A dynamic continuous measurement device and method for borehole spatial position
By using in-hole measuring probes and borehole monitors in underground coal mine drilling, combined with high-precision sensors and computing systems, automatic measurement and real-time data transmission of borehole spatial position have been achieved. This solves the problems of large data errors and manual synchronous recording in existing technologies, improves construction efficiency, and meets the needs of unmanned or minimally manned drilling.
Patent Information
- Application Number
- CN202410028755.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-08
- Publication Date
- 2026-11-10
- Estimated Expiration
- 2044-01-08
AI Technical Summary
Existing underground drilling trajectory measurement instruments in coal mines have large data errors during dynamic measurement and require manual synchronous recording, which affects construction efficiency and cannot meet the needs of unmanned or minimally manned drilling.
A dynamic and continuous borehole spatial position measurement device is adopted, including an in-hole measuring probe, a borehole monitor, and a locator. High-precision sensors and computing systems are used to realize the automatic measurement and real-time data transmission of borehole spatial position, and to store or calculate the borehole spatial position in real time.
It enables automatic measurement and real-time data transmission of borehole spatial location, reduces manual intervention, improves construction efficiency, and meets the needs of unmanned or minimally manned drilling in coal mines.
Smart Images

Figure CN117868789B_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of application of geophysics in drilling (hole drilling) technology, and relates to a device and method for dynamic continuous measurement of the spatial position of a borehole. Background Technology
[0002] Whether underground coal mine boreholes can be drilled according to the required dip and azimuth angles is crucial to whether the boreholes can ultimately reach their intended location. Borehole trajectory measurement technology is a key technology for achieving quantitative measurement of underground boreholes.
[0003] Currently, the working methods of borehole trajectory measurement instruments in coal mines are divided into the following types: storage during drilling, manual storage, real-time transmission via manual cable, storage pushed by the drilling rig after drilling, and real-time transmission to the borehole opening during drilling. When these borehole trajectory measurement instruments are in operation, the inclinometer must remain stationary at each measuring point for approximately one minute, and an operator must be present at the borehole opening to record the data synchronously. In other words, the working method is point measurement. Otherwise, when the instrument is in motion, the measured magnetic field parameters and acceleration parameters measured by the accelerometer sensor will be significantly affected, resulting in large measurement errors. During the trajectory measurement process, the synchronized inclinometer data must be based on the data from when the instrument is stationary. Since the inclinometer is not stationary when the operator is simultaneously measuring at the borehole opening, the final synchronized inclinometer data will be based on the data from when the instrument is not stationary. Furthermore, to ensure measurement accuracy, the stopping time will be extended, which affects the entire measurement process and reduces the efficiency of underground coal mine construction.
[0004] With the development of intelligent coal mines, unmanned or minimally manned operation is required for all underground coal mine work. In the future, the combination of borehole trajectory measurement with unmanned drilling and tunneling requires automatic control, and continuous inclination measurement is a requirement for trajectory measurement. Summary of the Invention
[0005] To address the shortcomings of existing technologies, the present invention aims to provide a dynamic and continuous measurement device and method for borehole spatial position. This device enables automatic measurement of borehole spatial position during underground drilling in coal mines. When real-time information about the borehole spatial position is needed during drilling, the position is transmitted to the borehole opening via a drilling data transmission system for the driller's use. In boreholes where real-time information about the borehole spatial position is not required, the measurement data is stored in the instrument. Once the instrument is brought to the borehole opening, it is connected to a borehole monitor, and the borehole spatial position data is exported to the monitor for use by personnel who require it.
[0006] To solve the above-mentioned technical problems, the present invention adopts the following technical solution:
[0007] A dynamic continuous measurement device for borehole spatial position includes an in-hole measuring probe, a metal outer tube, a borehole monitor, and a borehole locator. The borehole measurement probe is installed in a metal outer tube. One end of the metal outer tube is connected to a metal drill rod and a drill bit in sequence, and the other end is connected to multiple metal drill rods and a drilling rig in sequence. The borehole measurement probe includes a measurement control center CPU, a probe attitude measurement module, a borehole temperature measurement module, a pressure parameter measurement module, a borehole communication control module, a data storage module, and a battery. The probe attitude measurement module includes an attitude measurement integrated sensor. The orifice locator is installed at the orifice of the drilled hole. The orifice locator can perform high-precision coordinate measurement to measure the absolute spatial coordinates (X0, Y0, Z0) of the opening position. After the measurement is completed, the measured absolute spatial coordinate data of the opening position is transmitted to the orifice monitor wirelessly and stored by the orifice monitor. The orifice monitor is an explosion-proof mobile phone or explosion-proof tablet that enables human-computer interaction. The orifice monitor issues start and data acquisition commands to the in-hole measuring probe. The orifice monitor includes a power supply battery, an orifice communication control module, and an orifice monitor control center. The orifice communication control module provides communication between the orifice monitor and the in-hole measuring probe, and the power supply battery powers the orifice monitor.
[0008] The present invention also includes the following technical features: Specifically, the measurement control center CPU can control the operation of the probe attitude measurement module, pressure parameter measurement module, borehole temperature measurement module, borehole communication control module, and data storage module; the battery powers the measurement control center CPU, and the other modules are powered by the measurement control center CPU; the measurement control center CPU has a high-precision clock, which can perform high-precision timing and provide time stamps for measurement data; the borehole communication control module provides a communication control channel between the measurement control center CPU and the borehole monitor; the data storage module provides data storage space for the measurement control center CPU, storing all data that needs to be recorded and stored in this module for the use of the measurement control center CPU.
[0009] Specifically, the probe attitude measurement module includes two or more integrated attitude measurement sensors, which can measure the three magnetic field components at each measurement point. , , 3 acceleration components , , 3 attitude angles , 、 ; j For the first jEach measurement point; the attitude measurement integrated sensor sampling is high-speed continuous sampling, uninterrupted throughout the entire measurement process, with a sampling frequency greater than 20Hz, a minimum of 20 samples per second, a maximum sampling time interval of 50ms, and the sampling time is provided by the measurement control center CPU; The borehole temperature measurement module is used to measure the temperature of the environment in which the measuring probe is located when it is in the borehole. The sampling frequency and sampling time interval of this module are the same as those of the probe attitude measurement module. The data collected at each measuring point is Tj. The pressure parameter measurement module is used to measure the pressure experienced by the probe tip inside the borehole. This module has the same sampling frequency and sampling time interval as the probe attitude measurement module. The pressure parameter measurement module measures pressure in two directions: one is the pressure along the drill bit direction, i.e., the forward pressure P. aj One is the pressure in the direction of the borehole opening, i.e., the backward pressure P. bj ; The data measured by the attitude measurement integrated sensor, the borehole temperature measurement module, and the pressure parameter measurement module are all stored in the data storage module.
