A high-speed railway subgrade settlement monitoring device

By using a ball joint to connect the monitoring rod to the base plate and utilizing the enclosure and positioning components, the problem of level deviation caused by the tilt of the settlement plate was solved, thus achieving accurate monitoring of roadbed settlement.

CN117803024BActive Publication Date: 2026-11-17CHINA COAL ZHEJIANG SURVEY & DESIGN CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202311206117.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-18
Publication Date
2026-11-17
Estimated Expiration
2043-09-18

AI Technical Summary

Technical Problem

Existing settlement plates are prone to level deviation due to tilting during roadbed settlement monitoring, making it difficult to accurately observe the vertical settlement value of the roadbed.

Method used

The monitoring rod is connected to the base plate using a ball joint. Combined with the enclosure and positioning components, the vertical status of the monitoring rod is indicated by an indicator, and the monitoring rod is positioned using components such as abutment seats and anti-slip components to ensure that it remains vertical when tilted.

Benefits of technology

It effectively eliminates the deviation caused by the tilt of the monitoring pole, ensuring that the monitoring pole can accurately maintain a vertical state when the roadbed settles, which facilitates accurate measurement of the vertical settlement deviation of the roadbed.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117803024B_ABST
    Figure CN117803024B_ABST
Patent Text Reader

Abstract

This application relates to the technical field of settlement monitoring and discloses a high-speed railway subgrade settlement monitoring device, which includes a base plate, a monitoring rod, and a enclosure. The monitoring rod is ball-hinged to the base plate, and has a monitoring line and an indicator at its top to indicate the vertical position of the monitoring rod. The enclosure is disposed on the base plate to enclose the monitoring rod, allowing the monitoring rod to move within the enclosure. The monitoring line of the monitoring rod extends beyond the enclosure to the side away from the base plate. A positioning component is provided between the monitoring rod and the enclosure for positioning the monitoring rod. This application enables easy observation of the vertical settlement deviation of the subgrade.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the technical field of settlement monitoring, and in particular to a high-speed railway subgrade settlement monitoring device. Background Technology

[0002] During the construction of high-speed railways, monitoring points are set up along the line to measure the settlement of the roadbed. Currently, settlement plates are often buried on the roadbed to observe the settlement of the roadbed.

[0003] A Chinese utility model patent document with publication number CN205879166U discloses a settlement plate, including a settlement base plate, a bottom pipe disposed on the settlement base plate, and a connecting pipe threadedly connected to the bottom pipe. The upper end of the connecting pipe has a level line. When used in roadbeds, the settlement base plate is usually buried in the roadbed, and the upper end of the connecting pipe extends out of the roadbed surface. The elevation of the level line on the connecting pipe is measured using a level instrument to monitor the settlement value of the roadbed.

[0004] Regarding the aforementioned technologies, after the settlement plate is buried in the soil subgrade, the settlement that occurs in the subgrade may cause the settlement plate to tilt, resulting in the level line of the connecting pipe also tilting. This causes the detection of the vertical settlement value of the subgrade to be affected by the tilting deviation, making it difficult to directly observe the vertical settlement of the subgrade. Summary of the Invention

[0005] To facilitate the observation of vertical settlement deviation of the roadbed, this application provides a high-speed railway roadbed settlement monitoring device.

[0006] This application provides a high-speed railway subgrade settlement monitoring device, which adopts the following technical solution: A high-speed railway subgrade settlement monitoring device includes a base plate, a monitoring rod, and a enclosure. The monitoring rod is ball-hinged to the base plate, has a monitoring line at its top, and an indicator at its top to guide the vertical position of the monitoring rod. The enclosure is disposed on the base plate to enclose the monitoring rod, allowing the monitoring rod to move within the enclosure. The monitoring line of the monitoring rod extends beyond the enclosure to the side away from the base plate. A positioning component is provided between the monitoring rod and the enclosure to position the monitoring rod.

