A method for constructing a high-rise concrete modular building

By using the combination technology of factory-preset L-shaped two-way connection grooves and prefabricated steel bars in high-rise concrete modular buildings, the problems of structural complexity and unclear stress mechanism of modular buildings are solved, and the simple structure and simplicity of the building are achieved. Efficient construction reduces costs and construction periods and improves industrialization.

CN117988562BActive Publication Date: 2024-10-29TSINGHUA UNIVERSITY
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410170396.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-02-06
Publication Date
2024-10-29
Estimated Expiration
2044-02-06

AI Technical Summary

Technical Problem

High-rise concrete modular buildings have problems such as complex modular unit structures, difficulty in on-site assembly, custom-made modules that cannot be used across multiple projects, unclear structural stress mechanisms, increased wall thickness, and high overall cost.

Method used

Modular units are produced in the factory that integrate electromechanical and decoration internally, and L-shaped two-way connection grooves are preset on the outer edge. Prefabricated steel cages are installed in the modular frame and additional steel bars are buried, and then concrete is poured layer by layer, combined with vertical prestressing. In order to improve the rigidity and crack resistance of the building, the surrounding truss steel bars are eliminated, and standardized module design and hanging ring layout are adopted to achieve a simple structure and coordinated force bearing of the modular building.

Benefits of technology

It simplifies the production, transportation and installation of modules, reduces the difficulty of on-site management and construction period, reduces the weight and cost of the building, realizes the standardization and industrialization of modular buildings, and breaks through the bottleneck of large-scale promotion.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117988562B_ABST
    Figure CN117988562B_ABST
Patent Text Reader

Abstract

The present invention proposes a construction method of a novel high-rise concrete modular building, which is to construct a modular frame by layers by multiple module units, install steel cages in the gaps between adjacent module units, bury steel bars in the L-shaped two-way connecting grooves connected in adjacent module units, and pour concrete by layers to form a whole, and at the same time, vertical prestressed steel bars are arranged in the post-cast layer of the exterior wall to improve the building rigidity and enhance the crack resistance of the exterior wall. After implementing the above steps layer by layer, the entire modular frame is integrated into an integrated modular building. The novel high-rise concrete modular building not only has a simple structure, a clear force mechanism, fast and convenient construction, easy on-site management, and a high degree of industrialization, but also has standardized module units that can be used in different projects, and can effectively reduce the cost of existing modular buildings and further shorten the construction period, and can be widely used in the construction of high-rise concrete buildings.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of modular integrated buildings, and in particular to a construction method of a high-rise concrete modular building. Background Art

[0002] Modular integrated buildings are an advanced form of building industrialization. As a solution to building industrialization, they can comprehensively improve the construction level of building industrialization. After the modules are prefabricated in a standardized manner in the factory, the building can be conveniently, quickly and greenly constructed on site, just like "building blocks".

[0003] Although high-rise concrete modular buildings have made certain breakthroughs in China, they still have shortcomings such as complex module unit structure, difficult on-site assembly and construction, customized module units cannot be used in multiple projects, the side walls of the module units do not work together with the cast-in-place shear walls, the thickness of the structural wall is too heavy, and the overall cost is too high. One of the important reasons for the above drawbacks is that the concrete modules are currently only used as templates after the installation is completed. The real structural forces are the newly cast reinforced concrete beams, columns, shear walls, etc., which not only increase the wall thickness by about 30% compared with the traditional cast-in-place shear wall structure (the minimum wall thickness is 260mm), but also make the overall structural force mechanism unclear. In addition, a large number of truss steel bars need to be extended from the side walls and top plates of the modules. On the one hand, it is to form a composite floor plate on the top plate of the module, and on the other hand, it is to enhance the stiffness of the thinner side walls of the module and to be used for the side wall tension between the two modules. The setting of the extended truss steel bars makes the module structure very complicated, which is not convenient for module production, transportation and installation. It also requires the interior of one of the two modules to be renovated on site. The advantage of modular buildings should be integrated and produced in factories as much as possible, which greatly increases the difficulty of on-site management of the protection of the finished products inside the modules. Summary of the invention

[0004] In view of this, the present invention proposes a method for constructing a high-rise concrete modular building, and the specific scheme is as follows:

[0005] A method for constructing a high-rise concrete modular building, the method comprising:

[0006] A plurality of module units with internal integrated electromechanical and decoration and L-shaped bidirectional connection grooves preset on the external edges which are completed in the factory are transported to the site and constructed into a modular frame by layers; at least part of the L-shaped bidirectional connection grooves on two adjacent module units in the modular frame are aligned;

[0007] Prefabricated steel cages are installed in the gaps between adjacent module units of the modular frame, and additional horizontal and vertical steel bars are embedded in the L-shaped two-way connecting grooves connected in the adjacent module units, and then concrete is poured layer by layer to form a whole. At the same time, vertical prestressed steel bars are arranged in the post-cast layer of the exterior wall to improve the building rigidity and enhance the crack resistance of the exterior wall;

[0008] After implementing the above steps layer by layer, the entire modular frame will eventually be integrated into an integrated modular building.