[0010] Specifically, the measurement control center CPU is equipped with an intelligent computing instrument spatial positioning system; the intelligent computing instrument spatial positioning system calculates the spatial position of the probe in two ways: real-time transmission requirements during drilling measurement and non-drilling storage calculation requirements during storage measurement. For measurement-while-drilling (MSD) mode, the system retrieves stored data from the data storage module in real time. , , , , , , , 、 T j P aj P bj The system performs intelligent calculations of the borehole spatial position, which is the same as the probe spatial position. After the calculation is completed, the probe spatial position data is transmitted to the data storage module for storage. For the storage-type measurement method, the measurement data is stored in the data storage module. After the instrument is launched, the borehole monitor issues a command to calculate the borehole spatial position and transmits the borehole coordinate position to the intelligent calculation instrument spatial position system. The intelligent calculation instrument spatial position system then performs intelligent calculation of the probe spatial position.
[0011] A method for dynamic and continuous measurement of borehole spatial position, the method being implemented based on the aforementioned dynamic and continuous measurement device for borehole spatial position; comprising the following steps: Step 1: Fix the orifice locator to the orifice and measure the orifice coordinates (x0, y0, z0). After the measurement is completed, remove the orifice locator. Step 2: Start the borehole measuring probe and borehole monitor. The borehole monitor sends a start command to the borehole measuring probe, and the borehole measuring probe starts working. Insert the borehole measuring probe into the metal outer tube, and then connect the metal outer tube to the metal drill rod. Step 3: For the storage-type measurement method, use a drilling rig to push the measuring device into the hole, and then repeatedly add metal drill rods to push the measuring device into the hole; after pushing it to the bottom of the hole, start lifting the drill to retrieve the instrument from the hole to the hole opening; For measurement while drilling, the drilling rig pushes the measuring device into the hole. Each time a metal drill rod is added, the borehole monitor issues a command, and the measuring probe in the hole uploads the measurement data to the borehole monitor. The borehole monitor displays the current drilling position, and the operation is repeated until drilling is completed. Step four: For the storage-type measurement method, after the instrument extracts the data to the borehole opening, the borehole monitor issues a calculation command. The intelligent calculation instrument spatial position system of the borehole measuring probe calculates the drilling spatial position. After the calculation is completed, the calculation result is stored in the borehole measuring probe, and a calculation completion command is sent to the borehole monitor. The borehole monitor issues a command to extract the data as needed. The borehole measuring probe transmits the data to the borehole monitor according to the command. After the data transmission is successful, the borehole measuring probe and the borehole monitor are turned off, and one measurement process ends. For measurement while drilling, after the instrument is raised to the borehole opening, the measurement is ended by directly closing the in-hole measuring probe and the borehole monitor.
[0012] Specifically, the preprocessing of the nine parameters measured by the probe attitude measurement module of the in-hole measuring probe is carried out in two steps, including: Step a1: The measurement parameters of a single attitude measurement integrated sensor are filtered using a sliding window filtering method with fixed sampling points within a time window. , ,
[0013] , ,
[0014] , ,
[0015] In the formula, k For the first k Individual attitude measurement integrated sensor serial number j For the first k The attitude measurement integrated sensor measures the firstj Each measuring point number n The number of sampling points within a fixed time window. n >2, 、 、 The first k The first attitude measurement integrated sensor j The magnetic field components in the X, Y, and Z directions at each measuring point 、 、 The first k The first attitude measurement integrated sensor j Acceleration components in the X, Y, and Z directions at each measuring point 、 、 The first k The first attitude measurement integrated sensor j Inclination angle, azimuth angle, and instrument / tool facing angle of each measuring point; Step a2: After the parameters of each attitude measurement integrated sensor are filtered as described above, the average is calculated and used as the parameter output of the entire probe attitude measurement integrated sensor. , ,
[0016] , ,
[0017] , ,
[0018] In the formula, k For the first k Individual attitude measurement integrated sensor serial number j For the first j Each measuring point number m To increase the number of integrated sensors for attitude measurement, m >1, 、 、 Let X, Y, and Z be the magnetic field components in the X, Y, and Z directions, respectively, for the j-th measurement point. 、 、 The first jThe gravitational acceleration components in the X, Y, and Z directions at each measuring point 、 、 These are the inclination angle, azimuth angle, and instrument / tool facing angle of the j-th measuring point, respectively.
