Marine locker moisture-proof installation node
By designing the blocking flat iron, wall panels and cement tile structures at the bottom of the locker, the problem of corrosion and rust in traditional lockers is solved, and the moisture-proof and waterproof effect and aesthetics of the locker are achieved.
Patent Information
- Application Number
- CN202410013373.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-04
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2044-01-04
AI Technical Summary
Traditional lockers are prone to corrosion and rust due to long-term exposure to water flow in the locker room, and the steel base is directly exposed, which is not beautiful, affecting the coordination of the cabin.
Design a moisture-proof installation node for marine locker, adopting a flat iron, wall panel and base structure, the flat iron and wall panel form an isolation layer, and cement layers and ceramic tiles are laid on both sides of the base to ensure that the base and the locker do not come into direct contact. Deck to prevent corrosion and rust.
It realizes moisture-proof and waterproofing at the bottom of the locker, avoids corrosion and rust, improves the durability and aesthetics of the locker, and facilitates daily cleaning.
Smart Images

Figure CN117698930B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of shipbuilding, and in particular to a moisture-proof installation node for a ship locker. Background Art
[0002] Ships usually have dressing rooms with several lockers and wash basins to provide service places for sea workers to change clothes and wash, so as to facilitate sea workers to change work clothes and shoes. Since dressing rooms are frequently used, with high personnel mobility, and work shoes or clothes often carry oil or water stains, in order to facilitate daily cleaning and management of dressing rooms, and for the sake of easy cleaning, firmness and durability, dressing room floors are usually laid with ceramic tiles, which can be cleaned by direct flushing.
[0003] In traditional designs, lockers are directly installed on a steel base, which is then treated with a paint finish. During daily cleaning of the locker room floor, the bottom of the locker and the steel base will inevitably be washed by water. The base and the bottom of the locker are often soaked in water and oil, which can easily lead to corrosion, rust and damage over time, causing losses. In addition, the steel base is directly exposed, which is not aesthetically pleasing and affects the coordination of the cabin.
[0004] Therefore, a device is urgently needed to solve the above problems. Summary of the invention
[0005] The object of the present invention is to provide a moisture-proof installation node for a marine locker, which has a simple structure, is neat and beautiful, is easy to clean daily, and can prevent a base and a locker from being corroded and rusted.
[0006] To achieve this object, the present invention adopts the following technical solutions:
[0007] Marine locker moisture-proof installation nodes, including:
[0008] A water-blocking flat iron, the water-blocking flat iron comprising a first water-blocking portion and a second water-blocking portion connected to each other, the first water-blocking portion and the second water-blocking portion are both vertically arranged and at right angles, and the bottoms of the first water-blocking portion and the second water-blocking portion are both connected to the deck;
[0009] A wall panel, the wall panel comprising a first wall panel and a second wall panel connected to each other, the first wall panel and the second wall panel are both vertically arranged at a right angle, and the first water retaining portion is inserted at the bottom of the first wall panel along its length direction, and the second water retaining portion is inserted at the bottom of the second wall panel along its length direction;
[0010] A base, the base is arranged on the deck, two adjacent sides of the base are respectively connected to the first water retaining part and the second water retaining part, the other two sides of the base are provided with a cement layer and a ceramic tile, the cement layer can cover the outer surface of the other two sides of the base, and the cement layer can abut against the first water retaining part and the second water retaining part, and the ceramic tile can cover the cement layer and be at the same height as the base;
[0011] A locker, wherein a plurality of lockers are provided, and a plurality of lockers are sequentially arranged on the top of the base close to the first wall panel, wherein a side wall of one of the lockers is close to the second wall panel, and a surface of the locker is flush with the outer side of the tile.
[0012] Preferably, the base includes a top plate, a first side plate, a second side plate, a front plate and a back plate, the tops of the first side plate, the second side plate, the front plate and the back plate are all connected to the top plate, the adjacent two sides of the top plate are respectively connected to the first water blocking portion and the second water blocking portion, and the opposite two sides of the first side plate are respectively connected to the first water blocking portion and one side of the front plate, the other side of the front plate is connected to the second water blocking portion, the opposite two sides of the back plate are respectively connected to the first side plate and the second water blocking portion, and the opposite two sides of the second side plate are respectively connected to the front plate and the back plate.
[0013] Preferably, the edge of the top plate extends out of the first side plate and the front plate, and the outer side of the first side plate and the outer side of the front plate are paved with the cement layer, the cement layer can cover the first side plate and the front plate, and the cement layer abuts against the bottom of the top plate and is flush with the edge of the top plate.
