A method and system for calculating the volume of subway track bed

CN117972829BActive Publication Date: 2024-11-19CHINA RAILWAY FIRST GROUP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311827043.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-12-27
Publication Date
2024-11-19
Estimated Expiration
2043-12-27

Smart Images

  • Figure CN117972829B_ABST
    Figure CN117972829B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and system for calculating the volume of a subway track ballast, which belongs to the field of railway engineering technology, including constructing a line mathematical model; obtaining the horizontal and vertical curve characteristics of the line according to the line mathematical model, and determining the key mileage according to the horizontal and vertical curve characteristics; combining the tunnel structure BIM model, calculating the key points of the tunnel inner contour cross section of the key mileage; generating the tunnel structure inner contour line according to the key points of the tunnel inner contour cross section of the key mileage; calculating the ballast top line at the key mileage, and combining it with the corresponding tunnel structure inner contour line to obtain the ballast cross section line; obtaining multiple ballast BIM models based on the ballast cross section line; wherein the ballast cross section lines of two adjacent key mileages generate a ballast BIM model; calculating the volume of multiple ballast BIM models and accumulating the volumes to obtain the total volume of the ballast. The present invention can create a high-precision track ballast BIM model, thereby realizing the accurate calculation of the volume of the subway track ballast.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of railway engineering technology, and more particularly to a method and system for calculating the volume of a subway track bed. Background Art

[0002] At present, in the process of subway track construction, the measurement data of the tunnel contour at the key mileage of the route is obtained at a certain distance. The area of ​​each section is calculated in AutoCAD based on the cross-sectional contour line of the roadbed. Then, the roadbed volume between every two cross-sections is calculated according to the section method. Finally, the roadbed volume of the entire construction area is accumulated.

[0003] However, this method is limited by the measurement data of the tunnel contour, which means that the roadbed volume can only be calculated after the tunnel structure is completed, and it is impossible to accurately calculate it before construction. At the same time, without the support of suitable software tools, AutoCAD, Excel and other tools are used to assist in calculating the area of ​​each cross section. The calculation process is cumbersome and prone to errors. In addition, the measurement data is generally spaced at 6 meters along the route direction, and the width of the shield tunnel segment is generally less than 2 meters. This method cannot fully reflect the true accuracy of the shield tunnel contour.

[0004] Therefore, it is an urgent problem to be solved by those skilled in the art to propose a method and system for calculating the volume of a subway track bed to achieve accurate calculation of the volume of a subway track bed. Summary of the invention

[0005] In view of this, the present invention provides a method and system for calculating the volume of a subway track bed, which fully utilizes the subway section tunnel structure model, and on this basis accurately calculates the cross-section of the tunnel contour in sections, and combines it with the top contour line of the track bed to create a high-precision track bed BIM model, thereby calculating the volume of the track bed.

[0006] In order to achieve the above object, the present invention adopts the following technical solution:

[0007] In one aspect, the present invention discloses a method for calculating the volume of a subway track bed, comprising the following steps:

[0008] Construct mathematical model of the line;

[0009] Acquiring horizontal and vertical curve characteristics of the route according to the route mathematical model, and determining key mileage according to the horizontal and vertical curve characteristics;

[0010] Combined with the tunnel structure BIM model, calculate the key points of the tunnel profile cross section at the critical mileage;

[0011] Generate the inner contour line of the tunnel structure according to the key points of the tunnel inner contour cross section at the key mileage;

[0012] Calculate the top line of the ballast at the key mileage, and combine it with the corresponding inner contour line of the tunnel structure to obtain the ballast cross-section line;

[0013] Based on the roadbed cross-section line, a plurality of roadbed BIM models are obtained; wherein the roadbed cross-section lines of two adjacent key mileages generate one roadbed BIM model;

[0014] The volumes of the multiple track bed BIM models are calculated and the volumes are accumulated to obtain the total track bed volume.