[0009] In a specific embodiment, the module unit includes a fully enclosed unit, and / or a unit without a bottom plate, and / or a unit without a bottom and a top, and / or an external wall panel unit, and different module units correspond to different requirements of building functional space. Among them, the fully enclosed unit includes a top plate, a bottom plate and a side wall, and the two sides of the side wall are vertically connected to the top plate and the bottom plate respectively; the unit without a bottom plate includes a top plate and a side wall, and the side wall is vertically connected to the top plate; the unit without a bottom and a top includes a side wall; and the external wall panel unit includes a wall panel.

[0010] In practical applications, installation openings can be opened on the side walls and wall panels of the module unit according to actual needs. The installation openings can be used to open doors and windows or other line pipes, wherein the thickness range of the side walls, wall panels, top panels and bottom panels can be set to 60 to 80 mm.

[0011] In actual applications, modular units can be combined with fully enclosed units, bottomless units, and bottomless and roofless units according to the functional requirements of the building. For example, fully enclosed hexahedrons can be used in spaces such as kitchens and bathrooms where there are dense pipelines, difficult on-site management, and prone to water leakage. Bottomless pentahedron units can be used in most other spaces, bottomless and roofless tetrahedron units can be used in a small number of shaft areas, and bottomless and roofless tetrahedron units can be used in a small number of shaft areas. Flexible unit combinations can achieve the best balance between quality, cost, and construction period.

[0012] In a specific embodiment, the module units include multiple different types, at least two types of module units have the same height, or at least two types of module units have an integer multiple relationship of height; at least two types of module units have the same length; at least two types of module units have the same width. The same height between the module units or an integer multiple relationship between the heights can make the module units aligned in the horizontal direction or vertical direction, and the rooms and appearance of the modular building are more standardized.

[0013] In practical applications, the module unit is in the shape of a hollow cuboid. In one application, the size of a module unit can be designed as a cuboid with a length of 6m, a width of 3.5m, and a height of 3m, so that the module unit can be transported by a transport vehicle.

[0014] In a specific embodiment, the L-shaped two-way connection grooves are evenly distributed on the preset edges of each module unit. In practical applications, the L-shaped two-way connection grooves can be a strip-shaped groove, and the length direction of the multiple L-shaped two-way connection grooves is perpendicular to the preset edges of the module unit. It should be noted that the connection can be all edges of the module unit or part of the edges, and the L-shaped two-way connection grooves do not penetrate the module unit, and the concrete slab at the bottom is still a complete concrete slab, which can be used as a template for the concrete poured later.

[0015] In practical applications, the width a of the L-shaped two-way connection groove is in the range of 30-40 mm, the depth h is 30 mm, and the length n is in the range of 200 mm-250 mm. It should be noted that as long as the width of the L-shaped two-way connection groove can achieve the effect that the additional steel bars can be placed in the L-shaped two-way connection groove, the post-cast concrete can fully flow into the L-shaped two-way connection groove, the depth of the L-shaped two-way connection groove does not conflict with the steel bars in the module unit, and the concrete slab at the bottom of the L-shaped two-way connection groove is still a complete concrete post-casting layer template, the depth and width of the L-shaped two-way connection groove can be adjusted according to actual conditions.

[0016] In a specific embodiment, the size of the L-shaped two-way connection groove is fixed, and the thickness of the side wall is also fixed, so as to facilitate standardized and modular design and installation. For example, in a high-rise building, the length of the L-shaped two-way connection groove is 250 mm, the width is 40 mm, and the thickness of the side wall, wall panel, top plate and bottom plate 22 in the module unit is 60 mm. The four side walls of the standardized module unit are all modularly designed, and the gap between adjacent module units arranged horizontally can be adjusted according to the structural stress and building function requirements. The steel cage installed in the gap can also be determined according to the structural stress conditions of different buildings.