[0014] Preferably, the ceramic tile is attached to the outer side of the cement layer, the ceramic tile can cover the cement layer, and the ceramic tile extends along its height direction to be flush with the top of the top plate.
[0015] Preferably, the side of the first wall panel close to the base protrudes from the first water retaining portion, and a portion of the bottom of the first wall panel abuts against the top plate, and the side of the second wall panel close to the base protrudes from the second water retaining portion, and a portion of the bottom of the second wall panel abuts against the top plate.
[0016] Preferably, the edge of the top plate extends out of the back plate, and the top plate, the back plate and the first water retaining portion form a first gap, one end of the bolt can pass through the locker and the top plate, and the other end of the bolt can extend into the first gap.
[0017] Preferably, the edge of the top plate extends out of the second side plate, and the top plate, the second side plate, the front plate, the back plate and the second water retaining portion form a second gap, one end of the bolt can pass through the locker and the top plate, and the other end of the bolt can extend into the second gap.
[0018] Preferably, two opposite sides of the first side plate are respectively welded to the first water retaining portion and one side of the front plate, and the other side of the front plate is welded to the second water retaining portion.
[0019] Preferably, the thickness of the cement layer is 25 mm.
[0020] Preferably, the top plate, the first side plate, the second side plate, the front plate and the back plate are all made of steel.
[0021] Beneficial effect: The present invention provides a moisture-proof installation node for a marine locker, comprising a water-blocking flat iron, the water-blocking flat iron comprising a first water-blocking portion and a second water-blocking portion connected, the first water-blocking portion and the second water-blocking portion are both vertically arranged at right angles, and the bottoms of the first water-blocking portion and the second water-blocking portion are both connected to the deck, a wall panel, the wall panel comprising a first wall panel and a second wall panel connected, the first wall panel and the second wall panel are both vertically arranged at right angles, and the first water-blocking portion is inserted at the bottom of the first wall panel along its length direction, and the second water-blocking portion is inserted at the bottom of the second wall panel along its length direction, and a base is arranged on the deck, the adjacent two sides of the base are respectively connected to the first water-blocking portion and the second water-blocking portion, and the other two sides of the base A cement layer and ceramic tiles are provided, the cement layer can cover the outer surfaces of the other two sides of the base, and the cement layer can abut against the first water retaining part and the second water retaining part, the ceramic tiles can cover the cement layer to improve the aesthetics, and the ceramic tiles are at the same height as the base to avoid gaps that cause the base to get damp, and there are multiple lockers. Multiple lockers are arranged in sequence close to the first wall panel on the top of the base, and the side wall of one of the lockers is close to the second wall panel to prevent gaps from hiding dirt and garbage, and the surface of the locker is flush with the outer side of the ceramic tiles to prevent the bottom of the locker from getting damp and rusting; the structure is simple, neat and beautiful, easy to clean daily, and can prevent the base and locker from corrosion and rust. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 is a front view of a moisture-proof installation node for a marine locker provided by an embodiment of the present invention;
[0023] Figure 2 is a cross-sectional view of a moisture-proof installation node for a marine locker provided by an embodiment of the present invention;
[0024] Figure 3 yes Figure 2 The enlarged view of point A in the middle;
[0025] Figure 4 is a top view of a base provided by an embodiment of the present invention;
[0026] Figure 5 It is a top view of a moisture-proof installation node for a marine locker provided by an embodiment of the present invention.
[0027] In the figure:
[0028] 100, deck; 101, ceiling;
[0029] 11. First water retaining part; 12. Second water retaining part; 21. First wall panel; 22. Second wall panel; 3. Base; 31. Top panel; 32. First side panel; 33. Second side panel; 34. Front panel; 35. Back panel; 4. Locker; 5. Cement layer; 6. Ceramic tile; 7. Bolts. DETAILED DESCRIPTION
[0030] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.
[0031] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0032] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0033] In the description of this embodiment, the terms "upper", "lower", "right", etc., directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplification of operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.
[0034] The present embodiment provides a moisture-proof installation node for a marine locker, which has a simple structure, is easy to install, and is neat and beautiful, convenient for daily cleaning, and can prevent the base 3 and the locker 4 from corrosion and rust.
