A grid division method for multi-source DC component monitoring

Through preprocessing and clustering analysis of power grid data, grids are divided to monitor multi-source DC components, the problem of incomplete monitoring in the existing technology is solved, and effective monitoring and precise investment of multi-source DC components are achieved.

CN117807738BActive Publication Date: 2024-11-22STATE GRID HUBEI ELECTRIC POWER RES INST +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311701771.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-12
Publication Date
2024-11-22
Estimated Expiration
2043-12-12

AI Technical Summary

Technical Problem

The existing technology is difficult to effectively monitor and manage multi-source DC components, resulting in transformer damage, noise disturbance, grid security threats and infrastructure corrosion. The existing grid division method is not suitable for multi-source DC component monitoring.

Method used

By collecting grid structure diagrams, substation coordinates and other related data, performing preprocessing and clustering analysis, and dividing grids to achieve monitoring of multi-source DC components. Specific steps include data collection, preprocessing and clustering analysis, using Euclidean distance to determine the cluster to which the substation belongs, thereby dividing the grid.

Benefits of technology

Effective monitoring and precise investment of multi-source DC components are achieved, the economy and accuracy of monitoring are improved, and the problems of monitoring coverage and investment costs are solved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117807738B_ABST
    Figure CN117807738B_ABST
Patent Text Reader

Abstract

The present invention provides a grid division method for multi-source DC component monitoring, comprising the following steps: A. collecting relevant data required for grid division; B. performing preprocessing based on the data collected in step A; C. clustering the data according to the preprocessing result of step B, and completing grid division; the grid division method for multi-source DC component monitoring provided by the present invention can be used for grid monitoring of multi-source DC components, and can achieve effectiveness and precise investment in multi-source DC component monitoring.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of multi-source direct current component monitoring, and in particular to a grid division method for multi-source direct current component monitoring. Background Art

[0002] The unipolar operation of ultra-high and extra-high voltage DC projects, the operation of urban rail transit, photovoltaic, wind power, and DC distribution networks will all generate DC components. The DC component flows in urban pipe corridors, energy pipe corridors, and power grids, and flows into transformers, causing DC magnetic bias in transformers, which not only affects the life of transformers and endangers the safety of large power grid operations, but also causes noise disturbances and leads to complaints from neighboring residents, affecting the social image of power grid companies. When the DC component flows into the earth, it will also accelerate the corrosion of tap water, gas, oil pipelines, and rail transit rails. The DC component problem has become a major common problem and challenge faced by multiple fields and industries in the future.

[0003] Specifically for DC component monitoring, there are three main modes: one is single-station deployment. Since the monitoring points are scattered and asynchronous, the correlation between the monitoring points is weak; the second is deployment only along the subway line, without considering the flow characteristics of the DC component in the power grid, and the monitoring data cannot provide a basis for the traceability and precise comprehensive management of the DC component; the third is full coverage deployment, which has problems such as large investment, large workload, and difficulty in coordination. In order to take into account the economy and effectiveness of DC component monitoring, it is necessary to conduct grid monitoring of multi-source DC components.

[0004] The Chinese invention patent application number 202111368963.3, "A distribution network grid division method and system", proposes a distribution network grid division method and system, according to the constructed load matrix and the peak and valley times marked in the constructed peak and valley time matrix, the peak-valley difference of each plot at the peak and valley times is determined to obtain the plot peak-valley difference matrix, and the grid to which each plot belongs is used as the quantity to be optimized based on the connection matrix to construct the plot belonging matrix, and the plot peak-valley difference matrix is ​​used as input, and the plot belonging matrix is ​​used as the variable to be optimized to establish an integer programming model, and the plot belonging matrix in the integer programming model is solved to obtain the target plot belonging matrix, and each plot is divided into the corresponding network according to the target plot belonging matrix to obtain the plot division result. This method is only applicable to the planning of distribution networks, and is not applicable to the monitoring of multi-source DC components. The Chinese invention patent "A method, device and storage medium for grid division of an integrated energy system" with application number 202210749524.5 proposes a method, device and storage medium for grid division of an integrated energy system, which belongs to the technical field of integrated energy system planning. First, an energy grid division method based on improved k-means clustering is used to form an initial grid layout, and then an energy grid correction method considering load characteristics is used to form the final grid layout. Finally, the optimal energy grid quantity scheme is selected through a fuzzy ideal decision method based on expert weights. This method is only applicable to grid division of integrated energy systems, not to monitoring of multi-source DC components, and when dividing the grid, the class of K-Means needs to be determined in advance, which will affect the accuracy of grid division. Summary of the invention