[0017] In a specific embodiment, the outer surface of the modular building is evenly provided with a plurality of lifting rings for lifting and anti-shearing of the overlapping surface. Through the L-shaped two-way connection grooves around the module and the lifting rings evenly arranged on the surface, the module top plate can form a superimposed floor with the cast-in-place layer of the floor, and the module side wall can form a superimposed shear wall with the cast-in-place concrete between the modules, so that the structural force transmission and force mechanism are clear, and the wall thickness is reduced by 25% compared with traditional buildings, and the floor thickness is reduced by 48%. It can not only greatly reduce the overall deadweight of the building and increase the internal usable clearance, but also effectively reduce the comprehensive cost of the building and break through the key bottleneck that restricts the large-scale promotion of modular buildings.

[0018] In a specific embodiment, the cross-sectional shape of the L-shaped two-way connection groove includes a wedge shape, and / or a rectangle, and / or a triangle. The amount of steel bars that can be added and the amount of post-poured concrete that can flow into the different L-shaped two-way connection groove shapes are also different. For example, the amount of concrete that can be poured and the amount of steel bars that can be embedded in the wedge-shaped L-shaped two-way connection groove are the largest, the rectangular L-shaped two-way connection groove is the second largest, and the triangular L-shaped two-way connection groove is the least.

[0019] In a specific embodiment, using wedge-shaped slots of the same size on the preset edges of a module unit can achieve shear, tension and compression strengths of the joints that are comparable to those of a cast-in-place integral building.

[0020] In practical applications, by embedding steel bars in the L-shaped two-way connection grooves and pouring concrete on site in the L-shaped two-way connection grooves and in the gaps between the module units, the module unit parts and the concrete parts poured on site can be reliably connected in the modular building, and the whole after connection can be synergistically stressed. By making the L-shaped two-way connection grooves, additional steel bars and steel cages cooperate with each other, a combined system of prefabricated formwork and internal cast-in-place concrete is formed, and the side walls of the module units and the cast-in-place shear walls are synergistically stressed to form a composite shear wall structure.

[0021] In a specific embodiment, each surface of the module unit is provided with grid-shaped in-slab steel bars, and the L-shaped two-way connection groove is located between the in-slab steel bars, and there is a preset distance between the L-shaped two-way connection groove and the in-slab steel bars. In practical applications, the distribution spacing m between each L-shaped two-way connection groove is 200 mm, and the width and depth of the L-shaped two-way connection groove do not conflict with the in-slab steel bars. Among them, the in-slab steel bars are located in the cross section of the concrete slab of the module unit, and are composed of transversely arranged steel bars and vertically arranged steel bars, forming a grid-shaped arrangement. Since the side walls, top plates and bottom plates of the module unit are all of a certain thickness, the in-slab steel bars and the L-shaped two-way connection grooves in the module unit are in the same wall, but not at the same depth, so there is no contact between the in-slab steel bars and the L-shaped two-way connection grooves, and the in-slab steel bars are not exposed to the module unit, so there is no exposed steel bar in the module unit. During the production and transportation process, there is no collision of steel bars between modules, so that the module unit is less damaged during transportation and assembly.

[0022] Different from the traditional concrete modules that have truss steel bars extending outwards around the modules for binding and pouring, the module units in this solution have eliminated the truss steel bars around the modules and retained the interface shear steel bars, making the structure of the module units simpler, and the steel bars between the module units will not collide, making the process of transporting and binding the module units more convenient. By eliminating the large number of steel truss bars extending outwards around the module units, factory-prefabricated steel mesh can be used between the two module units, and there is no need to cross-tie the side walls of the two modules, avoiding the need for one of the two module units to be renovated on site, which can effectively reduce the difficulty of on-site management of the protection of the finished products inside the module units, greatly improve the degree of industrialization and further shorten the construction period.

[0023] In a specific embodiment, the gap between adjacent module units arranged horizontally is greater than the gap between adjacent module units arranged vertically. In practical applications, the width of the gap between adjacent module units arranged horizontally ranges from 80 mm to 120 mm, while the width of the gap between module units in the vertical direction can be smaller. In one embodiment, this gap can be set to 10 mm.

[0024] In a specific embodiment, prestressed tendons are arranged in the vertical direction in the post-cast concrete layer of the high-rise concrete modular building, which can further improve the rigidity of the high-rise concrete modular building. The prestressed tendons extend from the lowest floor to the highest floor of the high-rise concrete modular building.

[0025] In a specific embodiment of a construction process, the shape and size of the module unit and the number and location of the installation ports are first modularized according to actual needs to complete the factory production of the module unit. The prefabricated module unit is then transported to the project site and hoisted and spliced ​​according to the design. There is a gap between adjacent module units in the horizontal direction and between the module and the exterior wall panel unit of the modular building. The size of the gap ranges from 80 to 120 mm. After pouring, a 200 to 240 mm thick composite shear wall can be formed.

