Control method, device and storage medium of enterprise risk assessment system
By generating risk assessment models and using GPT analysis models, the enterprise risk assessment process is automated, and the problems of low efficiency and poor accuracy of manual assessment in the existing technology are solved, efficient and accurate risk assessment is achieved, abnormal situations are discovered in a timely manner, and enterprise stability is ensured. sex.
Patent Information
- Application Number
- CN202311689053.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-08
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2043-12-08
AI Technical Summary
The existing enterprise risk assessment model relies on manual data monitoring, which leads to low evaluation efficiency and difficulty in accurately assessing risks, and the inability to detect abnormal situations in a timely manner, affecting the stability of the enterprise.
By acquiring and analyzing enterprise data, generating risk assessment models, using GPT analysis models and risk assessment rules, automating risk assessment processes, generating risk assessment texts, and improving assessment efficiency and accuracy.
It improves the efficiency and accuracy of enterprise risk assessment, reduces miscalculation, timely detects abnormal situations, reduces the probability of errors and accidents in the operation of the enterprise, and ensures the stability of the enterprise.
Smart Images

Figure CN117829586B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data processing technology, and in particular to a control method, device and storage medium for an enterprise risk assessment system. Background Art
[0002] Enterprise risk assessment is a process of identifying, evaluating and managing various internal and external risks that may affect the enterprise. Enterprise risk assessment usually monitors enterprise data to timely discover various abnormal situations, thereby reducing the probability of errors and accidents in the operation of the enterprise and ensuring the stability of the enterprise operation. In the process of enterprise monitoring, enterprise data is mainly sorted and counted manually.
[0003] Nowadays, enterprise services are widely open to the whole society and generate a large amount of enterprise data. In this case, the enterprise risk assessment model that relies on manual data monitoring usually requires manual data review through cumbersome processes. This leads to low efficiency in enterprise risk assessment.
[0004] The above contents are only used to assist in understanding the technical solution of the present application and do not constitute an admission that the above contents are prior art. Summary of the invention
[0005] The main purpose of this application is to provide a control method for an enterprise risk assessment system, aiming to solve the technical problem of low efficiency in risk assessment of enterprise data.
[0006] To achieve the above objectives, the present application provides a control method for an enterprise risk assessment system, the control method for the enterprise risk assessment system comprising the following steps:
[0007] Acquire risk assessment source data, and determine data items corresponding to the risk assessment source data;
[0008] Acquire historical evaluation data of the data item, and determine a corresponding risk scoring model according to the historical evaluation data;
[0009] Determining a corresponding single risk score according to the risk scoring model and the risk assessment source data;
[0010] A risk assessment text is generated based on the individual risk scores and risk assessment rules and a pre-stored assessment text template.
[0011] Optionally, the step of obtaining historical evaluation data of the data item and determining a corresponding risk scoring model according to the historical evaluation data includes:
[0012] According to the data item, obtaining the corresponding historical evaluation data;
[0013] Determining the risk assessment function according to the historical source data and the historical risk scores in the historical assessment data;
[0014] Based on the risk assessment function and the risk assessment standard, the risk assessment model is established.
[0015] Optionally, before the step of acquiring the corresponding historical evaluation data according to the data item, the step further includes:
[0016] Obtaining the target risk assessment source data and displaying the target risk assessment source data in a scoring interface;
[0017] After acquiring the target risk score based on the scoring interface, generating historical source data according to the target risk assessment source data, and generating the historical risk score according to the target risk score;
[0018] The historical assessment data is generated according to the historical source data and the historical risk score.
[0019] Optionally, before the step of obtaining risk assessment source data and determining data items corresponding to the risk assessment source data, the step further includes:
[0020] After the risk assessment process is triggered, determine the name of the enterprise corresponding to the risk assessment process and the purpose of the risk assessment;
[0021] Obtaining a pre-stored text template, and generating a question text based on the text template, the enterprise name, and the risk assessment purpose;
[0022] Send the question text to the GPT analysis model through a preset API interface, and receive the data label fed back by the GPT analysis model;
[0023] The risk assessment source data is acquired according to the data tag.
[0024] Optionally, the step of acquiring risk assessment source data according to the data tag includes:
[0025] Send an authorization request to the data source to obtain enterprise data;
[0026] After receiving the authorization response, determining a corresponding authorization link according to the authorization response, and acquiring enterprise data based on the authorization link;
[0027] The risk assessment source data in the enterprise data is selected according to the data tag.