[0015] Preferably, obtaining the horizontal and vertical curve characteristics of the line according to the line mathematical model, and determining the key mileage according to the horizontal and vertical curve characteristics include:

[0016] The line is divided into sections using the line plane segmentation points and line curve segmentation points as dividing points;

[0017] The track bed is divided into sections in each interval according to the sampling length, and the starting mileage and the ending mileage of each track bed section are taken as the key mileage.

[0018] Preferably, in combination with the tunnel structure BIM model, the key points of the tunnel inner profile cross section at the key mileage are calculated, including:

[0019] Determine the key elevation of the tunnel inner contour, and determine the corresponding ray according to the key elevation;

[0020] Construct a local coordinate system at the critical mileage, transform the ray to the real position, and perform intersection calculation with the tunnel structure BIM model, and the obtained intersection is the key point of the tunnel contour at the critical mileage;

[0021] The coordinates of the key points are calculated, and the coordinates of the key points are transformed into local coordinates of the tunnel inner contour cross section to obtain the key points of the tunnel inner contour cross section.

[0022] Preferably, generating the inner contour line of the tunnel structure according to the key points of the inner contour cross section of the tunnel at the key mileage includes:

[0023] Creating a spline curve according to the key points of the tunnel profile cross section at each of the key mileages;

[0024] Calculate the distances between two adjacent key points and the starting point of the spline curve respectively, and obtain the midpoint of the distances between the two adjacent key points based on the distances;

[0025] A plurality of arc segments are generated according to two adjacent key points and corresponding distance midpoints, and the plurality of arc segments are spliced ​​into an inner contour line of the tunnel structure.

[0026] Preferably, calculating the top line of the ballast bed at the key mileage includes:

[0027] Taking the intersection of the center line of the two tracks and the top surface of the designed rail as the origin, a parametric contour family of the top surface line of the ballast bed is produced;

[0028] The outer rail superelevation and arc direction corresponding to the key mileage are obtained according to the mathematical model of the line, and the corresponding ballast top line is calculated.

[0029] Preferably, the roadbed top line at the key mileage and the corresponding inner contour line of the tunnel structure are drawn in the same local coordinate system, and the intersection of the two is calculated to obtain a sub-curve where the roadbed top line and the inner contour line of the tunnel structure are located between the two intersection points; the two sub-curves are merged to obtain a closed roadbed cross-section line.

[0030] Preferably, the track bed cross-section lines of two adjacent key mileages generate a track bed BIM model, including:

[0031] Based on the line mathematical model, the plane stretching path line between two adjacent key mileages is obtained, the elevations at the two key mileages are queried, and the track bed cross-section lines at the two key mileages are laid out and merged to generate a track bed model.

[0032] On the other hand, the present invention further provides a subway track bed volume calculation system, which is used to implement the above-mentioned subway track bed volume calculation method, comprising:

[0033] Model building module, used to build line mathematical model;

[0034] A key mileage determination module is used to obtain the horizontal and vertical curve characteristics of the line according to the line mathematical model, and determine the key mileage according to the horizontal and vertical curve characteristics;

[0035] A key point calculation module, used to calculate the key points of the tunnel profile cross section at the key mileage in combination with the tunnel structure BIM model;

[0036] An inner contour line generating module, used for generating an inner contour line of a tunnel structure according to key points of a tunnel inner contour cross section at the key mileage;

[0037] A cross-section line acquisition module is used to calculate the top line of the ballast at the key mileage and combine it with the corresponding inner contour line of the tunnel structure to obtain the cross-section line of the ballast;

[0038] A roadbed BIM model acquisition module is used to obtain multiple roadbed BIM models based on the roadbed cross-section line; wherein the roadbed cross-section lines of two adjacent key mileages generate one roadbed BIM model;

[0039] The track bed volume calculation module is used to calculate the volumes of multiple track bed BIM models and accumulate the volumes to obtain the total track bed volume.