[0026] There is a 10mm gap between vertically adjacent module units. If the upper module unit has a bottom plate, after pouring cement mortar in the gap, the bottom plate of the upper module unit, the post-casting layer in the gap and the top plate of the lower module unit can eventually form a 110-130mm thick floor plate. If the upper module unit is a bottomless unit, a 60-70mm thick cast-in-place concrete layer needs to be poured on the top plate of the lower module unit to eventually form a 110-130mm thick floor plate.

[0027] Beneficial effects:

[0028] The present invention proposes a method for constructing a high-rise concrete modular building, which has the following significant effects compared with the prior art: (1) The modular units with integrated electromechanical and decoration inside and L-shaped two-way connection grooves preset on the outer edges are produced in the factory, and the large number of steel truss bars protruding around the modular units are eliminated. Only a number of hanging rings are evenly arranged on the outer surface. The modular structure is simple and the connection is reliable, which is convenient for module production, transportation, installation and splicing, and can effectively improve the integrity and safety of modular buildings. (2) Through the L-shaped two-way connection grooves around the modules and the hanging rings evenly arranged on the surface, the module top plate can form a superimposed floor with the cast-in-place layer of the floor slab, and the module side wall can form a superimposed shear wall with the cast-in-place concrete between the modules, so that the structural force transmission and force bearing mechanism are clear, and the wall thickness is reduced by 25%, and the floor thickness is reduced by 48%. It can not only greatly reduce the overall self-weight of the building and increase the internal usable clearance, but also effectively reduce the comprehensive cost of the building and break through the key bottleneck that restricts the large-scale promotion of modular buildings. (3) Since the large number of steel truss bars protruding around the module unit are eliminated, the prefabricated steel cage can be used between the two module units. At the same time, there is no need to cross-tie the side walls of the two modules, which avoids the need for one of the two modules to be renovated on site. This can effectively reduce the difficulty of managing the protection of the finished products inside the module on site, greatly improve the degree of industrialization and further shorten the construction period. (4) The four side walls of the standardized module unit are all modular in design. The gap between the adjacent module units arranged horizontally can be adjusted according to the structural stress and building function requirements. The steel cage installed in the gap can be determined according to the structural stress conditions of different buildings. The disadvantages of the customized design of traditional module units are eliminated. Module units with the same function can be used in different projects, greatly improving the degree of industrialization of modular buildings. (5) The modular units can be combined and used in combination with fully enclosed units, bottomless units, and bottomless and topless units according to the functional requirements of the building. For example, fully enclosed hexahedrons can be used in spaces such as kitchens and bathrooms where pipelines are dense, on-site management is difficult, and water leakage is easy. Most other spaces can use bottomless pentahedron units. A small number of hoistway areas can use bottomless and topless tetrahedron units. Flexible unit combination can achieve the best balance between quality, cost, and construction period. (6) The four wall formworks of the modular unit can adopt corresponding construction methods according to whether they are shear walls. If they are shear wall modules, corresponding stress-bearing steel bars are configured in the formwork of this area. If they are non-load-bearing partition walls, the formwork of this area is designed as a lightweight wall panel. This not only makes the overall structural force transmission mechanism clear, but also effectively reduces the weight of the module, making it easier to transport and hoist. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0030] Figure 1 It is a schematic diagram of the arrangement of the module units of the concrete module building in the present invention;

[0031] Figure 2 It is a partial detail schematic diagram of the concrete module building in the present invention;

[0032] Figure 3 is a schematic diagram of a fully enclosed unit in the present invention;

[0033] Figure 4 is a schematic diagram of a bottomless unit in the present invention;

[0034] Figure 5 It is a schematic diagram of a topless and bottomless unit in the present invention;

[0035] Figure 6 is a schematic diagram of an exterior wall panel unit in the present invention;

[0036] Figure 7 It is a schematic diagram of the structure of the rectangular L-shaped bidirectional connection groove in the present invention;

[0037] Figure 8 Schematic diagram of the relative positions of the steel bars and the L-shaped bidirectional connection grooves in the module unit plate of the present invention;

[0038] Fig. 9 Schematic diagram of the distribution of prestressed tendons in the present invention;

[0039] Fig.10 It is a schematic diagram of the construction steps of the concrete module building in the present invention.

