Method and device for increasing the number of high-speed trains with time window constraints considering passenger demand
By constructing a multi-objective optimization model and combining passenger travel demand and train operation data, the problem of adding high-speed rail trains that is difficult to meet passenger needs and neglecting economic benefits has been solved, and passenger needs can be met without changing the existing operation chart. and optimize the train operation efficiency plan.
Patent Information
- Application Number
- CN202311807883.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-26
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2043-12-26
AI Technical Summary
The existing method of increasing the number of high-speed trains is difficult to meet passenger travel needs and ignores the economic benefits of the railway sector, especially when passenger demand has time window constraints.
Construct an optimization model for the first train addition with the goal of maximizing profits and an optimization model for the second train with the goal of maximizing passenger travel needs. Combine passenger travel needs and existing train operation data to determine the constraints and solve them. Obtain the corresponding expansion plan.
While meeting the travel needs of passengers, we also consider the economic benefits of the railway sector and provide a train expansion plan that meets passenger needs, which does not change the existing train operation chart and optimizes railway operation benefits.
Smart Images

Figure CN117829491B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of railway operation diagram compilation, and in particular to a method and device for increasing the operation of high-speed trains with time window constraints taking into account passenger demand. Background Art
[0002] The high-speed train timetable is highly matched with the travel needs of passengers, which is crucial to ensure that passengers have a high-quality travel experience. Usually, the high-speed train timetable needs to be formulated before the ticket window opens, and necessary adjustments need to be made according to the actual passenger flow during the ticket sales period. Given the high priority of passenger trains, when the travel needs of passengers cannot be met, the timetable adjustment generally does not cancel the existing train arrangements, but meets the overflow passenger travel needs by adding trains.
[0003] High-speed trains are public welfare services and should give priority to meeting passengers' travel needs. However, high-speed trains are generally in a loss-making state, and the economic benefits of the railway department must also be considered when compiling and adjusting the operation diagram.
[0004] In the related technology, for the problem of scheduling additional trains on the existing operation diagram, the traffic capacity management algorithm takes the expected train schedule and the tolerable error as input, and gives the operation diagram adjustment plan that maximizes the overall benefit by weighing the service benefits and the gap between the actual schedule and the operator's expected schedule; the additional train service scheduling technology allows the modification of the schedule of existing trains, introduces time window constraints on their actual running time, and adds trains on this basis. However, in actual operation, the departure time of existing trains is basically not modified; and passenger demand has a time window constraint. Only when the train's departure time is within the time window can passengers choose to travel on this train. Therefore, the existing method of adding trains is difficult to truly meet the travel needs of passengers, and ignores the economic benefits of the railway department. Summary of the invention
[0005] In view of the above problems, an embodiment of the present application provides a method and device for increasing the number of high-speed trains with time window constraints taking into account passenger demand, so as to overcome the above problems or at least partially solve the above problems.
[0006] In a first aspect of an embodiment of the present application, a method for increasing the number of high-speed trains with time window constraints considering passenger demand is disclosed, the method comprising:
[0007] Constructing a first train increase optimization model with the goal of maximizing profits, and constructing a second train increase optimization model with the goal of maximizing passenger travel needs;
[0008] Determine constraint conditions, and obtain overflow passenger travel demand and existing train operation data, wherein the passenger travel demand includes a boarding time window and a boarding departure and arrival demand, and the existing train operation data includes a train route, a train stop plan set, and a train interval operation time;
[0009] According to the constraint conditions, the passenger travel demand and the train operation data, the first train increase optimization model and the second train increase optimization model are solved respectively to obtain a first train increase plan and a second train increase plan.
[0010] Optionally, constructing an optimization model for increasing the number of first trains with the goal of maximizing profits includes:
[0011] Constructing a first sub-model based on train operation costs and passenger ticket revenue, wherein the first sub-model aims to maximize profits;
[0012] constructing a second sub-model according to the time when the train arrives at the station, the time when the train leaves the station, and the selected train stop plan, wherein the second sub-model aims to minimize the total travel time;
[0013] The first train increase optimization model is obtained according to the first sub-model and the second sub-model.
[0014] Optionally, a second train additional operation optimization model is constructed with the goal of maximizing passenger travel demand, including:
[0015] A third sub-model is constructed according to the number of tickets reserved for the train, wherein the third sub-model aims to maximize the satisfaction of passenger travel needs;
[0016] Constructing a fourth sub-model according to the selected train stop plan, wherein the fourth sub-model aims to minimize the number of additional trains;
[0017] constructing a fifth sub-model according to the time when the train arrives at the station, the time when the train leaves the station, and the selected train stop plan, wherein the fifth sub-model aims to minimize the total travel time;
[0018] The second train increase optimization model is obtained according to the third sub-model, the fourth sub-model and the fifth sub-model.
[0019] Optionally, determine constraints, including:
[0020] Determine a stop plan constraint condition, wherein the stop plan constraint condition is used to constrain each train to select only one train stop plan from the train stop plan set;
[0021] Determining timetable constraints, wherein the timetable constraints are used to constrain the time when a train arrives at a station, the time when a train leaves a station, and the time when a train runs between stations;
[0022] Determining a passenger travel time window constraint condition, wherein the passenger travel time window constraint condition is used to constrain the matching relationship between the train and the passenger travel demand;
[0023] Determining a passenger ticket allocation constraint condition, wherein the passenger ticket allocation constraint condition is used to constrain the relationship between the number of passenger tickets reserved for the train and the number of passenger travel demands;
[0024] A train sequence constraint condition is determined, wherein the train sequence constraint condition is used to constrain the activation sequence of the trains.
[0025] Optionally, the schedule constraints include:
[0026] The time when the train arrives at the station cannot be later than the start time of maintenance, and the time when the train leaves the station cannot be earlier than the end time of maintenance;
[0027] The duration of the stop at the station between the time when the train arrives at the station and the time when the train leaves the station cannot be less than the shortest stop duration and cannot be greater than the longest stop duration;
[0028] The train interval running time between the time when the train leaves the station and the time when the train arrives at the next station cannot be less than the shortest train interval running time and cannot be greater than the longest train interval running time;
[0029] The departure interval between two adjacent trains cannot be less than the shortest departure interval, and the arrival interval between two adjacent trains cannot be less than the shortest arrival interval.
[0030] Optionally, the passenger travel time window constraint includes:
[0031] When the train's stop stations match the departure and arrival requirements, and the train's stop time window matches the boarding time window, the train meets the passengers' travel needs.
[0032] Optionally, the ticket allocation constraint conditions include:
[0033] The number of tickets reserved for a train does not exceed the number of passengers required;
[0034] The number of passenger demands satisfied by the train does not exceed the capacity of the train;
[0035] The number of tickets reserved for a train is non-zero if and only if the train's stop stations match the boarding departure and arrival requirements and the train's stop time window matches the boarding time window.
