By estimating the power consumption of uphill sections and adjusting the power threshold, the power management of extended-range vehicles is optimized, which solves the problems of insufficient power and poor NVH performance when going uphill, reduces noise and vibration, and improves overall performance and Computational efficiency.
Patent Information
- Application Number
- CN202311625414.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-11-30
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2043-11-30
AI Technical Summary
Extended-range vehicles have problems with insufficient power and poor noise and vibration when going uphill. Existing technology cannot effectively solve the overall NVH performance problem.
By estimating the power consumption of the uphill section, power generation is carried out according to the optimal power generation curve, and pre-generation is performed on the fast section before the uphill section. The power threshold is adjusted to control the power generation noise to be less than the environmental noise, and the energy recovery of the downhill section is used to supplement the uphill section. segmented power, optimizing power management to reduce the burden of pre-generation.
While ensuring uphill power, it significantly reduces power generation noise and vibration, improves overall NVH performance, improves calculation accuracy and real-time performance, and reduces the pre-generation burden of trams.
Smart Images

Figure CN117818385B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of new energy vehicle technology, and in particular to an energy planning method, system, device and medium. Background Art
[0002] Since the extended-range vehicle is driven by both fuel and electric power, it can provide additional power to the electric motor through the generator, thereby extending the driving range and providing good power. However, when going uphill, if the power is too low, there will still be a problem of insufficient power.
[0003] In this regard, extended-range vehicles can first generate high-power electricity before going uphill, and then continue to maintain high-power electricity generation when going uphill to delay the decline of battery power, thereby ensuring that the car has sufficient power to go uphill.
[0004] Although this method ensures uphill power, it does not take into account the noise, vibration and sound roughness (NVH) performance of the car, resulting in not only a large power generation noise when the car goes uphill, but also a large power generation noise on the road section before going uphill. Summary of the invention
[0005] Based on this, the present application provides an energy planning method, system, device and medium, which can improve the problem of poor overall NVH in the prior art.
[0006] In a first aspect, the present application provides an energy planning method, which includes: estimating the power consumption of an uphill section and the maximum power generation when generating power according to an optimal power generation curve, wherein the optimal power generation curve is a curve of maximum power generation over time; adjusting the power threshold of the nearest fast section before the uphill section according to the difference between the power consumption and the maximum power generation, wherein the fast section is a smooth and flat section; sending the power threshold of each section to the vehicle end, so that the vehicle end pre-generates power according to the power threshold of the fast section when on the fast section, and if it is monitored that the remaining power is greater than the power threshold of the uphill section when going uphill, while using the battery to output power, generate power according to the maximum power corresponding to the current vehicle speed, so as to control the power generation noise to be lower than the environmental noise.
[0007] In combination with the first aspect, in a first possible implementation mode of the first aspect, before sending the power threshold of each road section to the vehicle end, the method also includes: determining whether there is a downhill section between the two express sections closest to the uphill section; if there is a downhill section, determining whether the downhill section is located behind the uphill section; if it is located behind, estimating the recovered power during energy recovery in the downhill section; lowering the power threshold of the uphill section according to the recovered power to reduce the impact of the estimation error.
[0008] In combination with the first possible implementation of the first aspect, in the second possible implementation of the first aspect, the aforementioned adjustment of the power threshold of the nearest express section located before the uphill section based on the difference between the power consumption and the maximum power generation includes: if there is a downhill section, estimating the recovered power during energy recovery in the downhill section; calculating the sum of the maximum power generation and the recovered power, and increasing the power threshold of the express section based on the difference between the power consumption and the total, so as to reduce the pre-power generation of the express section.
[0009] In combination with the first aspect, in a third possible implementation manner of the first aspect, the above-mentioned estimation of the maximum power generation when generating electricity according to the optimal power generation curve includes: obtaining operating condition information, the operating condition information including a target curve of the estimated vehicle speed changing with time; determining the maximum power generation corresponding to multiple estimated vehicle speeds on the target curve, and drawing an optimal power generation curve based on the target curve and the maximum power generation corresponding to the multiple estimated vehicle speeds; performing integral calculation based on the optimal power generation curve to obtain the maximum power generation on the uphill section.
[0010] In combination with the third possible implementation mode of the first aspect, in a fourth possible implementation mode of the first aspect, the above-mentioned determination of the maximum power generation corresponding to the multiple estimated vehicle speeds on the target curve includes: establishing a first function of environmental noise and vehicle speed based on the data of vehicle speed and environmental noise; establishing a second function of power generation noise and power generation power based on the data of power generation noise; and determining the maximum power generation corresponding to each estimated vehicle speed using the first function and the second function based on the constraint that the power generation noise is less than the environmental noise.
[0011] In the second aspect, the present application also provides an energy planning system, which includes an energy planning device deployed on the cloud and an energy management device deployed on the vehicle side, wherein: the energy planning device is used to execute an energy planning method as in the first aspect or any one of the implementation modes of the first aspect; the energy management device is used to pre-generate electricity according to the electricity threshold of the fast section when on a fast section after receiving the electricity threshold of each road section, and when going uphill, if it is monitored that the remaining electricity is greater than the electricity threshold of the uphill section, then while using the battery to output power, it generates electricity according to the maximum power generation power corresponding to the current vehicle speed, so as to control the power generation noise to be lower than the environmental noise.
[0012] In combination with the second aspect, in a first possible implementation of the second aspect, the aforementioned energy planning system also includes a navigation device deployed on the cloud, and a communication device deployed on the vehicle side, wherein: the navigation device is used to perform route planning and provide operating condition information to the energy planning device; the communication device is used to interact with the energy planning device for data, and forward the received power threshold of each road section to the energy management device.