[0028] Optionally, after the steps of obtaining the risk assessment source data and determining the data items corresponding to the risk assessment source data, the method further includes:
[0029] Determine the risk assessment cycle according to the preset risk assessment plan, and determine the risk assessment time based on the risk assessment cycle;
[0030] When the system time is the risk assessment time, updating the enterprise data according to the authorized connection, and determining the risk assessment data according to the updated enterprise data;
[0031] Determine the data item corresponding to the risk assessment data, and execute the steps of obtaining historical assessment data of the data item and determining a corresponding risk scoring model according to the historical assessment data.
[0032] Optionally, the step of generating a risk assessment text according to the single risk score and risk assessment rules and a pre-stored assessment text template includes:
[0033] Based on the risk assessment rules, the single risk score is evaluated to generate a single risk assessment text;
[0034] Fill the single risk assessment text into the corresponding module of the assessment text template to generate the risk assessment text.
[0035] Optionally, after the step of generating a risk assessment text according to the single risk score and risk assessment rules and a pre-stored assessment text template, the step further includes:
[0036] Obtaining a historical risk assessment text, and generating a development trajectory of the enterprise based on the historical risk assessment text;
[0037] According to the development trajectory, a development forecast text of the enterprise is generated.
[0038] In addition, to achieve the above-mentioned purpose, the present application also provides a control device for an enterprise risk assessment system, the control device of the enterprise risk assessment system comprising: a memory, a processor, and an enterprise risk assessment control system stored on the memory and executable on the processor, the enterprise risk assessment control system being configured to implement the steps of the control method for the enterprise risk assessment system as described above.
[0039] In addition, to achieve the above-mentioned purpose, the present application also provides a storage medium, on which an enterprise risk assessment control system is stored, and when the enterprise risk assessment control system is executed by a processor, the steps of the control method of the enterprise risk assessment system as described above are implemented.
[0040] This application can generate a risk assessment model based on historical risk assessment data, and conduct risk assessment through the risk assessment model to improve the efficiency of risk assessment of enterprise data. At the same time, through the risk assessment model for enterprise data, this application can also improve the accuracy of enterprise risk assessment and avoid misassessment to a certain extent. In addition, this application can generate risk assessment texts to help enterprises detect abnormal situations in a timely manner, reduce the probability of errors and accidents during enterprise operation, and ensure the stability of enterprise operation. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] Figure 1 This is a flow chart of the first embodiment of the control method of the enterprise risk assessment system of the present application;
[0042] Figure 2 A schematic diagram of the enterprise risk assessment process involved in the enterprise risk assessment system of this application;
[0043] Figure 3 This is a flow chart of a second embodiment of the control method of the enterprise risk assessment system of the present application;
[0044] Figure 4 A schematic diagram of an enterprise risk assessment process involved in a third embodiment of a control method for an enterprise risk assessment system of the present application;
[0045] Figure 5 This is a flow chart of a fourth embodiment of the control method of the enterprise risk assessment system of the present application;
[0046] Figure 6 It is a structural diagram of a control device of an enterprise risk assessment system of a hardware operating environment involved in an embodiment of the present application.
[0047] The realization of the purpose, functional features and advantages of this application will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0048] It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0049] This application is based on the enterprise risk assessment system, generates a risk assessment model through historical assessment data, and performs risk assessment on enterprise data through the risk assessment model and risk assessment rules, thereby improving the efficiency and accuracy of risk assessment on enterprise data.
[0050] In order to better understand the above technical solution, exemplary embodiments of the present application will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present application are shown in the accompanying drawings, it should be understood that the present application can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present application and to fully convey the scope of the present application to those skilled in the art.
[0051] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0052] Embodiment 1
[0053] In the case of widespread openness of enterprise services and relatively complex data, the enterprise risk assessment model that relies on manual review is inefficient and difficult to accurately assess risks. In order to improve the efficiency and accuracy of enterprise risk assessment, the present application embodiment provides a control method for an enterprise risk assessment system, referring to Figure 1 , Figure 1 This is a flow chart of the first embodiment of the control method of the enterprise risk assessment system of the present application.