[0036] Optionally, solving the first train increase optimization model according to the constraint condition, the passenger travel demand and the train operation data includes:
[0037] Solving the first sub-model according to the constraint conditions, the passenger travel demand and the train operation data to obtain a first optimal solution, wherein the first optimal solution includes: a stop plan of the first additional train, a travel order of the first additional train, and a number of tickets provided by the first additional train to meet the passenger travel demand;
[0038] Substitute the first optimal solution into the second sub-model for solution to obtain a timetable for the first additional train;
[0039] A plan for adding a first train is obtained according to the timetable of the first additional train and the first optimal solution.
[0040] Optionally, solving the second train increase optimization model according to the constraint condition, the passenger travel demand and the train operation data includes:
[0041] Solving the third sub-model and the fourth sub-model according to the constraint conditions, the passenger travel demand and the train operation data to obtain a second optimal solution, wherein the second optimal solution includes: a stop plan of the second additional train, a travel order of the second additional train, and a number of tickets provided by the second additional train to meet the passenger travel demand;
[0042] The second optimal solution is brought into the fifth sub-model for solving to obtain the timetable of the second additional train;
[0043] A second train additional plan is obtained according to the timetable of the second additional train and the second optimal solution.
[0044] In a second aspect of the embodiments of the present application, a device for increasing the number of high-speed trains with time window constraints considering passenger demand is disclosed, the device comprising:
[0045] A construction module is used to construct a first train increase optimization model with the goal of maximizing profits, and to construct a second train increase optimization model with the goal of maximizing passenger travel needs;
[0046] A determination module, used to determine constraint conditions, and to obtain overflow passenger travel demands and existing train operation data, wherein the passenger travel demands include a boarding time window and a boarding departure and arrival demand, and the existing train operation data includes a train route, a train stop plan set, and a train interval operation time;
[0047] A solution module is used to solve the first train increase optimization model and the second train increase optimization model according to the constraint conditions, the passenger travel demand and the train operation data, so as to obtain the first train increase plan and the second train increase plan.
[0048] The embodiments of the present application include the following advantages:
[0049] In an embodiment of the present application, considering adding trains to meet excess passenger demand with time window constraints, firstly, a first train addition optimization model with the goal of maximizing profits and a second train addition optimization model with the goal of maximizing passenger travel demand are constructed; then, the constraints are determined, and the overflow passenger travel demand and existing train operation data are obtained, the passenger travel demand includes the boarding time window and the boarding departure and arrival demand, and the existing train operation data includes the train route, the train stop plan set, and the train interval operation time; finally, according to the constraints, the passenger travel demand and the train operation data, the first train addition optimization model and the second train addition optimization model are solved respectively to obtain the first train addition plan and the second train addition plan.
[0050] Since the first train additional operation optimization model aims to maximize profits, and the second train additional operation optimization model aims to maximize the satisfaction of passengers' travel needs, the first train additional operation plan and the second train additional operation plan obtained by solving can meet the travel needs of passengers while taking into account the economic benefits of the railway department to varying degrees. In addition, the first train additional operation plan and the second train additional operation plan are solved based on the travel needs of passengers and the existing operation data, so the provided train additional operation plan meets the travel needs of passengers (i.e., meets the passengers' travel time window) and is obtained without changing the basic line of the existing train operation diagram. In this way, a train additional operation plan that takes economic benefits into consideration and meets the travel needs of passengers is realized. BRIEF DESCRIPTION OF THE DRAWINGS
[0051] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the description of the embodiments of the present application will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0052] Figure 1 This is a flowchart of the steps of a method for adding high-speed trains with time window constraints considering passenger demand provided by an embodiment of the present application;
[0053] Figure 2 This is a schematic diagram of the Shenyang South-Dalian North railway line provided in an embodiment of the present application;
[0054] Figure 3 is a schematic diagram of a set of train stop solutions provided in an embodiment of the present application;
[0055] Figure 4 It is a schematic diagram of the results of Experiment 1 provided in the embodiments of the present application;
[0056] Figure 5 This is a schematic diagram of the results of Experiment 2 provided in the embodiments of the present application;
[0057] Figure 6 This is a schematic diagram of the results of Experiment 3 provided in the embodiments of the present application;
[0058] Figure 7 It is a schematic diagram of the results of Experiment 4 provided in the embodiments of the present application;
[0059] Figure 8 It is a schematic diagram of the results of Experiment 5 provided in the embodiments of the present application;
[0060] Fig. 9 It is a schematic diagram of the results of Experiment 6 provided in the embodiments of the present application;
[0061] Fig.10 It is a schematic diagram of the results of Experiment 7 provided in the embodiments of the present application;
[0062] Fig.11 It is a schematic diagram of the results of Experiment 8 provided in the embodiments of the present application;
[0063] Fig.12 It is a structural schematic diagram of a high-speed train additional operation device with time window constraints taking into account passenger demand, provided in an embodiment of the present application. DETAILED DESCRIPTION
[0064] In order to make the above-mentioned purposes, features and advantages of the present application more obvious and understandable, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0065] The embodiment of the present application provides a method for increasing the number of high-speed trains with time window constraints considering passenger demand, such as Figure 1 As shown, Figure 1 A flowchart of a method for increasing the number of high-speed trains with time window constraints considering passenger demand provided in an embodiment of the present application includes steps S110 to S130:
[0066] Step S110: constructing a first train increase optimization model with the goal of maximizing profits, and constructing a second train increase optimization model with the goal of maximizing satisfaction of passenger travel needs.
[0067] In the embodiment of the present application, the public welfare and general loss status of high-speed rail are combined, and the economic benefits of the railway department are taken into account to varying degrees while meeting the travel needs of passengers, and two train increase optimization models are provided, namely the first train increase optimization model and the second train increase optimization model. For the convenience of calculation, it is assumed that the first train increase optimization model and the second train increase optimization model are constructed on a corridor-type railway. A corridor-type railway means that all stations are distributed on a railway line, and there is a line for each line in the up and down directions that is parallel to each other and does not affect each other, and all trains use the same starting and ending stations. In addition, it is assumed that all available trains are high-speed trains and have the same attributes. The existing fare setting is adopted based on the selection of the train stop plan (for example, the second-class seat fare is uniformly used for calculation).
