A tower crane remote monitoring intelligent control method and control system

By identifying the number of rotations of the tower crane winch and measuring the hook height, the height error curve is obtained, which solves the problem of safety performance and accuracy when the tower crane winch operates under different weight conditions, and realizes intelligent control of the tower crane.

CN117886245BActive Publication Date: 2024-10-08HANGZHOU HUANGSHI DIGITAL CHAINSTORE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410106342.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-25
Publication Date
2024-10-08
Estimated Expiration
2044-01-25

AI Technical Summary

Technical Problem

The existing remote intelligent control method for tower cranes lacks control over the weight of the towed object when the winch is operating, resulting in reduced safety performance and low hoisting accuracy.

Method used

By identifying the number of turns and single-turn length of the winch, preset the lifting height, use a ranging camera to measure the hook height, set multiple lifting weights to obtain the preset and actual hook position curves, and calculate the height error and time error curves , control the height and speed of objects of different weights based on these curves.

Benefits of technology

It effectively controls the operation of the winch under different weight conditions, improves safety performance and hoisting accuracy, and prevents damage to mechanical components and excessive extension of the wire rope.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117886245B_ABST
    Figure CN117886245B_ABST
Patent Text Reader

Abstract

The invention provides a tower crane remote monitoring intelligent control method and control system, which relate to the technical field of intelligent tower crane control, and include: obtaining the initial number of turns and single turn length of a winch; presetting a lifting height; placing a ranging camera on a hook; setting a preset hook position curve and an actual hook position curve; obtaining a height error curve and a time error curve; and controlling the lifting heights of objects of different weights according to the height error curve and the time error curve. The invention is used to solve the problem that there are deficiencies in the prior art in improving the operation control of the winch of a tower crane, that the operation of the winch is not controlled according to the weight of a towed object during operation, which easily causes damage to mechanical components and low accuracy of the lifting height.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of intelligent tower crane control, and in particular to a tower crane remote monitoring intelligent control method and control system. Background Art

[0002] At present, tower cranes are basically controlled by personnel in the central control room on the tower crane, or by operators performing real-time intelligent control remotely. As for the tower crane industry, the current development direction is unmanned tower cranes and intelligent tower cranes, so many technical problems will be encountered in the process of industrial upgrading.

[0003] The existing remote monitoring and intelligent control methods for tower cranes usually monitor the operating status of the tower crane through video acquisition. For example, in the patent with application publication number CN106276612A, a tower crane remote control method is disclosed. The scheme is to set a wireless data acquisition device to wirelessly receive the video data of the tower crane within a certain range, debug the collected video data, and allow the wireless data and the real image to be reproduced synchronously. Other improvements for remote intelligent control of tower cranes usually remotely collect the operating status data of the tower crane and control the tower crane based on the collected operating status data. However, when the existing technology collects the operating status data of the tower crane, there are deficiencies in the improvement of the operation control of the winch of the tower crane. When the winch is running, there is a lack of control over the operation of the winch according to the weight of the traction object, which results in that when the weight of the traction object is too large, the safety performance of the winch will be affected, causing damage to the mechanical components and low accuracy of the hoisting height. In view of this, it is necessary to improve the existing remote intelligent control method of the tower crane. Summary of the invention

[0004] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a tower crane remote monitoring intelligent control method and control system, which is used to solve the shortcomings of the prior art in improving the operation control of the tower crane winch. When the winch is running, there is a lack of control over the operation of the winch according to the weight of the towing object. When the weight of the towing object is too large, it will affect the safety performance of the winch, easily cause damage to mechanical components and low accuracy of the lifting height.

[0005] In order to achieve the above object, the present invention provides a tower crane remote monitoring intelligent control method, comprising:

[0006] Identify the number of rotations of the tower crane's hoist and obtain the initial number of rotations and the length of a single rotation of the hoist;

[0007] Before using the tower crane for hoisting, preset the hoisting height and control the hoisting machine to hoist according to the hoisting height;

[0008] A rangefinder camera is placed on the hook to measure the height of the hook from the ground, which is recorded as the initial height. A preset hook position curve is set based on the preset lifting height of the tower crane, and the actual hook position curve is set by obtaining the hook height after the tower crane is hoisted.

[0009] Setting multiple lifting weights, obtaining multiple preset hook position curves and multiple actual hook position curves according to different lifting weights, and obtaining a height error curve and a time error curve based on the multiple preset hook position curves and the multiple actual hook position curves;

[0010] The lifting height of objects of different weights is controlled according to the height error curve and the time error curve.

[0011] Furthermore, the number of rotations of the hoist of the tower crane is identified, and the initial number of rotations and the length of a single rotation of the hoist are obtained, including:

[0012] Get the length of the traction wire rope or chain moved when the hoist of the tower crane is wound one circle, and record it as the single circle length;

[0013] Obtain the number of turns of the wire rope or chain wound by the winch in the standby state, and record it as the initial number of turns;

[0014] A rotation sensor is placed on the rotating shaft of the winch. The rotation sensor is used to detect the number of turns of the rope of the winch. When the number of turns of the wire rope or chain wound by the winch is the initial number, the number of turns of the rotation sensor is set to the first standard number. Every time the winch is detected to rotate one circle in the forward direction, the number of turns of the rotation sensor increases by the second standard number, wherein the direction of forward rotation is the direction of rope winding during the lifting process of the winch.

[0015] Furthermore, before using the tower crane for hoisting, the hoisting height is preset, and the hoisting is controlled according to the hoisting height, including:

[0016] Before using the tower crane's hoist for hoisting, obtain the height to which the towed object needs to be hoisted, recorded as the hoisting height;

[0017] Divide the lifting height by the length of a single circle, and record the resulting value as the number of lifting rotations;

[0018] Detect whether the number of rotations of the rotation sensor is the first standard number of rotations; when the number of rotations of the rotation sensor is the first standard number of rotations, control the winch to rotate in the forward direction, and the number of rotations is the lifting rotation number;

[0019] When the number of rotations of the rotation sensor is not equal to the first standard number of rotations, a winch non-zeroing signal is sent to the staff.

