealing treatment at different positions during the integrated biogas treatment, thereby improving the liquid sealing effect and the stability of the operation of the integrated biogas treatment equipment.

[0048] For example, Figure 7 , Fig. 9 and Fig.10 As shown, a plurality of groups of eighth control valves 311 are distributed in a circular array at the bottom of the desulfurization disk 310, a sixth electric push rod 312 is installed on the inner wall of the bottom of the desulfurization disk 310, a third motor 313 is installed on the output end of the sixth electric push rod 312, and a desulfurization mechanism 314 is transmission-connected to the output end of the third motor 313;

[0049] The desulfurization mechanism 314 includes a fixed disc 3141, the bottom of which is transmission-connected to the output end of the third motor 313, and a plurality of groups of second slide grooves 3143 are provided in a circular array on the top of the fixed disc 3141, each group of the second slide grooves 3143 is provided with a group of second screw rods 3142, each group of the second screw rods 3142 is rotationally connected in the second slide grooves 3143, each group of the second screw rods 3142 is threadedly connected to a group of second sliding plates 3144, each group of the second sliding plates 3144 is slidably connected in the second slide grooves 3143, and the top of each group of the second sliding plates 3144 A group of connecting rods 3145 are installed, and a plurality of air holes 3149 are opened on the outer wall of each group of connecting rods 3145 in a circular array. The top of each group of connecting rods 3145 is connected to a group of clamping tubes 3147, and a group of desulfurization plates 3148 are arranged in each group of clamping tubes 3147. The outer wall of each group of clamping tubes 3147 is movably clamped with the inner wall of the receiving tube 302. A plurality of fourth motors 3146 are distributed in a circular array on the outer wall of the fixed disk 3141, and the output end of each group of the fourth motors 3146 passes through the fixed disk 3141 and is then transmission-connected to one of the second screw rods 3142.

[0050] After the liquid seal is completed, the biogas enters the desulfurization disk 310 through the receiving pipe 302. Since the receiving pipe 302 and the clamping pipe 3147 are in a clamping state, the biogas contacts several groups of desulfurization plates 3148 after entering the desulfurization disk 310 to perform desulfurization work. The desulfurized biogas passes through the clamping pipe 3147 and the connecting rod 3145 in turn and is discharged through the air vent 3149. Since the desulfurization plate 3148 will be blocked after working for a long time, in order to improve the desulfurization effect, the sixth electric push rod 312 is started to drive the fixed disc 3141 to descend, and then the third motor 313 is started to drive the fixed disc 3141 to rotate, so that the desulfurization plate 3148 that has not yet worked is located directly below the receiving pipe 302, and then the sixth electric push rod 312 is started to drive the receiving pipe 302 to be actively clamped with the clamping pipe 3147, and the desulfurization work is continued, which improves the desulfurization effect and speeds up the work progress.

[0051] Beneficial effects:

[0052] The biogas after dehydration enters the desulfurization disk 310 through the designated receiving pipe 302; when liquid seal control is required, the biogas is sucked into the liquid seal ring 304 through the second vacuum pump 305 to balance the pressure, and the sixth control valve 308 is opened while the third vacuum pump 307 is started to transport the biogas previously sucked into the liquid seal ring 304 into the receiving pipe 302 to balance the pressure, so as to achieve the effect of liquid seal; the biogas liquid seal mechanism can perform liquid seal treatment at different positions during the integrated biogas treatment, thereby improving the liquid seal effect and the stability of the operation of the integrated biogas treatment equipment.

[0053] After passing through the first dewatering plate 106, the biogas enters the second conveying pipe 121, and the dewatering effect is improved by the full contact between the first dewatering plate 106 and the biogas; the first dewatering plate 106 is pushed into the threshing box 108, and the dewatering screen 114 is driven to vibrate by the vibration motor 115 to shake off the particulate matter in the first dewatering plate 106, and then the first dewatering plate 106 is pressed, so that the residual biogas and moisture are dewatered through the second dewatering plate 118, and the first vacuum pump 120 is started to suck the dewatered biogas in the fixing box 117 into the second conveying pipe 121 through the first conveying pipe 119, thereby avoiding waste of resources and improving the dewatering effect of the device.

[0054] It is connected to the biogas tank that needs to be dewatered through the air supply pipe 201, and several groups of elastic plastic plates 20357 are squeezed to limit them according to the width of the output pipe, and then the several groups of elastic plastic plates 20357 are driven to move toward the air supply pipe 201, thereby reducing the labor intensity of assembling the air supply pipe 201 and the output pipe on the biogas tank; the limiting ring 206 is driven to move to the junction of the air supply pipe 201 and the output pipe, and the inflatable structure 205 is started to fill the filling bag structure 207, so that the filling bag structure 207 fills the gap between the air supply pipe 201 and the output pipe, thereby avoiding the problem of biogas leakage caused by air leakage, and at the same time improving the buffering effect of the device and the stability of biogas transportation.