[0040] It can be seen from the above technical solutions that, compared with the prior art, the present invention discloses a method and system for calculating the volume of a subway track ballast bed, establishes a mathematical model of the line, and can quickly complete the generation of various models based on the model, such as placing sleepers at certain intervals along the line; can quickly calculate the key points of the contour in the tunnel structure model; can quickly generate a high-precision high-ballast bed BIM model of the subway track, and output an accurate ballast bed volume based on the segmented ballast bed BIM model. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0042] Figure 1 is a flow chart of the method of the present invention;

[0043] Figure 2 A location diagram of key points of a tunnel profile cross section provided by an embodiment of the present invention;

[0044] Figure 3 A schematic diagram of a local coordinate system at a key mileage provided by an embodiment of the present invention;

[0045] Figure 4 A schematic diagram of determining a distance midpoint provided in an embodiment of the present invention;

[0046] Figure 5 A schematic diagram of a ballast cross-section line generated in an embodiment of the present invention;

[0047] Figure 6 It is a schematic diagram of the track bed segment BIM model generated in an embodiment of the present invention. DETAILED DESCRIPTION

[0048] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0049] The subway track bed volume calculation method and system proposed in the present invention are implemented based on the Autodesk Revit platform (Revit 2016 and above). The fundamental purpose of this technical solution is to create a high-precision track bed BIM model during the subway construction stage and calculate the volume of the track bed model within a specified interval in order to obtain accurate concrete cost control.

[0050] The embodiment of the present invention discloses a method for calculating the volume of a subway track bed. Figure 1 , the method comprises the following steps:

[0051] S1. Construct a mathematical model of the line.

[0052] Based on the initial line data file, a line mathematical model is created to achieve rapid conversion between key mileage coordinates and geodetic coordinates, and to quickly query information such as elevation and outer rail superelevation based on mileage.

[0053] Specifically, the initial line data of this step includes three parts of data: horizontal curve, vertical curve, and broken link. The line mathematical model is an algorithm component (there are many ways to implement it, and this technical solution only uses it as a basic component), which is used to complete the import of each type of data in the volume calculation process and provide fast query of several types of data, including:

[0054] 1) Mileage coordinates can quickly query geodetic coordinates and tangent directions;

[0055] 2) Quickly query the corresponding mileage and horizontal offset of geodetic coordinates;

[0056] 3) Quickly query route elevation using mileage coordinates;

[0057] 4) Quickly query the super-high value of mileage coordinates;

[0058] 5) Conversion between key mileage and continuous mileage.

[0059] S2. Obtain the horizontal and vertical curve characteristics of the line according to the line mathematical model, and determine the key mileage according to the horizontal and vertical curve characteristics, including:

[0060] S21. Divide the line into sections using the line plane segmentation points and the line curve segmentation points as demarcation points.

[0061] Among them, the line plane segmentation points include straight-slow points, slow-round points, round-slow points, and slow-straight points; the line curve segmentation points include the starting point and end point of the straight slope section, and the starting point and end point of the vertical curve.

[0062] S22. The track bed is divided into sections in each interval according to the sampling length, and the starting mileage and the ending mileage of each track bed section are taken as the key mileage.

[0063] Taking into account the accuracy requirements of construction, each section is divided into trackbed sections according to a sampling length of 2 meters, and the remaining length of each section is used as a trackbed section.

[0064] S3. Combined with the tunnel structure BIM model, calculate the key points of the tunnel profile cross section at key mileage, including:

[0065] S31. Determine the key elevation of the tunnel contour, and determine the corresponding ray according to the key elevation.

[0066] In this embodiment, the characteristics of the tunnel cross section and the characteristics of the rail surface line as the line elevation reference line are combined to take the bottom point of the tunnel contour, 0.958 meters on the bottom surface (rail surface line elevation), 3.0 meters on the bottom surface (half of the tunnel contour height), 4.5 meters on the bottom surface (3 / 4 of the tunnel contour height), and the top surface point as the key elevations of the tunnel contour, which are used to calculate the ray position of each key point, such as Figure 2 As shown, 8 key points are obtained.

[0067] S32. Construct a local coordinate system at the critical mileage, transform the ray to the real position, and perform intersection calculation with the tunnel structure BIM model. The obtained intersection is the key point of the tunnel contour at the critical mileage.