[0020] Furthermore, a ranging camera is placed on the hook to measure the height of the hook from the ground, which is recorded as the initial height including:

[0021] A distance measuring camera is placed on the hook to measure the height of the hook from the ground;

[0022] Before the tower crane's winch is hoisted, the height of the ranging camera from the ground is recorded as the initial height. When the hook moves, the height of the ranging camera from the ground is obtained in real time, and the height measured by the ranging camera at this time is recorded as the lifting height.

[0023] Further, setting a preset hook position curve based on a preset lifting height of the tower crane includes:

[0024] Establish a plane rectangular coordinate system, recorded as the preset hook coordinate system, where the x-axis of the preset hook coordinate system is time, in seconds, and the y-axis is the height of the ranging camera from the ground, in meters;

[0025] Before the hoist of the tower crane is hoisted, the initial height is marked in the preset hook coordinate system, and a curve corresponding to the hoisting height and time is drawn in the preset hook coordinate system based on the rotation speed of the hoist and the hoisting height, which is recorded as the preset hook position curve;

[0026] The variable of the preset hook position curve in the y-axis direction is recorded as the preset lifting height, and the variable of the preset hook position curve in the x-axis direction is recorded as the preset lifting time, wherein the preset lifting height is equal to the lifting height.

[0027] Further, obtaining the hook height after the tower crane is hoisted to set the actual hook position curve includes:

[0028] Establish a plane rectangular coordinate system, recorded as the actual hook coordinate system, where the x-axis of the actual hook coordinate system is time, in seconds, and the y-axis is the height of the ranging camera from the ground, in meters;

[0029] When the tower crane starts to hoist using the winch, the initial height is marked in the actual hook coordinate system, and a curve corresponding to the hoisting height and time is drawn in the actual hook coordinate system based on the hoisting height, which is recorded as the actual hook position curve. When the number of rotations of the winch is equal to the number of hoisting rotations, the hoisting is stopped;

[0030] After the winch stops hoisting, the variable of the actual hook position curve in the y-axis direction is recorded as the actual lifting height, and the variable of the actual hook position curve in the x-axis direction is recorded as the actual lifting time.

[0031] Furthermore, setting a plurality of lifting weights, and obtaining a plurality of preset hook position curves and a plurality of actual hook position curves according to different lifting weights includes:

[0032] Use the hoist of the tower crane to perform multiple hoists, and record each hoisting as test hoist 1 to test hoist N. The weight pulled by each hoist in test hoist 1 to test hoist N is recorded as test weight 1 to test weight N in sequence, and the lifting height of all test hoists is the same;

[0033] For any test hoist from test hoist 1 to test hoist N, after the test hoist is completed, a preset hook position curve and an actual hook position curve corresponding to the test hoist are obtained;

[0034] The value of the preset lifting height in the preset hook position curve minus the actual lifting height in the actual hook position curve is recorded as the height difference value;

[0035] The value of subtracting the preset lifting time in the preset hook position curve from the actual lifting time of the actual hook position curve is recorded as the time difference.

[0036] Further, obtaining a height error curve and a time error curve based on a plurality of preset hook position curves and a plurality of actual hook position curves includes:

[0037] Obtain height difference 1 to height difference N and time difference 1 to time difference N corresponding to test winch 1 to test winch N;

[0038] Establish a plane rectangular coordinate system, recorded as a difference coordinate system, where the x-axis of the difference coordinate system is weight, in kg, and the y-axis of the difference coordinate system is time or height, in s or m;

[0039] Mark the test weight 1 to the test weight N and the height difference and time difference corresponding to each test weight in the difference coordinate system;

[0040] A fitting curve is established for the scatter plot consisting of all test weight and height difference points, which is recorded as the height error curve. A fitting curve is established for the scatter plot consisting of all test weight and time difference points, which is recorded as the time error curve.

[0041] Controlling the lifting height of objects of different weights according to the height error curve and the time error curve includes:

[0042] The closed interval formed by the weight corresponding to the height less than or equal to the standard height error in the height error curve is recorded as the normal traction weight interval;

[0043] The closed interval formed by the weight corresponding to the height greater than the standard height error in the height error curve is recorded as the heavier traction weight interval, wherein when the heavier traction weight interval overlaps with the fast-lift weight interval, the overlapping part is removed from the heavier traction weight interval;

[0044] When a winch is used to tow a heavy object within a normal towing weight range and a normal towing time range, the winching process is performed normally;

[0045] When a winch is used to tow a heavy object in a heavier towing weight range, the height difference value corresponding to the heavy object is obtained and recorded as the heavier difference value, and the absolute values ​​obtained by subtracting the height difference values ​​1 to N from the heavier difference value are recorded as reference absolute values ​​1 to reference absolute values ​​N respectively;

[0046] Record the height difference corresponding to the minimum value of the reference absolute value 1 to the reference absolute value N as the reference difference, obtain the actual lifting height corresponding to the reference difference, record it as the reference lifting height, and set the maximum lifting height when the heavy object is towed to the first standard percentage of the reference lifting height;

[0047] The closed interval formed by the weight corresponding to the time less than or equal to the standard time error in the time error curve is recorded as the normal traction time interval;

[0048] The interval corresponding to the weight in the normal traction weight interval and not in the normal traction time interval is recorded as the slow-rise weight interval;

[0049] The interval corresponding to the weight that is in the normal traction time interval and not in the normal traction weight interval is recorded as the fast-lift weight interval;

[0050] When the winch is used to pull a heavy object in a slow-rising weight range, the winch rate is increased to the second standard percentage; when the winch is used to pull a heavy object in a fast-rising weight range, the winch rate is reduced to the third standard percentage;

[0051] The closed interval formed by the weight corresponding to the time greater than the standard time error in the time error curve is recorded as the longer traction time interval, wherein, when the longer traction time interval coincides with the slow-rise weight interval, the coincident part is removed from the longer traction time interval;

[0052] When a winch is used to tow a heavy object in a relatively long towing time interval, the hoisting speed of the winch is increased to the fourth standard percentage.