[0013] On the third aspect, the present application also provides an energy planning device, which includes: an estimating unit, used to estimate the power consumption of an uphill section and the maximum power generation when generating electricity according to an optimal power generation curve, wherein the optimal power generation curve is a curve of maximum power generation over time; an adjusting unit, used to adjust the power threshold of the nearest fast section before the uphill section according to the difference between the power consumption and the maximum power generation, wherein the fast section is a smooth and flat section; a sending unit, used to send the power threshold of each section to the vehicle end, so that the vehicle end pre-generates power according to the power threshold of the fast section when on the fast section, and if it is monitored that the remaining power is greater than the power threshold of the uphill section when going uphill, then while using the battery to output power, it generates power according to the maximum power corresponding to the current vehicle speed, so as to control the power generation noise to be lower than the environmental noise.
[0014] In combination with the third aspect, in a first possible implementation mode of the third aspect, the aforementioned adjustment unit is also used to: determine whether there is a downhill section between the two express sections closest to the uphill section; if there is a downhill section, determine whether the downhill section is located behind the uphill section; if it is located behind, estimate the amount of recovered energy during energy recovery in the downhill section; lower the power threshold of the uphill section according to the recovered power to reduce the impact of the estimation error.
[0015] In combination with the first possible implementation mode of the third aspect, in the second possible implementation mode of the third aspect, the aforementioned adjustment unit is also used to: if there is a downhill section, estimate the amount of recovered electricity when energy is recovered on the downhill section; calculate the sum of the maximum power generation and the recovered electricity, and increase the power threshold of the express section according to the difference between the power consumption and the total, so as to reduce the pre-power generation of the express section.
[0016] In combination with the third aspect, in a third possible implementation mode of the third aspect, the estimation unit is specifically used to: obtain operating condition information, the operating condition information including a target curve of estimated vehicle speed changing over time; determine the maximum power generation corresponding to multiple estimated vehicle speeds on the target curve, and draw an optimal power generation curve based on the target curve and the maximum power generation corresponding to the multiple estimated vehicle speeds; perform integral calculation based on the optimal power generation curve to obtain the maximum power generation on the uphill section.
[0017] In combination with the third possible implementation method of the third aspect, in a fourth possible implementation method of the third aspect, the estimation unit is further used to: establish a first function of environmental noise and vehicle speed based on the data of vehicle speed and environmental noise; establish a second function of power generation noise and power generation power based on the data of power generation power and power generation noise; based on the constraint that the power generation noise is less than the environmental noise, use the first function and the second function to determine the maximum power generation power corresponding to each estimated vehicle speed.
[0018] In a fourth aspect, the present application also provides an energy planning device, which includes a processor, a transceiver and a memory, wherein the processor, the transceiver and the memory are connected via a bus; the processor is used to execute multiple instructions; the transceiver is used to exchange data with other devices; the memory is used to store multiple instructions, and the instructions are suitable for being loaded by the processor and executed as an energy planning method such as the first aspect or any one embodiment of the first aspect.
[0019] In a fifth aspect, the present application further provides a computer-readable storage medium, in which a plurality of instructions are stored, and the instructions are suitable for being loaded by a processor and executed by a method for energy planning such as the first aspect or any one embodiment of the first aspect.
[0020] In summary, the present application provides an energy planning method, system, device and medium, wherein, in the energy planning method provided by the present application, when the car is going uphill, the uphill power is mainly output through the battery pack, without maintaining the power of the battery pack, and the range extender is controlled to supplement the uphill power according to the maximum power generation power at the current vehicle speed, thereby optimizing the NVH performance of the uphill section while also reducing the pre-generation burden of the electric vehicle before going uphill, thereby improving the overall NVH performance. In addition, the energy planning method of the present application is applied to the cloud, taking advantage of the powerful computing power of the cloud, improving the accuracy and real-time performance of the calculation, and the interaction between the cloud and the vehicle is simple, thereby also improving the efficiency and real-time performance of the control. In general, the present application provides an efficient energy planning method, which can improve the problem of poor overall NVH performance in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 A schematic flow chart of an energy planning method in an embodiment of the present application;
[0022] Figure 2 is a schematic flow chart of an energy planning method in another embodiment of the present application;
[0023] Figure 3 is a schematic block diagram of an energy planning system in another embodiment of the present application;
[0024] Figure 4 is a schematic block diagram of an energy planning device in an embodiment of the present application;
[0025] Figure 5 It is a structural block diagram of an energy planning device in an embodiment of the present application. DETAILED DESCRIPTION
[0026] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0027] At present, in order to ensure the uphill power of electric vehicles, the existing technology performs high-power power generation before going uphill, and continues to perform high-power power generation after going uphill to delay the decline of the battery pack. Therefore, the existing technology still has the problem of poor overall NVH performance of electric vehicles. In this regard, the present application provides an energy planning method for extended-range vehicles, which is applied to an energy planning device in the cloud. Specifically, the method includes: estimating the power consumption of the uphill section and the maximum power generation when generating power according to the optimal power generation power curve, wherein the optimal power generation power curve is a curve of the maximum power generation power changing with time; according to the difference between the power consumption and the maximum power generation, adjusting the power threshold of the nearest fast section before the uphill section, wherein the fast section is a smooth and flat section; sending the power threshold of each section to the vehicle end, so that the vehicle end performs pre-generation according to the power threshold of the fast section when on the fast section, and when going uphill, if it is monitored that the remaining power is greater than the power threshold of the uphill section, while using the battery to output power, it generates power according to the maximum power corresponding to the current vehicle speed to control the power generation noise to be less than the environmental noise.
[0028] It should be noted that the cloud-based energy planning device proposed in this application can be a server or a terminal device, and this application does not limit this. In addition, the energy planning device can exchange data with other devices such as the communication device on the vehicle side, and execute the energy planning method proposed in this application.