[0068] refer to Figure 3 , the key milestones in the embodiment of the present invention (such as Figure 3 The observation direction of the local coordinate system at mileage 1, mileage 2, etc. coincides with the forward direction of the line. The track surface elevation point at the mileage is taken as the origin, the forward direction is rotated -90 degrees around the Z axis of the world coordinate system as the X axis, the Z axis of the world coordinate system is the Y axis, and the opposite direction of the observation direction is the Z axis.

[0069] On the Revit platform, you can use the ReferenceIntersector.Find method to calculate the intersection of a ray with all entities of a specific type in the view and return the world coordinates of the intersection.

[0070] S33, calculating the coordinates of the key points, transforming the coordinates of the key points into the local coordinates of the tunnel inner contour cross section, and obtaining the key points of the tunnel inner contour cross section.

[0071] S4. Generate the inner contour line of the tunnel structure according to the key points of the tunnel inner contour cross section at the key mileage, including:

[0072] S41. Create a spline curve based on the key points of the tunnel profile cross section at each key mileage.

[0073] In this embodiment, a closed spline curve is created in a counterclockwise order according to the eight key points at each mileage. The starting point and the end point of the spline curve are set at the points at the top of the tunnel inner contour, and the tangent directions of the starting point and the end point are both horizontal.

[0074] Since spline curves cannot be used in lofting and merging cross sections in Revit, the embodiment of the present invention can only use multiple arcs to "replace" the spline curves, with specific reference to S42-S43.

[0075] S42, respectively calculating the distances between two adjacent key points and the starting point of the spline curve, and obtaining the midpoint of the distances between the two adjacent key points based on the distances.

[0076] Specifically, Figure 4 As shown, 8 key points ( Figure 4 For every two adjacent key points (1-9 in the figure, where 1 and 9 are the same point), such as A and B, calculate the distance D1 and D2 between the two key points A and B on the spline curve (the distance along the line to the starting point), and calculate the point C on the line as the midpoint of the distance between the key points A and B according to the distance (D1+D2) / 2.

[0077] S43, generating a plurality of arc segments according to two adjacent key points and corresponding distance midpoints, and splicing the plurality of arc segments into an inner contour line of the tunnel structure.

[0078] An arc is generated based on two adjacent key points A and B and the inferred point C; 7 arcs of other adjacent key points are calculated in a similar way, and finally 8 arcs are generated and spliced ​​to generate the inner contour line of the closed tunnel structure.

[0079] In the actual implementation process, there is a design inner contour line, such as Figure 4 As shown by the black line in the middle, the construction error leads to the construction result that can only be very close to the designed inner contour line. The measuring points cannot be too many, so 8 measuring points are used to fit the spline curve to obtain the inner contour line of the tunnel structure. Figure 4 The red line in the figure, that is, the inner contour line of the tunnel structure and the spline curve are actually the same curve.

[0080] S5. Calculate the top line of the ballast at the key mileage and combine it with the corresponding inner contour line of the tunnel structure to obtain the ballast cross-section line.

[0081] Establish a parametric family of the contour line on the roadbed. At each key mileage, query the outer rail superelevation, drive the contour line on the roadbed with parameters, calculate the intersection of the driving result line and the cross-sectional curve of the tunnel inner contour, and intercept part of the line from the contour line on the roadbed and the inner contour line of the tunnel according to the intersection to generate the closed cross-sectional line of the roadbed. Specifically, it includes:

[0082] S51, taking the intersection of the center line of the two tracks and the top surface of the designed track as the origin, a parametric contour family of the top surface line of the ballast bed is prepared;

[0083] S52, obtain the outer rail superelevation and arc direction corresponding to the key mileage, and calculate the top line of the ballast bed in this case, such as Figure 5 As shown by the red line and its extension line;

[0084] S53, draw the inner contour line of the tunnel structure obtained in S4 and the top line of the roadbed in the same local coordinate system. The inner contour line of the tunnel structure is Figure 5 The blue line in the figure and its extension line; calculate the two intersection points of the ballast top line and the inner contour line of the tunnel structure, and obtain the sub-curves of the ballast top line and the inner contour line of the tunnel structure located between the two intersection points; merge the two sub-curves to obtain the closed ballast cross-section line.