[0053] In a second aspect, the present invention also provides a tower crane remote monitoring intelligent control system, including a stroke self-identification module, a height preset module, a monitoring module, an analysis module and a control module;

[0054] The stroke self-identification module is used to identify the number of rotations of the tower crane's hoist and obtain the initial number of rotations and the length of a single rotation of the hoist;

[0055] The height preset module is used to preset the lifting height before using the tower crane for hoisting, and control the hoisting machine to hoist according to the lifting height;

[0056] The monitoring module is used to place a ranging camera on the hook, and the ranging camera is used to measure the height of the hook from the ground, which is recorded as the initial height; a preset hook position curve is set based on the preset lifting height of the tower crane, and the actual hook position curve is set by obtaining the hook height after the tower crane is hoisted;

[0057] The analysis module is used to set multiple lifting weights, obtain multiple preset hook position curves and multiple actual hook position curves according to different lifting weights, and obtain a height error curve and a time error curve based on the multiple preset hook position curves and the multiple actual hook position curves;

[0058] The control module is used to control the lifting height of heavy objects of different weights according to the height error curve and the time error curve.

[0059] Beneficial effects of the present invention: The present invention obtains the initial number of turns and the length of a single turn of the hoist by identifying the number of turns of the hoist of the tower crane; before using the tower crane for hoisting, the lifting height is preset, and the hoist is controlled to hoist according to the lifting height. The advantage of this is that by obtaining the lifting height and the length of a single turn of the hoist, the number of turns of the hoist at different lifting heights can be obtained, which is conducive to accurately controlling the operation of the hoist during the test hoisting in the subsequent analysis, and preventing the change of the number of turns from affecting the result of the test hoisting;

[0060] The present invention also places a distance measuring camera on the hook, and the distance measuring camera is used to measure the height of the hook from the ground; a preset hook position curve is set based on the preset lifting height of the tower crane, and the actual hook position curve is set by obtaining the hook height after the tower crane is hoisted. The advantage of this is that by obtaining the preset hook position curve and the actual hook position curve, the error between the actual operation and the preset operation of the hoist can be effectively obtained, which is conducive to controlling the lifting weight and operation rate of the hoist through the error in subsequent analysis;

[0061] The present invention also sets multiple lifting weights, obtains multiple preset hook position curves and multiple actual hook position curves according to different lifting weights, and obtains height error curves and time error curves based on the multiple preset hook position curves and the multiple actual hook position curves. Finally, the lifting height of heavy objects of different weights is controlled according to the height error curve and the time error curve. The advantage of this is that by obtaining the height error curve and the time error curve, the operation status of the winch and the extension status of the wire rope when the winch is towing objects of different weights can be intuitively obtained. When the wire rope is extended too long, the height corresponding to the height error curve is larger, thereby effectively controlling the weight of the towing object and the towing speed of the object by the winch.

[0062] Advantages of additional aspects of the present invention will be given in part in the description of the following specific embodiments, and in part will become apparent from the following description, or will be learned through the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0063] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:

[0064] Figure 1 is a functional block diagram of the system of the present invention;

[0065] Figure 2 is a flow chart of the steps of the method of the present invention;

[0066] Figure 3 It is a schematic diagram of the preset hook coordinate system;

[0067] Figure 4 It is a schematic diagram of the actual hook coordinate system;

[0068] Figure 5 It is a schematic diagram of the difference coordinate system of the present invention. DETAILED DESCRIPTION

[0069] It should be noted that the following detailed descriptions are exemplary and are intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.

[0070] It should be noted that the terms used herein are for describing specific embodiments only and are not intended to be limiting of exemplary embodiments according to the present invention.

[0071] In the absence of conflict, the embodiments of the present invention and the features of the embodiments may be combined with each other.

[0072] Example 1, please refer to Figure 1 As shown, the present invention provides a tower crane remote monitoring intelligent control system, including a stroke self-identification module, a height preset module, a monitoring module, an analysis module and a control module;

[0073] The stroke self-identification module is used to identify the number of rotations of the tower crane's hoist and obtain the initial number of rotations and the length of a single rotation of the hoist;

[0074] The travel self-identification module is equipped with a winch preset strategy, which includes:

[0075] Get the length of the traction wire rope or chain moved when the hoist of the tower crane is wound one circle, and record it as the single circle length;

[0076] Obtain the number of turns of the wire rope or chain wound by the winch in the standby state, and record it as the initial number of turns;

[0077] A rotation sensor is placed on the rotating shaft of the winch. The rotation sensor is used to detect the number of turns of the winch rope. When the number of turns of the wire rope or chain wound by the winch is the initial number, the number of turns of the rotation sensor is set to the first standard number of turns. Whenever the winch is detected to rotate one circle in the positive direction, the number of turns of the rotation sensor increases by the second standard number of turns, wherein the rotation direction of the positive rotation is the direction of the rope winding during the hoisting process;

[0078] In the specific implementation process, by obtaining the single-turn length, the traction distance of the winch can be obtained when the number of turns of the winch is obtained, so as to accurately control the operation of the winch, set the first standard number of turns to 0, and set the second standard number of turns to 1. For example, if the initial number of turns of the winch is 3, then when the number of turns of the winch is 3, the number of turns of the rotation sensor is set to 0. Whenever the number of turns of the rope of the winch is increased by one turn, the number of turns is increased by 1. Because the length of the wire rope and the position of the hook will change due to actual conditions, the initial number of turns of the winch depends on the specific situation.

[0079] The height preset module is used to preset the lifting height before using the tower crane for hoisting, and control the hoisting machine to hoist according to the lifting height;

[0080] The height preset module is configured with a winch preset strategy, which includes:

[0081] Before using the tower crane's hoist for hoisting, obtain the height to which the towed object needs to be hoisted, recorded as the hoisting height;

[0082] Divide the lifting height by the length of a single circle, and record the resulting value as the number of lifting rotations;

[0083] In the specific implementation process, for example, if the length of a single circle is 1m and the lifting height is 30m, the number of lifting rotation circles can be calculated to be 30. After the winch is hoisted, the hoisting of the winch is stopped when the number of rotations of the rotation sensor reaches 30;

[0084] Detect whether the number of rotations of the rotation sensor is the first standard number of rotations; when the number of rotations of the rotation sensor is the first standard number of rotations, control the winch to rotate in the forward direction, and the number of rotations is the lifting rotation number;