[0005] In view of the above technical problems existing in the prior art, the present invention provides a grid division method for multi-source DC component monitoring, which can be used for grid monitoring of multi-source DC components and can achieve effectiveness and precise investment in multi-source DC component monitoring.

[0006] The technical solution adopted by the present invention is:

[0007] A grid division method for multi-source DC component monitoring comprises the following steps:

[0008] A. Collect relevant data required for grid division;

[0009] B. Preprocess the data collected in step A;

[0010] C. Based on the preprocessing results of step B, cluster the data and complete the grid division.

[0011] Furthermore, in step A, relevant data required for grid division is collected, specifically:

[0012] 1) Network structure diagram of power grid 220kV and above;

[0013] 2) Longitude and latitude coordinates of 220kV and above substations;

[0014] 3) Substation voltage level, represented by variable SV;

[0015] 4) Whether the substation is a terminal substation, indicated by the variable SE;

[0016] 5) Taking the substation as the center, count whether there are multiple subway lines within C1 km, represented by the variable DSN;

[0017] 6) The distance between the substation and the nearest subway line is represented by the variable DS. With the substation as the center, search for subway lines within C1 kilometers on the map and calculate the vertical distance between the substation and the nearest subway line.

[0018] 7) With the substation as the center, count whether there are multiple water systems within C2 kilometers, represented by the variable DWN, where water systems include rivers, lakes, and seas;

[0019] 8) The distance between the substation and the nearest water system is represented by the variable DW. With the substation as the center, search for water systems within C2 kilometers on the map and calculate the distance between the substation and the nearest water system.

[0020] 9) Longitude and latitude coordinates of the UHV converter station.

[0021] Furthermore, in step B, based on the data collected in step A, the data is preprocessed, specifically:

[0022] The data of all substations collected in step A are preprocessed to obtain the following matrix:

[0023]

[0024] Among them: SP i is the partition of the ith substation, SV i is the voltage level of the ith substation, SE i Indicates whether the i-th substation is a terminal substation, DSN i Indicates whether there are multiple subway lines within C1 km with the i-th substation as the center, DS i is the distance between the ith substation and the nearest subway line, DWN i Indicates whether there are multiple water systems within C2 km with the i-th substation as the center, DW i is the distance between the ith substation and the nearest water system, DT i is the distance between the i-th substation and the UHV converter station.

[0025] Further, the data of all substations collected in step A are preprocessed as follows:

[0026] Assuming there are n substations in total, the collected data is preprocessed as follows:

[0027] 1) According to the network structure diagram of 220kV and above, the power grid is divided into sections. Each substation has its own section. The section of the i-th substation is recorded as SP i , 1≤i≤n;

[0028] 2) The voltage level of the i-th substation is denoted as SV i , if the substation is a 220kV substation, then let SV i =1, otherwise, let SV i =2,1≤i≤n;

[0029] 3) If the ith substation is a terminal station, let SE i =1, otherwise, let SE i =2,1≤i≤n;

[0030] 4) If there are multiple subway lines within 1 km of the i-th substation C, let DSN i =1, otherwise, let DSN i =2,1≤i≤n;

[0031] 5) The distance between the i-th substation and the nearest subway line is DS i , 1≤i≤n;

[0032] 6) If there are multiple water systems within C2 km of the i-th substation, let DWN i =1, otherwise, let DWN i =2,1≤i≤n;

[0033] 7) The distance between the i-th substation and the nearest water system is DW i , 1≤i≤n;

[0034] 8) According to the longitude and latitude coordinates of the substation and the UHV converter station, calculate the distance DT between the i-th substation and the UHV converter station i , 1≤i≤n.