[0085] Follow these steps to generate closed track bed cross-section lines at the starting and ending mileages of each track bed.

[0086] S6. Obtain multiple track bed BIM models based on the track bed cross-section line.

[0087] The cross-section line of the ballast between two adjacent key mileages generates a ballast BIM model, including: obtaining a plane stretching path line between two adjacent key mileages based on the line mathematical model (that is, obtaining a line from the line mathematical model according to the start and end mileages of the ballast segment, and the line type may be a straight line segment or an arc);

[0088] According to the mathematical model of the line, the elevations at two key mileages (i.e. the starting and ending mileages of the trackbed segment) are queried as the starting and ending vertical offsets of the subsequent fusion contours;

[0089] According to the cross-section lines at the two key mileages, Revit is used to perform lofting and fusion to generate the trackbed model of this section. Figure 6 shown.

[0090] S7. Obtain the volumes of multiple track bed BIM models respectively through Revit, and add up the volumes of the multiple track bed BIM models to obtain the total track bed volume.

[0091] On the other hand, an embodiment of the present invention further provides a subway track bed volume calculation system, which is used to implement the above-mentioned subway track bed volume calculation method, including:

[0092] Model building module, used to build line mathematical model;

[0093] The key mileage determination module is used to obtain the horizontal and vertical curve characteristics of the line according to the line mathematical model, and determine the key mileage according to the horizontal and vertical curve characteristics;

[0094] The key point calculation module is used to calculate the key points of the tunnel profile cross section at key mileages in combination with the tunnel structure BIM model;

[0095] An inner contour line generation module is used to generate the inner contour line of the tunnel structure according to the key points of the tunnel inner contour cross section at the key mileage;

[0096] The cross-section line acquisition module is used to calculate the top line of the ballast at key mileages and combine it with the corresponding inner contour line of the tunnel structure to obtain the cross-section line of the ballast;

[0097] The track bed BIM model acquisition module is used to obtain multiple track bed BIM models based on the track bed cross-section line; wherein the track bed cross-section lines of two adjacent key mileages generate a track bed BIM model;

[0098] The track bed volume calculation module is used to calculate the volume of multiple track bed BIM models and add up the volumes to obtain the total track bed volume.

[0099] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0100] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A method for calculating the volume of subway track bed. It is characterized in that The following steps are involved: Construct mathematical model of the line; Acquiring horizontal and vertical curve characteristics of the route according to the route mathematical model, and determining key mileage according to the horizontal and vertical curve characteristics; Combined with the tunnel structure BIM model, calculate the key points of the tunnel profile cross section at the critical mileage, including: Determine the key elevation of the tunnel inner contour, and determine the corresponding ray according to the key elevation; Construct a local coordinate system at the critical mileage, transform the ray to the real position, and perform intersection calculation with the tunnel structure BIM model, and the obtained intersection is the key point of the tunnel contour at the critical mileage; Calculating the coordinates of the key points, transforming the coordinates of the key points into local coordinates of the tunnel inner contour cross section, and obtaining the key points of the tunnel inner contour cross section; Generating the inner contour line of the tunnel structure according to the key points of the tunnel inner contour cross section at the key mileage includes: Creating a spline curve according to the key points of the tunnel profile cross section at each of the key mileages; Calculate the distances between two adjacent key points and the starting point of the spline curve respectively, and obtain the midpoint of the distances between the two adjacent key points based on the distances; Generate a number of arcs according to two adjacent key points and the corresponding distance midpoints, and splice the arcs into an inner contour line of the tunnel structure; The top line of the ballast at the key mileage is calculated, and the ballast cross-section line is obtained by combining the top line with the corresponding inner contour line of the tunnel structure, wherein the top line of the ballast at the key mileage is calculated, including: Taking the intersection of the center line of the two tracks and the top surface of the designed rail as the origin, a parametric contour family of the top surface line of the ballast bed is produced; According to the mathematical model of the line, the outer rail superelevation and arc direction corresponding to the key mileage are obtained, and the corresponding ballast top line is calculated; Based on the roadbed cross-section line, a plurality of roadbed BIM models are obtained; wherein the roadbed cross-section lines of two adjacent key mileages generate one roadbed BIM model; The volumes of the multiple track bed BIM models are calculated and the volumes are accumulated to obtain the total track bed volume.