[0085] When the number of rotations of the rotation sensor is not equal to the first standard number of rotations, a winch non-zeroing signal is sent to the staff;

[0086] In the specific implementation process, before each winch is hoisted, the initial number of turns must be set. When the number of turns of the rotation sensor is not 0, it means that the number of turns of the wire rope in the winch is not equal to the initial number of turns. This will cause the hook to not be in the preset position or the winch to malfunction, so an alarm must be sent to the staff;

[0087] The monitoring module is used to place a ranging camera on the hook, and the ranging camera is used to measure the height of the hook from the ground, which is recorded as the initial height; a preset hook position curve is set based on the preset lifting height of the tower crane, and the actual hook position curve is set by obtaining the hook height after the tower crane is hoisted;

[0088] A distance measuring camera is placed on the hook to measure the height of the hook from the ground;

[0089] Before the tower crane hoist is hoisted, the height of the ranging camera from the ground is recorded as the initial height. When the hook moves, the height of the ranging camera from the ground is obtained in real time, and the height measured by the ranging camera at this time is recorded as the lifting height;

[0090] The monitoring module is configured with preset curve strategies, which include:

[0091] See also Figure 3 As shown, C1 is the preset lifting time, C2 is the preset lifting height, C5 is the preset hook position curve, and a plane rectangular coordinate system is established, which is recorded as the preset hook coordinate system, wherein the x-axis of the preset hook coordinate system is time, in seconds, and the y-axis is the height of the ranging camera from the ground, in meters;

[0092] Before the hoist of the tower crane is hoisted, the initial height is marked in the preset hook coordinate system, and a curve corresponding to the hoisting height and time is drawn in the preset hook coordinate system based on the rotation speed of the hoist and the hoisting height, which is recorded as the preset hook position curve;

[0093] The variable of the preset hook position curve in the y-axis direction is recorded as the preset lifting height, and the variable of the preset hook position curve in the x-axis direction is recorded as the preset lifting time, wherein the preset lifting height is equal to the lifting height;

[0094] In the specific implementation process, for example, the initial height is 3m, and the preset start time of the winch corresponds to 0 seconds in the preset hook coordinate system, the rotation speed of the winch is 0.5m / s, the single loop length of the winch is 1m, and the lifting height is 40m. Then, by calculation, it can be obtained that the winch completes the hoisting in 80 seconds, and the height of the towed object is 43m. The preset hook position curve in the preset hook coordinate system is y=0.5x+3;

[0095] The monitoring module is also configured with actual curve strategies, which include:

[0096] See also Figure 4 As shown, C3 is the actual lifting time, C4 is the actual lifting height, C6 is the actual hook position curve, the difference between C3 and C1 is the time difference, and the difference between C2 and C4 is the height difference. A plane rectangular coordinate system is established, which is recorded as the actual hook coordinate system. The x-axis of the actual hook coordinate system is time, in seconds, and the y-axis is the height of the ranging camera from the ground, in meters;

[0097] When the tower crane starts to hoist using the winch, the initial height is marked in the actual hook coordinate system, and a curve corresponding to the hoisting height and time is drawn in the actual hook coordinate system based on the hoisting height, which is recorded as the actual hook position curve. When the number of rotations of the winch is equal to the number of hoisting rotations, the hoisting is stopped;

[0098] In the specific implementation process, ideally, when the number of rotations of the winch is equal to the number of hoisting rotations, the actual hoisting height of the hook is equal to the preset hoisting height. However, in actual situations, the wire rope will deform during hoisting, resulting in a deviation between the final position of the hook after hoisting and the expected position. Therefore, the number of rotations of the winch is used as the basis for judging whether to stop hoisting.

[0099] After the winch stops hoisting, the variable of the actual hook position curve in the y-axis direction is recorded as the actual lifting height, and the variable of the actual hook position curve in the x-axis direction is recorded as the actual lifting time;

[0100] In the specific implementation process, for example, the initial height is 3m, and the preset start time of the winch corresponds to 0 seconds in the actual hook coordinate system, the rotation speed of the winch is 0.5m / s, the single circle length of the winch is 1m, and the number of hoisting circles is 40. When the number of rotation circles of the winch is equal to 40, the corresponding time in the actual hook coordinate system is 80s, and the height is 38m. Then the actual hook position curve in the actual hook coordinate system is approximately y=0.4375x+3. By calculation, it can be obtained that the number of meters hoisted by the winch is 40m, but the actual lifting distance of the towed object is 35m, then the difference between 40m and 35m is the deformation length of the wire rope;

[0101] The analysis module is used to set multiple lifting weights, obtain multiple preset hook position curves and multiple actual hook position curves according to different lifting weights, and obtain a height error curve and a time error curve based on the multiple preset hook position curves and the multiple actual hook position curves;

[0102] The analysis module is configured with a difference acquisition strategy, which includes:

[0103] Use the hoist of the tower crane to perform multiple hoists, and record each hoisting as test hoist 1 to test hoist N. The weight pulled by each hoist in test hoist 1 to test hoist N is recorded as test weight 1 to test weight N in sequence, and the lifting height of all test hoists is the same;

[0104] For any test hoist from test hoist 1 to test hoist N, after the test hoist is completed, a preset hook position curve and an actual hook position curve corresponding to the test hoist are obtained;

[0105] The value of the preset lifting height in the preset hook position curve minus the actual lifting height in the actual hook position curve is recorded as the height difference value;

[0106] The value of subtracting the preset lifting time in the preset hook position curve from the actual lifting time of the actual hook position curve is recorded as the time difference;

[0107] In the specific implementation process, for example, the preset lifting height in the preset hook position curve is 40m, and the actual lifting height in the actual hook position curve is 35m, then the height difference is 5m, the preset lifting time in the preset hook position curve is 80s, and the actual lifting time of the actual hook position curve is 100s, then the time difference is 20s. In actual operation, due to factors such as the friction of the wire rope in the winch during rotation, the actual hoisting time will be greater than or equal to the preset hoisting time;

[0108] The analysis module is also configured with an error curve acquisition strategy, which includes:

[0109] Obtain height difference 1 to height difference N and time difference 1 to time difference N corresponding to test winch 1 to test winch N;