[0068] The model parameters involved in the first train additional operation optimization model and the second train additional operation optimization model include: S station set, i.e., stations on the train route; S 0 The train's departure station; S l The train's terminal station; L is a set of optional train stop plans. A train will pass through multiple stations on its route, but it does not stop at all stations. Therefore, multiple trains on the same route involve multiple train stop plans; C N N 0 Alternative additional train collection; N 0 The set of existing scheduled trains; N is the set of all available trains, including the alternative additional trains and the existing scheduled trains, that is, N = C N N 0 ∪N 0 ; W is the width of the boarding time window; h d The minimum interval between trains departing from the same station; h a The minimum interval time between trains arriving at the same station; U l,s The constant takes a value between 0 and 1. If the stop plan l stops at station s, it is 1, otherwise it is 0; d i,s The departure time of train i at station s is i∈N 0 , s∈S and s≠S l ; a i,s The arrival time of train i at station s is i∈N 0 , s∈S and s≠S 0 ; The maximum dwell time of a train at a station; T stop The shortest stay time of a train at a station; p = (o, d, t) represents the passenger demand for departing from station o to station d at time t, p∈P; P is the set of all passenger demands to be solved; Q is a list of the number of passengers with different demands, Q p The number of passengers representing the travel demand p; M is a large constant; T start The earliest time (in minutes) that a train is allowed to depart from the starting station; T end The latest time (in minutes) that a train is allowed to arrive at the terminal; The maximum time required for a train to run from station m to station n using operation plan l; Trans l,m,n The shortest time required for a train to run from station m to station n using operation plan l; Ca is the passenger capacity of the train (regardless of seat class); C is the operating cost of running a train; Pr is the cost of running a train; i,j,l The average price per passenger (second class) from station i to station j in operation plan l.
[0069] The decision variables of the first train additional operation optimization model and the second train additional operation optimization model include relevant variables and sequence variables of the additional train operation diagram.
[0070] Among them, the variables related to the additional train operation diagram include: i,l ∈{0, 1}, that is, it is 1 when train i chooses stop plan l to depart, otherwise it is 0, i∈C N N 0 ;d i,s is the departure time of train i at station s, i∈C N N 0 , s∈S and s≠S l ; a i,s is the arrival time of train i at station s, i∈C N N 0 , s∈S and s≠S 0 The above variables determine the choice of stop plan for all spare trains and the arrival and departure time at each station. In addition, the variable π i,j,s , which means that on the segment (s, s+1), if train i departs before train j, it is 1, otherwise it is 0, i∈C N N 0 , j∈N, s∈S and s≠S i .
[0071] Sequential variables can more conveniently describe the distance between trains. On a single-track railway, trains are only allowed to overtake in stations and are not allowed to overtake on the track. Therefore, it is only necessary to determine the departure time sequence of the two trains at the station to simultaneously determine the arrival order of the two trains at the next station.
[0072] In an optional embodiment, constructing a first train additional operation optimization model with the goal of maximizing profit includes:
[0073] The first sub-model is constructed based on the train operation cost and passenger ticket revenue, and the first sub-model aims to maximize profit:
[0074] constructing a second sub-model according to the time when the train arrives at the station, the time when the train leaves the station, and the selected train stop plan, wherein the second sub-model aims to minimize the total travel time;
[0075] The first train increase optimization model is obtained according to the first sub-model and the second sub-model.
[0076] In an embodiment of the present application, the first train increase optimization model includes a first sub-model and a second sub-model. The first sub-model is used to optimize the profits of the railway department, and the second sub-model is used to further optimize the total travel time of the train in its optimal solution space while optimizing the profits, so as to maximize the profits and reduce the running time of the train in the section and the stop time at the station as much as possible without causing conflicts.
[0077] For example, the first sub-model z 1 and the second submodel z 2 Respectively expressed as:
[0078]
[0079]
[0080] Among them, Cx i,l represents the train operation cost of train i choosing the l-stop plan; y i,p represents the number of tickets reserved by train i for demand p; y i,p Pr p.o,p.d,l Represents ticket revenue; variable x i,l ∈{0, 1} is 1 when train i chooses stop plan l to depart, otherwise it is 0, i∈C N N 0 ; is the departure time of train i at station s, i∈C N N 0 , s∈S and s≠S i ; is the arrival time of train i at station s, i∈C N N 0 , s∈S and s≠S 0 .
[0081] In an optional embodiment, a second train additional operation optimization model is constructed with the goal of maximizing passenger travel demand, including:
[0082] A third sub-model is constructed according to the number of tickets reserved for the train, wherein the third sub-model aims to maximize the satisfaction of passenger travel needs;
[0083] The fourth sub-model is constructed according to the selected train stop plan, and the fourth sub-model aims to minimize the number of additional trains:
[0084] constructing a fifth sub-model according to the time when the train arrives at the station, the time when the train leaves the station, and the selected train stop plan, wherein the fifth sub-model aims to minimize the total travel time;
[0085] The second train increase optimization model is obtained according to the third sub-model, the fourth sub-model and the fifth sub-model.
[0086] In the embodiment of the present application, the second train additional optimization model includes a third sub-model, a fourth sub-model and a fifth sub-model. The third sub-model maximizes the total number of passengers; the fourth sub-model considers minimizing the number of additional trains, reducing the operating cost by reducing the number of additional trains operated by the railway department; the fifth sub-model considers minimizing the total travel time of all spare trains to improve operating efficiency.
[0087] For example, the third sub-model z 3 , Fourth, in model z 4 and the fifth submodel z 5 Respectively expressed as:
[0088]
[0089]
[0090]
[0091] Among them, y i,p represents the number of tickets reserved by train i for demand p; variable x i,l ∈{0, 1} is 1 when train i chooses stop plan l to depart, otherwise it is 0, i∈C N N 0 ; is the departure time of train i at station s, i∈C N N 0 , s∈S and s≠S l ; is the arrival time of train i at station s, i∈C N N 0 , s∈S and s≠S 0 .
[0092] Step S120: Determine the constraint conditions, and obtain the overflow passenger travel demand and existing train operation data, wherein the passenger travel demand includes the boarding time window and the boarding departure and arrival requirements, and the existing train operation data includes the train route, the train stop plan set, and the train interval operation time.
[0093] In the embodiment of the present application, the constraint conditions are used to constrain the stop plan, timetable, passenger travel time window, ticket allocation and activation order of the additional trains. When solving the first train additional optimization model and the second train additional optimization model, the first constraint condition is calculated as the constraint.
[0094] The overflow passenger travel demand is obtained from the passenger data of "standby" tickets. Currently, high-speed rail provides a "standby" ticket purchase plan. The passenger data of "standby" tickets can provide overflow passenger travel demand information, which includes the passenger's departure station and destination station (i.e., the departure and arrival demand), and the passenger's expected boarding time (i.e., the boarding time window).
[0095] The existing train operation data includes train routes, train stop plan sets, and train interval operation time, wherein the train route refers to the route of the train, including the train's departure station, terminal station, and stations along the way; the train will pass through multiple stations when traveling, but the train will not stop at all stations, so the train stop plan set refers to the possible stopping plans of the train on a train route, and the stop plan for the additional train is selected from the existing train stop plan set; the train interval operation time includes the train operation timetable and the train operation time in each operation interval.
[0096] In an optional embodiment, the constraint conditions are determined, including items A1 to A5:
[0097] Item A1: Determine a stop plan constraint condition, where the stop plan constraint condition is used to constrain each train to select only one train stop plan from the train stop plan set.
[0098] In the embodiment of the present application, the stop plan for the additional train is to select one from the existing train stop plan set for execution (or none of them can be selected, that is, no train will be dispatched). i,l To indicate whether train i has chosen the stop plan l. For each train, only one stop plan can be selected based on the downlink only.