[0055] The biogas enters the desulfurization disk 310 through the receiving pipe 302 for desulfurization. The desulfurized biogas passes through the clamping pipe 3147 and the connecting rod 3145 in turn and is discharged through the air vent 3149. Since the desulfurization plate 3148 may be blocked after working for a long time, in order to improve the desulfurization effect, the sixth electric push rod 312 is started to drive the fixed disc 3141 to descend, and then the third motor 313 is started to drive the fixed disc 3141 to rotate, so that the desulfurization plate 3148 that has not yet worked is located directly below the receiving pipe 302, and then the receiving pipe 302 is driven to be engaged with the clamping pipe 3147, which improves the desulfurization effect and speeds up the work progress.

[0056] Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein; and these modifications or substitutions do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A biogas liquid seal mechanism, comprising a liquid seal assembly (3), characterized in that: The liquid seal assembly (3) comprises a receiving tray (301), a desulfurization tray (310) is arranged at the bottom of the receiving tray (301), a plurality of groups of receiving tubes (302) are connected in a circular array at the bottom of the receiving tray (301), the other end of each group of receiving tubes (302) is connected to the top of the desulfurization tray (310), a group of fifth control valves (303) are installed at the junction of each group of receiving tubes (302) and the receiving tray (301), a group of liquid seal rings (304) are sleeved on the outer wall of each group of receiving tubes (302), a group of second vacuum pumps (305) are installed on the outer wall of each group of liquid seal rings (304), and a plurality of groups of seventh control valves (309) are distributed in a circular array on the inner wall of the liquid seal ring (304), and the output end of each group of the seventh control valves (309) is installed on the receiving tube (302). on the outer wall of the desulfurization disk (310); a group of conversion tubes (306) are connected to the outer wall of each group of liquid seal rings (304); a group of sixth control valves (308) are installed at the junction of each group of conversion tubes (306) and the liquid seal ring (304); the other end of each group of conversion tubes (306) passes through the liquid seal ring (304) and is connected to the outer wall of the receiving tube (302); a group of third vacuum pumps (307) are installed on the outer wall of each group of conversion tubes (306); a plurality of groups of eighth control valves (311) are distributed in a ring array at the bottom of the desulfurization disk (310); a sixth electric push rod (312) is installed on the inner wall of the bottom of the desulfurization disk (310); a third motor (313) is installed on the output end of the sixth electric push rod (312); and a desulfurization mechanism (314) is transmission-connected to the output end of the third motor (313); The desulfurization mechanism (314) comprises a fixed disc (3141), the bottom of the fixed disc (3141) is drivingly connected to the output end of the third motor (313), the top of the fixed disc (3141) is provided with a plurality of groups of second slide grooves (3143) in a ring array, each group of the second slide grooves (3143) is provided with a group of second screw rods (3142), each group of the second screw rods (3142) is rotatably connected to the second slide grooves (3143), each group of the second screw rods (3142) is threadedly connected to a group of second sliding plates (3144), and each group of the second sliding plates (3144) is slidably connected to the second slide grooves (3143); A group of connecting rods (3145) are installed on the top of each group of the second sliding plates (3144); a plurality of groups of air holes (3149) are opened in a circular array on the outer wall of each group of the connecting rods (3145); a group of clamping tubes (3147) are connected to the top of each group of the connecting rods (3145); a group of desulfurization plates (3148) are arranged in each group of the clamping tubes (3147); the outer wall of each group of the clamping tubes (3147) is movably clamped with the inner wall of the receiving tube (302); a plurality of groups of fourth motors (3146) are distributed in a circular array on the outer wall of the fixed disc (3141); the output end of each group of the fourth motors (3146) passes through the fixed disc (3141) and is then transmission-connected to one of the second screw rods (3142).

2. An integrated water removal device, characterized in that: The invention comprises a dewatering component (1) and a liquid seal component (3) as claimed in claim 1, wherein a mounting component (2) is arranged on one side wall of the dewatering component (1), the dewatering component (1) comprises a dewatering box (101), a first electric push rod (102) is mounted on the top inner wall of the dewatering box (101), a push plate (103) is mounted on the output end of the first electric push rod (102), the outer wall of the push plate (103) is slidably fitted on the inner wall of the dewatering box (101), and a first push plate (103) is mounted on the bottom inner wall of the dewatering box (101). a dewatering plate (106); the bottom of the dewatering box (101) is connected to a second conveying pipe (121); the top of the receiving tray (301) is connected to the second conveying pipe (121); a second electric push rod (104) is installed on an inner wall of one side of the dewatering box (101); a first push block (105) is installed on the output end of the second electric push rod (104); the bottom of the first push block (105) is slidably attached to the top of the first dewatering plate (106); the dewatering box (101) is away from the first push block (10 A threshing box (108) is connected to one side wall of the threshing box (108), a first control valve (107) is installed at the junction of the threshing box (108) and the water removal box (101), a limit clamp ring (113) is installed on the inner wall of the threshing box (108), a rectangular plate is arranged in the threshing box (108), a dewatering screen (114) is sleeved on the outer wall of the rectangular plate, the outer wall of the dewatering screen (114) is clamped in the limit clamp ring (113), the bottom of the rectangular plate is connected to a vibration motor (115), and the threshing box (108) is connected to the outer wall of the rectangular plate. 08) A fourth electric push rod (111) is installed on the inner wall on the side away from the first control valve (107), a second push block (112) is installed on the output end of the fourth electric push rod (111), and the second push block (112) is located directly above the dewatering screen (114); a third electric push rod (109) is installed on the top inner wall of the threshing box (108), a pressing block (110) is installed on the output end of the third electric push rod (109), and the pressing block (110) is located directly above the dewatering screen (114).