[0019] Specifically, for the storage-based measurement method, i.e., non-drilling storage-based calculation of the probe's spatial position, the intelligent calculation instrument spatial position system comprehensively utilizes data measured by the attitude measurement integrated sensor, the borehole temperature measurement module, and the pressure parameter measurement module. It comprehensively analyzes the drilling status, including drilling forward, backward, and stopped movements, extracts valid data, automatically calculates the probe's spatial position, and saves the calculated spatial position in the data storage module for later use. The algorithm for non-drilling storage-based calculation of the probe's spatial position is as follows: Step b1: By comprehensively utilizing the trend of change of tilt angle and azimuth angle of all attitude measurement data stored in the data storage module at the current time, it is determined whether the data measured by the probe is the data measured when it is outside the borehole or the data measured after it enters the borehole. The data measured when it is outside the borehole is deleted, and the data measured after it enters the borehole is retained. Step b2: Extract all data measured when the probe is inside the borehole, including the time label data t of each measuring point, and determine whether the probe is in a forward or backward state. The forward state is when the probe is moving along the direction of the drill bit, and the backward state is when the probe is moving towards the borehole opening. Extract the overall forward raw data. Step b3: Analyze the extracted overall forward data. The starting point of the data is the starting point N1 of the borehole measurement, and the ending point of the data is the ending point N2 of the overall forward movement. Analyze and determine whether the probe in the borehole is in a stationary state with the drill rod attached or in a non-stationary state. Step b4: Based on the static and non-static states determined in step b3, extract all smoothed data for the valid non-static states. , , , , , , , , The drilling depth is automatically calculated using acceleration and recorded time information as follows: ; ; In the formula, G jLet be the acceleration at the j-th measuring point, where j is the measuring point, g is the gravitational acceleration, MD is the drilling depth, and dt is the time interval between each measuring point. The calculation starts from the data of the first non-stationary point after entering the hole. Step b5: Based on the data of the non-stationary state during the forward movement, the data of the stationary state is effectively processed to extract the effective inclination angle and azimuth angle data of the stationary state. For the position and depth data of each stationary state, the depth is calculated according to the depth calculated in step b4. That is, the drilling depth of the stationary state is the end depth of the previous non-stationary state or the starting depth of the next non-stationary state. Step b6: Calculate the spatial coordinates of the probe, i.e., the coordinates of the current borehole position (X), based on the effective dip angle, azimuth, and depth data extracted in step b5. k ,Y k Z k ):
[0020] In the formula, , , ; ; The Z-direction increment of adjacent measuring points. The increment in the Y direction between adjacent measuring points. The X-direction increment of adjacent measurement points, DLA k The dogleg angle of the current measuring point. The hole depth at the current measuring point k. The depth of the hole at the previous measuring point k-1, The measured inclination angle of the previous measuring point k-1, The measured inclination angle of the current measuring point k. The azimuth angle of the current measuring point k. The measurement azimuth of the previous measuring point k-1, k is the current point, k=1~K, K is the number of stationary states extracted in step b3, and (X0,Y0,Z0) are the measured orifice coordinates; MD and MD represent the tilt angle, azimuth angle, and depth in the stationary state of step b5, respectively.
[0021] Specifically, for the measurement-while-drilling method, which calculates the spatial position of the probe in real time, the intelligent calculation instrument spatial position system integrates the commands issued by the wellhead monitor and the data measured by the attitude measurement integrated sensor, the borehole temperature measurement module, and the pressure parameter measurement module to realize intelligent calculation of the probe spatial position under the human-computer interaction model. After the calculation is completed, the probe spatial position coordinates are transmitted to the wellhead monitor for display.
[0022] Compared with the prior art, the present invention has the following technical effects: This invention enables automatic measurement of the spatial position of boreholes in underground coal mine roadways or working faces. The operation is simple; after the borehole probe is initially set up using a borehole monitor, the device automatically measures and stores the data. No manual intervention is required during subsequent drilling. This invention is easy to transport; the metal drill rod, borehole probe device, and metal outer tube are transported by a mining vehicle, while the borehole monitor can be carried by personnel. The drilling depth and trajectory are automatically calculated without human intervention. Attached Figure Description
[0023] Figure 1 This is a schematic diagram of the structural components used in underground coal mines. Figure 2 A block diagram showing the components of the borehole probe; Figure 3 A flowchart for intelligently calculating the spatial position of the probe; Figure 4 A flowchart for non-drilling-while-storage intelligent calculation of probe spatial position; Figure 5 To determine whether a flowchart is static or non-static.
[0024] The meanings of the labels in the diagram are as follows: 1. Borehole measuring probe, 2. Metal outer tube, 3. Borehole locator, 4. Borehole monitor, 5. Metal drill rod, 6. Drill bit, 7. Drilling rig, 8. Borehole, 9. Tunnel, 10. Formation. Detailed Implementation
[0025] This invention provides a dynamic and continuous measurement device and method for borehole spatial position. The device is designed to automatically measure the borehole spatial position when inserted into the borehole, eliminating the need for manual control of pauses and personnel to perform point measurements at the borehole opening. It utilizes a high-speed sampling sensor to collect a large amount of sensor data, and employs big data analysis and processing technology to extract features from the data before the measuring probe enters the borehole, the data during entry, and the data during withdrawal. Valid data from the entry process is selected, and measurement noise is eliminated. The borehole spatial position can be calculated, enabling automatic and continuous measurement without manual intervention. This solves the problem of current borehole trajectory measurement requiring static measurement (point measurement) using inclinometers, improving construction efficiency and providing a device and method for unmanned trajectory measurement in coal mines.
[0026] The following are specific embodiments of the present invention. It should be noted that the present invention is not limited to the following specific embodiments. All equivalent modifications made based on the technical solutions of this application fall within the protection scope of the present invention.
[0027] Example 1: This embodiment provides a dynamic continuous measurement device for borehole spatial position, including an in-hole measuring probe, a metal outer tube, a borehole monitor, and a borehole locator. When used in underground coal mine drilling, it needs to be used in conjunction with a drilling rig, drill rod, and drill bit. A connection diagram for underground coal mine use is shown below. Figure 1 As shown.
[0028] The borehole measurement probe is housed within a metal outer tube. One end of the outer tube is sequentially connected to a metal drill rod and a drill bit, while the other end is sequentially connected to multiple metal drill rods and a drilling rig. The borehole measurement probe comprises a measurement control center CPU, a probe attitude measurement module, a borehole temperature measurement module, a pressure parameter measurement module, a borehole communication control module, a data storage module, and a battery. Its components are as follows: Figure 2 As shown; the probe attitude measurement module includes an integrated attitude measurement sensor.
[0029] The borehole locator is installed at the borehole opening. The borehole locator can perform high-precision coordinate measurement to measure the absolute spatial coordinates (X0, Y0, Z0) of the opening position. After the measurement is completed, the measured absolute spatial coordinate data of the opening position is transmitted to the borehole monitor wirelessly, and the borehole monitor stores the data.
[0030] The orifice monitor is a lightweight device such as an explosion-proof mobile phone or explosion-proof tablet that enables human-machine interaction. The orifice monitor issues commands such as start and data acquisition to the measuring probe inside the orifice. The orifice monitor includes a power supply battery, an orifice communication control module, and an orifice monitor control center. The orifice communication control module provides communication between the orifice monitor and the measuring probe inside the orifice, and the power supply battery powers the orifice monitor.