[0029] It should also be noted that the battery of the extended-range vehicle usually sets a minimum power, which is used to limit the minimum value of the battery power. The extended-range vehicle generates electricity through the range extender to keep the remaining power of the vehicle from being less than the minimum power. Similarly, in the energy planning method provided in the present application, a power threshold is set for each road section, and the initial value of the power threshold of each road section is equal and can be equal to the aforementioned minimum power. Based on this, in the energy planning method provided in the present application, the energy planning device controls the range extender to pre-generate power in the fast section by adjusting the power threshold of the fast section, thereby providing power for the future uphill section, so that the car can use the battery to output power in the uphill section while generating power according to the maximum power generation corresponding to the current vehicle speed, so that it can climb uphill. Because the power generation noise is less than or equal to the environmental noise when generating power according to the maximum power generation corresponding to the current vehicle speed, the present application can control the power generation noise of the range extender to be less than or equal to the environmental noise while providing sufficient climbing power. In general, the present application can not only reduce the power generation noise when going uphill, but also reduce the pre-discharge in the fast section to a certain extent through parallel discharge, so it also reduces the power generation noise in the fast section, thereby improving the overall NVH performance of the tram.
[0030] It should also be noted that the maximum power generation is the maximum power under which the power generation noise of the range extender is controlled to be less than the environmental noise. That is, when the car generates power according to the maximum power generation at the current speed, the maximum power generation can be obtained under the condition that the power generation noise of the range extender is controlled to be less than the environmental noise. The maximum power generation curve is a curve of the maximum power generation over time. Therefore, the maximum power generation obtained by generating power according to the maximum power generation curve is the maximum power generation that can be obtained by the vehicle end under the premise of controlling the power generation noise to be less than the environmental noise. In order to obtain the maximum power generation, the optimal power generation curve of the uphill section can be integrated and calculated. In more detail, each vehicle speed has a corresponding maximum power generation, and the optimal power generation curve is obtained by drawing the maximum power generation corresponding to the estimated vehicle speed at each time. Because the power generation is equal to the product of the power generation and time, the maximum power generation of the uphill section can be obtained by integrating the optimal power generation curve of the uphill section. In addition, the maximum power generation corresponding to each vehicle speed can be obtained by actual testing or by a power generation optimization model. The power generation optimization model will be described in detail in the following text of this application.
[0031] It should also be noted that the energy planning method provided in this application is applied to the energy planning device in the cloud, which takes advantage of the large number of examples and powerful computing power in the cloud, and can greatly improve the computing efficiency and accuracy. In addition, in the energy planning method provided in this application, the signal interaction between the energy planning device in the cloud and the vehicle side is simple, and the energy planning device controls the vehicle side to perform energy management by sending the power threshold of each section of the road to the vehicle side in real time, and facilitates the subsequent algorithm upgrade, which will not affect the algorithm on the vehicle side, and there is no need to use the vehicle system online upgrade technology (Over The Air Technology, OTA) to upgrade the vehicle side algorithm, and it is directly iterated in the cloud without affecting user use. Therefore, the energy planning method provided in this application has high real-time performance, and can meet the needs of energy planning even when the car is driving at high speed.
[0032] In order to better understand the energy planning method of the present application, Figure 1 As shown, the present application provides an embodiment of the energy planning method. Next, the present application will use the energy planning device as the execution subject to Figure 1 The energy planning method described is explained in detail:
[0033] 101: Estimate the power consumption on the uphill section and the maximum power generation when generating electricity according to the optimal power generation curve.
[0034] Among them, the energy planning device obtains the working condition information of the car, and estimates the power consumption of the car on the uphill section by using the power consumption information recorded in the working condition information, and can draw the optimal power generation curve according to the estimated vehicle speed information in the working condition information. The estimated vehicle speed information includes the target curve of the estimated vehicle speed changing with time, etc. The optimal power generation curve is a curve of the maximum power generation changing with time. Therefore, according to the optimal power generation curve of the uphill section, the maximum power generation of the uphill section can be obtained by integrating and calculating. In addition, the maximum power generation is the maximum power generation allowed by the car during driving, under the premise of controlling the power generation noise to be less than the environmental noise. Therefore, the maximum power generation is the maximum power generation that can be obtained under the premise of controlling the power generation noise to be less than the environmental noise.
[0035] In one possible implementation, in order to estimate the maximum power generation on an uphill section, the present application provides a specific implementation method, and the aforementioned step of estimating the maximum power generation when generating electricity according to the optimal power generation curve includes: the energy planning device obtains operating condition information, and the operating condition information includes a target curve for estimating the change of vehicle speed over time; determines the maximum power generation corresponding to multiple estimated vehicle speeds on the target curve, and draws an optimal power generation curve based on the target curve and the maximum power generation corresponding to multiple estimated vehicle speeds; performs integral calculation based on the optimal power generation curve to obtain the maximum power generation on the uphill section.
[0036] In this embodiment, the energy planning device first obtains the working condition information of the planned route, and divides the planned route into multiple sections according to the working condition information, then obtains the target curve of the estimated vehicle speed over time in the working condition information, collects multiple discrete points on the target curve, and determines the maximum power generation corresponding to the estimated vehicle speed of the multiple discrete points, and plots and draws the curve of the maximum power generation over time, that is, the optimal power generation curve. Finally, the integration calculation is performed according to the optimal power generation curve to obtain the maximum power generation of the uphill section.
[0037] In another possible implementation, in order to obtain the maximum power generation at each vehicle speed, the present application provides a power generation optimization model, which includes a first function for describing the mapping relationship between environmental noise and vehicle speed, and a second function for describing the mapping relationship between power generation noise and power generation. In order to make the environmental noise cover up the power generation noise of the range extender to improve the NVH performance, the power generation noise of the range extender is limited to be less than the environmental noise. Based on the constraint that the power generation noise is less than the environmental noise, and the power generation optimization model, the maximum power generation efficiency corresponding to each vehicle speed can be determined. Specifically, the aforementioned step of determining the maximum power generation corresponding to multiple estimated vehicle speeds on the target curve includes: establishing a first function of environmental noise and vehicle speed based on the data of vehicle speed and environmental noise; establishing a second function of power generation noise and power generation based on the data of power generation and power generation noise; based on the constraint that the power generation noise is less than the environmental noise, the first function and the second function are used to determine the maximum power generation corresponding to each estimated vehicle speed.