[0099] For example, the stop plan constraints can be expressed as:
[0100]
[0101]
[0102] When x i,l When it is equal to 0, it means that no stop plan is selected. i,l When it is equal to 1, it means that stop plan l is selected. i,s ≤T end It means that the departure time is less than the latest time allowed for the latest train to arrive at the terminal station.
[0103] Item A2: Determine timetable constraints, which are used to constrain the time when a train arrives at a station, the time when a train leaves a station, and the time when a train runs between stations.
[0104] In the embodiment of the present application, the timetable determines the arrival time and departure time of each train at each station (a i,s, d i,s ), in order to ensure operational safety and service quality, it is necessary to take into account the constraints of train maintenance window time, train overtaking, safe vehicle distance, station services, etc.
[0105] Specifically, the schedule constraints include the following items B1 to B4:
[0106] Item B1: The time when the train arrives at the station cannot be later than the start time of maintenance, and the time when the train leaves the station cannot be earlier than the end time of maintenance.
[0107] For example, if train i stops at station s, the time a at which the train arrives at the station is i,s No later than the maintenance start time T end It is expressed as:
[0108]
[0109] The time the train leaves the station i,s Cannot be earlier than the maintenance end time T start It is expressed as:
[0110]
[0111] Item B2: The duration of the train's stop at the station between the time the train arrives at the station and the time the train leaves the station cannot be less than the shortest stop duration and cannot be greater than the longest stop duration.
[0112] For example, the stop duration cannot be less than the minimum stop duration, which is expressed as:
[0113]
[0114] Among them, d i,s -a i,s represents the stop time of train i at station s;T stop Indicates the shortest stop time; x i,l U l,s Indicates whether train i stops at station s when it chooses stop plan l. If it stops, then x i,l U l,s is equal to 1, otherwise it is equal to 0.
[0115] For example, the stop duration cannot be greater than the maximum stop duration, which is expressed as:
[0116]
[0117] in, Indicates the maximum stop duration.
[0118] Item B3: The train interval running time between the time when the train leaves the station and the time when the train arrives at the next station cannot be less than the shortest train interval running time and cannot be greater than the longest train interval running time.
[0119] For example, the train interval running time cannot be less than the shortest train interval running time expressed as:
[0120]
[0121] Among them, a i,s+1 represents the time for train i to arrive at the next station s+1 of station s; d i,s represents the time when train i leaves station s; a i,s+1 -d i,s Indicates the running time of the train section; Trans l,m,n represents the shortest time required to run from station m to station n, that is, the shortest train interval running time; x i,l Trans l,m,n It represents the shortest time required for train i to travel from station m to station n when train i chooses stop plan l.
[0122] For example, the train interval running time cannot be greater than the longest train interval running time expressed as:
[0123]
[0124] in, It represents the longest time required for a train to run from station m to station n using operation plan l, that is, the longest train interval operation time; It represents the longest time required for train i to travel from station m to station n when train i chooses stop plan l.
[0125] Item B4: The departure interval between two adjacent trains cannot be less than the shortest departure interval, and the arrival interval between two adjacent trains cannot be less than the shortest arrival interval.
[0126] For example, train i and train j are two adjacent trains. If train i is in front of train j, the departure interval between the two adjacent trains cannot be less than the shortest departure interval, which can be expressed as:
[0127]
[0128] That is, the departure time of train i at station s is earlier than the departure time of train j at station s minus the shortest departure interval h. d .
[0129] If train j is in front of train i, the departure interval between two adjacent trains cannot be less than the shortest departure interval, which can be expressed as:
[0130]
[0131] That is, the departure time of train j at station s is earlier than the departure time of train i at station s minus the shortest departure interval h d .
[0132] If train i is ahead of train j, the arrival interval between two adjacent trains cannot be less than the shortest arrival interval, which can be expressed as:
[0133]
[0134] That is, the time when train i arrives at station s+1 is earlier than the time when train j arrives at station s minus the shortest arrival interval h a .
[0135] If train j is ahead of train i, the arrival interval between two adjacent trains cannot be less than the shortest arrival interval, which can be expressed as:
[0136]
[0137] That is, the time when train j arrives at station s+1 is earlier than the time when train i arrives at station s minus the shortest arrival interval h a .
[0138] Among them, π i,j,s Indicates that on the segment (s, s+1), if train i departs before train j, it is 1, otherwise it is 0, i∈C N N 0 , j∈N, s∈S and s≠S l π j,i,s Indicates that on the segment (s, s+1), if train j departs before train i, it is 1, otherwise it is 0, i∈C N N 0 , j∈N, s∈S and s≠Sl .
[0139] Therefore, π i,j,s and π j,i,s The following relationship exists:
[0140]
[0141] Item A3: Determine the passenger travel time window constraint condition, wherein the passenger travel time window constraint condition is used to constrain the matching relationship between the train and the passenger travel demand.
[0142] In the embodiment of the present application, the passenger travel demand is mainly characterized by two aspects: one is the space demand: the train needs to stop at the passenger's departure station and destination station, and the other is the time demand: the passenger has specific requirements for the departure time.
[0143] Specifically, the passenger travel time window constraint includes: when the train's stop stations match the departure and arrival requirements, and the train's stop time window matches the boarding time window, the train meets the passenger travel needs.
[0144] For example, the matching between the train's stop stations and the train's departure and arrival requirements is expressed as:
[0145]
[0146]
[0147] Among them, z i,p ∈{0, 1}, which means that it is 1 when train i meets the demand p, otherwise it is 0; x i,l U l,o Indicates whether train i departs from station o when it chooses stop plan l. If it departs from station o, then x i,l U l,o is equal to 1, otherwise it is equal to 0; x i,l U l,d Indicates whether train i stops at station d when it chooses stop plan l. If it stops at station d, then x i,l U l,d is equal to 1, otherwise it is equal to 0. i,l U l,o is equal to 1, and x i,l U l,d When it is equal to 1, the passenger's departure and arrival demand from station o to station d is met, that is, the demand p is met.
[0148] For example, the train stop time window matches the ride time window as follows:
[0149]
[0150]
[0151]
[0152] Among them, d i,p.o Indicates that train i meets demand p is the departure time from station o, that is, the train's stop time window. The train's stop time window needs to match the passenger's boarding time window. The boarding time window is obtained by using the passenger's original train departure time t as the center and setting a time window with a width of W. For example, the original train departure time is 8 o'clock and the time window width is 2 hours. It is considered that the passenger's expected travel time window is from 7 to 9 o'clock.
[0153] Item A4: Determine the passenger ticket allocation constraint condition, which is used to constrain the relationship between the number of passenger tickets reserved for the train and the number of passengers' travel demands.
