Supply Chain Visualization Management Method
Through the supply chain visual management method, the problem of unclear cargo packaging in the existing technology is solved. By decomposing order information, planning transportation trajectories and evaluating packaging capacity, accurate management of cargo delivery status and delivery vehicle packaging capacity is achieved. , improving the transparency and efficiency of the transportation process.
Patent Information
- Application Number
- CN202311660180.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-06
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2043-12-06
AI Technical Summary
In the existing supply chain transportation process, the packing and unloading of goods mainly rely on human control, resulting in unclear packing conditions, especially for large or heavy goods, which are prone to transportation errors.
Through the supply chain visual management method, the order order information is obtained, decomposed into the first characteristic information and the second characteristic information, the transportation trajectory is planned, the packing capacity is evaluated, the transportation information is generated, and the cargo transportation status and the truck packing capacity are determined in real time. and perform visual management. The method includes a decomposition module, a trajectory planning model and a binning evaluation model, and uses natural semantic rules and neural networks for information processing and business rule definition.
It achieves accurate determination and visual management of cargo delivery status and delivery vehicle packing capacity, improves the transparency and efficiency of the transportation process, and reduces the possibility of transportation errors.
Smart Images

Figure CN117875600B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of supply chain visualization, and in particular to a supply chain visualization management method. Background Art
[0002] In the existing supply chain transportation process, the packing of goods at the destination and the unloading during transportation are all controlled manually. Due to manual control, the packing situation of each time is not very clear, which may lead to errors in the transportation of goods. In the current technology, such as in the express delivery industry, packing is basically completed by identifying electronic codes, and sorting is carried out after arriving at the distribution center. However, for some large goods or heavy goods, the above method is not applicable. Summary of the invention
[0003] In view of this, in order to solve the problems in the prior art, the present invention provides a supply chain visualization management method.
[0004] Its main technical solutions are as follows:
[0005] Supply chain visualization management methods include:
[0006] Get order information from the order server;
[0007] Input the order information into the decomposition module in sequence according to the order formation time nodes for decomposition, so as to obtain the first characteristic information and the second characteristic information corresponding to the order information, and the first characteristic information and the second characteristic information are uniquely associated with each other;
[0008] The obtained first characteristic information is input into a trajectory planning model, and the trajectory planning model is used to plan the delivery trajectory of each order, and the first characteristic information with the same delivery trajectory is classified into the same form;
[0009] Extract all first characteristic information on the same transport track from the form, and derive second characteristic information corresponding to the first characteristic information;
[0010] The derived second characteristic information is input into a packing evaluation model to evaluate packing capacity, so as to determine a transportation plan form;
[0011] Generate the transportation information of the goods according to the obtained transportation plan form, and determine the transportation status of the goods and the packing capacity of the transportation vehicle in real time according to the transportation information and the second characteristic information;
[0012] The delivery status of the goods and the packing capacity of the delivery vehicle will be determined and sent to the management server for visual management.
[0013] Further, the order form information is edited according to a set program format;
[0014] Among them, the setting program format is composed of multiple components that are interconnected with natural semantics, and the components are defined in sequence with natural semantic rules in the form of information flow nodes in accordance with business process orchestration; and the corresponding business rules between the interconnected components are defined by script components.
[0015] Furthermore, the method of editing the order information according to the set program format is:
[0016] The order information is generated by an event generator into multiple event information marked with time as a benchmark, and each event information corresponds to an information flow node;
[0017] Each information flow node is used as the basis for defining the business boundary, where each information flow node corresponds to a single task, and each task corresponds to a component;
[0018] Call the business rule table and natural semantic rule setting package through the script component to define the business rules of each component with natural semantic rules;
[0019] The components are connected through the business rules.
[0020] Furthermore, the event generator is used to monitor event actions in the ordering server, and mark the obtained event actions based on time to obtain corresponding event information.
[0021] Furthermore, the natural semantic rules are stored in a business rule table.
[0022] Furthermore, the business rule table and the natural semantic rule setting package are set in the natural semantic generation model.