[0038] Among them, based on the power generation optimization model provided by the present application, the energy planning device can first set the power generation noise equal to the environmental noise, solve the target power generation at each vehicle speed by combining the first function and the second function, and then subtract a very small value from the target power generation to obtain the maximum power generation at each speed. The very small value can be expressed as ΔP, and ΔP is so small that it can even be ignored. When power generation is performed according to the target power generation at the current vehicle speed, the power generation noise is equal to the environmental noise; when power generation is performed according to the target power generation at a speed greater than the current vehicle speed, the power generation noise is greater than the environmental noise; when power generation is performed according to the target power generation at a speed less than the current vehicle speed, the power generation noise is less than the environmental noise. The maximum power generation at the current vehicle speed is less than the target power generation, so when power generation is performed according to the maximum power generation at the current vehicle speed, the power generation noise is less than the environmental noise. However, it should be noted that although the maximum power generation is less than the target power generation, the difference with the target power generation is very small and can be ignored. Therefore, the maximum power generation is the maximum power generation that can be achieved when the power generation noise is controlled to be less than the environmental noise.
[0039] It should be noted that when establishing the power generation optimization model, since the environmental noise is related to the vehicle speed, the higher the vehicle speed, the greater the environmental noise. The environmental noise includes air noise and tire noise, etc., and the power generation noise of the range extender is related to the power generation power. The greater the power generation power, the greater the power generation noise. Therefore, according to the measured environmental noise at various vehicle speeds, the first function of environmental noise and vehicle speed can be fitted, and according to the measured power generation noise at various power generation powers, the second function of power generation noise and power generation power can be fitted.
[0040] It should also be noted that each road section can be divided according to working condition information, and the power consumption of each road section can be calculated in the cloud using a clustering algorithm. Before determining the uphill section, the user can initiate destination navigation to the energy planning device in the cloud through the communication device on the vehicle side. After the energy planning device obtains the planned route through the navigation device, it obtains the working condition information of the route from the navigation device. The working condition information includes preset vehicle speed information, energy consumption information, average slope, congestion degree and ambient temperature, etc. After obtaining the working condition information, the energy planning device can divide the route into multiple road section segments according to a fixed length, such as S1, S2, S3, S4..., Sn, and then extract the working condition information of each road section segment, and determine the section type of each road section segment according to the estimated vehicle speed, slope and congestion degree in the working condition information of each road section. The section types include fast, uphill, congested and downhill, etc. For example: when 3km / h<estimated vehicle speed≤200km / h, and -5<average When the slope is <5, it is determined to be fast; when 3km / h<estimated speed≤80km / h and the average slope is >5, it is determined to be uphill; 3km / h<estimated speed≤80km / h&average slope<-5, it is determined to be downhill; when the car is in D gear (forward gear) or R gear (reverse gear), the estimated speed is <3km / h, and the duration is greater than 30 seconds, it is determined to be congested; or when the car is in P gear (brake gear) and the duration is greater than 30 seconds, it is determined to be congested. After determining the segment type of the road segment, it is determined whether the segment types of adjacent segment segments are the same. If they are the same, they are merged into one segment. If they are not the same, they are not merged. Finally, multiple segments are obtained, including at least one of a high-speed segment, an uphill segment, a congested segment, and a downhill segment. In addition, the present application also provides an energy consumption model for estimating the power consumption of each road section. The model adopts the K-means clustering algorithm. Specifically: according to the above four road section types, K=4 is set, and the ambient temperature T, driver IDD, longitude J, latitude W, slope S, vehicle speed V, pedal opening P, and average energy consumption EC are introduced; the vehicle operating condition data array FT is established n , FD n 、FJ n 、FW n , FS n 、FV n , FPn ; The energy consumption of each road section is calculated using the K-means clustering algorithm and the vehicle operating condition data array, and finally equivalent to the power consumption of each road section.
[0041] 102: According to the difference between the power consumption and the maximum power generation, the power threshold of the nearest fast section before the uphill section is adjusted.
[0042] The expressway section is a smooth and gentle section, and the aforementioned nearest expressway section before the uphill section refers to: the expressway section before the uphill section and closest to the uphill section. In order to adjust the power threshold of the nearest expressway section before the uphill section, the energy planning device can first calculate the target value based on the difference between the power consumption and the maximum power generation. For example, the target value is equal to the difference between the power consumption and the maximum power generation, and then the initial power threshold of the expressway section is adjusted up by the target value to obtain the power threshold of the expressway section. The difference between the power consumption and the maximum power generation is actually the battery power that needs to be obtained from the battery pack in the uphill section.
[0043] It should be noted that the embodiment of the present application raises the power threshold of the express section, while the power threshold of other sections can be less than or equal to the initial power threshold. When the power threshold of the uphill section is equal to the initial power threshold, the power obtained by pre-generating electricity in the express section is just enough for the car to climb uphill through parallel discharge on the uphill section. The car can control the power generation noise to be lower than the environmental noise throughout the climbing process, thereby maintaining good NVH performance.
[0044] It should also be noted that, only when the aforementioned target value is greater than 0, the power threshold of the nearest express section before the uphill section is adjusted. If the target value is less than or equal to 0, it means that there is no need to replenish power by generating electricity in advance, because the slope may be relatively small at this time, the power consumption is relatively small, etc., only according to the maximum power generation power corresponding to the current vehicle speed can be used to climb the slope, and there is no need for pre-generation of power on the express section, so as to optimize the NVH performance of the express section and reduce the power generation of the express section.