[0007] By adopting the above technical solution, the monitoring rod is ball-jointed to the base plate. When the base plate tilts and settles with the roadbed, the monitoring rod can be moved to a vertical position inside the enclosure by the direction of the indicator. Then, the positioning component is used to position the monitoring rod, so that the monitoring rod can be kept in a vertical position when measuring, which is convenient for measuring the vertical settlement deviation of the foundation.

[0008] Optionally, the positioning component includes an abutment seat and an anti-shifting member. Two abutment seats are staggered along the length of the monitoring rod, and their length directions are perpendicular to each other. Each abutment seat includes a sleeve and an adjusting rod. The sleeve slides through the monitoring rod perpendicular to its length direction. The adjusting rod is slidably connected to opposite ends of the sleeve to adjust the extension length of the abutment seat. The anti-shifting member moves on the monitoring rod to abut against the abutment seat, thereby positioning the abutment seat relative to the monitoring rod.

[0009] By adopting the above technical solution, two abutment seats simultaneously abut against the inner wall of the enclosure, and the abutment seats are positioned by the anti-slip component so that the two abutment seats can jointly position the monitoring rod. During the movement and adjustment of the monitoring rod, the extension length of the abutment seats is adjusted by the relative movement of the sleeve and the adjusting rod, so that the abutment rod can adapt to the distance between the two sides of the enclosure in the horizontal direction after tilting.

[0010] Optionally, the sleeve includes a main tube and a movable seat. The main tube slides on the monitoring rod, and the movable seat slides within the main tube along the length of the monitoring rod, with the movable seat opposite to the adjusting rod. The movable seat has a first rack on the side facing the adjusting rod, a second rack on the side facing away from the adjusting rod, and a third rack on the side of the adjusting rod facing the movable seat. The anti-shifting component includes an anti-shifting seat, a holding seat, and a resetting part. The anti-shifting seat slides along the length of the monitoring rod on the monitoring rod and corresponds to the main tube. The side of the anti-shifting seat facing the main tube has a positioning tooth, and the side of the main tube opposite to the anti-shifting seat has a clearance groove for the anti-shifting seat to extend into. The resetting part acts on the anti-shifting seat to give the anti-shifting seat a tendency to move away from the main tube. The pressure seat moves on the monitoring seat. When the pressure seat is in use, the pressure seat moves to abut against the anti-shift seat and drives the anti-shift seat to abut into the main tube so that the positioning tooth meshes with the second rack, and the moving seat moves towards the adjusting rod so that the first rack meshes with the third rack.

[0011] By adopting the above technical solution, the pressing seat drives the anti-shifting seat to move to engage with the moving seat, and then drives the moving seat to move together to engage with the adjusting rod. In this way, the movement of the pressing seat is restricted in sequence between the main pipe and the adjusting rod relative to the monitoring rod, thereby positioning the abutment seat.

[0012] Optionally, the pressure seat includes a fixed part, a threaded part, and a sliding disk. The fixed part is fixed to the monitoring rod, the threaded part is threaded through the fixed part along the length of the monitoring rod, the sliding disk is magnetically attracted to the threaded part and sleeved on the monitoring rod, and the sliding disk is located between the fixed part and the anti-shift seat to push the anti-shift seat.

[0013] By adopting the above technical solution, when the threaded part moves relative to the fixed part, it can drive the sliding plate to move together, thereby causing the sliding plate to collide or separate from the anti-slip seat.

[0014] Optionally, the pressure seat further includes an extension portion connected to the sliding plate. The sliding plate is opposite to the anti-shift seat of one of the main pipes, and the extension portion is opposite to the anti-shift seat of the other main pipe. When the sliding plate abuts against the opposite anti-shift seat, the extension portion abuts against the opposite anti-shift seat at the same time.

[0015] By adopting the above technical solution, when the threaded part moves, the extension part and the sliding plate can drive all the anti-slip seats to move together, thereby saving operation steps.