[0040] Figure numerals: 1-modular building; 10-module unit; 11-fully enclosed unit; 12-bottomless unit; 13-topless and bottomless unit; 14-exterior wall panel unit; 21-top plate; 22-bottom plate; 23-side wall; 3-L-shaped two-way connection groove; 4-lifting ring; 5-reinforcement bars in the plate; 6-prestressed tendons. DETAILED DESCRIPTION

[0041] Hereinafter, various embodiments disclosed in the present application will be described more fully. The present application may have various embodiments, and adjustments and changes may be made therein. However, it should be understood that there is no intention to limit the various embodiments disclosed in the present application to the specific embodiments disclosed herein, but the present application should be understood to cover all adjustments, equivalents and / or alternatives falling within the spirit and scope of the various embodiments disclosed in the present application.

[0042] The terms used in the various embodiments disclosed in the present application are only used to describe the purpose of specific embodiments and are not intended to limit the various embodiments disclosed in the present application. As used herein, the singular form is intended to also include the plural form, unless the context clearly indicates otherwise. Unless otherwise specified, all terms used here (including technical terms and scientific terms) have the same meaning as the meanings commonly understood by ordinary technicians in the field of various embodiments disclosed in the present application. Terms (such as terms defined in generally used dictionaries) will be interpreted as having the same meaning as the contextual meaning in the relevant technical field and will not be interpreted as having an idealized meaning or an overly formal meaning, unless clearly defined in the various embodiments disclosed in the present application.

[0043] Example 1

[0044] Embodiment 1 of the present invention discloses a method for constructing a high-rise concrete modular building, as shown in the attached diagram. Figures 1 to 10 The specific plan is as follows:

[0045] A method for constructing a high-rise concrete modular building, the specific steps of the method are as follows:

[0046] S101, constructing a plurality of module units 10 into a modular frame by layers, wherein the outer edge of each module unit 10 is provided with a plurality of L-shaped bidirectional connection grooves, and at least some of the L-shaped bidirectional connection grooves 3 on two adjacent module units in the modular frame are aligned.

[0047] S102. After installing the vertical prefabricated steel cage in the gap between the side walls 23 of the adjacent module units 10 in the modular frame and installing the horizontal prefabricated steel cage on the module top plate 21, embed the additional horizontal and vertical steel bars into the L-shaped two-way connecting groove 3, and then pour the entire layer of concrete layer by layer to form a whole with all the lower floors.

[0048] S103, implementing step S101 and step S102 layer by layer, and vertically setting prestressed tendons 6 along the building height to improve the building rigidity and enhance the crack resistance of the exterior wall, and finally integrating the entire modular frame into an integrated modular building 1.

[0049] In step S101, the module unit 10 includes a fully enclosed unit 11, and / or a bottomless unit 12, and / or a bottomless and topless unit 13, and / or an exterior wall panel unit 14. The fully enclosed unit 11 includes a top panel 21, a bottom panel 22, and a side wall 23, and the sides of the side wall 23 are respectively vertically connected to the top panel 21 and the bottom panel 22; the bottomless unit 12 includes a top panel 21 and a side wall 23, and the side wall 23 is vertically connected to the top panel 21; the bottomless and topless unit 13 includes a side wall 23; and the exterior wall panel unit 14 includes a wall panel.

[0050] In practical applications, installation openings can be opened on the side walls 23 and wall panels of the module unit 10 according to actual needs, and the installation openings can be used to open doors and windows or other line pipes, wherein the thickness range of the side walls 23, wall panels, top panels 21 and bottom panels 22 can be set to 60 to 80 mm.

[0051] In practical applications, the fully enclosed unit 11 can be used to construct rooms such as kitchens and bathrooms that have dense pipelines, are difficult to manage on site and are prone to water leakage. The bottomless unit 12 can be used to build rooms for general purposes. The bottomless and roofless unit 13 can be used to build stairwells, patios and other functional places that require vertical connection.

[0052] In a specific embodiment, the module units 10 include multiple different types, at least two types of module units 10 have the same height, or at least two types of module units 10 have an integer multiple relationship in height; at least two types of module units 10 have the same length; at least two types of module units 10 have the same width. The same height between the module units 10 or an integer multiple relationship between the heights can make the module units 10 aligned in the horizontal direction or vertical direction, and the rooms and appearance of the modular building 1 are more standardized.

[0053] In actual application, the module unit 10 is in the shape of a hollow cuboid. In one application, the size of a module unit 10 can be designed as a cuboid with a length of 6m, a width of 3.5m, and a height of 3m, so that the module unit 10 can be transported by a transport vehicle.