[0054] In this embodiment, the control method of the enterprise risk assessment system includes:
[0055] Step S10: Acquire risk assessment source data, and determine data items corresponding to the risk assessment source data;
[0056] In this embodiment, the enterprise risk assessment system is an online system for assessing enterprise risks based on enterprise data. The enterprise risk assessment system selects risk assessment source data from the enterprise data based on the acquired enterprise data and data tags, and determines the data items corresponding to the risk assessment source data. Among them, the enterprise risk assessment system can determine the data tags according to the risk assessment purpose and the enterprise name, and select the risk assessment source data according to the data tags, or filter the risk assessment source data from the enterprise data according to the data tags set by the user.
[0057] As an optional implementation method for determining data labels, after triggering the risk assessment process, the enterprise risk assessment system can determine the enterprise name corresponding to the risk assessment process and the purpose of the risk assessment. The enterprise risk assessment system generates question texts based on pre-stored text templates, enterprise names, and risk assessment purposes, and sends the question texts to the GPT analysis model through a preset API interface, and receives data labels fed back by the GPT analysis model.
[0058] As another optional implementation for determining data tags, the enterprise risk assessment system may output a data tag selection page. The user may select the data to be assessed by selecting the corresponding data tag on the data tag selection page. The enterprise risk assessment system may obtain the risk assessment source data according to the data tag and determine the data item corresponding to the risk assessment source data.
[0059] Alternatively, if Figure 2 As shown, Figure 2 The following is a schematic diagram of the enterprise risk assessment process involved in this application. Enterprise data can be obtained from other data sources or through user input.
[0060] As an optional implementation method for obtaining risk assessment source data, the enterprise risk assessment system can send an authorization request to the data source to obtain enterprise data. After receiving the authorization response, the enterprise risk assessment system will obtain the corresponding authorization link according to the authorization response, and obtain the enterprise data from the data source based on the authorization link. According to the data tag, the risk assessment source data in the enterprise data is selected.
[0061] Exemplarily, the data source for obtaining enterprise data may include but is not limited to credit reporting systems, public data platforms, enterprises to be assessed, and industrial and commercial, tax, judicial and other institutions. The enterprise risk assessment system will send an authorization request to the data source to seek authorization to ensure the legitimacy of the data source.
[0062] As another optional implementation method for obtaining risk assessment source data, the enterprise risk assessment system may determine the enterprise data input by the user based on the user's operation on the risk assessment interface, and obtain the risk assessment source data based on the data label and the enterprise data.
[0063] Optionally, the user can input a text file containing enterprise data. The enterprise risk assessment system can read the character information in the text file and extract the enterprise data. Alternatively, the user can also enter the corresponding enterprise data in the risk assessment interface according to the input box on the risk assessment interface.
[0064] Step S20: Acquire historical evaluation data of the data item, and determine a corresponding risk scoring model according to the historical evaluation data;
[0065] Step S30: Determine a corresponding single risk score according to the risk scoring model and the risk assessment source data;
[0066] In this embodiment, after determining the data items that need to be monitored for risk, the enterprise risk assessment system can establish a corresponding risk assessment model based on the historical assessment data and risk assessment criteria of the data items. The risk assessment model can score the risk assessment source data and generate a corresponding single risk score.
[0067] As an optional implementation method for establishing a risk assessment model, the enterprise risk assessment system can obtain the corresponding historical assessment data based on the data item. Based on the historical source data and historical risk scores in the historical assessment data, the enterprise risk assessment system can determine the mapping relationship between the risk assessment source data and the single risk score, and generate a risk assessment function. Based on the risk assessment function and the risk assessment standard, the enterprise risk assessment system can establish a risk assessment model for the data item.
[0068] During specific implementation, the risk assessment source data can first be manually scored through the scoring interface.
[0069] The target risk assessment source data is obtained and displayed in a scoring interface; after obtaining the target risk score based on the scoring interface, historical source data is generated according to the target risk assessment source data, and the historical risk score is generated according to the target risk score; the historical assessment data is generated according to the historical source data and the historical risk score.
[0070] Exemplarily, when an enterprise risk assessment model performs an assessment based on the enterprise's judicial information, it can first match the enterprise's judicial information with the judicial information function to determine the enterprise's judicial risk mapping value, and then determine the corresponding judicial risk score based on the risk scoring rules and the number of lawsuits in the enterprise's judicial information.
[0071] As another optional implementation method of establishing a risk assessment model, the enterprise risk assessment system can also generate a risk assessment model by matching with low-risk enterprises and adjusting data based on the matching results.