[0016] Optionally, the sleeve has an elastic element between the adjusting rods at opposite ends to drive the two adjusting rods to move away from each other.

[0017] By adopting the above technical solution, the two adjusting rods of the elastic device move away from each other, which enables the extension length of the abutment seat to be automatically adjusted during the adjustment of the monitoring rod.

[0018] Optionally, the adjusting rod has a travel portion, and the sleeve has a travel groove for the travel portion to slide and for restricting the travel portion from disengaging from the sleeve.

[0019] By adopting the above technical solution, the stroke section and the stroke groove cooperate to guide the movement of the adjusting rod.

[0020] Optionally, the monitoring rod includes a connecting section and an installation section, the connecting section having at least one and being connected in sequence, the installation section being detachably connected to the connecting section at the end away from the base plate, the installation section being used to install the positioning component; the enclosure includes a splicing section, the splicing section having at least one and being spliced ​​in sequence.

[0021] By adopting the above technical solution, the monitoring pole and the enclosure can be spliced ​​together to increase their height, thereby enabling the device to adapt to roadbeds of different heights.

[0022] Optionally, the end of the enclosure away from the base plate may be detachably connected to a cover for covering the opening of the enclosure and the monitoring rod.

[0023] By adopting the above technical solution, the cover can protect the monitoring rod and the space inside the enclosure when no observation is being conducted.

[0024] Optionally, the cross-section of the enclosure gradually decreases towards the base plate.

[0025] By adopting the above technical solution, the cross-section of the enclosure gradually decreases towards the bottom plate so that the enclosure can adapt to the movement direction of the monitoring rod, and the direction of foundation settlement can be observed by observing the tilt direction of the enclosure.

[0026] In summary, this application has the following beneficial effects: 1. The monitoring rod is moved inside the enclosure by the indicator, and then the monitoring rod is positioned by the positioning component, so that the monitoring plate can be adjusted to a vertical state for monitoring when the roadbed tilts and settles, thus making it easy to observe the vertical settlement deviation of the roadbed. Attached Figure Description

[0027] Figure 1 This is a structural schematic diagram of an embodiment of this application; Figure 2 This is a schematic diagram of the positioning component and the enclosure structure in the embodiments of this application; Figure 3 This is a schematic diagram of the positioning component structure in an embodiment of this application; Figure 4 This is a schematic diagram of the structure of the abutment seat when it is not locked in the embodiment of this application; Figure 5 This is a schematic diagram of the explosive structure of the abutment seat in an embodiment of this application; Figure 6 This is a schematic diagram of the anti-displacement component structure in an embodiment of this application; Figure 7 yes Figure 3 A magnified structural diagram of point A in the middle.

[0028] Explanation of reference numerals in the attached drawings: 1. Base plate; 2. Monitoring rod; 201. Connecting section; 202. Installation section; 3. Enclosure cover; 31. Splicing section; 4. Monitoring line; 5. Indicator; 6. Abutment seat; 61. Sleeve; 611. Main pipe; 612. Moving seat; 62. Adjusting rod; 7. Anti-slip element; 71. Anti-slip seat; 72. Pressing seat; 721. Fixing part; 722. Threaded part; 723. Sliding disc; 724. Extension part; 73. Reset part; 731. Reset block; 732. Reset spring; 8. First rack; 9. Second rack; 10. Third rack; 11. Positioning tooth; 12. Relief groove; 13. Elastic element; 14. Stroke part; 15. Stroke groove; 16. Cover cloth; 17. Guide block; 18. Guide groove; 19. Guide spring; 20. Moving groove; 21. Protruding edge. Detailed Implementation

[0029] The following is in conjunction with the appendix Figure 1-7 This application will be described in further detail.