[0054] In a specific embodiment, the L-shaped two-way connection grooves 3 are evenly distributed on the preset edges of each module unit 10. In practical applications, the L-shaped two-way connection grooves 3 can be a strip-shaped groove, and the length direction of multiple L-shaped two-way connection grooves 3 is perpendicular to the preset edge of the module unit 10. It should be noted that the connection can be all edges of the module unit 10 or part of the edges. The L-shaped two-way connection grooves 3 on the edges of the contacting side between adjacent module units 10 can be aligned in the horizontal or vertical direction to better embed additional steel bars in the L-shaped two-way connection grooves 3.

[0055] like Figure 7 As shown, in actual application, the width a of the L-shaped two-way connection groove 3 is in the range of 30-40 mm, the depth h is 30 mm, and the length n is in the range of 200 mm-250 mm. It should be noted that as long as the width of the L-shaped two-way connection groove 3 can achieve the effect that the additional steel bars can be placed in the L-shaped two-way connection groove 3, the post-cast concrete can fully flow into the L-shaped two-way connection groove 3, the depth of the L-shaped two-way connection groove 3 does not conflict with the steel bars in the module unit 10, and the concrete slab at the bottom of the L-shaped two-way connection groove 3 is still a complete concrete post-casting layer template, the depth and width of the L-shaped two-way connection groove 3 can be adjusted according to actual conditions.

[0056] In a specific embodiment, the size and side wall thickness of the L-shaped two-way connection groove 3 are fixed values ​​to facilitate standardized, modular design and installation. For example, in a high-rise building, the length of the L-shaped two-way connection groove 3 is 250 mm and the width is 40 mm. The thickness of the side wall 23, wall panel, top plate 21 and bottom plate 22 in the module unit 10 is 60 mm. In actual applications, the four side walls of the standardized module unit are all modularly designed, and the gap between adjacent module units arranged horizontally can be adjusted according to the structural stress and building function requirements. The steel cage installed in the gap can also be determined according to the structural stress conditions of different buildings.

[0057] In a specific embodiment, the cross-sectional shape of the L-shaped two-way connection groove 3 includes a wedge shape, and / or a rectangle, and / or a triangle. Among them, the amount of steel bars that can be added and the amount of post-poured concrete that can flow into the different L-shaped two-way connection grooves 3 are also different. For example, the amount of concrete that can be poured and the amount of steel bars that can be buried in the wedge-shaped L-shaped two-way connection groove 3 are the largest, the rectangular L-shaped two-way connection groove 3 is the second largest, and the triangular L-shaped two-way connection groove 3 is the least. The schematic diagram of the cross section of the wedge-shaped L-shaped two-way connection groove 3 on the AA line is shown in FIG. Figure 8 As shown, the three-dimensional schematic diagram of the rectangular L-shaped two-way connection groove 3 is as follows Figure 7 shown.

[0058] In a specific embodiment, using wedge-shaped slots of the same size on the predetermined edges of a module unit 10 can achieve shear and tensile strengths and integrity of the joints that are comparable to those of cast-in-place buildings.

[0059] In step 102, a vertical prefabricated steel cage is installed in the gap between the side walls 23 of adjacent module units 10, and a horizontal prefabricated steel cage is installed on the module top plate 21. Then, additional horizontal and vertical steel bars are embedded in the L-shaped two-way connecting groove 3, and then the entire layer of concrete is poured layer by layer to form a whole with all the lower floors.

[0060] It should be noted that the other space remaining after the L-shaped two-way connecting groove 3 is embedded with the steel bars is also a part that needs to be poured with concrete. By making the L-shaped two-way connecting groove 3, the additional steel bars and the steel cage cooperate with each other, a combined system of the prefabricated formwork and the internal cast-in-place concrete that works as a whole is formed. The whole after the concrete is poured can be subjected to force synergistically, and the side walls of the module units 10 can form a composite shear wall with the cast-in-place concrete between the module units 10, and the structural force transmission and force-bearing mechanism are clear.