[0072] Exemplarily, the enterprise risk assessment system can determine the matching degree of the risk assessment model by matching the risk assessment model with low-risk enterprises. According to the historical adjustment parameters and historical matching degree of the risk assessment model, the adjustment direction of the risk assessment model can be determined, and adjustments can be made based on the adjustment direction to improve the accuracy of the risk assessment model in assessing enterprise data risks.
[0073] Step S40: Generate a risk assessment text according to the single risk score and risk assessment rules and a pre-stored assessment text template.
[0074] In this embodiment, the enterprise risk assessment model can evaluate the single risk score based on the risk assessment rules, generate a single risk assessment text, and fill the single risk assessment text into the corresponding module of the assessment text template to generate a risk assessment text.
[0075] It should be noted that users can modify the corresponding risk assessment rules in the risk assessment interface. The enterprise risk assessment model will update the risk assessment rules in the current database according to the risk assessment rules input by the user, and perform risk assessment using the updated risk assessment rules.
[0076] Exemplarily, the enterprise risk assessment system can use multiple risk assessment models to perform risk scores on different data items. The enterprise risk assessment model will fill the assessment text corresponding to each risk score into the corresponding module in the assessment text template according to the risk assessment rules.
[0077] The embodiment of the present application generates a risk assessment model through historical assessment data, and assesses enterprise risks through the risk assessment model and risk assessment rules to generate a risk assessment text, thereby improving the efficiency and accuracy of enterprise risk assessment.
[0078] Embodiment 2
[0079] Based on the same inventive concept, the present application also provides a second embodiment, referring to Figure 3 , Figure 3 This is a flow chart of the second embodiment of the control method of the enterprise risk assessment system of the present application.
[0080] In this embodiment, after obtaining the risk assessment source data as described in step S10 and determining the data items corresponding to the risk assessment source data, the following steps are further included:
[0081] Step S11: determining a risk assessment cycle according to a preset risk assessment plan, and determining a risk assessment time based on the risk assessment cycle;
[0082] In this embodiment, a risk assessment plan can be set in the enterprise risk assessment system to guide the enterprise risk assessment system to perform enterprise risk assessment actions according to the risk assessment plan. The risk assessment plan can guide the enterprise risk assessment system to perform risk assessment actions based on the risk assessment cycle. The risk assessment plan can be set according to dimensions such as monthly, weekly, daily, and hourly.
[0083] For example, the user can set a risk assessment plan based on a period of every four hours. The enterprise risk assessment system will calculate the time of the next risk assessment based on the historical risk assessment time and the risk assessment period.
[0084] Step S12: when the system time is the risk assessment time, updating the enterprise data according to the authorized connection, and determining the risk assessment source data according to the updated enterprise data;
[0085] Step S13: Determine the data item corresponding to the risk assessment source data, and execute the step of obtaining the historical assessment data of the data item, and determining the corresponding risk scoring model according to the historical assessment data.
[0086] In this embodiment, the enterprise risk assessment system will trigger the risk assessment process when the system time reaches the risk assessment time. The enterprise risk assessment system will determine whether there is a corresponding authorization connection based on the enterprise name corresponding to the risk assessment plan. If there is a corresponding authorization link, the enterprise risk assessment system can directly obtain enterprise data from the corresponding data source based on the authorization link, and update the enterprise data stored in the system based on the enterprise data. If there is no corresponding authorization link or the authorization link is damaged, the enterprise risk assessment system needs to first send an authorization request to the data source, obtain the authorization link, and obtain the enterprise data based on the authorization link, and update the enterprise data stored in the system.
[0087] Furthermore, the enterprise risk assessment system can determine the data tags that need to be risk assessed according to the risk assessment plan, and determine the corresponding risk assessment source data according to the data tags. The user can set the corresponding data tags in the risk assessment plan, or enter the corresponding risk assessment purpose in the risk assessment system. After obtaining the user's risk assessment source data, the enterprise risk assessment system can perform enterprise risk assessment through the risk assessment source data.
[0088] During specific implementation, the enterprise risk assessment system can monitor enterprise data based on the risk assessment plan to ensure stable operation of the enterprise.
[0089] For example, Figure 2 As shown, users can set up risk assessment plans. The enterprise risk assessment system can obtain enterprise data based on the set risk assessment plan, update data in the data according to the enterprise data, and input enterprise data into the risk assessment model to perform risk assessment. After the risk assessment is completed, the risk assessment model will output the risk assessment text to the user and save the risk assessment text to the database.