[0030] This application discloses a high-speed railway subgrade settlement monitoring device. (Refer to...) Figure 1 and Figure 2 The high-speed railway subgrade settlement monitoring device includes a base plate 1, a monitoring rod 2, and a containment cover 3. The base plate 1 is square, and the monitoring rod 2 is square, with its bottom end spherically hinged to the center of the base plate 1. The containment cover 3 is fixed to the upper surface of the base plate 1. The containment cover 3 is a hollow conical shell that encloses the monitoring rod 2, thus protecting it. When the length of the monitoring rod 2 is perpendicular to the surface of the base plate 1, the central axis of the containment cover 3 coincides with the vertical centerline of the monitoring rod 2, and the inner radial direction of the containment cover 3 gradually increases away from the base plate 1.

[0031] Reference Figure 2 and Figure 3 An indicator 5 is fixed on the top surface of the monitoring rod 2 away from the base plate 1. In this embodiment, the indicator 5 is a circular level with a circular ring at its center. By moving the detection rod, the level is moved to the center ring, allowing the monitoring rod 2 to extend vertically. In other embodiments, the indicator 5 can also be four strip-shaped level bulbs fixed to the top surface of the monitoring rod 2. The four strip-shaped level bulbs are arranged end to end to form a square. By moving the detection rod, the level bulbs of the four strip-shaped level bulbs are moved to the center of the strip-shaped level, allowing the monitoring rod 2 to extend vertically.

[0032] The top outer wall of the monitoring rod 2 is engraved with a monitoring line 4 that circles around the circumference of the monitoring rod 2. This serves as the observation line during measurement. When the monitoring rod 2 rotates within the enclosure 3, the monitoring line 4 of the monitoring rod 2 is always higher than the highest point of the enclosure 3. During installation, the monitoring device is buried horizontally in the roadbed with the base plate 1 fully embedded in the soil. The lower part of the enclosure 3 is also buried in the soil along with the base plate 1, while the upper part of the enclosure 3 extends beyond the roadbed surface, allowing the monitoring line 4 to be observed.

[0033] To ensure the stability of the monitoring plate and prevent displacement during monitoring rod 2 observation, a positioning assembly is provided between monitoring rod 2 and enclosure cover 3 to position monitoring rod 2. The positioning assembly includes abutment seat 6 and anti-movement component 7. There are two abutment seats 6, which are distributed sequentially along the length of monitoring rod 2.

[0034] Reference Figure 3 and Figure 4Each abutment seat 6 includes a sleeve 61 and an adjusting rod 62. The sleeve 61 is a hollow tube, and its two ends are connected to each other. Each abutment seat 6 has two adjusting rods 62, which are slidably inserted through opposite ends of the sleeve 61. The adjusting rods 62 are square rods, and their length direction is consistent with the length direction of the sleeve 61. The sliding of the adjusting rods 62 relative to the sleeve 61 adjusts the overall extension length of the abutment seat 6. The sleeve 61 slides through the monitoring rod 2 along the length direction perpendicular to the monitoring rod 2, and the length directions of the sleeves 61 on the two abutment seats 6 are perpendicular to each other. The anti-slip member 7 moves on the monitoring rod 2 and is used to cooperate with the abutment seat 6 to position the abutment seat 6 relative to the monitoring rod 2.

[0035] Reference Figure 2 and Figure 3 When the monitoring rod 2 is in a vertical position, each abutment 6 is adjusted so that the two ends of the abutment 6 that are far apart from each other abut against the two opposite inner walls of the enclosure 3. Then, the abutment 6 is positioned relative to the monitoring rod 2 by the anti-slip member 7, so as to restrict the movement of the abutment 6 within the enclosure 3, thereby positioning the monitoring rod 2.

[0036] Reference Figure 4 and Figure 5 The sleeve 61 includes a main pipe 611 and a movable seat 612. The main pipe 611 is made of rigid material and is a square tube with both ends connected. The main pipe 611 is slidably inserted on the monitoring rod 2. The movable seat 612 is a square plate. The movable seat 612 slides inside the main pipe 611 along the height direction of the main pipe 611, and the length direction of the movable seat 612 is consistent with the length direction of the main pipe 611. The two far apart ends of the movable seat 612 are flush with the two far apart ends of the main pipe 611.