[0110] Establish a plane rectangular coordinate system, recorded as a difference coordinate system, where the x-axis of the difference coordinate system is weight, in kg, and the y-axis of the difference coordinate system is time or height, in s or m;

[0111] Mark the test weight 1 to the test weight N and the height difference and time difference corresponding to each test weight in the difference coordinate system;

[0112] A fitting curve is established for the scatter plot composed of all the points corresponding to the test weight and the height difference, which is recorded as the height error curve; a fitting curve is established for the scatter plot composed of all the points corresponding to the test weight and the time difference, which is recorded as the time error curve;

[0113] The control module is used to control the lifting height of heavy objects of different weights according to the height error curve and the time error curve;

[0114] The control module is configured with an interval division strategy, which includes:

[0115] See also Figure 5 As shown, U1 is the time error curve, U2 is the height error curve, U3 is the standard time error, U4 is the standard height error, U5 is the normal traction weight interval, U6 is the fast lifting weight interval, and U7 is the longer traction time interval; wherein, the standard time error and the standard height error are determined by those skilled in the art according to specific application requirements. In a specific implementation, the standard time error is set to 2s, and the standard height error is set to 15cm;

[0116] The closed interval formed by the weight corresponding to the height less than or equal to the standard height error in the height error curve is recorded as the normal traction weight interval;

[0117] The closed interval formed by the weight corresponding to the height greater than the standard height error in the height error curve is recorded as the heavier traction weight interval, wherein when the heavier traction weight interval overlaps with the fast-lift weight interval, the overlapping part is removed from the heavier traction weight interval;

[0118] The closed interval formed by the weight corresponding to the time less than or equal to the standard time error in the time error curve is recorded as the normal traction time interval;

[0119] The interval corresponding to the weight in the normal traction weight interval and not in the normal traction time interval is recorded as the slow-rise weight interval;

[0120] The interval corresponding to the weight that is in the normal traction time interval and not in the normal traction weight interval is recorded as the fast-lift weight interval;

[0121] The closed interval formed by the weight corresponding to the time greater than the standard time error in the time error curve is recorded as the longer traction time interval, wherein, when the longer traction time interval coincides with the slow-rise weight interval, the coincident part is removed from the longer traction time interval;

[0122] The control module is also configured with an interval control strategy, which includes:

[0123] When a winch is used to tow a heavy object within a normal towing weight range and a normal towing time range, the winching process is performed normally;

[0124] In the specific implementation process, when the normal traction weight interval coincides with the slow-lift weight interval, the coincident interval is analyzed as the slow-lift weight interval first; when the normal traction time interval coincides with the fast-lift weight interval, the coincident interval is analyzed as the fast-lift weight interval first;

[0125] When a winch is used to tow a heavy object in a heavier towing weight range, the height difference value corresponding to the heavy object is obtained and recorded as the heavier difference value, and the absolute values ​​obtained by subtracting the height difference values ​​1 to N from the heavier difference value are recorded as reference absolute values ​​1 to reference absolute values ​​N respectively;

[0126] Record the height difference corresponding to the minimum value of the reference absolute value 1 to the reference absolute value N as the reference difference, obtain the actual lifting height corresponding to the reference difference, record it as the reference lifting height, and set the maximum lifting height when the heavy object is towed to the first standard percentage of the reference lifting height;

[0127] In the specific implementation process, when the height difference is large, it means that the weight of the towed object is large. Therefore, when towing a heavy object, the maximum lifting height of the winch needs to be adjusted to prevent the heavy weight of the object from affecting the wire rope and the winch. The first standard percentage is set to 70%;

[0128] When the winch is used to pull a heavy object in a slow-rising weight range, the winch rate is increased to the second standard percentage; when the winch is used to pull a heavy object in a fast-rising weight range, the winch rate is reduced to the third standard percentage;

[0129] In the specific implementation process, the second standard percentage is set to 120%, and the third standard percentage is set to 80%; for heavy objects in the slow-rising weight range, the weight of the heavy object has a smaller effect on the deformation of the wire rope, but the traction time is longer, so the hoisting rate of the winch can be increased during the subsequent traction, thereby improving the overall work efficiency; for heavy objects in the fast-rising weight range, the weight of the heavy object has a greater effect on the deformation of the wire rope, but the traction time is shorter, so the hoisting speed of the winch can be reduced during the subsequent traction to prevent the wire rope from being further deformed due to the excessive hoisting speed;

[0130] When a winch is used to tow a heavy object in a long towing time interval, the hoisting rate of the winch is increased to the fourth standard percentage;

[0131] During the specific implementation process, the fourth standard percentage is set to 110%. A heavy object in a longer traction time interval consumes too long a time when towed by a winch. Therefore, the winch rate should be increased when the heavy object is subsequently towed to improve overall work efficiency.

[0132] Example 2, please refer to Figure 2 As shown, the present invention also provides a tower crane remote monitoring intelligent control method, comprising:

[0133] Step S1, identifying the number of rotations of the hoist of the tower crane to obtain the initial number of rotations and the length of a single rotation of the hoist;

[0134] Step S2, before using the tower crane for hoisting, preset the hoisting height, and control the hoisting machine to hoist according to the hoisting height;

[0135] Step S3, placing a ranging camera on the hook, the ranging camera is used to measure the height of the hook from the ground, recorded as the initial height; setting a preset hook position curve based on the preset lifting height of the tower crane, and obtaining the hook height after the tower crane is hoisted to set the actual hook position curve;

[0136] Step S4, setting a plurality of lifting weights, obtaining a plurality of preset hook position curves and a plurality of actual hook position curves according to different lifting weights, and obtaining a height error curve and a time error curve based on the plurality of preset hook position curves and the plurality of actual hook position curves;

[0137] Step S5, controlling the lifting height of objects of different weights according to the height error curve and the time error curve.

[0138] The step S1 includes the following sub-steps:

[0139] Step S101, obtaining the length of the traction wire rope or chain moved when the hoist of the tower crane is wound one circle, which is recorded as the single circle length;

[0140] Step S102, obtaining the number of turns of the wire rope or chain wound by the hoist in the standby state, and recording it as the initial number of turns;

[0141] A rotation sensor is placed on the rotating shaft of the winch. The rotation sensor is used to detect the number of turns of the rope of the winch. When the number of turns of the wire rope or chain wound by the winch is the initial number, the number of turns of the rotation sensor is set to the first standard number. Every time the winch is detected to rotate one circle in the forward direction, the number of turns of the rotation sensor increases by the second standard number, wherein the direction of forward rotation is the direction of rope winding during the lifting process of the winch.