[0090] In an embodiment of the present application, a user can schedule an enterprise risk assessment through a risk assessment plan, or regularly monitor the enterprise risk situation to promptly discover abnormal situations in the enterprise, thereby reducing the probability of errors and accidents during the operation of the enterprise and ensuring the stability of the enterprise's operation.
[0091] Since the system introduced in the second embodiment of the present application is a system used to implement the method of the first embodiment of the present application, based on the method introduced in the first embodiment of the present application, the person skilled in the art can understand the specific structure and deformation of the system, so it is not repeated here. All systems used in the method of the first embodiment of the present application belong to the scope of protection of this application.
[0092] Embodiment 3
[0093] Reference Figure 4 , Figure 4 This is a schematic diagram of the enterprise risk assessment process involved in the third embodiment of the control method of the enterprise risk assessment system of the present application.
[0094] In this embodiment, before obtaining the risk assessment source data as described in step S10 and determining the data item corresponding to the risk assessment source data, the enterprise risk assessment system determines whether there is a risk assessment process corresponding to the risk assessment source data.
[0095] When there is a corresponding risk assessment process, the enterprise risk assessment system will confirm the current process of the risk assessment process. When the risk assessment process is in the current assessment stage, the enterprise risk assessment system will wait for the risk assessment process to complete the assessment. When the risk assessment process is in the authorization waiting stage, the enterprise risk assessment system will resend the authorization request to the data source, and after obtaining the authorization link and obtaining the enterprise data based on the authorization link, perform risk assessment based on the risk assessment model.
[0096] When there is no corresponding risk assessment process, the enterprise risk assessment system will initiate an authorization request to the data source, and after obtaining the authorization link and obtaining the enterprise data based on the authorization link, the enterprise risk assessment system will determine whether there is a data conflict and run the risk assessment when there is no conflict.
[0097] In addition, the enterprise risk assessment system will review and approve the risk assessment results to ensure the accuracy of the risk assessment results.
[0098] Embodiment 5
[0099] Based on the same inventive concept, the present application also provides a second embodiment, referring to Figure 5 , Figure 5 This is a flow chart of the second embodiment of the control method of the enterprise risk assessment system of the present application.
[0100] In this embodiment, the control method of the enterprise risk assessment system includes:
[0101] Step S50: Obtain a historical risk assessment text, and generate a development trajectory of the enterprise according to the historical risk assessment text;
[0102] Step S60: Generate a development forecast text for the enterprise according to the development trajectory.
[0103] In this embodiment, the enterprise risk assessment system can generate an enterprise development trajectory map based on key indicators and data in the historical risk assessment text. And predict the future development of the enterprise based on the enterprise development trajectory map and the current market environment, policies and regulations and other factors. The enterprise risk assessment system can write an enterprise development forecast text based on the forecast results.
[0104] Optionally, the enterprise risk assessment system can display the development trend and changes of the enterprise in the form of charts, graphs, etc. It is convenient for users to understand the development trajectory of the enterprise, as well as the development status and change trend of the enterprise in different time periods.
[0105] For example, the enterprise risk assessment system can analyze and predict future sales, market share, staff size, and other contents, as well as the development trend of the enterprise and the risks it may face. The enterprise risk assessment system can use time series analysis, regression analysis and other methods to make predictions through quantitative or qualitative analysis to generate enterprise development forecast texts. In addition, the enterprise risk assessment system can review and verify the forecast text to ensure the accuracy and reliability of the forecast results.
[0106] Since the system introduced in the second embodiment of the present application is a system used to implement the method of the first embodiment of the present application, based on the method introduced in the first embodiment of the present application, the person skilled in the art can understand the specific structure and deformation of the system, so it is not repeated here. All systems used in the method of the first embodiment of the present application belong to the scope of protection of this application.
[0107] Embodiment 6
[0108] Reference Figure 6 , Figure 6 This is a schematic diagram of the control device structure of the enterprise risk assessment system of the hardware operating environment involved in the embodiment of the present application.
[0109] like Figure 6As shown, the control device of the enterprise risk assessment system may include: a processor 1001, such as a central processing unit (CPU), a communication bus 1002, a user interface 1003, a network interface 1004, and a memory 1005. Among them, the communication bus 1002 is used to realize the connection and communication between these components. The user interface 1003 may include a display screen (Display), an input unit such as a keyboard (Keyboard), and the optional user interface 1003 may also include a standard wired interface and a wireless interface. The network interface 1004 may optionally include a standard wired interface and a wireless interface (such as a wireless fidelity (WIreless-FIdelity, WI-FI) interface). The memory 1005 may be a high-speed random access memory (Random Access Memory, RAM) memory, or a stable non-volatile memory (Non-Volatile Memory, NVM), such as a disk memory. The memory 1005 may also be a storage device independent of the aforementioned processor 1001.