[0037] The hollow interior of the main pipe 611 is divided into upper and lower spaces. The upper space is used for the sliding seat 612 to slide along the height direction of the main pipe 611, and the lower space is used for the sliding rod 62 to slide along the length direction of the main pipe 611. A first rack 8 with teeth distributed along the length direction of the sliding seat 612 is fixed on the lower surface of the sliding seat 612, a second rack 9 with teeth distributed along the length direction of the sliding seat 612 is fixed on the upper surface of the sliding seat 612, and a third rack 10 with teeth distributed along the length direction of the adjusting rod 62 is distributed on the upper surface of the adjusting rod 62. When the sliding seat 612 moves downward, the first rack 8 and the third rack 10 can mesh, so that the adjusting rod 62 and the sleeve 61 are relatively positioned.

[0038] Reference Figure 5To facilitate the adjustment of the adjusting rod 62 relative to the sleeve 61, guide blocks 17 are fixed on the outer side walls of the moving seat 612 on both sides. The guide blocks 17 are square. A guide groove 18 is provided in the upper space inside the main pipe 611 for the guide blocks 17 to slide along the height direction of the main pipe 611. A guide spring 19 connected to the guide blocks 17 is installed in the guide groove 18. The guide spring 19 gives the guide blocks 17 a tendency to move away from the adjusting rod 62, so that the moving seat 612 moves upward under the elastic force of the guide spring 19 without any other external force, until the first rack 8 and the third rack 10 separate, so that the adjusting rod 62 can slide inside the sleeve 61.

[0039] In order to improve the stability of the main pipe 611, the outer walls of the main pipe 611, which are far apart from each other, have protrusions 21. When the main pipe 611 moves to the end and approaches the monitoring rod 2, the protrusions 21 at the end of the main pipe 611 abut against the outer wall of the monitoring rod 2 to prevent the main pipe 611 from completely detaching from the monitoring rod 2.

[0040] In addition, the two adjusting rods 62 in the same abutment seat 6 are each fixed with a stroke portion 14 on the outer wall of the end that is close to each other. The lower space inside the main pipe 611 is provided with a stroke groove 15 for the stroke portion 14 to slide along the length direction of the main pipe 611. The stroke groove 15 is close to the outer walls of the two ends of the main pipe 611 that are far apart and does not penetrate the end of the main pipe 611, so that when the adjusting rod 62 slides to the position that is about to leave the main pipe 611, it is blocked by the stroke groove 15, thereby improving the stability of the adjusting rod 62 relative to the main pipe 611.

[0041] Reference Figure 4 and Figure 6 The anti-shift component 7 includes an anti-shift seat 71, a holding seat 72, a reset part 73, and an extension part 724. The anti-shift seat 71 is block-shaped, and each main pipe 611 is fitted with two anti-shift seats 71. The two anti-shift seats 71 opposite to the main pipe 611 slide along the length direction of the monitoring rod 2 on opposite sides of the monitoring rod 2, and the distribution direction of the two anti-shift seats 71 is parallel to the length direction of the opposite main pipe 611. The bottom surface of the anti-shift seat 71 is fixed with a positioning tooth 11 opposite to the moving seat 612 inside the main pipe 611. A clearance groove 12 is opened on the side of the main pipe 611 facing the anti-shift seat 71, which makes way for the anti-shift seat 71 and communicates with the inner cavity of the main pipe 611. The clearance groove 12 passes through the opposite ends of the main pipe 611.

[0042] Reference Figure 5 and Figure 6When the anti-shift seat 71 moves closer to the main pipe 611, it can enter the main pipe 611 through the relief groove 12, causing the positioning tooth 11 to mesh with the second rack 9, thereby restricting the movement of the sleeve 61 along the length direction of the vertical monitoring rod 2. The anti-shift seat 71 continues to move downward, driving the moving seat 612 downward together until the first rack 8 meshes with the third rack 10, thereby restricting the movement of the adjusting rod 62 along the length direction of the vertical monitoring rod 2.