[0035] like Figure 1-Figure 5 As shown, the moisture-proof installation node for ship lockers provided in this embodiment includes a water-blocking flat iron, a wall panel, a base 3 and a plurality of lockers 4, wherein the water-blocking flat iron is connected to the deck 100, and the wall panel is arranged on the water-blocking flat iron. Since the ship is in the water for a long time, the deck 100 is relatively humid. The water-blocking flat iron is arranged to avoid direct contact between the wall panel and the ground, thereby playing a moisture-proof role. The base 3 is arranged on the deck 100 and connected to the water-blocking flat iron, and the locker 4 is arranged on the base 3.
[0036] Specifically, Figure 1 and Figure 2 As shown, the water blocking flat iron includes a first water blocking portion 11 and a second water blocking portion 12 connected to each other, the first water blocking portion 11 and the second water blocking portion 12 are both vertically arranged, and the first water blocking portion 11 and the second water blocking portion 12 are arranged at a right angle, and the bottoms of the first water blocking portion 11 and the second water blocking portion 12 are both connected to the deck 100; Figure 5 As shown, the wall panel includes a first wall panel 21 and a second wall panel 22 that are connected. The first wall panel 21 and the second wall panel 22 are both vertically arranged, and the angle between the first wall panel 21 and the second wall panel 22 is a right angle. The tops of the first wall panel 21 and the second wall panel 22 are connected to the ceiling 101, and the top of the first water retaining portion 11 is inserted at the bottom of the first wall panel 21 along its length direction, and the top of the second water retaining portion 12 is inserted at the bottom of the second wall panel 22 along its length direction, thereby being able to achieve isolation of the first wall panel 21 and the second wall panel 22 from the deck 100; in this embodiment, a plurality of lockers 4 are arranged in sequence on the top of the base 3 close to the first wall panel 21, and the side wall of one of the lockers 4 is close to the second wall panel 22 to prevent gaps from being generated to hide dirt and garbage.
[0037] Furthermore, a placement space is formed inside the first water retaining portion 11 and the second water retaining portion 12, the base 3 is arranged in the placement space, and the adjacent two sides of the base 3 are respectively connected to the first water retaining portion 11 and the second water retaining portion 12, and the other two sides of the base 3 are paved with cement layers 5, and the cement layers 5 can cover the outer surfaces of the other two sides of the base 3. When the floor is cleaned daily, the cement layers 5 can play a certain waterproof role to prevent the base 3 from getting damp and rusting, and the cement layers 5 are L-shaped, and the two ends of the L-shaped cement layers 5 are respectively in contact with the first water retaining portion 11 and the second water retaining portion 12 to prevent the generation of gaps, thereby causing dirt and garbage to hide; further, as Figure 2 and Figure 3 As shown, ceramic tiles 6 are also provided on the outside of the cement layer 5, and the ceramic tiles 6 can cover the cement layer 5 to improve the aesthetics. Preferably, the ceramic tiles 6 are at the same height as the base 3 to avoid gaps that cause the base 3 to get damp. Further preferably, the outside of the ceramic tiles 6 is flush with the surface of the locker 4 to prevent the bottom of the locker 4 from getting damp and rusting.
[0038] Specifically, Figure 4 As shown, in this embodiment, the base 3 includes a top plate 31, a first side plate 32, a second side plate 33, a front plate 34 and a back plate 35. The tops of the first side plate 32, the second side plate 33, the front plate 34 and the back plate 35 are all connected to the top plate 31, the adjacent two sides of the top plate 31 are respectively connected to the first water blocking portion 11 and the second water blocking portion 12, and the opposite two sides of the first side plate 32 are respectively connected to the first water blocking portion 11 and one side of the front plate 34, the other side of the front plate 34 is connected to the second water blocking portion 12, the opposite two sides of the back plate 35 are respectively connected to the first side plate 32 and the second water blocking portion 12, and the opposite two sides of the second side plate 33 are respectively connected to the front plate 34 and the back plate 35. In this embodiment, the first side plate 32, the second side plate 33, the front plate 34 and the back plate 35 have the same height, the first side plate 32 is parallel to the second side plate 33, the front plate 34 is parallel to the back plate 35, and the first side plate 32 is perpendicular to the front plate 34.
[0039] Preferably, two opposite sides of the first side plate 32 are respectively welded to the first water retaining portion 11 and one side of the front plate 34 , and the other side of the front plate 34 is welded to the second water retaining portion 12 to ensure connection strength.
[0040] Exemplarily, the top plate 31 , the first side plate 32 , the second side plate 33 , the front plate 34 and the back plate 35 are all made of steel, which has high strength and is easy to weld.