[0154] In the embodiment of the present application, the purpose of the first train additional optimization model and the second train additional optimization model is to solve the operation diagram of the additional train when facing additional passenger demand, that is, the timetable of each additional train. Therefore, the present application considers the timetable closely related to the passenger travel demand. An important connection between the two is the allocation method of the passenger demand to be solved, that is, the variable y i,p It represents the satisfaction of passenger travel demand p by train i, that is, the number of tickets reserved by train i for passenger travel demand p.
[0155] Specifically, the ticket allocation constraints include the following items C1 to C3:
[0156] Item C1: The number of tickets reserved for a train does not exceed the number of passengers demanded.
[0157] For example, the number of tickets reserved by a train does not exceed the number of passengers required, which is expressed as:
[0158]
[0159] That is, the number of tickets reserved by train i for passenger travel demand p is less than or equal to the number of passengers with demand p.
[0160] Item C2: The number of passenger demands satisfied by the train does not exceed the capacity of the train.
[0161] For example, the number of passenger demands satisfied by a train that does not exceed the capacity of the train is expressed as:
[0162]
[0163] That is, the number of tickets reserved by train i for passenger travel demand p is less than or equal to the train passenger capacity Ca of the train.
[0164] Item C3: The number of tickets reserved for a train is non-zero if and only if the train's stop stations match the boarding departure and arrival requirements and the train's stop time window matches the boarding time window.
[0165] For example, the number of tickets reserved for a train is non-zero if and only if the train's stop stations match the boarding departure and arrival requirements and the train's stop time window matches the boarding time window, which is expressed as:
[0166]
[0167] That is to say, z i,p When it is equal to 1, it means that train i meets the passenger travel demand p, that is, the train's stop stations match the departure and arrival requirements and the train's stop time window matches the i boarding time window. At this time, train i is the reserved ticket.
[0168] Item A5: Determine train sequence constraints, which are used to constrain the activation order of trains.
[0169] In the embodiment of the present application, the capacity of all trains is the same, and the attributes of the trains are also the same. All spare trains are numbered and sorted. The timetables of any two trains, such as train i(m) and train i(n), can be interchanged without affecting the final solution result. However, if no restrictions are imposed, a large number of optimal solutions with the same effect will appear, slowing down the solution speed. Therefore, after sorting the spare trains, the present application stipulates that the trains with the highest sorting will be given priority, that is, if spare train i is not activated, then train i+1 will not be activated (and subsequent trains will not be activated either).
[0170] Step S130: According to the constraint conditions, the passenger travel demand and the train operation data, respectively solving the first train increase optimization model and the second train increase optimization model to obtain a first train increase plan and a second train increase plan.
[0171] In the embodiment of the present application, the passenger travel demand and the train operation data are brought into the first train additional optimization model, and the constraint conditions are used as constraints to solve the first train additional optimization model to obtain the first train additional plan. Among them, the first train additional plan includes the stop plan of the newly added train, the driving order of the additional train, the number of tickets provided by the additional train for passenger travel demand, the timetable of the additional train, etc. Since the first train additional optimization model aims to maximize profits, the first train additional plan is to meet the passenger travel demand as much as possible while maximizing the economic benefits of the railway department.
[0172] Similarly, the passenger travel demand and the train operation data are brought into the second train additional optimization model, and the second train additional optimization model is solved with the constraint conditions as constraints to obtain the second train additional plan. Among them, the second train additional plan includes the stop plan of the newly added train, the driving order of the additional train, the number of tickets provided by the additional train for passenger travel demand, the timetable of the additional train, etc. Since the second train additional optimization model aims to maximize the satisfaction of passenger travel demand, the second train additional plan is to maximize the economic benefits of the railway department while maximizing the satisfaction of passenger travel demand.
[0173] In an optional embodiment, the first train increase optimization model is solved according to the constraint conditions, the passenger travel demand and the train operation data, including steps D1 to D3:
[0174] Step D1: solving the first sub-model according to the constraint conditions, the passenger travel demand and the train operation data to obtain a first optimal solution, wherein the first optimal solution includes: a stop plan of the first additional train, a travel order of the first additional train, and a number of tickets provided by the first additional train for passenger travel demand;
[0175] Step D2: bringing the first optimal solution into the second sub-model for solving, and obtaining the timetable of the first additional train;
[0176] Step D3: Obtain a plan for adding a first train according to the timetable of the first additional train and the first optimal solution.
[0177] In the embodiment of the present application, the first train additional optimization model includes a first sub-model and a second sub-model. The first sub-model is aimed at maximizing profits, and the first sub-model is solved first to obtain the first optimal solution under profit maximization. Then, the second sub-model is used to further optimize the total travel time of the train, maximize profits and reduce the running time of the train in the section and the stop time of the station as much as possible without causing conflicts, so as to obtain the timetable of the first additional train, and then obtain the first train additional plan, which includes the number of additional trains, the stop plan of the additional trains, the timetable of the additional trains and other data.
[0178] In an optional embodiment, according to the constraint conditions, the passenger travel demand and the train operation data, solving the second train increase optimization model includes steps E1 to E3:
[0179] Step E1: solving the third sub-model and the fourth sub-model according to the constraint conditions, the passenger travel demand and the train operation data to obtain a second optimal solution, wherein the second optimal solution includes: a stop plan of the second additional train, a travel order of the second additional train, and a number of tickets provided by the second additional train for passenger travel demand;
[0180] Step E2: bringing the second optimal solution into the fifth sub-model for solving, and obtaining the timetable of the second additional train;
[0181] Step E3: Obtain a second train additional plan based on the timetable of the second additional train and the second optimal solution.
[0182] In the embodiment of the present application, the first train additional optimization model includes a third sub-model, a fourth sub-model and a fifth sub-model. The third sub-model is aimed at maximizing the satisfaction of passenger travel needs, and the second sub-model is aimed at minimizing the number of additional trains. The third sub-model and the fourth sub-model are solved first to obtain the second optimal solution that satisfies passenger travel needs to the greatest extent and satisfies economic news to a certain extent. Then, the fifth sub-model is used to further optimize the total travel time of the train, maximize the profit and reduce the running time of the train in the section and the stop time of the station as much as possible without causing conflicts, so as to obtain the timetable of the second additional train, and then obtain the second train additional plan, which includes the number of additional trains, the stop plan of the additional trains, the timetable of the additional trains and other data.
[0183] In summary, the embodiment of the present application considers adding trains to meet excess passenger demand with time window constraints. First, a first train addition optimization model with the goal of maximizing profits is constructed, and a second train addition optimization model with the goal of maximizing passenger travel demand is constructed; then, the constraints are determined, and the overflow passenger travel demand and the existing train operation data are obtained. The passenger travel demand includes the boarding time window and the boarding departure and arrival requirements, and the existing train operation data includes the train route, the train stop plan set, and the train interval operation time; finally, according to the constraints, the passenger travel demand and the train operation data, the first train addition optimization model and the second train addition optimization model are solved respectively to obtain the first train addition plan and the second train addition plan. Since the first train addition optimization model aims to maximize profits and the second train addition optimization model aims to maximize passenger travel demand, the first train addition plan and the second train addition plan obtained by solving can meet the travel needs of passengers while taking into account the economic benefits of the railway department to varying degrees. Moreover, the first train additional operation plan and the second train additional operation plan are obtained based on the passenger travel demand and the existing operation data, so the provided train additional operation plan meets the passenger travel demand (i.e., meets the passenger's travel time window) and is obtained without changing the existing train operation diagram. In this way, a train additional operation plan that takes economic benefits into consideration and meets the passenger travel demand is realized.