[0035] Furthermore, in step C, the data is clustered according to the preprocessing result of step B, and the grid division is completed;

[0036] 1) Input the preprocessed data into the hierarchical clustering analysis model to obtain the center point of the cluster. If there are m clusters, the jth cluster is recorded as CSP j ,CSV j ,CSE j ,CDSN j ,CDS j ,CDWN j ,CDWj ,CDT j , 1≤j≤m;

[0037] 2) Calculate the Euclidean distance between each substation and the center point of the cluster. For the i-th substation and the j-th cluster, the Euclidean distance between the two is:

[0038]

[0039] 3) According to the calculated Euclidean distance, the minimum Euclidean distance is obtained statistically to determine the cluster to which the substation belongs. For the i-th substation, the minimum Euclidean distance min{DIS i,1 ,DIS i,2 ,…,DIS i,j ,…,DIS i,m}, 1≤j≤m, if the Euclidean distance between the i-th substation and the j-th cluster is the smallest, then the i-th substation belongs to the j-th cluster, and the substation is divided into the j-th grid.

[0040] The present invention provides a grid division method for multi-source DC component monitoring, which can be used for grid monitoring of multi-source DC components and can achieve effectiveness and precise investment in multi-source DC component monitoring. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 It is a schematic diagram of one embodiment of a grid division method for multi-source DC component monitoring of the present invention. DETAILED DESCRIPTION

[0042] The technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings of the present invention.

[0043] See also Figure 1 , is a schematic diagram of one embodiment of a grid division method for multi-source DC component monitoring of the present invention, the method comprising the following steps:

[0044] A. Collect the relevant data required for grid division, specifically:

[0045] 1) Network structure diagram of power grid 220kV and above;

[0046] 2) Longitude and latitude coordinates of 220kV and above substations;

[0047] 3) Substation voltage level, represented by variable SV;

[0048] 4) Whether the substation is a terminal substation, indicated by the variable SE;

[0049] 5) Taking the substation as the center, count whether there are multiple subway lines within the kilometer range of C1, which is represented by the variable DSN. The value of C1 is set according to actual needs;

[0050] 6) The distance between the substation and the nearest subway line is represented by the variable DS. With the substation as the center, search for subway lines within C1 kilometers on the map and calculate the vertical distance between the substation and the nearest subway line.

[0051] 7) With the substation as the center, count whether there are multiple water systems within the C2 kilometer range, represented by the variable DWN, where water systems include rivers, lakes, and seas, and the value of C2 is set according to actual needs;

[0052] 8) The distance between the substation and the nearest water system is represented by the variable DW. With the substation as the center, search for water systems within C2 kilometers on the map and calculate the distance between the substation and the nearest water system.

[0053] 9) Longitude and latitude coordinates of UHV converter station;

[0054] B. Based on the data collected in step A, preprocess the data, specifically:

[0055] Assuming there are n substations in total, the collected data is preprocessed as follows:

[0056] 1) According to the network structure diagram of 220kV and above, the power grid is divided into sections. Each substation has its own section. The section of the i-th substation is recorded as SP i , 1≤i≤n;

[0057] 2) The voltage level of the i-th substation is denoted as SV i , if the substation is a 220kV substation, then let SV i =1, otherwise, let SV i =2,1≤i≤n;

[0058] 3) If the ith substation is a terminal station, let SE i =1, otherwise, let SE i =2,1≤i≤n;