[0041] In this embodiment, Figure 2As shown, the side of the first wall plate 21 close to the base 3 protrudes from the first water retaining portion 11, and the portion of the first wall plate 21 protruding from the first water retaining portion 11 has its bottom abutted against the top plate 31 to support the first wall plate 21. Similarly, the side of the second wall plate 22 close to the base 3 protrudes from the second water retaining portion 12, and the portion of the second wall plate 22 protruding from the second water retaining portion 12 has its bottom abutted against the top plate 31 to support the second wall plate 22.
[0042] Furthermore, the edge of the top plate 31 extends out of the first side plate 32 and the front plate 34, and the projections of the first side plate 32 and the front plate 34 on the top plate 31 are L-shaped, thereby reserving a space for laying the cement layer 5. The L-shaped cement layer 5 is laid on the outside of the first side plate 32 and the outside of the front plate 34, and the cement layer 5 can cover the first side plate 32 and the front plate 34, and the cement layer 5 is flush with the edge of the top plate 31, and the cement layer 5 abuts against the bottom of the top plate 31. The above arrangement ensures the waterproof effect of the base 3.
[0043] Preferably, the thickness of the cement layer 5 in this embodiment is 25 mm, that is, the distance between the projection of the first side panel 32 on the top panel 31 and the edge of one side of the top panel 31 closest to it is 25 mm, and the distance between the projection of the front panel 34 on the top panel 31 and the edge of one side of the top panel 31 closest to it is 25 mm.
[0044] Optionally, the edge of the top plate 31 extends out of the back plate 35, and then the bottom of the top plate 31, the side of the back plate 35 close to the first water retaining portion 11, and the side of the first water retaining portion 11 close to the back plate 35 cooperate to form a first gap, and the projection interval of the first gap on the top plate 31 is set as the first mounting portion. Preferably, the first mounting portion is provided with a plurality of first mounting holes spaced apart along the arrangement direction of the locker 4, and one locker 4 corresponds to at least one first mounting hole. One end of the bolt 7 can pass through the locker 4 and its corresponding first mounting hole in sequence, and the other end of the bolt 7 extends into the first gap and is fixed by a nut to connect the locker 4 to the base 3.
[0045] Optionally, the edge of the top plate 31 extends out from the second side plate 33, and then the bottom of the top plate 31, the side where the front plate 34 and the back plate 35 are close to each other, and the side where the second side plate 33 and the second water retaining portion 12 are close to each other cooperate to form a second gap, and the projection interval of the second gap on the top plate 31 is set as the second mounting portion. Preferably, the second mounting portion is provided with at least one second mounting hole, and one end of the bolt 7 can pass through a locker 4 closest to the second water retaining portion 12 and the corresponding second mounting hole on one side, and the other end of the bolt 7 extends into the second gap and is fixed by a nut to connect the locker 4 to the base 3, thereby improving the stability of the locker 4 connected to the base 3.
[0046] Furthermore, the ceramic tile 6 is attached to the outside of the cement layer 5, and the ceramic tile 6 can cover the cement layer 5, thereby improving the aesthetics, and the ceramic tile 6 extends along its height direction to be flush with the top of the top plate 31 to avoid the generation of gaps that cause the edge of the top plate 31 to become damp and rusty.
[0047] In this embodiment, the projection interval of the cement layer 5 on the top plate 31 is set as the third mounting portion, and the first mounting portion is provided with a plurality of third mounting holes at intervals. When installing this embodiment, firstly, bolts 7 are passed through the locker 4 and the corresponding first mounting holes, second mounting holes, and third mounting holes, and fixed by nuts, so that the locker 4 is firmly connected to the base 3, and then the cement layer 5 is further laid and the tiles 6 are pasted. It can be understood that some bolts 7 are cast in the cement layer 5.
[0048] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the protection scope of the present invention. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.