[0184] Next, taking the Shenyang South-Dalian North railway line as an example, the method for adding high-speed trains with time window constraints considering passenger demand in an embodiment of the present application is described in detail.
[0185] First, obtain the existing train operation data, namely, the train route, the train stop plan set, and the train interval operation time. Figure 2 As shown, Figure 2 This is a schematic diagram of a Shenyang South-Dalian North section railway line provided by an embodiment of the present application. In this Shenyang South-Dalian North section railway line, the train will pass through 8 stations, and the train will not stop at all stations during the journey. Figure 3 There are 8 existing stop plans on this route. The train interval running time is the timetable, which can be obtained from the ticket purchasing software (such as the 12306 platform) to obtain the timetable of the recent existing trains.
[0186] Secondly, obtain the demand for travel by car. The passenger flow data of high-speed trains is currently unavailable, and the embodiment of the present application adopts an estimation method. First, according to the selected 8 stop plans, for any driving interval, count how many of the 8 stop plans can realize the OD pair (i.e., the departure and arrival demand of the train), and use this number as the approximate proportion of the passenger flow between each driving interval. On this basis, the travel demand of passengers of different scales is obtained by modifying the cardinality. For each OD pair, the stop plans that stop at its starting and ending points are screened out, and the boarding time in the existing timetable corresponding to these stop plans is used as the optional time. The travel time demand of passengers is given by random sampling. For example, there are 4 trains departing from Shenyang South Station and stopping at Liaoyang Station. The departure times from Shenyang South are 7:21 (441min), 7:27 (447min), 9:47 (587min) and 19:50 (1190min), respectively, and the number of minutes corresponding to the departure time is in brackets. Then, when the travel demand of passengers between Shenyang South Station and Liaoyang Station is given, one of the four times will be randomly selected as the expected travel time for these passengers.
[0187] Afterwards, the calculation parameters are set according to the existing train operation data obtained, and the parameter settings are shown in Table 1.
[0188] Table 1 Calculation parameter settings
[0189]
[0190] Finally, 10 groups of experiments were set up for analysis and calculation. Among them, Experiments 1 to 8 were used to compare the performance of the first train additional optimization model and the second train additional optimization model under different passenger flow inputs, and Experiments 9 and 10 were used to compare the improvement of the model solution efficiency by enabling constraints in sequence. Specifically, the experimental parameter settings are shown in Table 2.
[0191] Table 2 Experimental parameter settings
[0192] Group Passenger flow base Optimization goals Whether to group numbers and enable in sequence 1 30 Profit first yes 2 40 Profit first yes 3 50 Profit first yes 4 70 Profit first yes 5 30 Passengers first yes 6 40 Passengers first yes 7 50 Passengers first yes 8 70 Passengers first yes 9 40 Profit first no 10 40 Passengers first no
[0193] All experiments were conducted on the same device with the following configurations: Win11 system, 12th Gen Intel(R) Core(TM) i9-12900H 2.50GHz processor, 32.0GB memory. Python 3.9.8 was used to call the Gurobi solver for solving, and the maximum solving time was set to 1 hour.
[0194] The experimental results of Experiment 1 to Experiment 8 are as follows Figures 4 to 11As shown in the figure, the solid line represents the timetable distribution of existing trains, and the dotted line represents the timetable distribution of new trains. The comparison results of the railway department's profits and costs for Experiments 1 to 8 are shown in Table 3, and the comparison results of the proportion of passenger travel demand satisfaction are shown in Table 4. The comparison results of the solution time consumption of Experiments 9 and 10 are shown in Table 5.
[0195] Table 3 Comparison of profits and costs in the railway sector
[0196] Group Profit value (yuan) Operating cost (yuan) 1 44381 120000 2 69378 120000 3 99409 240000 4 145678 300000 5 -150975 420000 6 -60184 420000 7 -27171 480000 8 30351 600000
[0197] Table 4 Comparison results of passenger travel demand satisfaction ratio
[0198] Group Proportion of passengers’ travel needs met (%) 1 55.9 2 49.3 3 66.3 4 66.2 5 100 6 100 7 100 8 100
[0199] Table 5 Comparison results of solution time consumption
[0200] Group Time consumption for one stage solution (s) Second stage solution time (s) Total solution time (s) Gap(%) 2 52.70 79.98 79.98 0 6 4.92 10.14 868.03 0 9 2133.65 3455.96 3544.96 0 10 3.37 332.20 3600.61 46.8919
[0201] The experimental results show that the first train increase optimization model will try to increase the train occupancy rate by increasing the operating time span of the train, thereby reducing the total train usage and increasing the profit of the railway department. As the passenger scale increases, the profit value shows a steady growth trend. In terms of passenger demand satisfaction, although profit priority does not maximize the satisfaction of passenger demand, overall, the proportion of passenger travel demand satisfaction is basically always maintained at more than 50%, and the model prefers to give priority to satisfying the needs of passengers with more people and farther distances. As the passenger scale increases, the overall satisfaction ratio has an upward trend, and it also has a relatively stable performance when the passenger scale decreases. However, the excessive time span of some timetable curves will increase the travel time of long-distance passengers to a certain extent and reduce their satisfaction.
[0202] The biggest advantage of the second train increase optimization model is that it can meet the travel needs of passengers to the greatest extent. The passenger priority model will also try to increase the time span of train operation to reduce costs. However, due to the need to prioritize the maximization of passenger demand satisfaction, there is no timetable curve with a large time span, and the optimization of the number of trains is limited. Overall, the number of additional trains is more than the result of the profit priority model. In terms of economic benefits, compared with the profit priority model, the passenger priority model performs poorly, especially when the scale of passenger demand is small. However, compared with the method of directly adding trains that have overflow phenomena, the passenger priority model still reduces the number of additional trains. The idea of "unbinding" provides room for model optimization.
[0203] By comparing the model solution time, it can be seen that by adding grouping and sorting of trains with the same attributes and enabling constraints in sequence, good results are achieved in both the profit priority and passenger priority models, which greatly shortens the solution time and improves the solution efficiency.