[0031] The measurement and control center CPU controls the operation of the probe attitude measurement module, pressure parameter measurement module, borehole temperature measurement module, borehole communication control module, and data storage module. The CPU is powered by a battery, and the other modules are also powered by the CPU. The CPU has a high-precision clock, enabling high-precision timing and providing time stamps for the measurement data. The borehole communication control module provides a communication channel between the CPU and the borehole monitor. The data storage module provides a large capacity for the CPU, storing all necessary data for its use.
[0032] The probe attitude measurement module includes two or more integrated attitude measurement sensors. Each integrated attitude measurement sensor measures nine parameters: three magnetic field components Hx, Hy, and Hz; three acceleration components Gx, Gy, and Gz; and three attitude angles, namely tilt angle θ, azimuth angle φ, and instrument working surface angle. The attitude measurement integrated sensor can measure the three magnetic field components at each measurement point. , , 3 acceleration components , , 3 attitude angles , 、 ; j is the j-th measurement point; the attitude measurement integrated sensor (chip) sampling is high-speed continuous sampling, which is uninterrupted throughout the entire measurement process. The sampling frequency is greater than 20Hz, with a minimum of 20 samples per second and a maximum sampling time interval of 50ms. The sampling time is provided by the CPU of the measurement control center.
[0033] The borehole temperature measurement module is used to measure the temperature of the environment in which the measuring probe is located when it is inside the borehole. The sampling frequency and sampling time interval of this module are the same as those of the probe attitude measurement module. The data collected at each measuring point is Tj. The pressure parameter measurement module measures the pressure experienced by the probe tip inside the borehole. This module uses the same sampling frequency and time interval as the probe attitude measurement module. The pressure parameter measurement module measures pressure in two directions: one is the pressure along the drill bit direction, i.e., the forward pressure P. aj One is the pressure in the direction of the borehole opening, i.e., the backward pressure P. bj .
[0034] The data measured by the attitude measurement integrated sensor, the borehole temperature measurement module, and the pressure parameter measurement module are all stored in the data storage module.
[0035] The measurement and control center's CPU incorporates an intelligent computing instrument spatial positioning system. The workflow of this intelligent computing instrument spatial positioning system is as follows: Figure 3 As shown, the intelligent computing instrument spatial positioning system calculates the spatial position of the probe in two ways: real-time transmission while drilling in the measurement-while-drilling mode and non-drilling storage calculation in the storage-based measurement mode.
[0036] For measurement-while-drilling (MSD) mode, the system retrieves stored data from the data storage module in real time. , , , , , , , 、 T j P aj P bjThe system performs intelligent calculations of the borehole spatial position, which is the same as the probe spatial position. The calculation of the probe spatial position will be explained directly below. After the calculation is completed, the spatial position data of the probe is transmitted to the data storage module for storage and then transmitted to the borehole opening in real time by the real-time communication module for the driller to view and use in real time.
[0037] For the storage-type measurement method, the measurement data is stored in the data storage module. After the instrument is launched, the borehole monitor issues a command to calculate the borehole spatial position and transmits the borehole coordinate position to the intelligent calculation instrument spatial position system. The intelligent calculation instrument spatial position system then performs intelligent calculation of the probe spatial position.
[0038] Example 2: This embodiment provides a method for dynamic and continuous measurement of borehole spatial position, which is based on the dynamic and continuous measurement device for borehole spatial position in Embodiment 1; the method includes the following steps: Step 1: Fix the orifice locator to the orifice and measure the orifice coordinates (x0, y0, z0). After the measurement is completed, remove the orifice locator. Step 2: Start the borehole measuring probe and borehole monitor. The borehole monitor sends a start command to the borehole measuring probe, and the borehole measuring probe starts working. Insert the borehole measuring probe into the metal outer tube, and then connect the metal outer tube to the metal drill rod. Step 3: For the storage-type measurement method, use a drilling rig to push the measuring device into the hole, and then repeatedly add metal drill rods to push the measuring device into the hole; after pushing it to the bottom of the hole, start lifting the drill to retrieve the instrument from the hole to the hole opening; For the measurement while drilling method, the drilling rig pushes the measuring device into the hole. Each time a metal drill rod is added, the borehole monitor sends a command through the communication system. The measuring probe in the hole uploads the measurement data to the borehole monitor, which displays the calculated current drilling position. The operation is repeated until drilling is finished. Step four: For the storage-type measurement method, after the instrument extracts the data to the borehole opening, the borehole monitor issues a calculation command. The intelligent calculation instrument spatial position system of the borehole measuring probe calculates the drilling spatial position. After the calculation is completed, the calculation result is stored in the borehole measuring probe, and a calculation completion command is sent to the borehole monitor. The borehole monitor issues a command to extract the data as needed. The borehole measuring probe transmits the data to the borehole monitor according to the command. After the data transmission is successful, the borehole measuring probe and the borehole monitor can be turned off, and one measurement process ends. For measurement while drilling, after the instrument is raised to the borehole opening, the measurement is ended by directly closing the in-hole measuring probe and the borehole monitor.
[0039] Specifically, the preprocessing of the nine parameters measured by the probe attitude measurement module of the borehole measurement probe is carried out in two steps, including: Step a1: The measurement parameters of a single attitude measurement integrated sensor are filtered using a sliding window filtering method with fixed sampling points within a time window. , ,
[0040] , ,
[0041] , ,
[0042] In the formula, k For the first k Individual attitude measurement integrated sensor serial number j For the first k The first chip (i.e., the attitude measurement integrated sensor) measures the first... j Each measuring point number n The number of sampling points within a fixed time window. n >2, 、 、 The first k The first trajectory measurement chip (i.e., the attitude measurement integrated sensor) j The magnetic field components in the X, Y, and Z directions at each measuring point 、 、 The first k The first trajectory measurement chip (i.e., the attitude measurement integrated sensor) j Acceleration components in the X, Y, and Z directions at each measuring point 、 、 The first k The first trajectory measurement chip (i.e., the attitude measurement integrated sensor) j Inclination angle, azimuth angle, and instrument / tool facing angle of each measuring point; Step a2: After the parameters of each attitude measurement integrated sensor are filtered as described above, the average is calculated and used as the parameter output of the entire probe attitude measurement integrated sensor. , ,
[0043] , ,
[0044] , ,
[0045] In the formula, k For the first k Individual attitude measurement integrated sensor serial number j For the first j Each measuring point number m To increase the number of integrated sensors for attitude measurement, m >1, 、 、 Let X, Y, and Z be the magnetic field components in the X, Y, and Z directions, respectively, for the j-th measurement point. 、 、 The first j The gravitational acceleration components in the X, Y, and Z directions at each measuring point 、 、 These are the inclination angle, azimuth angle, and instrument / tool facing angle of the j-th measuring point, respectively.