[0045] It should also be noted that the present application can adjust the power threshold of the expressway only according to the battery power required for the uphill section. In addition, on this basis, the power threshold of the expressway can also be comprehensively increased according to the power consumption of the congested section. Next, the present application will give examples of the specific values of the aforementioned target values, for example:
[0046] In the first case, E 0 =E 1 +(E 2 -E 3 ), where E 0 Indicates the power threshold of the fast section, E1 Indicates the initial power threshold of the fast section, E 2 Indicates the power consumption of the uphill section, E 3 Indicates the maximum power generation of the uphill section, (E 2 -E 3 ) represents the target value, in which case the entire battery power required for the uphill section is replenished by pre-generating power on the fast section;
[0047] In the second case, E 0 =E 1 +(E 2 -E 3 )+E 4 , where E 4 Indicates the power consumption of the congested road section, (E 2 -E 3 )+E 4 In this case, the target value is represented by pre-generating electricity on the fast road to replenish all the battery power required on the uphill road and replenish all the power consumed on the congested road.
[0048] 103: The power threshold of each road section is sent to the vehicle end, so that the vehicle end performs pre-generation according to the power threshold of the fast section when on the fast section, and when going uphill, if it is monitored that the remaining power is greater than the power threshold of the uphill section, while using the battery to output power, it generates power according to the maximum power generation power corresponding to the current vehicle speed to control the power generation noise to be lower than the environmental noise.
[0049] Among them, the power threshold of the fast section is used to control the start and stop of the range extender on the fast section, that is, when the car drives to the fast section, if the power of the battery pack is lower than the power threshold of the fast section, the range extender is started to generate electricity, and if the power of the battery pack is higher than the power threshold of the fast section, the range extender is prohibited from generating electricity, so that after the car has driven the fast section, the power of the battery pack is not less than the power threshold. In addition, the target threshold of the uphill section is used to control the range extender to start parallel discharge or stop parallel discharge. If the remaining power of the battery is greater than the target threshold of the uphill section when the car is going uphill, parallel discharge is performed, but if the remaining power of the battery is less than or equal to the target threshold of the uphill section, the range extender is controlled to follow the power generation. Parallel discharge means: on the one hand, the battery is used to output power, and on the other hand, power is generated according to the maximum power generation power corresponding to the current vehicle speed. In addition, the power threshold of the congested section is also used to control the start and stop of the range extender, while the power threshold of the downhill section is not used to control the start and stop of the range extender, because it is prohibited to start the range extender on the downhill section. The power threshold of the congested road section may be less than or equal to the initial power threshold. Furthermore, in order to reduce the power generation noise in the congested road section and the downhill road section and further improve the overall NVH performance, the energy planning device may set the power threshold of the power threshold of the congested road section to a value much smaller than the initial power threshold, so as to reduce the start-up of the range extender in the congested road section, thereby improving the overall NVH performance.
[0050] It should be noted that there will inevitably be an error between the estimated power consumption and the actual power consumption, and the error between the estimated vehicle speed and the actual vehicle speed will also lead to an error between the estimated maximum power generation and the actual maximum power generation. If the estimated power consumption is less than the actual power consumption, or the estimated maximum power generation is greater than the actual maximum power generation, it may cause the pre-power generation on the fast section to be insufficient to ensure that the car can climb uphill through the aforementioned parallel discharge method, because the battery power may be reduced to the power threshold of the uphill section while the car is climbing, causing the range extender to start early to follow the power generation. In this regard, the recovered power of the downhill section can be used to supplement it, but when the downhill section is behind the uphill section, the recovered power of the uphill section cannot be directly used to supplement the uphill section.
[0051] In one possible implementation, in response to the aforementioned error problem, the present application provides another possible implementation of the energy planning method. Specifically, before sending the power threshold of each road section to the vehicle end, the method also includes: determining whether there is a downhill section between the two express sections closest to the uphill section; if there is a downhill section, determining whether the downhill section is located behind the uphill section; if it is located behind, estimating the amount of recovered energy during energy recovery on the downhill section; lowering the power threshold of the uphill section according to the recovered amount to reduce the impact of the estimation error.
[0052] In this possible implementation mode, the energy planning device first determines whether there is a downhill section between the two express sections closest to the uphill section. If there is a downhill section, the recovered electricity of the downhill section can be used as redundancy to supplement the uphill section. Further, based on the positional relationship between the downhill section and the uphill section, it is determined whether the recovered electricity of the downhill section can be directly used to supplement the electricity of the uphill section. If the downhill section is after the uphill section, the amount of electricity recovered when the downhill section performs energy recovery is estimated, and the electricity threshold of the uphill section is lowered according to the amount of electricity recovered in the downhill section, so that the uphill section can "prepay" the recovered electricity of the downhill section. If the downhill section is before the uphill section, there is no need to adjust the electricity threshold of the uphill section.
[0053] It should be noted that, through this implementation method, the impact of the aforementioned estimation error problem can be reduced. Even if the estimated energy consumption on the uphill section is less than the actual energy consumption, or the estimated maximum power generation is greater than the actual maximum power generation, the car can also use the recovered electricity on the downhill section to extend the duration of the car's parallel discharge on the uphill section as much as possible, thereby maintaining good NVH performance for a longer time.
[0054] In another feasible manner, the amount of electricity recovered when going downhill can not only be used to improve the estimation error problem when going uphill, but also can be used to reduce the pre-generation of electricity in the fast section to improve the NVH performance of the fast section. Specifically, based on the previous implementation, the step of adjusting the power threshold of the nearest fast section before the uphill section according to the difference between the power consumption and the maximum power generation includes: if there is a downhill section, estimating the amount of recovered electricity when energy is recovered in the downhill section; calculating the sum of the maximum power generation and the recovered electricity, and raising the power threshold of the fast section according to the difference between the power consumption and the sum to reduce the pre-generation of electricity in the fast section.