[0110] Those skilled in the art will understand that Figure 4 The structure shown in does not constitute a limitation on the control device of the enterprise risk assessment system, and may include more or fewer components than shown in the figure, or a combination of certain components, or a different arrangement of components.
[0111] like Figure 6 As shown, the memory 1005 as a storage medium may include an operating system, a data storage module, a network communication module, a user interface module and an enterprise risk assessment control system.
[0112] exist Figure 6 In the control device of the enterprise risk assessment system shown, the network interface 1004 is mainly used for data communication with other devices; the user interface 1003 is mainly used for data interaction with the user; the processor 1001 and the memory 1005 in the control device of the enterprise risk assessment system of the present application can be set in the control device of the enterprise risk assessment system, and the control device of the enterprise risk assessment system calls the enterprise risk assessment control system stored in the memory 1005 through the processor 1001, and performs the following operations:
[0113] Acquire risk assessment source data, and determine data items corresponding to the risk assessment source data;
[0114] Acquire historical evaluation data of the data item, and determine a corresponding risk scoring model according to the historical evaluation data;
[0115] Determining a corresponding single risk score according to the risk scoring model and the risk assessment source data;
[0116] A risk assessment text is generated based on the individual risk scores and risk assessment rules and a pre-stored assessment text template.
[0117] Further, the processor 1001 may call the enterprise risk assessment control system stored in the memory 1005, and perform the following operations:
[0118] According to the data item, obtaining the corresponding historical evaluation data;
[0119] Determining the risk assessment function according to the historical source data and the historical risk scores in the historical assessment data;
[0120] Based on the risk assessment function and the risk assessment standard, the risk assessment model is established.
[0121] Further, the processor 1001 may call the enterprise risk assessment control system stored in the memory 1005, and perform the following operations:
[0122] Obtaining the target risk assessment source data and displaying the target risk assessment source data in a scoring interface;
[0123] After acquiring the target risk score based on the scoring interface, generating historical source data according to the target risk assessment source data, and generating the historical risk score according to the target risk score;
[0124] The historical assessment data is generated according to the historical source data and the historical risk score.
[0125] Further, the processor 1001 may call the enterprise risk assessment control system stored in the memory 1005, and perform the following operations:
[0126] After the risk assessment process is triggered, determine the name of the enterprise corresponding to the risk assessment process and the purpose of the risk assessment;
[0127] Obtaining a pre-stored text template, and generating a question text based on the text template, the enterprise name, and the risk assessment purpose;
[0128] Send the question text to the GPT analysis model through a preset API interface, and receive the data label fed back by the GPT analysis model;
[0129] The risk assessment source data is acquired according to the data tag, and a data item corresponding to the risk assessment source data is determined.
[0130] Further, the processor 1001 may call the enterprise risk assessment control system stored in the memory 1005, and perform the following operations:
[0131] Send an authorization request to the data source to obtain enterprise data;
[0132] After receiving the authorization response, determining a corresponding authorization link according to the authorization response, and acquiring enterprise data based on the authorization link;
[0133] According to the data tag, the risk assessment source data in the enterprise data is selected, and a data item corresponding to the risk assessment source data is determined.
[0134] Further, the processor 1001 may call the enterprise risk assessment control system stored in the memory 1005, and perform the following operations:
[0135] Determine the risk assessment cycle according to the preset risk assessment plan, and determine the risk assessment time based on the risk assessment cycle;
[0136] When the system time is the risk assessment time, updating the enterprise data according to the authorized connection, and determining the risk assessment source data according to the updated enterprise data;
[0137] Determine the data item corresponding to the risk assessment source data, and execute the steps of obtaining historical assessment data of the data item and determining the corresponding risk scoring model according to the historical assessment data.
[0138] Further, the processor 1001 may call the enterprise risk assessment control system stored in the memory 1005, and perform the following operations:
[0139] Based on the risk assessment rules, the single risk score is evaluated to generate a single risk assessment text;
[0140] Fill the single risk assessment text into the corresponding module of the assessment text template to generate the risk assessment text.