[0046] For storage-based measurement methods, i.e., non-drilling storage-based calculation of probe spatial position, the intelligent calculation instrument spatial position system comprehensively utilizes data measured by attitude measurement integrated sensors, borehole temperature measurement modules, and pressure parameter measurement modules. It comprehensively analyzes the drilling status, including forward, backward, and stopped drilling, extracts effective data, and automatically calculates the probe's spatial position using parameters from probe attitude measurement. The calculated spatial position is then stored in the data storage module for later use. The process of non-drilling storage-based intelligent calculation of probe spatial position is as follows: Figure 4 As shown; the algorithm for non-drilling storage-based calculation of probe spatial location is as follows, including: Step b1: Utilizing the trends in tilt and azimuth of all attitude measurement data stored in the data storage module at the current time, determine whether the probe's measurement data was taken outside the borehole or after entering the borehole. Data taken outside the borehole is deleted, while data taken inside the borehole is retained. Specifically, determine whether the probe's measurement data is: data taken when entering the borehole, data taken outside the borehole after the instrument is powered on but before entering the borehole, or data taken after the instrument is removed from the borehole but before being turned off. If the probe is outside the borehole, its spatial position within the borehole is not calculated, and the data outside the borehole is deleted. Data taken inside the borehole at each measuring point is retained for subsequent calculation of the probe's spatial position. Methods for determining whether the probe's measurement data is taken outside the borehole or after entering the borehole include: Step b1.1: For the two data columns consisting of the inclination and azimuth angles of all measuring points measured by the probe attitude measurement module, the distribution frequency of the statistical data is calculated by interval. The distribution intervals are drawn according to the distribution of the inclination and azimuth angles of the designed borehole. The maximum and minimum values of the inclination and azimuth angles are taken respectively. The distribution interval of the inclination angle is divided into intervals from the minimum value to the maximum value of the inclination angle data column, with an interval size of 2°. The distribution of each interval is statistically analyzed, and the distribution frequency of each interval is sorted from high to low. Then, the cumulative frequency is calculated, and the inclination angle data distribution interval with a cumulative frequency greater than 75% is found. The azimuth distribution range is from the minimum to the maximum azimuth value, with intervals set in 5° increments. The distribution of each interval is statistically analyzed, and the frequency of each interval is sorted from high to low. Then, the cumulative frequency is calculated, and the azimuth data distribution interval with a cumulative frequency greater than 75% is identified. ]; Step b1.2 involves filtering the two data columns—the inclination angle and azimuth angle—from all the measuring points of the probe attitude measurement. This filtering process primarily aims to prevent local anomalies from affecting subsequent judgments of data variation patterns. and azimuth The filtering method is as follows: There are a total of N data points for tilt angle data and N data points for azimuth angle data. The filtering calculation formulas for the tilt angle and azimuth angle of the first and second measuring points are as follows:
[0047]
[0048]
[0049]
[0050] The formulas for calculating the tilt and azimuth filtering for the last measuring point and the second-to-last measuring point are as follows:
[0051]
[0052]
[0053]
[0054] The formulas for calculating the inclination and azimuth filtering for other measuring points are as follows:
[0055]
[0056] In the above formula: , These are the filtered values for tilt and azimuth angles, respectively. These are the original measured values of the inclination angle and azimuth angle, respectively. i is the measurement point number, i=3…N-3, and N is the total number of measurement points for the inclination angle and azimuth angle. Step b1.3, for the tilt and azimuth data columns after smoothing filtering , The variation patterns of inclination and azimuth data were analyzed, and the inclination and azimuth data columns were segmented. The analysis method is as follows:
[0057] In the formula: Q is the index for determining stratification, i is the index of the calculated Q value, i=2,3,…,N-1, , These are the filtered values of the tilt and azimuth angles calculated in step b1.2, respectively. N is the total number of measurement points for the tilt and azimuth angles, and j is an intermediate variable in the calculation. judge The position numbers of the maximum and minimum values are the segment positions Ak, and the minimum value of Ak is the starting position point N1 of the inlet hole;
[0058] In the formula, Ak is the measurement point number of the segmentation point, i=2,3,…,N-1, and the total number of Ak is the number of segments. Step b1.4: Based on the measurement point number of the segment points, find the distribution range of the dip angle and azimuth angle before smoothing, and compare it with the dip angle distribution range and azimuth angle distribution range with a cumulative frequency greater than 75% found in step b1.1; extract the dip angle data segment points located in [ Outside, the azimuth segment point is located at [ The locations of the segment points outside the borehole; these segment points are considered the boundary points between the data measurement points entering the borehole and those not entering the borehole.
[0059] Step b2: Extract all data measured when the probe is inside the borehole, including the time-stamped data t of each measuring point, and determine whether the probe is in a forward or backward state. The forward state is when the probe is moving along the direction of the drill bit, and the backward state is when the probe is moving towards the borehole opening. Extract the overall forward raw data. At this time, the forward and backward states are determined based on the data of the general direction, and the backward state that occurs locally during the forward process or the forward state that occurs locally during the backward state is not considered. Since each measurement module is composed of high-precision, high-sampling-rate measurement chips, there is no need for manual stopping to wait for measurement during the measurement process. Therefore, during the drilling rig's pushing process and the process of lifting the instrument from inside the hole to the hole opening, if the entire process is smooth, the time required for the instrument to enter the hole is the same as the time required for the instrument to be lifted from inside the hole to the hole opening. Considering the excessive length of the borehole, it is possible that the instrument is powered during the entry process and the probe inside the hole works normally. However, due to the limited working time of the probe inside the hole during the withdrawal process, the measurement data during withdrawal may be incomplete, and the working time of the probe inside the hole during the entry process may be inconsistent with that during the withdrawal process. Therefore, it is necessary to comprehensively analyze all directional data acceleration components, forward pressure, and backward pressure data to determine the entry and withdrawal data from the data. The determination method is as follows: Step b2.1 involves extracting all measurements taken when the probe was inside the borehole. P aj P bj The data is smoothed and filtered to prevent individual anomalies from affecting subsequent judgments. The smoothing filter is implemented using a sliding window averaging method with a step size of 1. Smoothing is performed point by point. The calculation formulas for each data point are as follows: , ,
[0060] In the formula, j is the index of the j-th measurement point, n is the number of sampling points within a fixed time window, and 2 <n<5, , where is the smoothed value of the X-direction acceleration component at the j-th measurement point. , These are the smoothed values of the forward and backward pressures at the j-th measuring point, respectively.