[0204] The embodiment of the present application also provides a high-speed train additional operation device with time window constraints considering passenger demand, such as Fig.12 As shown, Fig.12 A schematic diagram of the structure of a high-speed train additional operation device with time window constraints considering passenger demand provided in an embodiment of the present application, the device comprising:
[0205] A construction module 1210 is used to construct a first train additional operation optimization model with the goal of maximizing profits, and to construct a second train additional operation optimization model with the goal of maximizing passenger travel demand;
[0206] The determination module 1220 is used to determine the constraint conditions and obtain the overflow passenger travel demand and train operation data, wherein the passenger travel demand includes: a boarding time window and a boarding departure and arrival demand, and the train operation data includes a train route, a train stop plan set, and a train interval operation time;
[0207] The solution module 1230 is used to solve the first train increase optimization model and the second train increase optimization model according to the constraints, the passenger travel demand and the train operation data, and obtain the first train increase plan and the second train increase plan.
[0208] In an optional embodiment, the constructing the model includes:
[0209] A first sub-model is constructed, for constructing a first sub-model according to train operation costs and passenger ticket revenue, wherein the first sub-model aims at maximizing profits;
[0210] A second sub-model construction, for constructing a second sub-model according to the time when the train arrives at the station, the time when the train leaves the station, and the selected train stop plan, wherein the second sub-model aims to minimize the total travel time;
[0211] The third sub-model is constructed to obtain the first train increase optimization model based on the first sub-model and the second sub-model.
[0212] In an optional embodiment, the constructing the model includes:
[0213] The fourth sub-model is used to construct a third sub-model according to the number of tickets reserved by the train, wherein the third sub-model aims to maximize the satisfaction of passenger travel needs;
[0214] A fifth construction sub-model is used to construct a fourth sub-model according to the selected train stop plan, wherein the fourth sub-model aims to minimize the number of additional trains;
[0215] a sixth sub-model construction, for constructing a fifth sub-model according to the time when the train arrives at the station, the time when the train leaves the station, and the selected train stop plan, wherein the fifth sub-model aims to minimize the total travel time;
[0216] The seventh constructs a sub-model, and is used to obtain the second train increase optimization model based on the third sub-model, the fourth sub-model and the fifth sub-model.
[0217] In an optional embodiment, the determining module includes:
[0218] A first determination submodule is used to determine a stop plan constraint condition, wherein the stop plan constraint condition is used to constrain each train to select only one train stop plan from the train stop plan set;
[0219] A second determination submodule is used to determine a timetable constraint condition, wherein the timetable constraint condition is used to constrain the time when the train arrives at the station, the time when the train leaves the station, and the train interval running time;
[0220] A third determination submodule is used to determine a passenger travel time window constraint condition, wherein the passenger travel time window constraint condition is used to constrain the matching relationship between the train and the passenger travel demand;
[0221] A fourth determination submodule is used to determine a passenger ticket allocation constraint condition, wherein the passenger ticket allocation constraint condition is used to constrain the relationship between the number of passenger tickets reserved by the train and the number of passenger travel demands;
[0222] The fifth determination submodule is used to determine a train sequence constraint condition, where the train sequence constraint condition is used to constrain the activation sequence of the trains.
[0223] In an optional embodiment, the schedule constraint condition includes:
[0224] The time when the train arrives at the station cannot be later than the start time of maintenance, and the time when the train leaves the station cannot be earlier than the end time of maintenance;
[0225] The duration of the stop at the station between the time when the train arrives at the station and the time when the train leaves the station cannot be less than the shortest stop duration and cannot be greater than the longest stop duration;
[0226] The train interval running time between the time when the train leaves the station and the time when the train arrives at the next station cannot be less than the shortest train interval running time and cannot be greater than the longest train interval running time;
[0227] The departure interval between two adjacent trains cannot be less than the shortest departure interval, and the arrival interval between two adjacent trains cannot be less than the shortest arrival interval.
[0228] In an optional embodiment, the passenger travel time window constraint condition includes:
[0229] When the train's stop stations match the departure and arrival requirements, and the train's stop time window matches the boarding time window, the train meets the passengers' travel needs.
[0230] In an optional embodiment, the ticket allocation constraint condition includes:
[0231] The number of tickets reserved for a train does not exceed the number of passengers required;
[0232] The number of passenger demands satisfied by the train does not exceed the capacity of the train;
[0233] The number of tickets reserved for a train is non-zero if and only if the train's stop stations match the boarding departure and arrival requirements and the train's stop time window matches the boarding time window.
[0234] In an optional embodiment, the solution module includes:
[0235] a first solving sub-model, used to solve the first sub-model according to the constraint conditions, the passenger travel demand and the train operation data, to obtain a first optimal solution, wherein the first optimal solution includes: a stop plan of the first additional train, a travel order of the first additional train, and a number of tickets provided by the first additional train to meet the passenger travel demand;
[0236] A second solving sub-model is used to bring the first optimal solution into the second sub-model for solving, so as to obtain a timetable for a first additional train;
[0237] The third solving sub-model is used to obtain a plan for adding a first train according to the timetable of the first additional train and the first optimal solution.
[0238] In an optional embodiment, the solution module includes:
[0239] a fourth solving sub-model, for solving the third sub-model and the fourth sub-model according to the constraint conditions, the passenger travel demand and the train operation data, to obtain a second optimal solution, wherein the second optimal solution includes: a stop plan of the second additional train, a travel order of the second additional train, and a number of tickets provided by the second additional train for the passenger travel demand;
[0240] A fifth solving sub-model is used to bring the second optimal solution into the fifth sub-model for solving, so as to obtain a timetable for the second additional train;
[0241] The sixth solving sub-model is used to obtain a second train additional train plan based on the timetable of the second additional train and the second optimal solution.
[0242] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0243] Although the preferred embodiments of the present application have been described, those skilled in the art may make additional changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the embodiments of the present application.
[0244] Finally, it should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or terminal device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or terminal device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or terminal device including the elements.
[0245] The above is a detailed introduction to a method and device for increasing the number of high-speed trains with time window constraints that take into account passenger demand provided by the present application. This article uses specific examples to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method of the present application and its core idea; at the same time, for general technical personnel in this field, based on the ideas of the present application, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as a limitation on the present application.