[0023] Furthermore, the natural semantic generation model is obtained by annotating the natural semantics in the extraction component and the semantic rules connected by the context by an artificial expert, and inputting them into the neural network unit for iterative training after the annotation is completed, wherein a number of natural semantic rule information is obtained after the training, and the natural semantic rule setting package is obtained by manually summarizing, summarizing and annotating the natural semantic rule information and then inputting them into the neural network unit for training;
[0024] The natural semantic rule information in the natural semantic rule setting package is classified to obtain a business rule table after classification.
[0025] Furthermore, the decomposition module has:
[0026] A splitting unit, used for splitting order information into multiple components;
[0027] A first identification unit is used to identify the task corresponding to each component, obtain the components corresponding to the departure place and the destination from the task, and obtain first characteristic information from the components corresponding to the departure place and the destination, wherein the first characteristic information includes the departure place and the destination in each order information;
[0028] A second identification unit is used to identify the task corresponding to each component, obtain the components related to the goods and order quantity from the task, and extract the second characteristic information from the components related to the order quantity, wherein the second characteristic information includes the name of the goods and the order quantity in each order form information;
[0029] The association unit is used to associate the first characteristic information and the second characteristic information under the same order information.
[0030] Furthermore, the trajectory planning model has:
[0031] A delivery track planning unit, used to call a map to plan a delivery track for each order according to the departure place and destination included in the first characteristic information;
[0032] The classification unit is used to classify the first characteristic information having the same transportation track into the same form.
[0033] Furthermore, the packing evaluation model has:
[0034] A configuration unit, configured to sequentially obtain the second characteristic information in each order information according to the order formation time node, and determine the physical properties of the goods and the order quantity according to the goods name and order quantity included in the second characteristic information to match the transport vehicle;
[0035] A capacity evaluation unit is used to obtain the capacity of the matching transport vehicle and estimate the packing capacity corresponding to each order according to the physical properties of the goods and the order quantity;
[0036] The packing evaluation unit is used to calculate the number of orders that meet the capacity of the transport vehicle based on the packing capacity corresponding to an order. After the number is determined, the packing sequence is determined based on the transportation tracks corresponding to the multiple orders.
[0037] By determining the packing capacity, the present application can determine the delivery status of the goods and the packing capacity of the delivery vehicle and send them to the management server for visual management. BRIEF DESCRIPTION OF THE DRAWINGS
[0038] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0039] Figure 1 The present invention provides a method flow chart. DETAILED DESCRIPTION
[0040] In order to make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.
[0041] Example 1
[0042] Reference Figure 1 The present invention provides a supply chain visualization management method, comprising:
[0043] Get order information from the order server;
[0044] Input the order information into the decomposition module in sequence according to the order formation time nodes for decomposition, so as to obtain the first characteristic information and the second characteristic information corresponding to the order information, and the first characteristic information and the second characteristic information are uniquely associated with each other;
[0045] The obtained first characteristic information is input into a trajectory planning model, and the trajectory planning model is used to plan the delivery trajectory of each order, and the first characteristic information with the same delivery trajectory is classified into the same form;
[0046] Extract all first characteristic information on the same transport track from the form, and derive second characteristic information corresponding to the first characteristic information;
[0047] The derived second characteristic information is input into a packing evaluation model to evaluate packing capacity, so as to determine a transportation plan form;
[0048] Generate the transportation information of the goods according to the obtained transportation plan form, and determine the transportation status of the goods and the packing capacity of the transportation vehicle in real time according to the transportation information and the second characteristic information;
[0049] The delivery status of the goods and the packing capacity of the delivery vehicle will be determined and sent to the management server for visual management.
[0050] In the above, the order form information is edited according to the set program format;
[0051] Among them, the setting program format is composed of multiple components that are interconnected with natural semantics, and the components are defined in sequence with natural semantic rules in the form of information flow nodes in accordance with business process orchestration; and the corresponding business rules between the interconnected components are defined by script components.