[0061] Step b2.2: Normalize the smoothed data so that the data is distributed between [0,1]. The normalization algorithm is as follows: , ,
[0062] In the formula, j is the index of the j-th measuring point. is the normalized value of the acceleration component in the X direction at the j-th measurement point, , are the normalized values of the forward pressure and the backward pressure at the j-th measurement point, respectively.
[0063] Step b2.3: Construct an index F for judging forward and backward movement, select a fixed window, the number of sampling points in the window length is n1, the step size is m, calculate the index F in the window, and the calculation formula is as follows:
[0064] In the formula, j is the serial number of the j-th measurement point, n1 is the number of sampling points in the fixed time window, 10<n1<30, is the normalized value of the acceleration component in the X direction at the j-th measurement point, , are the normalized values of the forward pressure and the backward pressure at the j-th measurement point, respectively. When F>0, it indicates forward movement, and when F<0, it indicates backward movement.
[0065] Step b2.4: Extract data moving in a single direction. In order to prevent the problem that the probe tube cannot work normally when the instrument is taken out due to insufficient power after long-time operation, the data in the forward direction is extracted as analysis data. The extracted forward direction data includes forward dynamic data during the forward process and data in a static state. The static state data refers to the process of adding drill rods during the drilling or pushing process, and the process of stopping drilling for a long time when encountering special conditions downhole. To extract the overall forward direction data, an index G needs to be constructed, and G is calculated as follows:
[0066] In the formula, j is the serial number of the j-th measurement point, n2 is the number of sampling points in the fixed time window, 50<n2<1 / N, N is the total number of measurement data points, F is the index for forward and backward movement, m1 is the step size, 5<m1<10. G>0 indicates forward movement, G<0 indicates backward movement, and the point where G first becomes less than 0 is taken as the end position N2 of the overall forward movement.
[0067] Step b3: Analyze the extracted overall forward raw data. The starting point of the data is N1, the starting point of the measurement when entering the hole, and the end point of the data is N2, the end point of the overall forward movement; analyze and judge whether the downhole probe tube is in a static state of adding drill rods or in a non-static state; the judgment method is as follows: Step b3.1: For all the measured data when the extracted probe tube is located in the hole , , , , , , , , T j P aj P bj The data is smoothed and filtered to prevent individual anomalies from affecting subsequent judgments. The smoothing filter is implemented using a sliding window averaging method with a step size of 1. Smoothing is performed point by point. The calculation formulas for each data point are as follows: , ,
[0068] , ,
[0069] , ,
[0070] , ,
[0071] In the formula, j is the sequence number of the j-th measurement point, j = N1, ..., N2-n, N1 is the starting point of the borehole measurement, N2 is the ending point of the borehole measurement, and n is the number of sampling points within the fixed time window. <n<5, , , , , , , , , They are respectively , , , , , , , , T j P aj P bj The smoothed value of the j-th measurement point.
[0072] Step b3.2, calculate the smoothed parameters. , , , , , , , , The variance and mean are used as attribute feature parameters. , , , , , , , , By combining human-computer interaction to identify the stationary state Yn of stopping the push of the drill rod and the non-stationary state Ys of pushing, a training sample set is created. Then, the probability is calculated, and the stationary and non-stationary states are determined based on the probability. The specific method is as follows: Step b3.2.1, let Given a sample set, x1, x2, ..., x12 represent... , , , , , , , , , which are attribute feature parameters; Step b3.2.2, the category label is
[0073] Step b3.2.3 involves statistically estimating the conditional probability of each attribute parameter under each category label. That is... ; Step b3.2.4, when each feature parameter is conditionally independent:
[0074] In the formula, each attribute parameter is conditionally independent, while the denominator is a constant. To obtain the maximum probability value, the numerator must be maximized.
[0075] When the probability of belonging to a certain label is maximized, the current data point is considered to belong to that label. The determination process is as follows: Figure 5 As shown; Step b4: Based on the static and non-static states determined in step b3, extract all smoothed data for the valid non-static states. , , , , , , , , The depth of each data point is calculated using acceleration and recorded time information, and the borehole depth is automatically calculated as follows: ; ; In the formula, G j Let be the acceleration at the j-th measuring point, where j is the measuring point, g is the gravitational acceleration, MD is the hole depth, and dt is the time interval between each measuring point. The calculation starts from the data of the first non-stationary point after entering the hole.
[0076] Step b5: Based on the data from the non-stationary state during the forward movement, the data from the stationary state is effectively processed to extract the effective tilt and azimuth data for the stationary state, providing tilt and azimuth angles for calculating the spatial position of the probe. Furthermore, the data for each stationary state time period during which the push is stopped is processed by removing the maximum and minimum values for that stationary time period and calculating the average of the remaining data as the effective value. The position and depth data for each stationary state are calculated based on the depth calculated in step b4, i.e., the ending depth of the previous non-stationary state event or the starting depth of the next non-stationary state event. Step b6: Calculate the spatial coordinates of the probe based on the effective dip angle, azimuth, and depth data extracted in step b5. The calculation method is as follows: Calculate the coordinates (X...) of the current borehole position. k ,Y k Z k ):
[0077] In the formula, , , ; ; The Z-direction increment of adjacent measuring points. The increment in the Y direction between adjacent measuring points. The X-direction increment of adjacent measurement points, DLA k The dogleg angle of the current measuring point. The hole depth at point k is the current point. The depth of the hole at the previous measuring point k-1, The measured inclination angle of the previous measuring point k-1, The measured inclination angle of the current measuring point k. The azimuth angle of the current measuring point k. The measurement azimuth of the previous measuring point k-1, k is the current point, k=1~K, K is the number of stationary states extracted in step b3, and (X0,Y0,Z0) are the measured orifice coordinates; MD and MD are the tilt angle, azimuth angle, and depth calculated in step b5 for the stationary state, respectively.