[0043] The reset part 73 includes a reset block 731 and a reset spring 732. The reset block 731 is fixed to the side of the anti-shift seat 71 facing the monitoring rod 2. A moving groove 20 is provided on the outer wall of the monitoring rod 2 for the reset block 731 to slide along the length of the monitoring rod 2. The reset block 731 is dovetail-shaped to prevent the reset block 731 from disengaging from the moving groove 20. The reset spring 732 connected to the reset block 731 is installed in the moving groove 20. The elastic force of the reset spring 732 gives the reset block 731 a tendency to move away from the opposite main pipe 611, so that the anti-shift seat 71 separates from the moving seat 612 without any other external force, thereby allowing the sleeve 61 to slide and adjust its position relative to the monitoring rod 2.

[0044] Reference Figure 6 and Figure 7 The pressure seat 72 includes a fixing part 721, a threaded part 722, a sliding plate 723, and an extension part 724. The fixing part 721 is fixedly sleeved on the outer wall of the monitoring rod 2, and the fixing part 721 is located on the side of both abutment seats 6 away from the base plate 1. The threaded part 722 is bolt-shaped and threaded through the fixing part 721 along the length direction of the monitoring rod 2. The sliding plate 723 is slidably sleeved on the outer wall of the monitoring rod 2, and the sliding plate 723 is located between the fixing part 721 and the abutment seats 6, and the sliding plate 723 is located on the side of all anti-movement seats 71 away from the base plate 1. A magnet capable of magnetically attracting the sliding plate 723 is embedded at one end of the threaded part 722 facing the sliding plate 723, so that when the threaded part 722 moves, it drives the sliding plate 723 to slide along the length direction of the monitoring rod 2.

[0045] The extension 724 is rod-shaped and has two parts. Both extensions 724 are fixed to the side of the sliding plate 723 away from the fixed part 721. The extensions 724 extend in a direction parallel to the length of the monitoring rod 2. The two extensions 724 are opposite to the main tube 611 that is far away from the fixed part 721 among the two main tubes 611. When the threaded part 722 moves threadedly towards the base, it first drives the side of the sliding plate 723 away from the fixed part 721 to abut against the anti-shift seat 71 that cooperates with the main pipe 611 near the fixed part 721. At the same time, the sides of the two extensions 724 away from the sliding plate 723 abut against the anti-shift seats 71 that cooperate with the main pipe 611 away from the fixed part 721. The threaded part 722 continues to move away from the fixed part 721, driving all the anti-shift seats 612 to move into the corresponding main pipe 611 and engage with the corresponding moving seats 612. The threaded part 722 continues to move away from the fixed part 721, causing all the moving seats 612 to move simultaneously to engage with the opposite sliding rod. Then the threaded part 722 stops moving. At this time, both abutment seats 6 are positioned relative to the monitoring rod 2.

[0046] Reference Figure 2 and Figure 5 Furthermore, an elastic element 13 is fitted in the lower space inside the main pipe 611. The elastic element 13 is a drive spring, and the two opposite ends of the drive spring are respectively connected to the close-to-each ends of the two adjusting rods 62 inside the main pipe 611. When the far-from-each ends of the two adjusting rods 62 inside the main pipe 611 abut against the opposite inner walls of the enclosure 3, the drive spring is in a compressed state. This causes the drive spring to give the two adjusting rods 62 inside the main pipe 611 a tendency to move away from each other when the monitoring rod 2 moves. This allows the far-from-each-other ends of the abutment seat 6 to automatically abut against the opposite sides of the enclosure 3 after the monitoring rod 2 moves to a vertical position, so as to quickly adjust the position of the abutment seat 6.