Claims
1. The moisture-proof installation node of the marine locker is characterized by: include: A water-blocking flat iron, the water-blocking flat iron comprising a first water-blocking portion (11) and a second water-blocking portion (12) connected to each other, the first water-blocking portion (11) and the second water-blocking portion (12) being both vertically arranged and at right angles, and the bottoms of the first water-blocking portion (11) and the second water-blocking portion (12) being both connected to a deck (100); A wall panel, the wall panel comprising a first wall panel (21) and a second wall panel (22) connected to each other, the first wall panel (21) and the second wall panel (22) being both vertically arranged at right angles, and the first water retaining portion (11) being inserted at the bottom of the first wall panel (21) along its length direction, and the second water retaining portion (12) being inserted at the bottom of the second wall panel (22) along its length direction; A base (3), the base (3) being arranged on the deck (100), the adjacent two sides of the base (3) being respectively connected to the first water retaining portion (11) and the second water retaining portion (12), the other two sides of the base (3) being provided with a cement layer (5) and a ceramic tile (6), the cement layer (5) being capable of covering the outer surfaces of the other two sides of the base (3), and the cement layer (5) being capable of abutting against the first water retaining portion (11) and the second water retaining portion (12), and the ceramic tile (6) being capable of covering the cement layer (5) and being at the same height as the base (3); A locker (4), wherein a plurality of lockers (4) are provided, and the plurality of lockers (4) are sequentially arranged on the top of the base (3) in close contact with the first wall plate (21), wherein the side wall of one of the lockers (4) is in close contact with the second wall plate (22), and the surface of the locker (4) is flush with the outer side of the tile (6); The base (3) comprises a top plate (31), a first side plate (32), a second side plate (33), a front plate (34) and a back plate (35); the tops of the first side plate (32), the second side plate (33), the front plate (34) and the back plate (35) are all connected to the top plate (31); and adjacent two sides of the top plate (31) are respectively connected to the first water retaining portion (11) and the second water retaining portion (12); The edge of the top plate (31) extends out of the first side plate (32) and the front plate (34), and the outer side of the first side plate (32) and the outer side of the front plate (34) are both paved with the cement layer (5), and the cement layer (5) can cover the first side plate (32) and the front plate (34), and the cement layer (5) abuts against the bottom of the top plate (31) and is flush with the edge of the top plate (31).
2. The moisture-proof installation node for marine lockers according to claim 1 is characterized in that: The opposite sides of the first side plate (32) are respectively connected to the first water retaining portion (11) and one side of the front plate (34), the other side of the front plate (34) is connected to the second water retaining portion (12), the opposite sides of the back plate (35) are respectively connected to the first side plate (32) and the second water retaining portion (12), and the opposite sides of the second side plate (33) are respectively connected to the front plate (34) and the back plate (35).
3. The moisture-proof installation node for marine lockers according to claim 1 is characterized in that: The ceramic tile (6) is attached to the outer side of the cement layer (5), the ceramic tile (6) can cover the cement layer (5), and the ceramic tile (6) extends along its height direction to be flush with the top of the top plate (31).
4. The moisture-proof installation node for marine lockers according to claim 2 is characterized in that: A side of the first wall plate (21) close to the base (3) protrudes from the first water retaining portion (11), and a portion of the bottom of the first wall plate (21) abuts against the top plate (31); a side of the second wall plate (22) close to the base (3) protrudes from the second water retaining portion (12), and a portion of the bottom of the second wall plate (22) abuts against the top plate (31).
5. The moisture-proof installation node for marine lockers according to claim 2, characterized in that: The edge of the top plate (31) extends out of the back plate (35), and the top plate (31), the back plate (35) and the first water retaining portion (11) form a first gap. One end of the bolt (7) can pass through the locker (4) and the top plate (31), and the other end of the bolt (7) can extend into the first gap.
6. The moisture-proof installation node for marine lockers according to claim 2, characterized in that: The edge of the top plate (31) extends out of the second side plate (33); the top plate (31), the second side plate (33), the front plate (34), the back plate (35) and the second water retaining portion (12) form a second gap; one end of the bolt (7) can pass through the locker (4) and the top plate (31), and the other end of the bolt (7) can extend into the second gap.
7. The moisture-proof installation node for marine lockers according to claim 2, characterized in that: The opposite sides of the first side plate (32) are respectively welded to the first water retaining portion (11) and one side of the front plate (34), and the other side of the front plate (34) is welded to the second water retaining portion (12).
8. The moisture-proof installation node for marine lockers according to any one of claims 1 to 7, characterized in that: The thickness of the cement layer (5) is 25 mm.
9. The moisture-proof installation node for marine lockers according to any one of claims 2 to 7, characterized in that: The top plate (31), the first side plate (32), the second side plate (33), the front plate (34) and the back plate (35) are all made of steel.
Citation Information
Patent Citations
Marine wardrobe mounting structure
CN208683056U
Damp-proof and corrosion-resistant electrical control cabinet for drum workshop
CN213880628U