[0078] For the measurement-while-drilling (MWD) method, which calculates the spatial position of the probe in real time, the intelligent calculation instrument spatial position system integrates commands issued by the wellhead monitor and data measured by the attitude measurement integrated sensor, the borehole temperature measurement module, and the pressure parameter measurement module to realize intelligent calculation of the probe spatial position in a human-computer interaction model. After the calculation is completed, the probe spatial position coordinates are transmitted to the wellhead monitor for display. The calculation method is consistent with the conventional real-time calculation of the probe spatial position during drilling.
Claims
1. A method for dynamic continuous measurement of borehole spatial position, characterized in that, This method is based on a dynamic continuous measurement device for borehole spatial position; the dynamic continuous measurement device for borehole spatial position includes an in-hole measuring probe, a metal outer tube, a borehole monitor, and a borehole locator; The borehole measurement probe is installed in a metal outer tube. One end of the metal outer tube is connected to a metal drill rod and a drill bit in sequence, and the other end is connected to multiple metal drill rods and a drilling rig in sequence. The borehole measurement probe includes a measurement control center CPU, a probe attitude measurement module, a borehole temperature measurement module, a pressure parameter measurement module, a borehole communication control module, a data storage module, and a battery. The probe attitude measurement module includes an attitude measurement integrated sensor. The orifice locator is installed at the orifice of the drilled hole. The orifice locator can perform high-precision coordinate measurement to measure the absolute spatial coordinates (X0, Y0, Z0) of the opening position. After the measurement is completed, the measured absolute spatial coordinate data of the opening position is transmitted to the orifice monitor wirelessly and stored by the orifice monitor. The orifice monitor is an explosion-proof mobile phone or explosion-proof tablet that can realize human-computer interaction. The orifice monitor sends start and data acquisition commands to the measuring probe inside the orifice. The orifice monitor includes a power supply battery, an orifice communication control module, and an orifice monitor control center. The orifice communication control module provides communication between the orifice monitor and the measuring probe inside the orifice, and the power supply battery powers the orifice monitor. The probe attitude measurement module includes two or more integrated attitude measurement sensors, which can measure three magnetic field components at each measurement point. , , 3 acceleration components , , 3 attitude angles , 、 ; j For the first j Each measurement point; the attitude measurement integrated sensor sampling is high-speed continuous sampling, uninterrupted throughout the entire measurement process, with a sampling frequency greater than 20Hz, a minimum of 20 samples per second, a maximum sampling time interval of 50ms, and the sampling time is provided by the measurement control center CPU; The borehole temperature measurement module is used to measure the temperature of the environment in which the measuring probe is located when it is in the borehole. The sampling frequency and sampling time interval of this module are the same as those of the probe attitude measurement module. The data collected at each measuring point is Tj. The pressure parameter measurement module is used to measure the pressure experienced by the probe tip inside the borehole. This module has the same sampling frequency and sampling time interval as the probe attitude measurement module. The pressure parameter measurement module measures pressure in two directions: one is the pressure along the drill bit direction, i.e., the forward pressure P. aj One is the pressure towards the borehole opening, i.e., the backward pressure P. bj ; The data measured by the attitude measurement integrated sensor, the borehole temperature measurement module, and the pressure parameter measurement module are all stored in the data storage module; The measurement and control center CPU is embedded with an intelligent computing instrument spatial positioning system; the intelligent computing instrument spatial positioning system calculates the spatial position of the probe in two ways: real-time transmission requirements during drilling measurement and non-drilling storage calculation requirements during storage measurement. For measurement-while-drilling (MSD) mode, the system retrieves stored data from the data storage module in real time. , , , , , , , 、 T j P aj P bj The system performs intelligent calculations of the borehole spatial position, which is the same as the probe spatial position. After the calculation is completed, the probe spatial position data is transmitted to the data storage module for storage. For the storage-type measurement method, the measurement data is stored in the data storage module. After the instrument is launched, the borehole monitor issues a command to calculate the borehole spatial position and transmits the borehole coordinate position to the intelligent calculation instrument spatial position system. The intelligent calculation instrument spatial position system then performs intelligent calculation of the probe spatial position. The measurement method includes the following steps: Step 1: Fix the orifice locator to the orifice and measure the orifice coordinates (x0, y0, z0). After the measurement is completed, remove the orifice locator. Step 2: Start the borehole measuring probe and borehole monitor. The borehole monitor sends a start command to the borehole measuring probe, and the borehole measuring probe starts working. Insert the borehole measuring probe into the metal outer tube, and then connect the metal outer tube to the metal drill rod. Step 3: For the storage-type measurement method, use a drilling rig to push the measuring device into the hole, and then repeatedly add metal drill rods to push the measuring device into the hole; after pushing it to the bottom of the hole, start lifting the drill to retrieve the instrument from the hole to the hole opening; For measurement while drilling, the drilling rig pushes the measuring device into the hole. Each time a metal drill rod is added, the borehole monitor issues a command, and the measuring probe in the hole uploads the measurement data to the borehole monitor. The borehole monitor displays the current drilling position, and the operation is repeated until drilling is completed. Step four: For the storage-type measurement method, after the instrument extracts the data to the borehole opening, the borehole monitor issues a calculation command. The intelligent calculation instrument spatial position system of the borehole measuring probe calculates the drilling spatial position. After the calculation is completed, the calculation result is stored in the borehole measuring probe, and a calculation completion command is sent to the borehole monitor. The borehole monitor issues a command to extract the data as needed. The borehole measuring probe transmits the data to the borehole monitor according to the command. After the data transmission is successful, the borehole measuring probe and the borehole monitor are turned off, and one measurement process ends. For measurement while drilling, after the instrument is raised to the borehole opening, the measurement is ended by directly closing the measuring probe inside the borehole and the borehole monitor. The preprocessing of the nine parameters measured by the probe attitude measurement module of the in-hole measuring probe is carried out in two steps, including: Step a1: The measurement parameters of a single attitude measurement integrated sensor are filtered using a sliding window filtering