[0142] The step S2 includes the following sub-steps:

[0143] Step S201, before using the hoist of the tower crane for hoisting, obtain the height that the towed heavy object needs to be hoisted, which is recorded as the hoisting height;

[0144] Step S202, dividing the lifting height by the length of a single circle, and recording the obtained value as the number of lifting rotation circles;

[0145] Step S203, detecting whether the number of rotations of the rotation sensor is the first standard number of rotations; when the number of rotations of the rotation sensor is the first standard number of rotations, controlling the winch to rotate forward, and the number of rotations is the lifting number of rotations;

[0146] When the number of rotations of the rotation sensor is not equal to the first standard number of rotations, a winch non-zeroing signal is sent to the staff.

[0147] The step S3 includes the following sub-steps:

[0148] Step S301, placing a distance measuring camera on the hook, the distance measuring camera is used to measure the height of the hook from the ground;

[0149] Before the tower crane's winch is hoisted, the height of the ranging camera from the ground is recorded as the initial height. When the hook moves, the height of the ranging camera from the ground is obtained in real time, and the height measured by the ranging camera at this time is recorded as the lifting height.

[0150] The step S3 also includes the following sub-steps:

[0151] Step S302, establishing a plane rectangular coordinate system, recorded as a preset hook coordinate system, wherein the x-axis of the preset hook coordinate system is time, in seconds, and the y-axis is the height of the ranging camera from the ground, in meters;

[0152] Before the hoist of the tower crane is hoisted, the initial height is marked in the preset hook coordinate system, and a curve corresponding to the hoisting height and time is drawn in the preset hook coordinate system based on the rotation speed of the hoist and the hoisting height, which is recorded as the preset hook position curve;

[0153] The variable of the preset hook position curve in the y-axis direction is recorded as the preset lifting height, and the variable of the preset hook position curve in the x-axis direction is recorded as the preset lifting time, wherein the preset lifting height is equal to the lifting height.

[0154] The step S3 also includes the following sub-steps:

[0155] Step S303, establishing a plane rectangular coordinate system, recorded as the actual hook coordinate system, wherein the x-axis of the actual hook coordinate system is time, in seconds, and the y-axis is the height of the ranging camera from the ground, in meters;

[0156] When the tower crane starts to hoist using the winch, the initial height is marked in the actual hook coordinate system, and a curve corresponding to the hoisting height and time is drawn in the actual hook coordinate system based on the hoisting height, which is recorded as the actual hook position curve. When the number of rotations of the winch is equal to the number of hoisting rotations, the hoisting is stopped;

[0157] After the winch stops hoisting, the variable of the actual hook position curve in the y-axis direction is recorded as the actual lifting height, and the variable of the actual hook position curve in the x-axis direction is recorded as the actual lifting time.

[0158] The step S4 includes the following sub-steps:

[0159] Step S401, use the hoist of the tower crane to perform multiple hoists, record each hoisting as test hoist 1 to test hoist N, and record the weight pulled by each hoisting in test hoist 1 to test hoist N as test weight 1 to test weight N in sequence, and the lifting heights of all test hoists are the same;

[0160] Step S402, for any test hoisting among test hoisting 1 to test hoisting N, after the test hoisting is completed, a preset hook position curve and an actual hook position curve corresponding to the test hoisting are obtained;

[0161] The value of the preset lifting height in the preset hook position curve minus the actual lifting height in the actual hook position curve is recorded as the height difference value;

[0162] The value of subtracting the preset lifting time in the preset hook position curve from the actual lifting time of the actual hook position curve is recorded as the time difference.

[0163] The step S4 further comprises the following sub-steps:

[0164] Step S403, obtaining height difference 1 to height difference N and time difference 1 to time difference N corresponding to test winch 1 to test winch N;

[0165] Establish a plane rectangular coordinate system, recorded as a difference coordinate system, where the x-axis of the difference coordinate system is weight, in kg, and the y-axis of the difference coordinate system is time or height, in s or m;

[0166] Mark the test weight 1 to the test weight N and the height difference and time difference corresponding to each test weight in the difference coordinate system;

[0167] A fitting curve is established for the scatter plot consisting of all test weight and height difference points, which is recorded as the height error curve. A fitting curve is established for the scatter plot consisting of all test weight and time difference points, which is recorded as the time error curve.

[0168] The step S5 includes the following sub-steps:

[0169] Step S501, recording a closed interval formed by weights corresponding to heights less than or equal to the standard height error in the height error curve as a normal traction weight interval;

[0170] The closed interval formed by the weight corresponding to the height greater than the standard height error in the height error curve is recorded as the heavier traction weight interval, wherein when the heavier traction weight interval overlaps with the fast-lift weight interval, the overlapping part is removed from the heavier traction weight interval;

[0171] When a winch is used to tow a heavy object within a normal towing weight range and a normal towing time range, the winching process is performed normally;

[0172] When a winch is used to tow a heavy object in a heavier towing weight range, the height difference value corresponding to the heavy object is obtained and recorded as the heavier difference value, and the absolute values ​​obtained by subtracting the height difference values ​​1 to N from the heavier difference value are recorded as reference absolute values ​​1 to reference absolute values ​​N respectively;

[0173] The height difference corresponding to the minimum value from the reference absolute value 1 to the reference absolute value N is recorded as the reference difference, the actual lifting height corresponding to the reference difference is obtained, recorded as the reference lifting height, and the maximum lifting height when towing a heavy object is set to the first standard percentage of the reference lifting height.

[0174] The step S5 further comprises the following sub-steps:

[0175] Step S502, recording the closed interval formed by the weight corresponding to the time less than or equal to the standard time error in the time error curve as the normal traction time interval;

[0176] The interval corresponding to the weight in the normal traction weight interval and not in the normal traction time interval is recorded as the slow-rise weight interval;

[0177] The interval corresponding to the weight that is in the normal traction time interval and not in the normal traction weight interval is recorded as the fast-lift weight interval;

[0178] When the winch is used to pull a heavy object in a slow-rising weight range, the winch rate is increased to the second standard percentage. When the winch is used to pull a heavy object in a fast-rising weight range, the winch rate is reduced to the third standard percentage.