[0061] In a specific embodiment, each surface of the module unit 10 is provided with grid-shaped inboard steel bars 5, and the L-shaped two-way connection grooves 3 are located between the inboard steel bars 5, and there is a preset distance between the L-shaped two-way connection grooves 3 and the inboard steel bars 5. Figure 7 As shown, the distribution spacing m between each groove 3 is 200 mm, and the width and depth of the L-shaped two-way connection groove 3 do not conflict with the steel bars 5 in the slab. The steel bars 5 in the slab are located in the cross section of the concrete slab of the module unit 10, and are composed of steel bars arranged horizontally and steel bars arranged vertically, forming a grid-like arrangement, such as Figure 7 and Figure 8 As shown. Since the side wall 23, top plate 21 and bottom plate 22 of the module unit 10 are all of a certain thickness, the plate steel bars 5 and the L-shaped two-way connection groove 3 in the module unit 10 are in the same wall and are not at the same depth, so there is no contact between the plate steel bars 5 and the L-shaped two-way connection groove 3, and the plate steel bars 5 are not exposed to the module unit 10. Therefore, there is no exposed steel bar in the module unit 10. During transportation, there is no collision of steel bars between modules, so that the module unit 10 is less damaged during transportation and assembly.

[0062] In a specific embodiment, a plurality of lifting rings 4 for lifting and anti-shearing of the overlapping surface are evenly arranged on the outer surface of the modular building.

[0063] In practical applications, the steel bars 5 in the slab refer to the distributed steel bars in the surface. Different from the traditional concrete module, which has a large number of truss steel bars extending outward around the module, the module unit 10 in this solution eliminates the truss steel bars around the module, and only sets evenly distributed L-shaped two-way connection grooves 3 and outer surface hanging rings on the edge of the module, so that the structure of the module unit 10 is very simple, the steel bars between the module units 10 will not collide, and the process of transporting and tying the module units 10 can be more convenient.

[0064] like Fig. 9As shown, there is a gap between vertically adjacent module units 10, and the gap width f in the vertical direction is 10 mm. When the module unit 10 located above has a bottom plate 22, after pouring cement mortar in the gap, the bottom plate 22 of the upper module unit 10, the post-cast layer in the gap and the top plate 21 of the lower module unit 10 can form a thick floor plate with a thickness of 110 to 130 mm. When the module unit 10 located above is a bottomless unit 12, a 60 to 70 mm thick cast-in-place concrete layer is post-cast on the top plate 21 of the lower module unit 10 to finally form a 110 to 130 mm thick floor plate. On the periphery of the modular building 1, adjacent exterior wall panel units 14 can be seamlessly spliced. As shown Fig. 9 As shown, there are gaps reserved between adjacent module units 10 in the horizontal direction and between the modules and the outer wall panel units 14 of the modular building 1. The width e of the gap in the horizontal direction ranges from 80 to 120 mm, and a shear wall with a thickness of 200 to 240 mm can be formed after pouring. In step S102 and step S103, the gap between adjacent module units 10 arranged horizontally is greater than the gap between adjacent module units 10 arranged vertically. In practical applications, the width of the gap between adjacent module units 10 arranged horizontally ranges from 80 mm to 120 mm, and the width of the gap between the module units 10 in the vertical direction can be smaller. In one embodiment, this gap can be set to 10 mm.

[0065] In step S103, prestressed tendons 6 are arranged in the vertical direction in the post-cast concrete layer of the high-rise concrete modular building 1, which can further improve the rigidity and anti-cracking performance of the exterior wall of the high-rise concrete modular building 1. Fig. 9As shown, the prestressed tendons 6 extend from the lowest floor to the highest floor of the high-rise concrete modular building 1. After implementing step S101 and step S102 layer by layer and adding prestressed tendons 6 that run through the height of the building, the entire modular frame is finally integrated into an integrated modular building 1. This embodiment proposes a construction method for a high-rise concrete modular building, which is to transport a plurality of modular units with internal integrated electromechanical and decoration and L-shaped bidirectional connection grooves 3 preset on the external edges, transport them to the site, and then construct them into a modular frame layer by layer, so that at least part of the L-shaped bidirectional connection grooves 3 on two adjacent modular units in the modular frame are aligned, and additional horizontal and vertical steel bars are embedded in the L-shaped bidirectional connection grooves 3 connected in adjacent modular units, and prefabricated steel cages are installed in the gaps between adjacent modular units, and then concrete is poured layer by layer to form a whole, and vertical prestressed steel bars are set in the post-cast layer of the exterior wall to improve the building rigidity and enhance the crack resistance of the exterior wall. After the above steps are implemented layer by layer, the entire modular frame is finally integrated into an integrated modular building. This high-rise concrete modular building not only has a simple structure, clear force mechanism, fast and convenient construction, easy on-site management, and a high degree of industrialization, but the standardized modular units can be used in different projects. It can also effectively reduce the cost of existing modular buildings and further shorten the construction period. It can be widely used in the construction of high-rise concrete buildings.