[0059] 4) If there are multiple subway lines within 1 km of the i-th substation C, let DSN i =1, otherwise, let DSN i =2,1≤i≤n;

[0060] 5) The distance between the i-th substation and the nearest subway line is DS i , 1≤i≤n;

[0061] 6) If there are multiple water systems within C2 km of the i-th substation, let DWN i =1, otherwise, let DWN i =2,1≤i≤n;

[0062] 7) The distance between the i-th substation and the nearest water system is DW i , 1≤i≤n;

[0063] 8) According to the longitude and latitude coordinates of the substation and the UHV converter station, calculate the distance DT between the i-th substation and the UHV converter station i , 1≤i≤n;

[0064] Preprocess the data of all substations to get the matrix:

[0065]

[0066] C. Cluster the data according to the preprocessing results in step B and complete the grid division;

[0067] 1) Input the preprocessed data into the hierarchical clustering analysis model to obtain the center point of the cluster. If there are m clusters, the jth cluster is recorded as CSP j ,CSV j ,CSE j ,CDSN j ,CDS j ,CDWN j ,CDW j ,CDT j , 1≤j≤m;

[0068] 2) Calculate the Euclidean distance between each substation and the center point of the cluster. Taking the i-th substation and the j-th cluster as an example, the Euclidean distance between the two is

[0069]

[0070] 3) According to the calculated Euclidean distance, the minimum Euclidean distance is obtained statistically to determine the cluster to which the substation belongs. For the i-th substation, the minimum Euclidean distance min{DIS i,1 ,DIS i,2 ,…,DIS i,j ,…,DIS i,m}, 1≤j≤m, if the Euclidean distance between the i-th substation and the j-th cluster is the smallest, then the i-th substation belongs to the j-th cluster, and the substation is divided into the j-th grid.

[0071] The technical solution and effects of the present invention are described in detail below with a specific embodiment:

[0072] In step A, relevant data is collected, including:

[0073] 1) Network structure diagram of a power grid 220kV and above;

[0074] 2) Latitude and longitude coordinates of 220kV and above substations (there are 50 substations in total);

[0075] 3) Substation voltage level;

[0076] 4) Whether the substation is a terminal substation;

[0077] 5) Taking the substation as the center, count whether there are multiple subway lines within a 3-kilometer radius, represented by the variable DSN;

[0078] 6) The distance between the substation and the nearest subway line is represented by the variable DS. With the substation as the center, search for subway lines within a 3-kilometer range on the map and calculate the vertical distance between the substation and the nearest subway line.

[0079] 7) With the substation as the center, count whether there are multiple water systems within a 3-kilometer radius, represented by the variable DWN, where water systems include rivers, lakes, and seas;

[0080] 8) The distance between the substation and the nearest water system is represented by the variable DW. With the substation as the center, search for water systems within a 3-kilometer range on the map and calculate the distance between the substation and the nearest water system.

[0081] 9) Longitude and latitude coordinates of UHV converter station;

[0082] In step B, the collected data is preprocessed, and the processed results (partial data) are shown in the following table:

[0083]

[0084] 3) In step C, based on the preprocessed data of step B, the preprocessed data is input into the hierarchical clustering analysis model to obtain the center point of the cluster; the Euclidean distance between each substation and the center point of the cluster is calculated; based on the minimum distance principle, the cluster to which the substation belongs is determined; based on the cluster to which the substation belongs, the 50 substations are divided into 10 grids.

[0085] The present invention provides a grid division method for multi-source DC component monitoring, which can be used for grid monitoring of multi-source DC components and can achieve effectiveness and precise investment in multi-source DC component monitoring.

[0086] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by technicians in this technical field within the technical scope disclosed by the present invention should be covered by the protection scope of the present invention.