[0179] The step S5 further comprises the following sub-steps:

[0180] Step S503, recording the closed interval formed by the weight corresponding to the time greater than the standard time error in the time error curve as a longer traction time interval, wherein when the longer traction time interval coincides with the slow-rise weight interval, the coincident part is removed from the longer traction time interval;

[0181] When a winch is used to tow a heavy object in a relatively long towing time interval, the hoisting speed of the winch is increased to the fourth standard percentage.

[0182] Example 3

[0183] In a third aspect, the difference between Example 3 and Example 1 is that when testing hoists 1 to N are performed in the difference acquisition strategy, when the wire rope of the test hoist P breaks during the hoisting process, the weight of the towed weight in the test hoist P is recorded as the broken weight;

[0184] When the breaking weight is greater than or equal to the standard breaking weight, the weight of the heavy object towed during subsequent hoisting should be less than the breaking weight;

[0185] When the breaking weight is less than the standard breaking weight, a signal indicating that the wire rope and winch are damaged is sent;

[0186] In the specific implementation process, the standard breaking weight depends on the material of the specific winch and wire rope, and is preferably 10 tons in this embodiment.

[0187] Working principle: first, the number of rotations of the tower crane's winch is identified; before using the tower crane for hoisting, the lifting height is preset, and the winch is controlled to hoist according to the lifting height. The present invention also places a ranging camera on the hook, sets a preset hook position curve based on the preset lifting height of the tower crane, and obtains the hook height after the tower crane is hoisted to set the actual hook position curve. The present invention also sets multiple lifting weights, obtains multiple preset hook position curves and multiple actual hook position curves according to different lifting weights, and obtains a height error curve and a time error curve based on the multiple preset hook position curves and the multiple actual hook position curves. Finally, the lifting height of heavy objects of different weights is controlled according to the height error curve and the time error curve.

[0188] It should be understood by those skilled in the art that the embodiments of the present invention can be provided as methods, systems, or computer program products. Therefore, the present invention can be in the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention can be in the form of a computer program product implemented on one or more computer-usable storage media containing computer-usable program codes. Wherein, the storage medium can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (Static Random Access Memory, referred to as SRAM), electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, referred to as EEPROM), erasable programmable read-only memory (Erasable Programmable Read Only Memory, referred to as EPROM), programmable read-only memory (Programmable Red-Only Memory, referred to as PROM), read-only memory (Read-Only Memory, referred to as ROM), magnetic memory, flash memory, disk or optical disk. These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0189] The above-described embodiments are only specific implementations of the present invention, which are used to illustrate the technical solutions of the present invention, rather than to limit them. The protection scope of the present invention is not limited thereto. Although the present invention is described in detail with reference to the above-described embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-described embodiments within the technical scope disclosed by the present invention, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.

Claims

1. A tower crane remote monitoring intelligent control method, characterized in that: include: Identify the number of rotations of the tower crane's hoist and obtain the initial number of rotations and the length of a single rotation of the hoist; Before using the tower crane for hoisting, preset the hoisting height and control the hoisting machine to hoist according to the hoisting height; A rangefinder camera is placed on the hook to measure the height of the hook from the ground, which is recorded as the initial height. A preset hook position curve is set based on the preset lifting height of the tower crane, and the actual hook position curve is set by obtaining the hook height after the tower crane is hoisted. A ranging camera is placed on the hook to measure the height of the hook from the ground. The initial height includes: A distance measuring camera is placed on the hook to measure the height of the hook from the ground; Before the tower crane hoist is hoisted, the height of the ranging camera from the ground is recorded as the initial height. When the hook moves, the height of the ranging camera from the ground is obtained in real time, and the height measured by the ranging camera at this time is recorded as the lifting height; The preset hook position curve is set based on the preset lifting height of the tower crane, including: Establish a plane rectangular coordinate system, recorded as the preset hook coordinate system, where the x-axis of the preset hook coordinate system is time, in seconds, and the y-axis is the height of the ranging camera from the ground, in meters; Before the hoist of the tower crane is hoisted, the initial height is marked in the preset hook coordinate system, and a curve corresponding to the hoisting height and time is drawn in the preset hook coordinate system based on the rotation speed of the hoist and the hoisting height, which is recorded as the preset hook position curve; The variable of the preset hook position curve in the y-axis direction is recorded as the preset lifting height, and the variable of the preset hook position curve in the x-axis direction is recorded as the preset lifting time, wherein the preset lifting height is equal to the lifting height; The actual hook position curve for obtaining the hook height after the tower crane is hoisted includes: Establish a plane rectangular coordinate system, recorded as the actual hook coordinate system, where the x-axis of the actual hook coordinate system is time, in seconds, and the y-axis is the height of the ranging camera from the ground, in meters; When the tower crane starts to hoist using the winch, the initial height is marked in the actual hook coordinate system, and a curve corresponding to the hoisting height and time is drawn in the actual hook coordinate system based on the hoisting height, which is recorded as the actual hook position curve. When the number of rotations of the winch is equal to the number of hoisting rotations, the hoisting is stopped; After the winch stops hoisting, the variable of the actual hook position curve in the y-axis direction is recorded as the actual lifting height, and the variable of the actual hook position curve in the x-axis direction is recorded as the actual lifting time; Setting multiple lifting weights, obtaining multiple preset hook position curves and multiple actual hook position curves according to different lifting weights, and obtaining a height error curve and a time error curve based on the multiple preset hook position curves and the multiple actual hook position curves; The lifting height of objects of different weights is controlled according to the height error curve and the time error curve.