[0047] Reference Figure 1 and Figure 2To accommodate the heightening of the roadbed during construction, the monitoring pole 2 includes a connecting section 201 and an installation section 202. The connecting section 201 is square-shaped and can be at least one. When there are multiple connecting sections 201, they are connected sequentially. The connecting sections 201 can be welded together or detachably connected by flange bolts. In this embodiment, there are two connecting sections 201 welded together. The installation section 202 is detachably connected to the connecting section 201 at the end away from the base plate 1 via flange and bolts (not shown in the figure). The positioning component, monitoring line 4, and indicator 5 are all installed on the installation section 202. The enclosure cover 3 includes at least one splicing section 31. When there are multiple splicing sections 31, they are connected sequentially along the direction perpendicular to the base plate 1 to raise the enclosure cover 3. The splicing sections 31 can be fixed together by glue or detachably connected by flange bolts. When the roadbed is raised, the monitoring rod 2 and the enclosure cover 3 are raised by adding connecting section 201 and splicing section 31, and the size of the positioning component on the installation section 202 is adapted to the raised enclosure cover 3 by replacing the installation section 202.

[0048] In addition, in order to prevent debris and dust from falling into the enclosure 3 when the monitoring rod 2 is not in use, a cover 16 for blocking the opening of the enclosure 3 and the monitoring rod 2 is detachably connected to the top of the enclosure 3. The cover 16 is detachably connected to the enclosure 3 by fixing male and female Velcro fasteners to the inside of the cover 16 and the outside of the enclosure 3, respectively.

[0049] The implementation principle of the high-speed railway subgrade settlement monitoring device in this application embodiment is as follows: When monitoring the monitoring rod 2, the cover 16 is first removed, and then the monitoring rod 2 is moved to a vertical position by the indication of the indicator 5. During the movement, the adjusting rods 62 at both ends of the abutment seat 6 are moved to abut against the inner walls of opposite sides of the enclosure cover 3 by the elastic force of the driving spring. Then, the threaded part 722 is moved so that the sliding plate 723 and the extension part 724 abut against the corresponding anti-shift seat 71, driving all the anti-shift seats 71 to move towards the base and engage with the corresponding moving seat 612. Then, the moving seat 612 is moved towards the base and engages with the corresponding adjusting rod 62, so that the abutment seat 6 and the monitoring rod 2 are relatively positioned, and then the monitoring rod 2 is measured.

[0050] The above are all preferred embodiments of this application, and are not intended to limit the scope of protection of this application. Therefore, all equivalent changes made in accordance with the structure, shape and principle of this application should be covered within the scope of protection of this application.

Claims

1. A high-speed railway subgrade settlement monitoring device, characterized in that: The system includes a base plate (1), a monitoring rod (2), and a enclosure cover (3). The monitoring rod (2) is ball-hinged to the base plate (1). The top of the monitoring rod (2) has a monitoring line (4) and an indicator to indicate the vertical position of the monitoring rod (2). The enclosure cover (3) is set on the base plate (1) to enclose the monitoring rod (2) so that the monitoring rod (2) can move within the enclosure cover (3). The monitoring line (4) of the monitoring rod (2) extends beyond the enclosure cover (3) to the side away from the base plate (1). There is a positioning component between the monitoring rod (2) and the enclosure cover (3) to position the monitoring rod (2). The positioning component includes an abutment (6) and a stopper (7). There are two abutments (6), which are staggered along the length of the monitoring rod (2) and are perpendicular to each other. Each abutment (6) includes a sleeve (61) and an adjusting rod (62). The sleeve (61) slides through the monitoring rod (2) along the length of the monitoring rod (2) perpendicular to the length of the monitoring rod (2). The adjusting rod (62) is slidably connected to the opposite ends of the sleeve (61) to adjust the extension length of the abutment (6). The stopper (7) moves on the monitoring rod (2) and abuts against the abutment (6) to position the abutment (6) relative to the monitoring rod (2). The sleeve (61) includes a main pipe (611) and a movable seat (612). The main pipe (611) slides on the monitoring rod (2). The movable seat (612) slides within the main pipe (611) along the length of the monitoring rod (2), and the movable seat (612) is opposite to the adjusting rod (62). The movable seat (612) has a first rack (8) on the side facing the adjusting rod (62), a second rack (9) on the side facing away from the adjusting rod (62), and a third rack (10) on the side facing the movable seat (612). The anti-shifting component (7) includes an anti-shifting seat (71), a holding seat (72), and a resetting part (73). The anti-shifting seat (71) slides along the length direction of the monitoring rod (2) on the monitoring rod (2), and the anti-shifting seat (71) corresponds to the main tube (611). The side of the anti-shifting seat (71) facing the main tube (611) has a positioning tooth (11). The side of the main tube (611) opposite to the anti-shifting seat (71) has a relief groove (12) into which the anti-shifting seat (71) extends. The resetting part (73) acts on the anti-shifting seat (71) to give the anti-shifting seat (71) a tendency to move away from the main tube (611). The pressure seat (72) moves on the monitoring rod (2). When the pressure seat (72) is in use, the pressure seat (72) moves to abut against the anti-shift seat (71) and drives the anti-shift seat (71) to abut against the main tube (611) so that the positioning tooth (11) meshes with the second rack (9), and the moving seat (612) moves towards the adjusting rod (62) until the first rack (8) meshes with the third rack (10).