[0055] In this embodiment, the range extender of the vehicle can reduce the pre-generated electricity on the fast road section according to the recovered electricity on the downhill road section. Next, this application will give examples of the specific numerical values of the above target values, for example:
[0056] In the third case, E 0 =E 1 +(E 2 -E 3 )-E 5 , (E 2 -E 3 )+E 3 -E 5 represents the target value, where E 0 Indicates the power threshold of the fast section, E 1 Indicates the initial power threshold of the fast section, E2 Indicates the power consumption of the uphill section, E 3 Indicates the maximum power generation on the uphill section, E 5 Indicates the amount of regenerated electricity on the downhill section. In this case, part of the battery power required on the uphill section is supplemented by pre-generating electricity on the fast section, and the rest is supplemented by the regenerated electricity on the downhill section;
[0057] In the fourth case, E 0 =E 1 +(E 2 -E 3 )+E 4 -E 5 , (E 2 -E 3 )+E 4 -E 5 represents the target value, where E 4 Indicates the power consumption of the congested section. In this case, the battery power required for the uphill section and part of the power consumption of the congested section are supplemented by pre-generation of power on the fast section, and the remaining power is supplemented by the recovered power on the downhill section.
[0058] In summary, in order to improve the NVH performance when going uphill and the NVH performance of other sections at the same time, the present application controls the range extender to reduce the pre-generation amount before going uphill as much as possible while improving the NVH performance of the uphill. Specifically, when on the uphill section, the range extender is controlled to generate electricity according to the maximum power generation corresponding to the current vehicle speed. The maximum power generation at the current vehicle speed is the maximum power generation at which the car can maintain good NVH performance at the current vehicle speed. The maximum power generation is calculated based on the maximum power generation noise allowed at the current vehicle speed. The maximum power generation noise is less than the environmental noise. Therefore, when the range extender generates electricity according to the maximum power generation at the current vehicle speed, the power generation noise of the range extender is less than the environmental noise. The environmental noise is used to cover up the power generation noise of the range extender, thereby improving the NVH performance of the uphill section. And the maximum power generation is the maximum amount of electricity that can be obtained by generating electricity according to the maximum power generation, so the power generation noise of the fast section is reduced as much as possible, and the NVH performance of the fast section is improved. In general, by implementing the energy planning method of the present application, the problem of poor overall NVH performance in the prior art can be improved.
[0059] In order to further optimize the overall NVH performance, the present application also provides another implementable method. In this implementable method, when adjusting the power threshold of the fast section, the energy planning device also takes into account the power recovery of the future downhill section. If there is a downhill section in the future, the power generation of the fast section is reduced, thereby reducing the power generation noise of the car on the fast section and improving the overall NVH performance. Specifically:
[0060] 201: Estimate the power consumption on the uphill section and the maximum power generation when generating electricity according to the optimal power generation curve.
[0061] 202; if there is a downhill section between the two express sections closest to the uphill section, the amount of energy recovered during energy recovery on the downhill section is estimated.
[0062] 203: If the downhill section is located behind the uphill section, the power threshold of the uphill section is lowered according to the recovered power.
[0063] 204: Calculate the sum of the maximum power generation and the recovered power, and increase the power threshold of the expressway section according to the difference between the power consumption and the sum.
[0064] 205: The power threshold of each road section is sent to the vehicle-side device, so that the vehicle-side device performs pre-generation according to the power threshold of the fast section when on the fast section, and when going uphill, if it is monitored that the remaining power is greater than the power threshold of the uphill section, while using the battery to output power, it generates power according to the maximum power generation power corresponding to the current vehicle speed to control the power generation noise to be lower than the environmental noise.
[0065] In one possible implementation, in order to further improve the overall NVH performance, the energy planning device estimates the power consumption of the fast section and the maximum power generation when generating power according to the optimal power generation curve of the fast section, and then determines the difference between the maximum power generation of the fast section and the power consumption of the fast section. If the difference between the maximum power generation of the fast section and the power consumption of the fast section is greater than the power consumption of the uphill section and the maximum power generation of the uphill section, then the step of adjusting the power threshold of the nearest fast section before the uphill section according to the difference between the power consumption and the maximum power generation is performed; but if the difference between the maximum power generation of the fast section and the power consumption of the fast section is less than the power consumption of the uphill section and the maximum power generation of the uphill section, then the power threshold of the fast section and at least one fast section before the fast section is adjusted so that the pre-power generation of each fast section is less than or equal to the difference between the maximum power generation of each fast section and the power consumption of the fast section, and then the power threshold of each fast section is sent to the vehicle-side device so that the car generates power in each fast section according to the maximum power generation corresponding to the current vehicle speed.
[0066] In summary, based on the previous embodiment, the embodiment of the present application also determines the power thresholds of the fast section and the uphill section according to the recovered power of the downhill section, thereby reducing the power generation of the fast section and further improving the overall NVH performance.
[0067] The present application also provides an energy management system, the energy planning system includes an energy planning device deployed on the cloud, and an energy management device deployed on the vehicle side, wherein: the energy planning device is used to implement the energy planning method of any one of the aforementioned embodiments and implementation methods, and the energy management device is used to pre-generate electricity according to the electricity threshold of the fast section when on the fast section after receiving the electricity threshold of each road section, and if the remaining electricity is monitored to be greater than the electricity threshold of the uphill section when going uphill, while using the battery to output power, generate electricity according to the maximum power generation power corresponding to the current vehicle speed, so as to control the power generation noise to be lower than the environmental noise.
[0068] In another possible implementation, Figure 3 As shown, the present application also provides another energy management system, the aforementioned energy planning system also includes a navigation device deployed in the cloud, and a communication device deployed in the vehicle, wherein: the navigation device is used to perform route planning and provide working condition information to the energy planning device; the communication device is used to interact with the energy planning device and forward the received power threshold of each road section to the energy management device. Among them, the communication device can be, for example, a vehicle networking system (TelematicsBox, TBOX), etc.