[0066] Those skilled in the art will appreciate that the accompanying drawings are only schematic diagrams of a preferred implementation scenario, and the modules or processes in the accompanying drawings are not necessarily necessary for the implementation of the present application. Those skilled in the art will appreciate that the modules in the devices in the implementation scenario can be distributed in the devices of the implementation scenario according to the description of the implementation scenario, or can be changed accordingly and located in one or more devices different from the present implementation scenario. The modules of the above-mentioned implementation scenarios can be combined into one module, or can be further split into multiple sub-modules. The above-mentioned serial numbers of this application are only for description and do not represent the pros and cons of the implementation scenarios. The above disclosure is only a few specific implementation scenarios of the present application, but the present application is not limited thereto, and any changes that can be thought of by a technician in this field should fall within the scope of protection of the present application.

Claims

1. A method for constructing a high-rise concrete modular building, characterized in that: The method includes: A plurality of module units with internal integrated electromechanical and decoration and L-shaped bidirectional connection grooves preset on the external edges which are completed in the factory are transported to the site and constructed into a modular frame by layers; at least part of the L-shaped bidirectional connection grooves on two adjacent module units in the modular frame are aligned; Prefabricated steel cages are installed in the gaps between adjacent module units in the modular frame, and additional horizontal and vertical steel bars are embedded in the L-shaped two-way connecting grooves connected between adjacent module units, and then concrete is poured layer by layer to form a whole. At the same time, vertical prestressed steel bars are arranged in the post-cast layer of the exterior wall to improve the building rigidity and enhance the crack resistance of the exterior wall; After implementing the above steps layer by layer, the entire modular frame will eventually be integrated into an integrated modular building; By making the L-shaped two-way connection groove, the additional steel bars and the steel cage cooperate with each other, a combined system of the prefabricated formwork and the internal cast-in-place concrete is formed, and the side wall of the module unit and the cast-in-place shear wall are synergistically stressed to form a composite shear wall structure; In the post-cast concrete layer of the high-rise concrete modular building, prestressed tendons are vertically arranged along the building height; The L-shaped bidirectional connection grooves are evenly distributed on the preset edges of each of the module units; In each surface of the module unit, grid-shaped in-plate steel bars are arranged, the L-shaped bidirectional connection grooves are located between the in-plate steel bars, and there is a preset distance between the L-shaped bidirectional connection grooves and the in-plate steel bars; The in-slab reinforcement is located in the cross section of the concrete slab of the module unit and is composed of transversely arranged reinforcement and vertically arranged reinforcement, forming a grid-like arrangement; The in-slab reinforcement and L-shaped two-way connection grooves in the module unit are in the same wall and are not at the same depth.

2. A method for constructing a high-rise concrete modular building according to claim 1, characterized in that: The module units include fully enclosed units, and / or units without bottom plates, and / or units without bottoms and tops, and / or exterior wall panel units, and different module units correspond to different building functional space requirements; The fully enclosed unit comprises a top plate, a bottom plate and a side wall, and two sides of the side wall are respectively vertically connected to the top plate and the bottom plate; The bottomless unit comprises a top plate and a side wall, wherein the side wall is vertically connected to the top plate; The bottomless and topless unit comprises side walls; and the exterior wall panel unit comprises wall panels.

3. The method for constructing a high-rise concrete modular building according to claim 1, characterized in that: The module units include multiple different types, and the heights of at least two types of the module units are the same, or the heights of at least two types of the module units are integer multiples; The lengths of at least two types of module units are the same; the widths of at least two types of module units are the same.

4. The method for constructing a high-rise concrete modular building according to claim 1, characterized in that: The cross-sectional shape of the L-shaped bidirectional connection groove includes a wedge shape, and / or a rectangle, and / or a triangle.

5. The method for constructing a high-rise concrete modular building according to claim 1, characterized in that: The gap between the adjacent module units arranged vertically is a fixed value, the gap between the adjacent module units arranged horizontally is adjusted according to the structural force and building function requirements, and the steel cage installed in the gap is determined according to the structural force.

6. The method for constructing a high-rise concrete modular building according to claim 1, characterized in that: The outer surface of the module unit is evenly provided with a plurality of lifting rings for lifting and anti-shearing of the overlapping surface.

Citation Information

Patent Citations

  • Prefabricated rib-out-free laminated slab and construction method thereof

    CN115538676A

  • Horizontal connecting structure of multi-layer and high-rise concrete modular combined building and construction method

    CN116084591A

  • Construction method of prefabricated modular building anti-seismic structure and anti-seismic structure thereof

    CN116378222A

  • Box-shaped modular fabricated building unit and house building

    CN215829646U

  • Concrete module box

    CN219527957U