[0052] In the above, the method of editing the order information according to the set program format is:
[0053] The order information is generated by an event generator into multiple event information marked with time as a benchmark, and each event information corresponds to an information flow node;
[0054] Each information flow node is used as the basis for defining the business boundary, where each information flow node corresponds to a single task, and each task corresponds to a component;
[0055] Call the business rule table and natural semantic rule setting package through the script component to define the business rules of each component with natural semantic rules;
[0056] The components are connected through the business rules.
[0057] In the above, the script component includes a rule part and a constraint part, wherein the rule part is used to define the association relationship with other components through natural semantic rules, and the constraint part is used to limit the exclusive association between the component and other components.
[0058] In the above, by linking the constraint part to the rule part, so that the constraint part calls the association relationship and limits the standard semantics between different association relationships, the standard semantics are used to limit the component to form a unique association with other components, so as to achieve the effect of exclusive association.
[0059] In the above, the event generator is used to monitor event actions in the order server, and mark the obtained event actions based on time to obtain corresponding event information.
[0060] In the above, the natural semantic rules are stored in the business rule table.
[0061] In the above, the business rule table and the natural semantic rule setting package are set in the natural semantic generation model.
[0062] In the above, the natural semantic generation model is obtained by annotating the natural semantics in the extraction component and the semantic rules connected by the context by an artificial expert, and inputting them into the neural network unit for iterative training after the annotation is completed, wherein a number of natural semantic rule information is obtained after the training, and the natural semantic rule setting package is obtained by manually summarizing, summarizing and annotating the natural semantic rule information and then inputting them into the neural network unit for training;
[0063] The natural semantic rule information in the natural semantic rule setting package is classified to obtain a business rule table after classification.
[0064] In the above, the decomposition module has:
[0065] A splitting unit, used for splitting order information into multiple components;
[0066] A first identification unit is used to identify the task corresponding to each component, obtain the components corresponding to the departure place and the destination from the task, and obtain first characteristic information from the components corresponding to the departure place and the destination, wherein the first characteristic information includes the departure place and the destination in each order information;
[0067] A second identification unit is used to identify the task corresponding to each component, obtain the components related to the goods and order quantity from the task, and extract the second characteristic information from the components related to the order quantity, wherein the second characteristic information includes the name of the goods and the order quantity in each order form information;
[0068] The association unit is used to associate the first characteristic information and the second characteristic information under the same order information.
[0069] In the above, the trajectory planning model has:
[0070] A delivery track planning unit, used to call a map to plan a delivery track for each order according to the departure place and destination included in the first characteristic information;
[0071] The classification unit is used to classify the first characteristic information having the same transportation track into the same form.
[0072] In the above, the binning evaluation model has:
[0073] A configuration unit, configured to sequentially obtain the second characteristic information in each order information according to the order formation time node, and determine the physical properties of the goods and the order quantity according to the goods name and order quantity included in the second characteristic information to match the transport vehicle;
[0074] A capacity evaluation unit is used to obtain the capacity of the matching transport vehicle and estimate the packing capacity corresponding to each order according to the physical properties of the goods and the order quantity;
[0075] The packing evaluation unit is used to calculate the number of orders that meet the capacity of the transport vehicle based on the packing capacity corresponding to an order. After the number is determined, the packing sequence is determined based on the transportation tracks corresponding to the multiple orders.
[0076] By determining the packing capacity, the application can determine the transportation status of the goods and the packing capacity of the transport vehicle and send them to the management server for visual management. In order to achieve the purpose of visual management, the transport route of the transport vehicle and the docking status of the unloading point during the transportation process are obtained in real time through the tracking device in the transport vehicle. At the same time, a monitoring device is set in the cab to monitor the driver's status in real time.