method with fixed sampling points within a time window. , , , , , , In the formula, k For the first k Individual attitude measurement integrated sensor serial number j For the first k The attitude measurement integrated sensor measures the first... j Each measuring point number n The number of sampling points within a fixed time window. n >2, 、 、 The first k The first attitude measurement integrated sensor j The magnetic field components in the X, Y, and Z directions at each measuring point 、 、 The first k The first attitude measurement integrated sensor j Acceleration components in the X, Y, and Z directions at each measuring point 、 、 The first k The first attitude measurement integrated sensor j Inclination angle, azimuth angle, and instrument / tool facing angle of each measuring point; Step a2: After the parameters of each attitude measurement integrated sensor are filtered as described above, the average is calculated and used as the parameter output of the entire probe attitude measurement integrated sensor. , , , , , , In the formula, k For the first k Individual attitude measurement integrated sensor serial number j For the first j Each measuring point number m To increase the number of integrated sensors for attitude measurement, m >1, 、 、 Let X, Y, and Z be the magnetic field components in the X, Y, and Z directions, respectively, for the j-th measuring point. 、 、 The first j The gravitational acceleration components in the X, Y, and Z directions at each measuring point 、 、 These are the inclination angle, azimuth angle, and instrument / tool facing angle of the j-th measuring point, respectively. For storage-based measurement methods, i.e., non-drilling storage-based calculation of the probe's spatial position, the intelligent calculation instrument spatial position system comprehensively utilizes data measured by attitude measurement integrated sensors, borehole temperature measurement modules, and pressure parameter measurement modules. It comprehensively analyzes the drilling status, including drilling forward, backward, and stop movements, extracts valid data, automatically calculates the probe's spatial position, and saves the calculated spatial position in the data storage module for later use. The algorithm for non-drilling storage-based calculation of the probe's spatial position is as follows: Step b1: By comprehensively utilizing the trend of change of tilt angle and azimuth angle of all attitude measurement data stored in the data storage module at the current time, it is determined whether the data measured by the probe is the data measured when it is outside the borehole or the data measured after it enters the borehole. The data measured when it is outside the borehole is deleted, and the data measured after it enters the borehole is retained. Step b2: Extract all data measured when the probe is inside the borehole, including the time label data t of each measuring point, and determine whether the probe is in a forward or backward state. The forward state is when the probe is moving along the direction of the drill bit, and the backward state is when the probe is moving towards the borehole opening. Extract the overall forward raw data. Step b3: Analyze the extracted overall forward data. The starting point of the data is the starting point N1 of the borehole measurement, and the ending point of the data is the ending point N2 of the overall forward movement. Analyze and determine whether the probe in the borehole is in a stationary state with the drill rod attached or in a non-stationary state. Step b4: Based on the static and non-static states determined in step b3, extract all smoothed data for the valid non-static states. , , , , , , , , The drilling depth is automatically calculated using acceleration and recorded time information as follows: ; ; In the formula, G j Let be the acceleration at the j-th measuring point, where j is the measuring point, g is the gravitational acceleration, MD is the drilling depth, and dt is the time interval between each measuring point. The calculation starts from the data of the first non-stationary point after entering the hole. , , , , , , , , They are respectively , , , , , , , 、 T j P aj P bj The smoothed value of the j-th measurement point; Step b5: Based on the data of the non-stationary state during the forward movement, the data of the stationary state is effectively processed to extract the effective inclination angle and azimuth angle data of the stationary state. For the position and depth data of each stationary state, the depth is calculated according to the depth calculated in step b4. That is, the drilling depth of the stationary state is the end depth of the previous non-stationary state or the starting depth of the next non-stationary state. Step b6: Calculate the spatial coordinates of the probe, i.e., the coordinates of the current borehole position (X), based on the effective dip angle, azimuth, and depth data extracted in step b5. k ,Y k Z k ): In the formula, , , ; ; The Z-direction increment of adjacent measuring points. The increment in the Y direction between adjacent measuring points. The X-direction increment of adjacent measurement points, DLA k The dogleg angle of the current measuring point. The hole depth at the current measuring point k. The depth of the hole at the previous measuring point k-1, The measured inclination angle of the previous measuring point k-1, The measured inclination angle at the current measuring point k. The azimuth angle of the current measuring point k. The azimuth angle of the previous measuring point k-1 is given, k is the current measuring point, k = 1~K, K is the number of stationary states extracted in step b3, and (X0, Y0, Z0) are the measured orifice coordinates. MD and MD represent the tilt angle, azimuth angle, and depth in the stationary state of step b5, respectively.
2. The method for dynamic continuous measurement of borehole spatial position as described in claim 1, characterized in that, The measurement and control center CPU can control the operation of the probe attitude measurement module, pressure parameter measurement module, borehole temperature measurement module, borehole communication control module, and data storage module. The battery powers the measurement and control center CPU, and the other modules are powered by the measurement and control center CPU. The measurement and control center CPU has a high-precision clock, which can perform high-precision timing and provide time stamps for measurement data. The borehole communication control module provides a communication control channel between the measurement and control center CPU and the borehole monitor. The data storage module provides data storage space for the measurement and control center CPU, storing all data that needs to be recorded and stored in this module for the use of the measurement and control center CPU.
3. The method for dynamic continuous measurement of borehole spatial position as described in claim 1, characterized in that, For the measurement-while-drilling (MSD) method, which calculates the spatial position of the probe in real time, the intelligent calculation instrument spatial position system integrates the commands issued by the borehole monitor and the data measured by the attitude measurement integrated sensor, borehole temperature measurement module, and pressure parameter measurement module to realize intelligent calculation of the probe spatial position under the human-computer interaction model. After the calculation is completed, the probe spatial position coordinates are transmitted to the borehole monitor for display.
Citation Information
Patent Citations
System and method for measuring drilling track under coal mine
CN103982173A
Mine borehole radar fine detecting device based on drilling machine pushing and detecting method thereof
CN110259432A
Drilling and blasting method tunnel blast hole spatial form testing device and method
CN113834456A
Bedding drilling track control system and method based on multiple parameters
CN115898369A