Claims

1. A grid division method for multi-source DC component monitoring, characterized in that: The following steps are involved: A. Collect relevant data required for grid division; B. Preprocess the data collected in step A; C. Cluster the data according to the preprocessing results in step B and complete the grid division; In step A, the relevant data required for grid division is collected, including the following data: 1) Network structure diagram of power grid 220kV and above; 2) Longitude and latitude coordinates of 220kV and above substations; 3) Substation voltage level, represented by variable SV; 4) Whether the substation is a terminal substation, indicated by the variable SE; 5) Taking the substation as the center, count whether there are multiple subway lines within C1 km, represented by the variable DSN; 6) The distance between the substation and the nearest subway line is represented by the variable DS. With the substation as the center, search for subway lines within C1 kilometers on the map and calculate the vertical distance between the substation and the nearest subway line. 7) With the substation as the center, count whether there are multiple water systems within C2 kilometers, represented by the variable DWN, where water systems include rivers, lakes, and seas; 8) The distance between the substation and the nearest water system is represented by the variable DW. With the substation as the center, search for water systems within C2 kilometers on the map and calculate the distance between the substation and the nearest water system. 9) Longitude and latitude coordinates of UHV converter station; In step B, based on the data collected in step A, the data is preprocessed, specifically: The data of all substations collected in step A are preprocessed to obtain the following matrix: Among them: SP i is the partition of the ith substation, SV i is the voltage level of the ith substation, SE i Indicates whether the ith substation is a terminal substation, DSN i Indicates whether there are multiple subway lines within C1 km with the i-th substation as the center, DS i is the distance between the ith substation and the nearest subway line, DWN i Indicates whether there are multiple water systems within C2 km with the i-th substation as the center, DW i is the distance between the ith substation and the nearest water system, DT i is the distance between the i-th substation and the UHV converter station; The data of all substations collected in step A are preprocessed as follows: Assuming there are n substations in total, the collected data is preprocessed as follows: 1) According to the network structure diagram of 220kV and above, the power grid is divided into sections. Each substation has its own section. The section of the i-th substation is recorded as SP i , 1≤i≤n; 2) The voltage level of the i-th substation is denoted as SV i , if the substation is a 220kV substation, then let SV i =1, otherwise, let SV i =2,1≤i≤n; 3) If the ith substation is a terminal station, let SE i =1, otherwise, let SE i =2,1≤i≤n; 4) If there are multiple subway lines within 1 km of the i-th substation C, let DSN i =1, otherwise, let DSN i =2,1≤i≤n; 5) The distance between the i-th substation and the nearest subway line is DS i , 1≤i≤n; 6) If there are multiple water systems within C2 km of the i-th substation, let DWN i =1, otherwise, let DWN i =2,1≤i≤n; 7) The distance between the i-th substation and the nearest water system is DW i , 1≤i≤n; 8) According to the longitude and latitude coordinates of the substation and the UHV converter station, calculate the distance DT between the i-th substation and the UHV converter station i , 1≤i≤n; In step C, according to the preprocessing results of step B, the data is clustered and the grid is divided, specifically: 1) Input the preprocessed data into the hierarchical clustering analysis model to obtain the center point of the cluster. If there are m clusters, the jth cluster is recorded as CSP j ,CSV j ,CSE j ,CDSN j ,CDS j ,CDWN j ,CDW j ,CDT j , 1≤j≤m; 2) Calculate the Euclidean distance between each substation and the center point of the cluster. For the i-th substation and the j-th cluster, the Euclidean distance between the two is: 3) According to the calculated Euclidean distance, the minimum Euclidean distance is obtained statistically to determine the cluster to which the substation belongs. For the i-th substation, the minimum Euclidean distance min{DIS i,1 ,DIS i,2 ,…,DIS i,j ,…,DIS i,m }, 1≤j≤m, if the Euclidean distance between the i-th substation and the j-th cluster is the smallest, then the i-th substation belongs to the j-th cluster, and the substation is divided into the j-th grid.