[0069] The present application also provides an energy planning device, such as Figure 4 As shown. The embodiment of the present application can divide the functional modules of the device according to the above method example. For example, each functional module can be divided according to each function, or two or more functions can be integrated into one module. The above integrated modules can be implemented in the form of hardware or in the form of software functional modules. It should be noted that the division of modules in the embodiment of the present application is schematic and is only a logical function division. There may be other division methods in actual implementation. Specifically, Figure 4 As shown, the energy planning device includes: an estimating unit 410, which is used to estimate the power consumption of the uphill section and the maximum power generation when power is generated according to the optimal power generation curve, wherein the optimal power generation curve is a curve of the maximum power generation over time; an adjusting unit 420, which is used to adjust the power threshold of the nearest fast section before the uphill section according to the difference between the power consumption and the maximum power generation, wherein the fast section is a smooth and flat section; a sending unit 430, which is used to send the power threshold of each section to the vehicle end, so that the vehicle end performs pre-power generation according to the power threshold of the fast section when on the fast section, and if it is monitored that the remaining power is greater than the power threshold of the uphill section when going uphill, while using the battery to output power, it generates power according to the maximum power corresponding to the current vehicle speed to control the power generation noise to be less than the environmental noise.
[0070] In another practicable manner, the aforementioned adjustment unit 420 is also used to: determine whether there is a downhill section between the two express sections closest to the uphill section; if there is a downhill section, determine whether the downhill section is located behind the uphill section; if it is located behind, estimate the amount of recovered electricity during energy recovery on the downhill section; lower the power threshold of the uphill section according to the recovered electricity to reduce the impact of the estimation error.
[0071] In another practicable manner, the aforementioned adjustment unit 420 is also used to: if there is a downhill section, estimate the amount of recovered electricity during energy recovery on the downhill section; calculate the sum of the maximum power generation and the recovered electricity, and increase the power threshold of the express section according to the difference between the power consumption and the total, so as to reduce the pre-power generation of the express section.
[0072] In another practicable manner, the estimation unit 410 is specifically used to: obtain operating condition information, the operating condition information including a target curve of estimated vehicle speed changing with time; determine the maximum power generation corresponding to multiple estimated vehicle speeds on the target curve, and draw an optimal power generation curve based on the target curve and the maximum power generation corresponding to the multiple estimated vehicle speeds; perform integral calculation based on the optimal power generation curve to obtain the maximum power generation on the uphill section.
[0073] In another practicable manner, the estimation unit 410 is also used to: establish a first function of environmental noise and vehicle speed based on the data of vehicle speed and environmental noise; establish a second function of power generation noise and power generation power based on the data of power generation power and power generation noise; and based on the constraint that the power generation noise is less than the environmental noise, use the first function and the second function to determine the maximum power generation power corresponding to each estimated vehicle speed.
[0074] This application also provides an energy planning device, see Figure 5 As shown in the figure, the energy planning device in this embodiment may include: a processor 510, a transceiver 520 and a memory 530. The processor 510, the transceiver 520 and the memory 530 are connected via a bus 540. The processor 510 is used to execute multiple instructions; the transceiver 520 is used to exchange data with other devices; the memory 530 is used to store multiple instructions, which are suitable for the processor 510 to load and execute the energy planning method in the above embodiment.
[0075] The processor 510 may be an electronic control unit (ECU), a central processing unit (CPU), a general processor, a coprocessor, a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field programmable gate array (FPGA) or other programmable logic devices, transistor logic devices, hardware components or any combination thereof. The processor 510 may also be a combination that implements computing functions, such as a combination of one or more microprocessors, a combination of 5SP and a microprocessor, etc. In this embodiment, the processor 510 may be a single-chip microcomputer, and various control functions may be implemented by programming the single-chip microcomputer. The processor has the advantages of powerful computing power and fast processing. Specifically, the processor 510 is used to execute the function of the estimation unit 410, which is used to estimate the power consumption of the uphill section and the maximum power generation when generating electricity according to the optimal power generation curve, wherein the optimal power generation curve is a curve of the maximum power generation changing with time; the processor 510 is also used to execute the function of the adjustment unit 420, which is used to adjust the power threshold of the nearest fast section before the uphill section according to the difference between the power consumption and the maximum power generation, wherein the fast section is a smooth and flat section; the transceiver 520 is used to execute the function of the sending unit 430, which is used to send the power threshold of each section to the vehicle end, so that the vehicle end performs pre-generation according to the power threshold of the fast section when on the fast section, and if it is monitored that the remaining power is greater than the power threshold of the uphill section when going uphill, while using the battery to output power, it generates power according to the maximum power generation corresponding to the current vehicle speed, so as to control the power generation noise to be less than the environmental noise.
[0076] In another practicable manner, the aforementioned processor 510 is also used to: determine whether there is a downhill section between the two express sections closest to the uphill section; if there is a downhill section, determine whether the downhill section is located behind the uphill section; if it is located behind, estimate the amount of recovered electricity during energy recovery on the downhill section; lower the power threshold of the uphill section according to the recovered electricity to reduce the impact of the estimation error.
[0077] In another practicable manner, the aforementioned processor 510 is also used to: if there is a downhill section, estimate the amount of recovered electricity during energy recovery on the downhill section; calculate the sum of the maximum power generation and the recovered electricity, and increase the power threshold of the fast section according to the difference between the power consumption and the total, so as to reduce the pre-power generation of the fast section.
[0078] In another practicable manner, the processor 510 is specifically used to: obtain operating condition information, the operating condition information including a target curve of estimated vehicle speed over time; determine the maximum power generation corresponding to multiple estimated vehicle speeds on the target curve, and draw an optimal power generation curve based on the target curve and the maximum power generation corresponding to the multiple estimated vehicle speeds; perform integral calculation based on the optimal power generation curve to obtain the maximum power generation on the uphill section.
[0079] In another practicable manner, the processor 510 is further used to: establish a first function of environmental noise and vehicle speed based on the data of vehicle speed and environmental noise; establish a second function of power generation noise and power generation power based on the data of power generation power and power generation noise; and determine the maximum power generation power corresponding to each estimated vehicle speed using the first function and the second function based on the constraint that the power generation noise is less than the environmental noise.