3. The integrated water removal device according to claim 2, characterized in that: The bottom of the threshing box (108) is connected to a fixed box (117); a second control valve (116) is installed at the junction of the fixed box (117) and the threshing box (108); a second dewatering plate (118) is arranged in the fixed box (117); a first conveying pipe (119) is connected to a side wall of the fixed box (117) close to the second conveying pipe (121); the first conveying pipe (119) is located below the second dewatering plate (118); the other end of the first conveying pipe (119) passes through the fixed box (117) and is connected to the second conveying pipe (121); a third control valve (122) is installed at the junction of the first conveying pipe (119) and the second conveying pipe (121); and a first vacuum pump (120) is installed on the outer wall of the first conveying pipe (119).

4. The integrated water removal device according to claim 2, characterized in that: The installation assembly (2) comprises an air supply pipe (201), a fourth control valve (202) is installed at the junction of the air supply pipe (201) and the water removal tank (101), and a limiting mechanism (203) is sleeved on the outer wall of the air supply pipe (201); the limiting mechanism (203) comprises a circular ring body (2031), and a plurality of groups of sliding cavities (2033) are provided in a circular array on a side wall of the circular ring body (2031) away from the water removal tank (101), each group of the sliding cavities (2033) is provided with a group of threaded rods (2032), and each group of the threaded rods (2032) is rotatably connected in the sliding cavity (2033).

5. The integrated dewatering device according to claim 4, characterized in that: A plurality of groups of second motors (2036) are distributed in a ring array on the outer wall of the annular body (2031); the output ends of each group of the second motors (2036) penetrate the annular body (2031) and are then drivingly connected to one of the groups of threaded rods (2032); each group of the threaded rods (2032) is threadedly connected to a group of sliding blocks (2034); each group of the sliding blocks (2034) is slidably connected in the sliding cavity (2033); and a group of limiting portions (2035) are installed on a side wall of each group of the sliding blocks (2034) away from the water removal tank (101).

6. The integrated dewatering device according to claim 4, characterized in that: A fifth electric push rod (204) is mounted on a side wall of the annular body (2031) close to the sliding cavity (2033); a limiting annular ring (206) is mounted on the output end of the fifth electric push rod (204); a filling bag structure (207) is arranged on the inner wall of the limiting annular ring (206); the outer wall of the filling bag structure (207) is slidably fitted on the outer wall of the second air supply pipe (201); an inflatable structure (205) is mounted on the outer wall of the limiting annular ring (206); the output end of the inflatable structure (205) passes through the limiting annular ring (206) and is connected to the input end of the filling bag structure (207).

7. The integrated water removal device according to claim 5, characterized in that: The limiting portion (2035) comprises a connecting plate (20351), a group of first sliding grooves (20353) are provided on a side wall corresponding to each group of the connecting plates (20351), a group of first screw rods (20352) are arranged in each group of the first sliding grooves (20353), each group of the first screw rods (20352) are rotatably connected to the inner wall of the first sliding grooves (20353), each group of the first screw rods (20352) are threadedly connected to a group of first sliding plates (20354), each group of the first sliding plates (20354) are slidably connected in the first sliding grooves (20353), and a group of fixing blocks (20355) are installed on a side wall corresponding to each group of the first sliding plates (20354).

8. The integrated water removal device according to claim 7, characterized in that: Two groups of limit blocks (20356) are symmetrically arranged at the edge of a side wall of each group of fixed blocks (20355) away from the first sliding plate (20354), and an elastic shaping plate (20357) is connected between the two groups of limit blocks (20356). A group of first motors (20358) are installed on a side wall of each group of connecting plates (20351) away from the annular body (2031), and the output end of each group of the first motors (20358) passes through the connecting plate (20351) and is then transmission-connected to the first screw rod (20352).

Citation Information

Patent Citations

  • Biogas liquid sealing and water removing integrated device

    CN214618009U

  • Piston reciprocating type low-concentration gas generator set

    CN101666264A

  • Methane desulfurizer capable of preventing tempering and dry combustion

    CN102120069A

  • Liquid seal method for on-off of gas pipeline and device thereof

    US20220018457A1

  • KR20190078265A