Claims
1. A method for increasing the number of high-speed trains with time window constraints considering passenger demand, characterized in that: The method comprises: Constructing a first train increase optimization model with the goal of maximizing profits, and constructing a second train increase optimization model with the goal of maximizing passenger travel needs; Determine constraint conditions, and obtain overflow passenger travel demand and existing train operation data, wherein the passenger travel demand includes a boarding time window and a boarding departure and arrival demand, and the existing train operation data includes a train route, a train stop plan set, and a train interval operation time, and the constraint conditions are used to constrain the stop plan, timetable, passenger travel time window, ticket allocation, and activation order of the additional trains; Solving the first train increase optimization model and the second train increase optimization model respectively according to the constraint conditions, the passenger travel demand and the train operation data to obtain a first train increase plan and a second train increase plan; The first train increase optimization model with the goal of maximizing profit is constructed, including: constructing a first sub-model according to the train operation cost and the passenger ticket revenue, the first sub-model is aimed at maximizing profit; constructing a second sub-model according to the time when the train arrives at the station, the time when the train leaves the station, and the selected train stop plan, the second sub-model is aimed at minimizing the total travel time; according to the first sub-model and the second sub-model, the first train increase optimization model is obtained; Solving the first train additional optimization model according to the constraint conditions, the passenger travel demand and the train operation data includes: solving the first sub-model according to the constraint conditions, the passenger travel demand and the train operation data to obtain a first optimal solution, wherein the first optimal solution includes: a stop plan of the first additional train, a travel order of the first additional train, and a number of tickets provided by the first additional train for passenger travel demand; bringing the first optimal solution into the second sub-model for solving to obtain a timetable of the first additional train; obtaining a first train additional plan according to the timetable of the first additional train and the first optimal solution; Among them, constructing a second train additional optimization model with the goal of maximizing passenger travel demand includes: constructing a third sub-model according to the number of tickets reserved for the train, the third sub-model is aimed at maximizing passenger travel demand; constructing a fourth sub-model according to the selected train stop plan, the fourth sub-model is aimed at minimizing the number of additional trains; constructing a fifth sub-model according to the time when the train arrives at the station, the time when the train leaves the station, and the selected train stop plan, the fifth sub-model is aimed at minimizing the total travel time; according to the third sub-model, the fourth sub-model and the fifth sub-model, the second train additional optimization model is obtained; The second train increase optimization model is solved according to the constraints, the passenger travel demand and the train operation data, including: according to the constraints, the passenger travel demand and the train operation data, the third sub-model and the fourth sub-model are solved to obtain a second optimal solution that meets the passenger travel demand to the greatest extent and satisfies the economic benefits to a certain extent, and the second optimal solution includes: the stop plan of the second additional train, the travel order of the second additional train, and the number of tickets provided by the second additional train to meet the passenger travel demand; the second optimal solution is brought into the fifth sub-model for solution to obtain the timetable of the second additional train; according to the timetable of the second additional train and the second optimal solution, a second train increase plan is obtained.
2. The method according to claim 1, characterized in that Identify constraints, including: Determine a stop plan constraint condition, wherein the stop plan constraint condition is used to constrain each train to select only one train stop plan from the train stop plan set; Determining timetable constraints, wherein the timetable constraints are used to constrain the time when a train arrives at a station, the time when a train leaves a station, and the time when a train runs between stations; Determining a passenger travel time window constraint condition, wherein the passenger travel time window constraint condition is used to constrain the matching relationship between the train and the passenger travel demand; Determining a passenger ticket allocation constraint condition, wherein the passenger ticket allocation constraint condition is used to constrain the relationship between the number of passenger tickets reserved for the train and the number of passenger travel demands; A train sequence constraint condition is determined, wherein the train sequence constraint condition is used to constrain the activation sequence of the trains.
3. The method according to claim 2, characterized in that The timetable constraints include: The time when the train arrives at the station cannot be later than the start time of maintenance, and the time when the train leaves the station cannot be earlier than the end time of maintenance; The duration of the stop at the station between the time when the train arrives at the station and the time when the train leaves the station cannot be less than the shortest stop duration and cannot be greater than the longest stop duration; The train interval running time between the time when the train leaves the station and the time when the train arrives at the next station cannot be less than the shortest train interval running time and cannot be greater than the longest train interval running time; The departure interval between two adjacent trains cannot be less than the shortest departure interval, and the arrival interval between two adjacent trains cannot be less than the shortest arrival interval.
4. The method according to claim 2, characterized in that: The passenger travel time window constraint conditions include: When the train's stop stations match the departure and arrival requirements, and the train's stop time window matches the boarding time window, the train meets the passengers' travel needs.
5. The method according to claim 2, characterized in that: The ticket allocation constraints include: The number of tickets reserved for a train does not exceed the number of passengers required; The number of passenger demands satisfied by the train does not exceed the capacity of the train; The number of tickets reserved for a train is non-zero if and only if the train's stop stations match the boarding departure and arrival requirements and the train's stop time window matches the boarding time window.
6. A high-speed train additional operation device with time window constraints considering passenger demand, characterized in that: The device comprises: A construction module is used to construct a first train increase optimization model with the goal of maximizing profits, and to construct a second train increase optimization model with the goal of maximizing passenger travel needs; A determination module, used to determine constraint conditions, and to obtain overflow passenger travel demand and train operation data, wherein the passenger travel demand includes: a boarding time window and a boarding departure and arrival demand, and the train operation data includes a train route, a train stop plan set, and a train interval operation time, and the constraint conditions are used to constrain the stop plan, timetable, passenger travel time window, ticket allocation, and activation order of the additional trains; A solution module, used for solving the first train additional operation optimization model and the second train additional operation optimization model respectively according to the constraint conditions, the passenger travel demand and the train operation data, to obtain a first train additional operation plan and a second train additional operation plan; The first train increase optimization model with the goal of maximizing profit is constructed, including: constructing a first sub-model according to the train operation cost and the passenger ticket revenue, the first sub-model is aimed at maximizing profit; constructing a second sub-model according to the time when the train arrives at the station, the time when the train leaves the station, and the selected train stop plan, the second sub-model is aimed at minimizing the total travel time; according to the first sub-model and the second sub-model, the first train increase optimization model is obtained; Solving the first train additional optimization model according to the constraint conditions, the passenger travel demand and the train operation data includes: solving the first sub-model according to the constraint conditions, the passenger travel demand and the train operation data to obtain a first optimal solution, wherein the first optimal solution includes: a stop plan of the first additional train, a travel order of the first additional train, and a number of tickets provided by the first additional train for passenger travel demand; bringing the first optimal solution into the second sub-model for solving to obtain a timetable of the first additional train; obtaining a first train additional plan according to the timetable of the first additional train and the first optimal solution; Among them, constructing a second train additional optimization model with the goal of maximizing passenger travel demand includes: constructing a third sub-model according to the number of tickets reserved for the train, the third sub-model is aimed at maximizing passenger travel demand; constructing a fourth sub-model according to the selected train stop plan, the fourth sub-model is aimed at minimizing the number of additional trains; constructing a fifth sub-model according to the time when the train arrives at the station, the time when the train leaves the station, and the selected train stop plan, the fifth sub-model is aimed at minimizing the total travel time; according to the third sub-model, the fourth sub-model and the fifth sub-model, the second train additional optimization model is obtained; The second train increase optimization model is solved according to the constraints, the passenger travel demand and the train operation data, including: according to the constraints, the passenger travel demand and the train operation data, the third sub-model and the fourth sub-model are solved to obtain a second optimal solution that meets the passenger travel demand to the greatest extent and satisfies the economic benefits to a certain extent, and the second optimal solution includes: the stop plan of the second additional train, the travel order of the second additional train, and the number of tickets provided by the second additional train to meet the passenger travel demand; the second optimal solution is brought into the fifth sub-model for solution to obtain the timetable of the second additional train; according to the timetable of the second additional train and the second optimal solution, a second train increase plan is obtained.