[0080] In one embodiment, the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a plurality of instructions, which are suitable for being loaded by a processor and executing the method in any of the foregoing embodiments. The processor is used to execute the plurality of instructions; the memory is used to store the plurality of instructions, which are loaded by the processor and execute the energy planning method in the foregoing embodiments.
[0081] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0082] The above embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the patent of the present application shall be subject to the attached claims.
Claims
1. An energy planning method, applied to a cloud energy planning device, characterized in that: include: Based on the constraint condition that the power generation noise is less than the environmental noise, and the first function used to describe the mapping relationship between the environmental noise and the vehicle speed in the power generation optimization model, and the second function used to describe the mapping relationship between the power generation noise and the power generation power, the maximum power generation power corresponding to each vehicle speed is determined; Estimate the power consumption of the uphill section and the maximum power generation when power is generated according to the optimal power generation curve, where the optimal power generation curve is a curve of maximum power generation changing with time; According to the difference between the power consumption and the maximum power generation, the power threshold of the nearest fast road section before the uphill road section is adjusted, wherein the fast road section is a smooth and flat road section; The power threshold of each road section is sent to the vehicle end, so that the vehicle end can pre-generate power according to the power threshold of the fast section when on the fast section, and when going uphill, if the remaining power is monitored to be greater than the power threshold of the uphill section, while using the battery to output power, it will generate power according to the maximum power generation power corresponding to the current vehicle speed to control the power generation noise to be lower than the environmental noise.
2. The method according to claim 1, characterized in that Before sending the power threshold of each road section to the vehicle end, the method further includes: Determine whether there is a downhill section between the two express sections closest to the uphill section; If there is a downhill section, determining whether the downhill section is located behind the uphill section; If it is at the rear, then estimating the amount of energy recovered during energy recovery on the downhill section; The power threshold of the uphill section is lowered according to the reclaimed power to reduce the impact of the estimation error.
3. The method according to claim 2, characterized in that Adjusting the power threshold of the nearest fast road section before the uphill road section according to the difference between the power consumption and the maximum power generation includes: If there is a downhill section, estimating the amount of energy recovered during energy recovery on the downhill section; The sum of the maximum power generation and the recovered power is calculated, and the power threshold of the express section is increased according to the difference between the power consumption and the sum to reduce the pre-power generation of the express section.
4. The method according to claim 1, characterized in that: Estimate the maximum power generation when generating electricity according to the optimal power generation curve, including: Acquiring operating condition information, the operating condition information including a target curve for estimating vehicle speed changes over time; Determine the maximum power generation corresponding to the multiple estimated vehicle speeds on the target curve, and draw an optimal power generation curve based on the target curve and the maximum power generation corresponding to the multiple estimated vehicle speeds; An integral calculation is performed based on the optimal power generation curve to obtain the maximum power generation capacity of the uphill section.
5. The method according to claim 4, characterized in that Determine the maximum power generation corresponding to multiple estimated vehicle speeds on the target curve, including: According to the data of vehicle speed and environmental noise, a first function of environmental noise and vehicle speed is established; According to the data of power generation and power generation noise, a second function of power generation noise and power generation is established; Based on the constraint that the power generation noise is less than the environmental noise, the maximum power generation power corresponding to each estimated vehicle speed is determined using the first function and the second function.
6. An energy planning system, characterized in that: The energy planning system includes an energy planning device deployed in the cloud and an energy management device deployed in the vehicle, wherein: The energy planning device is used to execute the energy planning method in any one of claims 1 to 5; The energy management device is used to, after receiving the power threshold of each road section, pre-generate electricity according to the power threshold of the fast section when on the fast section, and if it is monitored that the remaining power is greater than the power threshold of the uphill section when going uphill, while using the battery to output power, generate electricity according to the maximum power generation power corresponding to the current vehicle speed, so as to control the power generation noise to be lower than the environmental noise.
7. The system according to claim 6, characterized in that The energy planning system further includes a navigation device deployed in the cloud and a communication device deployed in the vehicle, wherein: The navigation device is used to perform route planning and provide operating condition information to the energy planning device; The communication device is used to exchange data with the energy planning device and forward the received power threshold of each road section to the energy management device.
8. An energy planning device, characterized in that: include: an estimation unit, for determining the maximum power generation corresponding to each vehicle speed based on the constraint condition that the power generation noise is less than the environmental noise, a first function for describing the mapping relationship between the environmental noise and the vehicle speed in the power generation optimization model, and a second function for describing the mapping relationship between the power generation noise and the power generation; the estimation unit is also used to estimate the power consumption of the uphill section and the maximum power generation when power generation is performed according to the optimal power generation curve, wherein the optimal power generation curve is a curve of the maximum power generation changing with time; an adjusting unit, configured to adjust a power threshold of a nearest fast road section located before the uphill road section according to a difference between the power consumption and the maximum power generation, wherein the fast road section is a smooth and flat road section; The sending unit is used to send the power threshold of each road section to the vehicle end, so that the vehicle end can pre-generate electricity according to the power threshold of the fast section when on the fast section, and when going uphill, if it is monitored that the remaining power is greater than the power threshold of the uphill section, while using the battery to output power, it will generate electricity according to the maximum power generation power corresponding to the current vehicle speed to control the power generation noise to be lower than the environmental noise.
9. An energy planning device, characterized in that: The energy planning device includes a processor, a transceiver and a memory, and the processor, transceiver and memory are connected via a bus; the processor is used to execute multiple instructions; the transceiver is used to exchange data with other devices; the memory is used to store the multiple instructions, and the instructions are suitable for being loaded by the processor and executing the energy planning method described in any one of claims 1 to 5.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a plurality of instructions, and the instructions are suitable for being loaded by a processor and executing the energy planning method according to any one of claims 1 to 5.
Citation Information
Patent Citations
Extended range electric vehicle control method and extended range electric vehicle
CN106828128A
Charging control method and device of vehicle and vehicle
CN108808815A