2. A method for calculating the volume of a subway track bed according to claim 1, It is characterized in that Acquiring the horizontal and vertical curve characteristics of the line according to the line mathematical model, and determining the key mileage according to the horizontal and vertical curve characteristics, including: The line is divided into sections using the line plane segmentation points and line curve segmentation points as dividing points; The track bed is divided into sections in each interval according to the sampling length, and the starting mileage and the ending mileage of each track bed section are taken as the key mileage.

3. A method for calculating the volume of a subway track bed according to claim 1, It is characterized in that The roadbed top line at the key mileage and the corresponding tunnel structure inner contour line are drawn in the same local coordinate system, and the intersection of the two is calculated to obtain a sub-curve where the roadbed top line and the tunnel structure inner contour line are located between the two intersection points; the two sub-curves are merged to obtain a closed roadbed cross-section line.

4. A method for calculating the volume of a subway track bed according to claim 1, It is characterized in that The track bed cross-section line of two adjacent key mileages generates a track bed BIM model, including: Based on the line mathematical model, the plane stretching path line between two adjacent key mileages is obtained, the elevations at the two key mileages are queried, and the track bed cross-section lines at the two key mileages are laid out and merged to generate a track bed model.

5. A subway track bed volume calculation system, It is characterized in that include: Model building module, used to build line mathematical model; A key mileage determination module is used to obtain the horizontal and vertical curve characteristics of the line according to the line mathematical model, and determine the key mileage according to the horizontal and vertical curve characteristics; The key point calculation module is used to calculate the key points of the tunnel profile cross section at the key mileage in combination with the tunnel structure BIM model, including: Determine the key elevation of the tunnel inner contour, and determine the corresponding ray according to the key elevation; Construct a local coordinate system at the critical mileage, transform the ray to the real position, and perform intersection calculation with the tunnel structure BIM model, and the obtained intersection is the key point of the tunnel contour at the critical mileage; Calculating the coordinates of the key points, transforming the coordinates of the key points into local coordinates of the tunnel inner contour cross section, and obtaining the key points of the tunnel inner contour cross section; The inner contour line generation module is used to generate the inner contour line of the tunnel structure according to the key points of the tunnel inner contour cross section of the key mileage, including: Creating a spline curve according to the key points of the tunnel profile cross section at each of the key mileages; Calculate the distances between two adjacent key points and the starting point of the spline curve respectively, and obtain the midpoint of the distances between the two adjacent key points based on the distances; Generate a number of arcs according to two adjacent key points and the corresponding distance midpoints, and splice the arcs into an inner contour line of the tunnel structure; The cross-section line acquisition module is used to calculate the top line of the roadbed at the key mileage, and combine it with the corresponding inner contour line of the tunnel structure to obtain the roadbed cross-section line, wherein the calculation of the top line of the roadbed at the key mileage includes: Taking the intersection of the center line of the two tracks and the top surface of the designed rail as the origin, a parametric contour family of the top surface line of the ballast bed is produced; According to the mathematical model of the line, the outer rail superelevation and arc direction corresponding to the key mileage are obtained, and the corresponding ballast top line is calculated; A roadbed BIM model acquisition module is used to obtain multiple roadbed BIM models based on the roadbed cross-section line; wherein the roadbed cross-section lines of two adjacent key mileages generate one roadbed BIM model; The track bed volume calculation module is used to calculate the volumes of multiple track bed BIM models and accumulate the volumes to obtain the total track bed volume.