[0077] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A supply chain visualization management method, characterized in that: include: Get order information from the order server; Input the order information into the decomposition module in sequence according to the order formation time nodes for decomposition, so as to obtain the first characteristic information and the second characteristic information corresponding to the order information, and the first characteristic information and the second characteristic information are uniquely associated with each other; The obtained first characteristic information is input into a trajectory planning model, and the trajectory planning model is used to plan the delivery trajectory of each order, and the first characteristic information with the same delivery trajectory is classified into the same form; Extract all first characteristic information on the same transport track from the form, and derive second characteristic information corresponding to the first characteristic information; The derived second characteristic information is input into a packing evaluation model to evaluate packing capacity, so as to determine a transportation plan form; Generate the transportation information of the goods according to the obtained transportation plan form, and determine the transportation status of the goods and the packing capacity of the transportation vehicle in real time according to the transportation information and the second characteristic information; The delivery status of the goods and the packing capacity of the delivery vehicle are sent to the management server for visual management; The order form information is edited according to the set program format; The setting program format is composed of a plurality of components interconnected by natural semantics, and the components are defined in turn by natural semantic rules in the form of information flow nodes in the manner of business process arrangement; and the corresponding business rules are defined by script components between the interconnected components; The method of editing the order information according to the set program format is: The order information is generated by an event generator into multiple event information marked with time as a benchmark, and each event information corresponds to an information flow node; Each information flow node is used as the basis for defining the business boundary, where each information flow node corresponds to a single task, and each task corresponds to a component; Call the business rule table and natural semantic rule setting package through the script component to define the business rules of each component with natural semantic rules; The components are connected through the business rules.
2. The supply chain visualization management method according to claim 1, characterized in that: The event generator is used to monitor event actions in the order server, and mark the obtained event actions based on time to obtain corresponding event information.
3. The supply chain visualization management method according to claim 2, characterized in that: The business rule table and the natural semantic rule setting package are set in the natural semantic generation model.
4. The supply chain visualization management method according to claim 3 is characterized in that: The natural semantic generation model is obtained by an artificial expert annotating the natural semantics in the extraction component and the semantic rules connected by the context, and inputting them into the neural network unit for iterative training after the annotation is completed, wherein a number of natural semantic rule information is obtained after the training, and the natural semantic rule setting package is obtained by manually summarizing, summarizing and annotating the natural semantic rule information and then inputting them into the neural network unit for training; The natural semantic rule information in the natural semantic rule setting package is classified to obtain a business rule table after classification.
5. The supply chain visualization management method according to claim 1, characterized in that: The decomposition module has: A splitting unit, used for splitting order information into multiple components; A first identification unit is used to identify the task corresponding to each component, obtain the components corresponding to the departure place and the destination from the task, and obtain first characteristic information from the components corresponding to the departure place and the destination, wherein the first characteristic information includes the departure place and the destination in each order information; A second identification unit is used to identify the task corresponding to each component, obtain the components related to the goods and order quantity from the task, and extract the second characteristic information from the components related to the order quantity, wherein the second characteristic information includes the name of the goods and the order quantity in each order form information; The association unit is used to associate the first characteristic information and the second characteristic information under the same order information.
6. The supply chain visualization management method according to claim 1, characterized in that: The trajectory planning model has: A delivery track planning unit, used to call a map to plan a delivery track for each order according to the departure place and destination included in the first characteristic information; The classification unit is used to classify the first characteristic information having the same transportation track into the same form.
7. The supply chain visualization management method according to claim 1, characterized in that: The binning evaluation model has: A configuration unit, configured to sequentially obtain the second characteristic information in each order information according to the order formation time node, and determine the physical properties of the goods and the order quantity according to the goods name and order quantity included in the second characteristic information to match the transport vehicle; A capacity evaluation unit is used to obtain the capacity of the matching transport vehicle and estimate the packing capacity corresponding to each order according to the physical properties of the goods and the order quantity; The packing evaluation unit is used to calculate the number of orders that meet the capacity of the transport vehicle based on the packing capacity corresponding to an order. After the number is determined, the packing sequence is determined based on the transportation tracks corresponding to the multiple orders.
Citation Information
Patent Citations
Vehicle scheduling method and vehicle scheduling system
CN107093050A
Multimodal transportation method of automobile logistics based on Internet +
CN109325619A