[0141] Further, the processor 1001 may call the enterprise risk assessment control system stored in the memory 1005, and perform the following operations:
[0142] Obtaining a historical risk assessment text, and generating a development trajectory of the enterprise based on the historical risk assessment text;
[0143] According to the development trajectory, a development forecast text of the enterprise is generated.
[0144] In addition, the present application also provides a computer-readable storage medium, which stores the enterprise risk assessment control system. The enterprise risk assessment control system can also be executed by a processor to implement the steps of each embodiment of the control method of the above-mentioned enterprise risk assessment system.
[0145] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0146] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0147] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0148] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0149] It should be noted that in the claims, any reference signs placed between brackets shall not be construed as limiting the claims. The word "comprising" does not exclude the presence of components or steps not listed in the claims. The word "a" or "an" preceding a component does not exclude the presence of a plurality of such components. The present application may be implemented by means of hardware comprising several different components and by means of a suitably programmed computer. In a unit claim enumerating several means, several of these means may be embodied by the same item of hardware. The use of the words first, second, and third etc. does not indicate any order. These words may be interpreted as names.
[0150] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.
[0151] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.
Claims
1. A control method for an enterprise risk assessment system, characterized in that: The enterprise data risk assessment method comprises the following steps: After the risk assessment process is triggered, determine the name of the enterprise corresponding to the risk assessment process and the purpose of the risk assessment; Obtaining a pre-stored text template, and generating a question text based on the text template, the enterprise name, and the risk assessment purpose; Send the question text to the GPT analysis model through a preset API interface, and receive the data label fed back by the GPT analysis model; Sending an authorization request to a data source, and after receiving an authorization response, obtaining an authorization link corresponding to the authorization response, and obtaining enterprise data of the data source through the authorization link, selecting the risk assessment source data of the data tag in the enterprise data, and determining the data item corresponding to the risk assessment source data; Acquire historical evaluation data of the data item, and determine a corresponding risk scoring model according to the historical evaluation data; Using the plurality of risk scoring models, risk scoring the risk assessment source data of different data items is performed to determine corresponding single risk scores; According to the risk assessment rules, the individual risk assessment text corresponding to each of the individual risk scores is filled into the assessment text template to generate the risk assessment text; Obtain historical risk assessment texts, and generate enterprise development trajectories of the historical risk assessment texts through time series analysis; Through qualitative analysis, a development forecast text for the enterprise is generated according to the development trajectory.
2. The control method of the enterprise risk assessment system according to claim 1, characterized in that: The step of obtaining the historical evaluation data of the data item and determining the corresponding risk scoring model according to the historical evaluation data comprises: According to the data item, obtaining the corresponding historical evaluation data; Determining the risk assessment function according to the historical source data and the historical risk scores in the historical assessment data; Based on the risk assessment function and the risk assessment standard, the risk assessment model is established.
3. The control method of the enterprise risk assessment system according to claim 2, characterized in that: Before the step of acquiring the corresponding historical evaluation data according to the data item, the method further includes: Obtain target risk assessment source data, and display the target risk assessment source data in the scoring interface; After acquiring the target risk score based on the scoring interface, generating historical source data according to the target risk assessment source data, and generating the historical risk score according to the target risk score; The historical assessment data is generated according to the historical source data and the historical risk score.
4. The control method of the enterprise risk assessment system according to claim 1, characterized in that: After the steps of obtaining the risk assessment source data and determining the data items corresponding to the risk assessment source data, the method further includes: Determine the risk assessment cycle according to the preset risk assessment plan, and determine the risk assessment time based on the risk assessment cycle; When the system time is the risk assessment time, updating the enterprise data according to the authorized connection, and determining the risk assessment source data according to the updated enterprise data; Determine the data item corresponding to the risk assessment source data, and execute the steps of obtaining historical assessment data of the data item and determining the corresponding risk scoring model according to the historical assessment data.
5. A control device for an enterprise risk assessment system, characterized in that: The control device of the enterprise risk assessment system includes: a memory, a processor, and an enterprise risk assessment control system stored in the memory and executable on the processor, wherein the enterprise risk assessment control system is configured to implement the steps of the control method of the enterprise risk assessment system as described in any one of claims 1 to 4.
6. A storage medium, characterized in that: The storage medium stores an enterprise risk assessment control system, which, when executed by a processor, implements the steps of the control method of the enterprise risk assessment system as described in any one of claims 1 to 4.