2. The high-speed railway subgrade settlement monitoring device according to claim 1, characterized in that: The pressure seat (72) includes a fixing part (721), a threaded part (722), and a sliding plate (723). The fixing part (721) is fixed to the monitoring rod (2). The threaded part (722) is threaded through the fixing part (721) along the length direction of the monitoring rod (2). The sliding plate (723) is magnetically attracted to the threaded part (722) and sleeved on the monitoring rod (2). The sliding plate (723) is located between the fixing part (721) and the anti-shift seat (71) for pushing the anti-shift seat (71).

3. The high-speed railway subgrade settlement monitoring device according to claim 2, characterized in that: The pressure seat (72) further includes an extension (724) connected to the sliding plate (723). The sliding plate (723) is opposite to the anti-slip seat (71) of one of the main pipes (611), and the extension (724) is opposite to the anti-slip seat (71) of the other main pipe (611). When the sliding plate (723) abuts against the opposite anti-slip seat (71), the extension (724) abuts against the opposite anti-slip seat (71) at the same time.

4. The high-speed railway subgrade settlement monitoring device according to claim 1, characterized in that: The sleeve (61) has an elastic element (13) between the two adjusting rods (62) at opposite ends to drive the two adjusting rods (62) to move away from each other.

5. The high-speed railway subgrade settlement monitoring device according to claim 1, characterized in that: The adjusting rod (62) has a travel portion (14), and the sleeve (61) has a travel groove (15) for the travel portion (14) to slide and for the travel portion (14) to be disengaged from the sleeve (61).

6. The high-speed railway subgrade settlement monitoring device according to claim 1, characterized in that: The monitoring rod (2) includes a connecting section (201) and an installation section (202). The connecting section (201) has at least one and is connected in sequence. The installation section (202) is detachably connected to the connecting section (201) at the end away from the base plate (1). The installation section (202) is used to install the positioning component. The enclosure cover (3) includes a splicing section (31). The splicing section (31) has at least one and is spliced ​​in sequence.

7. The high-speed railway subgrade settlement monitoring device according to claim 1, characterized in that: The end of the enclosure (3) away from the base plate (1) is detachably connected to a cover (16) for covering the opening of the enclosure (3) and the monitoring rod (2).

8. The high-speed railway subgrade settlement monitoring device according to claim 1, characterized in that: The cross-section of the enclosure (3) gradually decreases towards the base plate (1).

Citation Information

Patent Citations

  • Settlement plate

    CN205879166U

  • Physical settlement meter for roadbed observation

    CN103512551A

  • Displacement monitoring device and using method thereof

    CN112033356A

  • Hydrogeological support engineering monitoring equipment

    CN218116474U