2. A tower crane remote monitoring intelligent control method according to claim 1, characterized in that: The number of rotations of the tower crane winch is identified, and the initial number of turns and single turn length of the winch are obtained, including: Get the length of the traction wire rope or chain moved when the hoist of the tower crane is wound one circle, and record it as the single circle length; Obtain the number of turns of the wire rope or chain wound by the winch in the standby state, and record it as the initial number of turns; A rotation sensor is placed on the rotating shaft of the winch. The rotation sensor is used to detect the number of turns of the rope of the winch. When the number of turns of the wire rope or chain wound by the winch is the initial number, the number of turns of the rotation sensor is set to the first standard number. Every time the winch is detected to rotate one circle in the forward direction, the number of turns of the rotation sensor increases by the second standard number, wherein the direction of forward rotation is the direction of rope winding during the lifting process of the winch.

3. A tower crane remote monitoring intelligent control method according to claim 2, characterized in that: Before using the tower crane for hoisting, preset the hoisting height and control the hoisting machine for hoisting according to the hoisting height, including: Before using the tower crane's hoist for hoisting, obtain the height to which the towed object needs to be hoisted, recorded as the hoisting height; Divide the lifting height by the length of a single circle, and record the resulting value as the number of lifting rotations; Detect whether the number of rotations of the rotation sensor is the first standard number of rotations; when the number of rotations of the rotation sensor is the first standard number of rotations, control the winch to rotate in the forward direction, and the number of rotations is the lifting rotation number; When the number of rotations of the rotation sensor is not equal to the first standard number of rotations, a winch non-zeroing signal is sent to the staff.

4. A tower crane remote monitoring intelligent control method according to claim 3, characterized in that: Set multiple lifting weights, and obtain multiple preset hook position curves and multiple actual hook position curves according to different lifting weights, including: Use the hoist of the tower crane to perform multiple hoists, and record each hoisting as test hoist 1 to test hoist N. The weight pulled by each hoist in test hoist 1 to test hoist N is recorded as test weight 1 to test weight N in sequence, and the lifting height of all test hoists is the same; For any test hoist from test hoist 1 to test hoist N, after the test hoist is completed, a preset hook position curve and an actual hook position curve corresponding to the test hoist are obtained; The value of the preset lifting height in the preset hook position curve minus the actual lifting height in the actual hook position curve is recorded as the height difference value; The value of subtracting the preset lifting time in the preset hook position curve from the actual lifting time of the actual hook position curve is recorded as the time difference.

5. A tower crane remote monitoring intelligent control method according to claim 4, characterized in that: The height error curve and the time error curve obtained based on the multiple preset hook position curves and the multiple actual hook position curves include: Obtain height difference 1 to height difference N and time difference 1 to time difference N corresponding to test winch 1 to test winch N; Establish a plane rectangular coordinate system, recorded as a difference coordinate system, where the x-axis of the difference coordinate system is weight, in kg, and the y-axis of the difference coordinate system is time or height, in s or m; Mark the test weight 1 to the test weight N and the height difference and time difference corresponding to each test weight in the difference coordinate system; A fitting curve is established for the scatter plot consisting of all test weight and height difference points, which is recorded as the height error curve. A fitting curve is established for the scatter plot consisting of all test weight and time difference points, which is recorded as the time error curve.

6. A tower crane remote monitoring intelligent control method according to claim 5, characterized in that: Controlling the lifting height of objects of different weights according to the height error curve and the time error curve includes: The closed interval formed by the weight corresponding to the height less than or equal to the standard height error in the height error curve is recorded as the normal traction weight interval; the closed interval formed by the weight corresponding to the time less than or equal to the standard time error in the time error curve is recorded as the normal traction time interval; the interval corresponding to the weight in the normal traction time interval and not in the normal traction weight interval is recorded as the fast-lift weight interval; The closed interval formed by the weight corresponding to the height greater than the standard height error in the height error curve is recorded as the heavier traction weight interval, wherein when the heavier traction weight interval overlaps with the fast-lift weight interval, the overlapping part is removed from the heavier traction weight interval; When a winch is used to tow a heavy object within a normal towing weight range and a normal towing time range, the winching process is performed normally; When a winch is used to tow a heavy object in a heavier towing weight range, the height difference value corresponding to the heavy object is obtained and recorded as the heavier difference value, and the absolute values ​​obtained by subtracting the height difference values ​​1 to N from the heavier difference value are recorded as reference absolute values ​​1 to reference absolute values ​​N respectively; Record the height difference corresponding to the minimum value of the reference absolute value 1 to the reference absolute value N as the reference difference, obtain the actual lifting height corresponding to the reference difference, record it as the reference lifting height, and set the maximum lifting height when the heavy object is towed to the first standard percentage of the reference lifting height; The interval corresponding to the weight in the normal traction weight interval and not in the normal traction time interval is recorded as the slow-rise weight interval; When the winch is used to pull a heavy object in a slow-rising weight range, the winch rate is increased to the second standard percentage; when the winch is used to pull a heavy object in a fast-rising weight range, the winch rate is reduced to the third standard percentage; The closed interval formed by the weight corresponding to the time greater than the standard time error in the time error curve is recorded as the longer traction time interval, wherein, when the longer traction time interval coincides with the slow-rise weight interval, the coincident part is removed from the longer traction time interval; When a winch is used to tow a heavy object in a relatively long towing time interval, the hoisting speed of the winch is increased to the fourth standard percentage.

7. A tower crane remote monitoring intelligent control system, applicable to a tower crane remote monitoring intelligent control method according to any one of claims 1 to 6, characterized in that: It includes a travel self-identification module, a height preset module, a monitoring module, an analysis module and a control module; The stroke self-identification module is used to identify the number of rotations of the tower crane's hoist and obtain the initial number of rotations and the length of a single rotation of the hoist; The height preset module is used to preset the lifting height before using the tower crane for hoisting, and control the hoisting machine to hoist according to the lifting height; The monitoring module is used to place a ranging camera on the hook, and the ranging camera is used to measure the height of the hook from the ground, which is recorded as the initial height; a preset hook position curve is set based on the preset lifting height of the tower crane, and the actual hook position curve is set by obtaining the hook height after the tower crane is hoisted; The analysis module is used to set multiple lifting weights, obtain multiple preset hook position curves and multiple actual hook position curves according to different lifting weights, and obtain a height error curve and a time error curve based on the multiple preset hook position curves and the multiple actual hook position curves; The control module is used to control the lifting height of heavy objects of different weights according to the height error curve and the time error curve.